VOLUME
DIMENSI
NO. URAIAN PEKERJAAN SAT VOLUME N(JUMLAH) VOL TOTAL
P (m) L (m) A (m2) T (m)

I PEKERJAAN PERSIAPAN AWAL


1 1 M' Pekerjaan Pembersihan awal lokasi M2 12 6.00 72.00 - 72.00 - 72.00
2 1 M' Pasangan Bouwplank M' 29.50 - - - 29.50 - 29.50
TOTAL 101.5000

II PEKERJAAN GALIAN
1 Pekerjaan Galian Tanah pondasi M3 28.0000 0.7000 19.6000 0.7000 13.7200 1.0000 13.7200
TOTAL 13.7200

III PEKERJAAN URUGAN


1 Urugan Pasir Bawah Pondasi M3 28.0000 0.7000 19.6000 0.0500 0.9800 - 0.9800
2 Urugan tanah sisi pondasi M3 28.0000 0.7000 0.1500 0.6000 4.2000 - 4.2000
TOTAL 5.1800

IV PEKERJAAN PASANGAN
1 Pas pondasi Batu belah hitam adk 1:6 M3 28.0000 0.4500 0.2700 0.6000 7.5600 - 7.5600
2 Pasangan dinding bata adukan 1:4 M3 - - 110.9750 0.0750 8.3231 - 8.3231
3 Plesteran+acian dinding adk 1:4 M2 - 110.9750 0.0150 1.6646 2.0000 3.3293
TOTAL 19.2124

V PEKERJAAN BETON
1 Sloof (15/20) Adk 1:3:5 M3 28.0000 0.1500 4.2000 0.2000 0.8400 - 0.8400
2 Kolom Praktis 15/10 M3 0.1000 0.1500 0.0150 3.5000 0.0525 12.0000 0.6300
3 Ring Balk Beton 15/20 cm M3 0.1500 0.2000 0.0300 0.2000 0.0060 12.0000 0.0720
4 Pas.dak beton tebal 10 cm adkn 1:2:3 M3 3.0000 1.0000 3.0000 0.1000 0.3000 - 0.3000
TOTAL 1.8420

VI PEKERJAAN KUSEN PINTU


1 Pas.kusen pintu,jendela,boven,loster kayu kls II M3 - - - - 2.8296 - 2.8296
DIMENSI
NO. URAIAN PEKERJAAN SAT VOLUME N(JUMLAH) VOL TOTAL
P (m) L (m) A (m2) T (m)
2 Pas. Daun pintu panil M3 - - - - 8.4000 - 8.4000
3 Daun Jendela + Kaca 5 mm M2 4.0008 4.0008
4 pas. Kaca 5 mm M2 - - - - 0.0200 - 0.0200
TOTAL 15.2504

VII PEKERJAAAN PENGGANTUNG


1 Pas. Kunci 2 x buah - - - - - 8.0000 8.0000
2 Pas.Engsel pintu @3buah pasang - - - - - 12.0000 12.0000
3 Pas.Ensel jendela @2 buah pasang - - - - - 12.0000 12.0000
4 Pas. Hak angin @2 buah buah - - - - - 12.0000 12.0000
5 Pas.Tarikan jendela @1 buah buah - - - - - 6.0000 6.0000
6 Pas. Grendel Jendela @2buah buah - - - - - 12.0000 12.0000
TOTAL 62.0000

VIII PEKERJAAN ATAP & PLAFOND


1 pek.Kuda-Kuda,gording kayu kls II M3 - - - - 1.292 1.292
2 Pek.Rangka Atap kayu kls II M3 - - - - 0.4647 0.4647
3 Pas.Atap Genteng Pletong Buah 5.3000 3.5000 37.1000 - 37.1000 20.0000 742.0000
4 Pas.Bubungan Genteng Pletong M' - - - - 5.5000 - 5.5000
5 Pas.Lisplank papan M3 - - - - 0.0330 - 0.0330
6 Pas.Plafond Triplek M2 - - - - 27.5000 - 27.5000
7 Pas.List plafond profil M' 23.0000 - - - 23.0000 - 23.0000
TOTAL 799.7897

IX PEKERJAAN LANTAI
1 Pas. Urugan pasir bawah lantai M2 - - 28.0000 0.0500 1.4000 - 1.4000
2 Pas.Rabat Floor M2 156.1200 0.1500 0.3000 7.0254 - 7.0254
3 Pas.Lantai keramik 30x30 M2 - - - - 1.4850 - 1.4850
4 Pas. Lantai Keramik 20/20(Bagian km/Wc) M2 - - - - 0.0900 - 0.0900
5 Pas. Dinding Keramik 20/20 (bagian Km/Wc) M2 - - - - 0.0600 - 0.0600
TOTAL 10.0604

X PEKERJAAN PENGECATAN
1 Pengecatan dinding dengan cat tembok M2 28.0000 - 98.0000 3.5000 98.0000 2.0000 196.0000
DIMENSI
NO. URAIAN PEKERJAAN SAT VOLUME N(JUMLAH) VOL TOTAL
P (m) L (m) A (m2) T (m)
2 Pengecatan plafond dengan cat tembok M2 5.4000 5.0000 27.0000 - 27.0000 - 27.0000
3 Pengecatan kayu,kusen,pintu,jendela dan lisplank M2 - - 25.3200 - 25.3200 - 25.3200
TOTAL 248.3200

XI PEKERJAAN INSTALASI LISTRIK


1 Pas.Saklar Ganda Buah - - - - - 1 1
2 Pas.Saklar Tunggal Buah - - - - - 3 3
3 Pas. Stop Kontak Buah - - - - - 3 3
4 Lampu pijar 40 watt lengkap dengan fitting Buah - - - - - 5 5
5 Pas Lampu TL 20x20 watt Buah - - - - - 2 2
6 BOX Termis Buah - - - - - 1 1
7 Kabel Listrik 1,5mm Rol - - - - - 1 1
TOTAL 16.0000

XII PEKERJAAN INSTALASI AIR BERSIH & KOTOR


1 Pas.Saluran Air Hujan M' 3.5000 - - - 3.5000 2.0000 7.0000
2 Pas. Kloset jongkok Buah - - - - - 1.0000 1.0000
3 Pembuatan Septictank & sumur resapan Buah - - - - - 1.0000 1.0000
4 Pipa paralon PVC 0,75" AW 1 M' 3.0000 - - - - 1.0000 3.0000
5 Pipa paralon PVC 3" AW 1 M' 3.0000 - - - - 1.0000 3.0000
6 Pipa Paralon PVC 4" AW 1 M' 3.0000 - - - - 1 3.0000
7 Pembuatan sumur pantek LS - - - - - 1.0000 1.0000
8 Bak Fiber Plastik Buah - - - - - 1 1
9 Pas Floor Drain Ls - - - - - 1.0000 1
10 Kran Air dia 0.5 Buah - - - - - 2 2
TOTAL 23.0000
DAFTAR HARGA SATUAN UPAH

HARGA UPAH
No. PEKERJA SAT
(Rp)
(1) (2) (3) (4)
1 Mandor Hari 50,000.00
2 Kepala Tukang Hari 47,500.00
3 Kepala Tukang Kayu Hari 47,500.00
4 Kepala Tukang Batu Hari 45,000.00
5 Kepala Tukang Besi Hari 45,000.00
6 Kepala Tukang Cat Hari 38,500.00
7 Tukang Kayu Hari 45,000.00
8 Tukang Batu Hari 40,000.00
9 Tukang Besi Hari 38,500.00
10 Tukang Cat Hari 39,000.00
11 Tukang Gali Hari 39,000.00
12 Tukang Pipa Hari 45,000.00
13 Tukang Hari 45,000.00
14 Tukang Bongkar Begesting Hari 36,000.00
15 Pekerja Hari 35,000.00
16 Penjaga Malam Hari 30,000.00
17 Operator Terlatih Hari 60,000.00
18 Pembantu Operator Hari 30,000.00
19 Pekerja Tak Terlatih Hari 27,500.00
20 Sopir Terlatih Hari 42,500.00
21 Pembantu Sopir Hari 30,000.00

