Anda di halaman 1dari 71

Data awal :

1 Kelas jalan = 2C ...(1,2A, 2B, 2C, 3)


Vr (km/jam) = 60,40,30
maka, diambil :

2 Kecepatan rencana
Vr1 (km/jam) = 40
Vr2 (km/jam) = 30
Vr3 (km/jam) = 40

3 Koordinat masing-masing titik (Interpolasi peta)


Titik x y
A -4980.5 -15098.2
PI-1 -4785.1 -15328.8
PI-2 -4433.6 -15363.9
PI-3 -4207.6 -15675.3
B -3960.3 -15796.9

4 Panjang tangen pada peta topograf


Tangen Jarak (m) -4433.8224 Y=-15363.6371
d1 302.3
d2 353.2
d3 384.8
d4 275.6
Σd 1315.895

5 Sudut belok pada peta topograf


Sudut Derajat (°) 17-20
Δ1 44.026 157.903 ...(51.2431243625< x <25.784478636111
Δ2 48.331 152.58 ...(80.1804374333333< x <51.243124362
Δ3 27.871 166.81 ...(51.2431243625< x <25.784478636111

6 Sudut belok patokan


Vr (km/jam) Dmax Dmin kmaks fmaks α toleransi
30 80.180437433 51.243124 0.1 0.173 25
40 51.243124363 25.784479 0.1 0.166 21
60 25.784478636 11.821757 0.1 0.153 13
80 11.821757375 0 0.1 0.14 5
PERENCANAAN TRASE, SEMANGAT!!!

PERENCANAAN TRASE 1

Penyelesaian :
1. Perhitungan azimuth

αA-1 = arc tan -4980.521900 -


-15098.162600 -
= arc tan -195.387800
230.629600
= -0.70286 rad
= -40.271 °
= 139.729 °
α1-2 = arc tan -4785.134100 -
-15328.792200 -
= arc tan -351.499300
35.103500
= -1.47126 rad
= -84.2969 °
= 95.7031 °
α2-3 = arc tan -4433.634800 -
-15363.895700 -
= arc tan -225.992200

311.444300

= -0.62772 rad
= -35.9656
= 144.0344 °
α3-B = arc tan -4207.642600 -
-15675.340000 -
= arc tan -247.352100
< x <25.7844786361111) 121.518400

333< x <51.2431243625) = -1.11415 rad


< x <25.7844786361111) = -63.8362 °
= 116.1638 °
2
2. Perhitungan sudut tangen
25
21 ΔPI1 = 44.02586 °
13 ΔPI2 = 48.33127 °
5 ΔPI3 = 27.87055 °
MANGAT!!!

SE 1

Perhitungan panjang tangen


th

d1 (m) = 302.2687625
-4785.134100 d2 (m) = 353.2478077
-15328.792200 d3 (m) = 384.798683
d4 (m) = 275.5898817
Σd (m) = 1315.905135

KONTROL
...(lihat gambar)
-4433.634800 Sudut belok patokan Sudut belok rencana
Vr (km/jam)
-15363.895700 Dmax Dmin Peta
40 51.2431244 25.7844786 44.03
30 80.1804374 51.2431244 48.33
40 51.2431244 25.7844786 27.87

...(lihat gambar) Perhitungan


Tangen Peta (m) Kontrol
-4207.642600 (m)

-15675.340000 d1 302.2688 302.2687625 0.00


d2 353.2 353.2478077 0.00

d3 384.7889 384.798683 0.00

d4 275.6 275.5898817 0.00


Σd 1315.8952 1315.905135 0.00
...(lihat gambar)
-3960.290500
-15796.858400

...(lihat gambar)

ngen
ang tangen

OL

Sudut belok rencana


Kontrol Ket.
Perhitungan
44.026 0.00014 Ok
48.331 0.000271 Ok
27.871 0.000454 Ok

Ket.

OK
OK

OK

OK
OK
Perhitungan Tikungan Pertama (PI-1)

∆1 = 44.03
Vr1 = 40 km/jam
D1 = 302.269 m
e max = 0.100
f max = 0.166 dari buku hlm 70 daftar 16
R min = Vr² = 47.36250074 m
127(e+f)
Pada kecepatan Vr1=60 km/h Rmax 700 (daftar 18, hal 94). Maka diambil 300
R design = 250 m dengan bentuk tikungan Spiral Circle Spiral.
Rdesain>R hitung> Rsyarat Alhamdulillah AMAN
Perhitungan elemen tikungan
c = 0.68
k = Vr² = 0.050393701
127.R
Ls min = 0,022 Vr³ _ 2,727 Vr.k = 0.198610468 m
R.c c
Ls syarat 60 (lampiran 06)
Ls design = 95 m tentukan Lsdesain>Ls hitung> Ls syarat Alhamdulillah AMAN
2θs = Ls. 360 = 21.77239621
2π.R
θs = 10.8861981075
∆' = ∆ - 2θs = 22.25
x = Ls _ Ls³ = 94.65705 m
40.R² 94.65705
y = Ls² = 6.016666667 m
6.R
K* = x - R.sinθ = 47.44232626 m 47.44232626

