HARGA BAHAN DAN UPAH

TAHUN 2017

NO BAHAN HARGA DASAR + Satuan


JASA TERPAKAI 2017

1 Amplas 3,850.00 Lbr


2 Asbes gelombang besar pj. 3m 128,700.00 Lbr
3 Asbes gelombang besar pj. 2,4m 115,500.00 Lbr
4 Seng gelombang pjg. 3m, tbl. 0,3 mm 120,000.00 Lbr
5 Seng gelombang pjg. 2,4m, tbl. 0,3 mm 92,000.00 Lbr
6 Atap bitumenselulosa gelombang / onduline 160,000.00 Lbr
7 Nok bitumenselulosa gelombang / onduline 70,000.00 Unit
8 Bata merah 5 x 11 x 22 cm bakar kayu 880.00 bh
9 Bata merah 5 x 11 x 22 cm bakar sekam 550.00 bh
10 Bata ekspose 3,000.00 bh
11 Batu belah 15/20 cm 175,000.00 M3
12 Besi beton 10,000.00 kg
13 Besi beton polos 10,000.00 kg
14 Besi beton ulir 10,900.00 kg
15 Besi profil 13,000.00 kg
16 Besi strip 15,400.00 kg
17 Bubung stel gelombang besar 75,900.00 Unit
18 Bubung stel gelombang kecil 44,000.00 Unit
19 Cat kayu/besi dasar "emco" 54,800.00 kg
20 Cat kayu/besi penutup "emco" 54,800.00 kg
21 Cat meni kayu 29,700.00 kg
22 Cat meni besi 29,700.00 kg
23 cat tembok dasar "catylac" 25,080.00 kg
24 cat tembok penutup "catylac" 25,080.00 kg
25 cat tembok interior 25,080.00 kg
26 cat tembok eksterior (weather shield) 91,839.09 kg
27 cat tembok dasar eksterior (alkalibase) 91,839.09 kg
28 Dolken kayu Dia 8-10/ pjg 400 cm 23,000.00 btg
29 Engsel jendela (Engsel H) 10,450.00 unit
30 Engsel pintu (Engsel H) 14,850.00 unit
31 Engsel jendela (Engsel Kuningan kecil) 54,450.00 unit
32 Engsel pintu (Engsel Kuningan besar) 72,600.00 unit
33 Genteng beton lokal 3,850.00 bh
34 Genteng bubung beton lokal 5,500.00 bh
35 Genteng bubung Sokka besar 7,000.00 bh
36 Genteng Sokka besar 2,000.00 bh
37 Genteng bubung Sokka kecil 7,000.00 bh
38 Genteng Sokka kecil 2,000.00 bh
39 Genteng Morando 4,000.00 bh
40 Genteng bubung Morando 7,000.00 bh
41 Genteng press lokal 1,000.00 bh
42 Genteng bubung press lokal 5,500.00 bh
43 Ijuk 15,200.00 ikat
44 Kaca bening 3 mm 75,000.00 M2
45 Kaca bening 5 mm 90,000.00 M2
46 Kaca rayband 3 mm 80,850.00 M2
47 Kaca rayband 5 mm 95,150.00 M2
48 Kait angin kuningan 15,950.00 bh
49 Grendel jendela 10,450.00 bh
50 Kapur pasang / padam 250,000.00 M3
51 Kawat beton / bendrat 18,000.00 kg
52 Kawat kassa 21,780.00 M2
53 Kayu meranti balok 3,960,000.00 M3
54 Kayu meranti papan 4,180,000.00 M3
55 Kayu bangkirai, balok 9,900,000.00 M3
56 Kayu bengkirai, papan 11,000,000.00 M3
57 Kayu jati kualitas cat, balok 15,100,000.00 M3
58 Kayu jati kualitas cat, papan 15,100,000.00 M3
59 Kayu jati kualitas plitur, balok 20,872,500.00 M3
60 Kayu jati kualitas plitur, papan 20,872,500.00 M3
61 Kayu kamfer balok 9,350,000.00 M3
62 Kayu kamfer papan 9,900,000.00 M3
63 Kayu kruing balok 7,653,000.00 M3
64 Kayu kruing papan 8,250,000.00 M3
65 Kayu tahun 1,312,500.00 M3
66 Kayu sengon papan 1,312,500.00 M3
67 Kloset jongkok porselin "INA " 110,000.00 unit
68 Kloset duduk porselin "TOTO" 2,750,000.00 unit
69 Shower bidet 110,000.00 unit
70 Batu pecah mesin 2/3 192,500.00 M3
71 Kran air 20,000.00 bh
72 Kuas 15,000.00 bh
73 Kunci selot besar 109,780.00 unit
74 Lem kayu 14,300.00 kg
75 Meni besi 29,700.00 kg
76 Minyak begesting 2,200.00 ltr
77 Minyak cat 20,000.00 ltr
78 Paku 15,000.00 kg
79 Paku biasa 1/2" - 1" 15,000.00 kg
80 Paku biasa 2" - 5" 15,000.00 kg
81 Paku payung 36,300.00 kg
82 Paku sekrup 3,5 '' 1,250.00 bj
83 Pasir beton 224,000.00 M3
84 Pasir pasang 195,000.00 M3
85 Pasir urug 95,000.00 M3
86 PC warna 12,100.00 kg
87 Plamur kayu 29,700.00 kg
88 Plamur tembok 25,000.00 kg
89 Plat eternit 1 x 1 m, tb. 4mm 12,700.00 lbr
90 Asbes gelombang kecil pj. 3m 93,500.00 lbr
91 Asbes gelombang kecil pj. 2,4m 77,000.00 lbr
92 Plywood tebal 1,2 X 2,4 X 4mm 66,000.00 lbr
93 Plywood tebal 1,2 X 2,4 X 6mm 77,000.00 lbr
94 Plywood tebal 1,2 X 2,4 X 9mm 128,700.00 lbr
95 Plywood tebal 1,2 X 2,4 X 12mm 176,000.00 lbr
96 Teakwood 1,2 X 2,4 X 3mm 93,500.00 lbr
97 Residu atau ter 77,550.00 klg
98 Rolling door besi 322,000.00 M2
99 Rolling door alumunium 443,000.00 M2
100 Folding gate besi tebal 0.7 mm 571,000.00 M2
101 Folding gate alumunium tebal 0.7 mm 922,000.00 M2
102 Kusen alumunium silver 4'' 120,800.00 M'
103 Kusen alumunium coklat 4" (alexsindo) 148,500.00 M'
104 Kusen alumunium silver 3'' 115,500.00 M'
105 Kusen alumunium coklat 3" 126,500.00 M'
106 Daun pintu frame alumunium silver panil kaca ( 80 x 200 ) 1,012,000.00 Unit
107 Daun pintu frame alumunium coklat panil kaca ( 80 x 200 ) 1,144,000.00 Unit
108 Set pintu KM/WC 798,600.00 Unit
109 Roster beton 20x20 cm 5,500.00 bh
110 Roster gerabah 10 x 20 cm 6,000.00 bh
111 Roster gerabah 25 x 25 cm 10,450.00 bh
112 Seal tape 2,750.00 bh
113 Semen putih 80,300.00 zak
114 Semen warna 484,000.00 zak
115 Semen portland 40 kg 1,250.00 kg
116 Semen portland 50 kg 62,500.00 zak
117 Seng plat talang bjls 30, lbr 90 cm 45,000.00 M'
118 Sirtu (komposisi 60% batu :40% pasir) 125,000.00 M3
119 Tanah urug 80,000.00 M3
120 Tegel keramik 30/30 (putih ) "setara Asia tile" 46,750.00 M2
121 Tegel keramik 40/40 ( putih ) "setara Asia tile" 60,500.00 M2
122 Tegel keramik 20/25 ( warna ) "setara Roman" 99,000.00 M2
123 Tegel keramik 30/30 ( warna ) "setara Asia tile" 62,000.00 M2
124 Tegel keramik 30/60 ( warna ) "Setara Ikad" 130,000.00 M2
125 Tegel keramik 20/20 ( warna ) "setara Asia tile" 65,000.00 M2
126 Tegel keramik 40/40 ( warna ) "Setara Ikad" 63,250.00 M2
127 Tegel keramik 60/60 ( warna ) "Setara Platinum" 104,500.00 M2
128 homogenius tile 60/60 ( warna ) "Setara Indogress 278,300.00 M2
129 keramik list motif 7/20 cm 12,100.00 bh
130 Paving block "Setara Mutiara" 6 cm, K.200 122,000.00 M2
131 Paving block "Setara Mutiara" 8 cm, K.300 145,000.00 M2
132 Paving block "Lokal" 6 cm 42,000.00 M2
133 Paving block "Lokal" 8 cm 65,450.00 M2
134 Batako 15x30x9 3,500.00 bh
135 Batako 20x40x10 4,950.00 bh
136 Buis beton Ø 100 cm, p. 50cm 100,000.00 bh
137 Buis beton Ø 80 cm, p. 50cm 75,000.00 bh
138 Buis beton Ø 60 cm, p. 50cm 56,000.00 bh
139 Buis beton U Ø 30 cm, p. 100cm 29,000.00 bh
140 Plat gypsum tb. 9mm (240x120 cm) "Setara Elephant" 71,500.00 lbr
141 Plat calciboard Tb. 3,5mm (240x120 cm) 60,500.00 lbr
142 Polycarbonat tb. 12mm (200x1100 cm) 1,980,000.00 glg
143 Fiber 0,8 X 2,4 tb 0,8 mm 47,000.00 lbr
144 Fiber 0,8 X 3 tb 0,8 mm 99,000.00 lbr
145 Pagar BRC 0,9 x 2,4 dia. 6mm 192,500.00 unit
146 Pagar BRC 1,2 x 2,4 dia. 6mm 253,000.00 unit
147 cornice / list profil kayu 3cm x 3cm 5,500.00 M'
148 cornice / list profil kayu 5cm x 5cm 8,250.00 M'
149 Wastafel '' TOTO " 550,000.00 bh
150 Kran wastafel "TOTO " 110,000.00 bh
151 Kawat Las RB26 2.6mm 27,200.00 kg
152 Batu Pecah 5/7 mesin 150,000.00 M3
153 set slang outlet wastafel 90,900.00 bh
154 Air Kerja 27.50 ltr

NO UPAH HARGA DASAR + JASA

1 Pekerja 45,400.00 OH
2 Mandor - OH
3 Tukang kayu 59,000.00 OH
4 Kepala Tukang 63,600.00 OH
5 Tukang batu 59,000.00 OH
6 Tukang besi 59,000.00 OH
7 Tukang cat 59,000.00 OH
8 Tukang Plitur 59,000.00 OH

*) harga dasar plus jasa, tanpa ppn per 28 januari 2017


Analisa Biaya Konstruksi ( ABK ) Bangunan Gedung dan Perumahan
Pekerjaan Persiapan
SNI-BORONGAN
Kode Uraian Volume Sat Harga Sat Jumlah Harga Jumlah Harga
Rp. Rp. Rp.

6.2 1 m' Pagar sementara dari seng gelombang tinggi 2,4 meter
Bahan
Dolken kayu Dia 8-10/ 400 cm 1.250 Btg 23,000.00 = Rp. 28,750.00
Semen portland 2.500 Kg 1,250.00 = Rp. 3,125.00
Seng gelombang panjang 2,4m 1.200 Lbr 92,000.00 = Rp. 110,400.00
Pasir beton 0.005 M3 224,000.00 = Rp. 1,120.00
Koral beton 0.009 M3 192,500.00 = Rp. 1,732.50
Kayu meranti 5/7 dan 4/6 0.026 M3 3,960,000.00 = Rp. 102,960.00
Paku biasa 2" - 5" 0.060 Kg 15,000.00 = Rp. 900.00
Jumlah 248,987.50
Tenaga
Tukang kayu 0.200 Oh 59,000.00 = Rp. 11,800.00
Pekerja 0.400 Oh 45,400.00 = Rp. 18,160.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.020 Oh - = Rp. - 31,232.00
Jumlah = Rp. 280,219.50

6.4 1 m' Pengukuran dan pemasangan bouwplank


Bahan
Kayu meranti 5/7 0.012 M3 3,960,000.00 = Rp. 47,520.00
Paku biasa 2" - 5" 0.020 Kg 15,000.00 = Rp. 300.00
Kayu papan 3/20 ( meranti ) 0.007 M3 4,180,000.00 = Rp. 29,260.00
Jumlah = Rp. 77,080.00
Tenaga
Tukang kayu 0.100 Oh 59,000.00 = Rp. 5,900.00
Pekerja 0.100 Oh 45,400.00 = Rp. 4,540.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.005 Oh - = Rp. - 11,076.00
Jumlah = Rp. 88,156.00

6.4a 1 m' Pengukuran dan pemasangan bouwplank


Bahan
Kayu meranti 5/7 0.012 M3 3,960,000.00 = Rp. 47,520.00
Paku biasa 2" - 5" 0.020 Kg 15,000.00 = Rp. 300.00
Kayu papan 3/20 ( sengon ) 0.007 M3 1,312,500.00 = Rp. 9,187.50
Jumlah = Rp. 57,007.50
Tenaga
Tukang kayu 0.100 Oh 59,000.00 = Rp. 5,900.00
Pekerja 0.100 Oh 45,400.00 = Rp. 4,540.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.005 Oh - = Rp. - 11,076.00
Jumlah = Rp. 68,083.50

6.13 1 m' Bongkaran beton bertulang


Tenaga
Pekerja 6.667 Oh 45,400.00 = Rp. 302,681.80
Mandor 0.333 Oh - = Rp. -
Jumlah = Rp. 302,681.80

6.14 1 m3 Bongkaran dinding tembok bata merah

Tenaga
Pekerja 6.667 Oh 45,400.00 = Rp. 302,681.80
Mandor 0.033 Oh - = Rp. -
Jumlah 302,681.80
Analisa Biaya Konstruksi ( ABK ) Bangunan Gedung dan Perumahan
Pekerjaan Tanah

Kode Uraian Volume Sat Harga Sat Jumlah Harga Jumlah Harga
Rp. Rp. Rp.

6.1 1 m3 Galian tanah biasa sedalam 1 meter


Tenaga
Pekerja 0.750 Oh 45,400.00 = Rp. 34,050.00
Mandor 0.025 Oh - = Rp. -
Jumlah 34,050.00

6.2 1 m3 Galian tanah biasa sedalam 2 meter


Tenaga
Pekerja 0.900 Oh 45,400.00 = Rp. 40,860.00
Mandor 0.045 Oh - = Rp. -
Jumlah = Rp. 40,860.00

6.3 1 m3 Galian tanah biasa sedalam 3 meter


Tenaga
Pekerja 1.050 Oh 45,400.00 = Rp. 47,670.00
Mandor 0.067 Oh - = Rp. -
Jumlah = Rp. 47,670.00

6.4 1 m3 Galian tanah keras sedalam 1 meter


Tenaga
Pekerja 1.000 Oh 45,400.00 = Rp. 45,400.00
Mandor 0.032 Oh - = Rp. -
Jumlah = Rp. 45,400.00

6.5 1 m3 Galian tanah cadas sedalam 1 meter


Tenaga
Pekerja 1.500 Oh 45,400.00 = Rp. 68,100.00
Mandor 0.060 Oh - = Rp. -
Jumlah = Rp. 68,100.00

6.6 1 m3 Galian tanah lumpur sedalam 1 meter


Tenaga
Pekerja 1.200 Oh 45,400.00 = Rp. 54,480.00
Mandor 0.045 Oh - = Rp. -
Jumlah = Rp. 54,480.00

6.7 1 m2 stripping tebing setinggi 1 meter


Tenaga
Pekerja 0.050 Oh 45,400.00 = Rp. 2,270.00
Mandor 0.005 Oh - = Rp. -
Jumlah = Rp. 2,270.00

6.8 1 m3 Pembuangan tanah sejauh 30 meter


Tenaga
Pekerja 0.330 Oh 45,400.00 = Rp. 14,982.00
Mandor 0.010 Oh - = Rp. -
Jumlah = Rp. 14,982.00
6.9 1 m3 Urugan kembali
Tenaga
Pekerja 0.2500 Oh 45,400.00 = Rp. 11,350.00
Mandor 0.0083 Oh - = Rp. -
Jumlah 11,350.00
6.10 1 m3 Pemadatan tanah ( per 20 cm )
Tenaga
Pekerja 0.500 Oh 45,400.00 = Rp. 22,700.00
Mandor 0.050 Oh - = Rp. -
Jumlah = Rp. 22,700.00
6.11 1 m3 Urugan pasir
Bahan
Pasir Urug 1.200 M3 95,000.00 = Rp. 114,000.00
Jumlah 114,000.00
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Mandor 0.010 Oh - = Rp. - 13,620.00
Jumlah 127,620.00
6.14 1 m2 Pemasangan lapisan ijuk tebal 10 cm
Bahan
Ijuk 6.000 kg 15,200.00 = Rp. 91,200.00
Jumlah 91,200.00
Tenaga
Pekerja 0.150 Oh 45,400.00 = Rp. 6,810.00
Mandor 0.015 Oh - = Rp. - 6,810.00
Jumlah 98,010.00
6.15 1 m3 Urugan sirtu padat
Bahan
Sirtu 1.200 M3 125,000.00 = Rp. 150,000.00
Jumlah 150,000.00
Tenaga
Pekerja 0.250 Oh 45,400.00 = Rp. 11,350.00
Mandor 0.025 Oh - = Rp. - 11,350.00
Jumlah 161,350.00
Analisa Biaya Konstruksi ( ABK ) Bangunan Gedung dan Perumahan
Pekerjaan Pondasi
Kode Uraian Volume Sat Harga Sat Jumlah Harga Jumlah Harga
Rp. Rp. Rp.
6.1 1 m3 Pasang pondasi batu belah 1 Pc : 3 PP
Bahan
Batu belah 15/20 cm 1.200 M3 175,000.00 = Rp. 210,000.00
Semen portland 202.000 Kg 1,250.00 = Rp. 252,500.00
Pasir pasang 0.485 M3 195,000.00 = Rp. 94,575.00
Jumlah 557,075.00
Tenaga
Pekerja 1.500 Oh 45,400.00 = Rp. 68,100.00
Tukang batu 0.750 Oh 59,000.00 = Rp. 44,250.00
Kepala tukang 0.075 Oh 63,600.00 = Rp. 4,770.00
Mandor 0.075 Oh - = Rp. - 117,120.00
Jumlah 674,195.00
6.2 1 m3 Pasang pondasi batu belah 1 Pc : 4 PP
Bahan
Batu belah 15/20 cm 1.200 M3 175,000.00 = Rp. 210,000.00
Semen portland 163.000 Kg 1,250.00 = Rp. 203,750.00
Pasir pasang 0.520 M3 195,000.00 = Rp. 101,400.00
Jumlah 515,150.00
Tenaga
Pekerja 1.500 Oh 45,400.00 = Rp. 68,100.00
Tukang batu 0.750 Oh 59,000.00 = Rp. 44,250.00
Kepala tukang 0.075 Oh 63,600.00 = Rp. 4,770.00
Mandor 0.075 Oh - = Rp. - 117,120.00
Jumlah 632,270.00
6.3 1 m3 Pasang pondasi batu belah 1 Pc : 5 PP
Bahan
Batu belah 15/20 cm 1.200 M3 175,000.00 = Rp. 210,000.00
Semen portland 136.000 Kg 1,250.00 = Rp. 170,000.00
Pasir pasang 0.544 M3 195,000.00 = Rp. 106,080.00
Jumlah 486,080.00
Tenaga
Pekerja 1.500 Oh 45,400.00 = Rp. 68,100.00
Tukang batu 0.750 Oh 59,000.00 = Rp. 44,250.00
Kepala tukang 0.075 Oh 63,600.00 = Rp. 4,770.00
Mandor 0.075 Oh - = Rp. - 117,120.00
Jumlah 603,200.00
6.7 1 m3 Pasang pondasi batu belah 1 Pc : 3 KP : 10 PP
Bahan
Batu belah 15/20 cm 1.200 M3 175,000.00 = Rp. 210,000.00
Semen portland 61.000 Kg 1,250.00 = Rp. 76,250.00
Kapur pasang 0.147 M3 250,000.00 = Rp. 36,750.00
Pasir pasang 0.492 M3 195,000.00 = Rp. 95,940.00
Jumlah 418,940.00
Tenaga
Pekerja 1.500 Oh 45,400.00 = Rp. 68,100.00
Tukang batu 0.750 Oh 59,000.00 = Rp. 44,250.00
Kepala tukang 0.075 Oh 63,600.00 = Rp. 4,770.00
Mandor 0.075 Oh - = Rp. - 117,120.00
Jumlah 536,060.00
6.9 1 m3 Pasang pondasi batu kosong (aanstamping)
Bahan
Batu belah 15/20 cm 1.200 M3 175,000.00 = Rp. 210,000.00
Pasir urug 0.432 M3 95,000.00 = Rp. 41,040.00
Jumlah 251,040.00
Tenaga
Pekerja 0.780 Oh 45,400.00 = Rp. 35,412.00
Tukang batu 0.390 Oh 59,000.00 = Rp. 23,010.00
Kepala tukang 0.039 Oh 63,600.00 = Rp. 2,480.40
Mandor 0.039 Oh - = Rp. - 60,902.40
Jumlah 311,942.40
6.11 1 m3 Pasang pondasi sumuran, diameter 100 cm
Bahan
Batu belah 15/20 cm 0.450 M3 175,000.00 = Rp. 78,750.00
Semen portland 194.000 Kg 1,250.00 = Rp. 242,500.00
Pasir Beton 0.312 M3 224,000.00 = Rp. 69,888.00
Koral Beton 0.468 M3 192,500.00 = Rp. 90,090.00
Jumlah 481,228.00
Tenaga
Pekerja 2.400 Oh 45,400.00 = Rp. 108,960.00
Tukang batu 0.800 Oh 59,000.00 = Rp. 47,200.00
Kepala tukang 0.080 Oh 63,600.00 = Rp. 5,088.00
Mandor 0.119 Oh - = Rp. - 161,248.00
Jumlah 642,476.00
Analisa Biaya Konstruksi ( ABK ) Bangunan Gedung dan Perumahan
Pekerjaan Dinding
Kode Uraian Volume Sat Harga Sat Jumlah Harga Jumlah Harga
Rp. Rp. Rp.
6.2 1 m2 Pasangan bata merah tebal 1 bata 1 Pc : 3 PP
Bahan
Bata merah 5 x 11 x 22 cm 140.000 Bh 880.00 = Rp. 123,200.00
Semen portland 32.950 Kg 1,250.00 = Rp. 41,187.50
Pasir pasang 0.091 M3 195,000.00 = Rp. 17,745.00
Jumlah 182,132.50
Tenaga
Pekerja 0.600 Oh 45,400.00 = Rp. 27,240.00
Tukang batu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.030 Oh - = Rp. - 40,312.00
Jumlah 222,444.50
6.3 1 m2 Pasangan bata merah tebal 1 bata 1 Pc : 4 PP
Bahan
Bata merah 5 x 11 x 22 cm 140.000 Bh 880.00 = Rp. 123,200.00
Semen portland 26.550 Kg 1,250.00 = Rp. 33,187.50
Pasir pasang 0.093 M3 195,000.00 = Rp. 18,135.00
Jumlah 174,522.50
Tenaga
Pekerja 0.600 Oh 45,400.00 = Rp. 27,240.00
Tukang batu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.030 Oh - = Rp. - 40,312.00
Jumlah 214,834.50