DAFTAR HARGA SATUAN BAHAN BANGUNAN

HARGA SATUAN
No. JENIS BAHAN BANGUNAN SAT
(Rp)
(1) (2) (3) (4)
1 Aspal Kg 6,000.00
2 Pasir Urug M3 130,000.00
3 Pasir Pasang M3 130,000.00
4 Pasir Beton M3 150,000.00
5 Batu Split 1/2 cm M3 275,000.00
6 Batu Split 2/3 cm M3 300,000.00
7 Batu Split 3/5 cm M3 315,000.00
8 Batu Belah Hitam M3 186,000.00
9 Batu Belah Hitam 10/15 cm M3 165,000.00
10 Batu Belah Hitam 5/7 cm M3 155,000.00
HARGA SATUAN
No. JENIS BAHAN BANGUNAN SAT
(Rp)
(1) (2) (3) (4)
11 Batu Belah Putih M3 131,100.00
12 Batu Bata Bh 450.00
13 Batako Bh 3,000.00
14 Roster Beton 15/20 Bh 4,000.00
15 Semen Portland Zak 51,000.00
16 Semen Putih Zak 82,500.00
17 Semen Warna kg 15,000.00
18 Besi Beton Ulir Kg 10,500.00
19 Besi Beton Polos Kg 10,000.00
20 Besi Baja IWF Kg 11,550.00
21 Besi Baja Siku Kg 8,450.00
22 Kawat Bronjong Kg 16,250.00
23 Kawat Beton Kg 11,525.00
24 Ubin Abu-abu 30/30 Bh 3,150.00
25 Plint Abu-abu 10/30 Bh 1,650.00
26 Ubin Traso 30/30 Bh 3,150.00
27 Plint Traso 10/30 Bh 1,650.00
28 Ubin Wafel 20/20 Bh 1,500.00
29 Keramik 20/20 M2 45,000.00
30 Keramik 30/30 M2 37,500.00
31 Paving Block T = 6 cm Bh 1,250.00
32 Paving Block T = 8 cm Bh 2,000.00
33 Balok Kayu kls. I M3 6,500,000.00
34 Papan Kayu kls. I M3 6,750,000.00
35 Balok Kayu kls. II M3 2,100,000.00
36 Papan Kayu kls. II M3 2,250,000.00
37 Balok Kayu kls. III M3 1,850,000.00
38 Papan Kayu kls. III M3 1,950,000.00
39 Balok Kayu kls. IV M3 966,000.00
40 Papan Kayu kls. IV M3 1,000,000.00
41 Kayu Bakar M3 70,000.00
42 Kayu Kasau 4/6 M3 1,850,000.00
43 Kayu Reng 2/3 - 4 m' Ikat 75,000.00
44 Triplek 3 mm Lbr 50,000.00
45 Triplek 4 mm Lbr 60,000.00
46 Triplek 5 mm Lbr 75,000.00
47 Gipsum 9 mm M2 75,000.00
48 Harplek 1 x 1 mm M2 20,000.00
49 Teakwood 5mm Lbr 100,000.00
50 Teakwood 3 mm Lbr 78,000.00
51 Multiplek 9 mm Lbr 125,000.00
52 Genteng Mantili Bh 850.00
53 Kerpus Genteng Mantili Bh 3,500.00
HARGA SATUAN
No. JENIS BAHAN BANGUNAN SAT
(Rp)
(1) (2) (3) (4)
54 Genteng Plentong Bh 850.00
55 Kerpus Genteng Plentong Bh 3,500.00
56 Genteng Keramik / Glasur Bh 6,500.00
57 Kerpus Genteng Keramik / Glasur Bh 14,700.00
58 Genteng Beton Bh 3,500.00
59 Kerpus Genteng Beton Bh 7,665.00
60 Asbes Semen Plat 1 M x 1 M Lbr 22,000.00
61 Asbes Gelombang Kecil Lbr 35,000.00
62 Kerpus Asbes Gel. Kecil Lbr 21,000.00
63 Nok Asbes Set 19,000.00
64 Seng Gelombang BJLS 30 Lbr 50,000.00
65 Seng Gelombang BJLS 27 Lbr 30,000.00
66 Seng Plat BJLS 30 Lbr 32,000.00
67 Seng Plat BJLS 27 Lbr 22,500.00
68 Paku Kg 9,000.00
69 Mur/baut bh 2,250.00
70 Paku Seng Kg 14,000.00
71 Paku Triplek Kg 12,500.00
72 Paku Asbes Kg 16,000.00
73 Kaca Bening 3 mm M2 67,000.00
74 Kaca Bening 5 mm M2 76,000.00
75 Kaca Ryband 5 mm M2 97,500.00
76 Bak Mandi Fiber Bh 200,000.00
77 Bak Mandi Plastik Bh 150,000.00
78 Kloset Jongkok Keramik Bh 150,000.00
79 Kloset Duduk Keramik (Natural) Bh 1,000,000.00
80 Kran Leideng 1/2" Bh 18,000.00
81 Kran Leideng 3/4" Bh 25,000.00
82 Pipa PVC 1/2 " Btg 12,500.00
83 Pipa PVC 3/4 " Btg 15,000.00
84 Pipa PVC 1" Btg 21,500.00
85 Pipa PVC 2" Btg 43,000.00
86 Pipa PVC 4" Btg 150,000.00
87 Pipa Leideng 1/2 " Btg 72,500.00
88 Pipa Leideng 3/4 " Btg 95,000.00
89 Pipa Leideng 1" Btg 135,000.00
90 Pipa Leideng 2" Btg 175,000.00
91 Reservoir Tower Air Fiber 0.50 M3 Bh 500,000.00
92 Reservoir Tower Air Fiber 1.00 M3 Bh 850,000.00
93 Cat Tembok Kg 40,000.00
94 Cat Kayu Kg 50,000.00
95 Cat Meni Kg 20,000.00
96 Minyak Cat Ltr 13,125.00
97 Cat Dasar Kg 18,000.00
HARGA SATUAN
No. JENIS BAHAN BANGUNAN SAT
(Rp)
(1) (2) (3) (4)
98 Minyak Pelumas Ltr 24,250.00
99 Bensin Ltr 4,500.00
100 Dempul Ltr 9,000.00
101 Amplas Lmb 3,250.00
102 Lem PVC bh 15,000.00
103 Lem Kayu bh 10,000.00
104 Teer Kg 6,000.00
105 Kawat Duri Kg 15,500.00
106 Stop Kontak + Instalasi Bh 61,000.00
107 Saklar Engkel Bh 25,000.00
108 Saklar Double Bh 35,000.00
109 Kunci 2x Putar Bh 115,000.00
110 Engsel Pintu Set 25,000.00
111 Engsel Jendela Set 17,500.00
112 Grendel Pintu Set 24,000.00
113 Grendel Jendela Set 12,000.00
114 Tarikan Jendela bh 42,000.00
115 Hak Angin / Pengkait Set 7,500.00
116 Plamir Tembok kg 18,000.00
117 List Profil M' 25,000.00
118 Kabel NYM 2 x 1.5 mm M' 3,500.00
119 Residu ltr 10,000.00
120 Sewa Stemper Kodok Hk 100,000.00
TABEL ANALISA HARGA SATUAN
Harga Satuan Harga Upah
N0 ANALISA URAIAN PEKERJAAN Koef.
( Rp ) ( Rp )
1 2 3 4 5.00 6
A PEKERJAAN PERSIAPAN AWAL

1 X-RSNI-T 12-2002 1 M' Pekerjaan Pembersihan awal lokasi 6,000.00


Pekerja 0.1000 35,000.00 3,500.00
Mandor 0.0500 50,000.00 2,500.00

2 X-RSNI-T 12-2002 1 M' Pasangan Bouwplank 8,725.00


Papan Kayu kls. III 0.0070 1,950,000.00
Kayu 5/7 0.0120 1,850,000.00
Paku 0.0200 9,000.00
Tukang Kayu 0.1000 45,000.00 4,500.00
Kepala Tukang Kayu 0.0100 47,500.00 475.00
Pekerja 0.1000 35,000.00 3,500.00
Mandor 0.0050 50,000.00 250.00

