Anda di halaman 1dari 2

PENGUJIAN RELAY

Peny I > OCR 300 Io > GFR 30.0 49 RMS SETTING OVER LOAD
GH Curve SIT Curve SIT Di Non Aktifkan
Delay (ms) 0.06 Delay 0.06 Es1 Alarm 87
Es2 Tripping 109
I >> OCR M 900 Io >> GFR M 120.0 T1 Running 13
Curve Def Curve Def T2 Stopped 5
CT Terpasang 400 5 Delay 0 Delay 0
Ib 300 A Merk Relay
Trafo Pel 0 KVA Type
In Trafo 0 A SN
PEMERIKSAAN WAKTU KERJA RELAY OCR/GFR

OVER CURRENT

MENURUT RUMUS MENURUT ALAT UJI

Arus di Arus
Pengujian Waktu Trip
Relay Injek Arus (Ampere) Waktu Trip (Detik)
(detik)
(Ampere) (Ampere)

R-S R-T S-T R-S R-T


1.5 Iset 450 5.6 1.032
2 Iset 600 7.5 0.602
3 Iset 900 11.3 0.378
4 Iset 1,200 15.0 0.299
1.5 Iset M 1,350 16.9 0.275
GROUND FAULT

MENURUT RUMUS MENURUT ALAT UJI

Arus di Arus
Pengujian Waktu Trip
Relay Injek Arus (Ampere) Waktu Trip (Detik)
(detik)
(Ampere) (Ampere)

R-N S-N T-N R-N S-N


1.5 Iset 45 0.56 1.032
2 Iset 60 0.75 0.602
3 Iset 90 1.13 0.378
4 Iset 120 1.50 0.299
1.5 Iset M 180 2.25 0.230
Depok,

Penguji

(......................................................
LOAD

%
%
mnt
mnt

S-T

T-N

.............)