6.6 1 m2 Pasangan bata merah tebal 1 bata 1 Pc : 3 Kp :10 PP


Bahan
Bata merah 5 x 11 x 22 cm 140.000 Bh 880.00 = Rp. 123,200.00
Semen portland 10.080 Kg 1,250.00 = Rp. 12,600.00
Pasir pasang 0.0925 M3 195,000.00 = Rp. 18,037.50
Kapur pasang 0.0275 M3 250,000.00 = Rp. 6,875.00
Jumlah 160,712.50
Tenaga
Pekerja 0.600 Oh 45,400.00 = Rp. 27,240.00
Tukang batu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.030 Oh - = Rp. - 40,312.00
Jumlah 201,024.50

6.8 1 m2 Pasangan bata merah tebal 1/2 bata 1 Pc : 3 PP


Bahan
Bata merah 5 x 11 x 22 cm 70.000 Bh 880.00 = Rp. 61,600.00
Semen portland 14.370 Kg 1,250.00 = Rp. 17,962.50
Pasir pasang 0.0400 M3 195,000.00 = Rp. 7,800.00
Jumlah 87,362.50
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.015 Oh - = Rp. - 20,156.00
Jumlah 107,518.50
6.9 1 m2 Pasangan bata merah tebal 1/2 bata 1 Pc : 4 Ps
Bahan
Bata merah 5 x 11 x 22 cm 70.000 Bh 880.00 = Rp. 61,600.00
Semen portland 11.500 Kg 1,250.00 = Rp. 14,375.00
Pasir pasang 0.0430 M3 195,000.00 = Rp. 8,385.00
Jumlah 84,360.00
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.015 Oh - = Rp. - 20,156.00
Jumlah 104,516.00

6.13 1 m2 Pasangan bata merah tebal 1/2 bata 1 Pc : 3 Kp : 10 Ps


Bahan
Bata merah 5 x 11 x 22 cm 70.000 Bh 880.00 = Rp. 61,600.00
Semen portland 4.500 Kg 1,250.00 = Rp. 5,625.00
Pasir pasang 0.0500 M3 195,000.00 = Rp. 9,750.00
Kapur pasang 0.015 M3 250,000.00 = Rp. 3,750.00
Jumlah 80,725.00
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.015 Oh - = Rp. - 20,156.00
Jumlah 100,881.00
6.23 1 m2 Pasang dinding roster/ terawang ( 12 x 11 x 24 ) cm, 1 Pc : 4 PP
Bahan
Roster / terawang 30.000 Bh 6,000.00 = Rp. 180,000.00
semen portland 11.000 Kg 1,250.00 = Rp. 13,750.00
Pasir pasang 0.035 M3 195,000.00 = Rp. 6,825.00
Jumlah 200,575.00
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.015 Oh - = Rp. - 20,156.00
Jumlah 220,731.00

dihitung 1 m2 Pasang dinding roster beton (20x20) cm, 1 Pc : 4 PP


Bahan
Roster beton 21.000 Bh 5,500.00 = Rp. 115,500.00
semen portland 11.000 Kg 1,250.00 = Rp. 13,750.00
Pasir pasang 0.035 M3 195,000.00 = Rp. 6,825.00
Jumlah 136,075.00
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.015 Oh - = Rp. - 20,156.00
Jumlah 156,231.00

dihitung 1 m2 Pasang dinding roster gerabah (10x20) cm, 1 Pc : 4 PP


Bahan
Roster gerabah 10x20 cm 45.000 Bh 6,000.00 = Rp. 270,000.00
semen portland 11.000 Kg 1,250.00 = Rp. 13,750.00
Pasir pasang 0.035 M3 195,000.00 = Rp. 6,825.00
Jumlah 290,575.00
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.015 Oh - = Rp. - 20,156.00
Jumlah 310,731.00

dihitung 1 m2 Pasang dinding roster gerabah (25x25) cm, 1 Pc : 4 PP


Bahan
Roster gerabah 25x25 cm 14.000 Bh 10,450.00 = Rp. 146,300.00
semen portland 11.000 Kg 1,250.00 = Rp. 13,750.00
Pasir pasang 0.035 M3 195,000.00 = Rp. 6,825.00
Jumlah 166,875.00
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.015 Oh - = Rp. - 20,156.00
Jumlah 187,031.00
Analisa Biaya Konstruksi ( ABK ) bangunan Gedung dan Perumahan
Pekerjaan plesteran

Kode Uraian Volume Sat Harga Sat Jumlah Harga Jumlah Harga
Rp. Rp. Rp.

6.3 1 m2 Plesteran 1 Pc : 3 Ps, tebal 15 mm


Bahan
semen portland 7.776 Kg 1,250.00 = Rp. 9,720.00
Pasir pasang 0.023 M3 195,000.00 = Rp. 4,485.00
Jumlah 14,205.00
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.150 Oh 59,000.00 = Rp. 8,850.00
Kepala tukang 0.015 Oh 63,600.00 = Rp. 954.00
Mandor 0.015 Oh - = Rp. - 23,424.00
Jumlah 37,629.00

6.4 1 m2 Plesteran 1 Pc : 4 Ps, tebal : 15 mm


Bahan
semen portland 6.240 Kg 1,250.00 = Rp. 7,800.00
Pasir pasang 0.024 M3 195,000.00 = Rp. 4,680.00
Jumlah 12,480.00
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.150 Oh 59,000.00 = Rp. 8,850.00
Kepala tukang 0.015 Oh 63,600.00 = Rp. 954.00
Mandor 0.015 Oh - = Rp. - 23,424.00
Jumlah 35,904.00

6.5 1 m2 Plesteran 1 Pc : 5 Ps, tebal : 15 mm


Bahan
semen portland 5.184 Kg 1,250.00 = Rp. 6,480.00
Pasir pasang 0.026 M3 195,000.00 = Rp. 5,070.00
Jumlah 11,550.00
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.150 Oh 59,000.00 = Rp. 8,850.00
Kepala tukang 0.015 Oh 63,600.00 = Rp. 954.00
Mandor 0.015 Oh - = Rp. - 23,424.00
Jumlah 34,974.00

6.10 1 m2 Plesteran 1 Pc : 2 Kp : 8 Ps, tebal : 15 mm


Bahan
semen portland 3.000 Kg 1,250.00 = Rp. 3,750.00
Kapur padam 0.005 M3 250,000.00 = Rp. 1,250.00
Pasir pasang 0.020 M3 195,000.00 = Rp. 3,900.00
Jumlah 8,900.00
Tenaga
Pekerja 0.360 Oh 45,400.00 = Rp. 16,344.00
Tukang batu 0.120 Oh 59,000.00 = Rp. 7,080.00
Kepala tukang 0.012 Oh 63,600.00 = Rp. 763.20
Mandor 0.018 Oh - = Rp. - 24,187.20
Jumlah 33,087.20

6.20 1 m' Plesteran skoning 1 Pc : 2 Ps, lebar 10 mm


Bahan
semen Portland 0.500 Kg 1,250.00 = Rp. 625.00
Pasir pasang 0.013 M3 195,000.00 = Rp. 2,535.00
Jumlah 3,160.00
Tenaga
Pekerja 0.080 Oh 45,400.00 = Rp. 3,632.00
Tukang batu 0.040 Oh 59,000.00 = Rp. 2,360.00
Kepala tukang 0.040 Oh 63,600.00 = Rp. 2,544.00
Mandor 0.004 Oh - = Rp. - 8,536.00
Jumlah 11,696.00
6.23 1 m2 Plesteran ciprat. 1 Pc : 2 Ps
Bahan
Semen Portland 4.320 Kg 1,250.00 = Rp. 5,400.00
Pasir Pasang 0.006 M3 195,000.00 = Rp. 1,170.00
Jumlah 6,570.00
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.015 Oh - = Rp. - 20,156.00
Jumlah 26,726.00
6.26 1 m2 Finishing Siar adukan 1 PC : 2 PS.
Bahan
Semen Portland 6.340 Kg 1,250.00 = Rp. 7,925.00
Pasir Pasang 0.012 M3 195,000.00 = Rp. 2,340.00
Jumlah 10,265.00
Tenaga
Pekerja 0.300 Oh 45,400.00 = Rp. 13,620.00
Tukang batu 0.150 Oh 59,000.00 = Rp. 8,850.00
Kepala tukang 0.015 Oh 63,600.00 = Rp. 954.00
Mandor 0.015 Oh - = Rp. - 23,424.00
Jumlah 33,689.00

6.27 1 m2 acian
Bahan
Semen Portland 3.250 Kg 1,250.00 = Rp. 4,062.50
Jumlah 4,062.50
Tenaga
Pekerja 0.200 Oh 45,400.00 = Rp. 9,080.00
Tukang batu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.010 Oh - = Rp. - 15,616.00
Jumlah 19,678.50

Analisa biaya konstruksi ( ABK ) Bangunan Gedung dan Perumahan


Pekerjaan kayu

Kode Uraian Volume Sat Harga Sat Jumlah Harga Jumlah Harga
Rp. Rp. Rp.

6.1 1 m3 Pasang kusen pintu dan jendela kayu jati kelas plitur
Bahan
Kayu jati, balok 1.100 M3 20,872,500.00 = Rp. 22,959,750.00
Paku 1.250 kg 15,000.00 = Rp. 18,750.00
Lem kayu 1.000 kg 14,300.00 = Rp. 14,300.00
Jumlah 22,992,800.00
Tenaga
Pekerja 7.000 Oh 45,400.00 = Rp. 317,800.00
Tukang kayu 21.000 Oh 59,000.00 = Rp. 1,239,000.00
Kepala tukang 2.100 Oh 63,600.00 = Rp. 133,560.00
Mandor 0.350 Oh - = Rp. - 1,690,360.00
Jumlah 24,683,160.00
6.1a 1 m3 Pasang kusen pintu dan jendela kayu jati kualitas cat
Bahan
Kayu jati, balok 1.100 M3 15,100,000.00 = Rp. 16,610,000.00
Paku 1.250 kg 15,000.00 = Rp. 18,750.00
Lem kayu 1.000 kg 14,300.00 = Rp. 14,300.00
Jumlah 16,643,050.00
Tenaga
Pekerja 7.000 Oh 45,400.00 = Rp. 317,800.00
Tukang kayu 21.000 Oh 59,000.00 = Rp. 1,239,000.00
Kepala tukang 2.100 Oh 63,600.00 = Rp. 133,560.00
Mandor 0.350 Oh - = Rp. - 1,690,360.00
Jumlah 18,333,410.00
6.2 1 m3 Pasang kusen pintu dan jendela kayu kamper
Bahan
Kayu kamper, balok 1.200 M3 9,350,000.00 = Rp. 11,220,000.00
Paku 1.250 kg 15,000.00 = Rp. 18,750.00
Lem kayu 1.000 kg 14,300.00 = Rp. 14,300.00
Jumlah 11,253,050.00
Tenaga
Pekerja 6.000 Oh 45,400.00 = Rp. 272,400.00
Tukang kayu 18.000 Oh 59,000.00 = Rp. 1,062,000.00
Kepala tukang 1.800 Oh 63,600.00 = Rp. 114,480.00
Mandor 0.300 Oh - = Rp. - 1,448,880.00
Jumlah 12,701,930.00
6.10 1 m2 Pasang Jalusi Kusen Kayu Kamfer
Bahan
Kayu kamper, papan 0.060 M3 9,900,000.00 = Rp. 594,000.00
Paku 0.150 kg 15,000.00 = Rp. 2,250.00
Jumlah 596,250.00
Tenaga
Pekerja 0.670 Oh 45,400.00 = Rp. 30,418.00
Tukang kayu 2.000 Oh 59,000.00 = Rp. 118,000.00
Kepala tukang 0.200 Oh 63,600.00 = Rp. 12,720.00
Mandor 0.335 Oh - = Rp. - 161,138.00
Jumlah 757,388.00
6.5 1 m2 Pasang pintu panel kayu jati klas plitur
Bahan
Kayu jati, papan 0.040 M3 20,872,500.00 = Rp. 834,900.00
Lem kayu 0.500 kg 14,300.00 = Rp. 7,150.00
Jumlah 842,050.00
Tenaga
Pekerja 1.000 Oh 45,400.00 = Rp. 45,400.00
Tukang kayu 3.000 Oh 59,000.00 = Rp. 177,000.00
Kepala tukang 0.300 Oh 63,600.00 = Rp. 19,080.00
Mandor 0.050 Oh - = Rp. - 241,480.00
Jumlah 1,083,530.00
6.5a 1 m2 Pasang pintu panel kayu jati klas cat
Bahan
Kayu jati, papan 0.040 M3 15,100,000.00 = Rp. 604,000.00
Lem kayu 0.500 kg 14,300.00 = Rp. 7,150.00
Jumlah 611,150.00
Tenaga
Pekerja 1.000 Oh 45,400.00 = Rp. 45,400.00
Tukang kayu 3.000 Oh 59,000.00 = Rp. 177,000.00
Kepala tukang 0.300 Oh 63,600.00 = Rp. 19,080.00
Mandor 0.050 Oh - = Rp. - 241,480.00
Jumlah 852,630.00
6.5b 1 m2 Pasang pintu panel kayu kamfer
Bahan
Kayu kamfer, papan 0.040 M3 9,900,000.00 = Rp. 396,000.00
Lem kayu 0.500 kg 14,300.00 = Rp. 7,150.00
Jumlah 403,150.00
Tenaga
Pekerja 1.000 Oh 45,400.00 = Rp. 45,400.00
Tukang kayu 3.000 Oh 59,000.00 = Rp. 177,000.00
Kepala tukang 0.300 Oh 63,600.00 = Rp. 19,080.00
Mandor 0.050 Oh - = Rp. - 241,480.00
6.6 1 m2 Pasang pintu dan jendela kaca kayu jati klas plitur
Bahan
Kayu jati, papan 0.024 M3 20,872,500.00 = Rp. 500,940.00
Lem kayu 0.300 kg 14,300.00 = Rp. 4,290.00
Jumlah 505,230.00
Tenaga
Pekerja 0.800 Oh 45,400.00 = Rp. 36,320.00
Tukang kayu 2.400 Oh 59,000.00 = Rp. 141,600.00
Kepala tukang 0.240 Oh 63,600.00 = Rp. 15,264.00
Mandor 0.040 Oh - = Rp. - 193,184.00
Jumlah 698,414.00
6.6a 1 m2 Pasang pintu dan jendela kaca kayu jati klas cat
Bahan
Kayu jati, papan 0.024 M3 15,100,000.00 = Rp. 362,400.00
Lem kayu 0.300 kg 14,300.00 = Rp. 4,290.00
Jumlah 366,690.00
Tenaga
Pekerja 0.800 Oh 45,400.00 = Rp. 36,320.00
Tukang kayu 2.400 Oh 59,000.00 = Rp. 141,600.00
Kepala tukang 0.240 Oh 63,600.00 = Rp. 15,264.00
Mandor 0.040 Oh - = Rp. - 193,184.00
Jumlah 559,874.00
6.6b 1 m2 Pasang pintu dan jendela kaca kayu kamfer
Bahan
Kayu kamfer, papan 0.024 M3 9,900,000.00 = Rp. 237,600.00
Lem kayu 0.300 kg 14,300.00 = Rp. 4,290.00
Jumlah 241,890.00
Tenaga
Pekerja 0.800 Oh 45,400.00 = Rp. 36,320.00
Tukang kayu 2.400 Oh 59,000.00 = Rp. 141,600.00
Kepala tukang 0.240 Oh 63,600.00 = Rp. 15,264.00
Mandor 0.040 Oh - = Rp. - 193,184.00
Jumlah 435,074.00
6.7 1 m2 Pasang pintu dan jendela jalusi kayu jati klas plitur
Bahan
Kayu jati, papan 0.064 M3 20,872,500.00 = Rp. 1,335,840.00
Lem kayu 0.500 kg 14,300.00 = Rp. 7,150.00
Jumlah 1,342,990.00
Tenaga
Pekerja 1.000 Oh 45,400.00 = Rp. 45,400.00
Tukang kayu 3.000 Oh 59,000.00 = Rp. 177,000.00
Kepala tukang 0.300 Oh 63,600.00 = Rp. 19,080.00
Mandor 0.050 Oh - = Rp. - 241,480.00
Jumlah 1,584,470.00
6.7a 1 m2 Pasang pintu dan jendela jalusi kayu jati klas cat
Bahan
Kayu jati, papan 0.064 M3 15,100,000.00 = Rp. 966,400.00
Lem kayu 0.500 kg 14,300.00 = Rp. 7,150.00
Jumlah 973,550.00
Tenaga
Pekerja 1.000 Oh 45,400.00 = Rp. 45,400.00
Tukang kayu 3.000 Oh 59,000.00 = Rp. 177,000.00
Kepala tukang 0.300 Oh 63,600.00 = Rp. 19,080.00
Mandor 0.050 Oh - = Rp. - 241,480.00
Jumlah 1,215,030.00
6.7b 1 m2 Pasang pintu dan jendela jalusi kayu kamfer
Bahan
Kayu kamfer, papan 0.064 M3 9,900,000.00 = Rp. 633,600.00
Lem kayu 0.500 kg 14,300.00 = Rp. 7,150.00
Jumlah 640,750.00
Tenaga
Pekerja 1.000 Oh 45,400.00 = Rp. 45,400.00
Tukang kayu 3.000 Oh 59,000.00 = Rp. 177,000.00
Kepala tukang 0.300 Oh 63,600.00 = Rp. 19,080.00
Mandor 0.050 Oh - = Rp. - 241,480.00
882,230.00
6.9 1 m2 Pasang pintu plywood rangkap rangka ekspose kayu jati klas plitur
Bahan
Kayu jati, papan 0.0256 M3 20,872,500.00 = Rp. 534,336.00
Paku biasa 1/2" - 1" 0.030 Kg 15,000.00 = Rp. 450.00
Lem kayu 0.500 Lt 14,300.00 = Rp. 7,150.00
Plywood 90cm x 220cm x 4mm 1.000 Lbr 66,000.00 = Rp. 66,000.00
Jumlah 607,936.00
Tenaga
Pekerja 0.800 Oh 45,400.00 = Rp. 36,320.00
Tukang kayu 2.400 Oh 59,000.00 = Rp. 141,600.00
Kepala tukang 0.240 Oh 63,600.00 = Rp. 15,264.00
Mandor 0.040 Oh - = Rp. - 193,184.00
Jumlah 801,120.00