B PEKERJAAN GALIAN DAN URUGAN

1 SNI 2835-2008 1 M3 Pekerjaan Galian Tanah Biasa sedalam 1 m 30,500.00


Tukang Gali 0.7500 39,000.00 29,250.00
Mandor 0.0250 50,000.00 1,250.00

2 A.16 1 M3 PekerjaanPemadatan & Perataan 9,250.00


Pekerja 0.2500 35,000.00 8,750.00
Mandor 0.0100 50,000.00 500.00

3 A.18 1 M3 Pekerjaan Urugan pasir bawah pondasi/lantai 11,000.00


Pasir Urug 1.2000 130,000.00
Harga Satuan Harga Upah
N0 ANALISA URAIAN PEKERJAAN Koef.
( Rp ) ( Rp )
1 2 3 4 5.00 6
Mandor 0.0100 50,000.00 500.00
Pekerja 0.3000 35,000.00 10,500.00

C PEKERJAAN PASANGAN DAN PLESTERAN

1 SNI 2836-2008 1 M3 Pek. Pondasi batu belah hitam adk 1:6 89,625.00
Batu Belah hitam 1.2000 186,000.00
Semen Portland 2.3400 51,000.00
Pasir Pasang 0.5610 130,000.00
Kepala Tukang Batu 0.0750 45,000.00 3,375.00
Tukang Batu 0.7500 40,000.00 30,000.00
Mandor 0.0750 50,000.00 3,750.00
Pekerja 1.5000 35,000.00 52,500.00

2 SNI 6897-2008 1 M3 Pek. dinding bata adukan 1:2 31,400.00


Batu bata 140.0000 450.00
Semen Portland 0.8700 51,000.00
Pasir pasang 0.0800 130,000.00
Kepala tukang batu 0.0200 45,000.00 900.00
Tukang Batu 0.2000 40,000.00 8,000.00
Mandor 0.0300 50,000.00 1,500.00
Pekerja 0.6000 35,000.00 21,000.00

3 SNI 6897-2008 1 M3 Pek. dinding bata adukan 1:6 31,450.00


Batu bata 140.0000 450.00
Semen Portland 0.3700 51,000.00
Pasir pasang 0.1220 130,000.00
Kepala Tukang 0.0200 47,500.00 950.00
Harga Satuan Harga Upah
N0 ANALISA URAIAN PEKERJAAN Koef.
( Rp ) ( Rp )
1 2 3 4 5.00 6
Tukang Batu 0.2000 40,000.00 8,000.00
Mandor 0.0300 50,000.00 1,500.00
Pekerja 0.6000 35,000.00 21,000.00

4 SNI 2837-2008 1 M3 Pek. Plesteran adk 1:2 tebal 15 mm 7,987.50


Semen Portland 0.2045 51,000.00
Pasir pasang 0.0200 130,000.00
Kepala tukang 0.0150 47,500.00 712.50
Tukang Batu 0.1500 40,000.00 6,000.00
Mandor 0.0150 50,000.00 750.00
Pekerja 0.0150 35,000.00 525.00

5 SNI 2837-2008 1 M3 Pek. Plesteran adk 1:6 tebal 15 mm 8,512.50


Semen Portland 0.0883 51,000.00
Pasir pasang 0.0270 130,000.00
Kepala tukang 0.0150 47,500.00 712.50
Tukang Batu 0.1500 40,000.00 6,000.00
Mandor 0.0150 50,000.00 750.00
Pekerja 0.0300 35,000.00 1,050.00

6 G.14 1 M3 Perekat adk 1:2


Semen Portland 11.8750 51,000.00
Pasir pasang 0.9500 130,000.00

7 G.16 1 m3 Perekat adk 1 : 3


Semen Portland 9.0000 51,000.00
Pasir Pasang 1.0800 130,000.00

8 G.19 1 m3 Perekat adk 1 : 6


Semen Portland 2.2500 51,000.00
Harga Satuan Harga Upah
N0 ANALISA URAIAN PEKERJAAN Koef.
( Rp ) ( Rp )
1 2 3 4 5.00 6
Pasir Pasang 1.9600 130,000.00

D PEKERJAAN BETON

1 G.41 1 m3 Pek. Beton adukan 1:2:3 274,750.00


Batu split 1/2 cm 0.8200 275,000.00
Pasir beton 0.5400 150,000.00
Semen Portland 6.8000 51,000.00
Kepala tukang 0.1000 47,500.00 4,750.00
Tukang 1.0000 45,000.00 45,000.00
Mandor 0.3000 50,000.00 15,000.00
Pekerja 6.0000 35,000.00 210,000.00

2 G.44 1 m3 Pek. Beton adukan 1:3:5 264,875.00


Batu split 1/2 cm 1.0000 275,000.00
Pasir beton 0.5000 150,000.00
Semen Portland 4.2400 51,000.00
Kepala Tukang 0.0500 47,500.00 2,375.00
Tukang 0.5000 45,000.00 22,500.00
Mandor 0.6000 50,000.00 30,000.00
Pekerja 6.0000 35,000.00 210,000.00

3 I.2 100 Kg Besi Beton Pekerjaan 597,375.00


Besi beton polos 110.0000 10,000.00
Kawat beton 2.0000 11,525.00
Kepala tukang besi 2.2500 45,000.00 101,250.00
Tukang besi 6.7500 38,500.00 259,875.00
Pekerja 6.7500 35,000.00 236,250.00
Harga Satuan Harga Upah
N0 ANALISA URAIAN PEKERJAAN Koef.
( Rp ) ( Rp )
1 2 3 4 5.00 6
4 F.8 1 m3 Bekisting untuk Pekerjaan 1 m Beton
3 323,750.00
Papan Kayu kls. III 0.4000 1,950,000.00
Paku 4.0000 9,000.00
Kepala Tukang 0.5000 47,500.00 23,750.00
Tukang Kayu 5.0000 45,000.00 225,000.00
Mandor 0.1000 50,000.00 5,000.00
Pekerja 2.0000 35,000.00 70,000.00

5 F.9 1 m2 Pek. Pasang stootwerk Beton 606,125.00


Papan Kayu kls. III 0.7000 1,950,000.00
Paku 4.0000 9,000.00
Tukang 10.5000 45,000.00 472,500.00
Kepala Tukang 0.0500 47,500.00 2,375.00
Pekerja 3.5000 35,000.00 122,500.00
Mandor 0.1750 50,000.00 8,750.00

6 F.8 + G.41 + I.2 1 m3 Pek. Beton bertulang sloof, kolom dan ring balok praktis 4,735,711.25
1 m3 Bekisting untuk Pekerjaan 1 m3 Beton 0.5000 1,139,750.00 569,875.00
1 m3 Pek. Beton adukan 1:2:3 1.0000 928,050.00 928,050.00
100 Kg Besi Beton Pekerjaan 1.8500 1,720,425.00 3,182,786.25
Pekerja bongkar dan menyiram 2.0000 27,500.00 55,000.00

7 G.41 + 1.2 1 m3 Pek. Beton Pondasi telapak (120kg/M3) 2,992,560.00


1 m3 Pek. Beton adukan 1:2:3 1.0000 928,050.00 928,050.00
100 Kg Besi Beton Pekerjaan 1.2000 1,720,425.00 2,064,510.00

8 F.8 + G.41 +I2 1 m3 Pek. Beton Kolom 25/25 3,418,518.75


1 m3 Bekisting untuk Pekerjaan 1 m3 Beton 0.2500 1,139,750.00 284,937.50
1 m3 Pek. Beton adukan 1:2:3 1.0000 928,050.00 928,050.00
100 Kg Besi Beton Pekerjaan 1.2500 1,720,425.00 2,150,531.25
Harga Satuan Harga Upah
N0 ANALISA URAIAN PEKERJAAN Koef.
( Rp ) ( Rp )
1 2 3 4 5.00 6
Pekerja bongkar dan menyiram 2.0000 27,500.00 55,000.00