P* = y - R(1 - cosθ) = 1.517725446 m

Maka diperoleh :
Ts1 = (R + P*)tan½∆ + K*
= 149.13 m 149.1281161
Es1 = (R + P*) _R
cos ½∆
= 21.295 m
Lc = 0,01744.∆'.R
= 97.03 m Ls memakai SCS > 30 Alhamdulillah AMAN
L = Lc + 2 Ls
= 287.03 m
Kontrol : L < 2 Ts
287.03 298.2562322 Alhamdulillah AMAN
L maks = 2 menit. Vr = 1333.333333 m

Kecepatan c Data Vr = 60 Vr = 40 Vr = 30
30.00 0.75 m/det 2
e maks 0.100 0.100 0.100
40.00 0.68 m/det3 f maks 0.153 0.166 0.173 Daftar 16 Hal 70
60.00 0.54 m/det4 S maks 0.00625 0.0083333333 0.01 Daftar 20 hal 98
80.00 0.40 m/det5

Perhitungan Pelebaran Tikungan

Tikungan 1 Tikungan 2 Tikungan 3


Vr 40 Vr 30 Vr 40
R desain 250 R desain 150 R desain 275
Ls desain 95 Ls desain 75 Ls desain 90
L 287.03 L 201.49 L 223.74
Lc 97.03 Lc 51.49 Lc 43.74

Tikungan n P A Z (m) Td (m) b' (m)


1 2 3.654 0.914 0.266 0.015 0.334
2 2 3.654 0.914 0.257 0.025 0.371
3 2 3.654 0.914 0.253 0.014 0.315
Dafar 18 Hal 103

Perhitungan Kemiringan mel

Tikungan Vr b' B R L Ls Lc em en

1 40.00 0.33 6.00 250.00 287.03 95.00 97.025 0.069 0.029


2 30.00 0.37 6.00 150.00 201.49 75.00 51.492 0.075 0.029
3 40.00 0.32 6.00 275.00 223.74 90.00 43.736 0.064 0.029

56.488
43.735681729
Perhitungan Tik

perhitun
Perhitungan Kebebasan Samping Jarak Pandang
Jarak
pandang Jarak pandang
Kec. minimum
minimum
henti menyiap
120 225 790 Ket: Lampiran 02
100 165 670
80 115 520
60 75 380
40 40 140
30 30 80

Perhitungan Jarak Pandang Menyiap

d1 = 0.278 t1 (Vr - m + (a.t1/2))


d2 = 0.278 Vr t2
d3 = 30 - 100 meter Ket: Hal 125
d4 = 2/3 d2 Kontrol: d3= 30-100 m
t1 = 2.12 + 0.026 Vr
t2 = 6.56 + 0.048 Vr
a= 2.052 + 0.0036 Vr

Kecepatan t1 t2 a m d1 d2 d3 d4 d dmin
40 3.16 8.48 2.196 15 25.01004449 94.2976 40 62.865066667 222.17271 131.44178
30 2.9 8 2.16 15 14.6180184 66.72 30 44.48 155.81802 94.133333
40 3.16 8.48 2.196 15 25.01004449 94.2976 40 62.865066667 222.17271 131.44178
Perhitungan Jarak Pandang Hent
Keadaan jalan datar
kecepatan fn dr d min d desain Tikungan Vr
40 0.166 37.947063846 40 40 1.00 40.00
30 0.173 20.481543853 30 30 Ket: Hal 119 2.00 30.00
40 0.166 37.947063846 40 40 Lampiran 02 3.00 40.00
Ket= t= kecepatan orang berfkir
Hal 171
Keadaan jalan landai Landai max lampiran 1 tergantu
Kecepatan fn L dr pndkn dr pnrnn Ket: Hal 120 fm hal 121
40 0.166 0.08 37.875201212 38.019199696 L: Lampiran 01(Landai maks) d min lampiran 2
30 0.173 0.08 20.4443232929 20.518900187
40 0.166 0.08 37.875201212 38.019199696

Tikungan pertama
Jika Sdesain < L Jika Sdesain > L
Vr = 40 km/jam Vr = 40 km/jam
Rdesain = 250 m Rdesain = 250 m
S= 45.00 S= 230
L= 287.03 m L= 287.02510352 m
90 . S 90 . S
φ= φ=
π.R π.R
φ= 5.15662016 φ= 26.356058576
m = (R(1-cosφ) m = (R(1-cosφ)+(0.5(S-L)sinφ)
m= 1.01181675 m m= 13.32878224 m

Tikungan Kedua
Jika Sdesain < L Jika Sdesain > L
Vr = 30 km/jam Vr = 30 km/jam
Rdesain = 150 m Rdesain = 150 m
S= 30.00 S= 160
L= 201.49 m L= 201.49172624 m
90 . S 90 . S
φ= φ=
π.R π.R
φ= 5.72957795 φ= 30.557749074
m = (R(1-cosφ) m = (R(1-cosφ)+(0.5(S-L)sinφ)
m= 0.74937521 m m= 10.285091917 m

Tikungan Ketiga
Jika Sdesain < L Jika Sdesain > L
Vr = 40 km/jam Vr = 40 km/jam
Rdesain = 275 m Rdesain = 275 m
S= 45.00 S= 230
L= 223.74 m L= 223.73568173 m
90 . S 90 . S
φ= φ=
π.R π.R
φ= 4.68783651 φ= 23.960053251
m = (R(1-cosφ) m = (R(1-cosφ)+(0.5(S-L)sinφ)
m= 0.91994118 m m= 24.969044969 m
`
b
Perhitungan Alinyemen Ho
Perhitungan Tikungan Pertama (PI-2)

