RANCANGAN ANGGARAN BIAYA

LOKASI : Alfamart SM Amin 1 Pekanbaru


LINGKUP PEKERJAAN : Sipil
TANGGAL : 18 November 2015

Harga Satuan (Rp)


VOL
NO JENIS PEKERJAAN Sat Material Upah
a b c

1 Servis Atap Zincalume ls 1 Rp 200,000


2 Bongkar + Pasang Talang Air (Dengan Dudukan Besi) m1 15 Rp 162,500 Rp 88,200
3 Bongkar + Pasang Plafon Gypsum m2 15 Rp 36,000 Rp 65,000
4 Pasangan Bata m1 15 Rp 15,000 Rp 10,000
5 Bambanan Atap m1 10 Rp 11,000 Rp 3,500
6 Cat plafon Area Gudang Ex Metrlollite Putih m2 15 Rp 12,000 Rp 8,000

GRAND TOTAL

M. Adithya Hidayat Rangkuti


Total Harga (Rp) Total
Material Upah Rp
d=axb e=axc f=d+e

Rp - Rp 200,000 Rp 200,000
Rp 2,437,500 Rp 1,323,000 Rp 3,760,500
Rp 540,000 Rp 975,000 Rp 1,515,000
Rp 225,000 Rp 150,000 Rp 375,000
Rp 110,000 Rp 35,000 Rp 145,000
Rp 180,000 Rp 120,000 Rp 300,000

3,492,500.00 2,803,000.00 6,295,500.00

M. Adithya Hidayat Rangkuti


Lampiran : 1 Berkas
Hal : Penawaran Harga

Kepada Yth
Pemimpin Maintenance Alfamart
Di Tempat

Dengan Hormat,

1. Akan mematuhi ketentuan dalam rencana kerja dan syarat, termasuk risalah Aanweizjing
2. Sanggup menyediakan bahan-bahan, peralatan dan tenaga kerja yang diperlukan untuk melaksanakan :
Proyek : RENOVASI TOKO ALFAMART
Pekerjaan : SIPIL
Lokasi : SOEKARNO HATTA 2 PEKANBARU
3. Dengan ini mengajukan penawaran senilai Rp
4. Harga penawaran tersebut fixed (tetap) dengan jangka waktu pelaksanaan sesuai dengan SPK yang diberik
5. Kami bersedia menambah kerja lembur proyek atau menambah peralatan bahan dan tenaga kerja atas bia
sendiri, apabila dalam pelaksanaan terjadi keterlambatan yang ditandai dengan prestasi dibawah target
yang ditetapkan dan distujui pemberi tugas atau wakilnya.

Demikian surat penawaran ini saya buat agar dapat digunakan sebagai mana mestinya, atas perhatian dan kerjasamanya
saya ucapkan terima kasih.

Pekanbaru, 18 NOVEMBER 2015

M. Adithya Hidayat Rangkuti


alah Aanweizjing
perlukan untuk melaksanakan :

an sesuai dengan SPK yang diberikan


an bahan dan tenaga kerja atas biaya
dengan prestasi dibawah target

as perhatian dan kerjasamanya

u, 18 NOVEMBER 2015

hya Hidayat Rangkuti


LOKASI
LINGKUP PEKERJAAN
TANGGAL

NO JENIS PEKERJAAN Sat VOL


a
1 Bongkar + Pasang Atap Zincalume ls 1
2 Bongkar + Pasang Talang Air m1 15
3 Bongkar + Pasang Pipa Pvc ls 12
4 Bongkar + Pasang Plafon Gypsum m2 25
5 Pasangan Bata m2 2.25
6 Plesteran Atap m2 0.5
7
GR
RANCANGAN ANGGARAN BIAYA

:
:
:

Harga Satuan (Rp) Total Harga (Rp) Total


Material Upah Material Upah Rp
b c d=axb e=axc f=d+e
200,000.00 - 200,000.00 200,000.00
130,000.00 72,000.00 1,950,000.00 1,080,000.00 3,030,000.00
20,760.00 - 249,120.00 249,120.00
29,968.00 48,000.00 749,200.00 1,200,000.00 1,949,200.00
80,000.00 60,000.00 180,000.00 135,000.00 315,000.00
45,219.84 48,000.00 22,609.92 24,000.00 46,609.92

GRAND TOTAL RP 2,901,809.92 2,888,120.00 5,789,929.92

1400000
ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA (1:3) (SNI. 2008)


TENAGA
Pekerja 0.6000 OH 100,000.00 60,000.00
Tukang 0.2000 OH 100,000.00 20,000.00
Kepala Tukang 0.0200 OH 100,000.00 2,000.00
Mandor 0.0300 OH 100,000.00 3,000.00
BAHAN
Batu Bata 140.0000 Bh 500.00 70,000.00
Semen Portland 32.9500 Kg 1,220.00 40,199.00
Pasir Pasang 0.0910 M3 130,000.00 11,830.00
SUB TOTAL 85,000.00 ###
JUMLAH ###
DIBULATKAN 207,020.00

