DINAS KESEHATAN
KABUPATEN PELALAWAN
KOMPLEK PERKANTORAN BAKTI PRAJA, PANGKALAN KERINCI - KABUPATEN PELALAWAN
KEGIATAN :
BILL
Pembangunan Pagar / Kanopi / Tempat Parkir Pemda / Dinas ( BO
PEKERJAAN :
-
PEMBANGUNAN TEMPAT PARKIR DINAS KESEHATAN
LOKASI :
KABUPATEN PELALAWAN
TAHUN ANGGARAN :
2017
PEJABAT PENGADAAN
INTAH KABUPATEN PELALAWAN
INAS KESEHATAN
UPATEN PELALAWAN
AN BAKTI PRAJA, PANGKALAN KERINCI - KABUPATEN PELALAWAN
BILL OF QUANTITY
( BOQ )
ar / Kanopi / Tempat Parkir Pemda / Dinas
BILL OF QUANTITY
(BOQ)
PROGRAM : PENINGKATAN SARANA DAN PARASARANA APARATUR
KEGIATAN : PEMBANGUNAN PAGAR / KANOPI / TEMPAT PARKIR PEMDA / DINAS
PAKET :-
PEKERJAAN : PEMBANGUNAN TEMPAT PARKIR DINAS KESEHATAN
LOKASI : KABUPATEN PELALAWAN
T.A : 2017
1 2 3
TERBILANG : -
...............................................
PIMPINAN PERUSAHAAN
ULASI BIAYA PEKERJAAN
LL OF QUANTITY
(BOQ)
JUMLAH HARGA
-
-
-
-
-
-
-
-
-
-
-
-
...................................................
PIMPINAN PERUSAHAAN
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
PROGRAM : PENINGKATAN SARANA DAN PARASARANA APARATUR
KEGIATAN : PEMBANGUNAN PAGAR / KANOPI / TEMPAT PARKIR PEMDA / DINAS
PAKET : -
PEKERJAAN : PEMBANGUNAN TEMPAT PARKIR DINAS KESEHATAN
LOKASI : KABUPATEN PELALAWAN
T.A : 2017
1 M3 URUGAN KEMBALI
TENAGA
Pekerja 0.2500 OH 78,000.00 19,500.00
Mandor 0.0083 OH 110,000.00 916.67
SUB TOTAL 20,416.67
JUMLAH
OVERHEAD (10%)
JUMLAH TOTAL
1 M3 URUGAN PASIR
TENAGA
Pekerja 0.3000 OH 78,000.00 23,400.00
Mandor 0.0100 OH 110,000.00 1,100.00
BAHAN
Pasir urug 1.2000 M3 67,500.00
SUB TOTAL 24,500.00
JUMLAH
OVERHEAD (10%)
JUMLAH TOTAL
ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING ( SNI 6897 : 2008 )
1 M2 ACIAN
TENAGA
Pekerja 0.2000 OH 78,000.00 15,600.00
Tukang batu 0.1000 OH 105,000.00 10,500.00
Kepala Tukang 0.0100 OH 110,000.00 1,100.00
Mandor 0.0100 OH 110,000.00 1,100.00
BAHAN
Semen Portland 3.2500 Kg 1,300.00
SUB TOTAL 28,300.00
JUMLAH
OVERHEAD (10%)
JUMLAH TOTAL
PEKERJAAN BETON ( SNI 7394 : 2008 )
1 KG PEMBESIAN
TENAGA
Pekerja 0.0070 OH 78,000.00 546.00
Tukang Besi 0.0070 OH 105,000.00 735.00
Kepala Tukang 0.0007 OH 110,000.00 77.00
Mandor 0.0004 OH 110,000.00 44.00
BAHAN
Besi 1.0500 Kg 12,960.00
Kawat bendrat 0.0150 Kg 18,360.00
SUB TOTAL 1,402.00
JUMLAH
OVERHEAD (10%)
JUMLAH TOTAL
ANALISA BIAYA KONSTRUKSI PEKERJAAN LANTAI & DINDING ( SNI 7395 : 200
