Anda di halaman 1dari 108

Perencanaan Geometrik Jalan

MUHLIS NGAJI
215 190 010

1 DAFTAR TINGGI TANAH


DAFTAR TINGGI TANAH

JARAK KEMIRINGAN
NO. STA JARAK PATOK ELEVASI BEDA TINGGI KET
LANGSUNG (%)

PA 0 94.00
100 -1.625 -1.625
1 100 92
100 -0.375 -0.375
2 200 92
100 0.2 0.2
3 300 92.2
100 -1.2 -1.2
4 400 91
100 -0.9 -0.9
5 500 90.10
50 0.4 0.4
6 550 90.50
50 -0.22 -0.22
7 600 90.28
50 0 0
8 650 90.28
100 -0.2 -0.2
9 750 90.8
100 -0.92 -0.92
10 850 89.16
100 0.44 0.44
11 950 89.60
100 -0.44 -0.44
12 1050 89.16
100 -0.77 -0.77
PB 1150 89.09
100 0.11 0.11
13 1250 89.2
100 0.24 0.24
14 1350 89.44
100 0.56 0.56
15 1450 90.00
100 -0.75 -0.75
16 1550 89.25
50 -0.75 -0.75
17 1600 89.15
50 -0.35 0.35
18 1650 89.5
50 0.3 0.30
19 1700 89.8
100 -0.3 -0.3
20 1800 89.5
100
-0.4 -0.4
21 1900 89.1

Page 1
Perencanaan Geometrik Jalan
MUHLIS NGAJI
215 190 010

100 -1.1 -1.1


22 2000 88.00
100 -0.13 -0.13
PC 2100 87.87

Page 2
Perencanaan Geometrik Jalan
MUHLIS NGAJI
215 190 010

Page 3
Perencanaan Geometrik Jalan
MUHLIS NGAJI
215 190 010

Page 4
Perencanaan Geometrik Jalan
MUHLIS NGAJI
215 190 010

2. KLASIFIKASI MEDAN
ADA 3 KLASIFIKASI MEDAN ANTARA LAIN :

a. Daerah datar dengan kemiringan maksimum : 0.00 % - 9.90%

b. Daerah bukit dengan kemiringan maksimum : 10.00 % - 24.9%

c. Daerah gunung dengan kemiringan maksimum : 25.00 % - Keatas

Kota A dan kota B

ketinggian kota A = 94.00 m

ketinggian kota B = 0.00 m

jarak kota A - B = 2100 m

94.00 - 0.00
kemiringan medan = X 100%
2100

= 4.48 %

Kota B dan kota C

ketinggian kota B = 0.00 m

ketinggian kota C = 0.00 m

jarak kota B - C = 810 m

kemiringan medan 0.0 - 0.0


= X 100%
810

= 0.00 %

maka klasifikasi kedua daerah ini adalah :

- Kota A dan kota B termasuk daerah datar

- Kota B dan kota C termasuk daerah datar

Page 5
Perencanaan Geometrik Jalan
MUHLIS NGAJI
215 190 010

3. PERHITUNGAN PANJANG BUSUR


Panjang busur tikungan adalah :

A. Tikungan I

Panjang busur antara P2-P5

R = 120 m
D = 70 0

maka : D
LC = x 2P x R
360

70 x
= 6.28 x 120
360

= 147 m

B. Tikungan II

Panjang busur antara P16- P21

R = 180 m
D = 80.5 0

maka : D
LC = x 2P x R
360

80.5
= x 6.28 x 180
360

= 253 m

C. Tikungan III

Panjang busur antara P25-P30

R = 250 m
D = 60 0

maka : D
LC = x 2P x R
360

60
= x 6.28 x 250
360

= 262 m

Page 6
Perencanaan Geometrik Jalan
MUHLIS NGAJI
215 190 010

4. MENCARI KECEPATAN PADA TIKUNGAN


Fm = -0.000625 VR + 0.19

VR2
R =
127 (e+Fm)

Dimana e= kemiringan elevasi jalan yaitu 10 % atau 9,9%

VR2 = R x 127 (e+Fm)

Km/Jam 30 40 60 80 100 120

Fm 0.17125 0.165 0.1525 0.14 0.115 0.10

5. PENENTUAN TRASE

Dari perhitungan klasifikasi medan didapat :

A- B = 4.48 % Berarti daerah ini termasuk datar

B-C = - % Daerah ini datar

Batas besaran R minimum Indonesia ditetapkan oleh Bina Marga


sebagai berikut :
Jari-jari lengkung dengan
Kecepatan Rencana (Km/Jam)
emaks = 10 %
120 600
100 370
90 280
80 210
60 115
50 80
40 50
30 30
20 15

Pada medan datar Rminimum = 210 m

emax = 10%

VR = 80 km/jam

Page 7
Perencanaan Geometrik Jalan
MUHLIS NGAJI
215 190 010

5. DAFTAR KECEPATAN RENCANA


DATAR BUKIT GUNUNG

80 Km/Jam 60 Km/Jam 40 Km/Jam

Kecepatan pada tikungan I dari patok 3-6


DIK. R = 120 m

VR = 80 km/jam

Fm = 0.14

e = 10%
Maka :
V2 = 120 x 127 ( 0.14 + 0.10 )

= 3657.6

V = 60.48 km/jam

Kecepatan pada tikungan II dari patok 16-19


DIK. R = 180 m

VR = 80 km/jam

Fm = 0.153

e = 10%
Maka:
V2 = 180 x 127 ( 0.15 + 0.10 )

= 5772.15

V = 75.97 km/jam

Kecepatan pada tikungan III dari patok 28-34


DIK. R = 250 m

VR = 80 km/jam

Fm = 0.153

e = 10%
Maka :
V2 = 250 x 127 ( 0.15 + 0.10 )

= 8016.875

V = 89.54 km/jam

Page 8
7 PERHITUNGAN SUPERELEVASI

RUMUS V R2
E =
127 x R x Fm x 100 %

Dimana:
E = Superelevasi
Vt = Kecepatan
R = Jari-jari tikungan
Fm = Koefisien (konstanta)

a. Tikungan I
Kecepatan pada tikungan I &II di dapatkan 95,62 Km/Jam Jadi Fm =……….?
dicari dengan cara Interpolasi karena kecepatan yang didapatkan tidak ada dalam tabel :

FM = 80 x1 0.14 y1
60.48 x2 …… y2
100 x3 0.115 y3
x2 - x1 y2 - y1
=
x3 - x1 y3 - y1
60.4781 - 80 y2 - 0.14
=
100 - 80 0.115 - 0.14
-19.52 y2 - 0.14
=
20 -0.03
-0.976 y2 - 0.14
=
-0.03
0.0244 = y2 - 0.14
0.0244 + 0.14 = y2
0.1644 = y2
y2 = 0.1644
Diketahui :
Vt = 60.48 km/jam
Fm = 0.164
R = 120 m

Maka :
V t2
E =
127 x R x Fm x 100%

60.48 2
=
127 x 120 x 0.16440 x 100%

= 1.4598
b. Tikungan II

Diketahui :
Vt = 75.97 km/jam
Fm = 0.164
R = 180 m

FM = 80 x1 0.15 y1
75.97 x2 …… y2
100 x3 0.115 y3
x2 - x1 y2 - y1
=
x3 - x1 y3 - y1
75.97467 - 80 y2 - 0.15
=
100 - 80 0.115 - 0.15
-4.03 y2 - 0.15
=
20 -0.04
-0.201 y2 - 0.15
=
-0.04
0.0075 = y2 - 0.1525
0.0075 + 0.15 = y2
0.1600 = y2
y2 = 0.1600

Maka :
V t2
E =
127 x R x Fm x 100%

75.97 2
=
127 x 180 x 0.160 x 100%

= 1.5777
c. Tikungan III

Diketahui :
Vt = 89.54 km/jam
Fm = 0.164
R = 250 m

FM = 80 x1 0.15 y1
89.54 x2 …… y2
100 x3 0.115 y3
x2 - x1 y2 - y1
=
x3 - x1 y3 - y1
89.54 - 80 y2 - 0.15
=
100 - 80 0.115 - 0.15
9.54 y2 - 0.15
=
20 -0.04
0.477 y2 - 0.15
=
-0.04
-0.0179 = y2 - 0.1525
-0.0179 + 0.15 = y2
0.1346 = y2
y2 = 0.1346

Maka :
E = V t2
127 x R x Fm x 100%

= 89.54 2
127 x 250 x 0.135 x 100%

= 1.8757
8 PERHITUNGAN LENGKUNG PERALIHAN
a. Tikungan I
Diketahui : R = 120 m
D = 70 0
VR = 80 km/jam
Dengan S-S
Syarat : 1 1
q = D Tt = ( R + P ) x tan D x k
2 2
qs x R
Ls =
28.648 ( R + P )
Et = - Rc
Lc = 2 x Ls cos 1
D
P = Ls x P* 2
k = Ls x k*

Syarat pemakaian :
1 1 0
q = D = 70 = 35
2 2

qs x R 35 x 120
Ls = = = 146.607 m
28.648 28.648

Lc = 2 x Ls = 2 x 146.607 = 293.214 m
Dari tabel J. Barnett : Jadi :
q = 35 0 P = P* x Ls
P* = 0.0555956 = 0.05559557 x 146.607
k* = 0.4932057 = 8.151

k = k* x Ls
= 0.4932057 x 146.607
= 72.307

1
Tt = ( R + P ) x tan D + k
2
1
= ( 120 + 8.151 ) x tan 70 + 72.31
2
= 128.15 x 0.700 + 72.31
= 162.04

( R + P ) ( 120 + 8.151 )
Et = - R = - 120
1 1
cos D cos 70
2 2
128.151
= - 120
0.8191520443
= 36.4431

Kontrol denga2 Ls < 2 Tt = 2 x 146.6 < 2 x 162.040


= 293.214 < 324.079
= oke !!!!
b. Tikungan II
Diketahui : R = 180 m
D = 80.5 0
VR = 80 km/jam
Dengan S-S
Syarat : 1 1
q = D Tt = ( R + P ) x tan D x k
2 2
qs x R ( R + P )
Ls = Et = - Rc
28.648 1
cos D
Lc = 2 x Ls 2
P = Ls x P*
k = Ls x k*

Syarat pemakaian :