9 F.8 + G.41 +I2 1 m3 Pek. Beton Kolom 15/15 5,565,167.12


1 m3 Bekisting untuk Pekerjaan 1 m3 Beton 0.2500 1,139,750.00 284,937.50
1 m3 Pek. Beton adukan 1:2:3 1.1000 928,050.00 1,020,855.00
100 Kg Besi Beton Pekerjaan 2.4438 1,720,425.00 4,204,374.62
Pekerja bongkar dan menyiram 2.000 27,500.00 55000.000

10 F.8 + G.41 + I.2 + F.9 1 m3 Pek. Balok 20/40 3,691,461.25


1 m3 Bekisting untuk Pekerjaan 1 m3 Beton 0.5000 1,139,750.00 569,875.00
1 m3 Pek. Beton adukan 1:2:3 1.0000 928,050.00 928,050.00
100 Kg Besi Beton Pekerjaan 1.1000 1,720,425.00 1,892,467.50
1 m2 Pek. Pasang stootwerk Beton 0.1500 2,007,125.00 301,068.75

11 F.8 + G.41 + I.2 + F.9 1 m3 Pek. Balok 20/30 4,049,113.75


1 m3 Bekisting untuk Pekerjaan 1 m3 Beton 0.5000 1,139,750.00 569,875.00
1 m3 Pek. Beton adukan 1:2:3 1.2000 928,050.00 1,113,660.00
100 Kg Besi Beton Pekerjaan 1.2000 1,720,425.00 2,064,510.00
1 m2 Pek. Pasang stootwerk Beton 0.1500 2,007,125.00 301,068.75

12 F.8 + G.41 + I.2 + F.9 1 m2Pek. Sloof 15/20 4,163,866.10


1 m3 Bekisting untuk Pekerjaan 1 m3 Beton 0.5000 1,139,750.00 569,875.00
1 m3 Pek. Beton adukan 1:2:3 1.2000 928,050.00 1,113,660.00
100 Kg Besi Beton Pekerjaan 1.2667 1,720,425.00 2,179,262.35
1 m2 Pek. Pasang stootwerk Beton 0.1500 2,007,125.00 301,068.75

13 F.8 + G.41 + I.2 + F.9 1 m2 Pek. ringbalk 15/20 4,163,866.10


1 m3 Bekisting untuk Pekerjaan 1 m3 Beton 0.5000 1,139,750.00 569,875.00
1 m3 Pek. Beton adukan 1:2:3 1.2000 928,050.00 1,113,660.00
Harga Satuan Harga Upah
N0 ANALISA URAIAN PEKERJAAN Koef.
( Rp ) ( Rp )
1 2 3 4 5.00 6
100 Kg Besi Beton Pekerjaan 1.2667 1,720,425.00 2,179,262.35
1 m2 Pek. Pasang stootwerk Beton 0.1500 2,007,125.00 301,068.75

14 F.8 + G.41 + I.2 + F.9 1 m2 Pek. Dak Beton tebal 10 cm,adk 1:2:3 4,274,946.50
1 m3 Bekisting untuk Pekerjaan 1 m3 Beton 0.3000 1,139,750.00 341,925.00
1 m3 Pek. Beton adukan 1:2:3 1.0000 928,050.00 928,050.00
100 Kg Besi Beton Pekerjaan 0.5800 1,720,425.00 997,846.50
1 m2 Pek. Pasang stootwerk Beton 1.0000 2,007,125.00 2,007,125.00

E PEKERJAAN ATAP & PLAFOND

1 F.1.A 1 m2 Pek. Pasang Plafond + Rangka 50,300.00


Triplek 3 mm 0.3500 50,000.00
Paku Triplek 0.0200 12,500.00
Paku 0.0200 9,000.00
Kayu Kasau 4/6 0.0120 1,850,000.00
Tukang Kayu 0.8000 45,000.00 36,000.00
Kepala Tukang Kayu 0.0800 47,500.00 3,800.00
Pekerja 0.2800 35,000.00 9,800.00
Mandor 0.0140 50,000.00 700.00

1m2 Pasang Plafond Triplek + Rangka


1m2 Pasang Plafond = Upah - 1/2X

2 F.22 Pek. Kuda-Kuda kayu Kls.II 1,176,500.00


Balok Kayu kls. II 0.2000 2,100,000.00
Mur/baut 7.0000 2,250.00
Pekerja 8.0000 35,000.00 280,000.00
Tukang Kayu 18.0000 45,000.00 810,000.00
Harga Satuan Harga Upah
N0 ANALISA URAIAN PEKERJAAN Koef.
( Rp ) ( Rp )
1 2 3 4 5.00 6
Kepala Tukang Kayu 1.4000 47,500.00 66,500.00
Mandor 0.4000 50,000.00 20,000.00

3 F.16 1 M2 Pas. Kasau dan Reng 8,725.00


Kayu Kasau 4/6 0.0180 1,850,000.00
Paku 0.2500 9,000.00
Pekerja 0.1000 35,000.00 3,500.00
Tukang Kayu 0.1000 45,000.00 4,500.00
Kepala Tukang Kayu 0.0100 47,500.00 475.00
Mandor 0.0050 50,000.00 250.00

4 F.21 1 m2 Pek. Lisplank Papan tebal 3 cm 23,300.00


Papan Kayu kls. III 0.0100 1,950,000.00
Paku 0.1000 9,000.00
Pekerja 0.2800 35,000.00 9,800.00
Tukang Kayu 0.2000 45,000.00 9,000.00
Kepala Tukang Kayu 0.0800 47,500.00 3,800.00
Mandor 0.0140 50,000.00 700.00

5 H.2 1 m2 Pas. Atap Genteng Plentong 24,700.00


Genteng Plentong 22.0000 850.00
Pekerja 0.4000 35,000.00 14,000.00
Tukang Kayu 0.2000 45,000.00 9,000.00
Kepala Tukang Kayu 0.0200 47,500.00 950.00
Mandor 0.0150 50,000.00 750.00

6 H.6 1 m2 Pas. Bubungan Genteng Plentong 12,475.00


Kerpus Genteng Plentong 5.0000 3,500.00
Perekat adk.1:3 0.0300 599,400.00
Pekerja 0.2000 35,000.00 7,000.00
Harga Satuan Harga Upah
N0 ANALISA URAIAN PEKERJAAN Koef.
( Rp ) ( Rp )
1 2 3 4 5.00 6
Tukang Kayu 0.1000 45,000.00 4,500.00
Kepala Tukang Kayu 0.0100 47,500.00 475.00
Mandor 0.0100 50,000.00 500.00

F PEK. KUSEN , DAUN PINTU DAN JENDELA

1 F.2 Daun Jendela + Kaca 5 mm 73,700.00


Kaca Bening 5 mm 1.0000 76,000.00
Papan Kayu kls. II 0.0070 2,250,000.00
Paku 0.0300 9,000.00
Tukang Kayu 1.2000 45,000.00 54,000.00
Kepala Tukang Kayu 0.1200 47,500.00 5,700.00
Pekerja 0.4000 35,000.00 14,000.00

2 F.4 Daun Pintu & Jendela Panil 466,875.00


Papan Kayu kls. II 0.0350 2,250,000.00
Paku 0.2500 9,000.00
Tukang Kayu 7.5000 45,000.00 337,500.00
Kepala Tukang Kayu 0.7500 47,500.00 35,625.00
Pekerja 2.5000 35,000.00 87,500.00
Mandor 0.1250 50,000.00 6,250.00

3 F.27 Kayu Kusen Pintu /Jendela 1,341,000.00


Balok Kayu kls. II 0.8000 2,100,000.00
Paku 2.5000 9,000.00
Pekerja 12.0000 35,000.00 420,000.00
Tukang Kayu 16.0000 45,000.00 720,000.00
Kepala Tukang Kayu 3.6000 47,500.00 171,000.00
Mandor 0.6000 50,000.00 30,000.00
Harga Satuan Harga Upah
N0 ANALISA URAIAN PEKERJAAN Koef.
( Rp ) ( Rp )
1 2 3 4 5.00 6
4 F.33 Pintu Panil Penuh 161,875.00
Papan Kayu kls. II 0.0200 2,250,000.00
Lem Kayu 0.0800 10,000.00
Paku 0.0500 9,000.00
Pekerja 1.5000 35,000.00 52,500.00
Tukang Kayu 1.5000 45,000.00 67,500.00
Kepala Tukang Kayu 0.7500 47,500.00 35,625.00
Mandor 0.1250 50,000.00 6,250.00

