( TKDN )
Uraian Pekerjaan
Total Nilai
DN LN % gabungan
Ribu Barang/jasa
( KDN )
1 2 3 4 5 6 7
BARANG
( Bahan Baku )
( Barang Jadi )
JASA
dan Perekayasaan
Kerja
= 56.30% + 43.70%
% TKDN = 100%
.............................
Direktur
ANALISA HARGA SATUAN S.N.I
NO. URAIAN KOEF SAT HARGA SAT matrial HARGA SAT upah JUMLAH matrial JUMLAH upah TOTAL harga
A B C D E F G=(CXE) H = (C X F ) I=(G+H)
I PEKERJAAN PERSIAPAN
ANALISA 001 1 m' Pagar Sementara dari Kayu tinggi 2 m 310,752.00 77,200.00 387,952.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.250 btg Rp 100,000.00 Rp 125,000.00
Semen Portland 2.500 Kg Rp 1,900.00 Rp 4,750.00
Pasir Beton 0.005 m3 Rp 340,000.00 Rp 1,700.00
Koral Beton 0.009 m3 Rp 380,000.00 Rp 3,420.00
Kaso 5 / 7 ( albasiah ) 0.072 m3 Rp 2,300,000.00 Rp 165,600.00
Paku Biasa 2" - 5" 0.060 Kg Rp 28,700.00 Rp 1,722.00
Residu 0.400 Lt Rp 21,400.00 Rp 8,560.00
Tenaga
Tukang Kayu 0.200 Oh Rp 135,000.00 Rp 27,000.00
Perkerja 0.400 Oh Rp 110,000.00 Rp 44,000.00
Kepala Tukang 0.020 Oh Rp 150,000.00 Rp 3,000.00
Mandor 0.020 Oh Rp 160,000.00 Rp 3,200.00
ANALISA 002 1 m' Pagar Sementara dari Seng Gelombang tinggi 2 m 812,292.00 77,200.00 889,492.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.250 btg Rp 100,000.00 125,000.00
Semen Portland 2.500 Kg Rp 1,900.00 4,750.00
Pasir Beton 1.200 m3 Rp 340,000.00 408,000.00
Koral Beton 0.009 m3 Rp 380,000.00 3,420.00
Kaso 5 / 7 ( albasiah ) 0.072 m3 Rp 2,300,000.00 165,600.00
Paku Biasa 2" - 5" 0.060 Kg Rp 28,700.00 1,722.00
Seng Gelombang BJLS 0.20 2.000 Lbr Rp 51,900.00 103,800.00
Tenaga
Tukang Kayu 0.200 Oh Rp 135,000.00 Rp 27,000.00
Perkerja 0.400 Oh Rp 110,000.00 Rp 44,000.00
Kepala Tukang 0.020 Oh Rp 150,000.00 Rp 3,000.00
Mandor 0.020 Oh Rp 160,000.00 Rp 3,200.00
ANALISA 003 1 m' Pagar Sementara dari Kawat Duri tinggi 1.8 m 1,478,142.00 66,200.00 1,544,342.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.000 btg Rp 100,000.00 100,000.00
Semen Portland 2.000 Kg Rp 1,900.00 3,800.00
Kawat Duri 25.000 Kg Rp 54,700.00 1,367,500.00
Pasir Beton 0.005 m3 Rp 340,000.00 1,700.00
Koral Beton 0.009 m3 Rp 380,000.00 3,420.00
Paku Biasa 2" - 5" 0.060 Kg Rp 28,700.00 1,722.00
Tenaga
Tukang Kayu 0.200 Oh Rp 135,000.00 27,000
Perkerja 0.300 Oh Rp 110,000.00 33,000
Kepala Tukang 0.020 Oh Rp 150,000.00 3,000
Mandor 0.020 Oh Rp 160,000.00 3,200
ANALISA 004 1 m' Pek. Pengukuran kembali (site) & Pemasangan Bowplank 64,974.00 26,800.00 91,774.00
Bahan
Kayu Kaso 5 / 7 (borneo) 0.021 m3 Rp 2,300,000.00 48,300.00
Paku Biasa 2" - 5" 0.020 Kg Rp 28,700.00 574.00
Kayu Papan 3 / 20 borneo 0.007 m3 Rp 2,300,000.00 16,100.00
Tenaga
Tukang Kayu 0.100 Oh Rp 135,000.00 13,500
Perkerja 0.100 Oh Rp 110,000.00 11,000
Kepala Tukang 0.010 Oh Rp 150,000.00 1,500
Mandor 0.005 Oh Rp 160,000.00 800
ANALISA 005 1 m² Pek. Kantor Direksi Keet , dengan lantai plesteran 1,293,759.00 678,000.00 1,971,759.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.250 btg Rp 100,000.00 125,000.00
Kayu Balok Borneo 0.180 m3 Rp 2,300,000.00 414,000.00
Paku 0.850 Kg Rp 28,700.00 24,395.00
Besi Strip 1.100 Kg Rp 18,300.00 20,130.00
Semen Portland 35.000 Kg Rp 1,900.00 66,500.00
Pasir Pasang 0.150 m3 Rp 350,000.00 52,500.00
Pasir Beton 0.100 m3 Rp 340,000.00 34,000.00
Koral Beton 0.150 m3 Rp 380,000.00 57,000.00
Bata merah kelas I 30.000 bh Rp 1,800.00 54,000.00
Seng Plat 0.250 lbr Rp 79,100.00 19,775.00
Jendela Nako 2.000 bh Rp 200,000.00 400,000.00
Kaca Polos 0.080 m2 Rp 100,900.00 8,072.00
Kunci Tanam 0.150 bh Rp 90,900.00 13,635.00
Plywood 3 mm 0.060 lbr Rp 79,200.00 4,752.00
Tenaga
Tukang Kayu 2.000 Oh Rp 135,000.00 270,000
Tukang Batu 1.000 Oh Rp 135,000.00 135,000
Perkerja 2.000 Oh Rp 110,000.00 220,000
Kepala Tukang 0.300 Oh Rp 150,000.00 45,000
Mandor 0.050 Oh Rp 160,000.00 8,000
ANALISA 006 1 m² Pembuatan Gudang Semen dan Alat - alat 792,410.00 663,000.00 1,455,410.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 1.700 btg Rp 100,000.00 170,000.00
Kayu Balok Borneo 0.210 m3 Rp 2,300,000.00 483,000.00
Paku 0.300 Kg Rp 28,700.00 8,610.00
Semen Portland 12.500 Kg Rp 1,900.00 23,750.00
Pasir Beton 0.030 m3 Rp 340,000.00 10,200.00
Koral Beton 0.050 m3 Rp 380,000.00 19,000.00
Seng Gelombang BJLS 0.20 1.500 lbr Rp 51,900.00 77,850.00
Tenaga
Tukang Kayu 3.000 Oh Rp 135,000.00 405,000
Perkerja 2.000 Oh Rp 110,000.00 220,000
Kepala Tukang 0.200 Oh Rp 150,000.00 30,000
Mandor 0.050 Oh Rp 160,000.00 8,000
ANALISA 007 1 m² Pembuatan Rumah Jaga / Konstruksi Kayu 1,032,740.00 343,000.00 1,375,740.00
Bahan
Dolken Kayu Ø 8 - 10/400 cm 3.000 btg Rp 100,000.00 300,000.00
Kayu Balok Borneo 0.276 m3 Rp 2,300,000.00 634,800.00
Paku 0.700 Kg Rp 28,700.00 20,090.00
Seng Gelombang BJLS 0.20 1.500 lbr Rp 51,900.00 77,850.00
Tenaga