1 1 o
q = D = 80.50 = 40.3
2 2

qs x R 40.25 x 180 m
Ls = = = 252.897
28.648 28.648

Lc = 2 x Ls = 505.7945 m

Dari tabel J. Barnett : Jadi :


q = 40 0 P = P* x Ls
P* = 0.0651522 = 0.0651522 x 252.89723541
k* = 0.4908985 = 16.4768

k = k* x Ls
= 0.4908985 x 252.89723541
= 124.1469

1
Tt = ( R + P ) x tan D + k
2
1
= ( 180 + 16.477 ) x tan 60 + 124.147
2
= 196.48 x 0.577 + 124.15
= 237.5828
( R + P ) ( 180 + 16.4768 )
Et = - R = - 180
1 D 1
cos cos 80.50
2 2
196.4768
= - 180
0.7632325
= 77.4272

Kontrol dengan :2 Ls< 2 Tt = 2 x 252.9 < 2 x 237.5828


= 505.7945 < 475.1656267749
= oke !!!!
c. Tikungan III
Diketahui :
R = 250 m
D = 60 0
VR = 80 km/jam

Dengan S-S

Syarat :
q = 1 D
2
Ls = qs x R
28.648
Lc = 2 x Ls
P = Ls x P*
k = Ls x k*

Tt = ( R + P ) x tan 1
D x k
2
Et = ( R + P)
- Rc
1
cos D
2
Syarat pemakaian :

q = 1 D = 1 60 = 30.0 o
2 2

qs x R 30 x 250
Ls = = = 261.798 m
28.648 28.648

Lc = 2 x Ls = 523.5968 m

Dari tabel J. Barnett :


q = 30 0 Jadi :
P* = 0.0465966 P = P* x Ls
k* = 0.4951196 = 0.0465966 x 261.79838
= 12.1989

k = k* x Ls
= 0.4951196 x 261.79838
= 129.6215

Tt = ( R + P ) x 1 D k
tan +
2
= ( 250 + 12.199 ) x 1
tan 60 + 129.622
2
= 262.20 x 0.577 + 129.62
= 281.0021
Et = ( R + P) ( 250 + 12.1989 )
- R = - 250
cos 1 D cos 1 60
2 2
262.1989
= - 250
0.8660254

= 52.7612
Kontrol dengan : 2 Ls < 2 Tt = 2 x 261.8 < 2 x 281.0021
= 523.5968 < 562.004246

= oke !!!!
0
9 PERHITUNGAN KEMIRINGAN MELINTANG

a. Tikungan I
Diketahui : R = 120 m
D = 70 0
VR = 80 km/jam
S - S (Spiral-Spiral)
Dipakai e = 10%
b. Tikungan II
Diketahui : R = 180 m
D = 80.5 0
VR = 80 km/jam
S - S (Spiral-Spiral)
Dipakai e = 10%
c. Tikungan III
Diketahui : R = 250 m
D = 60 0
VR = 80 km/jam

S - S (Spiral-Spiral)
Dipakai e = 10%
d. Tikungan IV
Diketahui : R = 0m
D = 00
VR = 80 km/jam
S - S (Spiral-Spiral)
Dipakai e = 10%

10 PERHITUNGAN JARAK PANDANG BEBAS (MENYIAP)

RUMUS
dm = d1 + d2 + d3 + d4

dm = Jarak pandang menyiap

d1 = Jarak yang ditempuh selama kendaraan menyiap :

d2 = Jarak yang ditempuh kendaraan menyiap selama jalur kanan

d3 = Jarak antara kendaraan yang menyiap dengan lendaraan yang datang

d4 = Jarak yang ditempuh untuk kendaraan yag menyiap

m = Perbedaan kecepatan ( 15 km/jam )


a = Percepatan rata-rata
maka :
d1 = 0.278 t1 ( V - m + a t1 )
2

d2 = 0.278 V t2

d3 = diambil 30 - 100 m

d4 = 2/3 . d2

maka :
d1 a t1
= 0.278 t1 ( V - m + )
2

d2 = 0.278 V t2

d3 = diambil 30 - 100 m

d4 = 2/3 . d2

a = 2.052 + ( 0.0036 x 80 )

= 2.34 km/jam2

Vm = VR + m

= 80 + 15

= 95 km/jam
t1 = 2.12 + 0.026 x VR
= 2.12 + 0.026 x 80 = 4.2
t2 = 6.56 + 0.048 x VR
= 6.56 + 0.048 x 80 = 10.4
Sehingga :
d1 a t1
= 0.278 t1 ( V - m + )
2
= 87.369 m

d2 = 0.278 V . t2

= 231.296 m

d3 = 55 m

VR 50-65 65-80 80-95 95-110

d3 30 55 75 90

d4 = 2/3 d2
= 2/3 231.296
= 154.20 m

Jadi :
dm = d1 + d2 + d3 + d4

dm = 87.369 + 231.296 + 55 + 154.20


= 527.8625 m
C00000Perencanaan Geometrik Jalan
MUHLIS NGAJI
215 190 010
### PERHITUNGAN JARAK PANDANG HENTI

RUMUS :

dh = dp + dr

Dimana :

dh = Jarak yang ditempuh kendaraan dari waktu melihat benda


dimana harus berhenti sampai mengijak rem
dp = 0.278 x VR x tR
VR = Kecepatan
tR = Waktu berhenti ( 2.5 sekon )

Rumus untuk jalan mendaki dan menurun :

VR2
dr =
254 ( fm + L )

Dimana :

VR = Kecepatan rencana (km/jam)


fm = Koefisien gesek maksimum
L = kelandaian (12 % = 0,12)

a. Untuk Jalan datar

VR = 80 km/jam
dp = 0.278 x 80 x 2.5
= 55.6 m

VR2
dr =
254 fm

80 2
=
254 0.1525
= 165.23 m
C00000Perencanaan Geometrik Jalan
MUHLIS NGAJI
215 190 010
b. Untuk Jalan Mendaki (+)

VR = 80 km/jam
dp = 0.278 x 80 x 2.5
= 55.6 m

VR2
dr =
254 ( fm + L )

80 2
=
254 ( 0.1525 + 0.12 )

= 92.466 m

Jadi :
dh = dp + dr

= 55.6 + 92.4655

= 148.066 m

c. Untuk Jalan menurun (-)

VR = 80 km/jam
dp = 0.278 x 80 x 2.5
= 55.6 m

VR2
dr =
254 ( fm - L )

80 2
=
254 ( 0.1525 - 0.12 )

= 775.29 m

Jadi :
dh = dp + dr

= 55.6 + 775.29
= 830.888 m
12 PERHITUNGAN PELEBARAN JALAN

RUMUS :

B = n ( b' + c ) + ( n - 1 ) Td + 2

dimana :
B = Lebar perkerasan pada hitungan
n = Jumlah jalur lalu lintas
b' = Lebar lintasan pada tikungan
Td = Lebar melintang akibat tanjakan depan (m)
Z = Lebar tambahan akibat kalainan dalam mengemudi

c = Kebebasan samping ( 0.8 )

Untuk : b' = 2.4 + ( R - R2 - P2 )

Td = R2 + A ( 2P + A ) - R

0.105 x VR
Z =
R
dimana :

R = Jari-jari tikungan
P = Jarak ban muka dan ban belakang ( 6.100 )
A = Jarak ujung mobil dan ban depan ( 1.2 )
VR = Kecepatan rencana

Rumus pelebaran :

W = B - L W = Pelebaran
B = Lebar total
L = Lebar badan jalan

Syarat I

Bila B < 7 tidak perlu pelebaran


Bila B > 7 Perlu pelebaran
a. Tikungan I

R = 120 m
VR = 80 km/jam

b' = 2.4 + ( R - R2 - P2 )

= 2.4 + ( 120 - 120 2 - 6.100 2 )

= 2.4 + ( 120 - 119.84 )

= 2.5551 m

Td = R2 + A ( 2P + A ) - R

= 120 2 + 1.20 ( ( 2 x 6.1 ) + 1.2 ) - 120

= 120.06698 - 120

= 0.0670 m

0.105 x VR
Z =
R

0.105 x 80
=
120
8.4
=
10.9545

= 0.7668

Maka :
B = n ( b' + c ) + ( n - 1 ) Td + Z
= 2( 2.55514 + 0.8 ) + ( 2 - 1 ) x 0.067 + 0.7668
= 6.7102839 + 0.0669813063 + 0.76681
= 7.5441 m > 7 (perlu pelebaran)
b. Tikungan II

R = 180 m
VR = 80 km/jam

b' = 2.4 + ( R - R2 - P2 )

= 2.4 + ( 180 - 180 2 - 6.100 2 )

= 2.4 + ( 180 - 179.9 )

= 2.503 m

Td = R2 + A ( 2P + A ) - R

= 180 2 + 1.2 ( ( 2x 6.1 ) + 1.2 ) - 180

= 180.0447 - 180

= 0.0447 m

0.105 x VR
Z =
R

0.105 x 80
=
180
8.4
=
13.4164

= 0.6261

Maka :
B = n ( b' + c ) + ( n - 1 ) Td + Z
= 2( 2.50339 + 0.8 ) + ( 2 - 1 ) x 0.04466 + 0.6261
= 6.6067816092 + 0.0446611261 + 0.62610
7.2775 m > 7 (perlu pelebaran)
c. Tikungan III

R = 250 m
VR = 80 km/jam

b' = 2.4 + ( R - R2 - P2 )

= 2.4 + ( 250 - 250 2 - 0.000 2 )

= 2.4 + ( 250 - 250 )

= 2.400 m

Td = R2 + A ( 2P + A ) - R

= 250 2 + 1.2 ( ( 2x 0.0 ) + 1.2 ) - 250

= 250.00288 - 250

= 0.0029 m

0.105 x VR
Z =
R

0.105 x 80
=
250
8.4
=
15.8114

= 0.5313

Maka :
B = n ( b' + c ) + ( n - 1 ) Td + Z
= 2( 2.40000 + 0.8 ) + ( 2 - 1 ) x 0.00288 + 0.5313
= 6.4 + 0.0028799834 + 0.53126
6.9341 m > 7 (tidak perlu pelebaran)
d. Tikungan Iv

R= 0 m
VR= 80 km/jam

b' = 2.4 + ( R - R2 - P2 )

= 2.4 + ( 0 - 0 2 - 0.000 2 )

= 2.4 + ( 0 - 0 )

= 2.400 m

Td = R2 + A ( 2P + A ) - R

= 0 2 + 1.2 ( ( 2x 0.0 ) + 1.2

= 1.2 - 0

= 1.2000 m

0.105 x VR
Z =
R

0.105 x 80
=
0
8.4
=
0.0000

= #DIV/0!