∆2 = 48.33
Vr2 = 30 km/jam
D2 = 353.248 m
e max = 0.100
f max = 0.173 dari buku hlm 70 daftar 16
R min = Vr² = 25.958294 m
127(e+f)
Pada kecepatan Vr1=60 km/h Rmax 700 (daftar 18, hal 94). Maka diambil 180
R design = 150 m dengan bentuk tikungan Spiral Circle Spiral.
Rdesain>R hitung> Rsyarat Alhamdulillah AMAN
Perhitungan elemen tikungan
c = 0.75
k = Vr² = 0.0472441
127.R
Ls min = 0,022 Vr³ _ 2,727 Vr.k = 0.1266142 m
R.c c
Ls syarat 60 (lampiran 06)
Alhamdulillah AMAN Ls design = 75 m tentukan Lsdesain>Ls hitung> Ls syarat
2θs = Ls. 360 = 28.64789
2π.R
θs = 14.323944878
∆' = ∆ - 2θs = 19.68
x = Ls _ Ls³ = 74.53125 m
40.R²
y = Ls² = 6.25 m 102.8592077991
6.R 69.6188888889
K* = x - R.sinθ = 37.420656 m 34.9356180437

P* = y - R(1 - cosθ) = 1.5868632566 m

Maka diperoleh :
Ts2 = (R + P*)tan½∆ + K*
= 105.44 m
Es2 = (R + P*) _R
cos ½∆
= 16.147 m 15.920
Lc = 0,01744.∆'.R
= 51.49 m Ls memakai SCS > 30 Alhamdulillah AMAN
L = Lc + 2 Ls
= 201.49 m
Kontrol : L < 2 Ts
201.49 210.87449 Alhamdulillah AMAN
L maks = 2 menit. Vr = 1000 m

aftar 16 Hal 70
aftar 20 hal 98
ngan Kemiringan melintang, super elevasi

Kontrol Syarat Nyaman Syarat Aman


e max (%) S' hn hm hm' a (m)
(Ls-2a)>a S maks Kontrol e max Kontrol
6.9 0.0083 0.092 0.219 0.219 28.112 Alhamdulillah 0.0065 Alhamdulillah 4.90 Alhamdulillah
7.5 0.0100 0.092 0.239 0.239 20.913 Alhamdulillah 0.0088 Alhamdulillah 5.20 Alhamdulillah
6.4 0.0083 0.092 0.202 0.202 28.065 Alhamdulillah 0.0065 Alhamdulillah 4.65 Alhamdulillah

0.098
0.104
0.093
Perhitungan Tikungan

perhitungan jarak pandang

Maka di
dmin syarat Kontrol d desain ambil d
140 oke 222.17271 230
80 noo 155.81802 160 Ket: dmin=lampiran 02
140 oke 222.17271 230
m=kelas 1=25 m hal 170
m Kelas 2= 15 m
Landai Max t fm dp dmin syarat dp desain
0.08 2.50 0.38 44.58 40.00 45.00
0.08 2.50 0.40 29.70 30.00 30.00
0.08 2.50 0.38 44.58 40.00 45.00
cepatan orang berfkir

max lampiran 1 tergantung kondisi topograf

min lampiran 2
linyemen Horizontal, Semangat!!!
Perhitungan Tikungan Pertama (PI-3)

∆3 = 27.87
Vr3 = 40 km/jam
D3 = 384.79868 m
e max = 0.100 dari buku hlm 70 daftar 16
f max = 0.166
R min = Vr² = 47.362501 m
127(e+f)
Pada kecepatan Vr1=60 km/h Rmax 700 (daftar 18, hal 94). Maka diambil 300
R design = 275 m dengan bentuk tikungan Spiral Circle Spiral.
Rdesain>R hitung> Rsyarat Alhamdulillah AMAN
Perhitungan elemen tikungan
c = 0.68
k = Vr² = 0.0458125
127.R
Ls min = 0,022 Vr³ _ 2,727 Vr.k = 0.180555 m
R.c c
Ls syarat 50 (lampiran 06)
Alhamdulillah AMAN Ls design = 90 m tentukan Lsdesain>Ls hitung> Ls syarat
2θs = Ls. 360 = 18.751346
2π.R
θs = 9.375673
∆' = ∆ - 2θs = 9.12
x = Ls _ Ls³ = 89.759008 m
40.R²
y = Ls² = 4.9090909 m
6.R
K* = x - R.sinθ = 44.959566 m

P* = y - R(1 - cosθ) = 1.23548103 m

Maka diperoleh :
Ts3 = (R + P*)tan½∆ + K*
= 113.50144 m
Es3 = (R + P*) _R
cos ½∆
= 9.6120677 m 9.6120677
Lc = 0,01744.∆'.R
= 43.74 mLs memakai SCS > 30 Alhamdulillah AMAN
L = Lc + 2 Ls
= 223.73568 m
Kontrol : L < 2 Ts
223.73568 227.00287 Alhamdulillah AMAN
L maks = 2 menit. Vr = 1333.3333 m
0.65
h
Kontrol Panjang Tangen Jarak antar belokan (dx)

VR X minimum
> Data 1 80 200
Data PI-1 30 20
TS1 : 149.128 Vr maks 40 Interpolasi dx
D1 : 302.269 x desain = 58.01 m 60 128
L1 : 287.025 40 56
Data PI-2 x interpolasi 56 30 20
TS2 : 105.437
L2 : 201.492
Alhamdulillah
Maka x = 58.010