5 F.33 a Pintu Lapis Double Triplek 339,750.00


Papan Kayu kls. II 0.0250 2,250,000.00
Triplek 3 mm 0.7000 50,000.00
Paku 0.0500 9,000.00
Pekerja 1.0000 35,000.00 35,000.00
Tukang Kayu 6.0000 45,000.00 270,000.00
Kepala Tukang Kayu 0.6000 47,500.00 28,500.00
Mandor 0.1250 50,000.00 6,250.00

6 F.34 Pasang Jalusi 11,212.50


Papan Kayu kls. II 0.0400 2,250,000.00
Paku 0.2500 9,000.00
Pekerja 0.1000 35,000.00 3,500.00
Tukang 0.1500 45,000.00 6,750.00
Kepala Tukang 0.0150 47,500.00 712.50
Mandor 0.0050 50,000.00 250.00

7 F.38. C Pasang Daun Pintu Lapis Seng Aluminium 305,000.00


Papan Kayu kls. II 0.0250 2,250,000.00
Paku 0.0700 9,000.00
Seng Plat BJLS 27 1.0000 22,500.00
Harga Satuan Harga Upah
N0 ANALISA URAIAN PEKERJAAN Koef.
( Rp ) ( Rp )
1 2 3 4 5.00 6
Triplek 3 mm 0.3500 50,000.00
Lem Kayu 0.7500 10,000.00
Tukang 6.0000 45,000.00 270,000.00
Pekerja 1.0000 35,000.00 35,000.00

G PEKERJAAN PENGGANTUNG

1 Pas. Kunci Pintu


Kunci 2x Putar 1.0000 115,000.00

2 Pas. Engsel Pintu


Engsel Pintu 1.0000 25,000.00

3 Pas. Egsel Jendela


Engsel Jendela 1.0000 17,500.00

4 Pas. Hak Angin


Hak Angin / Pengkait 1.0000 7,500.00

5 Pas. Tarikan Jendela


Tarikan Jendela 1.0000 42,000.00

6 Pas. Grendel Jendela


Grendel Jendela 1.0000 12,000.00

7 Supl.b Pas. Kaca 5 mm 19,500.00


Kaca Bening 5 mm 1.0000 76,000.00
Tukang 0.4000 45,000.00 18,000.00
Mandor 0.0300 50,000.00 1,500.00
Harga Satuan Harga Upah
N0 ANALISA URAIAN PEKERJAAN Koef.
( Rp ) ( Rp )
1 2 3 4 5.00 6

8 Supl.6 Papan Partisi 48,662.50


Papan Kayu kls. II 0.0150 2,250,000.00
Papan Kayu kls. III 0.0170 1,950,000.00
Paku 0.2000 9,000.00
Triplek 3 mm 0.7000 50,000.00
Tukang Kayu 0.6000 45,000.00 27,000.00
Kepala Tukang Kayu 0.0350 47,500.00 1,662.50
Pekerja 0.5000 35,000.00 17,500.00
Mandor 0.0500 50,000.00 2,500.00

H PEKERJAAN LANTAI

1 G.69 A Pas. lantai adk 1pc:5ps 26,687.50


Ubin Abu-abu 30/30 36.3500 3,150.00
Keramik 20/20 1.1000 45,000.00
Keramik 30/30 2.2000 37,500.00
Perekat G14 0.0210 729,125.00
Pasir Pasang 0.0320 130,000.00
Semen Portland 0.0160 51,000.00
Pekerja 0.5000 35,000.00 17,500.00
Mandor 0.0250 50,000.00 1,250.00
Tukang 0.1500 45,000.00 6,750.00
Kepala tukang 0.0250 47,500.00 1,187.50

2 G.60 Pas.beton cetak /paving block 25,250.00


Paving Block T = 6 cm 40.0000 1,250.00
Pasir Beton 0.1000 150,000.00
Pekerja 0.4000 35,000.00 14,000.00
Tukang 0.2500 45,000.00 11,250.00
Harga Satuan Harga Upah
N0 ANALISA URAIAN PEKERJAAN Koef.
( Rp ) ( Rp )
1 2 3 4 5.00 6

3 SNI 7395-2008 1 m2 Pas. Lantai keramik 30/30 cm 41,912.50


Keramik 30/30 1.0683 37,500.00
Semen Portland 0.2000 51,000.00
Pasir Pasang 0.0450 130,000.00
Semen warna 1.5000 15,000.00
Tukang Batu 0.3500 40,000.00 14,000.00
Kepala Tukang 0.0350 47,500.00 1,662.50
Pekerja 0.7000 35,000.00 24,500.00
Mandor 0.0350 50,000.00 1,750.00

4 SNI 7395-2008 1 m2 Pas. keramik lantai km/wc 20/20 cm 41,912.50


Keramik 20/20 2.3850 45,000.00
Semen Portland 0.2180 51,000.00
Pasir Pasang 0.0450 130,000.00
Semen warna 1.6200 15,000.00
Tukang Batu 0.3500 40,000.00 14000.00
Kepala Tukang 0.0350 47,500.00 1662.50
Pekerja 0.7000 35,000.00 24500.00
Mandor 0.0350 50,000.00 1750.00

5 SNI 7395-2008 1 m2 Pas. keramik dinding km/wc 20/20 cm 41,912.50


Keramik 20/20 2.3850 45,000.00
Semen Portland 0.1860 51,000.00
Pasir Pasang 0.0180 130,000.00
Semen warna 1.9400 15,000.00
Tukang Batu 0.4500 40,000.00 14000.00
Kepala Tukang 0.0450 47,500.00 1662.50
Pekerja 0.9000 35,000.00 24500.00
Mandor 0.0450 50,000.00 1750.00
Harga Satuan Harga Upah
N0 ANALISA URAIAN PEKERJAAN Koef.
( Rp ) ( Rp )
1 2 3 4 5.00 6

I PEKERJAAN PENGECATAN DAN POLITURAN

1 K.17 10 m2 Pengerjaan Cat Kayu,kusen,pintu,jendela 179,275.00


Cat Kayu 3.5000 50,000.00
Minyak Cat 1.4400 13,125.00
Pekerja 1.5400 35,000.00 53,900.00
Tukang 2.5000 45,000.00 112,500.00
Kepala Tukang 0.2500 47,500.00 11,875.00
Mandor 0.0200 50,000.00 1,000.00

1 m2 Mengerjakan Cat Warna 1/10xK.17

2 Supl. 1xA 1 m2 Pengerjaan Cat Tembok 3 kali cat 8,775.00


Cat Tembok 0.4000 40,000.00
Plamir Tembok 0.0800 18,000.00
Amplas 0.0500 3,250.00
Pekerja 0.0750 35,000.00 2,625.00
Tukang 0.1200 45,000.00 5,400.00
Mandor 0.0150 50,000.00 750.00

3 Pengecatan plafond dgn cat tembok 11,212.50


Cat Tembok 0.0270 40,000.00
Kepala tukang 0.0150 47,500.00 712.50
Tukang 0.1500 45,000.00 6,750.00
Mandor 0.0050 50,000.00 250.00
Pekerja 0.1000 35,000.00 3,500.00

J PEKERJAAN INSTALASI AIR BERSIH DAN KOTOR


Harga Satuan Harga Upah
N0 ANALISA URAIAN PEKERJAAN Koef.
( Rp ) ( Rp )
1 2 3 4 5.00 6
1 G.81 Pasangan Saluran Air hujan (10 m') 321,775.00
Batu bata 400.0000 450.00
Perekat G.19 0.5340 369,550.00
Tukang 2.9000 45,000.00 130,500.00
Kepala tukang 0.2900 47,500.00 13,775.00
Pekerja 4.5000 35,000.00 157,500.00
Mandor 0.4000 50,000.00 20,000.00