Maka :
B = n ( b' + c ) + ( n - 1 ) Td + Z
0.5313 = 2( 2.40000 + 0.8 ) + ( 2 - 1 ) x 1.20000
= 6.4 + 1.2 + #DIV/0!
#DIV/0! m > 7 (tidak perlu pelebaran)
) - 0

1.20000 + #DIV/0!
#DIV/0!
PERHITUNGAN ALINEMEN VERTIKAL

A. ALINEMEN VERTIKAL PA (STA 0 + 000)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.0
G2 = -1.63

Jadi A = 0 - -1.625
= 1.625

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 91.5 = 91.5 m
Station = 0 + 0.000 = 0 m

Berdasarkan grafik V maka :


LV = 60
EV = A x LV 1.625 x 60
=
800 800
= 0.1219

Peninjauan titik
1
Misalnya X = LV
4
1
= 60
4
= 15

Y = A . X2 1.625 x 15 2
=
= 200.LV 200 x 60
= 0.030

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 15 30
Y 0.030 0.1219

Sta PLV = Sta PV1 - 1/2LV


= 0 - 30
= -30

Elevasi = Elevasi PV1 - ( G1% x 1/2LV )


= 91.5 - ( 0 x 30 )
= 91.5 - 0
= 91.50

Sta 1/4 LV = Sta PLV + 1/4 LV


= -30 + 15
= -15 meter
G. ALINEMEN VERTIKAL P6 (STA 0 + 550)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.4
G2 = -0.22

Jadi A = A = 0.4 - -0.22


= 0.62

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 90.50 = 90.50 m
Station = 0 + 550 = 550 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0.62 x 48
800 800
= 0.04

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12.0

Y = A . X2 = 0.62 x 12.0 2
200.LV 200 x 48
= 0.009

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.009 0.04

Sta PLV = Sta PV2 - 1/2LV


= 550 - 24
= 526

Elevasi = Elevasi PV2 - ( G1% x 1/2LV )


= 90.5 - ( 0.004 x 24 )
= 90.5 - 0.096
= 90

Sta 1/4 LV = Sta PLV + 1/4 LV


= 526.0 + 12.0
= 538 meter
M. ALINEMEN VERTIKAL P12 (STA 1 + 300)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -0.44
G2 = -0.77

Jadi A = A = -0.44 - -0.77


= 0.33

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 89.16 = 89.16 m
Station = 1 + 50 = 1050 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0.33 x 48
800 800
= 0.02

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12.0

Y = A . X2 = 0.33 x 12.0 2
200.LV 200 x 48
= 0.005

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.005 0.02

Sta PLV = Sta PV2 - 1/2LV


= 1050 - 24
= 1026

Elevasi = Elevasi PV2 - ( G1% x 1/2LV )


= 89.16 - ( -0.0044 x 24 )
= 89.16 - -0.1056
= 89

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1026.0 + 12.0
= 1038 meter
S. ALINEMEN VERTIKAL P17 (STA 2 + 150)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -0.75
G2 = 0.35

Jadi A = A = -0.75 - 0.35


= -1.1

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 89.25 = 89.25 m
Station = 1 + 550 = 1550 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -1.1 x 48
800 800
= -0.07

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12.0

Y = A . X2 = -1.1 x 12.0 2
200.LV 200 x 48
= -0.017

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.017 -0.07

Sta PLV = Sta PV2 - 1/2LV


= 1550 - 24
= 1526

Elevasi = Elevasi PV2 - ( G1% x 1/2LV )


= 89.25 - ( -0.0075 x 24 )
= 89.25 - -0.18
= 89

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1526.0 + 12.0
= 1538 meter
Y. ALINEMEN VERTIKAL PC (STA 2 + 650)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -0.13
G2 = 0

Jadi A = A = -0.13 - 0
= -0.13

VR = 60 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 88.00 = 88.00 m
Station = 1 + 1000 = 2000 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -0.13 x 48
800 800
= -0.01

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12.0

Y = A . X2 = -0.13 x 12.0 2
200.LV 200 x 48
= -0.002

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.002 -0.01

Sta PLV = Sta PV2 - 1/2LV


= 2000 - 24
= 1976

Elevasi = Elevasi PV2 - ( G1% x 1/2LV )


= 88 - ( -0.0013 x 24 )
= 88 - -0.0312
= 88

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1976.0 + 12.0
= 1988 meter
Elevasi = Elevasi PV1 - ( G1% x 1/4LV ) - Y
= 91.5 - ( 0.00 x 15 ) - 0.030
= 91.5 - 0 - 0.030
= 91.5

Sta PV = 0
Elevasi = Elevasi PV1 - EV
= 91.5 - 0.121875
= 91.38

Sta 3/4 LV = Sta PV1 + 1/4 LV


= 0 + 15
= 15

Elevasi = Elevasi PV1 + ( G2% x 1/4LV ) + Y


= 91.5 + ( -0.02 x 15 ) + 0.030
= 91.5 + -0.2133
= 91.29

Sta PEV = Sta PV1 + 1/2 LV


= 0 + 30
= 30

Elevasi = Elevasi PV1 + ( G2% x 1/2Lv )


= 91.5 + ( -0.02 x 30 )
= 91.5 + -0.4875
= 91.0125
Elevasi = Elevasi PV2 - ( G1% x 1/4LV ) - Y
= 90.5 - ( 0.4 x 12.0 ) - 0.009
= 90.5 - 4.8 - 0.009
= 85.7

Sta PV = 750
Elevasi = Elevasi PV2 - EV
= 90.5 - 0.04
= 90.5

Sta 3/4 LV = Sta PV2 + 1/4 LV


= 550 + 12
= 562.0

Elevasi = Elevasi PV2 + ( G2% x 1/4LV ) + Y


= 90.5 + ( 0.00 x 12 ) + 0.009
= 90.5 + -0.02
= 90

Sta PEV = Sta PV2 + 1/2 LV


= 550 + 24
= 574

Elevasi = Elevasi PV2 + ( G2% x 1/2Lv )


= 90.5 + ( 0.00 x 24 )
= 90.5 + -0.05
= 90
Elevasi = Elevasi PV2 - ( G1% x 1/4LV ) - Y
= 89.16 - ( -0.44 x 12.0 ) - 0.005
= 89.16 - -5 - 0.005
= 94.4

Sta PV = 750
Elevasi = Elevasi PV2 - EV
= 89.16 - 0.02
= 89.1

Sta 3/4 LV = Sta PV2 + 1/4 LV


= 1050 + 12
= 1062.0

Elevasi = Elevasi PV2 + ( G2% x 1/4LV ) + Y


= 89.16 + ( -0.01 x 12 ) + 0.005
= 89.16 + -0.09
= 89

Sta PEV = Sta PV2 + 1/2 LV


= 1050 + 24
= 1074

Elevasi = Elevasi PV2 + ( G2% x 1/2Lv )


= 89.16 + ( -0.01 x 24 )
= 89.16 + -0.18
= 89
Elevasi = Elevasi PV2 - ( G1% x 1/4LV ) - Y
= 89.25 - ( -0.75 x 12.0 ) - -0.017
= 89.25 - -9 - -0.017
= 98.3

Sta PV = 750
Elevasi = Elevasi PV2 - EV
= 89.25 - -0.1
= 89.3

Sta 3/4 LV = Sta PV2 + 1/4 LV


= 1550 + 12
= 1562.0

Elevasi = Elevasi PV2 + ( G2% x 1/4LV ) + Y


= 89.25 + ( 0.00 x 12 ) + -0.017
= 89.25 + 0.025
= 89

Sta PEV = Sta PV2 + 1/2 LV


= 1550 + 24
= 1574

Elevasi = Elevasi PV2 + ( G2% x 1/2Lv )


= 89.25 + ( 0.00 x 24 )
= 89.25 + 0.084
= 89
Elevasi = Elevasi PV2 - ( G1% x 1/4LV ) - Y
= 88 - ( -0.13 x 12.0 ) - -0.002
= 88 - -2 - -0.002
= 89.6

Sta PV = 750
Elevasi = Elevasi PV2 - EV
= 88 - 0
= 88.0

Sta 3/4 LV = Sta PV2 + 1/4 LV


= 2000 + 12
= 2012.0

Elevasi = Elevasi PV2 + ( G2% x 1/4LV ) + Y


= 88 + ( 0.00 x 12 ) + -0.002
= 88 + 0
= 88

Sta PEV = Sta PV2 + 1/2 LV


= 2000 + 24
= 2024

Elevasi = Elevasi PV2 + ( G2% x 1/2Lv )


= 88 + ( 0.00 x 24 )
= 88 + 0
= 88
B. ALINEMEN VERTIKAL P1 (STA 0 + 100)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -1.625
G2 = -0.375

Jadi A = A = -1.625 - -0.375


= -1.25

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 92.00 = 92.00 m
Station = 0 + 100 = 100 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -1.25 x 48
800 800
= -0.08

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 -1.25 x 12.0 ###


=
200.LV 200 x 48
= -0.019

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.019 -0.08

Sta PLV = Sta PV2 - 1/2LV


= 100 - 24
= 76

Elevasi = Elevasi PV2 - ( G1% x 1/2LV )


= 92 - ( -0.0163 x 24 )
= 92 - -0.39
= 92

Sta 1/4 LV = Sta PLV + 1/4 LV


= 76.0 + 12.0
= 88 meter
H. ALINEMEN VERTIKAL P7 (STA 0 + 600)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -0.22
G2 = 0

Jadi A = A = -0.22 - 0
= -0.22

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 90.28 = 90.28 m
Station = 0 + 600 = 600 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -0.22 x 48
800 800
= -0.0132

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12.0

Y = A . X2 = -0.22 x 12.0 2
200.LV 200 x 48
= -0.003

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.003 -0.013

Sta PLV = Sta PV3 - 1/2LV


= 600 - 24
= 576

Elevasi = Elevasi PV3 - ( G1% x 1/2LV )


= 90.28 - ( -0.0022 x 24 )
= 90.28 - -0.0528
= 90

Sta 1/4 LV = Sta PLV + 1/4 LV


= 576.0 + 12.0
= 588 meter
N. ALINEMEN VERTIKAL PB (STA 1 + 400)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -0.77
G2 = 0.11

Jadi A = A = -0.77 - 0.11


= -0.88

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 89.09 = 89.09 m
Station = 1 + 150 = 1150 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -0.88 x 48
800 800
= -0.0528

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12.0

Y = A . X2 = -0.88 x 12.0 2
200.LV 200 x 48
= -0.013

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.013 -0.053

Sta PLV = Sta PV3 - 1/2LV


= 1150 - 24
= 1126

Elevasi = Elevasi PV3 - ( G1% x 1/2LV )


= 89.09 - ( -0.0077 x 24 )
= 89.09 - -0.1848
= 89

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1126.0 + 12.0
= 1138 meter
T. ALINEMEN VERTIKAL P18 (STA 2 + 200)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.35
G2 = 0.30