Tukang Kayu 1.500 Oh Rp 135,000.00 202,500
Perkerja 1.000 Oh Rp 110,000.00 110,000
Kepala Tukang 0.150 Oh Rp 150,000.00 22,500
Mandor 0.050 Oh Rp 160,000.00 8,000
ANALISA 014 1 m³ Bongkaran Dinding Tembok Bata Merah 0.00 738,650.00 738,650.00
Tenaga
Perkerja 6.667 Oh 110,000.00 733,370
Mandor 0.033 Oh 160,000.00 5,280
II PEKERJAAN TANAH
ANALISA 015 1 m3 Pek. Galian Tanah Biasa Max Kedalaman 1 m' 0.00 50,400.00 50,400.00
Tenaga
Perkerja 0.400 Oh 110,000.00 44,000
Tukang Gali Oh 135,000.00 -
Kepala Tukang Oh 150,000.00 -
Mandor 0.040 Oh 160,000.00 6,400
ANALISA 016 1 m3 Pek. Galian Tanah Biasa Max Kedalaman 2 m' 0.00 66,070.00 66,070.00
Tenaga
Perkerja 0.525 Oh 110,000.00 57,750
Tukang Gali Oh 135,000.00 -
Kepala Tukang Oh 150,000.00 -
Mandor 0.052 Oh 160,000.00 8,320
ANALISA 017 1 m3 Pek. Galian Tanah Biasa Max Kedalaman 3 m' 0.00 92,530.00 92,530.00
Tenaga
Perkerja 0.735 Oh 110,000.00 80,850
Tukang Gali - Oh 135,000.00 -
Kepala Tukang - Oh 150,000.00 -
Mandor 0.073 Oh 160,000.00 11,680
ANALISA 018 1 m3 Pek. Galian Tanah Keras Max Kedalaman 1 m' 0.00 78,670.00 78,670.00
Tenaga
Perkerja 0.625 Oh 110,000.00 68,750
Tukang Gali - Oh 135,000.00 -
Kepala Tukang - Oh 150,000.00 -
Mandor 0.062 Oh 160,000.00 9,920
ANALISA 019 1 m3 Pek. Galian Tanah Cadas Max Kedalaman 1 m' 0.00 346,500.00 346,500.00
Tenaga
Perkerja 2.750 Oh 110,000.00 302,500
Tukang Gali - Oh 135,000.00 -
Kepala Tukang - Oh 150,000.00 -
Mandor 0.275 Oh 160,000.00 44,000
ANALISA 020 1 m3 Pek. Galian Tanah Lumpur Max Kedalaman 1 m' 0.00 103,810.00 103,810.00
Tenaga
Perkerja 0.823 Oh 110,000.00 90,530
Tukang Gali - Oh 135,000.00 -
Kepala Tukang - Oh 150,000.00 -
Mandor 0.083 Oh 160,000.00 13,280
IV PEKERJAAN DINDING
ANALISA 030 1 m2 Pasangan Bata Merah 1Pc : 3Ps 1 Bata 346,455.00 106,300.00 452,755.00
Bahan
Bata merah kelas I 140.000 bh 1,800.00 252,000.00
Semen Portland 32.950 Kg 1,900.00 62,605.00
Pasir Pasang 0.091 m3 350,000.00 31,850.00
Tenaga
Perkerja 0.650 Oh 110,000.00 71,500
Tukang Batu 0.200 Oh 135,000.00 27,000
Kepala Tukang 0.020 Oh 150,000.00 3,000
Mandor 0.030 Oh 160,000.00 4,800
ANALISA 031 1 m2 Pasangan Bata Merah 1Pc : 5Ps 1 Bata 329,880.00 106,300.00 436,180.00
Bahan
Bata merah kelas I 140.000 bh 1,800.00 252,000.00
Semen Portland 22.200 Kg 1,900.00 42,180.00
Pasir Pasang 0.102 m3 350,000.00 35,700.00
Tenaga
Perkerja 0.650 Oh 110,000.00 71,500
Tukang Batu 0.200 Oh 135,000.00 27,000
Kepala Tukang 0.020 Oh 150,000.00 3,000
Mandor 0.030 Oh 160,000.00 4,800
ANALISA 032 1 m2 Pasangan Bata Merah 1Pc : 3Ps 1/2 Bata 167,303.00 52,600.00 219,903.00
Bahan
Bata merah kelas I 70.000 bh 1,800.00 126,000.00
Semen Portland 14.370 Kg 1,900.00 27,303.00
Pasir Pasang 0.040 m3 350,000.00 14,000.00
Tenaga
Perkerja 0.320 Oh 110,000.00 35,200
Tukang Batu 0.100 Oh 135,000.00 13,500
Kepala Tukang 0.010 Oh 150,000.00 1,500
Mandor 0.015 Oh 160,000.00 2,400
ANALISA 033 1 m2 Pasangan Bata Merah 1Pc : 5Ps 1/2 Bata 160,142.00 52,600.00 212,742.00
Bahan
Bata merah kelas I 70.000 bh 1,800.00 126,000.00
Semen Portland 9.680 Kg 1,900.00 18,392.00
Pasir Pasang 0.045 m3 350,000.00 15,750.00
Tenaga
Perkerja 0.320 Oh 110,000.00 35,200
Tukang Batu 0.100 Oh 135,000.00 13,500
Kepala Tukang 0.010 Oh 150,000.00 1,500
Mandor 0.015 Oh 160,000.00 2,400
V PEKERJAAN PELESTERAN
ANALISA 032 1 m2 Plesteran Dinding 1Pc : 3Ps 18,962.00 46,100.00 65,062.00
Bahan
Semen Portland 6.480 Kg 1,900.00 12,312.00
Pasir Pasang 0.019 m3 350,000.00 6,650.00
Tenaga
Perkerja 0.200 Oh 110,000.00 22,000
Tukang Batu 0.150 Oh 135,000.00 20,250
Kepala Tukang 0.015 Oh 150,000.00 2,250
Mandor 0.010 Oh 160,000.00 1,600
ANALISA 034 1 m2 Plesteran Dinding 1Pc : 0. 5Kp : 3 Ps, tebal 15 mm 13,958.00 46,100.00 60,058.00
Bahan
Semen Portland 4.320 Kg 1,900.00 8,208.00
Kapur Padam 0.003 m3 400,000.00 1,200.00
Pasir Pasang 0.013 m3 350,000.00 4,550.00
Tenaga
Perkerja 0.200 Oh 110,000.00 22,000
Tukang Batu 0.150 Oh 135,000.00 20,250
Kepala Tukang 0.015 Oh 150,000.00 2,250
Mandor 0.010 Oh 160,000.00 1,600
ANALISA 035 1 m2 Plesteran Dinding 1Pc : 3Kp : 10Ps, tebal 15 mm 10,796.00 46,100.00 56,896.00
Bahan
Semen Portland 1.840 Kg 1,900.00 3,496.00
Kapur Padam 0.006 m3 400,000.00 2,400.00
Pasir Pasang 0.014 m3 350,000.00 4,900.00
Tenaga
Perkerja 0.200 Oh 110,000.00 22,000
Tukang Batu 0.150 Oh 135,000.00 20,250
Kepala Tukang 0.015 Oh 150,000.00 2,250
Mandor 0.010 Oh 160,000.00 1,600
ANALISA 036 1 m2 Plesteran 0.5Pc : 1Kp : 4Ps, tebal 15 mm 14,350.00 46,100.00 60,450.00
Bahan
Semen Portland 3.000 Kg 1,900.00 5,700.00
Kapur Padam 0.005 m3 400,000.00 2,000.00
Pasir Pasang 0.019 m3 350,000.00 6,650.00
Tenaga
Perkerja 0.200 Oh 110,000.00 22,000
Tukang Batu 0.150 Oh 135,000.00 20,250
Kepala Tukang 0.015 Oh 150,000.00 2,250
Mandor 0.010 Oh 160,000.00 1,600
