PIER. 1 PIER. 2 PIER. 3 PIER. 4
B
57600 57600 57600 57600 57600
57600
1800 1800 1800 1800 1800 1800 1800 RAILING Jembatan 1800 1800 1800 1800 1800 RAILING Jembatan 1800 1800 1800 1800 1800 1800 1800 RAILING Jembatan 1800 1800 1800
KOLOM RAILING
Tembok Railling Tembok Railling Tembok Railling
Precast Concrete Prestressed Precast Concrete Prestressed Precast Concrete Prestressed
Pipa Drainase Jembatan Pipa Drainase Jembatan Pipa Drainase Jembatan
Abutment
8 7
10000
PIER JEMBATAN
(PIER 4)
DINDING PELINDUNG
ABUTMENT
MUKA AIR SUNGAI MUKA AIR SUNGAI
TAMPAK SAMPING JEMBATAN (Sec. B)
1000 1000 1000 1:
5000
9350
PIER JEMBATAN
DINDING PELINDUNG
ABUTMENT
MUKA AIR SUNGAI MUKA AIR SUNGAI
POT. MEMANJANG JEMBATAN (Sec. B)
1000 1000 1000 1:
5000