Jadi A = A = 0.35 - 0.3


= 0.05

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 89.15 = 89.15 m
Station = 1 + 600 = 1600 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0.05 x 48
800 800
= 0.003

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12.0

Y = A . X2 = 0.05 x 12.0 2
200.LV 200 x 48
= 0.001

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.001 0.003

Sta PLV = Sta PV3 - 1/2LV


= 1600 - 24
= 1576

Elevasi = Elevasi PV3 - ( G1% x 1/2LV )


= 89.15 - ( 0.0035 x 24 )
= 89.15 - 0.084
= 89

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1576.0 + 12.0
= 1588 meter
Elevasi = Elevasi PV2 - ( G1% x 1/4LV ) - Y
= 92 - ( -1.625 x 12.0 ) - -0.019
= 92 - -19.5 - -0.019
= 111.5

Sta PV = 750
Elevasi = Elevasi PV2 - EV
= 92 - -0.1
= 92.1

Sta 3/4 LV = Sta PV2 + 1/4 LV


= 100 + 12
= 112.0

Elevasi = Elevasi PV2 + ( G2% x 1/4LV ) + Y


= 92 + ( 0.00 x 12 ) + -0.019
= 92 + -0.0638
= 92

Sta PEV = Sta PV2 + 1/2 LV


= 100 + 24
= 124

Elevasi = Elevasi PV2 + ( G2% x 1/2Lv )


= 92 + ( 0.00 x 24 )
= 92 + -0.09
= 92
Elevasi = Elevasi PV3 - ( G1% x 1/4LV ) - Y
= 90.28 - ( -0.22 x 12.0 ) - -0.003
= 90.28 - -2.6 - -0.003
= 93

Sta PV = 800
Elevasi = Elevasi PV3 - EV
= 90.28 - 0
= 90

Sta 3/4 LV = Sta PV3 + 1/4 LV


= 600 + 12
= 612

Elevasi = Elevasi PV3 + ( G2% x 1/4LV ) + Y


= 90.28 + ( 0.00 x 12 ) + -0.003
= 90.28 + -0.0033
= 90

Sta PEV = Sta PV3 + 1/2 LV


= 600 + 24
= 624

Elevasi = Elevasi PV3 + ( G2% x 1/2LV )


= 90.28 + ( 0.00 x 24 )
= 90.28 + 0
= 90
Elevasi = Elevasi PV3 - ( G1% x 1/4LV ) - Y
= 89.09 - ( -0.77 x 12.0 ) - -0.013
= 89.09 - -9.2 - -0.013
= 98

Sta PV = 800
Elevasi = Elevasi PV3 - EV
= 89.09 - -0.1
= 89

Sta 3/4 LV = Sta PV3 + 1/4 LV


= 1150 + 12
= 1162

Elevasi = Elevasi PV3 + ( G2% x 1/4LV ) + Y


= 89.09 + ( 0.00 x 12 ) + -0.013
= 89.09 + 0
= 89

Sta PEV = Sta PV3 + 1/2 LV


= 1150 + 24
= 1174

Elevasi = Elevasi PV3 + ( G2% x 1/2LV )


= 89.09 + ( 0.00 x 24 )
= 89.09 + 0.0264
= 89
Elevasi = Elevasi PV3 - ( G1% x 1/4LV ) - Y
= 89.15 - ( 0.35 x 12.0 ) - 0.001
= 89.15 - 4.2 - 0.001
= 85

Sta PV = 800
Elevasi = Elevasi PV3 - EV
= 89.15 - 0
= 89

Sta 3/4 LV = Sta PV3 + 1/4 LV


= 1600 + 12
= 1612

Elevasi = Elevasi PV3 + ( G2% x 1/4LV ) + Y


= 89.15 + ( 0.00 x 12 ) + 0.001
= 89.15 + 0.03675
= 89

Sta PEV = Sta PV3 + 1/2 LV


= 1600 + 24
= 1624

Elevasi = Elevasi PV3 + ( G2% x 1/2LV )


= 89.15 + ( 0.00 x 24 )
= 89.15 + 0.072
= 89
C. ALINEMEN VERTIKAL P2 (STA 0 + 200)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -0.375
G2 = 0.2

Jadi A = A = -0.375 - 0.2


= -0.575

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 92.00 = 92.00 m
Station = 0 + 200 = 200 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -0.575 x 48
800 800
= -0.0345

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 -0.575 x 12.0 2
=
200.LV 200 x 48
= -0.009

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.009 -0.035

Sta PLV = Sta PV3 - 1/2LV


= 200 - 24
= 176

Elevasi = Elevasi PV3 - ( G1% x 1/2LV )


= 92 - ( -0.00375 x 24 )
= 92 - -0.09
= 92

Sta 1/4 LV = Sta PLV + 1/4 LV


= 176.0 + 12.0
= 188 meter
I. ALINEMEN VERTIKAL P8 (STA 0 + 650)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0
G2 = -0.2

Jadi A = A = 0 - -0.2
= 0.2

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 90.28 = 90.28 m
Station = 0 + 650 = 650 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0.2 x 48
800 800
= 0.012

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12.0

Y = A . X2 = 0.2 x 12.0 2
200.LV 200 x 48
= 0.003

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.003 0.012

Sta PLV = Sta PV4 - 1/2LV


= 650 - 24
= 626

Elevasi = Elevasi PV4 - ( G1% x 1/2LV )


= 90.28 - ( 0 x 24 )
= 90.28 - 0
= 90

Sta 1/4 LV = Sta PLV + 1/4 LV


= 626.0 + 12.0
= 638 meter
0. ALINEMEN VERTIKAL P13 (STA 1 + 500)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.11
G2 = 0.24

Jadi A = A = 0.11 - 0.24


= -0.13

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 89.09 = 89.09 m
Station = 1 + 250 = 1250 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -0.13 x 48
800 800
= -0.0078

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12.0

Y = A . X2 = -0.13 x 12.0 2
200.LV 200 x 48
= -0.002

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.002 -0.008

Sta PLV = Sta PV4 - 1/2LV


= 1250 - 24
= 1226

Elevasi = Elevasi PV4 - ( G1% x 1/2LV )


= 89.09 - ( 0.0011 x 24 )
= 89.09 - 0.0264
= 89

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1226.0 + 12.0
= 1238 meter
U. ALINEMEN VERTIKAL P19 (STA 2 + 250)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.30
G2 = -0.3

Jadi A = A = 0.3 - -0.3


= 0.6

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 89.50 = 89.50 m
Station = 1 + 650 = 1650 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0.6 x 48
800 800
= 0.036

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12.0

Y = A . X2 = 0.6 x 12.0 2
200.LV 200 x 48
= 0.009

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.009 0.036

Sta PLV = Sta PV4 - 1/2LV


= 1650 - 24
= 1626

Elevasi = Elevasi PV4 - ( G1% x 1/2LV )


= 89.5 - ( 0.003 x 24 )
= 89.5 - 0.072
= 89

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1626.0 + 12.0
= 1638 meter
Elevasi = Elevasi PV3 - ( G1% x 1/4LV ) - Y
= 92 - ( -0.375 x 12.0 ) - -0.009
= 92 - -4.5 - -0.009
= 97

Sta PV = 800
Elevasi = Elevasi PV3 - EV
= 92 - -0.0345
= 92

Sta 3/4 LV = Sta PV3 + 1/4 LV


= 200 + 12
= 212

Elevasi = Elevasi PV3 + ( G2% x 1/4LV ) + Y


= 92 + ( 0.00 x 12 ) + -0.009
= 92 + 0.015
= 92

Sta PEV = Sta PV3 + 1/2 LV


= 200 + 24
= 224

Elevasi = Elevasi PV3 + ( G2% x 1/2LV )


= 92 + ( 0.00 x 24 )
= 92 + 0.048
= 92
Elevasi = Elevasi PV4 - ( G1% x 1/4LV ) - Y
= 90.28 - ( 0 x 12.0 ) - 0.003
= 90.28 - 0 - 0.003
= 90

Sta PV = 850
Elevasi = Elevasi PV4 - EV
= 90.28 - 0.012
= 90

Sta 3/4 LV = Sta PV4 + 1/4 LV


= 650 + 12
= 662

Elevasi = Elevasi PV4 + ( G2% x 1/4LV ) + Y


= 90.28 + ( 0.00 x 12 ) + 0.003
= 90.28 + -0.021
= 90

Sta PEV = Sta PV4 + 1/2 LV


= 650 + 24
= 674

Elevasi = Elevasi PV4 + ( G2% x 1/2LV )


= 90.28 + ( 0.00 x 24 )
= 90.28 + -0.048
= 90.232
Elevasi = Elevasi PV4 - ( G1% x 1/4LV ) - Y
= 89.09 - ( 0.11 x 12.0 ) - -0.002
= 89.09 - 1.32 - -0.002
= 88

Sta PV = 850
Elevasi = Elevasi PV4 - EV
= 89.09 - -0.0078
= 89

Sta 3/4 LV = Sta PV4 + 1/4 LV


= 1250 + 12
= 1262

Elevasi = Elevasi PV4 + ( G2% x 1/4LV ) + Y


= 89.09 + ( 0.00 x 12 ) + -0.002
= 89.09 + 0.027
= 89

Sta PEV = Sta PV4 + 1/2 LV


= 1250 + 24
= 1274

Elevasi = Elevasi PV4 + ( G2% x 1/2LV )


= 89.09 + ( 0.00 x 24 )
= 89.09 + 0.058
= 89.1476
Elevasi = Elevasi PV4 - ( G1% x 1/4LV ) - Y
= 89.5 - ( 0.3 x 12.0 ) - 0.009
= 89.5 - 3.6 - 0.009
= 86

Sta PV = 850
Elevasi = Elevasi PV4 - EV
= 89.5 - 0.036
= 89

Sta 3/4 LV = Sta PV4 + 1/4 LV


= 1650 + 12
= 1662

Elevasi = Elevasi PV4 + ( G2% x 1/4LV ) + Y


= 89.5 + ( 0.00 x 12 ) + 0.009
= 89.5 + -0.027
= 89

Sta PEV = Sta PV4 + 1/2 LV


= 1650 + 24
= 1674

Elevasi = Elevasi PV4 + ( G2% x 1/2LV )


= 89.5 + ( 0.00 x 24 )
= 89.5 + -0.072
= 89.428
D. ALINEMEN VERTIKAL P3 (STA 0 + 300)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.2
G2 = -1.2