ANALISA 055 1 m2 Pelesteran Beton 1Pc : 2Ps, tebal 15 mm 23,970.00 60,680.00 84,650.00
Bahan
Semen Portland 9.300 Kg 1,900.00 17,670.00
Pasir Pasang 0.018 m3 350,000.00 6,300.00
Tenaga
Perkerja 0.260 Oh 110,000.00 28,600
Tukang Batu 0.200 Oh 135,000.00 27,000
Kepala Tukang 0.020 Oh 150,000.00 3,000
Mandor 0.013 Oh 160,000.00 2,080
ANALISA 056 1 m2 Pelesteran Beton 1Pc : 3Ps, tebal 15 mm 20,783.00 60,680.00 81,463.00
Bahan
Semen Portland 7.070 Kg 1,900.00 13,433.00
Pasir Pasang 0.021 m3 350,000.00 7,350.00
Tenaga
Perkerja 0.260 Oh 110,000.00 28,600
Tukang Batu 0.200 Oh 135,000.00 27,000
Kepala Tukang 0.020 Oh 150,000.00 3,000
Mandor 0.013 Oh 160,000.00 2,080
ANALISA 058 1 m2 Pelesteran Granito 1Pc Warna : 2 Granito, tebal 10 mm 5,250,273.60 9,300.00 5,259,573.60
Bahan
PC Warna 0.144 Kg 1,900.00 273.60
Batu Granito 15.000 Kg 350,000.00 5,250,000.00
Tenaga
Perkerja 0.050 Oh 110,000.00 5,500
Tukang Batu 0.020 Oh 135,000.00 2,700
Kepala Tukang 0.002 Oh 150,000.00 300
Mandor 0.005 Oh 160,000.00 800
ANALISA 059 1 m2 Pelesteran Teraso 1Pc Warna : 2 Batu Teraso, tebal 10 mm 4,025,836.00 83,500.00 4,109,336.00
Bahan
PC Warna 0.440 Kg 1,900.00 836.00
Batu Teraso 11.500 Kg 350,000.00 4,025,000.00
Tenaga
Perkerja 0.450 Oh 110,000.00 49,500
Tukang Batu 0.200 Oh 135,000.00 27,000
Kepala Tukang 0.020 Oh 150,000.00 3,000
Mandor 0.025 Oh 160,000.00 4,000
1m³ Pasang Kusen Pintu dan Jendela Kayu Borneo 2,760,000.00 3,438,000.00 6,198,000.00
Bahan
Kayu Balok Borneo 1.200 m3 2,300,000.00 2,760,000.00
Tenaga
Perkerja 6.000 Oh 110,000.00 660,000
Tukang Kayu 18.000 Oh 135,000.00 2,430,000
Kepala Tukang 2.000 Oh 150,000.00 300,000
Mandor 0.300 Oh 160,000.00 48,000
1m³ Pasang Kusen Pintu dan Jendela Kayu Damar Laut 2,760,000.00 3,438,000.00 6,198,000.00
Bahan
Kayu Balok Damar Laut 1.200 m3 2,300,000.00 2,760,000.00
Tenaga
Perkerja 6.000 Oh 110,000.00 660,000
Tukang Kayu 18.000 Oh 135,000.00 2,430,000
Kepala Tukang 2.000 Oh 150,000.00 300,000
Mandor 0.300 Oh 160,000.00 48,000
1m² Pasang Pintu dan Jendela Kaca Kayu Jati 154,000.00 394,400.00 548,400.00
Bahan
Papan Kayu Jati 0.035 m3 4,400,000.00 154,000.00
Tenaga
Perkerja 0.800 Oh 110,000.00 88,000
Tukang Kayu 2.000 Oh 135,000.00 270,000
Kepala Tukang 0.200 Oh 150,000.00 30,000
Mandor 0.040 Oh 160,000.00 6,400
1m² Pasang Pintu dan Jendela Kaca Kayu Kamper 154,000.00 394,400.00 548,400.00
Bahan
Papan Kayu Kamper 0.035 m3 4,400,000.00 154,000.00
Tenaga
Perkerja 0.800 Oh 110,000.00 88,000
Tukang Kayu 2.000 Oh 135,000.00 270,000
Kepala Tukang 0.200 Oh 150,000.00 30,000
Mandor 0.040 Oh 160,000.00 6,400
1m² Pasang Pintu dan Jendela Kaca Kayu Borneo 87,500.00 394,400.00 481,900.00
Bahan
Papan Kayu Borneo 0.035 m3 2,500,000.00 87,500.00
Tenaga
Perkerja 0.800 Oh 110,000.00 88,000
Tukang Kayu 2.000 Oh 135,000.00 270,000
Kepala Tukang 0.200 Oh 150,000.00 30,000
Mandor 0.040 Oh 160,000.00 6,400
1m² Pasang Pintu dan Jendela Jalusi Kayu Borneo 160,000.00 608,000.00 768,000.00
Bahan
Papan Kayu Borneo 0.064 m3 2,500,000.00 160,000.00
Tenaga
Perkerja 1.000 Oh 110,000.00 110,000
Tukang Kayu 3.000 Oh 135,000.00 405,000
Kepala Tukang 0.300 Oh 150,000.00 45,000
Mandor 0.300 Oh 160,000.00 48,000
1m² Pasang Pintu dan Jendela Jalusi Kayu Kamper 160,000.00 640,000.00 800,000.00
Bahan
Papan Kayu Borneo 0.064 m3 2,500,000.00 160,000.00
Tenaga
Perkerja 1.000 Oh 110,000.00 110,000
Tukang Kayu 3.000 Oh 135,000.00 405,000
Kepala Tukang 0.300 Oh 150,000.00 45,000
Mandor 0.500 Oh 160,000.00 80,000
1m² Pasang Pintu Plywood rangkap, rangka kayu Jati 170,015.00 370,800.00 540,815.00
Bahan
Papan Kayu Jati 0.0196 m3 4,400,000.00 86,240.00
Paku Biasa ½" - 1" 0.030 Kg 27,500.00 825.00
Lem Kayu 0.300 Lt 12,500.00 3,750.00
Playwood 3 mm 1.000 Lbr 79,200.00 79,200.00
Tenaga
Perkerja 0.600 Oh 110,000.00 66,000
Tukang Kayu 2.000 Oh 135,000.00 270,000
Kepala Tukang 0.200 Oh 150,000.00 30,000
Mandor 0.030 Oh 160,000.00 4,800
1m² Pasang Pintu Plywood rangkap, rangka kayu Kamper 170,015.00 370,800.00 540,815.00
Bahan
Papan Kayu Jati 0.0196 m3 4,400,000.00 86,240.00
Paku Biasa ½" - 1" 0.030 Kg 27,500.00 825.00
Lem Kayu 0.300 Lt 12,500.00 3,750.00
Playwood 3 mm 1.000 Lbr 79,200.00 79,200.00
Tenaga
Perkerja 0.600 Oh 110,000.00 66,000
Tukang Kayu 2.000 Oh 135,000.00 270,000
Kepala Tukang 0.200 Oh 150,000.00 30,000
Mandor 0.030 Oh 160,000.00 4,800
1m² Pasang Jalusi Mati Kusen Kayu Jati 268,125.00 359,000.00 627,125.00
Bahan
Papan Kayu Jati 0.0600 m3 4,400,000.00 264,000.00
Paku Biasa ½" - 1" 0.150 Kg 27,500.00 4,125.00
Tenaga
Perkerja 0.500 Oh 110,000.00 55,000
Tukang Kayu 2.000 Oh 135,000.00 270,000
Kepala Tukang 0.200 Oh 150,000.00 30,000
Mandor 0.025 Oh 160,000.00 4,000
1m² Pasang Jalusi Mati Kusen Kayu Kamper 250,125.00 359,000.00 609,125.00
Bahan
Papan Kayu Jati 0.0600 m3 4,100,000.00 246,000.00