6.9a 1 m2 Pasang pintu plywood rangkap rangka ekspose kayu jati klas cat
Bahan
Kayu jati, papan 0.0256 M3 15,100,000.00 = Rp. 386,560.00
Paku biasa 1/2" - 1" 0.030 Kg 15,000.00 = Rp. 450.00
Lem kayu 0.500 Lt 14,300.00 = Rp. 7,150.00
Plywood 90cm x 220cm x 4mm 1.000 Lbr 66,000.00 = Rp. 66,000.00
Jumlah 460,160.00
Tenaga
Pekerja 0.800 Oh 45,400.00 = Rp. 36,320.00
Tukang kayu 2.400 Oh 59,000.00 = Rp. 141,600.00
Kepala tukang 0.240 Oh 63,600.00 = Rp. 15,264.00
Mandor 0.040 Oh - = Rp. - 193,184.00
Jumlah 653,344.00
6.9b 1 m2 Pasang pintu plywood rangkap rangka ekspose kayu kamfer
Bahan
Kayu kamfer, papan 0.0256 M3 9,900,000.00 = Rp. 253,440.00
Paku biasa 1/2" - 1" 0.030 Kg 15,000.00 = Rp. 450.00
Lem kayu 0.500 Lt 14,300.00 = Rp. 7,150.00
Plywood 90cm x 220cm x 4mm 1.000 Lbr 66,000.00 = Rp. 66,000.00
Jumlah 327,040.00
Tenaga
Pekerja 0.800 Oh 45,400.00 = Rp. 36,320.00
Tukang kayu 2.400 Oh 59,000.00 = Rp. 141,600.00
Kepala tukang 0.240 Oh 63,600.00 = Rp. 15,264.00
Mandor 0.040 Oh - = Rp. - 193,184.00
Jumlah 520,224.00
6.11 1 m2 Pasang pintu teakwood rangkap rangka kayu jati klas plitur
Bahan
Kayu jati, papan 0.025 M3 20,872,500.00 = Rp. 521,812.50
Paku biasa 1/2" - 1" 0.030 Kg 15,000.00 = Rp. 450.00
Lem kayu 0.300 Lt 14,300.00 = Rp. 4,290.00
Teakwood 4' x 8' x 4' mm 1.000 Lbr 93,500.00 = Rp. 93,500.00
Jumlah 620,052.50
Tenaga
Pekerja 0.800 Oh 45,400.00 = Rp. 36,320.00
Tukang kayu 2.400 Oh 59,000.00 = Rp. 141,600.00
Kepala tukang 0.240 Oh 63,600.00 = Rp. 15,264.00
Mandor 0.040 Oh - = Rp. - 193,184.00
Jumlah 813,236.50
6.11a 1 m2 Pasang pintu teakwood rangkap rangka kayu jati klas cat
Bahan
Kayu jati, papan 0.025 M3 15,100,000.00 = Rp. 377,500.00
Paku biasa 1/2" - 1" 0.030 Kg 15,000.00 = Rp. 450.00
Lem kayu 0.300 Lt 14,300.00 = Rp. 4,290.00
Teakwood 4' x 8' x 4' mm 1.000 Lbr 93,500.00 = Rp. 93,500.00
Jumlah 475,740.00
Tenaga
Pekerja 0.800 Oh 45,400.00 = Rp. 36,320.00
Tukang kayu 2.400 Oh 59,000.00 = Rp. 141,600.00
Kepala tukang 0.240 Oh 63,600.00 = Rp. 15,264.00
Mandor 0.040 Oh - = Rp. - 193,184.00
Jumlah 668,924.00
6.11b 1 m2 Pasang pintu teakwood rangkap rangka kayu kamfer
Bahan
Kayu kamfer, papan 0.0250 M3 9,900,000.00 = Rp. 247,500.00
Paku biasa 1/2" - 1" 0.030 Kg 15,000.00 = Rp. 450.00
Lem kayu 0.300 Lt 14,300.00 = Rp. 4,290.00
Teakwood 4' x 8' x 4' mm 1.000 Lbr 93,500.00 = Rp. 93,500.00
Jumlah 345,740.00
Tenaga
Pekerja 0.800 Oh 45,400.00 = Rp. 36,320.00
Tukang kayu 2.400 Oh 59,000.00 = Rp. 141,600.00
Kepala tukang 0.240 Oh 63,600.00 = Rp. 15,264.00
Mandor 0.040 Oh - = Rp. - 193,184.00
Jumlah 538,924.00
6.13 1 m3 Pasang konstruksi kuda - kuda kayu bangkirai
Bahan
Kayu bangkirai, balok 1.100 M3 9,900,000.00 = Rp. 10,890,000.00
Besi strip 15.000 Kg 15,400.00 = Rp. 231,000.00
Paku biasa 12 cm 5.600 Kg 15,000.00 = Rp. 84,000.00
Jumlah 11,205,000.00
Tenaga
Pekerja 4.000 Oh 45,400.00 = Rp. 181,600.00
Tukang kayu 12.000 Oh 59,000.00 = Rp. 708,000.00
Kepala tukang 1.200 Oh 63,600.00 = Rp. 76,320.00
Mandor 0.200 Oh - = Rp. - 965,920.00
Jumlah 12,170,920.00

6.13b 1 m3 Pasang konstruksi kuda - kuda kayu Kruing


Bahan
Kayu kruing, balok 1.100 M3 7,653,000.00 = Rp. 8,418,300.00
Besi strip 15.000 Kg 15,400.00 = Rp. 231,000.00
Paku biasa 12 cm 5.600 Kg 15,000.00 = Rp. 84,000.00
Jumlah 8,733,300.00
Tenaga
Pekerja 4.000 Oh 45,400.00 = Rp. 181,600.00
Tukang kayu 12.000 Oh 59,000.00 = Rp. 708,000.00
Kepala tukang 1.200 Oh 63,600.00 = Rp. 76,320.00
Mandor 0.200 Oh - = Rp. - 965,920.00
Jumlah 9,699,220.00

6.15 1 m3 Pasang konstruksi gording kayu bangkirai


Bahan
Kayu bangkirai, balok 1.100 M3 9,900,000.00 = Rp. 10,890,000.00
Besi strip 15.000 Kg 15,400.00 = Rp. 231,000.00
Paku biasa 12 cm 3.000 Kg 15,000.00 = Rp. 45,000.00
Jumlah 11,166,000.00
Tenaga
Pekerja 2.400 Oh 45,400.00 = Rp. 108,960.00
Tukang kayu 7.200 Oh 59,000.00 = Rp. 424,800.00
Kepala tukang 0.720 Oh 63,600.00 = Rp. 45,792.00
Mandor 0.120 Oh - = Rp. - 579,552.00
Jumlah 11,745,552.00

6.31 1 m2 Pasang rangka atap genteng keramik kayu kamfer


Bahan
Kayu kamfer 0.012 M3 9,350,000.00 = Rp. 112,200.00
Paku biasa 2" - 5" 0.150 Kg 15,000.00 = Rp. 2,250.00
Jumlah 114,450.00
Tenaga
Pekerja 0.100 Oh 45,400.00 = Rp. 4,540.00
Tukang kayu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.005 Oh - = Rp. - 11,076.00
Jumlah 125,526.00
6.31a 1 m2 Pasang rangka atap seng/asbes gelombang
Bahan
Kayu kamfer 0.008 M3 9,350,000.00 = Rp. 76,670.00
Paku biasa 2" - 5" 0.050 Kg 15,000.00 = Rp. 750.00
Jumlah 77,420.00
Tenaga
Pekerja 0.050 Oh 45,400.00 = Rp. 2,270.00
Tukang kayu 0.050 Oh 59,000.00 = Rp. 2,950.00
Kepala tukang 0.005 Oh 63,600.00 = Rp. 318.00
Mandor 0.002 Oh - = Rp. - 5,538.00
Jumlah 82,958.00
6.32 1 m2 Pasang rangka atap genteng keramik kayu bangkirai
Bahan
Kayu bangkirai, balok 0.012 M3 9,900,000.00 = Rp. 118,800.00
Paku biasa 2" - 5" 0.150 Kg 15,000.00 = Rp. 2,250.00
Jumlah 121,050.00
Tenaga
Pekerja 0.100 Oh 45,400.00 = Rp. 4,540.00
Tukang kayu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.005 Oh - = Rp. - 11,076.00
Jumlah 132,126.00
6.35 1 m2 Pasang rangka atap genteng beton kayu bangkirai
Bahan
Kayu bangkirai, balok 0.014 M3 9,900,000.00 = Rp. 138,600.00
Paku biasa 2" - 5" 0.150 Kg 15,000.00 = Rp. 2,250.00
Jumlah 140,850.00
Tenaga
Pekerja 0.100 Oh 45,400.00 = Rp. 4,540.00
Tukang kayu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.005 Oh - = Rp. - 11,076.00
Jumlah 151,926.00
6.39 1 m2 Pasang rangka Langit-langit ( 1 x 1 ) m kayu kamfer
Bahan :
Kayu kamfer, balok 0.012 m3 9,350,000.00 =Rp. 112,200.00
Paku biasa 2-5" 0.100 Kg 15,000.00 =Rp. 1,500.00
113,700.00
Tenaga
Pekerja 0.150 Oh 45,400.00 =Rp. 6,810.00
Tukang kayu 0.250 Oh 59,000.00 =Rp. 14,750.00
Kepala Tukang 0.025 Oh 63,600.00 =Rp. 1,590.00
Mandor 0.075 Oh - =Rp. - 23,150.00
Jumlah Jumlah =Rp. 136,850.00
6.40 1 m2 Pasang rangka Langit-langit ( 1 x 1 ) m kayu kruing
Bahan :
Kayu kruing, balok 0.012 m3 7,653,000.00 =Rp. 91,836.00
Paku biasa 2-5" 0.100 Kg 15,000.00 =Rp. 1,500.00
93,336.00
Tenaga
Pekerja 0.150 Oh 45,400.00 =Rp. 6,810.00
Tukang kayu 0.250 Oh 59,000.00 =Rp. 14,750.00
Kepala Tukang 0.025 Oh 63,600.00 =Rp. 1,590.00
Mandor 0.075 Oh - =Rp. - 23,150.00
Jumlah =Rp. 116,486.00
6.20 1 m2 Pasang rangka Langit-langit ( 60 x 60 ) cm kayu kruing
Bahan :
Kayu kruing, balok 0.016 m3 7,653,000.00 =Rp. 124,743.90
Paku biasa 2-5" 0.250 Kg 15,000.00 =Rp. 3,750.00
128,493.90
Tenaga
Pekerja 0.200 Oh 45,400.00 =Rp. 9,080.00
Tukang kayu 0.300 Oh 59,000.00 =Rp. 17,700.00
Kepala Tukang 0.030 Oh 63,600.00 =Rp. 1,908.00
Mandor 0.010 Oh - =Rp. - 28,688.00
Jumlah =Rp. 157,181.90
6. 21 1 m' Pasang lisplank ukuran ( 3 x 20 ) cm, kayu jati
Bahan
Kayu jati, papan 0.0108 M3 20,872,500.00 = Rp. 225,423.00
Paku biasa 2" - 5" 0.100 Kg 15,000.00 = Rp. 1,500.00
Jumlah 226,923.00
Tenaga
Pekerja 0.100 Oh 45,400.00 = Rp. 4,540.00
Tukang kayu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.005 Oh - = Rp. - 17,612.00
Jumlah 244,535.00
6.21b 1 m' Pasang lisplank ukuran ( 3 x 20 ) cm, kayu kamfer
Bahan
Kayu kamfer, papan 0.0108 M3 9,900,000.00 = Rp. 106,920.00
Paku biasa 2" - 5" 0.100 Kg 15,000.00 = Rp. 1,500.00
Jumlah 108,420.00
Tenaga
Pekerja 0.100 Oh 45,400.00 = Rp. 4,540.00
Tukang kayu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.005 Oh - = Rp. - 17,612.00
Jumlah 126,032.00
6. 22 1 m' Pasang lisplank ukuran ( 3 x 30 ) cm, kayu jati
Bahan
Kayu jati, papan 0.011 M3 20,872,500.00 = Rp. 229,597.50
Paku biasa 2" - 5" 0.050 Kg 15,000.00 = Rp. 750.00
Jumlah 230,347.50
Tenaga
Pekerja 0.100 Oh 45,400.00 = Rp. 4,540.00
Tukang kayu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.005 Oh - = Rp. - 17,612.00
Jumlah 247,959.50
6.22b 1 m' Pasang lisplank ukuran ( 3 x 30 ) cm, kayu kamfer
Bahan
Kayu kamfer, papan 0.011 M3 9,900,000.00 = Rp. 108,900.00
Paku biasa 2" - 5" 0.050 Kg 15,000.00 = Rp. 750.00
Tenaga Jumlah 109,650.00
Pekerja 0.100 Oh 45,400.00 = Rp. 4,540.00
Tukang kayu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.005 Oh - = Rp. - 17,612.00
Jumlah 127,262.00
6.23 1 m2 Pasang rangka dinding pemisah (60 x 120)cm, kayu kamfer
Bahan
Kayu kamfer, balok 0.0280 M3 9,350,000.00 = Rp. 261,800.00
Paku biasa 2" - 5" 0.150 Kg 15,000.00 = Rp. 2,250.00
Jumlah 264,050.00
Tenaga
Pekerja 0.150 Oh 45,400.00 = Rp. 6,810.00
Tukang kayu 0.450 Oh 59,000.00 = Rp. 26,550.00
Kepala tukang 0.045 Oh 63,600.00 = Rp. 2,862.00
Mandor 0.008 Oh - = Rp. - 36,222.00
Jumlah 300,272.00
6. 24 1 m2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamfer
Bahan
Kayu kamfer, balok 0.0280 M3 9,350,000.00 = Rp. 261,800.00
Paku biasa 2" - 5" 0.150 Kg 15,000.00 = Rp. 2,250.00
Lem kayu 0.560 Lt 14,300.00 = Rp. 8,008.00
Teakwood 120cm x 240cm x 3mm 0.860 Lbr 93,500.00 = Rp. 80,410.00
Jumlah 352,468.00
Tenaga
Pekerja 0.200 Oh 45,400.00 = Rp. 9,080.00
Tukang kayu 0.600 Oh 59,000.00 = Rp. 35,400.00
Kepala tukang 0.060 Oh 63,600.00 = Rp. 3,816.00
Mandor 0.010 Oh - = Rp. - 48,296.00
Jumlah 400,764.00
6. 25 1 m2 Pasang dinding pemisah plywood rangkap, rangka kayu kamfer
Bahan
Kayu kamfer, balok 0.0280 M3 9,350,000.00 = Rp. 261,800.00
Paku biasa 2" - 5" 0.150 Kg 15,000.00 = Rp. 2,250.00
Lem kayu 0.560 Lt 14,300.00 = Rp. 8,008.00
Plywood 120cm x 240cm x 4mm 0.860 Lbr 66,000.00 = Rp. 56,760.00
Jumlah 328,818.00
Tenaga
Pekerja 0.200 Oh 45,400.00 = Rp. 9,080.00
Tukang kayu 0.600 Oh 59,000.00 = Rp. 35,400.00
Kepala tukang 0.060 Oh 63,600.00 = Rp. 3,816.00
Mandor 0.010 Oh - = Rp. - 48,296.00
Jumlah 377,114.00

Analisa biaya konstruksi ( ABK ) Bangunan Gedung dan Perumahan


Pekerjaan beton
Kode Uraian Volume Sat Harga Sat Jumlah Harga Jumlah Harga
Rp. Rp. Rp.
6.1 1 m3 Membuat beton mutu f'c=7,4 MPa (K 100), slump (12 ± 2) cm, w/c=0,87
Bahan
Semen portland 247.000 Kg 1,250.00 = Rp. 308,750.00
Pasir beton 869.000 Kg 160.00 = Rp. 139,040.00
Koral beton/kerikil 999.000 Kg 142.59 = Rp. 142,450.00
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah 596,152.50
Tenaga
Pekerja 1.650 Oh 45,400.00 = Rp. 74,910.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Kepala tukang 0.028 Oh 63,600.00 = Rp. 1,780.80
Mandor 0.083 Oh - = Rp. - 92,915.80
Jumlah 689,068.30
6.2 1 m3 Membuat beton mutu f'c=9,8 MPa (K 125), slump (12 ± 2) cm, w/c=0,87
Bahan
Semen portland 276.000 Kg 1,250.00 = Rp. 345,000.00
Pasir beton 828.000 Kg 160.00 = Rp. 132,480.00
Koral beton/kerikil 1,012.000 Kg 142.59 = Rp. 144,303.70
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah 627,696.20
Tenaga
Pekerja 1.650 Oh 45,400.00 = Rp. 74,910.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Kepala tukang 0.028 Oh 63,600.00 = Rp. 1,780.80
Mandor 0.083 Oh - = Rp. - 92,915.80
Jumlah 720,612.00

6.3 1 m3 Membuat beton mutu f'c=12,2 MPa (K 150), slump (12 ± 2) cm, w/c=0,72
Bahan
Semen portland 299.000 Kg 1,250.00 = Rp. 373,750.00
Pasir beton 799.000 Kg 160.00 = Rp. 127,840.00
Koral beton/kerikil 1,017.000 Kg 142.59 = Rp. 145,016.67
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah 652,519.17
Tenaga
Pekerja 1.650 Oh 45,400.00 = Rp. 74,910.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Kepala tukang 0.028 Oh 63,600.00 = Rp. 1,780.80
Mandor 0.083 Oh - = Rp. - 92,915.80
Jumlah 745,434.97
6.4 1 m3 Membuat lantai kerja beton mutu f'c=7,4 MPa (K 100), slump (3-6) cm, w/c=0,87
Bahan
Semen portland 230.000 Kg 1,250.00 = Rp. 287,500.00
Pasir beton 893.000 Kg 160.00 = Rp. 142,880.00
Koral beton/kerikil 1,027.000 Kg 142.59 = Rp. 146,442.59
Air 200.000 Ltr 27.50 = Rp. 5,500.00
Jumlah 582,322.59
Tenaga
Pekerja 1.200 Oh 45,400.00 = Rp. 54,480.00
Tukang batu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.060 Oh - = Rp. - 67,552.00
Jumlah 649,874.59
6.5 1 m3 Membuat beton mutu f'c=14,5 MPa (K 175), slump (12 ± 2) cm, w/c=0,66
Bahan
Semen portland 326.000 Kg 1,250.00 = Rp. 407,500.00
Pasir beton 760.000 Kg 160.00 = Rp. 121,600.00
Koral beton/kerikil 1,029.000 Kg 142.59 = Rp. 146,727.78
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah 681,740.28
Tenaga
Pekerja 1.650 Oh 45,400.00 = Rp. 74,910.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Kepala tukang 0.028 Oh 63,600.00 = Rp. 1,780.80
Mandor 0.083 Oh - = Rp. - 92,915.80
Jumlah 774,656.08
6.6 1 m3 Membuat beton mutu f'c=16,9 MPa (K 200), slump (12 ± 2) cm, w/c=0,61
Bahan
Semen portland 352.000 Kg 1,250.00 = Rp. 440,000.00
Pasir beton 731.000 Kg 160.00 = Rp. 116,960.00
Koral beton/kerikil 1,031.000 Kg 142.59 = Rp. 147,012.96
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah 709,885.46
Tenaga
Pekerja 1.650 Oh 45,400.00 = Rp. 74,910.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Kepala tukang 0.028 Oh 63,600.00 = Rp. 1,780.80
Mandor 0.083 Oh - = Rp. - 92,915.80
Jumlah 802,801.26
6.7 1 m3 Membuat beton mutu f'c=19,3 MPa (K 225), slump (12 ± 2) cm, w/c=0,58
Bahan
Semen portland 371.000 Kg 1,250.00 = Rp. 463,750.00
Pasir beton 698.000 Kg 160.00 = Rp. 111,680.00
Koral beton/kerikil 1,047.000 Kg 142.59 = Rp. 149,294.44
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah 730,636.94
Tenaga
Pekerja 1.650 Oh 45,400.00 = Rp. 74,910.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Kepala tukang 0.028 Oh 63,600.00 = Rp. 1,780.80
Mandor 0.083 Oh - = Rp. - 92,915.80
Jumlah 823,552.74
6.8 1 m3 Membuat beton mutu f'c=21,7 MPa (K 250), slump (12 ± 2) cm, w/c=0,56
Bahan
Semen portland 384.000 Kg 1,250.00 = Rp. 480,000.00
Pasir beton 692.000 Kg 160.00 = Rp. 110,720.00
Koral beton/kerikil 1,039.000 Kg 142.59 = Rp. 148,153.70
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah 744,786.20
Tenaga
Pekerja 1.650 Oh 45,400.00 = Rp. 74,910.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Kepala tukang 0.028 Oh 63,600.00 = Rp. 1,780.80
Mandor 0.083 Oh - = Rp. - 92,915.80
Jumlah 837,702.00
6.9 1 m3 Membuat beton mutu f'c=24,0 MPa (K 275), slump (12 ± 2) cm, w/c=0,53
Bahan
Semen portland 406.000 Kg 1,250.00 = Rp. 507,500.00
Pasir beton 684.000 Kg 160.00 = Rp. 109,440.00
Koral beton/kerikil 1,026.000 Kg 142.59 = Rp. 146,300.00
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah 769,152.50
Tenaga
Pekerja 1.650 Oh 45,400.00 = Rp. 74,910.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Kepala tukang 0.028 Oh 63,600.00 = Rp. 1,780.80
Mandor 0.083 Oh - = Rp. - 92,915.80
Jumlah 862,068.30
6.10 1 m3 Membuat beton mutu f'c=26,4 MPa (K 300), slump (12 ± 2) cm, w/c=0,52
Bahan
Semen portland 413.000 Kg 1,250.00 = Rp. 516,250.00
Pasir beton 681.000 Kg 160.00 = Rp. 108,960.00
Koral beton/kerikil 1,021.000 Kg 142.59 = Rp. 145,587.04
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah 776,709.54
Tenaga
Pekerja 1.650 Oh 45,400.00 = Rp. 74,910.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Kepala tukang 0.028 Oh 63,600.00 = Rp. 1,780.80
Mandor 0.083 Oh - = Rp. - 92,915.80
Jumlah 869,625.34
6.11 1 m3 Membuat beton mutu f'c=28,8 MPa (K 325), slump (12 ± 2) cm, w/c=0,49
Bahan
Semen portland 439.000 Kg 1,250.00 = Rp. 548,750.00
Pasir beton 670.000 Kg 160.00 = Rp. 107,200.00
Koral beton/kerikil 1,006.000 Kg 142.59 = Rp. 143,448.15
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah 805,310.65
Tenaga
Pekerja 2.100 Oh 45,400.00 = Rp. 95,340.00
Tukang batu 0.350 Oh 59,000.00 = Rp. 20,650.00
Kepala tukang 0.035 Oh 63,600.00 = Rp. 2,226.00
Mandor 0.105 Oh - = Rp. - 118,216.00
Jumlah 923,526.65
6.12 1 m3 Membuat beton mutu f'c=31,2 MPa (K 350), slump (12 ± 2) cm, w/c=0,48
Bahan
Semen portland 448.000 Kg 1,250.00 = Rp. 560,000.00
Pasir beton 667.000 Kg 160.00 = Rp. 106,720.00
Koral beton/kerikil 1,000.000 Kg 142.59 = Rp. 142,592.59
Air 215.000 Ltr 27.50 = Rp. 5,912.50
Jumlah 815,225.09
Tenaga
Pekerja 2.100 Oh 45,400.00 = Rp. 95,340.00
Tukang batu 0.350 Oh 59,000.00 = Rp. 20,650.00
Kepala tukang 0.035 Oh 63,600.00 = Rp. 2,226.00
Mandor 0.105 Oh - = Rp. - 118,216.00
Jumlah 933,441.09
6.17 1 Kg Pembesian dengan besi polos
Bahan
Besi beton polos 1.050 Kg 10,000.00 = Rp. 10,500.00
Kawat beton 0.015 Kg 18,000.00 = Rp. 270.00
Jumlah 10,770.00
Tenaga
Pekerja 0.007 Oh 45,400.00 = Rp. 317.80
Tukang batu 0.007 Oh 59,000.00 = Rp. 413.00
Kepala tukang 0.0007 Oh 63,600.00 = Rp. 44.52
Mandor 0.0004 Oh - = Rp. - 775.32
Jumlah 11,545.32
6.17a 1 Kg Pembesian dengan besi ulir
Bahan
Besi beton ulir 1.050 Kg 10,900.00 = Rp. 11,445.00
Kawat beton 0.015 Kg 18,000.00 = Rp. 270.00
Jumlah 11,715.00
Tenaga
Pekerja 0.007 Oh 45,400.00 = Rp. 317.80
Tukang batu 0.007 Oh 59,000.00 = Rp. 413.00
Kepala tukang 0.0007 Oh 63,600.00 = Rp. 44.52
Mandor 0.0004 Oh - = Rp. - 775.32
Jumlah 12,490.32
6.20 1 M2 Pasang bekisting untuk pondasi
Bahan
Kayu terentang (tahun) 0.040 M3 1,312,500.00 = Rp. 52,500.00
Paku Biasa 2'' - 5'' 0.300 Kg 15,000.00 = Rp. 4,500.00
Minyak bekisting 0.100 Lt 2,200.00 = Rp. 220.00
Jumlah 57,220.00
Tenaga
Pekerja 0.520 Oh 45,400.00 = Rp. 23,608.00
Tukang kayu 0.260 Oh 59,000.00 = Rp. 15,340.00
Kepala tukang 0.026 Oh 63,600.00 = Rp. 1,653.60
Mandor 0.026 Oh - = Rp. - 40,601.60
Jumlah 97,821.60
6.21 1 M2 Pasang bekisting untuk sloof
Bahan
Kayu terentang (tahun) 0.045 M3 1,312,500.00 = Rp. 59,062.50
Paku Biasa 2'' - 5'' 0.300 Kg 15,000.00 = Rp. 4,500.00
Minyak bekisting 0.100 Lt 2,200.00 = Rp. 220.00
Jumlah 63,782.50
Tenaga
Pekerja 0.520 Oh 45,400.00 = Rp. 23,608.00
Tukang kayu 0.260 Oh 59,000.00 = Rp. 15,340.00
Kepala tukang 0.026 Oh 63,600.00 = Rp. 1,653.60
Mandor 0.026 Oh - = Rp. - 40,601.60
Jumlah 104,384.10
6.22 1 M2 Pasang bekisting untuk kolom
Bahan
Kayu terentang (tahun) 0.040 M3 1,312,500.00 = Rp. 52,500.00
Paku Biasa 2'' - 5'' 0.400 Kg 15,000.00 = Rp. 6,000.00
Minyak bekisting 0.200 Lt 2,200.00 = Rp. 440.00
kayu balok (meranti) 0.015 M3 3,960,000.00 = Rp. 59,400.00
Playwood 9 mm 0.350 Lbr 128,700.00 = Rp. 45,045.00
Dolken Ø -8 cm/ 4 m 2.000 Btg 23,000.00 = Rp. 46,000.00
Jumlah 209,385.00
Tenaga
Pekerja 0.660 Oh 45,400.00 = Rp. 29,964.00
Tukang kayu 0.330 Oh 59,000.00 = Rp. 19,470.00
Kepala tukang 0.033 Oh 63,600.00 = Rp. 2,098.80
Mandor 0.033 Oh - = Rp. - 51,532.80
Jumlah 260,917.80
Dihitung 1 M2 Pasang bekisting untuk kolom 2 kali pakai
Bahan
Kayu terentang (tahun) 0.020 M3 1,312,500.00 = Rp. 26,250.00
Paku Biasa 2'' - 5'' 0.400 Kg 15,000.00 = Rp. 6,000.00
Minyak bekisting 0.200 Lt 2,200.00 = Rp. 440.00
kayu balok (meranti) 0.008 M3 3,960,000.00 = Rp. 29,700.00
Playwood 9 mm 0.175 Lbr 128,700.00 = Rp. 22,522.50
Dolken Ø -8 cm/ 4 m 1.000 Btg 23,000.00 = Rp. 23,000.00
Jumlah 107,912.50
Tenaga
Pekerja 0.660 Oh 45,400.00 = Rp. 29,964.00
Tukang kayu 0.330 Oh 59,000.00 = Rp. 19,470.00
Kepala tukang 0.033 Oh 63,600.00 = Rp. 2,098.80
Mandor 0.033 Oh - = Rp. - 51,532.80
Jumlah 159,445.30