Jadi A = A = 0.2 - -1.2


= 1.4

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 92.20 = 92.20 m
Station = 0 + 300 = 300 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 1.4 x 48
800 800
= 0.084

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12.0

Y = A . X2 1.4 x 12.0 2
=
200.LV 200 x 48
= 0.021

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.021 0.084

Sta PLV = Sta PV4 - 1/2LV


= 300 - 24
= 276

Elevasi = Elevasi PV4 - ( G1% x 1/2LV )


= 92.2 - ( 0.002 x 24 )
= 92.2 - 0.048
= 92

Sta 1/4 LV = Sta PLV + 1/4 LV


= 276.0 + 12.0
= 288 meter
J. ALINEMEN VERTIKAL P9 (STA 0 + 750)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -0.2
G2 = -0.92

Jadi A = A = -0.2 - -0.92


= 0.72

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 90.80 = 90.80 m
Station = 0 + 750 = 750 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0.72 x 48
800 800
= 0.0432

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12

Y = A . X2 = 0.72 x 12.0 2
200.LV 200 x 48
= 0.011

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.011 0.043

Sta PLV = Sta PV5 - 1/2LV


= 750 - 24
= 726

Elevasi = Elevasi PV5 - ( G1% x 1/2LV )


= 90.8 - ( -0.002 x 24 )
= 90.8 - -0.048
= 91

Sta 1/4 LV = Sta PLV + 1/4 LV


= 726.0 + 12.0
= 738 meter
P. ALINEMEN VERTIKAL P14 (STA 1 + 600)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.24
G2 = 0.56

Jadi A = A = 0.24 - 0.56


= -0.32

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 89.20 = 89.20 m
Station = 1 + 350 = 1350 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -0.32 x 48
800 800
= -0.0192

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12

Y = A . X2 = -0.32 x 12.0 2
200.LV 200 x 48
= -0.005

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.005 -0.019

Sta PLV = Sta PV5 - 1/2LV


= 1350 - 24
= 1326

Elevasi = Elevasi PV5 - ( G1% x 1/2LV )


= 89.2 - ( 0.0024 x 24 )
= 89.2 - 0.0576
= 89

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1326.0 + 12.0
= 1338 meter
V. ALINEMEN VERTIKAL P20 (STA 2 + 350)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -0.3
G2 = -0.4

Jadi A = A = -0.3 - -0.4


= 0

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 89.80 = 89.80 m
Station = 1 + 700 = 1700 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0.1 x 48
800 800
= 0.006

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12

Y = A . X2 = 0.1 x 12.0 2
200.LV 200 x 48
= 0.002

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.002 0.006

Sta PLV = Sta PV5 - 1/2LV


= 1700 - 24
= 1676

Elevasi = Elevasi PV5 - ( G1% x 1/2LV )


= 89.8 - ( -0.003 x 24 )
= 89.8 - -0.072
= 90

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1676.0 + 12.0
= 1688 meter
Elevasi = Elevasi PV4 - ( G1% x 1/4LV ) - Y
= 92.2 - ( 0.2 x 12.0 ) - 0.021
= 92.2 - 2.4 - 0.021
= 90

Sta PV = 850
Elevasi = Elevasi PV4 - EV
= 92.2 - 0.084
= 92

Sta 3/4 LV = Sta PV4 + 1/4 LV


= 300 + 12
= 312

Elevasi = Elevasi PV4 + ( G2% x 1/4LV ) + Y


= 92.2 + ( -0.01 x 12 ) + 0.021
= 92.2 + -0.123
= 92

Sta PEV = Sta PV4 + 1/2 LV


= 300 + 24
= 324

Elevasi = Elevasi PV4 + ( G2% x 1/2LV )


= 92.2 + ( -0.01 x 24 )
= 92.2 + -0.288
= 91.912
Elevasi = Elevasi PV5 - ( G1% x 1/4LV ) - Y
= 90.8 - ( -0.2 x 12.0 ) - 0.011
= 90.8 - -2.4 - 0.011
= 93

Sta PV = 0
Elevasi = Elevasi PV5 - EV
= 90.8 - 0.0432
= 91

Sta 3/4 LV = Sta PV5 + 1/4 LV


= 750 + 12
= 762

Elevasi = Elevasi PV5 + ( G2% x 1/4LV ) + Y


= 90.8 + ( -0.01 x 12 ) + 0.011
= 90.8 + -0.1
= 91

Sta PEV = Sta PV5 + 1/2 LV


= 750 + 24
= 774

Elevasi = Elevasi PV5 + ( G2% x 1/2LV )


= 90.8 + ( -0.01 x 24 )
= 90.8 + -0.221
= 91
Elevasi = Elevasi PV5 - ( G1% x 1/4LV ) - Y
= 89.2 - ( 0.24 x 12.0 ) - -0.005
= 89.2 - 2.88 - -0.005
= 86

Sta PV = 0
Elevasi = Elevasi PV5 - EV
= 89.2 - -0.0192
= 89

Sta 3/4 LV = Sta PV5 + 1/4 LV


= 1350 + 12
= 1362

Elevasi = Elevasi PV5 + ( G2% x 1/4LV ) + Y


= 89.2 + ( 0.01 x 12 ) + -0.005
= 89.2 + 0.0624
= 89

Sta PEV = Sta PV5 + 1/2 LV


= 1350 + 24
= 1374

Elevasi = Elevasi PV5 + ( G2% x 1/2LV )


= 89.2 + ( 0.01 x 24 )
= 89.2 + 0.1344
= 89
Elevasi = Elevasi PV5 - ( G1% x 1/4LV ) - Y
= 89.8 - ( -0.3 x 12.0 ) - 0.002
= 89.8 - -3.6 - 0.002
= 93

Sta PV = 0
Elevasi = Elevasi PV5 - EV
= 89.8 - 0.006
= 90

Sta 3/4 LV = Sta PV5 + 1/4 LV


= 1700 + 12
= 1712

Elevasi = Elevasi PV5 + ( G2% x 1/4LV ) + Y


= 89.8 + ( 0.00 x 12 ) + 0.002
= 89.8 + -0.047
= 90

Sta PEV = Sta PV5 + 1/2 LV


= 1700 + 24
= 1724

Elevasi = Elevasi PV5 + ( G2% x 1/2LV )


= 89.8 + ( 0.00 x 24 )
= 89.8 + -0.096
= 90
E. ALINEMEN VERTIKAL P4 (STA 0 + 400)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -1.2
G2 = -0.9

Jadi A = A = -1.2 - -0.9


= -0.3

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 91.00 = 91.00 m
Station = 0 + 400 = 400 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -0.3 x 48
800 800
= -0.018

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 -0.3 x 12.0 2
=
200.LV 200 x 48
= -0.005

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.005 -0.018

Sta PLV = Sta PV5 - 1/2LV


= 400 - 24
= 376

Elevasi = Elevasi PV5 - ( G1% x 1/2LV )


= 91 - ( -0.012 x 24 )
= 91 - -0.288
= 91

Sta 1/4 LV = Sta PLV + 1/4 LV


= 376.0 + 12.0
= 388 meter
K. ALINEMEN VERTIKAL P10 (STA 1 + 100)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -0.92
G2 = 0.44

Jadi A = A = -0.92 - 0.44


= -1.36

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 89.16 = 89.16 m
Station = 0 + 850 = 850 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -1.36 x 48
800 800
= -0.0816

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12

Y = A . X2 = -1.36 x 12.0 2
200.LV 200 x 48
= -0.020

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.020 -0.082

Sta PLV = Sta PV6 - 1/2LV


= 850 - 24
= 826

Elevasi = Elevasi PV6 - ( G1% x 1/2LV )


= 89.16 - ( -0.009 x 24 )
= 89.16 - -0.221
= 89

Sta 1/4 LV = Sta PLV + 1/4 LV


= 826.0 + 12.0
= 838 meter
Q. ALINEMEN VERTIKAL P15 (STA 1 + 700)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.56
G2 = -0.75

Jadi A = A = 0.56 - -0.75


= 1.31

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 89.44 = 89.44 m
Station = 1 + 450 = 1450 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 1.31 x 48
800 800
= 0.0786

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12

Y = A . X2 = 1.31 x 12.0 2
200.LV 200 x 48
= 0.020

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.020 0.079

Sta PLV = Sta PV6 - 1/2LV


= 1450 - 24
= 1426

Elevasi = Elevasi PV6 - ( G1% x 1/2LV )


= 89.44 - ( 0.0056 x 24 )
= 89.44 - 0.1344
= 89

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1426.0 + 12.0
= 1438 meter
W. ALINEMEN VERTIKAL P21 (STA 2 + 450)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -0.4
G2 = -1.1

Jadi A = A = -0.4 - -1.1


= 0.7

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 89.5 = 89.5 m
Station = 1 + 800 = 1800 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0.7 x 48
800 800
= 0.042

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12

Y = A . X2 = 0.7 x 12.0 2
200.LV 200 x 48
= 0.011

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.011 0.042

Sta PLV = Sta PV6 - 1/2LV


= 1800 - 24
= 1776

Elevasi = Elevasi PV6 - ( G1% x 1/2LV )


= 89.5 - ( -0.004 x 24 )
= 89.5 - -0.096
= 90

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1776.0 + 12.0
= 1788 meter
Elevasi = Elevasi PV5 - ( G1% x 1/4LV ) - Y
= 91 - ( -1.2 x 12.0 ) - -0.005
= 91 - -14.4 - -0.005
= 105

Sta PV = 0
Elevasi = Elevasi PV5 - EV
= 91 - -0.018
= 91

Sta 3/4 LV = Sta PV5 + 1/4 LV


= 400 + 12
= 412

Elevasi = Elevasi PV5 + ( G2% x 1/4LV ) + Y


= 91 + ( -0.01 x 12 ) + -0.005
= 91 + -0.1125
= 91

Sta PEV = Sta PV5 + 1/2 LV


= 400 + 24
= 424

Elevasi = Elevasi PV5 + ( G2% x 1/2LV )


= 91 + ( -0.01 x 24 )
= 91 + -0.216
= 91
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 89.16 - ( -0.92 x 12.0 ) - -0.020
= 89.16 - -11.04 - -0.020
= 100

Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 89.16 - -0.0816
= 89

Sta 3/4 LV = Sta PV6 + 1/4 LV


= 850 + 12
= 862

Elevasi = Elevasi PV6 + ( G2% x 1/4LV ) + Y


= 89.16 + ( 0.00 x 12 ) + -0.020
= 89.16 + 0.0324
= 89

Sta PEV = Sta PV6 + 1/2 LV


= 850 + 24
= 874

Elevasi = Elevasi PV6 + ( G2% x 1/2LV )