Paku Biasa ½" - 1" 0.150 Kg 27,500.00 4,125.00
Tenaga
Perkerja 0.500 Oh 110,000.00 55,000
Tukang Kayu 2.000 Oh 135,000.00 270,000
Kepala Tukang 0.200 Oh 150,000.00 30,000
Mandor 0.025 Oh 160,000.00 4,000
1m² Pasang Pintu Plywood Rangkap, rangka Kayu Borneo 132,775.00 370,800.00 503,575.00
Bahan
Papan Kayu Borneo 0.0196 m3 2,500,000.00 49,000.00
Paku Biasa ½" - 1" 0.030 Kg 27,500.00 825.00
Lem Kayu 0.300 Lt 12,500.00 3,750.00
Playwood 3 mm 1.000 lbr 79,200.00 79,200.00
Tenaga
Perkerja 0.600 Oh 110,000.00 66,000
Tukang Kayu 2.000 Oh 135,000.00 270,000
Kepala Tukang 0.200 Oh 150,000.00 30,000
Mandor 0.030 Oh 160,000.00 4,800
1m² Pasang Pintu Teakwood Rangkap, rangka Kayu Jati 177,440.00 370,800.00 548,240.00
Bahan
Papan Kayu Jati 0.0196 m3 4,400,000.00 86,240.00
Paku Biasa ½" - 1" 0.300 Kg 27,500.00 8,250.00
Lem Kayu 0.300 Lt 12,500.00 3,750.00
Playwood 3 mm 1.000 lbr 79,200.00 79,200.00
Tenaga
Perkerja 0.600 Oh 110,000.00 66,000
Tukang Kayu 2.000 Oh 135,000.00 270,000
Kepala Tukang 0.200 Oh 150,000.00 30,000
Mandor 0.030 Oh 160,000.00 4,800
1m² Pasang Pintu Teakwood Rangkap, rangka Kayu Kamper 177,440.00 370,800.00 548,240.00
Bahan
Papan Kayu Jati 0.0196 m3 4,400,000.00 86,240.00
Paku Biasa ½" - 1" 0.300 Kg 27,500.00 8,250.00
Lem Kayu 0.300 Lt 12,500.00 3,750.00
Playwood 3 mm 1.000 lbr 79,200.00 79,200.00
Tenaga
Perkerja 0.600 Oh 110,000.00 66,000
Tukang Kayu 2.000 Oh 135,000.00 270,000
Kepala Tukang 0.200 Oh 150,000.00 30,000
Mandor 0.030 Oh 160,000.00 4,800
1m² Pasang Pintu Plywood & Formika, rangka Kayu Jati #N/A 469,400.00 #N/A
Bahan
Papan Kayu Jati 0.0196 m3 4,100,000.00 80,360.00
Paku Biasa ½" - 1" 0.300 Kg 27,500.00 8,250.00
Lem Kayu 0.800 Lt 12,500.00 10,000.00
Playwood 3 mm 1.000 lbr 79,200.00 79,200.00
Formika 4' x 3' 0.500 lbr #N/A #N/A
Tenaga
Perkerja 0.800 Oh 110,000.00 88,000
Tukang Kayu 2.500 Oh 135,000.00 337,500
Kepala Tukang 0.250 Oh 150,000.00 37,500
Mandor 0.040 Oh 160,000.00 6,400
1m3 Pasang Konstruksi Kuda - kuda Kayu Jati 5,137,460.00 2,272,000.00 7,409,460.00
Bahan
Balok Kayu Jati 1.100 m3 4,400,000.00 4,840,000.00
Besi Strip 15.000 18,300.00 274,500.00
Paku Biasa 2" - 5" 0.800 Kg 28,700.00 22,960.00
Tenaga
Perkerja 4.000 Oh 110,000.00 440,000
Tukang Kayu 12.000 Oh 135,000.00 1,620,000
Kepala Tukang 1.200 Oh 150,000.00 180,000
Mandor 0.200 Oh 160,000.00 32,000
1m3 Pasang Konstruksi Kuda - kuda Kayu Kamper 4,917,460.00 2,272,000.00 7,189,460.00
Bahan
Balok Kayu Kamper 1.100 m3 4,200,000.00 4,620,000.00
Besi Strip 15.000 Kg 18,300.00 274,500.00
Paku Biasa 2" - 5" 0.800 Kg 28,700.00 22,960.00
Tenaga
Perkerja 4.000 Oh 110,000.00 440,000
Tukang Kayu 12.000 Oh 135,000.00 1,620,000
Kepala Tukang 1.200 Oh 150,000.00 180,000
Mandor 0.200 Oh 160,000.00 32,000
1m3 Pasang Konstruksi Kuda - kuda Kayu Borneo 2,827,460.00 2,272,000.00 5,099,460.00
Bahan
Balok Kayu Borneo 1.100 m3 2,300,000.00 2,530,000.00
Besi Strip 15.000 Kg 18,300.00 274,500.00
Paku Biasa 2" - 5" 0.800 Kg 28,700.00 22,960.00
Tenaga
Perkerja 4.000 Oh 110,000.00 440,000
Tukang Kayu 12.000 Oh 135,000.00 1,620,000
Kepala Tukang 1.200 Oh 150,000.00 180,000
Mandor 0.200 Oh 160,000.00 32,000
1m3 Pasang Konstruksi Kuda - kuda Kayu Kruing 2,824,020.00 2,272,000.00 5,096,020.00
Bahan
Balok Kayu Kruing 1.100 m3 2,300,000.00 2,530,000.00
Besi Strip 15.000 Kg 18,300.00 274,500.00
Paku Biasa 2" - 5" 0.800 Kg 24,400.00 19,520.00
Tenaga
Perkerja 4.000 Oh 110,000.00 440,000
Tukang Kayu 12.000 Oh 135,000.00 1,620,000
Kepala Tukang 1.200 Oh 150,000.00 180,000
Mandor 0.200 Oh 160,000.00 32,000
1m² Pasang Kaso + Reng Genteng Kodok Kayu Kamper 54,705.00 26,800.00 81,505.00
Bahan
Balok Kayu Kamper 0.012 m3 4,200,000.00 50,400.00
Paku Biasa 2" - 5" 0.150 Kg 28,700.00 4,305.00
Tenaga
Perkerja 0.100 Oh 110,000.00 11,000
Tukang Kayu 0.100 Oh 135,000.00 13,500
Kepala Tukang 0.010 Oh 150,000.00 1,500
Mandor 0.005 Oh 160,000.00 800
1m² Pasang Kaso + Reng Genteng Kodok Kayu Borneo 31,905.00 26,800.00 58,705.00
Bahan
Balok Kayu Borneo 0.012 m3 2,300,000.00 27,600.00
Paku Biasa 2" - 5" 0.150 Kg 28,700.00 4,305.00
Tenaga
Perkerja 0.100 Oh 110,000.00 11,000
Tukang Kayu 0.100 Oh 135,000.00 13,500
Kepala Tukang 0.010 Oh 150,000.00 1,500
Mandor 0.005 Oh 160,000.00 800
1m² Pasang Kaso + Reng Genteng Monier Kayu Jati 63,105.00 26,800.00 89,905.00
Bahan
Balok Kayu Jati 0.014 m3 4,200,000.00 58,800.00
Paku Biasa 2" - 5" 0.150 Kg 28,700.00 4,305.00
Tenaga
Perkerja 0.100 Oh 110,000.00 11,000
Tukang Kayu 0.100 Oh 135,000.00 13,500
Kepala Tukang 0.010 Oh 150,000.00 1,500
Mandor 0.005 Oh 160,000.00 800
1m² Pasang Kaso + Reng Genteng Monier Kayu Kamper 63,105.00 26,800.00 89,905.00
Bahan
Balok Kayu Kamper 0.014 m3 4,200,000.00 58,800.00
Paku Biasa 2" - 5" 0.150 Kg 28,700.00 4,305.00
Tenaga