6.23 1 M2 Pasang bekisting untuk balok


Bahan
Kayu terentang (tahun) 0.040 M3 1,312,500.00 = Rp. 52,500.00
Paku Biasa 2'' - 5'' 0.400 Kg 15,000.00 = Rp. 6,000.00
Minyak bekisting 0.200 Lt 2,200.00 = Rp. 440.00
kayu balok (meranti) 0.018 M3 3,960,000.00 = Rp. 71,280.00
Playwood 9 mm 0.350 Lbr 128,700.00 = Rp. 45,045.00
Dolken Ø -8 cm/ 4 m 2.000 Btg 23,000.00 = Rp. 46,000.00
Jumlah 221,265.00
Tenaga
Pekerja 0.660 Oh 45,400.00 = Rp. 29,964.00
Tukang kayu 0.330 Oh 59,000.00 = Rp. 19,470.00
Kepala tukang 0.033 Oh 63,600.00 = Rp. 2,098.80
Mandor 0.033 Oh - = Rp. - 51,532.80
Jumlah 272,797.80
Dihitung 1 M2 Pasang bekisting untuk balok 2 kali pakai
Bahan
Kayu terentang (tahun) 0.020 M3 1,312,500.00 = Rp. 26,250.00
Paku Biasa 2'' - 5'' 0.400 Kg 15,000.00 = Rp. 6,000.00
Minyak bekisting 0.200 Lt 2,200.00 = Rp. 440.00
kayu balok (meranti) 0.009 M3 3,960,000.00 = Rp. 35,640.00
Playwood 9 mm 0.175 Lbr 128,700.00 = Rp. 22,522.50
Dolken Ø -8 cm/ 4 m 1.000 Btg 23,000.00 = Rp. 23,000.00
Jumlah 113,852.50
Tenaga
Pekerja 0.660 Oh 45,400.00 = Rp. 29,964.00
Tukang kayu 0.330 Oh 59,000.00 = Rp. 19,470.00
Kepala tukang 0.033 Oh 63,600.00 = Rp. 2,098.80
Mandor 0.033 Oh - = Rp. - 51,532.80
Jumlah 165,385.30

6.24 1 M2 Pasang bekisting untuk lantai


Bahan
Kayu terentang (tahun) 0.040 M3 1,312,500.00 = Rp. 52,500.00
Paku Biasa 2'' - 5'' 0.400 Kg 15,000.00 = Rp. 6,000.00
Minyak bekisting 0.200 Lt 2,200.00 = Rp. 440.00
kayu balok (meranti) 0.015 M3 3,960,000.00 = Rp. 59,400.00
Playwood 9 mm 0.350 Lbr 128,700.00 = Rp. 45,045.00
Dolken Ø -8 cm/ 4 m 6.000 Btg 23,000.00 = Rp. 138,000.00
Jumlah 301,385.00
Tenaga
Pekerja 0.660 Oh 45,400.00 = Rp. 29,964.00
Tukang kayu 0.330 Oh 59,000.00 = Rp. 19,470.00
Kepala tukang 0.033 Oh 63,600.00 = Rp. 2,098.80
Mandor 0.033 Oh - = Rp. - 51,532.80
Jumlah 352,917.80
Dihitung 1 M2 Pasang bekisting untuk lantai 2 kali pakai
Bahan
Kayu terentang (tahun) 0.020 M3 1,312,500.00 = Rp. 26,250.00
Paku Biasa 2'' - 5'' 0.400 Kg 15,000.00 = Rp. 6,000.00
Minyak bekisting 0.200 Lt 2,200.00 = Rp. 440.00
kayu balok (meranti) 0.008 M3 3,960,000.00 = Rp. 29,700.00
Playwood 9 mm 0.175 Lbr 128,700.00 = Rp. 22,522.50
Dolken Ø -8 cm/ 4 m 3.000 Btg 23,000.00 = Rp. 69,000.00
Jumlah 153,912.50
Tenaga
Pekerja 0.660 Oh 45,400.00 = Rp. 29,964.00
Tukang kayu 0.330 Oh 59,000.00 = Rp. 19,470.00
Kepala tukang 0.033 Oh 63,600.00 = Rp. 2,098.80
Mandor 0.033 Oh - = Rp. - 51,532.80
Jumlah 205,445.30
6.25 1 M2 Pasang bekisting untuk dinding
Bahan
Kayu terentang (tahun) 0.030 M3 1,312,500.00 = Rp. 39,375.00
Paku Biasa 2'' - 5'' 0.400 Kg 15,000.00 = Rp. 6,000.00
Minyak bekisting 0.200 Lt 2,200.00 = Rp. 440.00
kayu balok (meranti) 0.020 M3 3,960,000.00 = Rp. 79,200.00
Playwood 9 mm 0.350 Lbr 128,700.00 = Rp. 45,045.00
Dolken Ø -8 cm/ 4 m 3.000 Btg 23,000.00 = Rp. 69,000.00
Jumlah 239,060.00
Tenaga
Pekerja 0.660 Oh 45,400.00 = Rp. 29,964.00
Tukang kayu 0.330 Oh 59,000.00 = Rp. 19,470.00
Kepala tukang 0.033 Oh 63,600.00 = Rp. 2,098.80
Mandor 0.033 Oh - = Rp. - 51,532.80
Jumlah 290,592.80
6.26 1 M2 Pasang bekisting untuk tangga
Bahan
Kayu terentang (tahun) 0.030 M3 1,312,500.00 = Rp. 39,375.00
Paku Biasa 2'' - 5'' 0.400 Kg 15,000.00 = Rp. 6,000.00
Minyak bekisting 0.150 Lt 2,200.00 = Rp. 330.00
kayu balok (meranti) 0.015 M3 3,960,000.00 = Rp. 59,400.00
Playwood 9 mm 0.350 Lbr 128,700.00 = Rp. 45,045.00
Dolken Ø -8 cm/ 4 m 2.000 Btg 23,000.00 = Rp. 46,000.00
Jumlah 196,150.00
Tenaga
Pekerja 0.660 Oh 45,400.00 = Rp. 29,964.00
Tukang kayu 0.330 Oh 59,000.00 = Rp. 19,470.00
Kepala tukang 0.033 Oh 63,600.00 = Rp. 2,098.80
Mandor 0.033 Oh - = Rp. - 51,532.80
Jumlah 247,682.80

6.35 1 M3 Membuat beton dengan K225


Bahan
Semen portland 388.000 Kg 1,250.00 = Rp. 485,000.00
Pasir beton 0.650 M3 224,000.00 = Rp. 145,600.00
Koral beton 0.650 M3 192,500.00 = Rp. 125,125.00
Jumlah 755,725.00
Tenaga
Pekerja 6.000 Oh 45,400.00 = Rp. 272,400.00
Tukang batu 1.000 Oh 59,000.00 = Rp. 59,000.00
Kepala tukang 0.100 Oh 63,600.00 = Rp. 6,360.00
Mandor 0.300 Oh - = Rp. - 337,760.00
Jumlah 1,093,485.00

6.36 1 M3 Membuat beton dengan K275


Bahan
Semen portland 400.000 Kg 1,250.00 = Rp. 500,000.00
Pasir beton 0.400 M3 224,000.00 = Rp. 89,600.00
Koral beton 0.820 M3 192,500.00 = Rp. 157,850.00
Jumlah 747,450.00
Tenaga
Pekerja 6.000 Oh 45,400.00 = Rp. 272,400.00
Tukang batu 1.000 Oh 59,000.00 = Rp. 59,000.00
Kepala tukang 0.100 Oh 63,600.00 = Rp. 6,360.00
Mandor 0.300 Oh - = Rp. - 337,760.00
Jumlah 1,085,210.00

6.28 1 m3 Membuat Pondasi beton bertulang ( 150 Kg besi + Bekisting )


Bahan
Kayu terentang ( kayu tahun ) 0.200 M3 1,312,500.00 = Rp. 262,500.00
Paku Biasa 2'' - 5'' 1.500 Kg 15,000.00 = Rp. 22,500.00
Minyak bekisting 0.400 Lt 2,200.00 = Rp. 880.00
Besi beton polos 157.500 Kg 10,000.00 = Rp. 1,575,000.00
Kawat beton 2.250 Kg 18,000.00 = Rp. 40,500.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
Jumlah 2,598,265.00
Tenaga
Pekerja 5.300 Oh 45,400.00 = Rp. 240,620.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.300 Oh 59,000.00 = Rp. 76,700.00
Tukang Besi 1.050 Oh 59,000.00 = Rp. 61,950.00
Kepala tukang 0.262 Oh 63,600.00 = Rp. 16,663.20
Mandor 0.265 Oh - = Rp. - 412,158.20
Jumlah 3,010,423.20
6.28a 1 m3 Membuat Pondasi beton bertulang ( 125 Kg besi + Bekisting )
Bahan
Kayu terentang ( kayu tahun ) 0.200 M3 1,312,500.00 = Rp. 262,500.00
Paku Biasa 2'' - 5'' 1.500 Kg 15,000.00 = Rp. 22,500.00
Minyak bekisting 0.400 Lt 2,200.00 = Rp. 880.00
Besi beton polos 131.250 Kg 10,000.00 = Rp. 1,312,500.00
Kawat beton 1.875 Kg 18,000.00 = Rp. 33,750.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
Jumlah 2,329,015.00
Tenaga
Pekerja 5.300 Oh 45,400.00 = Rp. 240,620.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.300 Oh 59,000.00 = Rp. 76,700.00
Tukang Besi 0.875 Oh 59,000.00 = Rp. 51,625.00
Kepala tukang 0.262 Oh 63,600.00 = Rp. 16,663.20
Mandor 0.265 Oh - = Rp. - 401,833.20
Jumlah 2,730,848.20
6.29 1 m3 Membuat Sloof beton bertulang ( 200 Kg besi + Bekisting )
Bahan
Kayu terentang ( kayu tahun ) 0.270 M3 1,312,500.00 = Rp. 354,375.00
Paku Biasa 2'' - 5'' 2.000 Kg 15,000.00 = Rp. 30,000.00
Minyak bekisting 0.600 Lt 2,200.00 = Rp. 1,320.00
Besi beton polos 210.000 Kg 10,000.00 = Rp. 2,100,000.00
Kawat beton 3.000 Kg 18,000.00 = Rp. 54,000.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
Jumlah 3,236,580.00
Tenaga
Pekerja 5.650 Oh 45,400.00 = Rp. 256,510.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.560 Oh 59,000.00 = Rp. 92,040.00
Tukang Besi 1.400 Oh 59,000.00 = Rp. 82,600.00
Kepala tukang 0.323 Oh 63,600.00 = Rp. 20,542.80
Mandor 0.283 Oh - = Rp. - 467,917.80
Jumlah 3,704,497.80

6.29a 1 m3 Membuat Sloof beton bertulang ( 150 Kg besi + Bekisting )


Bahan
Kayu terentang ( kayu tahun ) 0.270 M3 1,312,500.00 = Rp. 354,375.00
Paku Biasa 2'' - 5'' 2.000 Kg 15,000.00 = Rp. 30,000.00
Minyak bekisting 0.600 Lt 2,200.00 = Rp. 1,320.00
Besi beton polos 157.500 Kg 10,000.00 = Rp. 1,575,000.00
Kawat beton 2.250 Kg 18,000.00 = Rp. 40,500.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
Jumlah 2,698,080.00
Tenaga
Pekerja 5.300 Oh 45,400.00 = Rp. 240,620.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.560 Oh 59,000.00 = Rp. 92,040.00
Tukang Besi 1.050 Oh 59,000.00 = Rp. 61,950.00
Kepala tukang 0.262 Oh 63,600.00 = Rp. 16,663.20
Mandor 0.265 Oh - = Rp. - 427,498.20
Jumlah 3,125,578.20

6.29b 1 m3 Membuat Sloof beton bertulang ( 125 Kg besi + Bekisting )