1 m' = 0,1 x G.81

2 Supl.BMPK.6 Pasang Kloset jongkok 19,500.00


Kloset jongkok Keramik 1.0000 150,000.00
Pekerja 0.3500 35,000.00 12,250.00
Tukang 0.1500 45,000.00 6,750.00
Mandor 0.0100 50,000.00 500.00

3 Supl.BMPK.12 Pasang saluran air bersih pipa 3/4" 62,375.0000


Pipa PVC 3/4 " 1.0000 15,000.00
Kran Leideng 3/4" 1.0000 25,000.00
Knee 'L' PVC diameter 3/4" 2.0000 5,000.00
Shockdrat dalam diameter 3/4" 1.0000 7,500.00
Klem pipa PVC diameter 3/4" 4.0000 10,000.00
Lem PVC 0.0300 35,000.00
Roll Sealtape 0.5000 17,500.00
Tukang Pipa 0.5000 45,000.00 22,500.0000
Kepala Tukang 0.0500 47,500.00 2,375.0000
Pekerja 1.0000 35,000.00 35,000.0000
Mandor 0.0500 50,000.00 2,500.0000
Harga Satuan Harga Upah
N0 ANALISA URAIAN PEKERJAAN Koef.
( Rp ) ( Rp )
1 2 3 4 5.00 6
4 Supl.BMPK.14 10 M' Pasang saluran air kotor pipa 4" 62,375.00
Pipa PVC 4" 2.5000 150,000.00
Kran Leideng 1/2" 1.0000 18,000.00
Knee 'L' PVC diameter 3/4" 2 5000
Shockdrat dalam diameter 3/4" 1 7500
Klem pipa PVC diameter 3/4" 4 10000
Lem PVC 0.03 35000
Roll Sealtape 0.5 17500
Tukang Pipa 0.5000 45,000.00 22,500.00
Kepala Tukang 0.0500 47,500.00 2,375.00
Pekerja 1.0000 35,000.00 35,000.00
Mandor 0.0500 50,000.00 2,500.00

1 M' = 0,1 x Supl.BMPK.14


Harga Bahan
Jumlah (Rp)
( Rp )
7 8

6,000.00

36,030.00 44,755.00
13,650.00
22,200.00
180.00

30,500.00

9,250.00

156,000.00 167,000.00
156,000.00
Harga Bahan
Jumlah (Rp)
( Rp )
7 8

415,470.00 505,095.00
223,200.00
119,340.00
72,930.00

117,770.00 149,170.00
63,000.00
44,370.00
10,400.00

97,730.00 129,180.00
63,000.00
18,870.00
15,860.00
Harga Bahan
Jumlah (Rp)
( Rp )
7 8

13,029.50 21,017.00
10,429.50
2,600.00

8,013.30 16,525.80
4,503.30
3,510.00

729,125.00 729,125.00
605,625.00
123,500.00

599,400.00 599,400.00
459,000.00
140,400.00

369,550.00 369,550.00
114,750.00
Harga Bahan
Jumlah (Rp)
( Rp )
7 8
254,800.00

653,300.00 928,050.00
225,500.00
81,000.00
346,800.00

566,240.00 831,115.00
275,000.00
75,000.00
216,240.00

1,123,050.00 1,720,425.00
1,100,000.00
23,050.00
Harga Bahan
Jumlah (Rp)
( Rp )
7 8
816,000.00 1,139,750.00
780,000.00
36,000.00

1,401,000.00 2,007,125.00
1,365,000.00
36,000.00

4,735,711.25

2,992,560.00

3,418,518.75
Harga Bahan
Jumlah (Rp)
( Rp )
7 8

5,565,167.12

3,691,461.25

4,049,113.75

4,163,866.10

4,163,866.10
Harga Bahan
Jumlah (Rp)
( Rp )
7 8

4,274,946.50

40,130.00 90,430.00
17,500.00
250.00
180.00
22,200.00

435,750.00 1,612,250.00
420,000.00
15,750.00
Harga Bahan
Jumlah (Rp)
( Rp )
7 8

35,550.00 44,275.00
33,300.00
2,250.00

20,400.00 43,700.00
19,500.00
900.00

18,700.00 43,400.00
18,700.00

35,482.00 47,957.00
17,500.00
17,982.00
Harga Bahan
Jumlah (Rp)
( Rp )
7 8

92,020.00 165,720.00
76,000.00
15,750.00
270.00

81,000.00 547,875.00
78,750.00
2,250.00

1,702,500.00 3,043,500.00
1,680,000.00
22,500.00
Harga Bahan
Jumlah (Rp)
( Rp )
7 8
46,250.00 208,125.00
45,000.00
800.00
450.00

91,700.00 431,450.00
56,250.00
35,000.00
450.00

92,250.00 103,462.50
90,000.00
2,250.00

104,380.00 409,380.00
56,250.00
630.00
22,500.00
Harga Bahan
Jumlah (Rp)
( Rp )
7 8
17,500.00
7,500.00

115,000.00 115,000.00
115,000.00

25,000.00 25,000.00
25,000.00

17,500.00 17,500.00
17,500.00

7,500.00 7,500.00
7,500.00

42,000.00 42,000.00
42,000.00

12,000.00 12,000.00
12,000.00

76,000.00 95,500.00
76,000.00
Harga Bahan
Jumlah (Rp)
( Rp )
7 8

103,700.00 152,362.50
33,750.00
33,150.00
1,800.00
35,000.00

266,790.13 293,477.63
114,502.50
49,500.00
82,500.00
15,311.63
4,160.00
816.00

65,000.00 90,250.00
50,000.00
15,000.00
Harga Bahan
Jumlah (Rp)
( Rp )
7 8

78,611.25 120,523.75
40,061.25
10,200.00
5,850.00
22,500.00

145,875.00 187,787.50
107,325.00
10,200.00
5,850.00
22,500.00

145,875.00 187,787.50
107325.00
10200.00
5850.00
22500.00
Harga Bahan
Jumlah (Rp)
( Rp )
7 8

193,900.00 373,175.00
175,000.00
18,900.00

17,602.50 17,602.50
16,000.00
1,440.00
162.50

1,080.00 12,292.50
1,080.00
Harga Bahan
Jumlah (Rp)
( Rp )
7 8
377,339.70 699,114.70
180,000.00
197,339.70

150,000.00 169,500.00
150,000.00

107,300.00 169,675.00
15,000.00
25,000.00
10,000.00
7,500.00
40,000.00
1,050.00
8,750.00
Harga Bahan
Jumlah (Rp)
( Rp )
7 8
460,300.00 522,675.00
375,000.00
18,000.00
10000
7500
40000
1050
8750
RENCANA ANGGARAN BIAYA

VOLUME H.SATUAN JUMLAH


No. URAIAN
(Rp) (Rp)
1 2 3 4 5
I. PEKERJAAN PERSIAPAN AWAL SUB TOTAL 1,752,272.50
1 1 M' Pekerjaan Pembersihan awal lokasi 72 6,000.00 432,000.00
2 1 M' Pasangan Bouwplank 29.5 44,755.00 1,320,272.50

II. PEKERJAAN GALIAN SUB TOTAL 418,460.00


1 1 M3 Pekerjaan Galian Tanah Biasa sedalam 1 m 13.72 30,500.00 418,460.00

III. PEKERJAAN URUGAN SUB TOTAL 215,460.00


1 1 M3 Pekerjaan Urugan pasir bawah pondasi/lantai 0.98 167,000.00 163,660.00
2 1 M3 PekerjaanPemadatan & Perataan 5.6 9,250.00 51,800.00
3 Urugan Tanah Sisi Pondasi 4.2 150,000.00 630,000.00

IV. PEKERJAAN PASANGAN SUB TOTAL 4,948,718.01


1 1 M3 Pek. Pondasi batu belah hitam adk 1:6 7.56 505,095.00 3,818,518.20
2 1 M3 Pek. dinding bata adukan 1:6 8.3231 129,180.00 1,075,181.29
3 1 M3 Pek. Plesteran adk 1:6 tebal 15 mm 3.3293 16,525.80 55,018.52