JUMLAH HARGA
BAHAN
(Rp)
6
13,300.00
1,330.00
14,600.00
61,200.00
6,120.00
67,300.00
-
20,400.00
2,040.00
22,400.00
81,000.00
81,000.00
105,500.00
10,550.00
116,000.00
I PEKERJAAN DINDING ( SNI 6897 : 2008 )
57,400.00
56,550.00
7,600.00
121,550.00
194,800.00
19,480.00
214,200.00
57,400.00
34,515.00
8,835.00
100,750.00
174,000.00
17,400.00
191,400.00
28,700.00
14,950.00
4,085.00
47,735.00
84,300.00
8,430.00
92,700.00
14,350.00
7,475.00
2,042.50
23,867.50
42,100.00
4,210.00
46,300.00
17,721.60
2,565.00
20,286.60
76,000.00
7,600.00
83,600.00
10,816.00
3,040.00
13,856.00
70,600.00
7,060.00
77,600.00
6,739.20
2,470.00
9,209.20
30,400.00
3,040.00
33,400.00
12,090.00
1,710.00
13,800.00
58,700.00
5,870.00
64,500.00
4,225.00
4,225.00
32,500.00
3,250.00
35,700.00
BETON ( SNI 7394 : 2008 )
299,000.00
108,435.71
182,577.78
20,000.00
590,013.49
713,400.00
71,340.00
784,700.00
80,000.00
5,832.00
340.00
86,172.00
159,700.00
15,970.00
175,600.00
90,000.00
5,832.00
340.00
96,172.00
169,700.00
16,970.00
186,600.00
62,200.00
80,000.00
7,776.00
680.00
30,000.00
47,250.00
55,000.00
220,706.00
314,000.00
31,400.00
345,400.00
115,133.33
80,000.00
7,776.00
680.00
81,000.00
47,250.00
55,000.00
271,706.00
365,000.00
36,500.00
401,500.00
133,833.33
90,000.00
5,832.00
340.00
96,172.00
169,700.00
16,970.00
186,600.00
62,200.00
456,400.00
150,409.43
224,855.56
21,500.00
853,164.98
1,022,900.00
102,290.00
1,125,100.00
13,608.00
275.40
13,883.40
15,200.00
1,520.00
16,700.00
ERJAAN LANTAI & DINDING ( SNI 7395 : 2008 )
84,000.00
16,450.00
3,325.00
103,775.00
196,000.00
19,600.00
215,600.00
96,000.00
16,450.00
3,325.00
115,775.00
208,000.00
20,800.00
228,800.00
35,700.00
4,320.00
40,020.00
68,300.00
6,830.00
75,100.00
1,296.00
2,800.00
11,050.00
15,146.00
24,200.00
2,420.00
26,600.00
NSTRUKSI PEKERJAAN LAIN-LAIN
11,000.00
11,000.00
12,300.00
1,230.00
13,500.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
PROGRAM PENINGKATAN SARANA DAN PARASARANA APARATUR
KEGIATAN PEMBANGUNAN PAGAR / KANOPI / TEMPAT PARKIR PEMDA / DINAS
PAKET -
PEKERJAAN PEMBANGUNAN TEMPAT PARKIR DINAS KESEHATAN
LOKASI KABUPATEN PELALAWAN
T.A 2017
JUMLAH TOTAL
1 M3 URUGAN KEMBALI
TENAGA
Pekerja 0.2500 OH 82,687.50 20,671.88
Mandor 0.0083 OH 110,250.00 918.75
SUB TOTAL 21,590.63
JUMLAH
OVERHEAD (10%)
JUMLAH TOTAL
HARGA JUMLAH HARG