Bahan
Kayu terentang ( kayu tahun ) 0.270 M3 1,312,500.00 = Rp. 354,375.00
Paku Biasa 2'' - 5'' 2.000 Kg 15,000.00 = Rp. 30,000.00
Minyak bekisting 0.600 Lt 2,200.00 = Rp. 1,320.00
Besi beton polos 131.250 Kg 10,000.00 = Rp. 1,312,500.00
Kawat beton 1.875 Kg 18,000.00 = Rp. 33,750.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
Jumlah 2,428,830.00
Tenaga
Pekerja 5.300 Oh 45,400.00 = Rp. 240,620.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.560 Oh 59,000.00 = Rp. 92,040.00
Tukang Besi 0.875 Oh 59,000.00 = Rp. 51,625.00
Kepala tukang 0.262 Oh 63,600.00 = Rp. 16,663.20
Mandor 0.265 Oh - = Rp. - 417,173.20
Jumlah 2,846,003.20
6.30 1 m3 Membuat Kolom beton bertulang ( 300 Kg besi + Bekisting )
Bahan
Kayu terentang (tahun) 0.400 M3 1,312,500.00 = Rp. 525,000.00
Paku Biasa 2'' - 5'' 4.000 Kg 15,000.00 = Rp. 60,000.00
Minyak bekisting 2.000 Lt 2,200.00 = Rp. 4,400.00
Besi beton polos 315.000 Kg 10,000.00 = Rp. 3,150,000.00
Kawat beton 4.500 Kg 18,000.00 = Rp. 81,000.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
kayu balok (meranti) 0.150 M3 3,960,000.00 = Rp. 594,000.00
Playwood 9 mm 3.500 Lbr 128,700.00 = Rp. 450,450.00
Dolken Ø -8 cm/ 4 m 20.000 Btg 23,000.00 = Rp. 460,000.00
Jumlah 6,021,735.00
Tenaga
Pekerja 7.050 Oh 45,400.00 = Rp. 320,070.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.650 Oh 59,000.00 = Rp. 97,350.00
Tukang Besi 2.100 Oh 59,000.00 = Rp. 123,900.00
Kepala tukang 0.403 Oh 63,600.00 = Rp. 25,630.80
Mandor 0.353 Oh - = Rp. - 583,175.80
Jumlah 6,604,910.80
6.30a 1 m3 Membuat Kolom beton bertulang ( 200 Kg besi + Bekisting )
Bahan
Kayu terentang (tahun) 0.320 M3 1,312,500.00 = Rp. 420,000.00
Paku Biasa 2'' - 5'' 3.200 Kg 15,000.00 = Rp. 48,000.00
Minyak bekisting 1.600 Lt 2,200.00 = Rp. 3,520.00
Besi beton polos 210.000 Kg 10,000.00 = Rp. 2,100,000.00
Kawat beton 2.250 Kg 18,000.00 = Rp. 40,500.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
kayu balok (meranti) 0.120 M3 3,960,000.00 = Rp. 475,200.00
Playwood 9 mm 2.800 Lbr 128,700.00 = Rp. 360,360.00
Dolken Ø -8 cm/ 4 m 32.000 Btg 23,000.00 = Rp. 736,000.00
Jumlah 4,880,465.00
Tenaga
Pekerja 6.350 Oh 45,400.00 = Rp. 288,290.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.650 Oh 59,000.00 = Rp. 97,350.00
Tukang Besi 1.400 Oh 59,000.00 = Rp. 82,600.00
Kepala tukang 0.333 Oh 63,600.00 = Rp. 21,178.80
Mandor 0.318 Oh - = Rp. - 505,643.80
Jumlah 5,386,108.80
6.32 1 m3 Membuat Kolom beton bertulang ( 150 Kg besi + Bekisting )
Bahan
Kayu terentang (tahun) 0.320 M3 1,312,500.00 = Rp. 420,000.00
Paku Biasa 2'' - 5'' 3.200 Kg 15,000.00 = Rp. 48,000.00
Minyak bekisting 1.600 Lt 2,200.00 = Rp. 3,520.00
Besi beton polos 157.500 Kg 10,000.00 = Rp. 1,575,000.00
Kawat beton 2.250 Kg 18,000.00 = Rp. 40,500.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
kayu balok (meranti) 0.120 M3 3,960,000.00 = Rp. 475,200.00
Playwood 9 mm 2.800 Lbr 128,700.00 = Rp. 360,360.00
Dolken Ø -8 cm/ 4 m 32.000 Btg 23,000.00 = Rp. 736,000.00
Jumlah 4,355,465.00
Tenaga
Pekerja 5.300 Oh 45,400.00 = Rp. 240,620.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.300 Oh 59,000.00 = Rp. 76,700.00
Tukang Besi 1.050 Oh 59,000.00 = Rp. 61,950.00
Kepala tukang 0.262 Oh 63,600.00 = Rp. 16,663.20
Mandor 0.265 Oh - = Rp. - 412,158.20
Jumlah 4,767,623.20
6.32a 1 m3 Membuat Kolom beton bertulang ( 125 Kg besi + Bekisting )
Bahan
Kayu terentang (tahun) 0.320 M3 1,312,500.00 = Rp. 420,000.00
Paku Biasa 2'' - 5'' 3.200 Kg 15,000.00 = Rp. 48,000.00
Minyak bekisting 1.600 Lt 2,200.00 = Rp. 3,520.00
Besi beton polos 131.250 Kg 10,000.00 = Rp. 1,312,500.00
Kawat beton 1.875 Kg 18,000.00 = Rp. 33,750.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
kayu balok (meranti) 0.120 M3 3,960,000.00 = Rp. 475,200.00
Playwood 9 mm 2.800 Lbr 128,700.00 = Rp. 360,360.00
Dolken Ø -8 cm/ 4 m 32.000 Btg 23,000.00 = Rp. 736,000.00
Jumlah 4,086,215.00
Tenaga
Pekerja 5.300 Oh 45,400.00 = Rp. 240,620.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.300 Oh 59,000.00 = Rp. 76,700.00
Tukang Besi 0.875 Oh 59,000.00 = Rp. 51,625.00
Kepala tukang 0.262 Oh 63,600.00 = Rp. 16,663.20
Mandor 0.265 Oh - = Rp. - 401,833.20
Jumlah 4,488,048.20
6.31 1 m3 Membuat balok beton bertulang ( 200 Kg besi + Bekisting )
Bahan
Kayu terentang (tahun) 0.320 M3 1,312,500.00 = Rp. 420,000.00
Paku Biasa 2'' - 5'' 3.200 Kg 15,000.00 = Rp. 48,000.00
Minyak bekisting 1.600 Lt 2,200.00 = Rp. 3,520.00
Besi beton polos 210.000 Kg 10,000.00 = Rp. 2,100,000.00
Kawat beton 3.000 Kg 18,000.00 = Rp. 54,000.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
kayu balok (meranti) 0.140 M3 3,960,000.00 = Rp. 554,400.00
Playwood 9 mm 2.800 Lbr 128,700.00 = Rp. 360,360.00
Dolken Ø -8 cm/ 4 m 16.000 Btg 23,000.00 = Rp. 368,000.00
Tenaga Jumlah 4,605,165.00
Pekerja 6.350 Oh 45,400.00 = Rp. 288,290.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.650 Oh 59,000.00 = Rp. 97,350.00
Tukang Besi 1.400 Oh 59,000.00 = Rp. 82,600.00
Kepala tukang 0.333 Oh 63,600.00 = Rp. 21,178.80
Mandor 0.318 Oh - = Rp. - 505,643.80
Jumlah 5,110,808.80
6.31a 1 m3 Membuat balok beton bertulang ( 150 Kg besi + Bekisting )
Bahan
Kayu terentang (tahun) 0.320 M3 1,312,500.00 = Rp. 420,000.00
Paku Biasa 2'' - 5'' 3.200 Kg 15,000.00 = Rp. 48,000.00
Minyak bekisting 1.600 Lt 2,200.00 = Rp. 3,520.00
Besi beton polos 157.500 Kg 10,000.00 = Rp. 1,575,000.00
Kawat beton 3.000 Kg 18,000.00 = Rp. 54,000.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
kayu balok (meranti) 0.140 M3 3,960,000.00 = Rp. 554,400.00
Playwood 9 mm 2.800 Lbr 128,700.00 = Rp. 360,360.00
Dolken Ø -8 cm/ 4 m 16.000 Btg 23,000.00 = Rp. 368,000.00
Tenaga Jumlah 4,080,165.00
Pekerja 5.300 Oh 45,400.00 = Rp. 240,620.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.300 Oh 59,000.00 = Rp. 76,700.00
Tukang Besi 1.050 Oh 59,000.00 = Rp. 61,950.00
Kepala tukang 0.262 Oh 63,600.00 = Rp. 16,663.20
Mandor 0.265 Oh - = Rp. - 412,158.20
Jumlah 4,492,323.20
6.31b 1 m3 Membuat balok beton bertulang ( 125 Kg besi + Bekisting )
Bahan
Kayu terentang (tahun) 0.320 M3 1,312,500.00 = Rp. 420,000.00
Paku Biasa 2'' - 5'' 3.200 Kg 15,000.00 = Rp. 48,000.00
Minyak bekisting 1.600 Lt 2,200.00 = Rp. 3,520.00
Besi beton polos 131.250 Kg 10,000.00 = Rp. 1,312,500.00
Kawat beton 1.875 Kg 18,000.00 = Rp. 33,750.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
kayu balok (meranti) 0.140 M3 3,960,000.00 = Rp. 554,400.00
Playwood 9 mm 2.800 Lbr 128,700.00 = Rp. 360,360.00
Dolken Ø -8 cm/ 4 m 16.000 Btg 23,000.00 = Rp. 368,000.00
Tenaga Jumlah 3,797,415.00
Pekerja 5.300 Oh 45,400.00 = Rp. 240,620.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.300 Oh 59,000.00 = Rp. 76,700.00
Tukang Besi 0.875 Oh 59,000.00 = Rp. 51,625.00
Kepala tukang 0.262 Oh 63,600.00 = Rp. 16,663.20
Mandor 0.265 Oh - = Rp. - 401,833.20
Jumlah 4,199,248.20
6.33 1 m3 Membuat dindng beton bertulang ( 150 Kg besi + Bekisting )
Bahan
Kayu terentang (tahun) 0.240 M3 1,312,500.00 = Rp. 315,000.00
Paku Biasa 2'' - 5'' 3.200 Kg 15,000.00 = Rp. 48,000.00
Minyak bekisting 1.600 Lt 2,200.00 = Rp. 3,520.00
Besi beton polos 157.500 Kg 10,000.00 = Rp. 1,575,000.00
Kawat beton 2.250 Kg 18,000.00 = Rp. 40,500.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
kayu balok (meranti) 0.160 M3 3,960,000.00 = Rp. 633,600.00
Playwood 9 mm 2.800 Lbr 128,700.00 = Rp. 360,360.00
Dolken Ø -8 cm/ 4 m 24.000 Btg 23,000.00 = Rp. 552,000.00
Jumlah 4,224,865.00
Tenaga
Pekerja 5.300 Oh 45,400.00 = Rp. 240,620.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.300 Oh 59,000.00 = Rp. 76,700.00
Tukang Besi 1.050 Oh 59,000.00 = Rp. 61,950.00
Kepala tukang 0.262 Oh 63,600.00 = Rp. 16,663.20
Mandor 0.265 Oh - = Rp. - 412,158.20
Jumlah 4,637,023.20
6.34 1 m3 Membuat dindng beton bertulang ( 200 Kg besi + Bekisting )
Bahan
Kayu terentang (tahun) 0.250 M3 1,312,500.00 = Rp. 328,125.00
Paku Biasa 2'' - 5'' 3.000 Kg 15,000.00 = Rp. 45,000.00
Minyak bekisting 1.200 Lt 2,200.00 = Rp. 2,640.00
Besi beton polos 210.000 Kg 10,000.00 = Rp. 2,100,000.00
Kawat beton 3.000 Kg 18,000.00 = Rp. 54,000.00
semen Portland 336.000 Kg 1,250.00 = Rp. 420,000.00
Pasir beton 0.540 M3 224,000.00 = Rp. 120,960.00
Koral beton 0.810 M3 192,500.00 = Rp. 155,925.00
kayu balok (meranti) 0.105 M3 3,960,000.00 = Rp. 415,800.00
Playwood 9 mm 2.500 Lbr 128,700.00 = Rp. 321,750.00
Dolken Ø -8 cm/ 4 m 14.000 Btg 23,000.00 = Rp. 322,000.00
Jumlah 4,286,200.00
Tenaga
Pekerja 5.650 Oh 45,400.00 = Rp. 256,510.00
Tukang batu 0.275 Oh 59,000.00 = Rp. 16,225.00
Tukang kayu 1.560 Oh 59,000.00 = Rp. 92,040.00
Tukang Besi 1.400 Oh 59,000.00 = Rp. 82,600.00
Kepala tukang 0.323 Oh 63,600.00 = Rp. 20,542.80
Mandor 0.283 Oh - = Rp. - 467,917.80
Jumlah 4,754,117.80
6.44 1 m3 Membuat tangga beton bertulang ( 200 Kg besi + Bekisting ) (SNI LAMA)
Bahan
Kayu terentang (tahun) 0.250 M3 1,312,500.00 = Rp. 328,125.00
Paku Biasa 2'' - 5'' 3.000 Kg 15,000.00 = Rp. 45,000.00
Minyak bekisting 1.200 Lt 2,200.00 = Rp. 2,640.00
Besi beton polos 210.000 Kg 10,000.00 = Rp. 2,100,000.00
Kawat beton 3.000 Kg 18,000.00 = Rp. 54,000.00
semen Portland 323.000 Kg 1,250.00 = Rp. 403,750.00
Pasir beton 0.520 M3 224,000.00 = Rp. 116,480.00
Koral beton 0.780 M3 192,500.00 = Rp. 150,150.00
kayu balok (meranti) 0.105 M3 3,960,000.00 = Rp. 415,800.00
Playwood 9 mm 2.500 Lbr 128,700.00 = Rp. 321,750.00
Dolken Ø -8 cm/ 4 m 14.000 Btg 23,000.00 = Rp. 322,000.00
Jumlah 4,259,695.00
Tenaga
Pekerja 5.600 Oh 45,400.00 = Rp. 254,240.00
Tukang batu 0.350 Oh 59,000.00 = Rp. 20,650.00
Tukang kayu 2.300 Oh 59,000.00 = Rp. 135,700.00
Tukang Besi 1.400 Oh 59,000.00 = Rp. 82,600.00
Kepala tukang 0.405 Oh 63,600.00 = Rp. 25,758.00
Mandor 0.202 Oh - = Rp. - 518,948.00
Jumlah 4,778,643.00
6.44a 1 m3 Membuat tangga beton bertulang ( 150 Kg besi + Bekisting ) (SNI LAMA)
Bahan
Kayu terentang (tahun) 0.250 M3 1,312,500.00 = Rp. 328,125.00
Paku Biasa 2'' - 5'' 3.000 Kg 15,000.00 = Rp. 45,000.00
Minyak bekisting 1.200 Lt 2,200.00 = Rp. 2,640.00
Besi beton polos 157.500 Kg 10,000.00 = Rp. 1,575,000.00
Kawat beton 2.250 Kg 18,000.00 = Rp. 40,500.00
semen Portland 323.000 Kg 1,250.00 = Rp. 403,750.00
Pasir beton 0.520 M3 224,000.00 = Rp. 116,480.00
Koral beton 0.780 M3 192,500.00 = Rp. 150,150.00
kayu balok (meranti) 0.105 M3 3,960,000.00 = Rp. 415,800.00
Playwood 9 mm 2.500 Lbr 128,700.00 = Rp. 321,750.00
Dolken Ø -8 cm/ 4 m 14.000 Btg 23,000.00 = Rp. 322,000.00
Jumlah 3,721,195.00
Tenaga -
Pekerja 5.600 Oh 45,400.00 = Rp. 254,240.00
Tukang batu 0.350 Oh 59,000.00 = Rp. 20,650.00
Tukang kayu 2.300 Oh 59,000.00 = Rp. 135,700.00
Tukang Besi 1.050 Oh 59,000.00 = Rp. 61,950.00
Kepala tukang 0.405 Oh 63,600.00 = Rp. 25,758.00
Mandor 0.202 Oh - = Rp. - 498,298.00
Jumlah 4,219,493.00
6.44b 1 m3 Membuat tangga beton bertulang ( 125 Kg besi + Bekisting ) (SNI LAMA)
Bahan
Kayu terentang (tahun) 0.250 M3 1,312,500.00 = Rp. 328,125.00
Paku Biasa 2'' - 5'' 3.000 Kg 15,000.00 = Rp. 45,000.00
Minyak bekisting 1.200 Lt 2,200.00 = Rp. 2,640.00
Besi beton polos 131.250 Kg 10,000.00 = Rp. 1,312,500.00
Kawat beton 1.875 Kg 18,000.00 = Rp. 33,750.00
semen Portland 323.000 Kg 1,250.00 = Rp. 403,750.00
Pasir beton 0.520 M3 224,000.00 = Rp. 116,480.00
Koral beton 0.780 M3 192,500.00 = Rp. 150,150.00
kayu balok (meranti) 0.105 M3 3,960,000.00 = Rp. 415,800.00
Playwood 9 mm 2.500 Lbr 128,700.00 = Rp. 321,750.00
Dolken Ø -8 cm/ 4 m 14.000 Btg 23,000.00 = Rp. 322,000.00
Jumlah 3,451,945.00
Tenaga
Pekerja 5.600 Oh 45,400.00 = Rp. 254,240.00
Tukang batu 0.350 Oh 59,000.00 = Rp. 20,650.00
Tukang kayu 2.300 Oh 59,000.00 = Rp. 135,700.00
Tukang Besi 0.875 Oh 59,000.00 = Rp. 51,625.00
Kepala tukang 0.405 Oh 63,600.00 = Rp. 25,758.00
Mandor 0.202 Oh - = Rp. - 487,973.00
Jumlah 3,939,918.00

6.35 1 m' Membuat kolom praktis beton bertulang ( 11 x 11 ) cm


Bahan
Kayu terentang (tahun) 0.002 M3 1,312,500.00 = Rp. 2,625.00
Paku Biasa 2'' - 5'' 0.010 Kg 15,000.00 = Rp. 150.00
Besi beton polos 3.000 Kg 10,000.00 = Rp. 30,000.00
Kawat beton 0.450 Kg 18,000.00 = Rp. 8,100.00
semen Portland 4.000 Kg 1,250.00 = Rp. 5,000.00
Pasir beton 0.006 M3 224,000.00 = Rp. 1,344.00
Koral beton 0.009 M3 192,500.00 = Rp. 1,732.50
Jumlah 48,951.50
Tenaga
Pekerja 0.180 Oh 45,400.00 = Rp. 8,172.00
Tukang batu 0.020 Oh 59,000.00 = Rp. 1,180.00
Tukang kayu 0.020 Oh 59,000.00 = Rp. 1,180.00
Tukang Besi 0.020 Oh 59,000.00 = Rp. 1,180.00
Kepala tukang 0.006 Oh 63,600.00 = Rp. 381.60
Mandor 0.009 Oh - = Rp. - 12,093.60
Jumlah 61,045.10
6.36 1 m' Membuat ring balok beton bertulang ( 10 x 15 ) cm
Bahan
Kayu meranti 0.003 M3 3,960,000.00 = Rp. 11,880.00
Paku Biasa 2'' - 5'' 0.020 Kg 15,000.00 = Rp. 300.00
Besi beton polos 3.600 Kg 10,000.00 = Rp. 36,000.00
Kawat beton 0.050 Kg 18,000.00 = Rp. 900.00
semen Portland 5.500 Kg 1,250.00 = Rp. 6,875.00
Pasir beton 0.009 M3 224,000.00 = Rp. 2,016.00
Koral beton 0.015 M3 192,500.00 = Rp. 2,887.50
Jumlah 60,858.50
Tenaga
Pekerja 0.297 Oh 45,400.00 = Rp. 13,483.80
Tukang batu 0.033 Oh 59,000.00 = Rp. 1,947.00
Tukang kayu 0.033 Oh 59,000.00 = Rp. 1,947.00
Tukang Besi 0.033 Oh 59,000.00 = Rp. 1,947.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.015 Oh - = Rp. - 19,960.80
Jumlah 80,819.30
Analisa biaya konstruksi ( ABK ) Bangunan gedung dan perumahan
Pekerjaan penutup atap

Kode Uraian Volume Sat Harga Sat Jumlah Harga Jumlah Harga
Rp. Rp. Rp.
6.1 1 m2 Pasang atap genting Sokka
Bahan
Genteng Sokka besar 25.000 Bh 2,000.00 = Rp. 50,000.00
Jumlah 50,000.00
Tenaga
Pekerja 0.150 Oh 45,400.00 = Rp. 6,810.00
Tukang kayu 0.075 Oh 59,000.00 = Rp. 4,425.00
Kepala tukang 0.008 Oh 63,600.00 = Rp. 508.80
Mandor 0.008 Oh - = Rp. - 11,743.80
Jumlah 61,743.80
6.1a 1 m2 Pasang atap genting lokal
Bahan
Genteng lokal 25.000 Bh 1,000.00 = Rp. 25,000.00
Jumlah 25,000.00
Tenaga
Pekerja 0.150 Oh 45,400.00 = Rp. 6,810.00
Tukang kayu 0.075 Oh 59,000.00 = Rp. 4,425.00
Kepala tukang 0.008 Oh 63,600.00 = Rp. 508.80
Mandor 0.008 Oh - = Rp. - 11,743.80
Jumlah 36,743.80
6.1b 1 m2 Pasang atap genting Morando
Bahan
Genteng Morando 18.000 Bh 4,000.00 = Rp. 72,000.00
Jumlah 72,000.00
Tenaga
Pekerja 0.150 Oh 45,400.00 = Rp. 6,810.00
Tukang kayu 0.075 Oh 59,000.00 = Rp. 4,425.00
Kepala tukang 0.008 Oh 63,600.00 = Rp. 508.80
Mandor 0.008 Oh - = Rp. - 11,743.80
Jumlah 83,743.80
6.4 1 m1 Pasang genteng bubung Sokka
Bahan
Genteng bubung sokka 4.000 Bh 7,000.00 = Rp. 28,000.00
Semen Portland 8.000 Kg 1,250.00 = Rp. 10,000.00
Pasir Pasang 0.032 M3 195,000.00 = Rp. 6,240.00 44,240.00
Jumlah
Tenaga
Pekerja 0.400 Oh 45,400.00 = Rp. 18,160.00
Tukang kayu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.002 Oh - = Rp. - 31,232.00
Jumlah 75,472.00
6.4b 1 m1 Pasang genteng bubung morando
Bahan
Genteng bubung sokka 4.000 Bh 7,000.00 = Rp. 28,000.00
Semen Portland 8.000 Kg 1,250.00 = Rp. 10,000.00
Pasir Pasang 0.032 M3 195,000.00 = Rp. 6,240.00 44,240.00
Jumlah
Tenaga
Pekerja 0.400 Oh 45,400.00 = Rp. 18,160.00
Tukang kayu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.002 Oh - = Rp. - 31,232.00
Jumlah 75,472.00
6.4a 1 m1 Pasang genteng bubung lokal
Bahan
Genteng bubung lokal 4.000 Bh 5,500.00 = Rp. 22,000.00
Semen Portland 8.000 Kg 1,250.00 = Rp. 10,000.00
Pasir Pasang 0.032 M3 195,000.00 = Rp. 6,240.00 38,240.00
Jumlah
Tenaga
Pekerja 0.400 Oh 45,400.00 = Rp. 18,160.00
Tukang kayu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.002 Oh - = Rp. - 31,232.00
Jumlah 69,472.00

6.8 1 m2 pasang atap asbes gelombang besar pjg. 3m


Bahan
Asbes gelombang 0.500 Lbr 128,700.00 = Rp. 64,350.00
Paku pancing 60 x230 0.120 Kg 36,300.00 = Rp. 4,356.00
Jumlah 68,706.00
Tenaga
Pekerja 0.140 Oh 45,400.00 = Rp. 6,356.00
Tukang kayu 0.075 Oh 59,000.00 = Rp. 4,425.00
Kepala tukang 0.008 Oh 63,600.00 = Rp. 508.80
Mandor 0.008 Oh - = Rp. - 11,289.80
Jumlah 79,995.80
6.10 1 m2 pasang atap asbes gelombang kecil pjg. 3m
Bahan
Asbes gelombang 0.500 Lbr 93,500.00 = Rp. 46,750.00
Paku pancing 60 x230 0.120 Kg 36,300.00 = Rp. 4,356.00
Jumlah 51,106.00
Tenaga
Pekerja 0.140 Oh 45,400.00 = Rp. 6,356.00
Tukang kayu 0.070 Oh 59,000.00 = Rp. 4,130.00
Kepala tukang 0.007 Oh 63,600.00 = Rp. 445.20
Mandor 0.007 Oh - = Rp. - 10,931.20
Jumlah 62,037.20

6.23 1 m' pasang nok stel gelombang besar


Bahan
Nok stel gelombang 2.050 Lbr 75,900.00 = Rp. 155,595.00
Paku sekrup 3,5 '' 6.000 Bh 1,250.00 = Rp. 7,500.00
Jumlah 163,095.00
Tenaga
Pekerja 0.084 Oh 45,400.00 = Rp. 3,813.60
Tukang kayu 0.125 Oh 59,000.00 = Rp. 7,375.00
Kepala tukang 0.013 Oh 63,600.00 = Rp. 826.80
Mandor 0.004 Oh - = Rp. - 12,015.40
Jumlah 175,110.40
6.24 1 m' pasang nok stel gelombang kecil
Bahan
Nok stel gelombang 2.050 Lbr 44,000.00 = Rp. 90,200.00
Paku sekrup 3,5 '' 6.000 Bh 1,250.00 = Rp. 7,500.00
Jumlah 97,700.00
Tenaga
Pekerja 0.084 Oh 45,400.00 = Rp. 3,813.60
Tukang kayu 0.125 Oh 59,000.00 = Rp. 7,375.00
Kepala tukang 0.013 Oh 63,600.00 = Rp. 826.80
Mandor 0.004 Oh - = Rp. - 12,015.40
Jumlah 109,715.40

