PERHITUNGAN
P x l = 188,14 m x 4,6 m
= 865,444 m²
140
160
Saluran T3 – T4
150 SALURAN T3-T4 150
P x l = 224,47 m x 4,4 m
= 987,668 m²
120
140
Saluran T5 – T2
150 150
SALURAN T5-T2 P x l = 479,5 m x 4,5 m
= 2157,75 m²
125
150
Saluran T2 – T4
SALURAN T2-T4
150 150
m²
100
P x l = 119,72 m x 4,1 m
= 490,852
110
Saluran T6 – T4
150 150 P x l = 191,01 m x 4,75 m
SALURAN T6-T4
= 907,2975 m²
140
175
Saluran T2 – T7
P x l = 151,05 m x 5,05 m
SALURAN T2-T7
= 762,8025 m²
170
205
Saluran T4 - T8
SALURAN T4-T8
P x l = 173,09 m x 5,20 m
= 900,068 m²
180
220
Saluran T9 – T7
SALURAN T9-T7
P x l = 363,08 m x 4,75 m
= 1724,63 m²
145
175
P x l = 422, 43 m x 4,6 m
= 1943,178 m²
130
160
m²
P x l = 372,54 m x 4,9 m
SALURAN T12-T10 = 1825,446
155
190
Saluran T8 – T7
SALURAN T8-T7
P x l = 115,44 m x 5,3m
= 611,832 m²
0
18
230
Saluran T7 – T10
P x l = 268,8 m x 6,65 m
SALURAN T7-T10
= 1787,52 m²
270
365
425
Total Luas Saluran Inlet = 15302,33075
m²
Saluran Outlet
SALURAN OUTLET
P x l = 46,67 m x 6 m
= 280,02 m²
265
260
P x l = 6m x 3m
= 18 m²
6m
3m
III. Pekerjaan Bowplank
1. Kolam
A1
A2
A3
A4 A5
A6
A7
m³
2. Saluran
Saluran T1 – T2
Jumlah Patok = (P.saluran x 2) + (l.
Saluran x 2)
=(188,14 m x 2) + (1,6 m x
2)
P= 188,14 m
l = 1,6 m m³
m³
Papan BP = (2xP.Saluran) +
(2xl.Saluran)
= (188,14 m x 2) + (2 x 1,6
m)
Saluran T3-T4 Jumlah Patok
= (P. Saluran x 2) + (L. Saluran x 2)
= (224,47 m x 2) + (1,4 m x 2)
= 76 x 0,04 m x 0,06 m x 4 m
=0,7296 m³
Papan Bowplank
L = 1,4 m = (P. Saluran x 2) + (L. Saluran x 2)
= (224,47 m x 2) + (1,4 m x 2)
Papan Bowplank
L = 1,5 m = (P. Saluran x 2) + (L. Saluran x 2)
= (479,5 m x 2) + (1,5 m x 2)
=241 keping
= 241 x 0,02 m x 0,2 m x 3m
m³
=2,892
Saluran T2-T4 Jumlah Patok
= (P. Saluran x 2) + (L. Saluran x 2)
= (119,72 m x 2) + (1,1 m x 2)
= 41 x 0,04 m x 0,06 m x 1m
= 0,3936 m³
Papan Bowplank
L = 1,1 m = (P. Saluran x 2) + (L. Saluran x 2)
= (119,72 m x 2) + (1,1 m x 2)
=61 keping
= 61 x 0,02 m x 0,2 m x 3m
m³
=0,732
= 65 x 0,04 m x 0,06 m x 1m
= 0,624 m³
Papan Bowplank
L = 1,75 m = (P. Saluran x 2) + (L. Saluran x 2)
= (191,01m x 2) + (1,75 m x 2)
= 96,38 keping ≈ 97 keping m³
= 97 x 0,02 m x 0,2 m x 3m
= 1,164
= 52 x 0,04 m x 0,06 m x 1m
= 0,4992 m³
Papan Bowplank
L = 2,05 m = (P. Saluran x 2) + (L. Saluran x 2)
= (151,05m x 2) + (2,05 m x 2)
= 59 x 0,04 m x 0,06 m x 1m