= 89.16 + ( 0.00 x 24 )
= 89.16 + 0.1056
= 89
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 89.44 - ( 0.56 x 12.0 ) - 0.020
= 89.44 - 6.72 - 0.020
= 83

Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 89.44 - 0.0786
= 89

Sta 3/4 LV = Sta PV6 + 1/4 LV


= 1450 + 12
= 1462

Elevasi = Elevasi PV6 + ( G2% x 1/4LV ) + Y


= 89.44 + ( -0.01 x 12 ) + 0.020
= 89.44 + -0.0704
= 89

Sta PEV = Sta PV6 + 1/2 LV


= 1450 + 24
= 1474

Elevasi = Elevasi PV6 + ( G2% x 1/2LV )


= 89.44 + ( -0.01 x 24 )
= 89.44 + -0.18
= 89
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 89.5 - ( -0.4 x 12.0 ) - 0.011
= 89.5 - -4.8 - 0.011
= 94

Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 89.5 - 0.042
= 89

Sta 3/4 LV = Sta PV6 + 1/4 LV


= 1800 + 12
= 1812

Elevasi = Elevasi PV6 + ( G2% x 1/4LV ) + Y


= 89.5 + ( -0.01 x 12 ) + 0.011
= 89.5 + -0.1215
= 89

Sta PEV = Sta PV6 + 1/2 LV


= 1800 + 24
= 1824

Elevasi = Elevasi PV6 + ( G2% x 1/2LV )


= 89.5 + ( -0.01 x 24 )
= 89.5 + -0.264
= 89
F. ALINEMEN VERTIKAL P5 (STA 0 + 500)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -0.9
G2 = 0.4

Jadi A = A = -0.9 - 0.4


= -1.3

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 90.1 = 90.1 m
Station = 0 + 500 = 500 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -1.3 x 48
800 800
= -0.078

Peninjauan titik
1
Misalnya X = LV
4
1
= 48
4
= 12

Y = A . X2 -1.3 x ### 2
=
200.LV 200 x 48
= -0.020

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.020 -0.078

Sta PLV = Sta PV6 - 1/2LV


= 500 - 24
= 476

Elevasi = Elevasi PV6 - ( G1% x 1/2LV )


= 90.1 - ( -0.009 x 24 )
= 90.1 - -0.216
= 90

Sta 1/4 LV = Sta PLV + 1/4 LV


= 476.0 + 12.0
= 488 meter
L. ALINEMEN VERTIKAL P11 (STA 1 + 200)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = 0.44
G2 = -0.44

Jadi A = A = 0.44 - -0.44


= 0.88

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 89.6 = 89.6 m
Station = 0 + 950 = 950 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0.88 x 48
800 800
= 0.0528

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12

Y = A . X2 = 0.88 x 12.0 2
200.LV 200 x 48
= 0.013

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.013 0.053

Sta PLV = Sta PV6 - 1/2LV


= 950 - 24
= 926

Elevasi = Elevasi PV6 - ( G1% x 1/2LV )


= 89.6 - ( 0.0044 x 24 )
= 89.6 - 0.1056
= 89

Sta 1/4 LV = Sta PLV + 1/4 LV


= 926.0 + 12.0
= 938 meter
R. ALINEMEN VERTIKAL P16 (STA 2 + 100)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -0.75
G2 = -0.75

Jadi A = A = -0.75 - -0.75


= 0

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 90 = 90 m
Station = 1 + 550 = 1550 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = 0 x 48
800 800
= 0

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12

Y = A . X2 = 0 x 12.0 2
200.LV 200 x 48
= 0.000

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y 0.000 0.000

Sta PLV = Sta PV6 - 1/2LV


= 1550 - 24
= 1526

Elevasi = Elevasi PV6 - ( G1% x 1/2LV )


= 90 - ( -0.0075 x 24 )
= 90 - -0.18
= 90

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1526.0 + 12.0
= 1538 meter
X. ALINEMEN VERTIKAL P22 (STA 2 + 550)

Berdasarkan jarak pandang menyiap (dm) perbedaan tanda Aljabar

A = G1 - G2

Diperoleh : G1 = -1.1
G2 = -0.13

Jadi A = A = -1.1 - -0.13


= -0.97

VR = 80 Km/Jam

Bentuk Alinemen adalah cekung


Elevasi = 0 + 89.1 = 89.1 m
Station = 1 + 900 = 1900 m

Berdasarkan grafik V maka :


LV = 48
EV = A x LV = -0.97 x 48
800 800
= -0.0582

Peninjauan titik
Misalnya X = 1 LV
4
= 1 48
4
= 12

Y = A . X2 = -0.97 x 12.0 2
200.LV 200 x 48
= -0.015

Dengan cara seperti diatas didapatkan nilai


Nilai X = 3/4 LV = 1/4 LV 1/2 LV = EV
X 12.0 24
Y -0.015 -0.058

Sta PLV = Sta PV6 - 1/2LV


= 1900 - 24
= 1876

Elevasi = Elevasi PV6 - ( G1% x 1/2LV )


= 89.1 - ( -0.011 x 24 )
= 89.1 - -0.264
= 89

Sta 1/4 LV = Sta PLV + 1/4 LV


= 1876.0 + 12.0
= 1888 meter
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 90.1 - ( -0.9 x 12.0 ) - -0.020
= 90.1 - -10.8 - -0.020
= 101

Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 90.1 - -0.078
= 90

Sta 3/4 LV = Sta PV6 + 1/4 LV


= 500 + 12
= 512

Elevasi = Elevasi PV6 + ( G2% x 1/4LV ) + Y


= 90.1 + ( 0.00 x 12 ) + -0.020
= 90.1 + 0.0285
= 90

Sta PEV = Sta PV6 + 1/2 LV


= 500 + 24
= 524

Elevasi = Elevasi PV6 + ( G2% x 1/2LV )


= 90.1 + ( 0.00 x 24 )
= 90.1 + 0.096
= 90
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 89.6 - ( 0.44 x 12.0 ) - 0.013
= 89.6 - 5.28 - 0.013
= 84

Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 89.6 - 0.0528
= 90

Sta 3/4 LV = Sta PV6 + 1/4 LV


= 950 + 12
= 962

Elevasi = Elevasi PV6 + ( G2% x 1/4LV ) + Y


= 89.6 + ( 0.00 x 12 ) + 0.013
= 89.6 + -0.04
= 90

Sta PEV = Sta PV6 + 1/2 LV


= 950 + 24
= 974

Elevasi = Elevasi PV6 + ( G2% x 1/2LV )


= 89.6 + ( 0.00 x 24 )
= 89.6 + -0.106
= 89
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 90 - ( -0.75 x 12.0 ) - 0.000
= 90 - -9 - 0.000
= 99

Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 90 - 0
= 90

Sta 3/4 LV = Sta PV6 + 1/4 LV


= 1550 + 12
= 1562

Elevasi = Elevasi PV6 + ( G2% x 1/4LV ) + Y


= 90 + ( -0.01 x 12 ) + 0.000
= 90 + -0.09
= 90

Sta PEV = Sta PV6 + 1/2 LV


= 1550 + 24
= 1574

Elevasi = Elevasi PV6 + ( G2% x 1/2LV )


= 90 + ( -0.01 x 24 )
= 90 + -0.18
= 90
Elevasi = Elevasi PV6 - ( G1% x 1/4LV ) - Y
= 89.1 - ( -1.1 x 12.0 ) - -0.015
= 89.1 - -13.2 - -0.015
= 102

Sta PV = 1050
Elevasi = Elevasi PV6 - EV
= 89.1 - -0.0582
= 89

Sta 3/4 LV = Sta PV6 + 1/4 LV


= 1900 + 12
= 1912

Elevasi = Elevasi PV6 + ( G2% x 1/4LV ) + Y


= 89.1 + ( 0.00 x 12 ) + -0.015
= 89.1 + -0.03
= 89

Sta PEV = Sta PV6 + 1/2 LV


= 1900 + 24
= 1924

Elevasi = Elevasi PV6 + ( G2% x 1/2LV )


= 89.1 + ( 0.00 x 24 )
= 89.1 + -0.031
= 89
PERENCANAAN GEMETRIK JALAN

Patok PA -P15
Sta 0 + 0
Jarak sta 1 + 300 adalah 89.44 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 7.6 3.8 1.4 0 7.3 6.6 6.6 7.405 7.48

X = 0 + 5.6 + 0 + 58.4 52.8 + 51.48 + 49.614 + 48.62 + 0 + 0 = 266.5135


Y = 30.4 + 24.7 + 11.2 + 0 56.94 + 44.22 + 42.9 + 29.62 + 0 + 0 = 239.98

1 1
luas = X Y = 266.5135 239.98
2 2
1
= x 26.534
2
= 13.26675 M2

Volume timbunan = Luas x Jarak (Sta 0 + 000 s/d Sta 1 + 300)


= 13.26675 x 89.44
= 1187 M3

B. Galiang
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 7.6 7.48 7.405 6.6 6.6 7.3 15.2 13.8 11.4

X = 0 + 29.62 + 42.9 + 44.22 56.94 + 121.6 + 110.4 + 74.1 + 0 = 479.78


Y = 30.4 + 48.62 + 49.614 + 51.48 52.8 + 58.4 + 98.8 + 55.2 + 0 = 445.3135

1 1
luas = X Y = 479.78 445.3135
2 2
1
= x 34.467
2
= 17.23325 M2

Volume galiang = Luas x Jarak (Sta 0 + 000 s/d Sta 1 + 300)


= 17.23325 x 89.44
= 1541.342 M 3
PERENCANAAN GEMETRIK JALAN

Patok P16 -P18


Sta 1 + 400
Jarak sta 1 + 500 adalah 89.15 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 4.00 2.00 0.8 0 3.70 3.00 3.00 3.8050 3.88

X = 0 + 3.2 + 0 + 29.6 24 + 23.4 + 25.494 + 25.22 + 0 + 0 = 130.9135


Y = 16 + 13 + 6.4 + 0 28.86 + 20.1 + 19.5 + 15.22 + 0 + 0 = 119.08

1 1
luas = X Y = 130.9135 119.08
2 2
1
= x 11.834
2
= 5.91675 M2

Volume timbunan = Luas x Jarak (Sta 1 + 400 s/d Sta 1 + 500)


= 5.91675 x 89.15
= 527 M3

B. Galiang
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 4 3.88 3.805 3 3 3.7 8 7.3 6

X = 0 + 15.22 + 19.5 + 20.1 28.86 + 64 + 58.4 + 39 + 0 = 245.08


Y = 16 + 25.22 + 25.494 + 23.4 24 + 29.6 + 52 + 29.2 + 0 = 224.9135

1 1
luas = X Y = 245.08 224.9135
2 2
1
= x 20.167
2
= 10.08325 M2

Volume galiang = Luas x Jarak (Sta 1 + 400 s/d Sta 1 + 500)


