I.

Pondasi
A. Pancang
1. Mini pile 25x25 s/d tanah keras 28 pcs

B. Pile Cap (P1)


1. Beton f'c 25 Mpa 8.064 m3
2. Besi Tulangan BJTD 40 718.153 kg
3. Bekisting Batako 49.28 m2

C. Tie Beam (TB1)


1. Beton f'c 25 Mpa 14.336 m3
2. Besi Tulangan BJTD 40 9988.5895 kg
3. Bekisting Batako 71.68 m2

D. Pedestal
K1
1. Beton f'c 25 Mpa 0.729 m3
2. Besi Tulangan BJTD 40 462.059 kg
3. Bekisting Kayu 6.48 m2
K2
1. Beton f'c 25 Mpa 0.08 m3
2. Besi Tulangan BJTD 40 69.043 kg
3. Bekisting Kayu 1.04 m2
K3
1. Beton f'c 25 Mpa 0.172 m3
2. Besi Tulangan BJTD 40 107.881 kg
3. Bekisting Kayu 1.8 m2

II. Struktur Atas


A. Kolom
1. K1 (H350.12.19) 34020 kg
2. K2 (WF 300.150.6.5.9) 2025.84 kg
3. K3 (WF 350.175.7.11) 3038.76 kg

B. Rafter
1. As A & L ( WF .250.125.6.9) 2385.76 kg
2. As B-K ( 600.200.11.17) 38446.2 kg

C. Gording
1. GNP. 125.50.20.3.2 13468.836 kg

D. Balok Ikat
1. Keliling ( WF.200.100) 4174.8 kg
2. Pinggir (WF.200.100) 2470.8 kg
3.Top/Puncak(350.175.7.11) 2876.8 kg

E. Trekstang ROD Diameter 12 805.02 kg


Ikatan Angin ROD Diameter 16 818.75 kg

F. Penutup Atap 2337.42 m2