NO URAIAN PEKERJAAN INDEKS SATUAN UPAH
(Rp) (Rp)
1 2 3 4 5
1 M3 URUGAN PASIR
TENAGA
Pekerja 0.3000 OH 82,687.50 24,806.25
Mandor 0.0100 OH 110,250.00 1,102.50
BAHAN
Pasir urug 1.2000 M3 76,322.40
SUB TOTAL 25,908.75
JUMLAH
OVERHEAD (10%)
JUMLAH TOTAL
1 M3 URUGAN TANAH
TENAGA
Pekerja 0.3000 OH 82,687.50 24,806.25
Mandor 0.0100 OH 110,250.00 1,102.50
BAHAN
Tanah 1.2000 M3 65,419.20
SUB TOTAL 25,908.75
JUMLAH
OVERHEAD (10%)
JUMLAH TOTAL
1 M2 ACIAN
TENAGA
Pekerja 0.2000 OH 82,687.50 16,537.50
Tukang batu 0.1000 OH 99,225.00 9,922.50
Kepala Tukang 0.0100 OH 110,250.00 1,102.50
Mandor 0.0100 OH 110,250.00 1,102.50
BAHAN
Semen Portland 3.2500 Kg 1,360.00
SUB TOTAL 28,665.00
JUMLAH
OVERHEAD (10%)
JUMLAH TOTAL
JUMLAH TOTAL
HARGA JUMLAH HARG
NO URAIAN PEKERJAAN INDEKS SATUAN UPAH
(Rp) (Rp)
1 2 3 4 5
1 M2 PASANG PINTU DAN JENDELA KACA BINGKAI KAYU KELAS II (Analisa 2007)
TENAGA
Pekerja 0.8000 OH 82,687.50 66,150.00
Tukang kayu 2.4000 OH 99,225.00 238,140.00
Kepala Tukang 0.2400 OH 110,250.00 26,460.00
Mandor 0.0400 OH 110,250.00 4,410.00
BAHAN
Papan kayu 0.0240 M3 5,197,500.00
Lem 0.3000 Kg 21,315.00
SUB TOTAL 335,160.00
JUMLAH
OVERHEAD (10%)
JUMLAH TOTAL
TENAGA
Pekerja 0.1000 OH 82,687.50 8,268.75
Tukang kayu 0.2000 OH 99,225.00 19,845.00
Kepala Tukang 0.0200 OH 110,250.00 2,205.00
Mandor 0.0050 OH 110,250.00 551.25
BAHAN
Kayu Klas II 0.0108 M3 4,961,250.00
Paku biasa 0.1000 Ltr 16,170.00
SUB TOTAL 30,870.00
JUMLAH
OVERHEAD (10%)
JUMLAH
1 KG PEMBESIAN
TENAGA
Pekerja 0.0070 OH 82,687.50 578.81
Tukang Besi 0.0070 OH 99,225.00 694.58
Kepala Tukang 0.0007 OH 110,250.00 77.18
Mandor 0.0004 OH 110,250.00 44.10
BAHAN
Besi 1.0500 Kg 10,500.00
Kawat bendrat 0.0150 Kg 20,790.00
SUB TOTAL 1,394.66
JUMLAH
OVERHEAD (10%)
JUMLAH TOTAL
ANALISA BIAYA KONSTRUKSI PEKERJAAN LANTAI & DINDING ( SNI 7395 : 2008 )
HARGA JUMLAH HARG
NO URAIAN PEKERJAAN INDEKS SATUAN UPAH
(Rp) (Rp)
1 2 3 4 5
JUMLAH HARGA
BAHAN
(Rp)
6
13,700.00
1,370.00
15,000.00
30,492.00
323.40
17,787.00
48,602.40
68,400.00
6,840.00
75,200.00
64,700.00
6,470.00
JUMLAH HARGA
BAHAN
(Rp)
6
71,100.00
-
21,500.00
2,150.00
23,600.00
JUMLAH HARGA
BAHAN
(Rp)
6
91,586.88
91,586.88
117,400.00
11,740.00
129,100.00
78,503.04
78,503.04
104,400.00
10,440.00
114,800.00
69,300.00
36,108.00
17,744.96
123,152.96
198,100.00
19,810.00
217,900.00
JUMLAH HARGA
BAHAN
(Rp)
6
34,650.00