> Data 2
Data PI-2
TS2 : 105.437 Vr maks 40
D2 : 353.248 x desain = 140.63 m
L2 : 201.492
Data PI-3 x interpolasi 56
Alhamdulillah AMAN TS3 : 113.501
L3 : 223.736
Alhamdulillah
Maka x = 140.634

> Data 3
Data PI-3
TS3 : 113.501 Vr maks 40
D3 : 384.799 x desain = 172.18 m
L3 : 223.736
Data PI-2 x interpolasi 56
TS2 : 105.437
L2 : 201.492
Alhamdulillah
Maka x = 172.185

> Data 2
Data PI-2
TS2 : 105.437 Vr maks 40
D2 : 353.248 x desain = 108.99 m
L2 : 201.492
Data PI-1 x interpolasi 56
TS1 : 149.128
L1 : 287.025
Alhamdulillah
Maka x = 108.989
Diketahui
PI1 PI2 PI3
TS Lc LS TS Lc LS TS3 Lc3 LS3
149.13 97.03 95 105.44 51.49 75 113.501 43.736 90
d1 = 302.268762503 m
d2 = 353.247807655 m 655.51657
d3 = 384.798683032 m
d4 = 275.5897 m
jumlah = 1315.90495319 m
Sta A = titik awal 0m Sta PI2 = Sta St1 + d2 - TS1 = 644.29 m Sta PI3 =
Sta PI1 = Sta A + d1 = 302.2687625 m Sta TS = Sta PI2 - TS2 = 538.8482 m Sta TS =
Sta TS = Sta PI1 - TS = 153.14 m Sta SC = Sta TS + LS = 613.8482 m Sta SC =
Sta SC = Sta TS + LS = 248.14064639 m Sta CS = Sta SC + LC = 665.3399 m Sta CS =
Sta CS = Sta SC + LC = 345.16574991 m Sta ST = Sta CS + LS = 740.3399 m Sta ST =
Sta ST = Sta CS + LS = 440.16574991 m Sta B =

Kontroling
jumlah - Sta B < 3% (d1 +d2)- Sta PI2 < 3% (d1 +d2+d3)- Sta PI3
Sta B Sta PI2 Sta PI3
0.0184834665 OK 0.0174319145 OK 0.0202156125

Tikungan 1 0 644.2854
titik A 302.2687625028 538.8482
kemiringan kanan = kemiringan kiri = hn = 0.091844 153.1406463907 613.8482
titik B 248.1406463907 665.3399
kemiringan kiri = 0 345.1657499095 740.3399
Kemiringan kanan = 0.0918440209 440.1657499095
titik C
kemiringan kiri = a*etot/d-a 0.0050278
Kemiringan kanan = a*etot/d-a -0.0050278
titik D
kemiringan kiri = 0.2185254289
Kemiringan kanan = -0.2185254289
Keadaan di titik E s/d H kebalikan dari D s/d A d1 =
Tikungan 2 d2 =
titik A d3 =
kemiringan kanan = kemiringan kiri = hn = 0.0923834 d4 =
titik B jumlah =
kemiringan kiri = 0 Sta A =
Kemiringan kanan = 0.0923833958 Sta PI1 =
titik C Sta TS =
kemiringan kiri = a*etot/d-a 0.008069 Sta SC =
Kemiringan kanan = a*etot/d-a -0.008069 Sta CS =
titik D Sta ST =
kemiringan kiri = 0.2389225753
Kemiringan kanan = -0.2389225753
Keadaan di titik E s/d H kebalikan dari D s/d A
Tikungan 3
titik A
kemiringan kanan = kemiringan kiri = hn = 0.0915746
titik B
kemiringan kiri = 0
Kemiringan kanan = 0.0915745542
titik C
kemiringan kiri = a*etot/d-a 0.0047712
Kemiringan kanan = a*etot/d-a -0.0047712
titik D
kemiringan kiri = 0.2020955679
Kemiringan kanan = -0.2020955679
Keadaan di titik E s/d H kebalikan dari D s/d A
0
153.14
248.14
302.268763
345.16575
440.16575
538.848199
Sta St2 + d3 - TS2 = 1019.701 m 613.848199
Sta PI3 - TS3 = 906.200 m 644.29
Sta TS + LS = 996.200 m 665.339925
Sta SC + LC = 1039.936 m 740.339925
Sta CS + LS = 1129.936 m 906.200
Sta ST3 + d4 - TS3 = 1292.024 m 996.200
1019.701
1039.936
< 3% 1129.936
1292.024
OK