Perkerja 0.100 Oh 110,000.00 11,000
Tukang Kayu 0.100 Oh 135,000.00 13,500
Kepala Tukang 0.010 Oh 150,000.00 1,500
Mandor 0.005 Oh 160,000.00 800
1m² Pasang Kaso + Reng Genteng Beton Kayu Borneo 36,505.00 26,800.00 63,305.00
Bahan
Balok Kayu Borneo 0.014 m3 2,300,000.00 32,200.00
Paku Biasa 2" - 5" 0.150 Kg 28,700.00 4,305.00
Tenaga
Perkerja 0.100 Oh 110,000.00 11,000
Tukang Kayu 0.100 Oh 135,000.00 13,500
Kepala Tukang 0.010 Oh 150,000.00 1,500
Mandor 0.005 Oh 160,000.00 800
1m² Pasang Kaso + Reng Atap Sirap Kayu Kamper 698,740.00 32,160.00 730,900.00
Bahan
Balok Kayu Kamper 0.165 m3 4,200,000.00 693,000.00
Paku Biasa 2" - 5" 0.200 Kg 28,700.00 5,740.00
Tenaga
Perkerja 0.120 Oh 110,000.00 13,200
Tukang Kayu 0.120 Oh 135,000.00 16,200
Kepala Tukang 0.012 Oh 150,000.00 1,800
Mandor 0.006 Oh 160,000.00 960
1m² Pasang Kaso + Reng Atap Sirap Kayu Borneo 698,740.00 32,160.00 730,900.00
Bahan
Balok Kayu Kamper 0.165 m3 4,200,000.00 693,000.00
Paku Biasa 2" - 5" 0.200 Kg 28,700.00 5,740.00
Tenaga
Perkerja 0.120 Oh 110,000.00 13,200
Tukang Kayu 0.120 Oh 135,000.00 16,200
Kepala Tukang 0.012 Oh 150,000.00 1,800
Mandor 0.006 Oh 160,000.00 960
1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Jati 53,270.00 66,000.00 119,270.00
Bahan
Balok Kayu Jati 0.012 m3 4,200,000.00 50,400.00
Paku Biasa 2" - 5" 0.100 Kg 28,700.00 2,870.00
Tenaga
Perkerja 0.150 Oh 110,000.00 16,500
Tukang Kayu 0.250 Oh 135,000.00 33,750
Kepala Tukang 0.025 Oh 150,000.00 3,750
Mandor 0.075 Oh 160,000.00 12,000
1m' Pasang papan ruiter ( 3 x 20 )cm Kayu Borneo 19,435.00 42,550.00 61,985.00
Bahan
Kayu Papan 3 / 20 borneo 0.0072 m3 2,500,000.00 18,000.00
Paku Biasa 2" - 5" 0.050 Kg 28,700.00 1,435.00
Tenaga
Perkerja 0.100 Oh 110,000.00 11,000
Tukang Kayu 0.200 Oh 135,000.00 27,000
Kepala Tukang 0.025 Oh 150,000.00 3,750
Mandor 0.005 Oh 160,000.00 800
1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Kamper 53,270.00 66,000.00 119,270.00
Bahan
Balok Kayu Kamper 0.012 m3 4,200,000.00 50,400.00
Paku Biasa 2" - 5" 0.100 Kg 28,700.00 2,870.00
Tenaga
Perkerja 0.150 Oh 110,000.00 16,500
Tukang Kayu 0.250 Oh 135,000.00 33,750
Kepala Tukang 0.025 Oh 150,000.00 3,750
Mandor 0.075 Oh 160,000.00 12,000
1m² Pasang Rangka Langit - langit ( 1 x 1 ) m Kayu Borneo 53,270.00 66,000.00 119,270.00
Bahan
Balok Kayu Kamper 0.012 m3 4,200,000.00 50,400.00
Paku Biasa 2" - 5" 0.100 Kg 28,700.00 2,870.00
Tenaga
Perkerja 0.150 Oh 110,000.00 16,500
Tukang Kayu 0.250 Oh 135,000.00 33,750
Kepala Tukang 0.025 Oh 150,000.00 3,750
Mandor 0.075 Oh 160,000.00 12,000
1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Jati 100,905.00 68,600.00 169,505.00
Bahan
Balok Kayu Jati 0.023 m3 4,200,000.00 96,600.00
Paku Biasa 2" - 5" 0.150 Kg 28,700.00 4,305.00
Tenaga
Perkerja 0.200 Oh 110,000.00 22,000
Tukang Kayu 0.300 Oh 135,000.00 40,500
Kepala Tukang 0.030 Oh 150,000.00 4,500
Mandor 0.010 Oh 160,000.00 1,600
1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Kamper 100,905.00 68,600.00 169,505.00
Bahan
Balok Kayu Kamper 0.023 m3 4,200,000.00 96,600.00
Paku Biasa 2" - 5" 0.150 Kg 28,700.00 4,305.00
Tenaga
Perkerja 0.200 Oh 110,000.00 22,000
Tukang Kayu 0.300 Oh 135,000.00 40,500
Kepala Tukang 0.030 Oh 150,000.00 4,500
Mandor 0.010 Oh 160,000.00 1,600
1m² Pasang Rangka Langit - langit ( 30 x 60 )cm Kayu Borneo 57,205.00 68,600.00 125,805.00
Bahan
Balok Kayu Borneo 0.023 m3 2,300,000.00 52,900.00
Paku Biasa 2" - 5" 0.150 Kg 28,700.00 4,305.00
Tenaga
Perkerja 0.200 Oh 110,000.00 22,000
Tukang Kayu 0.300 Oh 135,000.00 40,500
Kepala Tukang 0.030 Oh 150,000.00 4,500
Mandor 0.010 Oh 160,000.00 1,600
1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Jati 119,140.00 82,000.00 201,140.00
Bahan
Balok Kayu Jati 0.027 m3 4,200,000.00 113,400.00
Paku Biasa 2" - 5" 0.200 Kg 28,700.00 5,740.00
Tenaga
Perkerja 0.250 Oh 110,000.00 27,500
Tukang Kayu 0.350 Oh 135,000.00 47,250
Kepala Tukang 0.035 Oh 150,000.00 5,250
Mandor 0.0125 Oh 160,000.00 2,000
1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Kamper 119,140.00 82,000.00 201,140.00
Bahan
Balok Kayu Kamper 0.027 m3 4,200,000.00 113,400.00
Paku Biasa 2" - 5" 0.200 Kg 28,700.00 5,740.00
Tenaga
Perkerja 0.250 Oh 110,000.00 27,500
Tukang Kayu 0.350 Oh 135,000.00 47,250
Kepala Tukang 0.035 Oh 150,000.00 5,250
Mandor 0.0125 Oh 160,000.00 2,000
1m² Pasang Rangka Langit - langit ( 30 x 30 )cm Kayu Borneo 67,840.00 82,000.00 149,840.00
Bahan
Balok Kayu Borneo 0.027 m3 2,300,000.00 62,100.00
Paku Biasa 2" - 5" 0.200 Kg 28,700.00 5,740.00
Tenaga
Perkerja 0.250 Oh 110,000.00 27,500
Tukang Kayu 0.350 Oh 135,000.00 47,250
Kepala Tukang 0.035 Oh 150,000.00 5,250
Mandor 0.0125 Oh 160,000.00 2,000
1m² Pasang Rangka Dinding Pemisah Kayu Kamper 115,570.00 96,000.00 211,570.00
Bahan
