8 cm
8 cm 25 cm
15 cm
35 cm 3,75 cm
3,5 cm
0,5 cm
8 cm E F 25 cm
A B
15 cm C
D
35 cm
Tan a = DF
DE
Tan a = 3,75
3,5
A = tan-1 3,75
3,5
A = 46,97
A = 46058’
FED = FAG
Tan FED = Tan FAG
TAN (3,75) = (3,75 + DG)
(3,5) (4)
1,071 = 3,75 + DG
4
4,284 = 3,75 + DG
DG = 0,534 m
DG = 0,5 m
GF = DF + DG
= 3,75 + 0,5
= 4,25 m
90 cm 25 cm
530 50 cm 75 cm
D2 D1
X1 T2 = 78
X2 T1 = 90 cm
900 11 cm
11cm B C 370
B
C 530
T1 = 90 cm
T2 = T1 – 12 cm
= 90 – 12
= 78 cm
Cos 370 = 12
B
0,8 = 12
B
B = 15
C2 = B2 – 122
C2 = 152 – 122
C = 9
X2 = X1 – 2 ( C )
= 75 – 2 ( 9 )
= 57
Sin 530 = T2
D2
0,8 = 78
D2
D2 = 97,5 cm
Sin 530 = T1
D1
0,8 = 90
D1
D1 = 112,5
Luas trapesium 1 = D1 + D2 x 12
2
= 112,5 + 97,5 x 12
2
= 1260 cm2
Luas trapesium 2 = x1 + x2 x 12
2
= 75 + 57 x 12
2
= 792 cm2
Luas total = 2 x luas trapesium 1 + luas trapesium 2
= 2 x 1260 + 792
= 3312 cm2
= 0,3312 m2
Panjang total = 50 + 80 + 25 + 75
= 230 m
Volume beton = Panjang x luas
= 230 m2 x 0,3312 m2
= 76,176 m3
Volume baton yang diperluka yaitu 76,176 m3