I BAHAN
1.1 Pasir Urug 1.00 M3 80,000 80,000
1.2 Batu Kali 2.00 M3 190,000 380,000
1.3 Pasir Pasang 6.00 M3 140,000 840,000
1.4 Tanah Timbun 510.00 M3 65,000 33,150,000
1.5 Pasir Beton 1.00 M3 140,000 140,000
1.6 Kerikil 1.00 M3 180,000 180,000
1.7 Bata Merah 2,924.00 Bh 650 1,900,600
1.8 Balok Kayu Klas II ( Bekesting ) 0.08 M3 4,500,000 339,084
1.9 Kayu Klas III ( Bekesting ) 0.27 M3 3,650,000 1,000,197
1.10 Dolken kayu ᴓ 8 - 10 cm - panjang 4 m 10.00 Btg 25,000 250,000
1.11 Minyak Bekesting 2.00 Liter 17,000 34,000
1.12 Semen Portland 41.00 Zak 65,000 2,665,000
1.13 Plywood tebal 9 mm 2.00 Lbr 135,000 270,000
1.14 Besi Beton Polos 10" 14.00 Btg 85,000 1,190,000
1.15 Besi Beton Polos 8" 9.00 Btg 60,000 540,000
1.16 Besi Beton Polos 6" 22.00 Btg 32,000 704,000
1.17 Kawat Beton 3.00 Kg 19,000 57,000
1.18 Paku 3.00 Kg 16,000 48,000
1.19 Plamur 9.00 Kg 29,000 261,000
1.20 Cat Dasar ( Tembok ) 9.00 Kg 25,000 225,000
1.21 Cat Penutup ( Tembok ) 22.00 Kg 30,000 660,000
........................... ................................
Kuasa Pengguna Anggaran
Kabupaten : BIREUEN
Kecamatan : JULI
TAKE OF SHEET
Desa : .................
No URAIAN SKETSA
TOTAL
B. PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah
a. Pondasi Batu Kali Pagar
V1 = P x L x T
TOTAL
TOTAL
TOTAL
C. PEKERJAAN BETON BERTULANG
a. Sloof 15/15 cm Pagar
V= PxLxT
Bekisting
Bekisting
c. Ringbalk 13/13 cm
V= PxLxT
Bekisting
D. PEKERJAAN PASANGAN & PLESTERAN
1 Pasangan Bata
a. Dinding Pagar V= PxL
TOTAL
Plasteran
E. PEKERJAAN PENGECATAN
1 Cat Dinding Pagar
a. Luas Bagian Luar
b. Luas Bagian Dalam
TOTAL
C. VOLUME PEMBESIAN (GEDUNG)
No URAIAN SKETSA
0.15
0.15
0.20
0.20
0.13
0.13
Jenis Prasarana : PAGAR LAPANGAN FUTSAL
- M'
4.61 M3
0.38 M3
0.77 M3
41.77 M2
83.54 M2
84.48 M2
Timbunan B
Panjang = 21.00 M' Pekerjaan Timbunan
Lebar = 30.00 M' V. A1 =
Tinggi A = 0.50 M' =
Tinggi B = 0.50 M'
V. A2 =
=
V. B =
=
Total Timbunan
30.55 x 6.00
183.30 M2
21.00 x 30.00
630.00 M2
Pekerjaan Timbunan
27.15 x 1.35 x 0.50
18.33 M3
Rekap
Pembersihan dan Pemerataan = 849.95 M2
Pekerjaan Timbunan = 424.98 M3
Dibuat oleh :
ANALISA KEBUTUHAN
REKAPITULASI PEKERJAAN
No Uraian Volume
UPAH
1 Pekerja 424.98
2 Tukang -
3 Kepala Tukang -
4 Mandor 68.00
BAHAN
1 Tanah Timbun 509.97
ALAT
1 Sewa Molen -
Kebutuhan
Volume Berat Jenis Satuan
Upah/Bahan
M2
84.995 OH
42.498 OH
M3
127.493 OH
4.250 OH
509.972 m3
M3
212.488 OH
21.249 OH
OH 425.00 OH
OH - OH
OH - OH
OH 68.00 OH
m3 510.00 m3
- - -
ANALISA KEBUTUHAN
NO Analisa Uraian Volume
REKAPITULASI PEKERJAAN
No Uraian Volume
UPAH
1 Pekerja 2.16 OH
2 Tukang batu 0.88 OH
3 Kepala Tukang 0.09 OH
4 Mandor 0.10 OH
BAHAN
1 Pasir Urug 0.79 m3
2 Batu Kali 1.84 m3
3 Semen Portland 3.13 Zak
4 Pasir Pasang 1.40 m3
ALAT
1
2
3
4
5
UHAN
Kebutuhan
Berat Jenis Satuan
Upah/Bahan
SI
0.002 OH
0.004 OH
0.115 OH
0.004 OH
0.461 m3
0.288 OH
0.009 OH
0.599 OH
0.300 OH
0.030 OH
0.030 OH
0.922 m3
0.332 m3
1.152 OH
0.576 OH
0.058 OH
0.058 OH
0.922 m3
125.184 kg
0.399 m3
3.00 OH
1.00 OH
1.00 OH
1.00 OH
1.00 m3
2.00 m3
40.00 4.00 Zak
2.00 m3
Diambil
Jam
Jam
Jam
Jam
Jam
ANALISA KEBUTUHAN
NO Analisa Uraian Volume
3 SLOOF 2
- Beton
A. 4.1.1.5 Membuat 1 m3 beton mutu f'c = 14.5 Mpa (K 175) 0.43 M3
Pekerja 1.650 OH
Tukang batu 0.275 OH
Kepala Tukang 0.028 OH
Mandor 0.08 OH
Semen Portland 326 kg
Pasir Beton 760 kg
Kerikil (Maks 30 mm) 1,029 kg
Air 215 Liter
- Bekisting
A. 4.1.1.21 Pemasangan 1m2 bekesting untuk sloof 1.92 M2
Pekerja 0.520 OH
Tukang kayu 0.260 OH
Kepala Tukang 0.026 OH
Mandor 0.026 OH
Kayu Klas III 0.045 m3
Paku 5 - 10 cm 0.300 kg
Minyak Bekesting 0.100 liter
5 KLM.Pgr
- Beton
A. 4.1.1.5 Membuat 1 m3 beton mutu f'c = 14.5 Mpa (K 175) 0.45 M3
Pekerja 1.65 OH
Tukang batu 0.28 OH
Kepala Tukang 0.03 OH
Mandor 0.08 OH
Semen Portland 352.00 kg
Pasir Beton 731.00 kg
Kerikil (Maks 30 mm) 1031.00 kg
Air 215.00 Liter
- Bekisting
A. 4.1.1.22 Pemasangan 1m2 bekesting untuk kolom 3.03 M2
Pekerja 0.660 OH
Tukang kayu 0.330 OH
Kepala Tukang 0.033 OH
Mandor 0.033 OH
Kayu Klas III 0.040 m3
Paku 5 - 10 cm 0.400 kg
Minyak Bekesting 0.200 liter
Balok Kayu Klas II 0.015 m3
Plywood tebal 9 mm 0.350 Lbr
Dolken kayu ᴓ 8 - 10
2.000 Batang
cm - panjang 4 m
8 RING BALK
- Beton
A. 4.1.1.5 Membuat 1 m3 beton mutu f'c = 14.5 Mpa (K 175) 0.32 M3
Pekerja 1.65 OH
Tukang batu 0.28 OH
Kepala Tukang 0.03 OH
Mandor 0.08 OH
Semen Portland 352.00 kg
Pasir Beton 731.00 kg
Kerikil (Maks 30 mm) 1031.00 kg
Air 215.00 Liter
- Bekisting
A. 4.1.1.23 Pemasangan 1m2 bekesting untuk balok 1.66 M2
Pekerja 0.660 OH
Tukang kayu 0.330 OH
Kepala Tukang 0.033 OH
Mandor 0.033 OH
Kayu Klas III 0.040 m3
Paku 5 - 10 cm 0.400 kg
Minyak Bekesting 0.200 liter
Balok Kayu Klas II 0.018 m3
Plywood tebal 9 mm 0.350 Lbr
Dolken kayu ᴓ 8 - 10
2.000 Batang
cm - panjang 4 m
REKAPITULASI PEKERJAAN
No Uraian Volume
UPAH
1 Pekerja 7.17 OH
2 Tukang batu 0.33 OH
3 Tukang Besi 1.07 OH
4 Tukang Kayu 2.05 OH
5 Kepala Tukang 0.35 OH
6 Mandor 0.37 OH
BAHAN
1 Semen Portland 10.37 Zak
2 Pasir Beton 0.64 M3
3 Kerikil (Maks 30 mm) 0.92 M3
4 Air 260.25 Liter
5 Besi Beton Polos 10" 13.01 Btg
6 Besi Beton Polos 8" 8.10 Btg
7 Besi Beton Polos 6" 21.88 Btg
8 Kawat Beton 2.30 kg
9 Kayu Klas III 0.27 m3
10 Paku 5 - 10 cm 2.45 kg
11 Minyak Bekesting 1.13 liter
12 Balok Kayu Klas II 0.08 m3
13 Plywood tebal 9 mm 1.64 Lbr
14 Dolken kayu ᴓ 8 - 10 cm - panjang 4 m 9.38 Batang
ALAT
1
2
3
4
5
AN
Kebutuhan
Berat Jenis Satuan
Upah/Bahan
0.713 OH
0.119 OH
0.012 OH
0.036 OH
40 3.521 Zak
1,400 0.235 M3
1,350 0.329 M3
92.880 Liter
0.333 OH
0.333 OH
0.033 OH
0.019 OH
6.2 8.060 Btg
0.714 kg
0.105 OH
0.105 OH
0.011 OH
0.006 OH
2.22 7.128 Btg
0.226 kg
0.998 OH
0.499 OH
0.050 OH
0.050 OH
0.086 m3
0.576 kg
0.192 liter
0.749 OH
0.125 OH
0.013 OH
0.038 OH
40 3.995 Zak
1,400 0.237 M3
1,350 0.347 M3
97.610 Liter
0.205 OH
0.205 OH
0.020 OH
0.012 OH
6.2 4.949 Btg
0.438 kg
0.094 OH
0.094 OH
0.009 OH
0.005 OH
2.22 6.361 Btg
0.202 kg
1.998 OH
0.999 OH
0.100 OH
0.100 OH
0.121 m3