V. PEKERJAAN BETON SUB TOTAL 8,063,427.92


1 1 m2Pek. Sloof 15/20 0.84 4,163,866.10 3,497,647.52
2 1 m3 Pek. Beton bertulang sloof, kolom dan ring balok praktis 0.63 4,735,711.25 2,983,498.09
3 1 m2 Pek. ringbalk 15/20 0.072 4,163,866.10 299,798.36
4 1 m2 Pek. Dak Beton tebal 10 cm,adk 1:2:3 0.3 4,274,946.50 1,282,483.95

VI. PEKERJAAN KUSEN,PINTU SUB TOTAL 13,878,960.56


1 Kayu Kusen Pintu /Jendela 2.8296 3,043,500.00 8,611,887.60
2 Daun Pintu & Jendela Panil 8.4 547,875.00 4,602,150.00
3 Daun Jendela + Kaca 5 mm 4.0008 165,720.00 663,012.58
VOLUME H.SATUAN JUMLAH
No. URAIAN
(Rp) (Rp)
1 2 3 4 5
4 Pas. Kaca 5 mm 0.0200 95,500.00 1,910.38

VII PEKERJAAN PENGGANTUNG SUB TOTAL 1,916,000.00


1 Pas. Kunci Pintu 8 115,000.00 920,000.00
2 Pas. Engsel Pintu 12 25,000.00 300,000.00
3 Pas. Egsel Jendela 12 17,500.00 210,000.00
4 Pas. Hak Angin 12 7,500.00 90,000.00
5 Pas. Tarikan Jendela 6 42,000.00 252,000.00
6 Pas. Grendel Jendela 12 12,000.00 144,000.00

VIII. PEKERJAAN ATAP & PLAFOND SUB TOTAL 7,769,410.18


1 Pek. Kuda-Kuda kayu Kls.II 1.292 1,612,250.00 2,083,027.00
2 Pek. Rangka atap kayu Kelas II 0.4647 1,612,250.00 749,212.58
3 1 m2 Pas. Atap Genteng Plentong 37.1 43,400.00 1,610,140.00
4 1 m2 Pas. Bubungan Genteng Plentong 5.5 47,957.00 263,763.50
5 1 m2 Pek. Lisplank Papan tebal 3 cm 0.033 43,700.00 1,442.10
6 1 m2 Pek. Pasang Plafond + Rangka 27.5 90,430.00 2,486,825.00
7 Pas. Lis Plafond Profil 23 25,000.00 575,000.00

IX. PEKERJAAN LANTAI SUB TOTAL 4,132,293.39


1 1 M3 Pekerjaan Urugan pasir bawah pondasi/lantai 1.4 167,000.00 233,800.00
2 Pas. Rabat Floor 7.0254 525,428.80 3,691,347.49
3 1 m2 Pas. Lantai keramik 30/30 cm 1.485 120,523.75 178,977.77
4 1 m2 Pas. keramik lantai km/wc 20/20 cm 0.09 187,787.50 16,900.88
5 1 m2 Pas. keramik dinding km/wc 20/20 cm 0.06 187,787.50 11,267.25

X. PEKERJAAN PENGECATAN SUB TOTAL 4,726,866.60


1 1 m2 Pengerjaan Cat Tembok 3 kali cat 196 17,602.50 3,450,090.00
2 Pengecatan plafond dgn cat tembok 27 12,292.50 331,897.50
3 10 m2 Pengerjaan Cat Kayu,kusen,pintu,jendela 25.32 37,317.50 944,879.10
VOLUME H.SATUAN JUMLAH
No. URAIAN
(Rp) (Rp)
1 2 3 4 5

XI. PEKERJAAN INSTALASI LISTRIK SUB TOTAL 1,435,000.00


1 Pas. Saklar Ganda 1 35,000.00 35,000.00
2 Pas. Saklar Tunggal 3 25,000.00 75,000.00
3 Pas. Stop Kontak 3 45,000.00 135,000.00
4 Lampu Pijar 40 watt lengkap dengan Fitting 5 25,000.00 125,000.00
5 Pas. Lampu TL 2 x 20 watt 2 150,000.00 300,000.00
6 Box Termis 1 150,000.00 150,000.00
7 Kabel Listrik 1,5 mm 1 20,000.00 20,000.00
8 Instalasi Titik Lampu 7 85,000.00 595,000.00

XII. PEKERJAAN INSTALASI AIR BERSIH & KOTOR SUB TOTAL 4,325,707.79
1 Pasangan saluran air hujan 7 69,911.47 489,380.29
2 Pasang Kloset jongkok 1 169,500.00 169,500.00
3 Pembuatan Septiktank + Resapan (Ls) 1 2,750,000.00 2,750,000.00
4 Pasang saluran air bersih pipa 3/4" 3 169,675.00 509,025.00
6 Pasang Saluran air kotor pipa 4" 3 52,267.50 156,802.50
8 Bak Fiber Plastik 1 200,000.00 200,000.00
9 Pas. Floor Drain 1 15,000.00 15,000.00
10 Kran Air diameter 0,5" 2 18,000.00 36,000.00
REKAPITULASI ANGGARAN BIAYA

No. URAIAN PEKERJAAN

1 2
I PEKERJAAN PERSIAPAN AWAL
II PEKERJAAN GALIAN
III PEKERJAAN URUGAN
IV PEKERJAAN PASANGAN
V PEKERJAAN BETON
VI PEKERJAAN KUSEN,PINTU
VII PEKERJAAN PENGGANTUNG
VIII PEKERJAAN ATAP & PLAFOND
IX PEKERJAAN LANTAI
X PEKERJAAN PENGECATAN
XI PEKERJAAN INSTALASI LISTRIK
XII PEKERJAAN INSTALASI AIR BERSIH & KOTOR

JUMLAH
PPN 10%
JUMLAH TOTAL
DIBULATKAN

Terbilang : Sembilan Puluh Dua Juta Lima Ratus Sembilan Puluh Tiga Ribu Rupiah
ANGGARAN BIAYA

JUMLAH
( Rp )
3
1,752,272.50
418,460.00
215,460.00
4,948,718.01
8,063,427.92
13,878,960.56
1,916,000.00
7,769,410.18
4,132,293.39
4,726,866.60
1,435,000.00
4,325,707.79

53,582,576.93
5,358,257.69
58,940,834.63
58,941,000.00

Lima Ratus Sembilan Puluh Tiga Ribu Rupiah


0
WORK B
WORK BREAKDOWN STRUCTURE
COST BREAKDOWN STRUCTURE
No Deskripsi Pekerjaan Biaya yg dikeluarkan Total Biaya Persentase (%)

1 2 3 4 5

I PEKERJAAN PERSIAPAN AWAL SUB TOTAL 1,752,272.50 0.0197

1 Pek. Pembersihan awal lokasi 432,000.00


2 Pas. Bouwplank 1,320,272.50

II PEKERJAAN TANAH SUB TOTAL 1,263,920.00 0.0142

1 Pek. Galian 418,460.00


a Pek. Galian biasa sedalam 1m 418,460.00
2 Pek. Urugan 845,460.00
a Pek. Urugan Pasir bawah pondasi 163,660.00
b Pek. Pemadatan & Perataan 51,800.00
c Pek. Urugan tanah sisi pondasi 630,000.00

III PEKERJAAN STRUKTUR SUB TOTAL 20,781,556.10 0.2342

1 Pek. Atap & Plafond 7,769,410.18


a Pek. Kuda-Kuda kayu Kls.II 2,083,027.00
b Pek. Rangka atap kayu Kelas II 749,212.58
c Pas. Atap Genteng Plentong 1,610,140.00
d Pas. Bubungan Genteng Plentong 263,763.50
e Pek. Lisplank Papan tebal 3 cm 1,442.10
f Pek. Pasang Plafond + Rangka 2,486,825.00
g Pas. Lis Plafond Profil 575,000.00
2 Pek. Beton 8,063,427.92
a Pek. Sloof 15/20 3,497,647.52
b Pek. Beton bertulang sloof, kolom dan ring balok praktis 2,983,498.09
c Pek. ringbalk 15/20 299,798.36
d Pek. Dak Beton tebal 10 cm,adk 1:2:3 1,282,483.95
3 Pek. Pasangan 4,948,718.01
a Pek. Pondasi batu belah hitam adk 1:6 3,818,518.20
b Pek. dinding bata adukan 1:6 1,075,181.29
c Pek. Plesteran adk 1:6 tebal 15 mm 55,018.52