1 M2 PLESTERAN 1:2, TEBAL 45 MM (SNI. 2008)


TENAGA
Pekerja 0.3000 OH 100,000.00 30,000.00
Tukang batu 0.1500 OH 100,000.00 15,000.00
Kepala Tukang 0.0150 OH 100,000.00 1,500.00
Mandor 0.0150 OH 100,000.00 1,500.00
BAHAN
Semen Portland 30.6720 Kg 1,220.00 37,419.84
Pasir Pasang 0.0600 M3 130,000.00 7,800.00
SUB TOTAL 48,000.00 45,219.84
JUMLAH 93,219.84
DIBULATKAN 93,210.00

1 M' MEMASANG PIPA PVC TYPE AW DIA.3" (SNI. 2002)


TENAGA
Pekerja 0.0360 OH 100,000.00 3,600.00
Tukang Batu 0.0600 OH 100,000.00 6,000.00
Kepala Tukang 0.0060 OH 100,000.00 600.00
Mandor 0.0018 OH 100,000.00 180.00
BAHAN
Pipa PVC 3" 1.2000 M' 17,000.00 20,400.00
Perlengkapan (35%) 1.0000 Ls 5,950.00 5,950.00
SUB TOTAL 10,380.00 26,350.00
JUMLAH 36,730.00
DIBULATKAN 36,730.00

1 M2 PASANG PLAFOND PLYWOOD (SNI. 2008)


TENAGA
Pekerja 0.1000 OH 100,000.00 10,000.00
Tukang Kayu 0.0500 OH 100,000.00 5,000.00
Kepala Tukang 0.0050 OH 100,000.00 500.00
Mandor 0.0050 OH 100,000.00 500.00
BAHAN
Gypsum Board 0.3640 Lbr 62,000.00 22,568.00
SEMEN GYPSUM 1.0000 KG 3,000.00 3,000.00
Paku Skrup 0.1100 Kg 40,000.00 4,400.00
SUB TOTAL 16,000.00 29,968.00
JUMLAH 45,968.00

1 M2 PASANG ATAP GENTENG METAL (SNI. 2002)


TENAGA
Pekerja 0.2000 OH 100,000.00 20,000.00
Tukang Kayu 0.1000 OH 100,000.00 10,000.00
Kepala Tukang 0.0100 OH 100,000.00 1,000.00
Mandor 0.0100 OH 100,000.00 1,000.00
BAHAN
Genteng metal 1.0200 M2 40,000.00 40,800.00
Paku atap genteng metal 0.2000 Kg 40,000.00 8,000.00
SUB TOTAL 32,000.00 48,800.00
JUMLAH 80,800.00
DIBULATKAN 80,800.00

1M PEKERJAAN TALANG (SNI. 2002)


TENAGA
Pekerja 0.2000 OH 100,000.00 20,000.00
Tukang Kayu 0.1000 OH 100,000.00 10,000.00
Kepala Tukang 0.0100 OH 100,000.00 1,000.00
Mandor 0.0100 OH 100,000.00 1,000.00
BAHAN
SENG POLOS 1.0200 M2 35,000.00 35,700.00
Paku atap genteng metal 0.2000 Kg 40,000.00 8,000.00
DUDUKAN 2.0000 BH 50,000.00 100,000.00
SUB TOTAL 32,000.00 ###
JUMLAH ###
DIBULATKAN 175,700.00
6.66666667

20,338.17

20,338.17 11666.6667
15000
14.1666667
LOKASI
LINGKUP PEKERJAAN
TANGGAL

NO JENIS PEKERJAAN Sat VOL


a
1 Bongkar + Pasang Atap Zincalume m2 8
2 Bongkar + Pasang Talang Air m1 15
3 Bongkar + Pasang Pipa Pvc m1 12
4 Bongkar + Pasang Plafon Gypsum m2 25
5 Pasangan Bata m2 2.25
6 Plesteran Atap m2 5
7
GR
RANCANGAN ANGGARAN BIAYA

:
:
:

Harga Satuan (Rp) Total Harga (Rp) Total


Material Upah Material Upah Rp
b c d=axb e=axc f=d+e
58,560.00 115,200.00 468,480.00 921,600.00 1,390,080.00
156,000.00 86,400.00 2,340,000.00 1,296,000.00 3,636,000.00
31,620.00 38,925.00 379,440.00 467,100.00 846,540.00
35,961.60 57,600.00 899,040.00 1,440,000.00 2,339,040.00
146,434.80 102,000.00 329,478.30 229,500.00 558,978.30
54,263.81 40,000.00 271,319.04 200,000.00 471,319.04

GRAND TOTAL RP 4,687,757.34 4,554,200.00 9,241,957.34


LOKASI
LINGKUP PEKERJAAN
TANGGAL

NO JENIS PEKERJAAN Sat VOL


a
1 Bongkar + Pasang Atap Zincalume m2 8
2 Bongkar + Pasang Talang Air m1 15
3 Bongkar + Pasang Pipa Pvc 3" m1 12
4 Bongkar + Pasang Plafon Gypsum m2 25
5 Pasangan Bata m2 2.25
6 Plesteran Atap 1:2 m2 5
7
GR
RANCANGAN ANGGARAN BIAYA