Balok Kayu Kamper 0.0195 m3 4,200,000.00 81,900.00
Papan Kayu Kamper 0.007 m3 4,400,000.00 30,800.00
Paku Biasa 2" - 5" 0.100 Kg 28,700.00 2,870.00
Tenaga
Perkerja 0.150 Oh 110,000.00 16,500
Tukang Kayu 0.450 Oh 135,000.00 60,750
Kepala Tukang 0.045 Oh 150,000.00 6,750
Mandor 0.075 Oh 160,000.00 12,000
1m² Pasang Rangka Dinding Pemisah Kayu Borneo 316,250.00 96,000.00 412,250.00
Bahan
Balok Kayu Borneo 0.0195 m3 2,500,000.00 48,750.00
Papan Kayu Borneo 0.007 m3 2,500,000.00 17,500.00
Paku Biasa 2" - 5" 0.100 Kg 2,500,000.00 250,000.00
Tenaga
Perkerja 0.150 Oh 110,000.00 16,500
Tukang Kayu 0.450 Oh 135,000.00 60,750
Kepala Tukang 0.045 Oh 150,000.00 6,750
Mandor 0.075 Oh 160,000.00 12,000
1m² Pasang Dinding Pemisah Teakwood Rangkap, RangkaKayu Kamper 115,570.00 96,000.00 211,570.00
Bahan
Balok Kayu Kamper 0.0195 m3 4,200,000.00 81,900.00
Papan Kayu Kamper 0.007 m3 4,400,000.00 30,800.00
Paku Biasa 2" - 5" 0.100 Kg 28,700.00 2,870.00
Tenaga
Perkerja 0.150 Oh 110,000.00 16,500
Tukang Kayu 0.450 Oh 135,000.00 60,750
Kepala Tukang 0.045 Oh 150,000.00 6,750
Mandor 0.075 Oh 160,000.00 12,000
1m² Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper 115,570.00 96,000.00 211,570.00
Bahan
Balok Kayu Kamper 0.0195 m3 4,200,000.00 81,900.00
Papan Kayu Kamper 0.007 m3 4,400,000.00 30,800.00
Paku Biasa 2" - 5" 0.100 Kg 28,700.00 2,870.00
Tenaga
Perkerja 0.150 Oh 110,000.00 16,500
Tukang Kayu 0.450 Oh 135,000.00 60,750
Kepala Tukang 0.045 Oh 150,000.00 6,750
Mandor 0.075 Oh 160,000.00 12,000
1m² Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper 201,770.00 113,600.00 315,370.00
Bahan
Balok Kayu Kamper 0.0195 m3 4,200,000.00 81,900.00
Papan Kayu Kamper 0.007 m3 4,400,000.00 30,800.00
Paku Biasa 2" - 5" 0.100 Kg 28,700.00 2,870.00
Lem Kayu 0.560 lt 12,500.00 7,000.00
Tripleks 3 mm 1.000 lbr 79,200.00 79,200.00
Tenaga
Perkerja 0.200 Oh 110,000.00 22,000
Tukang Kayu 0.600 Oh 135,000.00 81,000
Kepala Tukang 0.060 Oh 150,000.00 9,000
Mandor 0.010 Oh 160,000.00 1,600
1m² Pasang Dinding Lambriziring dari papan Kayu jati 36,415.00 340,800.00 377,215.00
Bahan
Papan Kayu Jati 0.007 m3 4,400,000.00 30,800.00
Paku Biasa 2" - 5" 0.100 Kg 28,700.00 2,870.00
Paku Skrup 3.5" 0.150 Kg 18,300.00 2,745.00
Tenaga
Perkerja 0.600 Oh 110,000.00 66,000
Tukang Kayu 1.800 Oh 135,000.00 243,000
Kepala Tukang 0.180 Oh 150,000.00 27,000
Mandor 0.030 Oh 160,000.00 4,800
1m² Pasang Plywood tebal 3 mm, untuk dinding 33,055.00 14,208.00 47,263.00
Bahan
Tripleks 3 mm 0.400 lbr 79,200.00 31,680.00
Paku Biasa ½" - 1" 0.050 Kg 27,500.00 1,375.00
Tenaga
Perkerja 0.025 Oh 110,000.00 2,750
Tukang Kayu 0.075 Oh 135,000.00 10,125
Kepala Tukang 0.0075 Oh 150,000.00 1,125
Mandor 0.0013 Oh 160,000.00 208
PEKERJAAN BETON
1 m2 Membuat Lantai Kerja Beton Tumbuk 1 Pc : 3 Ps : 5 Kr 44,560.00 130,460.00 175,020.00
Bahan
Semen Portland 10.000 Kg 1,900.00 19,000.00
Pasir Beton 0.026 m3 340,000.00 8,840.00
Koral Beton 0.044 m3 380,000.00 16,720.00
Tenaga
Perkerja 1.150 Oh 110,000.00 126,500
Tukang Batu 0.020 Oh 135,000.00 2,700
Kepala Tukang 0.002 Oh 150,000.00 300
Mandor 0.006 Oh 160,000.00 960
1 Kg Pembesian dengan Besi Polos atau Besi Ulir 12,993.00 1,868.00 14,861.00
Bahan
Besi Beton ( Polos / Ulir ) 1.050 Kg 12,000.00 12,600.00
Kawat Beton 0.015 Kg 26,200.00 393.00
Tenaga
Perkerja 0.007 Oh 110,000.00 770
Tukang Besi 0.007 Oh 135,000.00 945
Kepala Tukang 0.0007 Oh 150,000.00 105
Mandor 0.0003 Oh 160,000.00 48
1 m³ Membuat Ring Balok Beton Bertulang (10 x 15) cm 76,360.00 66,760.00 143,120.00
Bahan
Kayu Albasiah 0.003 m3 2,300,000.00 6,900.00
Paku Biasa 2" - 5" 0.200 Kg 28,700.00 5,740.00
Besi Beton Polos 3.600 Kg 12,000.00 43,200.00
Kawat Beton 0.050 Kg 26,200.00 1,310.00
Semen Portland 5.500 Kg 1,900.00 10,450.00
Pasir Beton 0.009 m3 340,000.00 3,060.00
Koral Beton 0.015 m3 380,000.00 5,700.00
Tenaga
Perkerja 0.100 Oh 110,000.00 11,000
Tukang Batu 0.330 Oh 135,000.00 44,550
Tukang Kayu 0.033 Oh 135,000.00 4,455
Tukang Besi 0.033 Oh 135,000.00 4,455
Kepala Tukang 0.010 Oh 150,000.00 1,500
Mandor 0.005 Oh 160,000.00 800
IX PEKERJAAN SANITASI
Memasang 1 m' Pipa PVC tipe AW Ø ½" 7,130.00 13,248.00 20,378.00
Bahan
Pipa PVC D 1/2" 1.200 m' 4,600.00 5,520.00
Perlengkapan 35% Harga Pipa 1,610.00 1,610.00
Tenaga
Perkerja 0.036 Oh 110,000.00 3,960
Tukang Batu 0.060 Oh 135,000.00 8,100
Kepala Tukang 0.0060 Oh 150,000.00 900
Mandor 0.0018 Oh 160,000.00 288
Tenaga
Pembantu Tukang Las 1.000 Oh 110,000.00 110,000
Kepala Tukang Kas 0.500 Oh 150,000.00 75,000
Tukang Las 2.000 Oh 135,000.00 270,000
Tenaga
Pekerja 2.400 Oh 110,000.00 264,000.00
Tukang 1.200 Oh 135,000.00 162,000.00
Kepala Tukang 0.012 Oh 150,000.00 1,800.00
Mandor 0.001 Oh 160,000.00 160.00
HARGA SATUAN BAHAN FABRIKASI
LOKASI : .........................