1.211 kg
0.605 liter
0.045 m3
1.059 Lbr
6.053 Batang
0.535 OH
0.089 OH
0.009 OH
0.027 OH
40 2.855 Zak
1,400 0.169 M3
1,350 0.248 M3
69.763 Liter
0.213 OH
0.213 OH
0.021 OH
0.012 OH
3.95 8.097 Btg
0.457 kg
0.124 OH
0.124 OH
0.012 OH
0.007 OH
2.22 8.396 Btg
0.266 kg
1.098 OH
0.549 OH
0.055 OH
0.055 OH
0.067 m3
0.666 kg
0.333 liter
0.030 m3
0.582 Lbr
3.328 Batang
8.00 OH
1.00 OH
2.00 OH
3.00 OH
1.00 OH
1.00 OH
11.00 Zak
1.00 M3
1.00 M3
261.00 Liter
14.00 Btg
9.00 Btg
22.00 Btg
3.00 kg
0.27 m3
3.00 kg
2.00 liter
0.08 m3
2.00 Lbr
10.00 Batang
Diambil
Jam
Jam
Jam
Jam
Jam
ANALISA KEBUTUHAN
NO Analisa Uraian Volume
REKAPITULASI PEKERJAAN
No Uraian Volume
UPAH
1 Pekerja 37.59
2 Tukang batu 16.71
3 Kepala Tukang 1.67
4 Mandor 1.88
BAHAN
1 Bata Merah 2,923.76
2 Semen Portland 25.04
3 Pasir Pasang 3.801
ALAT
1
2
3
4
5
HAN
Kebutuhan
Volume Berat Jenis Satuan
Upah/Bahan
ERAN
M2
12.530 OH
4.177 OH
0.418 OH
0.627 OH
2,923.760 bh
40 12.008 Zak
1.796 m3
M2
25.061 OH
12.530 OH
1.253 OH
1.253 OH
40 13.032 Zak
2.005 m3
OH 38.00 OH
OH 17.00 OH
OH 2.00 OH
OH 2.00 OH
Bh 2,924.00 Bh
Zak 26.00 Zak
M3 4.00 M3
Diambil
Jam
Jam
Jam
Jam
Jam
ANALISA KEBUTUHAN
NO Analisa Uraian Volume
PEKERJAAN PENGECETAN
Pekerja 0.0200 OH
Tukang Cat 0.0630 OH
Kepala Tukang 0.0063 OH
Mandor 0.0030 OH
Plamur 0.100 kg
Cat Dasar 0.100 kg
Cat Penutup 0.260 kg
REKAPITULASI PEKERJAAN
No Uraian Volume
UPAH
1 Pekerja 1.69
2 Tukang Cat 5.32
3 Kepala Tukang 0.53
4 Mandor 0.25
BAHAN
1 Plamur 8.45
2 Cat Dasar ( Tembok ) 8.45
3 Cat Penutup ( Tembok ) 21.96
ALAT
1
2
TUHAN
Kebutuhan
Volume Berat Jenis Satuan
Upah/Bahan
N
M2
1.690 OH
5.322 OH
0.532 OH
0.253 OH
8.448 kg
8.448 kg
21.965 kg
AN
Berat Jenis Dibulatkan
OH 2.00 OH
OH 6.00 OH
OH 1.00 OH
OH 1.00 OH
Kg 9.00 Kg
Kg 9.00 Kg
Kg 22.00 Kg
Diambil
Jam
Jam
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A. 2.2.1.2 Pembuatan 1 m² pagar sementara dari seng gelombang tinggi 2 meter
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.200 86,100.00
Tukang kayu L.02 OH 0.400 100,737.00
Kepala Tukang L.03 OH 0.020 108,486.00
Mandor L.04 OH 0.020 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Dolken Kayu Ø8-10/400 cm Batang 1.250 27,113.00
Semen Portland Kg 2.500 1,646.15
Seng Gelombang Lembar 1.200 58,099.00
Pasir Beton m3 0.005 153,640.00
Kerikil m3 0.009 209,158.00
Kayu 5/7 m3 0.072 4,938,457.00
Paku Biasa 2" - 5" Kg 0.060 21,948.00
Cat Meni Liter 0.450 34,859.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.100 86,100.00
Tukang kayu L.02 OH 0.100 100,737.00
Kepala Tukang L.03 OH 0.010 108,486.00
Mandor L.04 OH 0.005 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Balok 5/7 m3 0.012 4,938,457.00
Paku 2"-3" Kg 0.020 21,948.00
Kayu Papan 3/20 m3 0.007 4,938,457.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.750 86,100.00
Mandor L.04 OH 0.025 109,347.00
Jumlah Tenaga Kerja
B BAHAN
A TENAGA
Pekerja L.01 OH 0.250 86,100.00
Mandor L.04 OH 0.008 109,347.00
Jumlah Tenaga Kerja
B BAHAN
A TENAGA
Pekerja L.01 OH 0.300 86,100.00
Mandor L.04 OH 0.010 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Pasir Urug m3 1.200 71,010.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.300 86,100.00
Mandor L.04 OH 0.010 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Tanah Timbun m3 1.200 51,644.00
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C)
E Harga Satuan Pekerjaan
A TENAGA
Pekerja L.01 OH 1.500 86,100.00
Tukang batu L.02 OH 0.750 100,737.00
Kepala Tukang L.03 OH 0.075 108,486.00
Mandor L.04 OH 0.075 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Batu Belah/ Kali m3 1.200 197,538.00
Semen Portland Kg 163.000 1,646.15
Pasir Pasang m3 0.520 153,640.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.780 86,100.00
Tukang batu L.02 OH 0.390 100,737.00
Kepala Tukang L.03 OH 0.039 108,486.00
Mandor L.04 OH 0.039 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Batu Kali m3 1.200 197,538.00
Pasir Urug m3 0.432 71,010.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 3.400 86,100.00
Tukang batu L.02 OH 0.850 100,737.00
Kepala Tukang L.03 OH 0.085 108,486.00
Mandor L.04 OH 0.170 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Batu Kali m3 0.480 197,538.00
Semen Portland kg 194.000 1,646.15
Pasir Beton m3 0.312 153,640.00
Kerikil m3 0.468 209,158.00
Besi Beton Polos kg 126.000 16,784.00
Kawat Beton kg 1.800 21,948.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 2.400 86,100.00
Tukang batu L.02 OH 0.800 100,737.00
Kepala Tukang L.03 OH 0.080 108,486.00
Mandor L.04 OH 0.119 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Batu Kali m3 0.450 197,538.00
Semen Portland kg 194.000 1,646.15
Pasir Beton m3 0.312 153,640.00
Kerikil m3 0.468 209,158.00
Jumlah Harga Bahan
C PERALATAN
A. 4.1.1.1 Membuat 1 m3 beton mutu f'c = 7.4 Mpa (K 100),slump (12 ± 2) cm, w/c = 0.87
A TENAGA
Pekerja L.01 OH 1.650 86,100.00
Tukang batu L.02 OH 0.275 100,737.00
Kepala Tukang L.03 OH 0.028 108,486.00
Mandor L.04 OH 0.083 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 247 1,646.15
Pasir Beton kg 869 109.74
Kerikil (Maks 30 mm) kg 999 154.93
Air Liter 215 150.00
Jumlah Harga Bahan
C PERALATAN
A. 4.1.1.2 Membuat 1 m3 beton mutu f'c = 9.8 Mpa (K 125),slump (12 ± 2) cm, w/c = 0.78
A TENAGA
Pekerja L.01 OH 1.650 86,100.00
Tukang batu L.02 OH 0.275 100,737.00
Kepala Tukang L.03 OH 0.028 108,486.00
Mandor L.04 OH 0.083 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 276 1,646.15
Pasir Beton kg 828 109.74
Kerikil (Maks 30 mm) kg 1,012 154.93
Air Liter 215 150.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.650 86,100.00
Tukang batu L.02 OH 0.275 100,737.00
Kepala Tukang L.03 OH 0.028 108,486.00
Mandor L.04 OH 0.083 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 299 1,646.15
Pasir Beton kg 799 109.74
Kerikil (Maks 30 mm) kg 1,017 154.93
Air Liter 215 150.00
Jumlah Harga Bahan
C PERALATAN
A. 4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f'c = 7.4 Mpa (K 100),slump (3 - 6) cm, w/c = 0.87