= 10.08325 x 89.15
= 898.9217 M 3
PERENCANAAN GEMETRIK JALAN

Patok P19
Sta 1 + 550
Jarak sta 1 + 550 adalah 89.5 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 3.70 1.80 0.7 0 3.40 2.70 2.70 3.505 3.58

X = 0 + 2.8 + 0 + 27.2 21.6 + 21.06 + 23.484 + 23.27 + 0 + 0 = 119.4135


Y = 14.8 + 11.7 + 5.6 + 0 26.52 + 18.09 + 17.55 + 14.02 + 0 + 0 = 108.28

1 1
luas = X Y = 119.4135 108.28
2 2
1
= x 11.134
2
= 5.56675 M2

Volume timbunan = Luas x Jarak (Sta 1 + 550 s/d Sta 1 + 550)


= 5.56675 x 89.5
= 498 M3

B. Galiang
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 3.7 3.58 3.505 2.7 2.7 3.4 7.5 6.7 5.6

X = 0 + 14.02 + 17.55 + 18.09 26.52 + 60 + 53.6 + 36.4 + 0 = 226.18


Y = 14.8 + 23.27 + 23.484 + 21.06 21.6 + 27.2 + 48.75 + 26.8 + 0 = 206.9635

1 1
luas = X Y = 226.18 206.9635
2 2
1
= x 19.217
2
= 9.60825 M2

Volume galiang = Luas x Jarak (Sta 1 + 400 s/d Sta 1 + 500)


= 9.60825 x 89.5
= 859.9384 M 3
PERENCANAAN GEMETRIK JALAN

Patok P20 - P24


Sta 1 + 650
Jarak sta 2 + 050 adalah 87.87 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 4.00 2.00 0.8 0 3.70 3.00 3.00 3.805 3.88

X = 0 + 3.2 + 0 + 29.6 24 + 23.4 + 25.494 + 25.22 + 0 + 0 = 130.9135


Y = 16 + 13 + 6.4 + 0 28.86 + 20.1 + 19.5 + 15.22 + 0 + 0 = 119.08

1 1
luas = X Y = 130.9135 119.08
2 2
1
= x 11.834
2
= 5.91675 M2

Volume timbunan = Luas x Jarak (Sta 1 + 650 s/d Sta 2 + 050)


= 5.91675 x 87.87
= 520 M3

B. Galiang
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 4 3.88 3.805 3 3 3.7 8 7.3 6

X = 0 + 15.22 + 19.5 + 20.1 28.86 + 64 + 58.4 + 39 + 0 = 245.08


Y = 16 + 25.22 + 25.494 + 23.4 24 + 29.6 + 52 + 29.2 + 0 = 224.9135

1 1
luas = X Y = 245.08 224.9135
2 2
1
= x 20.167
2
= 10.08325 M2

Volume galiang = Luas x Jarak (Sta 1 + 650 s/d Sta 2 + 050)


= 10.08325 x 87.87
= 886.0152 M 3
PERENCANAAN GEMETRIK JALAN

Patok P25
Sta 2 + 150
Jarak sta 2 + 150 adalah 0 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 5.00 2.50 0.9 0 4.70 4.00 4.00 4.805 4.88

X = 0 + 3.6 + 0 + 37.6 32 + 31.2 + 32.194 + 31.72 + 0 + 0 = 168.3135


Y = 20 + 16.25 + 7.2 + 0 36.66 + 26.8 + 26 + 19.22 + 0 + 0 = 152.13

1 1
luas = X Y = 168.3135 152.13
2 2
1
= x 16.184
2
= 8.09175 M2

Volume timbunan = Luas x Jarak (Sta 2 + 150 s/d Sta 2 + 150)


= 8.09175 x 0
= 0 M3

B. Galiang
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 5 4.88 4.805 4 4 4.7 10 9.1 7.5

X = 0 + 19.22 + 26 + 26.8 36.66 + 80 + 72.8 + 48.75 + 0 = 310.23


Y = 20 + 31.72 + 32.194 + 31.2 32 + 37.6 + 65 + 36.4 + 0 = 286.1135

1 1
luas = X Y = 310.23 286.1135
2 2
1
= x 24.117
2
= 12.05825 M2

Volume galiang = Luas x Jarak (Sta 2 + 150 s/d Sta 2 + 150)


= 12.05825 x 0
= 0 M 3
PERENCANAAN GEMETRIK JALAN

Patok P26 - P28


Sta 2 + 250
Jarak sta 2 + 450 adalah 0 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 5.80 2.90 1.1 0 5.50 4.80 4.80 5.605 5.68

X = 0 + 4.4 + 0 + 44 38.4 + 37.44 + 37.554 + 36.92 + 0 + 0 = 198.7135


Y = 23.2 + 18.85 + 8.8 + 0 42.9 + 32.16 + 31.2 + 22.42 + 0 + 0 = 179.53

1 1
luas = X Y = 198.7135 179.53
2 2
1
= x 19.184
2
= 9.59175 M2

Volume timbunan = Luas x Jarak (Sta 2 + 250 s/d Sta 2 + 450)


= 9.59175 x 0
= 0 M3

B. Galiang
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 5.8 5.68 5.605 4.8 4.8 5.5 11.6 10.5 8.7

X = 0 + 22.42 + 31.2 + 32.16 42.9 + 92.8 + 84 + 56.55 + 0 = 362.03


Y = 23.2 + 36.92 + 37.554 + 37.44 38.4 + 44 + 75.4 + 42 + 0 = 334.9135

1 1
luas = X Y = 362.03 334.9135
2 2
1
= x 27.117
2
= 13.55825 M2

Volume galiang = Luas x Jarak (Sta 2 + 250 s/d Sta 2 + 450)


= 13.55825 x 0
= 0 M 3
PERENCANAAN GEMETRIK JALAN

Patok P29 - P34


Sta 2 + 500
Jarak sta 2 + 750 adalah 0 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 6.70 3.80 1.2 0 6.40 5.70 5.70 6.505 6.58

X = 0 + 4.8 + 0 + 51.2 45.6 + 44.46 + 43.584 + 42.77 + 0 + 0 = 232.4135


Y = 26.8 + 24.7 + 9.6 + 0 49.92 + 38.19 + 37.05 + 26.02 + 0 + 0 = 212.28

1 1
luas = X Y = 232.4135 212.28
2 2
1
= x 20.134
2
= 10.06675 M2

Volume timbunan = Luas x Jarak (Sta 2 + 500 s/d Sta 2 + 750)


= 10.06675 x 0
= 0 M3

B. Galiang
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 6.7 6.58 6.505 5.7 5.7 6.4 13.3 12 10

X = 0 + 26.02 + 37.05 + 38.19 49.92 + 106.4 + 96 + 65 + 0 = 418.58


Y = 26.8 + 42.77 + 43.584 + 44.46 45.6 + 51.2 + 86.45 + 48 + 0 = 388.8635

1 1
luas = X Y = 418.58 388.8635
2 2
1
= x 29.717
2
= 14.85825 M2

Volume galiang = Luas x Jarak (Sta 2 + 500 s/d Sta 2 + 750)


= 14.85825 x 0
= 0 M 3
PERENCANAAN GEMETRIK JALAN

Patok PB - P36
Sta 2 + 850
Jarak sta 2 + 950 adalah 0 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 5.30 2.70 1 0 5.00 4.30 4.30 5.105 5.18

X = 0 + 4 + 0 + 40 34.4 + 33.54 + 34.204 + 33.67 + 0 + 0 = 179.8135


Y = 21.2 + 17.55 + 8 + 0 39 + 28.81 + 27.95 + 20.42 + 0 + 0 = 162.93

1 1
luas = X Y = 179.8135 162.93
2 2
1
= x 16.884
2
= 8.44175 M2

Volume timbunan = Luas x Jarak (Sta 2 + 850 s/d Sta 2 + 950)


= 8.44175 x 0
= 0 M3

B. Galiang
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 5.3 5.18 5.105 4.3 4.3 5 11 10 8.3

X = 0 + 20.42 + 27.95 + 28.81 39 + 88 + 80 + 53.95 + 0 = 338.13


Y = 21.2 + 33.67 + 34.204 + 33.54 34.4 + 40 + 71.5 + 40 + 0 = 308.5135

1 1
luas = X Y = 338.13 308.5135
2 2
1
= x 29.617
2
= 14.80825 M2

Volume galiang = Luas x Jarak (Sta 2 + 850 s/d Sta 2 + 950)


= 14.80825 x 0
= 0 M 3
PERENCANAAN GEMETRIK JALAN

Patok P37
Sta 3 + 50
Jarak sta 3 + 050 adalah 0 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 5.00 2.50 0.9 0 4.70 4.00 4.00 4.805 4.88

X = 0 + 3.6 + 0 + 37.6 32 + 31.2 + 32.194 + 31.72 + 0 + 0 = 168.3135


Y = 20 + 16.25 + 7.2 + 0 36.66 + 26.8 + 26 + 19.22 + 0 + 0 = 152.13

1 1
luas = X Y = 168.3135 152.13
2 2
1
= x 16.184
2
= 8.09175 M2

Volume timbunan = Luas x Jarak (Sta 3 + 050 s/d Sta 3 + 050)


= 8.09175 x 0
= 0 M3

B. Galiang
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 5 4.88 4.805 4 4 4.7 10 9.1 7.5

X = 0 + 19.22 + 26 + 26.8 36.66 + 80 + 72.8 + 48.75 + 0 = 310.23


Y = 20 + 31.72 + 32.194 + 31.2 32 + 37.6 + 65 + 36.4 + 0 = 286.1135

1 1
luas = X Y = 310.23 286.1135
2 2
1
= x 24.117
2
= 12.05825 M2

Volume galiang = Luas x Jarak (Sta 3 + 050 s/d Sta 3 + 050)


= 12.05825 x 0
= 0 M 3
PERENCANAAN GEMETRIK JALAN

Patok P38
Sta 3 + 150
Jarak sta 3 + 150 adalah 0 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 4.00 2.40 0.9 0 3.70 3.00 3.00 3.805 3.88

X = 0 + 3.6 + 0 + 29.6 24 + 23.4 + 25.494 + 25.22 + 0 + 0 = 131.3135


Y = 16 + 15.6 + 7.2 + 0 28.86 + 20.1 + 19.5 + 15.22 + 0 + 0 = 122.48

1 1
luas = X Y = 131.3135 122.48
2 2
1
= x 8.8335
2
= 4.41675 M2

Volume timbunan = Luas x Jarak (Sta 3 + 150 s/d Sta 3 + 150)