32 Pipa GIP Medium A Uk. 1/2 " Staf 130,000.00 143,000.00 400.00 14,340.00 788.70 157,740.00 157,700.00
33 Pipa GIP Medium A Uk. 3/4 " Staf 160,000.00 176,000.00 400.00 17,640.00 970.20 194,040.00 194,000.00
-
34 Pipa PVC Uk. 1/2 " M' 3,500.00 3,850.00 375.00 422.50 23.24 4,647.50 4,600.00
35 Pipa PVC Uk. 3/4 " M' 4,000.00 4,400.00 375.00 477.50 26.26 5,252.50 5,200.00
36 Pipa PVC Uk. 1 " M' 7,500.00 8,250.00 375.00 862.50 47.44 9,487.50 9,400.00
37 Pipa PVC Uk. 11/4 " M' 8,750.00 9,625.00 375.00 1,000.00 55.00 11,000.00 11,000.00
38 Pipa PVC Uk. 11/2 " M' 10,000.00 11,000.00 375.00 1,137.50 62.56 12,512.50 12,500.00
39 Pipa PVC Uk. 2 " M' 15,000.00 16,500.00 375.00 1,687.50 92.81 18,562.50 18,500.00
40 Pipa PVC Uk. 3 " M' 25,000.00 27,500.00 475.00 2,797.50 153.86 30,772.50 30,700.00
-
41 Knee PVC Uk. 1/2 " Bh 3,500.00 3,850.00 200.00 405.00 22.28 4,455.00 4,400.00
42 Knee PVC Uk. 3/4 " Bh 4,000.00 4,400.00 200.00 460.00 25.30 5,060.00 5,000.00
43 Knee PVC Uk. 1 " Bh 6,000.00 6,600.00 200.00 680.00 37.40 7,480.00 7,400.00
44 Knee PVC Uk. 11/4 " Bh 7,000.00 7,700.00 200.00 790.00 43.45 8,690.00 8,600.00
45 Knee PVC Uk. 11/2 " Bh 8,000.00 8,800.00 200.00 900.00 49.50 9,900.00 9,900.00
46 Knee PVC Uk. 2 " Bh 10,000.00 11,000.00 200.00 1,120.00 61.60 12,320.00 12,300.00
47 Knee PVC Uk. 3 " Bh 14,000.00 15,400.00 200.00 1,560.00 85.80 17,160.00 17,100.00
48 Knee PVC Uk. 4 " Bh 18,000.00 19,800.00 200.00 2,000.00 110.00 22,000.00 22,000.00
-
49 Batu Bata Semen Bh 1,500.00 1,500.00 200.00 170.00 9.35 1,870.00 1,800.00
50 Batu Bata Merah Bh 1,500.00 1,500.00 200.00 170.00 9.35 1,870.00 1,800.00
51 Paving Stone Bh 3,500.00 3,850.00 200.00 405.00 22.28 4,455.00 4,400.00
52 Bowling Bh 30,000.00 33,000.00 200.00 3,320.00 182.60 36,520.00 36,500.00
53 Block glass Bh 25,000.00 27,500.00 200.00 2,770.00 152.35 30,470.00 30,400.00
-
54 Besi Siku Uk. 40.40.4 M' 62,500.00 68,750.00 400.00 6,915.00 380.33 76,065.00 76,000.00
55 Besi Siku Uk. 50.50.5 M' 95,000.00 104,500.00 400.00 10,490.00 576.95 115,390.00 115,300.00
56 Besi Siku Uk. 80.80.8 M' 195,000.00 214,500.00 400.00 21,490.00 1,181.95 236,390.00 236,300.00
-
-
57 Seng Gelombang BJLS 0.20 mm Lbr 42,500.00 46,750.00 475.00 4,722.50 259.74 51,947.50 51,900.00
58 Seng Gelombang BJLS 0.25 mm Lbr 56,000.00 61,600.00 475.00 6,207.50 341.41 68,282.50 68,200.00
59 Seng Gelombang BJLS 0.30 mm Lbr 65,000.00 71,500.00 475.00 7,197.50 395.86 79,172.50 79,100.00
60 Seng Pelat Bubungan BJLS 0.30 mm Lbr 65,000.00 71,500.00 475.00 7,197.50 395.86 79,172.50 79,100.00
61 Atap Asbes Gelombang Lbr 45,000.00 49,500.00 475.00 4,997.50 274.86 54,972.50 54,900.00
62 Genteng Semen (Beton) Bh 5,000.00 5,500.00 250.00 575.00 31.63 6,325.00 6,300.00
-
63 Tegel Semen 30 x 30 cm M2 55,000.00 60,500.00 550.00 6,105.00 335.78 67,155.00 67,100.00
64 Tegel Semen 20 x 20 cm M2 60,000.00 66,000.00 550.00 6,655.00 366.03 73,205.00 73,200.00
65 Tegel Porselin 10 x 20 cm M2 75,000.00 82,500.00 550.00 8,305.00 456.78 91,355.00 91,300.00
66 Tegel Porselin 10 x 10 cm M2 60,000.00 66,000.00 550.00 6,655.00 366.03 73,205.00 73,200.00
67 Tegel Keramik 10 x 20 cm M2 65,000.00 71,500.00 550.00 7,205.00 396.28 79,255.00 79,200.00
68 Tegel Keramik 20 x 20 cm M2 67,500.00 74,250.00 550.00 7,480.00 411.40 82,280.00 82,200.00
69 Tegel Keramik 20 x 25 cm M2 67,500.00 74,250.00 550.00 7,480.00 411.40 82,280.00 82,200.00
70 Tegel Keramik 30 x 30 cm M2 72,000.00 79,200.00 550.00 7,975.00 438.63 87,725.00 87,700.00
71 Tegel Keramik 40 x 40 cm M2 75,000.00 82,500.00 550.00 8,305.00 456.78 91,355.00 91,300.00
-
72 Cat Kayu / Besi Glotex Kg 40,000.00 44,000.00 250.00 4,425.00 243.38 48,675.00 48,600.00
73 Cat Kayu / Besi Platone Kg 38,000.00 41,800.00 250.00 4,205.00 231.28 46,255.00 46,200.00
74 Cat Tembok 1 Kg 22,500.00 24,750.00 250.00 2,500.00 137.50 27,500.00 27,500.00
75 Cat Tembok 5 Kg 112,500.00 123,750.00 250.00 12,400.00 682.00 136,400.00 136,400.00
-
76 Cat Meni Kayu Altex Kg 25,000.00 27,500.00 250.00 2,775.00 152.63 30,525.00 30,500.00
77 Cat Meni Besi Altex Kg 30,000.00 33,000.00 250.00 3,325.00 182.88 36,575.00 36,500.00
78 Minyak Cat Thinner Liter 20,000.00 22,000.00 250.00 2,225.00 122.38 24,475.00 24,400.00
79 Minyak Cat Afduner Liter 12,000.00 13,200.00 250.00 1,345.00 73.98 14,795.00 14,700.00
80 Pelumas / Olie Liter 35,000.00 38,500.00 250.00 3,875.00 213.13 42,625.00 42,600.00
81 Dempul Kayu Altex Kg 25,000.00 27,500.00 250.00 2,775.00 152.63 30,525.00 30,500.00
82 Plamir Tembok Kaleng 5 Kg 57,500.00 63,250.00 1,250.00 6,450.00 354.75 70,950.00 70,900.00
83 Kuas Cat Bh 12,500.00 13,750.00 200.00 1,395.00 76.73 15,345.00 15,300.00
Residu Liter 26,000.00 28,600.00 250.00 2,885.00 158.68 31,735.00 31,700.00