25,772.00
7,250.63
67,672.63
105,100.00
10,510.00
115,600.00
JUMLAH HARGA
BAHAN
(Rp)
6
34,650.00
15,640.00
8,204.66
58,494.66
95,900.00
9,590.00
105,400.00
18,539.52
5,151.76
23,691.28
80,100.00
8,010.00
88,100.00
11,315.20
6,105.79
17,420.99
74,900.00
7,490.00
82,300.00
JUMLAH HARGA
BAHAN
(Rp)
6
7,050.24
4,960.96
12,011.20
33,500.00
3,350.00
36,800.00
JUMLAH HARGA
BAHAN
(Rp)
6
12,648.00
3,434.51
16,082.51
61,000.00
6,100.00
67,100.00
4,420.00
4,420.00
33,000.00
3,300.00
36,300.00
6,600,000.00
20,212.50
21,315.00
6,641,527.50
9,574,100.00
957,410.00
JUMLAH HARGA
BAHAN
(Rp)
6
10,531,500.00
JUMLAH HARGA
BAHAN
(Rp)
6
207,900.00
10,657.50
218,557.50
637,500.00
63,750.00
701,200.00
124,740.00
6,394.50
131,134.50
466,200.00
46,620.00
512,800.00
11,850.30
2,425.50
14,275.80
32,100.00
3,210.00
35,300.00
JUMLAH HARGA
BAHAN
(Rp)
6
53,581.50
1,617.00
55,198.50
86,000.00
8,600.00
94,600.00
312,800.00
147,345.00
243,437.04
703,582.04
831,400.00
83,140.00
914,500.00
110,250.00
4,851.00
808.50
115,909.50
190,400.00
19,040.00
209,400.00
124,031.25
4,851.00
808.50
129,690.75
204,200.00
20,420.00
224,600.00
JUMLAH HARGA
BAHAN
(Rp)
6
110,250.00
6,468.00
1,617.00
41,343.75
49,520.63
21,829.50
231,028.88
325,600.00
32,560.00
358,100.00
JUMLAH HARGA
BAHAN
(Rp)
6
110,250.00
6,468.00
1,617.00
68,400.00
49,520.63
21,829.50
258,085.13
352,600.00
35,260.00
387,800.00
110,250.00
6,468.00
1,617.00
57,000.00
49,520.63
65,488.50
290,344.13
384,900.00
38,490.00
423,300.00
82,687.50
6,468.00
1,212.75
57,000.00
49,520.63
JUMLAH HARGA
BAHAN
(Rp)
6
21,829.50
218,718.38
313,300.00
31,330.00
344,600.00
JUMLAH HARGA
BAHAN
(Rp)
6
443,360.00
125,400.00
243,911.11
812,671.11
988,600.00
98,860.00
1,087,400.00
11,025.00
311.85
11,336.85
12,700.00
1,270.00
13,900.00
41,233.50
4,389.00
45,622.50
74,200.00
7,420.00
81,600.00
JUMLAH HARGA
BAHAN
(Rp)
6
31,762.50
1,097.25
32,859.75
71,500.00
7,150.00
78,600.00
JUMLAH HARGA
BAHAN
(Rp)
6
31,762.50
1,097.25
32,859.75
71,500.00
7,150.00
78,600.00
58,212.00
1,617.00
59,829.00
91,200.00
9,120.00
100,300.00
KERJAAN LANGIT-LANGIT ( SNI 2839 : 2008 )
124,740.00
161.70
808.50
125,710.20
209,500.00
20,950.00
230,400.00
JUMLAH HARGA
BAHAN
(Rp)
6
3,501.82
161.70
3,663.52
13,600.00
1,360.00
14,900.00
28,014.53
218.30
28,232.82
40,100.00
4,010.00
44,100.00
38,556.00
16,170.00
5,512.50
60,238.50
110,900.00