= 0,5664 m³
Papan Bowplank
L = 2,2 m = (P. Saluran x 2) + (L. Saluran x 2)
= (173,09 m x 2) + (2,2 m x 2)
Papan Bowplank
L = 1,75 m = (P. Saluran x 2) + (L. Saluran x 2)
= (363,08 m x 2) + (1,75 m x 2)
Papan Bowplank
L = 1,6 m = (P. Saluran x 2) + (L. Saluran x 2)
= (422,43 m x 2) + (1,6 m x 2)
= 40 x 0,04 m x 0,06 m x 1m
= 0,384 m³
Papan Bowplank
L = 2,3 m = (P. Saluran x 2) + (L. Saluran x 2)
= (115,44 m x 2) + (2,3 m x 2)
= 91 x 0,04 m x 0,06 m x 1m
= 0,8736 m³
Papan Bowplank
L = 3,65 m = (P. Saluran x 2) + (L. Saluran x 2)
= (268,68 m x 2) + (3,65 m x 2)
= 17 x 0,04 m x 0,06 m x 1m
= 0,1632 m³
Papan Bowplank
L = 4,25 m = (P. Saluran x 2) + (L. Saluran x 2)
= (46,559 m x 2) + (4,25 m x 2)
= 17 x 0,04 m x 0,06 m x 1m
= 0,1632 m³
Papan Bowplank
L=3m = (P. Saluran x 2) + (L. Saluran x 2)
= (46,67m x 2) + (3 m x 2)
2. Saluran Inlet A6
Saluran T1-T2 A7
SALURAN T1-T2
150 POTONGAN KOLAM A4
150
Volume
=PxLxt
75
410,76
410
140
150
110
Saluran T6-T4 Volume
150 150 =PxLxt
SALURAN T6-T4
= 191,01 m x 1,75 m x 1,5 m
= 501,40125 m³
140
175
205
220
175
160
190
Saluran T8-T7 Volume
SALURAN T8-T7 =PxLxt
= 115,44 m x 2,3 m x 1,9 m
= 504,4728 m³
0
18
230
365
425
Total Volume Saluran Inlet
=10769,90685 m³
3. Saluran Outlet Volume
SALURAN OUTLET
=PxLxt
= 46,64 m x 3 m x 2,75 m
= 385,0275 m³
265
260
SALURAN T1-T2
x 1,2 m x 1,2 m)
55
=180,61
m³
140
65
120
160
Saluran T3-T4 =Volume 1 - Volume 2
SALURAN T3-T4 = (P x L x t) – (P x L1 x t1)
= (224,47m x 1,4m x 1,2m) – (224,47 m
x 1 m x 1 m)
50 =152,63
m³
120
50
100
140
Saluran T5-T2 =Volume 1 - Volume 2
SALURAN T5-T2 = (P x L x t) – (P x L1 x t1)
= (479,5m x 1,5m x 1,25m) – (479,5m x
50
1,1m x 1,05 m)
=345,24
125
m³
55
110
150
=64,64
m³
100
40
70
110
Saluran T6-T4 =Volume 1 - Volume 2
SALURAN T6-T4 = (P x L x t) – (P x L1 x t1)
= (191,01m x 1,75m x 1,4m) – (191,01
55
m x 1,35 m x 1,2 m)
140
=158,53
m³
65
135
175
SALURAN T2-T7
m x 1,65 m x 1,5 m)
=152,56
170
m³
85
165
205
Saluran T4-T8 =Volume 1 - Volume 2
SALURAN T4-T8
= (P x L x t) – (P x L1 x t1)
= (173,09m x 2,2m x 1,8m) – (173,09 m
65
x 1,8 m x 1,6 m)
=186,94
m³
180
95
180
220
m³
145
70
135
175
x 1,2 m x 1,1 m)
=321,05
130
m³
60
120
160
m x 1,5 m x 1,35 m)
155
=342,80
75
m³
150
190
x 1,9 m x 1,6 m)
=126,99
m³
95
190
230
Saluran T7-T10 (Batu Kali) =Volume 1 - Volume 2
SALURAN T7-T10