6.30 1 m2 pasang atap genteng beton


Bahan
Genteng beton 11.000 Bh 3,850.00 = Rp. 42,350.00
Paku Biasa 2'' - 5'' 0.030 Kg 15,000.00 = Rp. 450.00
Jumlah 42,800.00
Tenaga
Pekerja 0.200 Oh 45,400.00 = Rp. 9,080.00
Tukang kayu 0.100 Oh 59,000.00 = Rp. 5,900.00
Kepala tukang 0.010 Oh 63,600.00 = Rp. 636.00
Mandor 0.010 Oh - = Rp. - 15,616.00
Jumlah 58,416.00

6.34 1 m' pasang nok genteng beton


Bahan
Niok genteng beton 3.500 Bh 5,500.00 = Rp. 19,250.00
Paku Biasa 2'' - 5'' 0.050 Kg 15,000.00 = Rp. 750.00
SemenPortland 8.000 Kg 1,250.00 = Rp. 10,000.00
pasir pasang 0.032 M3 195,000.00 = Rp. 6,240.00
Jumlah 36,240.00
Tenaga
Pekerja 0.400 Oh 45,400.00 = Rp. 18,160.00
Tukang kayu 0.200 Oh 59,000.00 = Rp. 11,800.00
Kepala tukang 0.020 Oh 63,600.00 = Rp. 1,272.00
Mandor 0.020 Oh - = Rp. - 31,232.00
Jumlah 67,472.00
6.38 1 m2 Pasang atap seng gelombang pj. 3m
Bahan
Seng gelombang BJLS 30 0.500 Bh 120,000.00 = Rp. 60,000.00
paku biasa 1/2 - 1'' 0.020 Kg 15,000.00 = Rp. 300.00
Jumlah 60,300.00
Tenaga
Pekerja 0.120 Oh 45,400.00 = Rp. 5,448.00
Tukang kayu 0.060 Oh 59,000.00 = Rp. 3,540.00
Kepala tukang 0.006 Oh 63,600.00 = Rp. 381.60
Mandor 0.006 Oh - = Rp. - 9,369.60
Jumlah 69,669.60
6.39 1 m1 Pasang atap nok seng
Bahan
Seng gelombang BJLS 30 0.300 Bh 45,000.00 = Rp. 13,500.00
paku biasa 1/2 - 1'' 0.040 Kg 15,000.00 = Rp. 600.00
Jumlah 14,100.00
Tenaga
Pekerja 0.150 Oh 45,400.00 = Rp. 6,810.00
Tukang kayu 0.070 Oh 59,000.00 = Rp. 4,130.00
Kepala tukang 0.008 Oh 63,600.00 = Rp. 508.80
Mandor 0.006 Oh - = Rp. - 11,448.80
Jumlah 25,548.80
ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN
PEKERJAAN LANGIT-LANGIT
Kode Uraian Volume Sat Harga Sat Jumlah Harga Jumlah Harga
Rp. Rp. Rp.
6.1 1 m2 Langit-langit eternit ( 1 x 1 m ) tb 5 mm
Bahan :
Plat asbes tb 5 mm 1.100 Lbr 12,700.00 =Rp. 13,970.00
Paku 0.010 Kg 15,000.00 =Rp. 150.00
14,120.00
Tenaga
Pekerja 0.030 Oh 45,400.00 =Rp. 1,362.00
Tukang kayu 0.070 Oh 59,000.00 =Rp. 4,130.00
Kepala Tukang 0.007 Oh 63,600.00 =Rp. 445.20
Mandor 0.0040 Oh - =Rp. - 5,937.20
Jumlah =Rp. 20,057.20

6.5 1 m2 Langit-langit tripleks ( 120 x 240 cm ) tb 4 mm


Bahan :
Tripleks/plywood 0.375 Lbr 66,000.00 =Rp. 24,750.00
Paku biasa 2-5" 0.030 Kg 15,000.00 =Rp. 450.00
25,200.00
Tenaga
Pekerja 0.100 Oh 45,400.00 =Rp. 4,540.00
Tukang kayu 0.100 Oh 59,000.00 =Rp. 5,900.00
Kepala Tukang 0.010 Oh 63,600.00 =Rp. 636.00
Mandor 0.005 Oh - =Rp. - 11,076.00
Jumlah =Rp. 36,276.00

6.6 1 m2 Pasang Langit-langit lambriziring kayu jati klas plitur, tebal 9 mm


Bahan :
Kayu jati, papan 0.015 m3 20,872,500.00 =Rp. 313,087.50
Paku tripleks 0.010 Kg 15,000.00 =Rp. 150.00
313,237.50
Tenaga
Pekerja 0.800 Oh 45,400.00 =Rp. 36,320.00
Tukang kayu 0.800 Oh 59,000.00 =Rp. 47,200.00
Kepala Tukang 0.080 Oh 63,600.00 =Rp. 5,088.00
Mandor 0.040 Oh - =Rp. - 88,608.00
Jumlah =Rp. 401,845.50

6.7 1 m2 Pasang Langit-langit gypsum board (120cm x 240cm x 9mm)


Bahan :
Gypsum Board 0.364 Lbr 71,500.00 =Rp. 26,026.00
Paku Sekrup 0.110 Kg 62,500.00 =Rp. 6,875.00
32,901.00
Tenaga
Pekerja 0.100 Oh 45,400.00 =Rp. 4,540.00
Tukang kayu 0.050 Oh 59,000.00 =Rp. 2,950.00
Kepala Tukang 0.005 Oh 63,600.00 =Rp. 318.00
Mandor 0.005 Oh - =Rp. - 7,808.00
Jumlah =Rp. 40,709.00

6.7a 1 m2 Pasang Langit-langit calcyboard (120cm x 240cm x 3,5mm)


Bahan :
CalcyBoard 0.364 Lbr 60,500.00 =Rp. 22,022.00
Paku Sekrup 0.110 Kg 62,500.00 =Rp. 6,875.00
28,897.00
Tenaga
Pekerja 0.100 Oh 45,400.00 =Rp. 4,540.00
Tukang kayu 0.050 Oh 59,000.00 =Rp. 2,950.00
Kepala Tukang 0.005 Oh 63,600.00 =Rp. 318.00
Mandor 0.005 Oh - =Rp. - 7,808.00
Jumlah =Rp. 36,705.00

6.9 1 m1 Pasang list langit-langit kayu profil


Bahan :
List kayu profil 5x5 cm 1.050 m1 8,250.00 =Rp. 8,662.50
Paku 0.010 Kg 15,000.00 =Rp. 150.00
8,812.50
Tenaga
Pekerja 0.050 Oh 45,400.00 =Rp. 2,270.00
Tukang kayu 0.050 Oh 59,000.00 =Rp. 2,950.00
Kepala Tukang 0.005 Oh 63,600.00 =Rp. 318.00
Mandor 0.003 Oh - =Rp. - 5,538.00
Jumlah =Rp. 14,350.50
ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN
PEKERJAAN SANITASI
Kode Uraian Volume Sat Harga Sat Jumlah Harga Jumlah Harga
Rp. Rp. Rp.
6.2a Memasang 1 buah kloset jongkok porselen
Bahan :
Kloset jongkok porselin 1.000 bh 110,000.00 =Rp. 110,000.00
Semen portland 6.000 Kg 1,250.00 =Rp. 7,500.00
Pasir pasang 0.010 M3 195,000.00 =Rp. 1,950.00
119,450.00
Tenaga
Pekerja 0.500 Oh 45,400.00 =Rp. 22,700.00
Tukang batu 0.750 Oh 59,000.00 =Rp. 44,250.00
Kepala Tukang 0.750 Oh 63,600.00 =Rp. 47,700.00
Mandor 0.100 Oh - =Rp. - 114,650.00
Jumlah =Rp. 234,100.00

6.35 Memasang 1 buah kran diameter 3/4" atau 1/2"


Bahan :
Kran air 1.000 Bh 20,000.00 =Rp. 20,000.00
Seal tape 0.025 M3 2,750.00 =Rp. 68.75
20,068.75
Tenaga
Pekerja 0.010 Oh 45,400.00 =Rp. 454.00
Tukang batu 0.100 Oh 59,000.00 =Rp. 5,900.00
Kepala Tukang 0.010 Oh 63,600.00 =Rp. 636.00
Mandor 0.005 Oh - =Rp. - 6,990.00
Jumlah =Rp. 27,058.75

ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN BESI DAN ALUMUNIUM
Kode Uraian Volume Sat Harga Sat Jumlah Harga Jumlah Harga
Rp. Rp. Rp.
6.1 1 Kg Pasang Besi Profil
Bahan :
Besi profil 1.150 Kg 13,000.00 =Rp. 14,950.00
14,950.00
Tenaga :
Tukang besi 0.060 Oh 59,000.00 =Rp. 3,540.00
Pekerja 0.060 Oh 45,400.00 =Rp. 2,724.00
Kepala Tukang 0.006 Oh 63,600.00 =Rp. 381.60
Mandor 0.003 Oh - =Rp. - 6,645.60
Jumlah =Rp. 21,595.60
6.2 1 Kg Pasang Rangka Kuda-kuda Baja IWF
Bahan :
Besi baja IWF 1.150 Kg 13,000.00 =Rp. 14,950.00
14,950.00
Tenaga :
Tukang besi 0.060 Oh 59,000.00 =Rp. 3,540.00
Pekerja 0.060 Oh 45,400.00 =Rp. 2,724.00
Kepala Tukang 0.006 Oh 63,600.00 =Rp. 381.60
Mandor 0.003 Oh - =Rp. - 6,645.60
Jumlah =Rp. 21,595.60
6.10 1 m2 Pasang Rolling door Alumunium
Bahan :
Roll door 1.000 M2 322,000.00 =Rp. 322,000.00
322,000.00
Tenaga :
Tukang besi konstruksi 1.000 Oh 59,000.00 =Rp. 59,000.00
Pekerja 1.000 Oh 45,400.00 =Rp. 45,400.00
Kepala Tukang 0.100 Oh 63,600.00 =Rp. 6,360.00
Mandor 0.050 Oh - =Rp. - 110,760.00
Jumlah =Rp. 432,760.00

6.18 1 m' Pasang talang datar, seng bjls 30, dudukan bengkirai
Bahan :
Seng bjls 30 1.050 Lbr 45,000.00 =Rp. 47,250.00
Paku biasa 1/2" - 1" 0.015 Kg 15,000.00 =Rp. 225.00
Kayu bengkirai, papan 0.008 M3 11,000,000.00 =Rp. 88,000.00
135,475.00
Tenaga :
Tukang kayu 0.400 Oh 59,000.00 =Rp. 23,600.00
Pekerja 0.200 Oh 45,400.00 =Rp. 9,080.00
Kepala Tukang 0.025 Oh 63,600.00 =Rp. 1,590.00
Mandor 0.010 Oh - =Rp. - 34,270.00
Jumlah =Rp. 169,745.00

6.18a 1 m' Pasang talang datar, seng bjls 30, dudukan kamfer
Bahan :
Seng bjls 30 1.050 Lbr 45,000.00 =Rp. 47,250.00
Paku biasa 1/2" - 1" 0.015 Kg 15,000.00 =Rp. 225.00
Kayu kamfer, papan 0.008 M3 9,900,000.00 =Rp. 79,200.00
- 126,675.00
Tenaga : -
Tukang kayu 0.400 Oh 59,000.00 =Rp. 23,600.00
Pekerja 0.200 Oh 45,400.00 =Rp. 9,080.00
Kepala Tukang 0.025 Oh 63,600.00 =Rp. 1,590.00
Mandor 0.010 Oh - =Rp. - 34,270.00
Jumlah =Rp. 160,945.00

ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN KUNCI DAN KACA
Kode Uraian Volume Sat Harga Sat Jumlah Harga Jumlah Harga
Rp. Rp. Rp.
6.5 1 buah Pasang Engsel pintu (engsel H besar)
Bahan :
Engsel pintu 1.000 Bh 14,850.00 =Rp. 14,850.00
14,850.00
Tenaga :
Pekerja 0.015 Oh 45,400.00 =Rp. 681.00
Tukang kayu 0.150 Oh 59,000.00 =Rp. 8,850.00
Kepala Tukang 0.015 Oh 63,600.00 =Rp. 954.00
Mandor 0.00075 Oh - =Rp. - 10,485.00
Jumlah =Rp. 25,335.00
6.6 1 buah Pasang Engsel jendela (engsel H kecil)
Bahan :
Engsel jendela 1.000 Bh 10,450.00 =Rp. 10,450.00
10,450.00
Tenaga :
Pekerja 0.010 Oh 45,400.00 =Rp. 454.00
Tukang kayu 0.100 Oh 59,000.00 =Rp. 5,900.00
Kepala Tukang 0.010 Oh 63,600.00 =Rp. 636.00
Mandor 0.0005 Oh - =Rp. - 6,990.00
Jumlah =Rp. 17,440.00
6.5a 1 buah Pasang Engsel pintu (engsel kuningan besar)
Bahan :
Engsel pintu 1.000 Bh 72,600.00 =Rp. 72,600.00
72,600.00
Tenaga :
Pekerja 0.015 Oh 45,400.00 =Rp. 681.00
Tukang kayu 0.150 Oh 59,000.00 =Rp. 8,850.00
Kepala Tukang 0.015 Oh 63,600.00 =Rp. 954.00
Mandor 0.00075 Oh - =Rp. - 10,485.00
Jumlah =Rp. 83,085.00
6.6a 1 buah Pasang Engsel jendela (engsel kuningan kecil)
Bahan :
Engsel jendela 1.000 Bh 54,450.00 =Rp. 54,450.00
54,450.00
Tenaga :
Pekerja 0.010 Oh 45,400.00 =Rp. 454.00
Tukang kayu 0.100 Oh 59,000.00 =Rp. 5,900.00
Kepala Tukang 0.010 Oh 63,600.00 =Rp. 636.00
Mandor 0.0005 Oh - =Rp. - 6,990.00
Jumlah =Rp. 61,440.00

6.9 1 buah Pasang Kait Angin


Bahan :
Kait angin 1.000 Bh 15,950.00 =Rp. 15,950.00
15,950.00
Tenaga :
Pekerja 0.015 Oh 45,400.00 =Rp. 681.00
Tukang kayu 0.150 Oh 59,000.00 =Rp. 8,850.00
Kepala Tukang 0.015 Oh 63,600.00 =Rp. 954.00
Mandor 0.00075 Oh - =Rp. - 10,485.00
Jumlah =Rp. 26,435.00

6.9a 1 buah Pasang grendel


Bahan :
Kait angin 1.000 Bh 10,450.00 =Rp. 10,450.00
10,450.00
Tenaga :
Pekerja 0.015 Oh 45,400.00 =Rp. 681.00
Tukang kayu 0.150 Oh 59,000.00 =Rp. 8,850.00
Kepala Tukang 0.015 Oh 63,600.00 =Rp. 954.00
Mandor 0.00075 Oh - =Rp. - 10,485.00
Jumlah =Rp. 20,935.00
6.11 1 buah Pasang Kunci selot
Bahan :
Kunci selot 1.000 Bh 109,780.00 =Rp. 109,780.00
109,780.00
Tenaga :
Pekerja 0.020 Oh 45,400.00 =Rp. 908.00
Tukang kayu 0.200 Oh 59,000.00 =Rp. 11,800.00
Kepala Tukang 0.020 Oh 63,600.00 =Rp. 1,272.00
Mandor 0.001 Oh - =Rp. - 13,980.00
Jumlah =Rp. 123,760.00
6.16 1 m2 Pasang Kaca bening, tb. 3 mm
Bahan :
Kaca 1.100 Bh 75,000.00 =Rp. 82,500.00
82,500.00
Tenaga :
Pekerja 0.015 Oh 45,400.00 =Rp. 681.00
Tukang kayu 0.150 Oh 59,000.00 =Rp. 8,850.00
Kepala Tukang 0.015 Oh 63,600.00 =Rp. 954.00
Mandor 0.00075 Oh - =Rp. - 10,485.00
Jumlah =Rp. 92,985.00
6.16a 1 m2 Pasang Kaca rayband, tb. 3 mm
Bahan :
Kaca 1.100 Bh 80,850.00 =Rp. 88,935.00
88,935.00
Tenaga :
Pekerja 0.015 Oh 45,400.00 =Rp. 681.00
Tukang kayu 0.150 Oh 59,000.00 =Rp. 8,850.00
Kepala Tukang 0.015 Oh 63,600.00 =Rp. 954.00
Mandor 0.00075 Oh - =Rp. - 10,485.00
Jumlah =Rp. 99,420.00

6.17 1 m2 Pasang Kaca bening, tb. 5 mm


Bahan :
Kaca 1.100 Bh 90,000.00 =Rp. 99,000.00
99,000.00
Tenaga :
Pekerja 0.015 Oh 45,400.00 =Rp. 681.00
Tukang kayu 0.150 Oh 59,000.00 =Rp. 8,850.00
Kepala Tukang 0.015 Oh 63,600.00 =Rp. 954.00
Mandor 0.00075 Oh - =Rp. - 10,485.00
Jumlah =Rp. 109,485.00

6.17a 1 m2 Pasang Kaca rayband, tb. 5 mm


Bahan :
Kaca 1.100 Bh 95,150.00 =Rp. 104,665.00
104,665.00
Tenaga :
Pekerja 0.015 Oh 45,400.00 =Rp. 681.00
Tukang kayu 0.150 Oh 59,000.00 =Rp. 8,850.00
Kepala Tukang 0.015 Oh 63,600.00 =Rp. 954.00
Mandor 0.00075 Oh - =Rp. - 10,485.00
Jumlah =Rp. 115,150.00

ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN PENGECATAN
Kode Uraian Volume Sat Harga Sat Jumlah Harga Jumlah Harga
Rp. Rp. Rp.
6.7 1 m2 pengecatan bidang kayu lama
Bahan :
Plamir kayu 0.150 Kg 29,700.00 =Rp. 4,455.00
Cat dasar 0.170 Kg 54,800.00 =Rp. 9,316.00
cat penutup 0.170 Kg 54,800.00 =Rp. 9,316.00
23,087.00
Tenaga :
Pekerja 0.070 Oh 45,400.00 =Rp. 3,178.00
Tukang cat 0.075 Oh 59,000.00 =Rp. 4,425.00
Kepala Tukang 0.0075 Oh 63,600.00 =Rp. 477.00
Mandor 0.0025 Oh - =Rp. - 8,080.00
Jumlah =Rp. 31,167.00

6.8 1 m2 pengecatan bidang kayu baru ( 1 lapis plamir ), 1 lapis cat dasar, 2 lapis cat penutup
Bahan :
Cat meni kayu 0.200 Kg 29,700.00 =Rp. 5,940.00
Plamir kayu 0.150 Kg 29,700.00 =Rp. 4,455.00
Cat dasar 0.170 Kg 54,800.00 =Rp. 9,316.00
cat penutup 2 kali 0.260 Kg 54,800.00 =Rp. 14,248.00
33,959.00
Tenaga :
Pekerja 0.070 Oh 45,400.00 =Rp. 3,178.00
Tukang cat 0.009 Oh 59,000.00 =Rp. 531.00
Kepala Tukang 0.006 Oh 63,600.00 =Rp. 381.60
Mandor 0.0025 Oh - =Rp. - 4,090.60
Jumlah =Rp. 38,049.60

6.9 1 m2 pengecatan bidang kayu baru ( 1 lapis plamir ), 1 lapis cat dasar, 3 lapis cat penutup
Bahan :
Cat meni kayu 0.200 Kg 29,700.00 =Rp. 5,940.00
Plamir kayu 0.150 Kg 29,700.00 =Rp. 4,455.00
Cat dasar 0.170 Kg 54,800.00 =Rp. 9,316.00
cat penutup 3 kali 0.350 Kg 54,800.00 =Rp. 19,180.00
38,891.00
Tenaga :
Pekerja 0.070 Oh 45,400.00 =Rp. 3,178.00
Tukang cat 0.105 Oh 59,000.00 =Rp. 6,195.00
Kepala Tukang 0.004 Oh 63,600.00 =Rp. 254.40
Mandor 0.0025 Oh - =Rp. - 9,627.40
Jumlah =Rp. 48,518.40

6.14 1 m2 Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar dan 2 lapis cat penutup )
Bahan :
plamir tembok 0.100 Kg 25,000.00 =Rp. 2,500.00
Cat dasar 0.100 Kg 25,080.00 =Rp. 2,508.00
Cat penutup 2 kali 0.260 Kg 25,080.00 =Rp. 6,520.80
11,528.80
Tenaga :
Pekerja 0.020 Oh 45,400.00 =Rp. 908.00
Tukang cat 0.063 Oh 59,000.00 =Rp. 3,717.00
Kepala Tukang 0.006 Oh 63,600.00 =Rp. 400.68
Mandor 0.0025 Oh - =Rp. - 5,025.68
Jumlah =Rp. 16,554.48
6.14b 1 m2 Pengecatan tembok eksterior (weather shield) ( 1 lapis cat dasar dan 2 lapis cat penutup )
Bahan :
Cat dasar 0.100 Kg 91,839.09 =Rp. 9,183.91
Cat penutup 2 kali 0.260 Kg 91,839.09 =Rp. 23,878.16
- 33,062.07
Tenaga : -
Pekerja 0.020 Oh 45,400.00 =Rp. 908.00
Tukang cat 0.063 Oh 59,000.00 =Rp. 3,717.00
Kepala Tukang 0.006 Oh 63,600.00 =Rp. 400.68
Mandor 0.0025 Oh - =Rp. - 5,025.68
Jumlah =Rp. 38,087.75
6.15 1 m2 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup )
Bahan :
Cat dasar 0.120 Kg 25,080.00 =Rp. 3,009.60
Cat penutup 2 kali 0.180 Kg 25,080.00 =Rp. 4,514.40
7,524.00
Tenaga :
Pekerja 0.028 Oh 45,400.00 =Rp. 1,271.20
Tukang cat 0.042 Oh 59,000.00 =Rp. 2,478.00
Kepala Tukang 0.0042 Oh 63,600.00 =Rp. 267.12
Mandor 0.0025 Oh - =Rp. - 4,016.32
Jumlah =Rp. 11,540.32
6.20 1 m2 Pengecatan Permukaan baja dengan meni besi
Bahan :
meni besi 0.100 Kg 29,700.00 =Rp. 2,970.00
Kuas 0.010 Bh 15,000.00 =Rp. 150.00
3,120.00
Tenaga :
Pekerja 0.020 Oh 45,400.00 =Rp. 908.00
Tukang cat 0.200 Oh 59,000.00 =Rp. 11,800.00
Kepala Tukang 0.020 Oh 63,600.00 =Rp. 1,272.00
Mandor 0.010 Oh - =Rp. - 13,980.00
Jumlah =Rp. 17,100.00