11,090.00
121,900.00
64,680.00
11,138.40
8,586.27
6,548.85
90,953.52
191,200.00
19,120.00
210,300.00
JUMLAH HARGA
BAHAN
(Rp)
6
64,680.00
12,648.00
3,434.51
11,116.88
91,879.38
109,700.00
10,970.00
120,600.00
TRUKSI PEKERJAAN PENGECATAN
4,875.80
2,598.75
4,144.43
18,200.00
29,818.98
46,700.00
4,670.00
51,300.00
1,732.50
2,437.90
9,360.00
13,530.40
22,400.00
2,240.00
24,600.00
JUMLAH HARGA
BAHAN
(Rp)
6
23,100.00
8,160.00
1,908.06
33,168.06
232,700.00
23,270.00
255,900.00
-
-
8,160.00
1,908.06
10,068.06
280,700.00
28,070.00
308,700.00
-
-
Err:509
Err:509
Err:509
JUMLAH HARGA
BAHAN
(Rp)
6
2,310.00
2,310.00
4,000.00
DAFTAR HARGA SATUAN UPAH DAN BAHAN
1 2 3 5
I TENAGA KERJA
1 MANDOR ORANG/HARI Rp 110,250.00
2 KEPALA TUKANG ORANG/HARI Rp 110,250.00
3 TUKANG ORANG/HARI Rp 99,225.00
4 PEKERJA ORANG/HARI Rp 82,687.50
II BAHAN
A BAHAN PASANGAN
1 PASIR URUG M3. Rp 76,322.40
2 PASIR PASANG M3. Rp 190,806.00
3 PASIR BETON / COR M3. Rp 231,000.00
4 TANAH URUG / TIMBUN M3. Rp 65,419.20
5 KERIKIL / KORAL BETON M3. Rp 320,000.00
6 BATU BATA UK. (4 x 8 x 16) CM BH. Rp 495.00
7 PORTLAND CEMENT / SEMEN PADANG TYPE I KG. Rp 1,360.00
8 PORTLAND CEMENT WARNA KG. Rp 11,550.00
B BAHAN KAYU
1 KAYU KELAS I M3. Rp 6,000,000.00
2 KAYU BALOK KELAS II M3. Rp 3,800,000.00
3 KAYU KASO 5/7 M3. Rp 2,541,000.00
4 PAPAN 2/30 M3. Rp 2,541,000.00
5 PAPAN MERANTI M3. Rp 5,197,500.00
6 KAYU CEROCOK / KAYU UBAR BTG. Rp 23,100.00
7 KAYU DOLKEN BTG. Rp 10,914.75
8 KAYU PERANCAH / BEKISTING DALAM M3. Rp 2,756,250.00
9 LISTPLANK (GRC) (2440x200x9) mm M' Rp 55,440.00
10 SINGAP UKIR ( GRC ) M2. Rp 655,000.00
11 SELEMBAYUNG UKIR ( GRC ) BH. Rp 465,000.00
1 2 3 5
D BAHAN LANTAI
1 KERAMIK UK. 60x60 CM BH. Rp 11,550.00
2 KERAMIK DINDING 30X60 CM BH. Rp 5,775.00
NO. JENIS BAHAN SATUAN HARGA SATUAN
1 2 3 5
E BAHAN ATAP
1 ATAP GENTENG METAL 0,35 MM (SAKURA ROOF / SETARA) M2. Rp 40,425.00
2 PERABUNG GENTENG METAL BULAT (SAKURA ROOF / SETARA) LBR. Rp 28,875.00
3 PERABUNG GENTENG METAL PERSEGI / BOLA-BOLA ATAP LBR. Rp 28,875.00
G BAHAN PAKU
1 PAKU ATAP GENTENG METAL KG. Rp 21,945.00
2 PAKU SERI KG. Rp 16,170.00
3 PAKU 2" - 5" KG. Rp 16,170.00
4 PAKU 5 cm - 12 cm KG. Rp 16,170.00
5 PAKU 1 Cm - 2,5 Cm KG. Rp 16,170.00
6 PAKU SKRUP + BAUT + KARET DIA. 8" BH. Rp 3,870.30
7 PAKU GYPSUM KG. Rp 19,845.00
I BAHAN KACA
1 KACA BENING 5 MM M2. Rp 10,773.00