A TENAGA
Pekerja L.01 OH 1.200 86,100.00
Tukang batu L.02 OH 0.200 100,737.00
Kepala Tukang L.03 OH 0.020 108,486.00
Mandor L.04 OH 0.060 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 230 1,646.15
Pasir Beton kg 893 109.74
Kerikil (Maks 30 mm) kg 1,027 154.93
Air Liter 200 150.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.650 86,100.00
Tukang batu L.02 OH 0.275 100,737.00
Kepala Tukang L.03 OH 0.028 108,486.00
Mandor L.04 OH 0.083 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 326 1,646.15
Pasir Beton kg 760 109.74
Kerikil (Maks 30 mm) kg 1,029 154.93
Air Liter 215 150.00
Jumlah Harga Bahan
C PERALATAN
A. 4.1.1.6 Membuat 1 m3 beton mutu f'c = 16.9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0.61
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 1.650 86,100.00
Tukang batu L.02 OH 0.275 100,737.00
Kepala Tukang L.03 OH 0.028 108,486.00
Mandor L.04 OH 0.083 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 352 1,646.15
Pasir Beton kg 731 109.74
Kerikil (Maks 30 mm) kg 1,031 154.93
Air Liter 215 150.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.650 86,100.00
Tukang batu L.02 OH 0.275 100,737.00
Kepala Tukang L.03 OH 0.028 108,486.00
Mandor L.04 OH 0.083 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 371 1,646.15
Pasir Beton kg 698 109.74
Kerikil (Maks 30 mm) kg 1,047 154.93
Air Liter 215 150.00
Jumlah Harga Bahan
C PERALATAN
A. 4.1.1.8 Membuat 1 m3 beton mutu f'c = 21.7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0.56
A TENAGA
Pekerja L.01 OH 1.650 86,100.00
Tukang batu L.02 OH 0.275 100,737.00
Kepala Tukang L.03 OH 0.028 108,486.00
Mandor L.04 OH 0.083 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 384 1,646.15
Pasir Beton kg 692 109.74
Kerikil (Maks 30 mm) kg 1,039 154.93
Air Liter 215 150.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.650 86,100.00
Tukang batu L.02 OH 0.275 100,737.00
Kepala Tukang L.03 OH 0.028 108,486.00
Mandor L.04 OH 0.083 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 406 1,646.15
Pasir Beton kg 684 109.74
Kerikil (Maks 30 mm) kg 1,026 154.93
Air Liter 215 150.00
Jumlah Harga Bahan
C PERALATAN
A. 4.1.1.10 Membuat 1 m3 beton mutu f'c = 26.4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0.52
A TENAGA
Pekerja L.01 OH 1.650 86,100.00
Tukang batu L.02 OH 0.275 100,737.00
Kepala Tukang L.03 OH 0.028 108,486.00
Mandor L.04 OH 0.083 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 413 1,646.15
Pasir Beton kg 681 109.74
Kerikil (Maks 30 mm) kg 1,021 154.93
Air Liter 215 150.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 2.100 86,100.00
Tukang batu L.02 OH 0.350 100,737.00
Kepala Tukang L.03 OH 0.035 108,486.00
Mandor L.04 OH 0.105 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 439 1,646.15
Pasir Beton kg 670 109.74
Kerikil (Maks 30 mm) kg 1,006 154.93
Air Liter 215 150.00
Jumlah Harga Bahan
C PERALATAN
A. 4.1.1.12 Membuat 1 m3 beton mutu f'c = 31.2 Mpa (K 350), slump (12 ± 2) cm, w/c = 0.48
A TENAGA
Pekerja L.01 OH 2.100 86,100.00
Tukang batu L.02 OH 0.350 100,737.00
Kepala Tukang L.03 OH 0.035 108,486.00
Mandor L.04 OH 0.105 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 448 1,646.15
Pasir Beton kg 667 109.74
Kerikil (Maks 30 mm) kg 1,000 154.93
Air Liter 215 150.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.070 86,100.00
Tukang besi L.02 OH 0.070 100,737.00
Kepala Tukang L.03 OH 0.007 108,486.00
Mandor L.04 OH 0.004 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Besi Beton Polos kg 10.500 16,784.00
Kawat Beton kg 0.150 21,948.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.070 86,100.00
Tukang besi L.02 OH 0.070 100,737.00
Kepala Tukang L.03 OH 0.007 108,486.00
Mandor L.04 OH 0.004 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Besi Beton Ulir kg 10.500 18,075.00
Kawat Beton kg 0.150 21,948.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.520 86,100.00
Tukang kayu L.02 OH 0.260 100,737.00
Kepala Tukang L.03 OH 0.026 108,486.00
Mandor L.04 OH 0.026 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.040 3,692,520.00
Paku 5 - 10 cm kg 0.300 21,948.00
Minyak Bekesting liter 0.100 28,404.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.520 86,100.00
Tukang kayu L.02 OH 0.260 100,737.00
Kepala Tukang L.03 OH 0.026 108,486.00
Mandor L.04 OH 0.026 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.045 3,692,520.00
Paku 5 - 10 cm kg 0.300 21,948.00
Minyak Bekesting liter 0.100 28,404.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.660 86,100.00
Tukang kayu L.02 OH 0.330 100,737.00
Kepala Tukang L.03 OH 0.033 108,486.00
Mandor L.04 OH 0.033 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.040 3,692,520.00
Paku 5 - 10 cm kg 0.400 21,948.00
Minyak Bekesting liter 0.200 28,404.00
Balok Kayu Klas II m3 0.015 6,584,610.00
Plywood tebal 9 mm Lbr 0.350 197,538.00
Dolken kayu ᴓ 8 - 10 cm -
Batang 2.000 27,113.00
panjang 4 m
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.660 86,100.00
Tukang kayu L.02 OH 0.330 100,737.00
Kepala Tukang L.03 OH 0.033 108,486.00
Mandor L.04 OH 0.033 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.040 3,692,520.00
Paku 5 - 10 cm kg 0.400 21,948.00
Minyak Bekesting liter 0.200 28,404.00
Balok Kayu Klas II m3 0.018 6,584,610.00
Plywood tebal 9 mm Lbr 0.350 197,538.00
Dolken kayu ᴓ 8 - 10 cm -
Batang 2.000 27,113.00
panjang 4 m
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.660 86,100.00
Tukang kayu L.02 OH 0.330 100,737.00
Kepala Tukang L.03 OH 0.033 108,486.00
Mandor L.04 OH 0.033 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.040 3,692,520.00
Paku 5 - 10 cm kg 0.400 21,948.00
Minyak Bekesting liter 0.200 28,404.00
Balok Kayu Klas II m3 0.015 6,584,610.00
Plywood tebal 9 mm Lbr 0.350 197,538.00
Dolken kayu ᴓ 8 - 10 cm -
Batang 6.000 27,113.00
panjang 4 m
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.660 86,100.00
Tukang kayu L.02 OH 0.330 100,737.00
Kepala Tukang L.03 OH 0.033 108,486.00