= (P x L x t) – (P x L1 x t1)
= (268,8m x 3,65m x 2,8m) – (268,8 m x
85
2,85 m x 2,30 m)
=985,15
m³
270
145
285
365
m³
170
345
425
Total Volume Dinding Batu Bata
=2340,6 m³
m³
260
100
2. Plesteran Saluran
Saluran T1-T2 = Panjang Saluran x (2a+2b+c)
= 188,14 m x (2x0,2m+2x1,1m+1,2m)
= 714,932 m²
SALURAN T1-T2
55
140
65
120
160
Saluran T3-T4
SALURAN T3-T4 = Panjang Saluran x (2a+2b+c)
= 224,47 m x (2x0,2m+2x1m+1m)
= 763,198
50
m²
120
50
100
140
Saluran T5-T2
SALURAN T5-T2 = Panjang Saluran x (2a+2b+c)
= 479,5 m x (2x0,2m+2x1,05m+1,1m)
50
= 1726,2 m²
125
55
110
150
Saluran T2-T4
SALURAN T2-T4 = Panjang Saluran x (2a+2b+c)
= 119,72 m x (2x0,2m+2x0,8m+0,7m)
= 323,244 m²
40
100
40
70
110
Saluran T6-T4
SALURAN T6-T4 = Panjang Saluran x (2a+2b+c)
= 191,01 m x (2x0,2m+2x1,2m+1,35m)
55
= 792,6915 m²
140
65
135
175
Saluran T2-T7
= Panjang Saluran x (2a+2b+c)
= 151,05 m x (2x0,2m+2x1,5m+1,65m)
65
SALURAN T2-T7
170 = 762,8025 m²
85
165
205
Saluran T4-T8
SALURAN T4-T8
= Panjang Saluran x (2a+2b+c)
= 173,09 m x (2x0,2m+2x1,6m+1,8m)
65
= 934,686 m²
180
95
180
220
Saluran T9-T7
SALURAN T9-T7 = Panjang Saluran x (2a+2b+c)
= 363,08 m x
(2x0,2m+2x1,25m+1,35m)
= 1543,09
55
m²
145
70
135
175
Saluran T11-T10
SALURAN T11-T10 = Panjang Saluran x (2a+2b+c)
= 422,43 m x (2x0,2m+2x1,1m+1,2m)
50
= 1605,234 m²
130
60
120
160
Saluran T12-T10
SALURAN T12-T10 = Panjang Saluran x (2a+2b+c)
= 372,54 m x (2x0,2m+2x1,35m+1,5m)
60
= 1713,684 m²
155
75
150
190
Saluran T8-T7
SALURAN T8-T7 = Panjang Saluran x (2a+2b+c)
= 115,44 m x (2x0,2m+2x1,6m+1,9m)
65 = 634,92 m²
95
285
365
345
425
260
- Saluran Outlet
=(2xP.Saluran Outlet) x L x t
=(2x46,67)m x 1,5 m x 0,15
=21,0015 m³
L=1,5m;t=0,15m
X. Pekerjaan Gorong-Gorong
1. Galian Gorong-Gorong = P x L x t x Jumlah Titik
= 6m x 1,2 m x 1,1 m x 13
10
=102,96 m³
80
20
20 80 20
2. Pasir Urug
= P x L x t x Jumlah Titik
= 6m x 1,2 m x 0,2 m x 13
=18,72 m³
L=1,2m;t=0,2m
3. Gorong-Gorong
60 = (Vol.1-Vol.2) x Jumlah Titik
= (πr² x P – πr1² x P) x 13
= ( π x 0,4² x 6m – π x 0,3² x 6m) x 13
10 10 = 17,153 m³
4. Timbunan Gorong-Gorong
=Vol. Galian Gorong-Gorong – Vol.
Pasir – Vol. Gorong-Gorong
= 102,96 – 18,72 – 17,153
= 67,087
m³
10
80
20
20 80 20
X. Pekerjaan Gorong-Gorong
1. Galian Gorong-Gorong 102,96 m³
2. Pasir Urug 18,72 m³
3. Gorong-Gorong 17,153 m³
4. Timbunan Gorong-Gorong 67,087 m³