J BAHAN LISTRIK
1 TITIK LAMPU (KABEL INSTALASI STANDAR PLN) TTK. Rp 193,620.00
2 LAMPU PIJAR 20 WATT BH. Rp 15,765.75
3 STOP KONTAK BIASA BH. Rp 17,364.38
4 SAKLAR GANDA ( STANDARD PLN) BH. Rp 26,565.00
5 SAKLAR TUNGGAL ( STANDARD PLN) BH. Rp 13,860.00
6 PANEL MCB KOMPLIT ( STANDARD PLN) BH. Rp 58,905.00
K BAHAN FINISHING
1 CAT MINYAK KG. Rp 52,000.00
2 CAT TEMBOK KG. Rp 36,000.00
3 CAT VERNISH KG. Rp 16,000.00
NO. JENIS BAHAN SATUAN HARGA SATUAN
1 2 3 5
KETERANGAN
6
KETERANGAN
6
KETERANGAN
6
KETERANGAN
6
RENCANA BIAYA PEKERJAAN
BILL OF QUANTITY
(BOQ)
PROGRAM : PENINGKATAN SARANA DAN PARASARANA APARATUR
KEGIATAN : PEMBANGUNAN PAGAR / KANOPI / TEMPAT PARKIR PEMDA / DINAS
PAKET : -
PEKERJAAN : PEMBANGUNAN TEMPAT PARKIR DINAS KESEHATAN
LOKASI : KABUPATEN PELALAWAN
TAHUN ANGGARAN : 2017
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT MATERIAL+UPAH
(Rp)
a b c d e
II PEKERJAAN PONDASI
1 Pek. Galian Tanah Pondasi 8.14 M3 -
2 Pek. Urugan Pasir Di Bawah Pondasi 0.76 M3 -
3 Pek. Cor Lantai Kerja 1:3:5 0.76 M3 -
4 Pek. Pas Pondasi 1 bata, Camp. 1:4 6.80 M2 -
5 Pek. Raben Pondasi 1 : 5 13.60 M2 -
6 Pek. Urugan Tanah Bekas Galian 2.71 M3 -
JUMLAH HARGA PEKERJAAN PONDASI
5 . b . Pembesian 87.74 Kg -
5 . c . Cor Beton K.175 1.00 M3 -
JUMLAH HARGA PEKERJAAN STRUKTUR
IV PEKERJAAN RELIEF
1 Pek. Pas. Batu Alam Andesit + Coating (Posisi : Keliling Kolom) 10.00 M2 -
JUMLAH HARGA PEKERJAAN RELIEF
VI PEKERJAAN LANTAI
1 Pek. Pas. Bekisting 4.20 M2 -
2 Cor Lantai Parkir, Beton K-175 9.00 M3 -
JUMLAH HARGA PEKERJAAN LANTAI
JUMLAH TOTAL
RENCANA BIAYA PEKERJAAN
BILL OF QUANTITY
(BOQ)
PROGRAM : PENINGKATAN SARANA DAN PARASARANA APARATUR
KEGIATAN : PEMBANGUNAN PAGAR / KANOPI / TEMPAT PARKIR PEMDA / DINAS
PAKET : -
PEKERJAAN : PEMBANGUNAN TEMPAT PARKIR DINAS KESEHATAN
LOKASI : KABUPATEN PELALAWAN
TAHUN ANGGARAN : 2017
II PEKERJAAN PONDASI
1 Pek. Galian Tanah Pondasi 8.14 M3 -
2 Pek. Urugan Pasir Di Bawah Pondasi 0.76 M3 -
3 Pek. Cor Lantai Kerja 1:3:5 0.76 M3 -
4 Pek. Pas Pondasi 1 bata, Camp. 1:4 6.80 M2 -
5 Pek. Raben Pondasi 1 : 5 13.60 M2 -
6 Pek. Urugan Tanah Bekas Galian 2.71 M3 -
JUMLAH HARGA PEKERJAAN PONDASI
5 . b . Pembesian 87.74 Kg -
5 . c . Cor Beton K.175 1.00 M3 -
JUMLAH HARGA PEKERJAAN STRUKTUR
IV PEKERJAAN RELIEF
1 Pek. Pas. Batu Alam Andesit + Coating (Posisi : Keliling Kolom) 10.00 M2 -