Mandor L.04 OH 0.033 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.030 3,692,520.00
Paku 5 - 10 cm kg 0.400 21,948.00
Minyak Bekesting liter 0.200 28,404.00
Balok Kayu Klas II m3 0.020 6,584,610.00
Plywood tebal 9 mm Lbr 0.350 197,538.00
Dolken kayu ᴓ 8 - 10 cm -
Batang 3.000 27,113.00
panjang 4 m
Penjaga Jarak bekesting/
Buah 4.000 5,000.00
spacer
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.660 86,100.00
Tukang kayu L.02 OH 0.330 100,737.00
Kepala Tukang L.03 OH 0.033 108,486.00
Mandor L.04 OH 0.033 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.030 3,692,520.00
Paku 5 - 10 cm kg 0.400 21,948.00
Minyak Bekesting liter 0.150 28,404.00
Balok Kayu Klas II m3 0.015 6,584,610.00
Plywood tebal 9 mm Lbr 0.350 197,538.00
Dolken kayu ᴓ 8 - 10 cm -
Batang 2.000 27,113.00
panjang 4 m
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga Alat
D Jumlah (A + B + C)
E Harga Satuan Pekerjaan
A. 4.1.1.27 Pemasangan 1m2 jembatan untuk pengecoran beton
A TENAGA
Pekerja L.01 OH 0.150 86,100.00
Tukang kayu L.02 OH 0.050 100,737.00
Kepala Tukang L.03 OH 0.005 108,486.00
Mandor L.04 OH 0.008 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Kayu Klas III m3 0.026 3,692,520.00
Paku 5 - 10 cm kg 0.600 21,948.00
Dolken kayu ᴓ 8 - 10 cm -
Batang 0.500 27,113.00
panjang 4 m
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.060 86,100.00
Tukang besi L.03 OH 0.060 100,737.00
Kepala Tukang L.03 OH 0.006 108,486.00
Mandor L.04 OH 0.003 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Besi Baja IWF kg 1.150 36,150.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.100 86,100.00
Tukang besi L.03 OH 0.100 100,737.00
Kepala Tukang L.03 OH 0.001 108,486.00
Mandor L.04 OH 0.005 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Solar Liter 1.000 10,492.00
Minyak Pelumas Liter 0.100 41,315.00
Jumlah Harga Bahan
C PERALATAN
Sewa Alat Jam 0.800 150,000.00
Jumlah Harga Alat
D Jumlah (A + B + C)
E Harga Satuan Pekerjaan
A. 4.2.1.20 Pemasangan 1 m2 rangka besi hollow 1 x 40.40.2 mm, modul 60 x 120 cm, dinding partisi
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.250 86,100.00
Tukang besi L.03 OH 0.250 100,737.00
Kepala Tukang L.03 OH 0.025 108,486.00
Mandor L.04 OH 0.013 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Rangka metal Hollow
m' 3.500 8,500.00
40.40.2 mm
Assesories (perkuatan,las.
Ls 1.000 8,500.00
dll), 100% dari rangka
Jumlah Harga Bahan
C PERALATAN
A. 4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1 x 40.40.2 mm, modul 60 x 60 cm, plafon
A TENAGA
Pekerja L.01 OH 0.350 86,100.00
Tukang besi L.03 OH 0.350 100,737.00
Kepala Tukang L.03 OH 0.035 108,486.00
Mandor L.04 OH 0.018 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Rangka metal Hollow
m' 4.000 8,500.00
40.40.2 mm
Assesories (perkuatan,las.
Ls 1.000 8,500.00
dll), 100% dari rangka
Jumlah Harga Bahan
C PERALATAN
A. 4.4.1.1 Pemasangan 1 m2 dinding bata merah (5 x11x 22) cm tebal 1 batu campuran 1SP : 2PP
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.600 86,100.00
Tukang batu L.02 OH 0.200 100,737.00
Kepala Tukang L.03 OH 0.020 108,486.00
Mandor L.04 OH 0.030 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Bata Merah bh 140.00 774.00
Semen Portland kg 43.50 1,646.15
Pasir Pasang m3 0.080 153,640.00
Jumlah Harga Bahan
C PERALATAN
A. 4.4.1.3 Pemasangan 1 m2 dinding bata merah (5 x11x 22) cm tebal 1 batu campuran 1SP : 4PP
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.600 86,100.00
Tukang batu L.02 OH 0.200 100,737.00
Kepala Tukang L.03 OH 0.020 108,486.00
Mandor L.04 OH 0.030 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Bata Merah bh 140.00 774.00
Semen Portland kg 26.55 1,646.15
Pasir Pasang m3 0.093 153,640.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.300 86,100.00
Tukang batu L.02 OH 0.100 100,737.00
Kepala Tukang L.03 OH 0.010 108,486.00
Mandor L.04 OH 0.015 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Bata Merah bh 70.000 774.00
Semen Portland kg 18.950 1,646.15
Pasir Pasang m3 0.038 153,640.00
Jumlah Harga Bahan
C PERALATAN
A. 4.4.1.8 Pemasangan 1 m2 dinding bata merah (5 x11x 22) cm tebal 1/2 batu campuran 1SP : 3PP
A TENAGA
Pekerja L.01 OH 0.300 86,100.00
Tukang batu L.02 OH 0.100 100,737.00
Kepala Tukang L.03 OH 0.010 108,486.00
Mandor L.04 OH 0.015 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Bata Merah bh 70.000 774.00
Semen Portland kg 14.370 1,646.15
Pasir Pasang m3 0.040 153,640.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.300 86,100.00
Tukang batu L.02 OH 0.100 100,737.00
Kepala Tukang L.03 OH 0.010 108,486.00
Mandor L.04 OH 0.015 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Bata Merah bh 70.000 774.00
Semen Portland kg 11.500 1,646.15
Pasir Pasang m3 0.043 153,640.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.300 86,100.00
Tukang batu L.02 OH 0.150 100,737.00
Kepala Tukang L.03 OH 0.015 108,486.00
Mandor L.04 OH 0.015 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 15.504 1,646.15
Pasir Pasang m3 0.016 153,640.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.300 86,100.00
Tukang batu L.02 OH 0.150 100,737.00
Kepala Tukang L.03 OH 0.015 108,486.00
Mandor L.04 OH 0.015 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 10.224 1,646.15
Pasir Pasang m3 0.020 153,640.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.300 86,100.00
Tukang batu L.02 OH 0.150 100,737.00
Kepala Tukang L.03 OH 0.015 108,486.00
Mandor L.04 OH 0.015 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 7.776 1,646.15
Pasir Pasang m3 0.023 153,640.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.300 86,100.00
Tukang batu L.02 OH 0.150 100,737.00
Kepala Tukang L.03 OH 0.015 108,486.00
Mandor L.04 OH 0.015 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 6.240 1,646.15
Pasir Pasang m3 0.024 153,640.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.200 86,100.00
Tukang batu L.02 OH 0.100 100,737.00
Kepala Tukang L.03 OH 0.010 108,486.00