Memasang Stop kontak AC


Kabel 5.000 m1 15,972.00 =Rp. 79,860.00
Stop kontak AC 1.000 bh 125,000.00 =Rp. 125,000.00
Tukang listrik 0.150 org 60,000.00 =Rp. 9,000.00
Kepala tukang listrik 0.015 org 64,400.00 =Rp. 966.00
Pekerja 0.010 org 45,000.00 =Rp. 450.00
Mandor 0.020 org 60,000.00 =Rp. 1,200.00
=Rp. 216,476.00

Memasang Stop kontak daya


Kabel 5.000 m1 15,972.00 =Rp. 79,860.00
Stop kontak daya 1.000 bh 21,962.00 =Rp. 21,962.00
Tukang listrik 0.150 org 60,000.00 =Rp. 9,000.00
Kepala tukang listrik 0.015 org 64,400.00 =Rp. 966.00
Pekerja 0.010 org 45,000.00 =Rp. 450.00
Mandor 0.020 org =Rp. -
=Rp. 112,238.00
Memasang Lampu SL + Fitting
Kabel 5.000 m1 15,972.00 =Rp. 79,860.00
lampu SL 1.000 bh 45,680.00 =Rp. 45,680.00
Fitting 1.000 bh 7,700.00 =Rp. 7,700.00
Tukang listrik 0.150 org 60,000.00 =Rp. 9,000.00
Kepala tukang listrik 0.015 org 64,400.00 =Rp. 966.00
Pekerja 0.010 org 45,000.00 =Rp. 450.00
Mandor 0.020 org =Rp. 143,656.00

Instalasi Listrik
Kabel 12.000 m1 15,972.00 =Rp. 191,664.00
Tukang listrik 0.500 org 60,000.00 =Rp. 30,000.00
Kepala tukang listrik 0.050 org 64,400.00 =Rp. 3,220.00
Pekerja 0.010 org 45,000.00 =Rp. 450.00
Mandor 0.020 org =Rp. -
225,334.00

1 Unit Septictank 2x1,5x1,5 rembesannya


Galian tanah 4.500 m3 40,860.00 =Rp. 183,870.00
Pasir urug 0.214 m3 95,000.00 =Rp. 20,330.00
Lantai kerja 2.250 m3 689,068.30 =Rp. 1,550,403.68
Pas. Bata & plesteran 15.000 m2 140,420.00 =Rp. 2,106,300.00
Plat beton penutup 0.300 m3 649,874.59 =Rp. 194,962.38
Sambungan PVC 4" 5.400 m' 15,000.00 =Rp. 81,000.00
Galian tanah utk rembesan 3.375 m3 11,350.00 =Rp. 38,306.25
Pasangan ijuk 5.400 m2 75,000.00 =Rp. 405,000.00
Urugan kerikil 1.050 m3 192,500.00 =Rp. 202,125.00
Pipa PVC 4" 9.000 m' 15,000.00 =Rp. 135,000.00
Urugan kembali 1.125 m3 11,350.00 =Rp. 12,768.75
Tambahan upah 0.600 ls 500,000.00 =Rp. 300,000.00 5,230,066.05
JUMLAH
DIBULATKAN

6.6.16 1 m2 Pasang Kaso kayu kruing & Reng Kayu jati


Kaso (5x7) cm Kayu Kruing 0.01 m3 7,653,000.00 =Rp. 107,142.00
Reng (2x3) cm Kayu jati 4.00 m' 2,500.00 =Rp. 10,000.00
Paku Biasa 2" - 5" 0.15 Kg 15,000.00 =Rp. 2,250.00
=Rp. -
Pekerja 0.100 OH 45,400.00 =Rp. 4,540.00
Tukang Kayu 0.100 OH 59,000.00 =Rp. 5,900.00
Kepala Tukang 0.010 OH 63,600.00 =Rp. 636.00
Mandor 0.005 OH 0 =Rp. - 130,468.00

6.6.15 1 m2 Pasang Reng Kayu jati


Reng (2x3) cm Kayu jati 4.000 m' 2500 =Rp. 10,000.00
Paku Biasa 2" - 5" 0.015 Kg 15,000.00 =Rp. 225.00
=Rp. -
Pekerja 0.100 OH 45,400.00 =Rp. 4,540.00
Tukang Kayu 0.100 OH 59,000.00 =Rp. 5,900.00
Kepala Tukang 0.010 OH 63,600.00 =Rp. 636.00
Mandor 0.005 OH - =Rp. - 21,301.00

6.6.16 1 m2 Pasang Kaso kayu kruing & Reng Kayu jati


Kaso (5x7) cm Kayu Kruing 0.01 m3 7,653,000.00 =Rp.
Reng (2x3) cm Kayu jati 4.00 m' 2,500.00 =Rp. 10,000.00
Paku Biasa 2" - 5" 0.15 Kg 15,000.00 =Rp. 2,250.00
=Rp. -
Pekerja 0.1 OH 45,400.00 =Rp. 4,540.00
Tukang Kayu 0.1 OH 59,000.00 =Rp. 5,900.00
Kepala Tukang 0.01 OH 63,600.00 =Rp. 636.00
Mandor 0.005 OH - =Rp. - 23,326.00

A.013 Membongkar 1 m³ beton bertulang


Pekerja 6.6670 OH 45,400.00 =Rp. 302,681.80
Mandor 0.3330 OH - =Rp. - 302,681.80
Jumlah
A.014 Membongkar 1 m³ dinding tembok bata merah -
Pekerja 6.6670 OH 45,400.00 =Rp. 302,681.80
Mandor 0.0330 OH - =Rp. - 302,681.80
Jumlah
-
A.015 Membongkar 1 m³ dinding bata/ pas. batu kali (bongkaran dipakai kembali) -
Pekerja 3 OH 45,400.00 =Rp. 136,200.00
Mandor 0.09 OH - =Rp. -
Jumlah - 136,200.00
A.016 Mengupas 1 m² plesteran
Pekerja 0.125 OH 45,400.00 =Rp. 5,675.00
Mandor 0.0125 OH - =Rp. - 5,675.00
Jumlah
A.017 Membongkar 1 m³ jembatan kayu (bongkaran dipakai kembali)
Pekerja 4 OH 45,400.00 =Rp. 181,600.00
Tukang Kayu 6 OH 59,000.00 =Rp. 354,000.00
Kepala Tukang 0.6 OH 63,600.00 =Rp. 38,160.00
Mandor 0.2 OH 0 =Rp. - 573,760.00
Jumlah
A.018 Membongkar 1 m³ jembatan kayu (bongkaran tidak dipakai kembali)
Pekerja 6 OH 45,400.00 =Rp. 272,400.00
Tukang Kayu 2 OH 59,000.00 =Rp. 118,000.00
Mandor 0.3 OH 0 =Rp. - 390,400.00
Jumlah -
A.019 Membongkar 1 m² plesteran dinding/ siaran
Pekerja 0.125 OH 45,400.00 =Rp. 5,675.00
Mandor 0.0125 OH - =Rp. - 5,675.00
Jumlah -
A.020 Membongkar 1 m² genteng/ sirap ( bongkaran dipakai kembali)
Pekerja 0.5 OH 45,400.00 =Rp. 22,700.00
Mandor 0.05 OH - =Rp. - 22,700.00
Jumlah -
A.021 Membongkar 1 m² genteng/ sirap (bongkaran tidak dipakai kembali)
Pekerja 0.1 OH 45,400.00 =Rp. 4,540.00
Mandor 0.01 OH - =Rp. - 4,540.00
Jumlah -
A.022 Membongkar 1 m² rangka atap/ reng/ kaso (bongkaran dipakai kembali)
Pekerja 0.2 OH 45400 =Rp. 9,080.00
Tukang Kayu 0.1 OH 59000 =Rp. 5,900.00
Kepala Tukang 0.01 OH 63600 =Rp. 636.00
Mandor 0.02 OH 0 =Rp. - 15,616.00
Jumlah -
A.023 Membongkar 1 m² rangka atap/ reng/ kaso (bongkaran tidak dipakai kembali)
Pekerja 0.15 OH 45,400.00 =Rp. 6,810.00
Tukang Kayu 0.075 OH 59,000.00 =Rp. 4,425.00
Kepala Tukang 0.0075 OH 63,600.00 =Rp. 477.00
Mandor 0.015 OH - =Rp. - 11,712.00
Jumlah -
A.24 Membongkar 1 m³ kuda-kuda/ gording/ balok (bongkaran dipakai kembali)
Pekerja 4 OH 45,400.00 =Rp. 181,600.00
Tukang Kayu 6 OH 59,000.00 =Rp. 354,000.00
Kepala Tukang 0.6 OH 63,600.00 =Rp. 38,160.00
Mandor 0.4 OH - =Rp. - 573,760.00
Jumlah -
A.025 Membongkar 1 m³ kuda-kuda/ gording/ balok (bongkaran tidak dipakai kembali)
Pekerja 4 OH 45,400.00 =Rp. 181,600.00
Tukang Kayu 3 OH 59,000.00 =Rp. 177,000.00
Mandor 0.2 OH - =Rp. - 358,600.00
Jumlah -
A.026 Membongkar 1 m² plafond (bongkaran dipakai kembali)
Pekerja 0.1 OH 45,400.00 =Rp. 4,540.00
Tukang Kayu 0.3 OH 59,000.00 =Rp. 17,700.00
Kepala Tukang 0.03 OH 63,600.00 =Rp. 1,908.00
Mandor 0.01 OH - =Rp. - 24,148.00
Jumlah -
A.027 Membongkar 1 m² plafond (bongkaran tidak dipakai kembali)
Pekerja 0.15 OH 45,400.00 =Rp. 6,810.00
Mandor 0.015 OH - =Rp. - 6,810.00
Jumlah -
Analisa Biaya Konstruksi ( ABK ) Bangunan Gedung dan Perumahan
Pekerjaan Tanah
BOW-BORONGAN
Kode Uraian Volume Sat Harga Sat Jumlah Harga
Rp. Rp.

SUPL 1 m3 Urugan Tanah


Bahan dan Upah
Tanah urug 1.200 M3 80,000.00 Rp. 96,000.00
Pekerja 0.300 Oh 45,400.00 Rp. 13,620.00
Mandor 0.010 Oh - Rp. -
Jumlah 109,620.00

ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN


PEKERJAAN KAYU

Kode Uraian Volume Sat Harga Sat Jumlah Harga


Rp. Rp.

F.21.b 1 M1 Pasang Papan list kamper tbl 2 cm


Kayu Kamper 0.0240 M3 9,900,000.00 Rp. 237,600.00
Paku 0.1000 Kg 15,000.00 Rp. 1,500.00
Tukang kayu 0.8000 OH 59,000.00 Rp. 47,200.00
Kepala Tukang 0.0800 OH 63,600.00 Rp. 5,088.00
Pekerja 0.2800 OH 45,400.00 Rp. 12,712.00
Mandor 0.0140 OH - Rp. -
Jumlah 304,100.00
Untuk papan list lebar 20 cm = 1/5 x 304,100.00 Rp. 60,820.00
Untuk papan list lebar 25 cm = 1/4 x 304,100.00 Rp. 76,025.00
Untuk papan list lebar 30 cm = 3/10 x 304,100.00 Rp. 91,230.00

F.21.c 1 M1 Pasang Papan list jati klas plitur tbl 2 cm


Kayu Jati 0.0240 M3 20,872,500.00 Rp. 500,940.00
Paku 0.1000 Kg 15,000.00 Rp. 1,500.00
Tukang kayu 0.8000 OH 59,000.00 Rp. 47,200.00
Kepala Tukang 0.0800 OH 63,600.00 Rp. 5,088.00
Pekerja 0.2800 OH 45,400.00 Rp. 12,712.00
Mandor 0.0140 OH - Rp. -
Jumlah 567,440.00

Untuk papan list lebar 20 cm = 1/5 x 567,440.00 Rp. 113,488.00


Untuk papan list lebar 25 cm = 1/4 x 567,440.00 Rp. 141,860.00
Untuk papan list lebar 30 cm = 3/10 x 567,440.00 Rp. 170,232.00

F.21.d 1 M1 Pasang Papan list jati klas cat tbl 2 cm


Kayu Jati 0.0240 M3 15,100,000.00 Rp. 362,400.00
Paku 0.1000 Kg 15,000.00 Rp. 1,500.00
Tukang kayu 0.8000 OH 59,000.00 Rp. 47,200.00
Kepala Tukang 0.0800 OH 63,600.00 Rp. 5,088.00
Pekerja 0.2800 OH 45,400.00 Rp. 12,712.00
Mandor 0.0140 OH - Rp. -
Jumlah 428,900.00

Untuk papan list lebar 20 cm = 1/5 x 428,900.00 Rp. 85,780.00


Untuk papan list lebar 25 cm = 1/4 x 428,900.00 Rp. 107,225.00
Untuk papan list lebar 30 cm = 3/10 x 428,900.00 Rp. 128,670.00
ANALISA BIAYA KONSTRUKSI ( ABK ) BANGUNAN GEDUNG DAN PERUMAHAN
PEKERJAAN KERAMIK
Kode Uraian Volume Sat Harga Sat Jumlah Harga
Rp. Rp.

M.7 d 1m2 Pasang keramik 30/30 ( putih )


Keramik 1.0000 m2 46,750.00 Rp. 46,750.00
PC 50 Kg 0.1200 zak 62,500.00 Rp. 7,500.00
Pasir Pasang 0.0095 m3 195,000.00 Rp. 1,852.50
Semen putih 0.0025 zak 80,300.00 Rp. 200.75
Tukang batu 0.3000 OH 59,000.00 Rp. 17,700.00
Kepala Tukang 0.0300 OH 63,600.00 Rp. 1,908.00
Pekerja 0.2000 OH 45,400.00 Rp. 9,080.00
Mandor 0.0500 OH - Rp. -
Jumlah 84,991.25

M.7 e 1m2 Pasang keramik 40/40 ( putih )


Keramik 1.0000 m2 60,500.00 Rp. 60,500.00
PC 50 Kg 0.1200 zak 62,500.00 Rp. 7,500.00
Pasir Pasang 0.0095 m3 195,000.00 Rp. 1,852.50
Semen putih 0.0025 zak 80,300.00 Rp. 200.75
Tukang batu 0.3000 OH 59,000.00 Rp. 17,700.00
Kepala Tukang 0.0300 OH 63,600.00 Rp. 1,908.00
Pekerja 0.2000 OH 45,400.00 Rp. 9,080.00
Mandor 0.0500 OH - Rp. -
Jumlah 98,741.25

Dihitung 1m2 Pasang keramik lanatai khusus 32,5 x 32,5 cm


Keramik 1.0000 m2 144,100.00 Rp. 144,100.00
PC 50 Kg 0.1200 zak 62,500.00 Rp. 7,500.00
Pasir Pasang 0.0095 m3 195,000.00 Rp. 1,852.50
Semen putih 0.0025 zak 80,300.00 Rp. 200.75
Tukang batu 0.3000 OH 59,000.00 Rp. 17,700.00
Kepala Tukang 0.0300 OH 63,600.00 Rp. 1,908.00
Pekerja 0.2000 OH 45,400.00 Rp. 9,080.00
Mandor 0.0500 OH - Rp. -
Jumlah 182,341.25

M.7 g 1m2 Pasang keramik 20/20 ( warna )


Keramik 1.0000 m2 65,000.00 Rp. 65,000.00
PC 50 Kg 0.1200 zak 62,500.00 Rp. 7,500.00
Pasir Pasang 0.0095 m3 195,000.00 Rp. 1,852.50
Semen warna 0.0025 zak 484,000.00 Rp. 1,210.00
Tukang batu 0.3000 OH 59,000.00 Rp. 17,700.00
Kepala Tukang 0.0300 OH 63,600.00 Rp. 1,908.00
Pekerja 0.2000 OH 45,400.00 Rp. 9,080.00
Mandor 0.0500 OH - Rp. -
Jumlah 104,250.50

M.7 h 1m2 Pasang keramik dinding 20/25 ( warna )


Keramik 1.0000 m2 99,000.00 Rp. 99,000.00
PC 50 Kg 0.1200 zak 62,500.00 Rp. 7,500.00
Pasir Pasang 0.0095 m3 195,000.00 Rp. 1,852.50
Semen warna 0.0025 zak 484,000.00 Rp. 1,210.00
Tukang batu 0.4000 OH 59,000.00 Rp. 23,600.00
Kepala Tukang 0.0400 OH 63,600.00 Rp. 2,544.00
Pekerja 0.2000 OH 45,400.00 Rp. 9,080.00
Mandor 0.0500 OH - Rp. -
Jumlah 144,786.50

Dihitung 1m2 Pasang keramikdinding khusus 32,5 x 50 cm


Keramik 1.0000 m2 139,700.00 Rp. 139,700.00
PC 50 Kg 0.1200 zak 62,500.00 Rp. 7,500.00
Pasir Pasang 0.0095 m3 195,000.00 Rp. 1,852.50
Semen warna 0.0025 zak 484,000.00 Rp. 1,210.00
Tukang batu 0.4000 OH 59,000.00 Rp. 23,600.00
Kepala Tukang 0.0400 OH 63,600.00 Rp. 2,544.00
Pekerja 0.2000 OH 45,400.00 Rp. 9,080.00
Mandor 0.0500 OH - Rp. -
Jumlah 185,486.50
Dihitung 1m2 Pasang keramik dinding 30 x 60 cm
Keramik 1.0000 m2 130,000.00 Rp. 130,000.00
PC 50 Kg 0.1200 zak 62,500.00 Rp. 7,500.00
Pasir Pasang 0.0095 m3 195,000.00 Rp. 1,852.50
Semen warna 0.0025 zak 484,000.00 Rp. 1,210.00
Tukang batu 0.4000 OH 59,000.00 Rp. 23,600.00
Kepala Tukang 0.0400 OH 63,600.00 Rp. 2,544.00
Pekerja 0.2000 OH 45,400.00 Rp. 9,080.00
Mandor 0.0500 OH - Rp. -
Jumlah 175,786.50
M.7 i 1m2 Pasang keramik 30/30 ( warna )
Keramik 1.0000 m2 62,000.00 Rp. 62,000.00
PC 50 Kg 0.1200 zak 62,500.00 Rp. 7,500.00
Pasir Pasang 0.0095 m3 195,000.00 Rp. 1,852.50
Semen warna 0.0025 zak 484,000.00 Rp. 1,210.00
Tukang batu 0.3000 OH 59,000.00 Rp. 17,700.00
Kepala Tukang 0.0300 OH 63,600.00 Rp. 1,908.00
Pekerja 0.2000 OH 45,400.00 Rp. 9,080.00
Mandor 0.0500 OH - Rp. -
Jumlah 101,250.50
M.7 j 1m2 Pasang keramik 40/40 ( warna )
Keramik 1.0000 m2 63,250.00 Rp. 63,250.00
PC 50 Kg 0.1200 zak 62,500.00 Rp. 7,500.00
Pasir Pasang 0.0095 m3 195,000.00 Rp. 1,852.50
Semen warna 0.0025 zak 484,000.00 Rp. 1,210.00
Tukang batu 0.3000 OH 59,000.00 Rp. 17,700.00
Kepala Tukang 0.0300 OH 63,600.00 Rp. 1,908.00
Pekerja 0.2000 OH 45,400.00 Rp. 9,080.00
Mandor 0.0500 OH - Rp. -
Jumlah 102,500.50
Dihitung 1m2 Pasang keramik 60x60 ( warna )
Keramik 1.0000 m2 104,500.00 Rp. 104,500.00
PC 50 Kg 0.1200 zak 62,500.00 Rp. 7,500.00
Pasir Pasang 0.0095 m3 195,000.00 Rp. 1,852.50
Semen warna 0.0025 zak 484,000.00 Rp. 1,210.00
Tukang batu 0.3000 OH 59,000.00 Rp. 17,700.00
Kepala Tukang 0.0300 OH 63,600.00 Rp. 1,908.00
Pekerja 0.2000 OH 45,400.00 Rp. 9,080.00
Mandor 0.0500 OH - Rp. -
Jumlah 143,750.50
M.15 1m2 Pasang Paving blok mutiara tebal 6 cm K.200
Paving blok 6 CM 1.0000 M2 122,000.00 Rp. 122,000.00
Pasir Pasang 0.1000 M3 195,000.00 Rp. 19,500.00
Tukang Batu 0.2000 OH 59,000.00 Rp. 11,800.00
Kepala Tukang 0.0200 OH 63,600.00 Rp. 1,272.00
Pekerja 0.2000 OH 45,400.00 Rp. 9,080.00
Mandor 0.0200 OH - Rp. -
Jumlah 163,652.00
M.16 1m2 Pasang Paving blok mutiara tebal 8 cm K.300
Paving blok 8 CM 1.0000 M2 145,000.00 Rp. 145,000.00
Pasir Pasang 0.1000 M3 195,000.00 Rp. 19,500.00
Tukang Batu 0.2000 OH 59,000.00 Rp. 11,800.00
Kepala Tukang 0.0200 OH 63,600.00 Rp. 1,272.00
Pekerja 0.2000 OH 45,400.00 Rp. 9,080.00
Mandor 0.0200 OH - Rp. -
Jumlah 186,652.00
M.15a 1m2 Pasang Paving blok lokal tebal 6 cm
Paving blok 6 CM 1.0000 M2 42,000.00 Rp. 42,000.00
Pasir Pasang 0.1000 M3 195,000.00 Rp. 19,500.00
Tukang Batu 0.2000 OH 59,000.00 Rp. 11,800.00
Kepala Tukang 0.0200 OH 63,600.00 Rp. 1,272.00
Pekerja 0.2000 OH 45,400.00 Rp. 9,080.00
Mandor 0.0200 OH - Rp. -
Jumlah 83,652.00
M.16a 1m2 Pasang Paving blok lokal tebal 8 cm
Paving blok 8 CM 1.0000 M2 65,450.00 Rp. 65,450.00
Pasir Pasang 0.1000 M3 195,000.00 Rp. 19,500.00
Tukang Batu 0.2000 OH 59,000.00 Rp. 11,800.00
Kepala Tukang 0.0200 OH 63,600.00 Rp. 1,272.00
Pekerja 0.2000 OH 45,400.00 Rp. 9,080.00
Mandor 0.0200 OH - Rp. -
Jumlah 107,102.00
KEGIATAN PEMERINTAH KABUPATEN KLATEN
TAHUN ANGGARAN 2017
REKAPITULASI ANGGARAN BIAYA