:
:
:

Harga Satuan (Rp) Total Harga (Rp) Total


Material Upah Material Upah Rp
b c d=axb e=axc f=d+e
40,000.00 50,000.00 320,000.00 400,000.00 720,000.00 26000
100,000.00 72,000.00 1,500,000.00 1,080,000.00 2,580,000.00
35,000.00 15,000.00 420,000.00 180,000.00 600,000.00 100000
25,000.00 48,000.00 625,000.00 1,200,000.00 1,825,000.00 62000
60,000.00 27,000.00 135,000.00 60,750.00 195,750.00 500
45,219.84 22,000.00 226,099.20 110,000.00 336,099.20 61000
130000
GRAND TOTAL RP 3,226,099.20 3,030,750.00 6,256,849.20 7,821,061.50

Rp 6,256,849
36000

100000
lbr
bh
semen
pasir
ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA (1:3) (SNI. 2008)


TENAGA
Pekerja 0.6000 OH 80,000.00 48,000.00
Tukang 0.2000 OH 80,000.00 16,000.00
Kepala Tukang 0.0200 OH 100,000.00 2,000.00
Mandor 0.0300 OH 100,000.00 3,000.00
BAHAN
Batu Bata 140.0000 Bh 600.00 84,000.00
Semen Portland 32.9500 Kg 1,200.00 39,540.00
Pasir Pasang 0.0910 M3 14,000.00 1,274.00
SUB TOTAL 69,000.00 ###
JUMLAH ###
DIBULATKAN 193,810.00

1 M2 PLESTERAN 1:2, TEBAL 45 MM (SNI. 2008)


TENAGA
Pekerja 0.3000 OH 80,000.00 24,000.00
Tukang batu 0.1500 OH 80,000.00 12,000.00
Kepala Tukang 0.0150 OH 100,000.00 1,500.00
Mandor 0.0150 OH 100,000.00 1,500.00
BAHAN
Semen Portland 30.6720 Kg 1,200.00 36,806.40
Pasir Pasang 0.0600 M3 14,000.00 840.00
SUB TOTAL 39,000.00 37,646.40
JUMLAH 76,646.40
DIBULATKAN 76,640.00

1 M' MEMASANG PIPA PVC TYPE AW DIA.3" (SNI. 2002)


TENAGA
Pekerja 0.0360 OH 80,000.00 2,880.00
Tukang Batu 0.0600 OH 80,000.00 4,800.00
Kepala Tukang 0.0060 OH 100,000.00 600.00
Mandor 0.0018 OH 100,000.00 180.00
BAHAN
Pipa PVC 3" 1.2000 M' 20,000.00 24,000.00
Perlengkapan (35%) 1.0000 Ls 7,000.00 7,000.00
SUB TOTAL 8,460.00 31,000.00
JUMLAH 39,460.00
DIBULATKAN 39,460.00

1 M2 PASANG PLAFOND PLYWOOD (SNI. 2008)


TENAGA
Pekerja 0.1000 OH 80,000.00 8,000.00
Tukang Kayu 0.0500 OH 80,000.00 4,000.00
Kepala Tukang 0.0050 OH 100,000.00 500.00
Mandor 0.0050 OH 100,000.00 500.00
BAHAN
Gypsum Board 0.3640 Lbr 96,000.00 34,944.00
Paku Skrup 0.1100 Kg 20,000.00 2,200.00
SUB TOTAL 13,000.00 37,144.00
JUMLAH 50,144.00

1 M2 PASANG ATAP GENTENG METAL (SNI. 2002)


TENAGA
Pekerja 0.2000 OH 80,000.00 16,000.00
Tukang Kayu 0.1000 OH 80,000.00 8,000.00
Kepala Tukang 0.0100 OH 100,000.00 1,000.00
Mandor 0.0100 OH 100,000.00 1,000.00
BAHAN
Genteng metal 1.0200 M2 40,250.00 41,055.00
Paku atap genteng meta 0.2000 Kg 23,000.00 4,600.00
SUB TOTAL 26,000.00 45,655.00
JUMLAH 71,655.00
DIBULATKAN 71,655.00

1M TALANG AIR (SNI. 2002)


TENAGA
Pekerja 0.2000 OH 80,000.00 16,000.00
Tukang Kayu 0.1000 OH 100,000.00 10,000.00
Kepala Tukang 0.0100 OH 100,000.00 1,000.00
Mandor 0.0100 OH - -
BAHAN
Genteng metal 1.0200 M2 40,250.00 41,055.00
Paku atap genteng meta 0.2000 Kg 23,000.00 4,600.00
SUB TOTAL 27,000.00 45,655.00
JUMLAH 72,655.00
DIBULATKAN 72,655.00