Mandor L.04 OH 0.010 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Semen Portland kg 3.250 1,646.15
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.700 86,100.00
Tukang batu L.02 OH 0.350 100,737.00
Kepala Tukang L.03 OH 0.035 108,486.00
Mandor L.04 OH 0.035 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Keramik Bh 11.870 6,390.96
Semen Portland kg 10.000 1,646.15
Pasir Pasang m3 0.045 153,640.00
Semen Warna kg 1.500 3,072.80
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.700 86,100.00
Tukang batu L.02 OH 0.350 100,737.00
Kepala Tukang L.03 OH 0.035 108,486.00
Mandor L.04 OH 0.035 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Keramik Bh 26.500 2,840.40
Semen Portland kg 10.400 1,646.15
Pasir Pasang m3 0.045 153,640.00
Semen Warna kg 1.620 3,072.80
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.900 86,100.00
Tukang batu L.02 OH 0.450 100,737.00
Kepala Tukang L.03 OH 0.045 108,486.00
Mandor L.04 OH 0.045 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Keramik Bh 10.000 7,101.00
Semen Portland kg 9.300 1,646.15
Pasir Pasang m3 0.018 153,640.00
Semen Warna kg 1.940 3,072.80
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.350 86,100.00
Tukang L.02 OH 0.175 100,737.00
Kepala Tukang L.03 OH 0.017 108,486.00
Mandor L.04 OH 0.002 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Walpaper m 2.200 23,000.00
Lem kg 0.250 25,000.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.100 86,100.00
Tukang Kayu L.02 OH 0.100 100,737.00
Kepala Tukang L.03 OH 0.010 108,486.00
Mandor L.04 OH 0.005 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Triplex Lembar 0.375 114,907.00
Paku Triplex kg 0.030 21,948.00
Jumlah Harga Bahan
C PERALATAN
A. 4.5.1.7 Pemasangan 1 m2 Langit-langit Gypsum Board ukuran (120 x 240) cm, tebal 9 mm
A TENAGA
Pekerja L.01 OH 0.100 86,100.00
Tukang Kayu L.02 OH 0.050 100,737.00
Kepala Tukang L.03 OH 0.005 108,486.00
Mandor L.04 OH 0.005 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Gypsum Board Lembar 0.364 86,500.00
Paku Skrup kg 0.110 38,733.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.050 86,100.00
Tukang Kayu L.02 OH 0.050 100,737.00
Kepala Tukang L.03 OH 0.005 108,486.00
Mandor L.04 OH 0.003 109,347.00
Jumlah Tenaga Kerja
B BAHAN
List Kayu Profil m' 1.050 7,746.00
Paku kg 0.010 21,948.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.200 86,100.00
Tukang Kayu L.03 OH 0.100 100,737.00
Kepala Tukang L.11 OH 0.010 108,486.00
Mandor L.15 OH 0.010 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Genteng Beton Bh 11.000 7,000.00
Paku Biasa 2" - 5" kg 0.030 21,948.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.200 86,100.00
Tukang Kayu L.03 OH 0.100 100,737.00
Kepala Tukang L.11 OH 0.010 108,486.00
Mandor L.15 OH 0.010 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Genteng Metal Lbr 1.020 87,794.00
Paku Seng kg 0.200 23,239.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.400 86,100.00
Tukang Kayu L.03 OH 0.200 100,737.00
Kepala Tukang L.11 OH 0.020 108,486.00
Mandor L.15 OH 0.020 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Nok Genteng Beton Bh 3.500 18,000.00
Paku Biasa 1/2"-1" kg 0.050 21,948.00
Semen Portland kg 10.800 1,646.15
Pasir Pasang m3 0.032 153,640.00
Semen Warna kg 1.000 3,072.80
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.250 86,100.00
Tukang Kayu L.03 OH 0.150 100,737.00
Kepala Tukang L.11 OH 0.015 108,486.00
Mandor L.15 OH 0.013 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Nok Genteng Metal Bh 1.100 35,000.00
Paku Seng kg 0.050 23,239.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.120 86,100.00
Tukang Kayu L.03 OH 0.060 100,737.00
Kepala Tukang L.11 OH 0.006 108,486.00
Mandor L.15 OH 0.006 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Seng Gelombang Lbr 0.700 58,099.00
Paku Seng kg 0.020 23,239.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.150 86,100.00
Tukang Kayu L.03 OH 0.750 100,737.00
Kepala Tukang L.11 OH 0.080 108,486.00
Mandor L.15 OH 0.006 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Almn Gelombang tbl 0.55 Lbr 1.050 115,000.00
Paku Hak Panjang 15 cm kg 0.020 23,239.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.100 86,100.00
Tukang Kayu L.03 OH 1.000 100,737.00
Kepala Tukang L.11 OH 0.100 108,486.00
Mandor L.15 OH 0.050 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Nok Standar 40 x 18 Bh 1.200 25,000.00
Paku Hak Panjang 15 cm kg 0.040 23,239.00
Jumlah Harga Bahan
C PERALATAN
A. 4.6.1.1 Pembuatan dan Pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas I
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 7.000 86,100.00
Tukang Kayu L.03 OH 21.000 100,737.00
Kepala Tukang L.03 OH 2.100 108,486.00
Mandor L.04 OH 0.350 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Balok Kayu m3 1.100 7,463,849.00
Paku kg 1.250 21,948.00
Lem Kayu kg 1.000 23,239.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 6.000 86,100.00
Tukang Kayu L.03 OH 18.000 100,737.00
Kepala Tukang L.03 OH 1.800 108,486.00
Mandor L.04 OH 0.300 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Balok Kayu m3 1.200 6,584,610.00
Paku kg 1.250 21,948.00
Lem Kayu kg 1.000 23,239.00
Jumlah Harga Bahan
C PERALATAN
A. 4.6.1.5 Pembuatan dan Pemasangan 1m2 Daun Pintu Panel, kayu kelas II
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 1.000 86,100.00
Tukang Kayu L.03 OH 3.000 100,737.00
Kepala Tukang L.03 OH 0.300 108,486.00
Mandor L.04 OH 0.050 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Papan Kayu m3 0.040 4,766,736.00
Lem Kayu kg 0.500 23,239.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.670 86,100.00
Tukang Kayu L.03 OH 2.000 100,737.00
Kepala Tukang L.03 OH 0.200 108,486.00
Mandor L.04 OH 0.335 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Papan Kayu m3 0.060 4,766,736.00
Lem Kayu kg 0.150 23,239.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 4.000 86,100.00
Tukang Kayu L.03 OH 12.000 100,737.00
