Anda di halaman 1dari 1

KONSULTAN JUDUL GAMBAR

REPUBLIK INDONESIA SATUAN KERJA PERENCANAAN Direncanakan Oleh : Diperiksa Oleh : Disetujui Oleh :
KEMETERIAN PEKJAAN UMUM DAN PERENCANAAN DAN PENGAWASAN PEMELIHARAAN BERKALA
PERUMAHAN RAKYAT
JALAN NASIONAL PROV. JATIM
DIREKTORAT JENDERAL BINA MARGA
Bridge Engineer Team Leader Team Leader
PIER. 1 PIER. 2 PIER. 3 PIER. 4
B
57600 57600 57600 57600 57600
57600
1800 1800 1800 1800 1800 1800 1800 RAILING Jembatan 1800 1800 1800 1800 1800 RAILING Jembatan 1800 1800 1800 1800 1800 1800 1800 RAILING Jembatan 1800 1800 1800
KOLOM RAILING
Tembok Railling Tembok Railling Tembok Railling
Precast Concrete Prestressed Precast Concrete Prestressed Precast Concrete Prestressed
Pipa Drainase Jembatan Pipa Drainase Jembatan Pipa Drainase Jembatan
Abutment
8 7
10000

PIER JEMBATAN
(PIER 4)
DINDING PELINDUNG
ABUTMENT
MUKA AIR SUNGAI MUKA AIR SUNGAI
TAMPAK SAMPING JEMBATAN (Sec. B)
1000 1000 1000 1:
5000
9350

RAILING Jembatan Ø 8cm RAILING Jembatan Ø 8cm RAILING Jembatan Ø 8cm


KOLOM RAILING KOLOM RAILING KOLOM RAILING
TROTOAR TROTOAR TROTOAR
Precast Concrete Prestressed Precast Concrete Prestressed Precast Concrete Prestressed
Precast Concrete Prestressed Precast Concrete Prestressed Precast Concrete Prestressed
Abutment
10000

PIER JEMBATAN
DINDING PELINDUNG
ABUTMENT
MUKA AIR SUNGAI MUKA AIR SUNGAI
POT. MEMANJANG JEMBATAN (Sec. B)
1000 1000 1000 1:
5000

Anda mungkin juga menyukai