1019.7014
906.19993
996.19993
1039.9356
1129.9356
1292.0239
302.2687625028 m
353.2478076545 m
384.7986830322 m
275.5897 m
1315.9049531896 m
titik awal 0.000 m Sta PI2 = Sta St1 + d 644.285 m Sta PI3 = Sta St2 + d 1019.854
Sta A + d1 = 302.269 m Sta TS = Sta PI2 - T 541.426 m Sta TS = Sta PI3 - T 906.352
Sta PI1 - TS = 153.141 m Sta SC = Sta TS + LS 611.426 m Sta SC = Sta TS + LS 996.352
Sta TS + LS = 248.141 m Sta CS = Sta SC + LC 667.914 m Sta CS = Sta SC + LC 1040.088
Sta SC + LC = 345.166 m Sta ST = Sta CS + LS 737.914 m Sta ST = Sta CS + LS 1130.088
Sta CS + LS = 440.166 m Sta B = Sta ST3 + d 1292.176
DATA TIKUNGAN PI1 DATA TIKUNGAN PI2 DATA TIKUNGAN PI3
Sta. = 0+ 302.26876 Sta. = 0+ 644.28544 Sta. = 0+ 1019.7014
Bentuk Tikungan : Bentuk Tikungan : Bentuk Tikungan :
Spiral-Circle-Spiral Spiral-Circle-Spiral Spiral-Circle-Spiral
∆PI1 = 44.02586 0 ∆PI2 = 48.331271 0 ∆PI3 = 27.870546 0
Vr1 = 40 km/jam Vr2 = 30 km/jam Vr3 = 40 km/jam
R1 = 250 meter R2 = 150 meter R3 = 275 meter
Ls = 95 meter Ls = 75 meter Ls = 90 meter
Lc = 97.03 meter Lc = 51.49 meter Lc = 43.735682 meter
L = 287.03 meter L = 201.49 meter L = 223.73568 meter
Ts = 149.13 meter Ts = 105.44 meter Ts = 113.50144 meter
Es = 21.295348 meter Es = 16.147023 meter Es = 9.6120677 meter
B = 2 x 3m meter B = 2 x 3m meter B = 2 x 3m meter
Sta t1 t2 ∆t d g
0 302.268762503 9.82 89.46 10.98% 6626.515%
302.2687625 644.285441452 0 342.0167 0.00%
644.2854415 1019.70136551 0 375.4159 0.00%
1019.701366 1292.0 0 272.32 0.00%

-4.64%
1.64%
-2.06%
4.09%

A. Perhitungan Lengkung 1
Data :
Vr = 40 km/jam
g1 = 10.98%
g2 = 0.00%
S siap = 230 m 2988.233
S henti = 45 m 13249.1217
A= 11.0% 1422.2186
L= 287.03 m 2292.5382
4206.7604
a. Perhitungan Lv minimum 8617.212 15541.6599
Untuk S siap 1.803560119
Lv = -168.9 m

Untuk S henti
Lv = -5.73 m

diambil Lv = 100 m
b. Perhitungan Ev
Ev = 1.3728 m -0.68169

c. Perhitungan parabola lengkung vertikal cekung


1/2 Lv = 50
No x (m) y (m)
1 5 0.014
2 10 0.055
3 15 0.124
4 20 0.220
5 25 0.343
6 30 0.494
7 35 0.673
8 40 0.879
9 45 1.112
ev 50 1.373
10 55 1.661
11 60 1.977
12 65 2.320
13 70 2.691
ev 75 3.089
14 80 3.514
10 85 3.967
11 90 4.448 302.268762502843,150
12 95 4.956 252.268762502843,150
13 100 5.491
d. Perhitungan elevasi ketinggian
Elv. A = 0 m
Elv. PPV = 0.00 m

∆t = 0.00 m
Jarak A - PPV = 89.455376 m 302.2688 252.5613 353.247808
Jarak A - PLV = 39.455376 m 252.2688 89216.7266
0.68650474
Titik x (m) Elevasi
PLV 0 0.00
1 5 0.00
2 10 0.00
3 15 0.00
4 20 0.00
5 25 0.00
6 30 0.00
7 35 0.00
8 40 0.00
9 45 0.00
10 50 0.00
11 55 0.00
12 60 0.00
13 65 0.00
14 70 0.00
15 75 0.00
16 80 0.00
17 85 0.00
18 90 0.00
19 95 0.00
20 100 0.00
e. Perhitungan elevasi grade line lengkung vertikal cekung
2
d ( A  xi )  xi 
ti  xh  Yi    .Ev
d ( A  PPV ) 1 / 2 Lv 
Titik X Ti Yi Elv. Grade
PLV 0 0.00 0.00 0.00 39.455376 39.45537603,0
1 5 0.00 0.01 -0.01 44.455376 44.45537603,-0.0137275565112562
2 10 0.00 0.05 -0.05 49.455376 49.45537603,-0.0549102260450249
3 15 0.00 0.12 -0.12 54.455376 54.45537603,-0.123548008601306
4 20 0.00 0.22 -0.22 59.455376 59.45537603,-0.2196409041801
5 25 0.00 0.34 -0.34 64.455376 64.45537603,-0.343188912781405
6 30 0.00 0.49 -0.49 69.455376 69.45537603,-0.494192034405224
7 35 0.00 0.67 -0.67 74.455376 74.45537603,-0.672650269051555
8 40 0.00 0.88 -0.88 79.455376 79.45537603,-0.878563616720398
9 45 0.00 1.11 -1.11 84.455376 84.45537603,-1.11193207741175
10 50 0.00 1.37 -1.37 89.455376 89.45537603,-1.37275565112562
11 55 0.00 1.66 -1.66 94.455376 94.45537603,-1.661034337862
12 60 0.00 1.98 -1.98 99.455376 99.45537603,-1.9767681376209
13 65 0.00 2.32 -2.32 104.455376 104.45537603,-2.3199570504023
14 70 0.00 2.69 -2.69 109.455376 109.45537603,-2.69060107620622
15 75 0.00 3.09 -3.09 114.455376 114.45537603,-3.08870021503265
16 80 0.00 3.51 -3.51 119.455376 119.45537603,-3.51425446688159
17 85 0.00 3.97 -3.97 124.455376 124.45537603,-3.96726383175305
18 90 0.00 4.45 -4.45 129.455376 129.45537603,-4.44772830964702
19 95 0.00 4.96 -4.96 134.455376 134.45537603,-4.9556479005635
20 100 0.00 5.49 -5.49 139.455376 139.45537603,-5.49102260450249
Chart Title
0.00
0 20 40 60 80 100 120