Kepala Tukang L.03 OH 1.200 108,486.00
Mandor L.04 OH 0.200 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Balok Kayu m3 1.100 6,584,610.00
Besi Strip kg 15.000 16,784.00
Paku kg 5.600 21,948.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 6.700 86,100.00
Tukang Kayu L.03 OH 20.100 100,737.00
Kepala Tukang L.03 OH 2.010 108,486.00
Mandor L.04 OH 0.335 109,347.00
Jumlah Tenaga Kerja
B BAHAN `
Balok Kayu m3 1.100 6,584,610.00
Besi Strip kg 15.000 16,784.00
Paku kg 3.000 21,948.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.100 86,100.00
Tukang Kayu L.03 OH 0.100 100,737.00
Kepala Tukang L.03 OH 0.010 108,486.00
Mandor L.04 OH 0.005 109,347.00
Jumlah Tenaga Kerja
B BAHAN `
Kaso 5 x 7 cm m3 0.014 6,584,610.00
Reng (3 x 4) cm m3 0.057 6,584,610.00
Paku kg 0.250 21,948.00
Jumlah Harga Bahan
C PERALATAN
A. 4.6.1.20 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas I atau II
No. Uraian Kode Satuan Koeefisien Harga Satuan
A TENAGA
Pekerja L.01 OH 0.200 86,100.00
Tukang Kayu L.03 OH 0.300 100,737.00
Kepala Tukang L.03 OH 0.030 108,486.00
Mandor L.04 OH 0.010 109,347.00
Jumlah Tenaga Kerja
B BAHAN `
Kaso 5 x 7 cm m3 0.0163 6,584,610.00
Paku kg 0.250 21,948.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.100 86,100.00
Tukang Kayu L.03 OH 0.200 100,737.00
Kepala Tukang L.03 OH 0.020 108,486.00
Mandor L.04 OH 0.005 109,347.00
Jumlah Tenaga Kerja
B BAHAN `
Papan Kayu m3 0.0110 6,584,610.00
Paku kg 0.050 21,948.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.010 86,100.00
Tukang Kayu L.02 OH 0.500 100,737.00
Kepala Tukang L.03 OH 0.050 108,486.00
Mandor L.04 OH 0.005 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Kunci Tanam Biasa Bh 1.000 127,000.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.015 86,100.00
Tukang Kayu L.02 OH 0.150 100,737.00
Kepala Tukang L.03 OH 0.015 108,486.00
Mandor L.04 OH 0.0008 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Engsel Pintu Bh 1.000 27,113.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.015 86,100.00
Tukang Kayu L.02 OH 0.150 100,737.00
Kepala Tukang L.03 OH 0.015 108,486.00
Mandor L.04 OH 0.008 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Kait Angin Bh 1.000 11,619.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.015 86,100.00
Tukang Kayu L.02 OH 0.150 100,737.00
Kepala Tukang L.03 OH 0.015 108,486.00
Mandor L.04 OH 0.0008 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Kaca Tebal 5 mm m2 1.100 126,527.00
Sealant kg 0.050 25,000.00
Jumlah Harga Bahan
C PERALATAN
A. 4.7.1.4 Pengecatan 1 m2 bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
Pekerja L.01 OH 0.070 86,100.00
Tukang Cat L.02 OH 0.009 100,737.00
Kepala Tukang L.03 OH 0.006 108,486.00
Mandor L.04 OH 0.003 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Cat Menie kg 0.200 34,859.00
Plamur kg 0.150 61,972.00
Cat Dasar kg 0.170 34,859.00
Cat Penutup kg 0.260 60,681.00
Kuas Bh 0.010 13,000.00
Thinner Ltr 0.030 21,948.00
Amplas Lbr 0.200 9,037.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.100 86,100.00
Mandor L.04 OH 0.006 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Residu atau ter Liter 0.350 28,404.00
Jumlah Harga Bahan
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.020 86,100.00
Tukang Cat L.02 OH 0.063 100,737.00
Kepala Tukang L.03 OH 0.0063 108,486.00
Mandor L.04 OH 0.003 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Plamur kg 0.100 61,972.00
Cat Dasar kg 0.100 34,859.00
Cat Penutup kg 0.260 41,315.00
Jumlah Harga Bahan
C PERALATAN
A. 4.7.1.11 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
A TENAGA
Pekerja L.01 OH 0.028 86,100.00
Tukang Cat L.02 OH 0.042 100,737.00
Kepala Tukang L.03 OH 0.0042 108,486.00
Mandor L.04 OH 0.003 109,347.00
Jumlah Tenaga Kerja
B BAHAN
Cat Dasar kg 0.120 34,859.00
Cat Penutup kg 0.180 41,315.00
Jumlah Harga Bahan
C PERALATAN
Jumlah Harga
17,220.00
40,294.80
2,169.72
2,186.94
61,871.46
33,891.25
4,115.38
69,718.80
768.20
1,882.42
355,568.90
1,316.88
15,686.55
482,948.38
544,819.84
544,819.00
Jumlah Harga
8,610.00
10,073.70
1,084.86
546.74
20,315.30
59,261.48
438.96
34,569.20
94,269.64
114,584.94
114,584.00
Jumlah Harga
172,200.00
201,474.00
100,737.00
32,545.80
5,467.35
512,424.15
33,891.25
888,922.26
1,755.84
18,462.40
57,615.25
23,046.00
15,364.00
31,373.70
23,220.00
18,075.00
100,000.00
10,122.16
19,050.00
6,894.42
1,247,792.28
1,760,216.43
1,760,216.00
Jumlah Harga
86,100.00
151,105.50
16,272.90
5,467.35
258,945.75
81,339.00
1,363,014.13
15,363.60
87,148.50
1,546,865.23
1,805,810.98
1,805,810.00
Jumlah Harga
86,100.00
201,474.00
21,697.20
5,467.35
314,738.55
46,092.10
737,476.32
6,584.40
17,284.58
4,609.20
10,457.90
87,148.50
18,075.00
927,728.00
1,242,466.55
1,242,466.00
Jumlah Harga
86,100.00
201,474.00
21,697.20
5,467.35
314,738.55
33,891.25
918,553.00
6,584.40
29,630.70
4,609.20
10,457.90
87,148.50
155,124.45
1,245,999.40
1,560,737.95
1,560,737.00
Jumlah Harga
8,610.00
5,467.35
14,077.35
14,077.35
14,077.00
Jumlah Harga
30,221.10
3,254.58
33,475.68
132,930.72
62,772.84
1,755.84
197,459.40
230,935.08
230,935.00
Jumlah Harga
86,100.00
546.74
86,646.74
41,444.25
37,532.25
1,536.40
80,512.90
167,159.64
167,159.00
Jumlah Harga
1,148,057.40
72,825.10
1,220,882.50
1,220,882.50
1,220,882.00
Jumlah Harga
574,028.70
36,412.55
610,441.25
610,441.25
610,441.00
AH
Jumlah Harga
64,575.00
2,733.68
67,308.68
67,308.68
67,308.00
Jumlah Harga
77,490.00
4,920.62
82,410.62
82,410.62
82,410.00
Jumlah Harga
90,405.00
7,326.25
97,731.25
97,731.25
97,731.00
Jumlah Harga
21,525.00
874.78
22,399.78
22,399.78
22,399.00
Jumlah Harga
43,050.00
5,467.35
48,517.35
48,517.35
48,517.00
Jumlah Harga
25,830.00
1,093.47
26,923.47
85,212.00
85,212.00
112,135.47
112,135.00
Jumlah Harga
25,830.00
1,093.47
26,923.47
61,972.80
61,972.80
88,896.27
88,896.00
ASI
Jumlah Harga
129,150.00
75,552.75
8,136.45
8,201.03
221,040.23
237,045.60
332,522.30
74,515.40
644,083.30
865,123.53
865,123.00
Jumlah Harga