JUMLAH HARGA PEKERJAAN RELIEF
VI PEKERJAAN LANTAI
1 Pek. Pas. Bekisting 4.20 M2 -
2 Cor Lantai Parkir, Beton K-175 9.00 M3 -
JUMLAH HARGA PEKERJAAN LANTAI
JUMLAH TOTAL
DAFTAR HARGA SATUAN UPAH DAN BAHAN
PROGRAM : PENINGKATAN SARANA DAN PARASARANA APARATUR
KEGIATAN : PEMBANGUNAN PAGAR / KANOPI / TEMPAT PARKIR PEMDA / DINAS
PAKET :-
PEKERJAAN : PEMBANGUNAN TEMPAT PARKIR DINAS KESEHATAN
LOKASI : KABUPATEN PELALAWAN
T.A : 2017
1 2 3 5
I TENAGA KERJA
1 MANDOR ORANG/HARI Rp 110,000.00
2 KEPALA TUKANG ORANG/HARI Rp 110,000.00
3 TUKANG ORANG/HARI Rp 105,000.00
4 PEKERJA ORANG/HARI Rp 78,000.00
II BAHAN
A BAHAN PASANGAN
1 PASIR URUG M3. Rp 67,500.00
2 PASIR PASANG M3. Rp 95,000.00
3 PASIR BETON / COR M3. Rp 170,000.00
4 TANAH URUG / TIMBUN M3. Rp 27,500.00
5 KERIKIL / KORAL BETON M3. Rp 240,000.00
6 BATU BATA BH. Rp 410.00
7 PORTLAND CEMENT / SEMEN PADANG TYPE I KG. Rp 1,300.00
8 PORTLAND CEMENT WARNA KG. Rp 9,000.00
9 PLASTIK HITAM M2. Rp 5,000.00
B BAHAN KAYU
1 KAYU KELAS I M3. Rp 6,500,000.00
2 KAYU BALOK KELAS II M3. Rp 4,500,000.00
3 KAYU KASO 5/7 M3. Rp 2,000,000.00
4 KAYU RENG 3/5 M3. Rp 2,756,250.00
4 PAPAN 2/30 M3. Rp 2,200,000.00
6 KAYU CEROCOK / KAYU UBAR BTG. Rp 12,000.00
7 KAYU DOLKEN BTG. Rp 27,500.00
8 KAYU PERANCAH / BEKISTING DALAM M3. Rp 2,000,000.00
9 KAYU BAKAR M3. Rp 134,400.00
D BAHAN DINDING
1 PLYWOOD 9 MM LBR Rp 135,000.00
2 PLYWOOD 6 MM LBR Rp 95,000.00
E BAHAN ATAP
1 RANGKA ATAP M2. Rp 350,000.00
2 ATAP LONGSPAN (TEBAL 3 MM) M2. Rp 35,000.00
3 PERABUNG Lbr Rp 26,250.00
4 Listplang M Rp 35,000.00
F BAHAN LANTAI
1 BATU ALAM ANDESIT M2. Rp 80,000.00
2 BATU ALAM ACAK (TEMPLEK) M2. Rp 70,000.00
G BAHAN PAKU
1 PAKU ATAP GENTENG METAL KG. Rp 21,600.00
2 PAKU SERI KG. Rp 21,600.00
3 PAKU 2" - 5" KG. Rp 19,440.00
4 PAKU 5 cm - 12 cm KG. Rp 19,440.00
5 PAKU 1 Cm - 2,5 Cm KG. Rp 19,440.00
6 PAKU SKRUP + BAUT + KARET DIA. 8" BH. Rp 1,080.00
H BAHAN FINISHING
1 CAT MINYAK KG. Rp 64,800.00
2 CAT TEMBOK (SETARA JOTUN, NIPPON. DAN DULUX) KG. Rp 42,500.00
3 CAT VERNISH KG. Rp 21,000.00
4 CAT KAYU DASAR / MENI KG. Rp 28,000.00
5 MINYAK CAT LTR. Rp 21,600.00
6 DEMPUL KG. Rp 21,600.00
7 PLAMIR KG. Rp 12,960.00
8 MINYAK BEKISTING LTR. Rp 3,400.00
9 LEM KAYU KG. Rp 16,200.00
A SATUAN UPAH DAN BAHAN
KETERANGAN
6
PERHITUNGAN VOLUME BANGUNAN
PROGRAM PENINGKATAN SARANA DAN PARASARANA APARATUR