-1.00

-2.00

-3.00

-4.00

-5.00

-6.00
-4.00

-5.00

-6.00
Jarak Pandang Menyiap
No Vr t1 t2 a m d1
1 40 3.16 8.48 2.196 15 25.01004
2 30 2.9 8 2.16 15 14.61802
3 40 3.16 8.48 2.196 15 25.01004
Jarak Pandang Henti
No Vr Landai t fm dp dmin
1 40.00 0.08 2.50 0.38 44.58 40.00
2 30.00 0.08 2.50 0.40 29.70 30.00
3 40.00 0.08 2.50 0.38 44.58 40.00

A. Perhitungan Lengkung 2
Data :
Vr = 30 km/jam
g1 = 0.00%
g2 = 0.00%
S siap = 160 m PPV1 Sta. 0 ± 302.269
S henti = 45.00 m Lv1 = 100 meter
A = 0.0% Ev1 = 0.6817 meter
L = 201.49 m
PPV2 Sta. 0 ± 644.285
a. Perhitungan Lv minimum Lv1 = 100 meter
Untuk S siap Ev1 = 0.40 meter
Lv = 0.0 m
PPV1 Sta. 0 ± 1019.8536
Untuk S henti Lv1 = 130 meter
Lv = 0.00 m Ev1 = 1.31 meter

diambil Lv = 100 m
b. Perhitungan Ev
Ev = 0.00 m

c. Perhitungan parabola lengkung vertikal cembung


1/2 Lv = 50
No x (m) y (m)
1 5 0.000
2 10 0.000
3 15 0.000
4 20 0.000
5 25 0.000
6 30 0.000
7 35 0.000
8 40 0.000
9 45 0.000
10 50 0.000
11 55 0.000
12 60 0.000
13 65 0.000
14 70 0.000
15 75 0.000
16 80 0.000
17 85 0.000
18 90 0.000
19 95 0.000
20 100 0.000
d. Perhitungan elevasi ketinggian
Elv. A = 0.0 m
Elv. PPV = 0.00 m

∆t = 0.00 m
Jarak A - PPV = 342.0167 m 644.2854 644.285441451828,150
Jarak A - PLV = 292.0167 m 594.2854 594.285441451828,150

Titik x (m) Elevasi


PLV 0 0.00
1 5 0.00
2 10 0.00
3 15 0.00
4 20 0.00
5 25 0.00
6 30 0.00
7 35 0.00
8 40 0.00
9 45 0.00
10 50 0.00
11 55 0.00
12 60 0.00
13 65 0.00
14 70 0.00
15 75 0.00
16 80 0.00
17 85 0.00
18 90 0.00
19 95 0.00
20 100 0.00
e. Perhitungan elevasi grade line lengkung vertikal cembung
2
d ( A  xi )  xi 
ti  xh  Yi    .Ev
d ( A  PPV ) 1 / 2 Lv 
Titik X Ti Yi Elv. Grade
302.268762502843,173.280627021472 PLV 0 0.00 0.00 0.00 594.29
307.268762502843,173.056348304414 1 5 0.00 0.00 0.00 599.29
312.268762502843,172.847777557533 2 10 0.00 0.00 0.00 604.29
317.268762502843,172.65491478083 3 15 0.00 0.00 0.00 609.29
322.268762502843,172.477759974305 4 20 0.00 0.00 0.00 614.29
327.268762502843,172.316313137957 5 25 0.00 0.00 0.00 619.29
332.268762502843,172.170574271787 6 30 0.00 0.00 0.00 624.29
337.268762502843,172.040543375794 7 35 0.00 0.00 0.00 629.29
342.268762502843,171.92622044998 8 40 0.00 0.00 0.00 634.29
347.268762502843,171.827605494342 9 45 0.00 0.00 0.00 639.29
352.268762502843,171.744698508883 10 50 0.00 0.00 0.00 644.29
11 55 0.00 0.00 0.00 649.29
12 60 0.00 0.00 0.00 654.29
13 65 0.00 0.00 0.00 659.29
14 70 0.00 0.00 0.00 664.29
15 75 0.00 0.00 0.00 669.29
16 80 0.00 0.00 0.00 674.29
17 85 0.00 0.00 0.00 679.29
18 90 0.00 0.00 0.00 684.29
19 95 0.00 0.00 0.00 689.29
20 100 0.00 0.00 0.00 694.29
Chart Title
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
0 20 40 60 80 100 120
0.30
0.20
0.10
0.00
0 20 40 60 80 100 120
d2 d3 d4 ∑d d min d ambil
94.2976 40 62.8650666667 222.1727 131.441778 230
66.72 30 44.48 155.818 94.1333333 160
94.2976 40 62.8650666667 222.1727 131.441778 230

dp ambil
45.00
30.00
45.00

A. Perhitungan Lengkung 3
Data :
Vr = 40 km/jam
g1 = 0.00%
g2 = 0.00%
S siap = 230 m
S henti = 45 m
A = 0.0%
L = 223.74 m