129,150.00
75,552.75
8,136.45
8,201.03
221,040.23
237,045.60
268,322.45
79,892.80
585,260.85
806,301.08
806,301.00
Jumlah Harga
67,158.00
39,287.43
4,230.95
4,264.53
114,940.92
237,045.60
30,676.32
267,721.92
382,662.84
382,662.00
: 3KR dan 40% Batu Belah
Jumlah Harga
292,740.00
85,626.45
9,221.31
18,588.99
406,176.75
94,818.24
319,353.10
47,935.68
97,885.94
2,114,784.00
39,506.40
2,714,283.36
3,120,460.11
3,120,460.00
Jumlah Harga
206,640.00
80,589.60
8,678.88
13,012.29
308,920.77
88,892.10
319,353.10
47,935.68
97,885.94
554,066.82
862,987.60
862,987.00
ON
Jumlah Harga
142,065.00
27,702.68
3,037.61
9,075.80
181,881.08
406,599.05
95,366.54
154,776.92
32,250.00
688,992.51
870,873.60
870,873.00
Jumlah Harga
142,065.00
27,702.68
3,037.61
9,075.80
181,881.08
454,337.40
90,867.09
156,791.03
32,250.00
734,245.52
916,126.60
916,126.00
± 2) cm, w/c = 0.72
Jumlah Harga
142,065.00
27,702.68
3,037.61
9,075.80
181,881.08
492,198.85
87,684.54
157,565.69
32,250.00
769,699.09
951,580.17
951,580.00
Jumlah Harga
103,320.00
20,147.40
2,169.72
6,560.82
132,197.94
378,614.50
98,000.37
159,115.01
30,000.00
665,729.88
797,927.82
797,927.00
2 ± 2) cm, w/c = 0.66
Jumlah Harga
142,065.00
27,702.68
3,037.61
9,075.80
181,881.08
536,644.90
83,404.57
159,424.88
32,250.00
811,724.35
993,605.43
993,605.00
142,065.00
27,702.68
3,037.61
9,075.80
181,881.08
579,444.80
80,222.03
159,734.74
32,250.00
851,651.57
1,033,532.65
1,033,532.00
), slump (12 ± 2) cm, w/c = 0.58
Jumlah Harga
142,065.00
27,702.68
3,037.61
9,075.80
181,881.08
610,721.65
76,600.51
162,213.65
32,250.00
881,785.81
1,063,666.90
1,063,666.00
Jumlah Harga
142,065.00
27,702.68
3,037.61
9,075.80
181,881.08
632,121.60
75,942.06
160,974.19
32,250.00
901,287.85
1,083,168.94
1,083,168.00
± 2) cm, w/c = 0.53
Jumlah Harga
142,065.00
27,702.68
3,037.61
9,075.80
181,881.08
668,336.90
75,064.11
158,960.08
32,250.00
934,611.09
1,116,492.18
1,116,492.00
Jumlah Harga
142,065.00
27,702.68
3,037.61
9,075.80
181,881.08
679,859.95
74,734.89
158,185.42
32,250.00
945,030.26
1,126,911.34
1,126,911.00
2 ± 2) cm, w/c = 0.49
Jumlah Harga
180,810.00
35,257.95
3,797.01
11,481.44
231,346.40
722,659.85
73,527.71
155,861.44
32,250.00
984,299.01
1,215,645.40
1,215,645.00
Jumlah Harga
180,810.00
35,257.95
3,797.01
11,481.44
231,346.40
737,475.20
73,198.49
154,931.85
32,250.00
997,855.54
1,229,201.93
1,229,201.00
Jumlah Harga
6,027.00
7,051.59
759.40
437.39
14,275.38
176,232.00
3,292.20
179,524.20
193,799.58
193,799.00
19,379.90
Jumlah Harga
6,027.00
7,051.59
759.40
437.39
14,275.38
189,787.50
3,292.20
193,079.70
207,355.08
207,355.00
20,735.50
Jumlah Harga
2,152.50
2,518.43
2,712.15
109.35
7,492.42
204,000.00
1,097.40
205,097.40
212,589.82
212,589.00
Jumlah Harga
44,772.00
26,191.62
2,820.64
2,843.02
76,627.28
147,700.80
6,584.40
2,840.40
157,125.60
233,752.88
233,752.00
Jumlah Harga
44,772.00
26,191.62
2,820.64
2,843.02
76,627.28
166,163.40
6,584.40
2,840.40
175,588.20
252,215.48
252,215.00
Jumlah Harga
56,826.00
33,243.21
3,580.04
3,608.45
97,257.70
147,700.80
8,779.20
5,680.80
98,769.15
69,138.30
54,226.000
384,294.25
481,551.95
481,551.00
Jumlah Harga
56,826.00
33,243.21
3,580.04
3,608.45
97,257.70
147,700.80
8,779.20
5,680.80
118,522.98
69,138.30
54,226.000
404,048.08
501,305.78
501,305.00
Jumlah Harga
56,826.00
33,243.21
3,580.04
3,608.45
97,257.70
147,700.80
8,779.20
5,680.80
98,769.15
69,138.30
162,678.000
492,746.25
590,003.95
590,003.00
Jumlah Harga
56,826.00
33,243.21
3,580.04
3,608.45
97,257.70
110,775.60
8,779.20
5,680.80
131,692.20
69,138.30
81,339.000
20,000.000
427,405.10
524,662.80
524,662.00
Jumlah Harga
56,826.00
33,243.21
3,580.04
3,608.45
97,257.70
110,775.60
8,779.20
4,260.60
98,769.15
69,138.30
54,226.000
345,948.85
443,206.55
443,206.00
Jumlah Harga
12,915.00
5,036.85
542.43
874.78
19,369.06
97,482.53
13,168.80
13,556.500
124,207.83
143,576.88
143,576.00
LUMINIUM
Jumlah Harga
5,166.00
6,044.22
650.92
328.04
12,189.18
41,572.50
41,572.50
53,761.68
53,761.00
Jumlah Harga
12,054.00
40,294.80
4,339.44
7,654.29
64,342.53
53,250.00
54,723.00
11,200.00
7,700.00
126,873.00
191,215.53
191,215.00
Jumlah Harga
8,610.00
10,073.70
108.49
546.74
19,338.92
10,492.00
4,131.50
14,623.50
120,000.00
120,000.00
153,962.42
153,962.00
120 cm, dinding partisi
Jumlah Harga
21,525.00
25,184.25
2,712.15
1,421.51
50,842.91
29,750.00
8,500.00
38,250.00
0.00
89,092.91
89,092.00
Jumlah Harga
30,135.00
35,257.95
3,797.01
1,968.25
71,158.21
34,000.00
8,500.00
42,500.00
0.00
113,658.21
113,658.00
DINDING
51,660.00
20,147.40
2,169.72
3,280.41
77,257.53
108,360.00
71,607.53
12,291.20
192,258.73
269,516.26
269,516.00
51,660.00
20,147.40
2,169.72
3,280.41
77,257.53
108,360.00
43,705.28
14,288.52
166,353.80
243,611.33
243,611.00
tu campuran 1SP : 2PP
Jumlah Harga
25,830.00
10,073.70
1,084.86
1,640.21
38,628.77
54,180.00
31,194.54
5,838.32
91,212.86
129,841.63
129,841.00
Jumlah Harga
25,830.00
10,073.70
1,084.86
1,640.21
38,628.77
54,180.00
23,655.18
6,145.60
83,980.78
122,609.54
122,609.00
tu campuran 1SP : 4PP
Jumlah Harga
25,830.00
10,073.70
1,084.86
1,640.21
38,628.77
54,180.00
18,930.73
6,606.52
79,717.25
118,346.01
118,346.00
ERAN
Jumlah Harga
25,830.00
15,110.55
1,627.29
1,640.21
44,208.05
25,521.91
2,458.24
27,980.15
72,188.19
72,188.00
Jumlah Harga
25,830.00
15,110.55
1,627.29
1,640.21
44,208.05
16,830.24
3,072.80
19,903.04
64,111.08
64,111.00
Jumlah Harga
25,830.00
15,110.55
1,627.29
1,640.21
44,208.05
12,800.46
3,533.72
16,334.18
60,542.23
60,542.00
Jumlah Harga
25,830.00
15,110.55
1,627.29
1,640.21
44,208.05
10,271.98
3,687.36
13,959.34
58,167.38
58,167.00
Jumlah Harga
25,830.00
10,073.70
1,084.86
1,640.21
38,628.77
7,111.37
921.84
8,033.21
46,661.97
46,661.00
Jumlah Harga
17,220.00
10,073.70
1,084.86
1,093.47
29,472.03
5,349.99
5,349.99
34,822.02
34,822.00
PENUTUP DINDING
Jumlah Harga
21,525.00
12,592.13
1,410.32
1,421.51
36,948.95
78,466.05
16,132.27
6,913.80
3,994.64
105,506.76
142,455.71
142,455.00
