RPD Paving Tajung
RPD Paving Tajung
Volume
Unit / Harga Satuan
No Uraian Real. s/d Pengajuan Jumlah Jumlah Rp.
Kebutuhan satuan Rp.
tahap lalu sekarang kumulatif
Jalan Lapen
I Bahan
1 Kerikil 2/3 2.0 0.0 2.00 m3 359,000 -
2 Pasir Pasang 24.0 0.0 24.00 m3 353,400 -
3 Pasir urug 46.0 24.0 46.00 m3 138,000 3,312,000
4 Semen PC 40 Kg 33.0 0.0 33.00 Zak 68,500 -
5 Paving Stone 210.0 0.0 210.00 m2 71,800 -
6 Pedel Lokal - 0.0 - m3 127,000 -
7 Paku 11.0 0.0 11.00 kg 25,000 -
8 Papan bekisting 0.1 0.0 0.12 m3 4,420,000 -
3,312,000
Alat
1 Papan Proyek 1.0 0.0 1 unit 500,000 -
2 Prasasti 1.0 0.0 1 unit 600,000 -
3 Cangkul 5.0 0.0 5 unit 35,000 -
4 Scop 4.0 0.0 4 unit 35,000 -
5 Drum Air - 0.0 - unit 150,000 -
6 Benang 4.0 0.0 4 rol 1,000 -
7 Slang Water Pas 6.0 4.0 6 m 2,000 8,000
8 Ember 12.0 0.0 12 bj 10,000 -
8,000
Upah
1 Pekerja 86 0.0 86 HOK 52,500 -
2 Tukang 24 0.0 24 HOK 60,000 -
3 Kepala Kelompok 4 0.0 4 HOK 63,750 -
-
Jumlah I 3,320,000
Operasional
- -
- -
Jumlah II -
Jumlah I + II 3,320,000
Jumlah I + II Rp. 3,320,000
Saldo Kas Rp. 0
Jml Pengajuan Rp. 3,320,000
24,617,500
3,312,000
3,312,000
1
-
0.55 -
-
58,660,000 -
3,320,000
-
-
-
-
-
-
-
-
-
-
-
-
-
3,320,000 -
-
-
-
-
-
-
-
-
REKAPITULASI RENCANA PENGGUNAAN DANA (RPD)
2 BOP Rp - Rp - Rp -
3 BOP Rp - Rp - Rp -
0 ___________________
2 BOP Rp - Rp - Rp -
3 BOP Rp - Rp - Rp -
0 ___________________
Rp 0
Rp 1
105,366,289
-
(105,366,289)