a. Perhitungan Lv minimum
Untuk S siap
Lv = 0.0 m

Untuk S henti
Lv = 0.00 m

diambil Lv = 130 m
b. Perhitungan Ev
Ev = 0.00 m

c. Perhitungan parabola lengkung vertikal cekung


1/2 Lv = 65
No x (m) y (m)
1 5 0.000
2 10 0.000
3 15 0.000
4 20 0.000
5 25 0.000
6 30 0.000
7 35 0.000
8 40 0.000
9 45 0.000
10 50 0.000
11 55 0.000
12 60 0.000
13 65 0.000
14 70 0.000
15 75 0.000
16 80 0.000
17 85 0.000
18 90 0.000
19 95 0.000
20 100 0.000
d. Perhitungan elevasi ketinggian
Elv. A = 0.0 m
Elv. PPV = 0.00 m

∆t = 0.00 m
Jarak A - PPV = 375.41592 m 1019.701
Jarak A - PLV = 310.415924 m 954.7014

Titik x (m) Elevasi


PLV 0 0.00
1 5 0.00
2 10 0.00
3 15 0.00
4 20 0.00
5 25 0.00
6 30 0.00
7 35 0.00
8 40 0.00
9 45 0.00
10 50 0.00
11 55 0.00
12 60 0.00
13 65 0.00
14 70 0.00
15 75 0.00
16 80 0.00
17 85 0.00
18 90 0.00
19 95 0.00
20 100 0.00
21 105 0.00
22 110 0.00
23 115 0.00
24 120 0.00
25 125 0.00
26 130 0.00

e. Perhitungan elevasi grade line lengkung vertikal cekung


2
d ( A  xi )  xi 
ti  xh  Yi    .E
d ( A  PPV ) 1 / 2 Lv 
Titik X Ti Yi
594.285441451828,0 594.285441451828,175.749932985941 PLV 0 0.00 0.00
599.285441451828,0 599.285441451828,175.827340045556 1 5 0.00 0.00
604.285441451828,0 604.285441451828,175.895507821591 2 10 0.00 0.00
609.285441451828,0 609.285441451828,175.954436314045 3 15 0.00 0.00
614.285441451828,0 614.285441451828,176.004125522918 4 20 0.00 0.00
619.285441451828,0 619.285441451828,176.044575448211 5 25 0.00 0.00
624.285441451828,0 624.285441451828,176.075786089923 6 30 0.00 0.00
629.285441451828,0 629.285441451828,176.097757448054 7 35 0.00 0.00
634.285441451828,0 634.285441451828,176.110489522604 8 40 0.00 0.00
639.285441451828,0 639.285441451828,176.113982313574 9 45 0.00 0.00
644.285441451828,0 644.285441451828,176.108235820962 10 50 0.00 0.00
649.285441451828,0 11 55 0.00 0.00
654.285441451828,0 12 60 0.00 0.00
659.285441451828,0 13 65 0.00 0.00
664.285441451828,0 14 70 0.00 0.00
669.285441451828,0 15 75 0.00 0.00
674.285441451828,0 16 80 0.00 0.00
679.285441451828,0 17 85 0.00 0.00
684.285441451828,0 18 90 0.00 0.00
689.285441451828,0 19 95 0.00 0.00
694.285441451828,0 20 100 0.00 0.00
21 105 0.00 0.00
22 110 0.00 0.00
23 115 0.00 0.00
24 120 0.00 0.00
25 125 0.00 0.00
26 130 0.00 0.00
Chart Title
1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
120 0 20 40 60 80 100 120 1
0.30
0.20
0.10
0.00
120 0 20 40 60 80 100 120 1
g vertikal cekung

1019.8536270951,150
969.853627095095,150
0.00 1019.70136551076,0 Kontrol Panjang Tangen

> Data 1
Data PI-1
d plv1 89.455 Vr maks 40
d1 302.269 x desain = 202.27 m
lv1 100.000
Data PI-2 x interpolasi 56
plv2 342.017
lv2 100.000 100
Alhamdulillah
Maka x = 202.269

> Data 2
Data PI-2
plv2 342.017 Vr maks 40
D2 : 353.248 x desain = 238.25 m
lv2 100.000
Data PI-3 x interpolasi 56
plv3 310.416
lv3 130.000
Alhamdulillah
Maka x = 238.248

> Data 3
Data PI-3
plv3 310.416 Vr maks 40
D3 : 384.799 x desain = 269.80 m
lv3 130.000
Data PI-2 x interpolasi 56
plv2 342.017
lv2 100.000
Alhamdulillah
Maka x = 269.799

> Data 2
Data PI-2
plv2 342.017 Vr maks 40
D2 : 353.248 x desain = 253.25 m
lv2 100.000
Data PI-1 x interpolasi 56
plv1 89.455
lv1 100.000
Alhamdulillah
Maka x = 253.248

lengkung vertikal cekung


2
 xi 
 Yi    .Ev
1 / 2 Lv 
Elv. Grade
0.00 954.7014 954.701365510755,0
0.00 959.7014 959.701365510755,0
0.00 964.7014 964.701365510755,0
0.00 969.7014 969.701365510755,0
0.00 974.7014 974.701365510755,0
0.00 979.7014 979.701365510755,0
0.00 984.7014 984.701365510755,0
0.00 989.7014 989.701365510755,0
0.00 994.7014 994.701365510755,0
0.00 999.7014 999.701365510755,0
0.00 1004.701 1004.70136551076,0
0.00 1009.701 1009.70136551076,0
0.00 1014.701 1014.70136551076,0
0.00 1019.701 1019.70136551076,0
0.00 1024.701 1024.70136551076,0
0.00 1029.701 1029.70136551076,0
0.00 1034.701 1034.70136551076,0
0.00 1039.701 1039.70136551076,0
0.00 1044.701 1044.70136551076,0
0.00 1049.701 1049.70136551076,0
0.00 1054.701 1054.70136551076,0
0.00
0.00
0.00
0.00
0.00
0.00
100 120 140
100 120 140
Jarak antar belokan (dx)