KEGIATAN PEMBANGUNAN PAGAR / KANOPI / TEMPAT PARKIR PEMD
PAKET -
PEKERJAAN PEMBANGUNAN TEMPAT PARKIR DINAS KESEHATAN
LOKASI KABUPATEN PELALAWAN
T.A 2017
Diameter 12
Tulangan Horizontal 1.200 0.012 6165.000 1.065
Tulangan Vertikal 1.200 0.012 6165.000 1.065
Over Lap 10 %
Grand Total
Pek. Pembesian
Dimensi (M')
No KETERANGAN
P D BJ BESI koefisien
Diameter 10
Tulangan Utama 1.070 0.010 6165.000 0.660
Over Lap 10 %
Diameter 6
Tulangan Begol 0.480 0.006 6165.000 0.107
Over Lap 10 %
Grand Total
Pek. Sloof 20 x 20 cm
Pek. Bekisting
Dimensi (M')
No KETERANGAN
B1 H P SISI
Diameter 10
Tulangan Utama 34.000 0.010 6165.000 20.961
Over Lap 10 %
Diameter 6
Tulangan Begol 0.480 0.006 6165.000 0.107
Over Lap 10 %
Grand Total
Pek. Pembesian
Dimensi (M')
No KETERANGAN
P D BJ BESI koefisien
Diameter 10
Tulangan Utama 34.000 0.010 6165.000 20.961
Over Lap 10 %
Diameter 6
Tulangan Begol 0.280 0.006 6165.000 0.062
Over Lap 10 %
Grand Total
Pek. Pembesian
Dimensi (M')
No KETERANGAN
P D BJ BESI koefisien
Diameter 10
Tulangan Utama 2.500 0.010 6165.000 1.541
Over Lap 10 %
Diameter 6
Tulangan Begol 0.480 0.006 6165.000 0.107
Over Lap 10 %
Grand Total
Dikurangi
Pipa D=150 mm 0.075 2.500
Pek. Pas. Batu Alam Andesit (Posisi : Kelliling Kolom) 0.250 1.000 4.000
LANTAI PARKIR
Pek. Pengecatan
Dimensi (M')
No KETERANGAN
B1 H P SISI
90.000 1 90.000
90.000
0.490 10 4.900
3.240 1 3.240
8.140
0.025 10 0.245
0.510 1 0.510
0.755
0.025 10 0.245
0.510 1 0.510
0.755
0.432 10 4.320
4.320
Jumlah Besi / 1
Jumlah Berat Total (Kg)
Item
6.000 10 63.919
6.000 10 63.919
12.784
140.621
0.648
0.416 10 4.160
4.160
Jumlah Besi / 1
Jumlah Berat Total (Kg)
Item
6.000 10 39.579
3.958
5.000 10 5.327
0.533
49.396
0.208
6.800 1 6.800
6.800
13.600 1 13.600
13.600
Jumlah Besi / 1
Jumlah Berat Total (Kg)
Item
4.000 1 83.844
8.384
227.000 1 24.183
2.418
118.829
1.360
5.100 1 5.100
10.200 1 10.200
15.300
Jumlah Besi / 1
Jumlah Berat Total (Kg)
Item
4.000 1 83.844
8.384
227.000 1 14.107
1.411
107.746
0.765
Luas (M2) Jumlah Luas Total (M2)
2.000 10 20.000
20.000
Jumlah Besi / 1
Jumlah Berat Total (Kg)
Item
4.000 10 61.650
6.165
17.000 10 18.110
1.811
87.736
0.044 0 0.000
0.500
2.760 0 0.000
0.000
0.063 0 0.000
0.000
1.000 10 10.000
10.000
Luas (M2) Jumlah Luas Total (M2)
90.000 1 90.000
90.000
4.200 1 4.200
4.200
9.000 1 9.000
9.000
1.200 10 12.000
15.300 1 15.300
27.300