PROGRAM :
KEGIATAN :
PEKERJAAN :
LOKASI / DESA :
KECAMATAN :
borongan
Kode Harga Satuan Jumlah Harga Rekapitulasi
No Uraian Pekerjaan Volume Sat
Analis Rp Rp Rp
1 2 3 4 5 6 7 8
A PEKERJAAN PENDAHULUAN
1 Pengukuran & pemasangan bouplank SNI - 6.4a 39 M1 68,083.50 2,655,256.50
2 Papan nama Proyek Taksir 1.00 Bh 350,000.00 350,000.00
3 Kantor direksi Taksir 8.00 M2 250,000.00 2,000,000.00
4 Brak Bahan Taksir 12.00 M2 250,000.00 3,000,000.00
8,005,256.50
B PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 m SNI - 6.1 7.92 M3 34,050.00 269,676.00
2 Galian tanah biasa sedalam 3 m SNI - 6.3 M3 47,670.00 -
3 Galian tanah keras sedalam 1 m SNI - 6.4 M3 45,400.00 -
4 Stripping tebing setinggi 1 m SNI - 6.7 M2 2,270.00 -
5 Urugan kembali SNI - 6.9 2.20 M3 11,350.00 24,970.00
6 Urugan tanah SUPL M3 109,620.00 -
7 Pemadatan tanah manual SNI - 6.10 2.20 M3 22,700.00 49,940.00
8 Urugan pasir SNI - 6.11 0.88 M3 127,620.00 112,305.60
9 Urugan sirtu padat ( komposisi 60% bt : 40% ps) SNI - 6.15 M3 161,350.00 - 456,891.60

C PEKERJAAN PASANGAN
1 Pas. Pondasi batu belah 1 Pc : 3 Ps SNI - 6.1 M3 674,195.00 -
2 Pas. Pondasi batu belah 1 Pc : 4 Ps SNI - 6.2 M3 632,270.00 -
3 Pas. Pondasi batu belah 1 Pc : 5 Ps SNI - 6.3 M3 603,200.00 -
4 Pas. Pondasi batu belah 1 Pc : 3Kp : 10 Ps SNI - 6.7 M3 536,060.00 -
5 Pas. Pondasi batu kosong/aanstamping SNI - 6.9 M3 311,942.40 -
6 Pas. pondasi sumuran, diameter 100 cm SNI - 6.11 M3 642,476.00 -
7 Pas. Batu merah tb. 1 bt 1Pc : 3 Kp : 10 Ps SNI - 6.6 M2 201,024.50 -
8 Pas. Batu merah tb. 1/2 bt 1Pc : 3 Ps SNI - 6.8 M2 107,518.50 -
9 Pas. Batu merah tb. 1/2 bt 1Pc : 4 Ps SNI - 6.9 0.96 M2 104,516.00 100,335.36
10 Pas. Batu merah tb. 1/2 bt 1Pc : 3 Kp : 10 Ps SNI - 6.13 M2 100,881.00 -
11 Pas. Dinding Rooster Terawang (12x11x24) cm, 1Pc SNI - 6.23 M2 220,731.00 -
12 Pas. Roster Beton (20x20) cm, 1Pc : 4PP Dihitung M2 156,231.00 -
13 Pas. Rooster Gerabah (10x20) cm, 1Pc : 4PP Dihitung M2 310,731.00 -
14 Pas. Rooster Gerabah (25x25) cm, 1Pc : 4PP Dihitung M2 187,031.00 -
15 Pas. Keramik lantai 30 x 30 cm putih M. 7d M2 84,991.25 -
16 Pas. Keramik lantai 20 x 20 cm warna M. 7g 2.25 M2 104,250.50 234,563.63
17 Pas. Keramik dinding 20 x 25 cm warna M. 7h M2 144,786.50 -
18 Pas. Keramik lantai 30 x 30 cm putih M. 7d M2 84,991.25 -
19 Pas. Keramik lantai 30 x 30 cm warna M. 7i M2 101,250.50 -
20 Pas. Keramik lantai 40 x 40 cm putih M. 7e 6.00 M2 98,741.25 592,447.50
21 Pas. Keramik lantai 40 x 40 cm warna M. 7j M2 102,500.50 -
22 Pas. Keramik dinding 30 x 60 cm Dihitung M2 175,786.50
23 Pas. Keramik lantai 60 x 60 cm Dihitung M2 143,750.50
24 Pas. Conblock eks "MUTIARA" tbl. 6 cm, K.200 M. 15 M2 163,652.00 -
25 Pas. Conblock eks "MUTIARA" tbl. 8 cm, K.300 M. 16 M2 186,652.00 -
26 Pas. Conblock eks "LOKAL" tbl. 6 cm M. 15a M2 83,652.00 -
27 Pas. Conblock eks "LOKAL" tbl. 8 cm M. 16a M2 107,102.00 -
28 Plesteran 1 Pc : 3 Ps SNI - 6.3 M2 37,629.00 -
29 Plesteran 1 Pc : 4 Ps SNI - 6.4 M2 35,904.00 -
30 Plesteran 1 Pc : 5 Ps SNI - 6.5 2.48 M2 34,974.00 86,735.52
31 Plesteran 1 Pc : 2 Kp : 8 Ps SNI - 6.10 M2 33,087.20 -
32 Plesteran skoning 1 Pc : 2 Ps SNI - 6.20 M' 11,696.00 -
33 Plesteran ciprat 1 Pc : 2 Ps SNI - 6.23 M2 26,726.00 -
34 Finishing Siar adukan 1 PC : 2 PS SNI - 6.26 M2 33,689.00 -
35 Acian SNI - 6.27 2.48 M2 19,678.50 48,802.68 1,062,884.69

D PEKERJAAN BETON
1 Membuat lantai kerja beton mutu K-100 SNI - 6.4 M3 649,874.59 -
2 Membuat beton mutu K-100 SNI - 6.1 M3 689,068.30 -
3 Membuat beton mutu K-125 SNI - 6.2 M3 720,612.00 -
4 Membuat beton mutu K-150 SNI - 6.3 M3 745,434.97 -
5 Membuat beton mutu K-175 SNI - 6.5 M3 774,656.08 -
6 Membuat beton mutu K-200 SNI - 6.6 M3 802,801.26 -
7 Membuat beton mutu K-225 SNI - 6.7 M3 823,552.74 -
8 Membuat beton mutu K-250 SNI - 6.8 M3 837,702.00 -
9 Membuat beton mutu K-275 SNI - 6.9 M3 862,068.30 -
10 Membuat beton mutu K-300 SNI - 6.10 M3 869,625.34 -
11 Membuat beton mutu K-325 SNI - 6.11 M3 923,526.65 -
12 Membuat beton mutu K-350 SNI - 6.12 M3 933,441.09 -
13 Pembesian dengan besi polos SNI - 6.17 Kg 11,545.32 -
14 Pembesian dengan besi ulir SNI - 6.17a Kg 12,490.32 -
15 Pas. Bekisting untuk pondasi SNI - 6.20 M2 97,821.60 -
16 Pas. Bekisting untuk sloof SNI - 6.21 M2 104,384.10 -
17 Pas. Bekisting untuk kolom SNI - 6.22 M2 260,917.80 -
18 Pas. Bekisting untuk kolom 2 kali pakai Dihitung M2 159,445.30 -
19 Pas. Bekisting untuk balok SNI - 6.23 M2 272,797.80 -
20 Pas. Bekisting untuk balok 2 kali pakai Dihitung M2 165,385.30
21 Pas. Bekisting untuk lantai SNI - 6.24 M2 352,917.80 -
22 Pas. Bekisting untuk lantai 2 kali pakai Dihitung M2 205,445.30 -
23 Pas. Bekisting untuk dinding SNI - 6.25 M2 290,592.80 -
24 Pas. Bekisting untuk tangga SNI - 6.26 M2 247,682.80 -
25 Membuat pondasi beton bertulang SNI - 6.28 M3 3,010,423.20 -
( 150 kg besi + bekisting )
26 Membuat pondasi beton bertulang SNI - 6.28a M3 2,730,848.20 -
( 125 kg besi + bekisting )
27 uat SNI - 6.29 M3 3,704,497.80 -
( 200 kg besi + bekisting )
28 Membuat sloof beton bertulang SNI - 6.29a M3 3,125,578.20 -
( 150 kg besi + bekisting )
29 Membuat sloof beton bertulang SNI - 6.29b M3 2,846,003.20 -
( 125 kg besi + bekisting )
30 Membuat kolom beton bertulang SNI - 6.30a M3 5,386,108.80 -
( 200 kg besi + bekisting ) -
31 Membuat kolom beton bertulang SNI - 6.32 M3 4,767,623.20 -
( 150 kg besi + bekisting ) -
32 Membuat kolom beton bertulang SNI - 6.32a M3 4,488,048.20 -
( 125 kg besi + bekisting ) -
33 Membuat balok beton bertulang SNI - 6.31 M3 5,110,808.80 -
( 200 kg besi + bekisting ) -
34 Membuat balok beton bertulang SNI - 6.31a M3 4,492,323.20 -
( 150 kg besi + bekisting )
35 Membuat balok beton bertulang SNI - 6.31b M3 4,199,248.20 -
( 125 kg besi + bekisting )
36 Membuat dinding beton bertulang SNI - 6.33 M3 4,637,023.20 -
( 150 kg besi + bekisting )
37 Membuat dinding beton bertulang SNI - 6.34 M3 4,754,117.80 -
( 200 kg besi + bekisting )
38 Membuat tangga beton bertulang SNI - 6.44 M3 4,778,643.00 -
( 200 kg besi + bekisting )
39 Membuat tangga beton bertulang SNI - 6.44a M3 4,219,493.00 -
( 150 kg besi + bekisting )
40 Membuat tangga beton bertulang SNI - 6.44b M3 3,939,918.00 -
( 125 kg besi + bekisting )
41 Membuat kolom beton bertulang praktis (11x11)cm SNI - 6.35 M' 61,045.10 -
42 Membuat balok beton bertulang praktis (10x15)cm SNI - 6.36 M' 80,819.30 - -

E PEKERJAAN PINTU DAN JENDELA


1 Pas. Kusen pintu dan jendela kayu jati klas B/plitur SNI - 6.1 M3 24,683,160.00 -
2 Pas. Kusen pintu dan jendela kayu jati klas C/cat SNI - 6.1a M3 18,333,410.00 -
3 Pas. Kusen pintu dan jendela kayu kamfer SNI - 6.2 M3 12,701,930.00 -
4 Pas. Jalusi Kusen kayu Kamfer SNI - 6.10 M2 757,388.00 -
5 Pas. Pintu panel kayu jati klas plitur SNI - 6.5 M2 1,083,530.00 -
6 Pas. Pintu panel kayu jati klas cat SNI - 6.5a M2 852,630.00 -
7 Pas. Pintu panel kayu kamfer SNI - 6.5b M2 882,230.00 -
8 Pas. Pintu dan jendela kaca rangka kayu jati klas plit SNI - 6.6 M2 698,414.00 -
9 Pas. Pintu dan jendela kaca rangka kayu jati klas cat SNI - 6.6a M2 559,874.00 -
10 Pas. Pintu dan jendela kaca rangka kayu kamfer SNI - 6.6b M2 435,074.00 -
11 Pas. Pintu dan jendela jalusi kayu jati klas plitur SNI - 6.7 M2 1,584,470.00 -
12 Pas. Pintu dan jendela jalusi kayu jati klas cat SNI - 6.7a M2 1,215,030.00 -
13 Pas. Pintu dan jendela jalusi kayu kamfer SNI - 6.7b M2 882,230.00 -
14 Pas. pintu plywood rangkap rangka kayu jati klas cat SNI - 6.9a M2 653,344.00 -
15 Pas. pintu plywood rangkap rangka kayu kamfer SNI - 6.9b M2 520,224.00 -
16 Pas. pintu teakwood rangkap rangka kayu jati klas pli SNI - 6.11 M2 813,236.50 -
17 Pas. pintu teakwood rangkap rangka kayu kamfer SNI - 6.11b M2 538,924.00 -
18 Pas. Engsel pintu (engsel H besar) SNI - 6.5 Bh 25,335.00 -
19 Pas. Engsel jendela (engsel H kecil) SNI - 6.6 Bh 17,440.00 -
20 Pas. Engsel pintu (engsel kuningan besar) SNI - 6.5a Bh 83,085.00 -
21 Pas. Engsel jendela (engsel kuningan kecil) SNI - 6.6a Bh 61,440.00 -
22 Pas. Kait angin kuningan SNI - 6.9 Bh 26,435.00 -
23 Pas. Grendel SNI - 6.9a Bh 20,935.00 -
24 Pas. Kunci selot SNI - 6.11 Bh 123,760.00 -
25 Pas. Kaca bening tb. 3 mm SNI - 6.16 M2 92,985.00 -
26 Pas. Kaca bening tb. 5 mm SNI - 6.17 M2 109,485.00 -
27 Pas. Kaca rayband tb. 3 mm SNI - 6.16a M2 99,420.00 -
28 Pas. Kaca rayband tb. 5 mm SNI - 6.17a M2 115,150.00 -
29 Pas. rangka dinding (60 x 120)cm, kayu kamfer SNI - 6.23 M2 300,272.00 -
30 Pas. dinding teakwood rangkap, rangka kayu kamfer SNI - 6.24 M2 400,764.00 -
31 Pas. dinding plywood rangkap, rangka kayu kamfer SNI - 6.25 M2 377,114.00 -
32 Pas. Pintu rolling door besi Taksir M2 322,000.00 - -
33 Pas. Pintu rolling door alumunium Taksir M2 443,000.00 - -
34 Pas. Pintu folding gate besi Taksir M2 571,000.00 -
35 Pas. Pintu folding gate alumunium Taksir M2 922,000.00 -
36 Pas. Kusen alumunium 4" coklat Taksir M1 148,500.00 -
37 Pas. Kusen alumunium 4" silver Taksir M1 120,800.00 -
38 Pas. Daun pintu rangka aluminium coklat panil kaca ( Taksir Unit 1,144,000.00 -
39 Pas. Daun pintu rangka aluminium silver panil kaca ( Taksir Unit 1,012,000.00 -
40 Pas. Set pintu KM/WC alumunium Taksir Unit 798,600.00 -

F PEKERJAAN KAYU / ATAP


1 Pas. Konstruksi kuda-kuda kayu bengkirai SNI - 6.13 M3 12,170,920.00 -
2 Pas. Konstruksi kuda-kuda kayu kruing SNI - 6.13b M3 9,699,220.00 -
3 Pas. Konstruksi gording kayu bengkirai SNI - 6.15 M3 11,745,552.00 -
4 Pas. Rangka atap genteng keramik kayu bengkirai SNI - 6.32 M2 132,126.00 -
5 Pas. Rangka atap genteng keramik kayu kamfer SNI - 6.31 M2 125,526.00 -
6 Pas. Rangka atap genteng beton kayu bengkirai SNI - 6.35 M2 151,926.00 -
7 Pas. Rangka atap asbes/seng gelombang kayu kamf SNI - 6.31a M2 82,958.00 -
8 Pas. Lisplank (2x20) cm kayu jati klas B/plitur F. 21c M' 113,488.00 -
9 Pas. Lisplank (2x20) cm kayu jati klas C/cat F. 21d M' 85,780.00 -
10 Pas. Lisplank (2x20) cm kayu kamfer F. 21b M' 60,820.00 -
11 Pas. Atap genteng sokka SNI - 6.1 M2 61,743.80 -
12 Pas. Atap genteng Lokal SNI - 6.1a M2 36,743.80 -
13 Pas. Atap genteng Morando SNI - 6.1b M2 83,743.80 -
14 Pas. Atap genteng beton lokal SNI - 6.30 M2 58,416.00 -
15 Pas. Genteng bubung sokka SNI - 6.4 M' 75,472.00 -
16 Pas. Genteng bubung lokal SNI - 6.4a M' 69,472.00 -
17 Pas. Genteng bubung Morando SNI - 6.4b M' 75,472.00 -
18 Pas. genteng bubung beton SNI - 6.34 M' 67,472.00 -
19 Pas. Atap asbes gelombang besar pj. 3m SNI - 6.8 M2 79,995.80 -
20 Pas. Atap asbes gelombang kecil pj. 3m SNI - 6.10 M2 62,037.20 -
21 Pas. Nok stel gelombang besar SNI - 6.23 M' 175,110.40 -
22 Pas. Nok stel gelombang kecil SNI - 6.24 M' 109,715.40 -
23 Pas. Atap seng gelombang p. 3,0 m SNI - 6.38 M2 69,669.60 -
24 Pas. Nok atap seng SNI - 6.39 M1 25,548.80 -
25 Pas. Kolom/Rangka atap baja profil SNI - 6.2 Kg 21,595.60 -
26 Pas. Talang datar seng BJLS 30, dudukan bengkirai SNI - 6.18 M' 169,745.00 -
27 Pas. Talang datar seng BJLS 31=0, dudukan kamfer SNI - 6.18a M' 160,945.00 -
28 Pas. Rangka langit-langit (100 x100) cm kamfer SNI - 6.39 M2 136,850.00 -
29 Pas. Rangka langit-langit (100x100) cm kruing SNI - 6.40 M2 116,486.00 -
30 Pas. Rangka langit-langit (60x60) cm kruing SNI - 6.20 M2 157,181.90 -
31 Pas. Langit-langit eternit ( 1x1) m SNI - 6.1 M2 20,057.20 -
32 Pas. Langit-langit tripleks ( 120 x 240 cm ) SNI - 6.5 M2 36,276.00 -
33 Pas. Langit-langit lambriziring jati, tebal 9 mm SNI - 6.6 M2 401,845.50 -
34 Pas. Langit-langit gypsum (120cm x 240cm x 9mm) SNI - 6.7 M2 40,709.00 -
35 Pas. Langit-langit kalsiboard (120cm x 240cm x 3,5m SNI - 6.7a M2 36,705.00 -
36 Pas. list langit-langit kayu profil SNI - 6.9 M1 14,350.50 - -

G PEKERJAAN CAT-CATAN DAN LAIN-LAIN


1 Pengecatan bidang kayu lama SNI - 6.7 M2 31,167.00 -
2 Pengecatan bidang kayu baru 2 lapis SNI - 6.8 M2 38,049.60 -
3 Pengecatan bidang kayu baru 3 lapis SNI - 6.9 M2 48,518.40 -
4 Pengecatan tembok baru SNI - 6.14 M2 16,554.48 -
5 Pengecatan tembok eksterior (weather shield) SNI - 6.14b M2 38,087.75 -
6 Pengecatan tembok lama SNI - 6.15 M2 11,540.32 -
7 Pengecatan baja dengan meni besi SNI - 6.20 M2 17,100.00 -
8 Pasang kloset jongkok SNI - 6.2a Unit 234,100.00 -
9 Pasang kloset duduk lengkap dgn shower be dead " Taksir Unit 2,860,000.00 -
10 Pasang set wastafel lengkap Taksir Unit 750,900.00
11 Pasang kran air dia 1/2" atau 3/4" SNI - 6.35 Unit 27,058.75 -
12 Pas. Septictank dan peresapan Taksir Unit 4,000,000.00 - -

JUMLAH 9,525,032.79
PPN 9,525,032.79
JUMLAH TOTAL 9,525,032.79

TERBILANG :

Klaten, Tgl.
Plt. Kepala Dinas Perumahan Kepala Bidang Kawasan Permukiman Plt. Ka Sie Perencanaan dan Evaluasi
Dan Kawasan Permukiman dan Tata Bangunan Bidang Kawasan Permukiman
Kabupaten Klaten DISPERWASKIM Kabupaten Klaten dan Tata Bangunan
DISPERWASKIM Kabupaten Klaten

Ir. BAMBANG EKO SUSILO Ir. H. AHMAD WAHYUDI, MM. ZULI PURWAHANDAKA, ST., MT.
Pembina Tingkat I Pembina Tingkat I NIP. 19780707 200604 1 008
NIP. 19650531 199203 1 008 NIP. 19610801 199008 1 001

per 28 januari 2017


0.888889