VR X minimum
80 200
30 20
Interpolasi dx
60 128
40 56
30 20
a 0 40.3668 20.1535 180 190 184.99259292 0 184.9926 0 4.642661823
1 0 71.9928 6.9061 170 180 170.95927648 302.2688 170.9593 302.268762503
2 0 28.6638 18.8328 170 180 176.57023842 644.29 176.5702 644.285441452
3 0 48.9934 11.2997 160 170 162.30637188 1019.701 162.3064 1019.8536271
b 0 0 0 180 180 180 1292.024 180 1292.17613477 6.4973065474

0 200

0 0 40.3668 20.1535 180 190 184.99259292


153.14 0 64.9762 8.4675 180 190 181.30316947
248.14 0 142.652 18.0247 170 160 168.73645655
302.2687625 0 71.9928 6.9061 170 180 170.95927648
345.16574991 0 71.4946 9.1915 180 170 178.71437843
440.16574991 0 106.9094 59.9669 190 180 184.39086741
541.42623365 0 98.7276 51.8758 190 180 184.74556254
611.42623365 0 14.0814 3.7472 180 170 177.33890096
644.29 0 28.6638 18.8328 170 180 176.57023842
667.91415186 0 48.517 0.6841 170 160 169.85899788
737.91415186 0 25.7168 11.4004 170 160 165.56694457
906.352 0 21.518 2.4712 170 160 168.85156613
996.352 0 55.577 21.4878 170 160 166.1336884
1019.854 0 48.9934 11.2997 160 170 162.30637188
1040.088 0 49.0345 17.6081 170 160 166.40903853
1130.088 0 41.0884 18.2171 170 160 165.56636423
1292.176 0 0 0 180 180 180

212
386.5591 219.2217
685.3446 525.3452

1,071.9037 956.8884
1.1201971933 1

393.4948 2391.2285
3572.1236 308.9947
474.0894

3965.6184 3174.3126
1.2492841442 1

393.4948 3482.833
3572.1236 308.9947
3965.6184 3791.8277
273.5381 308.9947
2954.5743 514.2366
393.4948 1699.6819
3621.6072 2522.9132
1.4354862466
200 400 600 800 1000

0,184.992592922897 po 0,184.992592922897
153.140646390667,181.303169468205 po 153.140646390667,181.303169468205
248.140646390667,168.736456551608 po 248.140646390667,168.736456551608
302.268762502843,170.959276483204 po 302.268762502843,170.959276483204
345.165749909461,178.714378428581 po 345.165749909461,178.714378428581
440.165749909462,184.390867407356 po 440.165749909461,184.390867407356
541.426233652689,184.74556253773 po 541.426233652689,184.74556253773
611.426233652689,177.338900961552 po 611.426233652689,177.338900961552
644.285441451828,176.570238419191 po 644.285441451828,176.570238419191
667.914151862014,169.858997877033 po 667.914151862014,169.858997877033
737.914151862014,165.56694456542 po 737.914151862014,165.56694456542
906.352190069315,168.851566130681 po 906.352190069315,168.851566130681
996.352190069315,166.133688396279 po 996.352190069315,166.133688396279
1019.8536270951,162.306371878661 po 1019.8536270951,162.306371878661
1040.08787179871,166.409038534093 po 1040.08787179871,166.409038534093
1130.08787179871,165.56636422932 po 1130.08787179871,165.56636422932
1292.17613477293,180 po ###

LUAS PENAMPANG (m2) VOLUME (m3)


NO. STA po
GALIAN TIMBUNAN GALIAN TIMBUNAN
1 sta 0±193.1876 273.5381 0.000 193.188 52844.169 0.000
2 sta 0±302.269 0.000 308.9947 113.995 0.000 35223.758
3 sta 0±644.2001 2954.5743 0.000 349.361 1032214.2 0.000
4 sta 0±829.2567 0.000 514.2366 173.690 0.000 89317.652
5 sta 0±950.8239 393.4948 0.000 131.393 51702.266 0.000
6 sta 0±1292.7613 0.000 1699.6819 332.471 0.000 565094.941
Jumlah 1136760.648 689636.351
Perbandingan 2099.567 1274
Column G

1000 1200 1400

Area
3169468205 1214.677
6456551608 20089.52 1972.863 13610.95 2846.598 12714.15
9276483204 1396.513 1396.513 1422.219
4378428581 2292.538 2292.538 2292.538
0867407356 4276.047 4276.047 4276.047
6887.237 22382.06 7645.423 15903.49 8544.864 15006.68
8900961552 3.249789 2.080132 1.756223
0238419191
8997877033
1566130681
3688396279

9038534093

Anda mungkin juga menyukai