84 Kaca Rayban 3 mm M2 115,000.00 126,500.00 3,750.00 13,025.00 716.38 143,275.00 143,200.00
85 Kaca Rayban 5 mm M2 170,000.00 187,000.00 3,750.00 19,075.00 1,049.13 209,825.00 209,800.00
86 Kaca Bening 2 mm M2 60,000.00 66,000.00 3,750.00 6,975.00 383.63 76,725.00 76,700.00
87 Kaca Bening 3 mm M2 100,000.00 110,000.00 3,750.00 11,375.00 625.63 125,125.00 125,100.00
88 Kaca Bening 5 mm M2 150,000.00 165,000.00 3,750.00 16,875.00 928.13 185,625.00 185,600.00
89 Dudukan Nako Bh 35,000.00 38,500.00 200.00 3,870.00 212.85 42,570.00 42,500.00
90 Kran (Kualitas Baik) Bh 40,000.00 44,000.00 200.00 4,420.00 243.10 48,620.00 48,600.00
91 Avour / Saringan Air Kotor Bh 35,000.00 38,500.00 200.00 3,870.00 212.85 42,570.00 42,500.00
92 Floor Drain Bh 37,000.00 40,700.00 200.00 4,090.00 224.95 44,990.00 44,900.00
93 Kloset Jongkok ISANO Bh 180,000.00 198,000.00 500.00 19,850.00 1,091.75 218,350.00 218,300.00
94 Kloset Jongkok TOTO Bh 225,000.00 247,500.00 500.00 24,800.00 1,364.00 272,800.00 272,800.00
95 Kloset Duduk / Lengkap INA Bh ### 1,430,000.00 1,000.00 143,100.00 7,870.50 1,574,100.00 1,574,100.00
96 Kloset Duduk / Lengkap TOTO Bh ### 1,870,000.00 1,000.00 187,100.00 10,290.50 2,058,100.00 2,058,100.00
97 Wastafel INA / TOTO Bh 500,000.00 550,000.00 750.00 55,075.00 3,029.13 605,825.00 605,800.00
98 Ijuk Kg 15,000.00 16,500.00 200.00 1,670.00 91.85 18,370.00 18,300.00
99 Kunci Pintu 1 Slaag Cap Kuda Terbang Bh 80,000.00 88,000.00 200.00 8,820.00 485.10 97,020.00 97,000.00
100 Kunci Pintu 2 Slaag Cap SES Bh 180,000.00 198,000.00 200.00 19,820.00 1,090.10 218,020.00 218,000.00
101 Grendel Jendela Bh 34,500.00 37,950.00 200.00 3,815.00 209.83 41,965.00 41,900.00
102 Kait Angin Bh 55,000.00 60,500.00 200.00 6,070.00 333.85 66,770.00 66,700.00
103 Engsel Jendela Kuningan Bh 45,000.00 49,500.00 200.00 4,970.00 273.35 54,670.00 54,600.00
104 Engsel Pintu Kuningan Bh 65,000.00 71,500.00 200.00 7,170.00 394.35 78,870.00 78,800.00
105 Lis Profil 5 cm M' 6,250.00 6,875.00 200.00 707.50 38.91 7,782.50 7,700.00
106 Kertas Ampelas Lbr 6,000.00 6,600.00 200.00 680.00 37.40 7,480.00 7,400.00
107 Mur / Baut / Beugel / Angker Kg 80,000.00 88,000.00 200.00 8,820.00 485.10 97,020.00 97,000.00
BAHAN FABRIKASI
LOKASI : ................
LOKASI : ......................
11 Sirtu M3 280,000.00
12 Timbunan Pilihan / Pasir Urug M3 300,000.00
13 Timbunan Biasa / Tanah Urug M3 220,000.00
14 Pasir Kasar / Pasir Beton M3 340,000.00
15 Pasir Pasangan M3 350,000.00
16 Pasir Plester M3 400,000.00
17 Ijuk M3 200,000.00
18 Kapur Padam M3 400,000.00
LOKASI : ..................
REKAPITULASI HARGA
HARGA
No. JENIS PEKERJAAN
(Rp)
1 2 3
A PEKERJAAN PERSIAPAN UMUM 29,598,690.00
B PEKERJAAN TALUD
I PEKERJAAN TANAH 0.00
II PEKERJAAN PASANGAN DAN PLESTERAN 0.00
C PEKERJAAN DEKER DAN SALURAN
I PEKERJAAN TANAH 0.00
II PEKERJAAN DEKER DAN SALURAN #REF!
JUMLAH #REF!
PPN 10 % #REF!
JUMLAH TOTAL #REF!
DIBULATKAN #REF!
TERBILANG : Dua Ratus Empat Puluh Juta Lima Puluh Ribu Rupiah
.............................
Direktur
RINCIAN KUANTITAS DAN HARGA
HARGA
HARGA JUMLAH SUB TOTAL
NO. JENIS PEKERJAAN SAT VOLUME
SATUAN HARGA
( Rp ) ( Rp ) ( Rp )
1 2 3 4.00 5.00 6.00 7
II PEKERJAAN SALURAN
1. Pek. Pengukuran dan Pas. Bouplank M1 350.00 91,774.00 32,120,900.00
2. Pek. Saluran Type A M1 124.00
a. Pekerjaan Tanah
- Galian Tanah Cadas/Berbatu M3 39.68 346,500.00 13,749,120.00
- Urugan Tanah Kembali M3 9.92 24,160.00 239,667.20
- Buangan Tanah Bekas Galian M3 29.76 29,120.00 866,611.20
- Urugan Pasir M3 5.27 454,600.00 2,395,742.00
b. Pekerjaan Pasangan
- Pasangan Batu Kali ad. 1 Ps : 5 Pc M3 29.76 1,125,700.00 33,500,832.00
- Pek. Plesteran Camp. 1 : 3 + Acian M2 229.40 89,680.00 20,572,592.00
103,445,464.40
3. Pekerjaan Saluran Type B M1 226.00
a. Pekerjaan Tanah
- Galian Tanah Cadas/Berbatu M3 33.90 346,500.00 11,746,350.00
- Urugan Tanah Kembali M3 8.48 24,160.00 204,876.80
- Buangan Tanah Bekas Galian M3 25.43 29,120.00 740,521.60
- Urugan Pasir M3 5.09 454,600.00 2,313,914.00
- Urugan Tanah dan Pemadatan (Samp. Siaga Sar) M3 64.13 87,160.00 5,589,570.80
b. Pekerjaan Pasangan
- Pasangan Batu Kali ad. 1 Ps : 5 Pc M3 37.29 1,125,700.00 41,977,353.00
- Pek. Plesteran Camp. 1 : 3 + Acian M2 271.20 89,680.00 24,321,216.00
86,893,802.20
Sub Total II 190,339,266.60
........................................
Direktur
JADWAL RENCANA PELAKSANAAN PEKERJAAN
PEKERJAAN PEMBUATAN SALURAN AIR KANTOR SAR TERNATE TAHUNN ANGGARAN 2014
B PEKERJAAN TALUD
I PEKERJAAN TANAH
1 Pekerjaan Pengukuran dan Pas. Bouplank 3,024,912.00 #REF! #REF!
2 Galian Tanah Pondasi (Keras berbatu) 0.00 #REF! #REF! #REF! #REF!
3 Urugan Tanah Kembali #REF! #REF! #REF! #REF! #REF! #REF! 60%
4 Urugan Pasir di Bawah Pondasi Sub Total B #VALUE! ### ### ### ### ###
.............................
Direktur