IV PEKERJAAN ARSITEKTUR SUB TOTAL 24,654,120.54 0.2778

1 Pek. Kusen, Pintu 13,878,960.56


a Kayu Kusen Pintu /Jendela 8,611,887.60
b Daun Pintu & Jendela Panil 4,602,150.00
c Daun Jendela + Kaca 5 mm 663,012.58
d Pas. Kaca 5 mm 1,910.38
2 Pek. Penggantung 1,916,000.00
a Pas. Kunci Pintu 920000.00
b Pas. Engsel Pintu 300000.00
c Pas. Egsel Jendela 210000.00
d Pas. Hak Angin 90000.00
e Pas. Tarikan Jendela 252000.00
f Pas. Grendel Jendela 144000.00
3 Pek. Lantai 4,132,293.39
a 1 M3 Pekerjaan Urugan pasir bawah pondasi/lantai 233,800.00
b Pas. Rabat Floor 3,691,347.49
c 1 m2 Pas. Lantai keramik 30/30 cm 178,977.77
d 1 m2 Pas. keramik lantai km/wc 20/20 cm 16,900.88
e 1 m2 Pas. keramik dinding km/wc 20/20 cm 11,267.25
4 Pek. Pengecatan 4,726,866.60
a 1 m2 Pengerjaan Cat Tembok 3 kali cat 3,450,090.00
b Pengecatan plafond dgn cat tembok 331,897.50
c 10 m2 Pengerjaan Cat Kayu,kusen,pintu,jendela 944,879.10

V PEKERJAAN INSTALASI LISTRIK SUB TOTAL 1,435,000.00 0.0162

1 Pas. Saklar Ganda 35,000.00


2 Pas. Saklar Tunggal 75,000.00
3 Pas. Stop Kontak 135,000.00
4 Lampu Pijar 40 watt lengkap dengan Fitting 125,000.00
5 Pas. Lampu TL 2 x 20 watt 300,000.00
6 Box Termis 150,000.00
7 Kabel Listrik 1,5 mm 20,000.00
8 Instalasi Titik Lampu 595,000.00

VI PEKERJAAN INSTALASI AIR BERSIH & KOTOR SUB TOTAL 4,325,707.79 0.0487

1 Pasangan Saluran Air hujan (10 m') 489,380.29


2 Pasang Kloset jongkok 169,500.00
3 Pembuatan Septiktank + Resapan 2,750,000.00
4 Pasang saluran air pipa 3/4" 509,025.00
5 Pasang saluran air pipa 4" 156,802.50
6 Bak Fiber Plastik 200,000.00
7 Pas. Floor Drain 15,000.00
8 Kran Air diameter 0,5" 36,000.00
COST B
COST BREAKDOWN STRUCTURE
Pekerjaan : Pembangunan Rumah Tinggal Type 21 M2
Lokasi : Natar - Lampung Selatan
TA : 2009

Bobot Durasi
No. Item Pekerjaan
(%) (hari)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 2 3 4

I PEKERJAAN PERSIAPAN AWAL 3.270 3 1.09 1.09 1.09


II PEKERJAAN GALIAN 0.781 7 0.11 0.11 0.11 0.11 0.11 0.11 0.11
III PEKERJAAN URUGAN 0.402 5 0.08 0.08 0.08 0.08
IV PEKERJAAN PASANGAN 9.236 30 0.31 0.31 0.31 0.31
V PEKERJAAN BETON 15.049 14
VI PEKERJAAN KUSEN, PINTU 25.902 7
VII PEKERJAAN PENGGANTUNG 3.576 3
VIII PEKERJAAN ATAP DAN PLAFOND 14.500 20
IX PEKERJAAN LANTAI 7.712 8
X PEKERJAAN PENGECATAN 8.822 4
XI PEKERJAAN INSTALASI LISTRIK 2.678 2
XII PEKERJAAN INSTALASI AIR BERSIH DAN KOTOR 8.073 5

TOTAL 100
1.09

1.09

1.09

0.39

0.39

0.39

0.39
0.11

0.11

0.11

0.11

0.11

0.11

0.11
RENCANA PROGRES HARIAN
1.09

2.18

3.27

3.38

3.49

3.60

3.72

3.83

3.94

4.05

4.44

4.83

5.22

5.60
KUMULATIF RENCANA PROGRES HARIAN
Prestasi : Realisasi =
Rencana =
Kurva S dan Bar Chart

JADWAL WAKTU PELAKSANAAN

Hari ke-

15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42

0.08
0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31
1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07 1.07
3.70 3.70

1.61 1.61 1.61 1.61 1.61


0.39

1.38

1.38

1.38

1.38

1.38

1.38

1.38

1.38

1.38

1.38

1.38

1.38

1.38

1.38

1.92

1.92

1.92

1.92

1.92

0.31

0.31

0.31

0.31

0.31

0.31

3.70

3.70
10.14

12.91

14.29

15.67

17.05

18.44

19.82

21.20

22.59

23.97

25.35

27.27

29.20

31.12

33.04

34.96

35.27

35.58

35.89

36.19

36.50

36.81

40.51

44.21
11.52
5.99

7.38

8.76
Hari ke-
47.91 3.70

43
51.61 3.70

44
55.31 3.70

45
59.01 3.70

46
62.71 3.70

47

3.70 3.70 3.70 3.70 3.70


63.44 0.72

48
64.16 0.72

49
64.89 0.72
50
65.61 0.72
51

66.34 0.72
52

67.06 0.72
53

67.79 0.72
54

68.51 0.72
55

69.24 0.72
56
57

70.0 0.72

70.7 0.72
58

71.4 0.72
59

72.1 0.72
60

72.9 0.72
61

73.6 0.72
62

74.3 0.72
63

75.0 0.72
64

75.8 0.72
65

76.5 0.72
66

77.2 0.72
67

0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72 0.72

79.5 2.30
68

81.8 2.30
69

1.34 1.34

82.8 0.96
70

0.96 0.96 0.96


No. Dokumen 01/KBS-LMGKP/XI/2009

No. Revisi

Tanggal

71 72 73 74 75 76 77 78 79 80 81 82

1.19 1.19 1.19

0.96 0.96 0.96 0.96 0.96


2.21 2.21 2.21 2.21
0.96

0.96

0.96

0.96

0.96

1.19

1.19

1.19

2.21

2.21

2.21

2.21
83.7

84.7

85.7

86.6

87.6

88.8

90.0

91.2

93.4

95.6

97.8

100
CRITICAL PATH
43 48 48 62

10 5 15 15 14 29

0 3 3 10

0 3 3 3 7 10

10 40 40 47

10 30 40 40 7 47
AL PATH
62 67 67 75

29 5 34 67 8 75

75 78 78 82

75 3 78 78 4 82

47 67 73 75

47 20 67 67 2 69
TIME COMPUTATION CHART
Activity i j D ES EF LS LF
Pek. Persiapan 1 2 3 0 3 0 3
Pek Galian 2 3 7 3 10 3 10
Pek. Urugan 3 4 5 10 15 43 48
Pek. Pasangan 3 5 30 10 40 10 40
Pek. Beton 4 6 14 15 29 48 62
Pek. Ins. Air Bersih & Kotor 6 8 5 29 34 62 67
Pek. Kusen & Pintu 5 7 7 40 47 40 47
Pek. Atap &Plafond 7 9 20 47 67 47 67
Pek. Listrik 9 10 2 67 69 73 75
Pek. Lantai 8 10 8 67 75 67 75
Pek. Penggantung 10 11 3 75 78 75 78
Pek. Pengecatan 11 12 4 78 82 78 82
TF FF
0 0
0 0
33 0
0 0
33 0
33 33
0 0
0 0
6 6
0 0
0 0
0 0

Anda mungkin juga menyukai