Jumlah Harga
20,664.00
12,088.44
1,301.83
1,312.16
35,366.44
221,071.41
15,803.04
4,609.20
6,913.80
248,397.45
283,763.88
283,763.00
Jumlah Harga
53,382.00
35,257.95
3,797.01
3,280.41
95,717.37
399,952.85
16,461.50
4,609.20
6,913.80
427,937.35
523,654.72
523,654.00
Jumlah Harga
60,270.00
35,257.95
3,797.01
3,827.15
103,152.11
75,860.74
16,461.50
6,913.80
4,609.20
103,845.24
206,997.35
206,997.00
Jumlah Harga
60,270.00
35,257.95
3,797.01
3,827.15
103,152.11
75,270.60
17,119.96
6,913.80
4,977.94
104,282.30
207,434.40
207,434.00
Jumlah Harga
60,270.00
35,257.95
3,797.01
3,827.15
103,152.11
82,113.96
17,119.96
6,913.80
4,977.94
111,125.66
214,277.76
214,277.00
Jumlah Harga
60,270.00
35,257.95
3,797.01
3,827.15
103,152.11
930,624.88
13,481.97
6,913.80
1,997.32
953,017.97
1,056,170.07
1,056,170.00
Jumlah Harga
77,490.00
45,331.65
4,881.87
4,920.62
132,624.14
75,270.60
15,309.20
2,765.52
5,961.23
99,306.55
231,930.68
231,930.00
Jumlah Harga
77,490.00
45,331.65
4,881.87
4,920.62
132,624.14
71,010.00
15,309.20
2,765.52
5,961.23
95,045.95
227,670.08
227,670.00
Jumlah Harga
30,135.00
17,628.98
1,844.26
218.69
49,826.93
50,600.00
6,250.00
56,850.00
106,676.93
106,676.00
T (PLAFOND)
Jumlah Harga
8,610.00
10,073.70
1,084.86
546.74
20,315.30
43,090.13
658.44
43,748.57
64,063.86
64,063.00
cm, tebal 9 mm
Jumlah Harga
8,610.00
5,036.85
542.43
546.74
14,736.02
31,486.00
4,260.63
35,746.63
50,482.65
50,482.00
Jumlah Harga
4,305.00
5,036.85
542.43
328.04
10,212.32
8,133.30
219.48
8,352.78
18,565.10
18,565.00
P ATAP
Jumlah Harga
17,220.00
10,073.70
1,084.86
1,093.47
29,472.03
77,000.00
658.44
77,658.44
107,130.47
107,130.00
Jumlah Harga
17,220.00
10,073.70
1,084.86
1,093.47
29,472.03
89,549.88
4,647.80
94,197.68
123,669.71
123,669.00
Jumlah Harga
34,440.00
20,147.40
2,169.72
2,186.94
58,944.06
63,000.00
1,097.40
17,778.42
4,916.48
3,072.80
89,865.10
148,809.16
148,809.00
Jumlah Harga
21,525.00
15,110.55
1,627.29
1,421.51
39,684.35
38,500.00
1,161.95
39,661.95
79,346.30
79,346.00
Jumlah Harga
10,332.00
6,044.22
650.92
656.08
17,683.22
40,669.30
464.78
41,134.08
58,817.30
58,817.00
Jumlah Harga
12,915.00
7,051.59
759.40
656.08
21,382.07
21,690.00
929.56
22,619.56
44,001.63
44,001.00
Jumlah Harga
12,915.00
75,552.75
8,678.88
656.08
97,802.71
120,750.00
464.78
121,214.78
219,017.49
219,017.00
Jumlah Harga
8,610.00
100,737.00
10,848.60
5,467.35
125,662.95
30,000.00
929.56
30,929.56
156,592.51
156,592.00
YU
602,700.00
2,115,477.00
227,820.60
38,271.45
2,984,269.05
8,210,233.90
27,435.00
23,239.00
8,260,907.90
11,245,176.95
11,245,176.00
ndela, kayu kelas II
Jumlah Harga
516,600.00
1,813,266.00
195,274.80
32,804.10
2,557,944.90
7,901,532.00
27,435.00
23,239.00
7,952,206.00
10,510,150.90
10,510,150.00
Jumlah Harga
86,100.00
302,211.00
32,545.80
5,467.35
426,324.15
190,669.44
11,619.50
202,288.94
628,613.09
628,613.00
Jumlah Harga
68,880.00
241,768.80
26,036.64
4,373.88
341,059.32
114,401.66
6,971.70
121,373.36
462,432.68
462,432.00
Jumlah Harga
57,687.00
201,474.00
21,697.20
36,631.25
317,489.45
286,004.16
3,485.85
289,490.01
606,979.46
606,979.00
Jumlah Harga
344,400.00
1,208,844.00
130,183.20
21,869.40
1,705,296.60
7,243,071.00
251,760.00
122,908.80
7,617,739.80
9,323,036.40
9,323,036.00
Jumlah Harga
576,870.00
2,024,813.70
218,056.86
36,631.25
2,856,371.81
7,243,071.00
251,760.00
65,844.00
7,560,675.00
10,417,046.81
10,417,046.00
Jumlah Harga
8,610.00
10,073.70
1,084.86
546.74
20,315.30
92,184.54
375,322.77
5,487.00
472,994.31
493,309.61
493,309.00
Jumlah Harga
17,220.00
30,221.10
3,254.58
1,093.47
51,789.15
107,329.14
5,487.00
112,816.14
164,605.29
164,605.00
Jumlah Harga
8,610.00
20,147.40
2,169.72
546.74
31,473.86
72,430.71
1,097.40
73,528.11
105,001.97
105,001.00
AN KACA
Jumlah Harga
861.00
50,368.50
5,424.30
546.74
57,200.54
127,000.00
127,000.00
184,200.54
184,200.00
Jumlah Harga
430.50
50,368.50
5,424.30
328.04
56,551.34
197,538.00
197,538.00
254,089.34
254,089.00
Jumlah Harga
1,291.50
15,110.55
1,627.29
87.48
18,116.82
27,113.00
27,113.00
45,229.82
45,229.00
Jumlah Harga
861.00
10,073.70
1,084.86
54.67
12,074.23
16,784.00
16,784.00
28,858.23
28,858.00
Jumlah Harga
1,291.50
15,110.55
1,627.29
874.78
18,904.12
11,619.00
11,619.00
30,523.12
30,523.00
Jumlah Harga
1,291.50
15,110.55
1,627.29
87.48
18,116.82
139,179.70
1,250.00
140,429.70
158,546.52
158,546.00
CATAN
Jumlah Harga
6,027.00
906.63
650.92
328.04
7,912.59
6,971.80
9,295.80
5,926.03
15,777.06
130.00
658.44
1,807.40
40,566.53
48,479.12
48,479.00
Jumlah Harga
8,610.00
656.08
9,266.08
9,941.40
9,941.40
19,207.48
19,207.00
asar, 2 lapis cat penutup)
Jumlah Harga
1,722.00
6,346.43
683.46
328.04
9,079.93
6,197.20
3,485.90
10,741.90
20,425.00
29,504.93
29,504.00
Jumlah Harga
2,410.80
4,230.95
455.64
328.04
7,425.44
4,183.08
7,436.70
11,619.78
19,045.22
19,045.00
Jumlah Harga
1,722.00
20,147.40
2,169.72
273.37
24,312.49
3,485.90
130.00
3,615.90
27,928.39
27,928.00
GEDUNG
Jumlah Harga
284,130.00
110,810.70
1,084.86
17,495.52
413,521.08
2,194,870.00
7,901.53
2,202,771.53
2,616,292.61
2,616,292.00
Jumlah Harga
86,100.00
151,105.50
16,272.90
17,495.52
270,973.92
307,281.00
1,536.40
9,876.90
318,694.30
589,668.22
589,668.00
Jumlah Harga
86,100.00
100,737.00
10,848.60
5,467.35
203,152.95
933,465.00
9,876.90
1,536.40
84,011.85
1,028,890.15
1,232,043.10
1,232,043.00
Jumlah Harga
103,320.00
146,068.65
16,272.90
6,560.82
272,222.37
593,389.20
9,876.90
1,536.40
7,120.67
611,923.17
884,145.54
884,145.00
Jumlah Harga
516,600.00
302,211.00
32,545.80
3,280.41
854,637.21
116,100.00
197,538.00
46,092.00
312,444.00
18,436.80
690,610.80
1,545,248.01
1,545,248.00
Jumlah Harga
861.00
10,073.70
1,084.86
546.74
12,566.30
22,000.00
22,000.00
34,566.30
34,566.00
Jumlah Harga
275,520.00
115,847.55
1,193.35
1,749.55
394,310.45
95,202.00
187,661.10
28,269.76
18,436.80
6,902.21
81,402.40
417,874.27
812,184.72
812,184.00
Jumlah Harga
861.00
40,294.80
4,339.44
546.74
46,041.98
21,948.00
125.00
22,073.00
68,114.98