= 4.41675 x 0
= 0 M3

B. Galiang
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 4 3.88 3.805 3 3 3.7 9.6 8.7 7.2

X = 0 + 15.22 + 19.5 + 20.1 28.86 + 76.8 + 69.6 + 46.8 + 0 = 276.88


Y = 16 + 25.22 + 25.494 + 23.4 24 + 29.6 + 62.4 + 34.8 + 0 = 240.9135

1 1
luas = X Y = 276.88 240.9135
2 2
1
= x 35.967
2
= 17.98325 M2

Volume galiang = Luas x Jarak (Sta 3 + 150 s/d Sta 3 + 150)


= 17.98325 x 0
= 0 M 3
PERENCANAAN GEMETRIK JALAN

Patok P39 - P40


Sta 3 + 250
Jarak sta 3 + 350 adalah 0 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 4.50 2.70 0.8 0 4.20 3.50 3.50 4.305 4.38

X = 0 + 3.2 + 0 + 33.6 28 + 27.3 + 28.844 + 28.47 + 0 + 0 = 149.4135


Y = 18 + 17.55 + 6.4 + 0 32.76 + 23.45 + 22.75 + 17.22 + 0 + 0 = 138.13

1 1
luas = X Y = 149.4135 138.13
2 2
1
= x 11.284
2
= 5.64175 M2

Volume timbunan = Luas x Jarak (Sta 3 + 250 s/d Sta 3 + 350)


= 5.64175 x 0
= 0 M3

B. Galiang
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 4.5 4.38 4.305 3.5 3.5 4.2 9 8.2 7

X = 0 + 17.22 + 22.75 + 23.45 32.76 + 72 + 65.6 + 45.5 + 0 = 279.28


Y = 18 + 28.47 + 28.844 + 27.3 28 + 33.6 + 58.5 + 32.8 + 0 = 255.5135

1 1
luas = X Y = 279.28 255.5135
2 2
1
= x 23.767
2
= 11.88325 M2

Volume galiang = Luas x Jarak (Sta 3 + 250 s/d Sta 3 + 350)


= 11.88325 x 0
= 0 M 3
PERENCANAAN GEMETRIK JALAN

Patok P41
Sta 3 + 450
Jarak sta 3 + 450 adalah 0 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 4.30 2.10 0.8 0 4.00 3.30 3.30 4.105 4.18

X = 0 + 3.2 + 0 + 32 26.4 + 25.74 + 27.504 + 27.17 + 0 + 0 = 142.0135


Y = 17.2 + 13.65 + 6.4 + 0 31.2 + 22.11 + 21.45 + 16.42 + 0 + 0 = 128.43

1 1
luas = X Y = 142.0135 128.43
2 2
1
= x 13.584
2
= 6.79175 M2

Volume timbunan = Luas x Jarak (Sta 3 + 450 s/d Sta 3 + 450)


= 6.79175 x 0
= 0 M3

B. Galiang
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 4.3 4.18 4.105 3.3 3.3 4 8.5 7.7 6.4

X = 0 + 16.42 + 21.45 + 22.11 31.2 + 68 + 61.6 + 41.6 + 0 = 262.38


Y = 17.2 + 27.17 + 27.504 + 25.74 26.4 + 32 + 55.25 + 30.8 + 0 = 242.0635

1 1
luas = X Y = 262.38 242.0635
2 2
1
= x 20.317
2
= 10.15825 M2

Volume galiang = Luas x Jarak (Sta 3 + 450 s/d Sta 3 + 450)


= 10.15825 x 0
= 0 M 3
PERENCANAAN GEMETRIK JALAN

Patok P42 - P43


Sta 3 + 550
Jarak sta 3 + 650 adalah 0 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 4.00 2.00 0.8 0 3.70 3.00 3.00 3.805 3.88

X = 0 + 3.2 + 0 + 29.6 24 + 23.4 + 25.494 + 25.22 + 0 + 0 = 130.9135


Y = 16 + 13 + 6.4 + 0 28.86 + 20.1 + 19.5 + 15.22 + 0 + 0 = 119.08

1 1
luas = X Y = 130.9135 119.08
2 2
1
= x 11.834
2
= 5.91675 M2

Volume timbunan = Luas x Jarak (Sta 3 + 550 s/d Sta 3 + 650)


= 5.91675 x 0
= 0 M3

B. Galiang
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 4 3.88 3.805 3 3 3.7 8 7.3 6

X = 0 + 15.22 + 19.5 + 20.1 28.86 + 64 + 58.4 + 39 + 0 = 245.08


Y = 16 + 25.22 + 25.494 + 23.4 24 + 29.6 + 52 + 29.2 + 0 = 224.9135

1 1
luas = X Y = 245.08 224.9135
2 2
1
= x 20.167
2
= 10.08325 M2

Volume galiang = Luas x Jarak (Sta 3 + 550 s/d Sta 3 + 650)


= 10.08325 x 0
= 0 M 3
PERENCANAAN GEMETRIK JALAN

Patok P44 - P46


Sta 3 + 750
Jarak sta 3 + 850 adalah 0 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 4.00 2.00 0.8 0 3.70 3.00 3.00 3.805 3.88

X = 0 + 3.2 + 0 + 29.6 24 + 23.4 + 25.494 + 25.22 + 0 + 0 = 130.9135


Y = 16 + 13 + 6.4 + 0 28.86 + 20.1 + 19.5 + 15.22 + 0 + 0 = 119.08

1 1
luas = X Y = 130.9135 119.08
2 2
1
= x 11.834
2
= 5.91675 M2

Volume timbunan = Luas x Jarak (Sta 3 + 750 s/d Sta 3 + 850)


= 5.91675 x 0
= 0 M3

B. Galiang
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 4 3.88 3.805 3 3 3.7 8 7.3 6

X = 0 + 15.22 + 19.5 + 20.1 28.86 + 64 + 58.4 + 39 + 0 = 245.08


Y = 16 + 25.22 + 25.494 + 23.4 24 + 29.6 + 52 + 29.2 + 0 = 224.9135

1 1
luas = X Y = 245.08 224.9135
2 2
1
= x 20.167
2
= 10.08325 M2

Volume galiang = Luas x Jarak (Sta 3 + 750 s/d Sta 3 + 850)


= 10.08325 x 0
= 0 M 3
PERENCANAAN GEMETRIK JALAN

Patok P47 - P49


Sta 3 + 900
Jarak sta 4 + 000 adalah 0 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 4.30 2.30 0.8 0 4.00 3.30 3.30 4.105 4.18

X = 0 + 3.2 + 0 + 32 26.4 + 25.74 + 27.504 + 27.17 + 0 + 0 = 142.0135


Y = 17.2 + 14.95 + 6.4 + 0 31.2 + 22.11 + 21.45 + 16.42 + 0 + 0 = 129.73

1 1
luas = X Y = 142.0135 129.73
2 2
1
= x 12.284
2
= 6.14175 M2

Volume timbunan = Luas x Jarak (Sta 3 + 900 s/d Sta 4 + 000)


= 6.14175 x 0
= 0 M3

B. Galiang
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 4.3 4.18 4.105 3.3 3.3 4 9 8.2 7

X = 0 + 16.42 + 21.45 + 22.11 31.2 + 72 + 65.6 + 45.5 + 0 = 274.28


Y = 17.2 + 27.17 + 27.504 + 25.74 26.4 + 32 + 58.5 + 32.8 + 0 = 247.3135

1 1
luas = X Y = 274.28 247.3135
2 2
1
= x 26.967
2
= 13.48325 M2

Volume galiang = Luas x Jarak (Sta 3 + 900 s/d Sta 4 + 000)


= 13.48325 x 0
= 0 M 3
PERENCANAAN GEMETRIK JALAN

Patok P50
Sta 4 + 50
Jarak sta 4 + 050 adalah 0 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 5.00 2.50 0.9 0 4.70 4.00 4.00 4.805 4.88

X = 0 + 3.6 + 0 + 37.6 32 + 31.2 + 32.194 + 31.72 + 0 + 0 = 168.3135


Y = 20 + 16.25 + 7.2 + 0 36.66 + 26.8 + 26 + 19.22 + 0 + 0 = 152.13

1 1
luas = X Y = 168.3135 152.13
2 2
1
= x 16.184
2
= 8.09175 M2

Volume timbunan = Luas x Jarak (Sta 4 + 050 s/d Sta 4 + 050)


= 8.09175 x 0
= 0 M3

B. Galiang
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 5 4.88 4.805 4 4 4.7 10 9.1 7.5

X = 0 + 19.22 + 26 + 26.8 36.66 + 80 + 72.8 + 48.75 + 0 = 310.23


Y = 20 + 31.72 + 32.194 + 31.2 32 + 37.6 + 65 + 36.4 + 0 = 286.1135

1 1
luas = X Y = 310.23 286.1135
2 2
1
= x 24.117
2
= 12.05825 M2

Volume galiang = Luas x Jarak (Sta 4 + 050 s/d Sta 4 + 050)


= 12.05825 x 0
= 0 M 3
PERENCANAAN GEMETRIK JALAN

Patok P51 - P53


Sta 4 + 150
Jarak sta 4 + 350 adalah 0 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 6.00 3.00 1.1 0 5.70 5.00 5.00 5.805 5.88

X = 0 + 4.4 + 0 + 45.6 40 + 39 + 38.894 + 38.22 + 0 + 0 = 206.1135


Y = 24 + 19.5 + 8.8 + 0 44.46 + 33.5 + 32.5 + 23.22 + 0 + 0 = 185.98

1 1
luas = X Y = 206.1135 185.98
2 2
1
= x 20.134
2
= 10.06675 M2

Volume timbunan = Luas x Jarak (Sta 4 + 150 s/d Sta 4 + 350)


= 10.06675 x 0
= 0 M3

B. Galiang
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 6 5.88 5.805 5 5 5.7 12 10.9 9

X = 0 + 23.22 + 32.5 + 33.5 44.46 + 96 + 87.2 + 58.5 + 0 = 375.38


Y = 24 + 38.22 + 38.894 + 39 40 + 45.6 + 78 + 43.6 + 0 = 347.3135

1 1
luas = X Y = 375.38 347.3135
2 2
1
= x 28.067
2
= 14.03325 M2

Volume galiang = Luas x Jarak (Sta 4 + 150 s/d Sta 4 + 350)


= 14.03325 x 0
= 0 M 3
PERENCANAAN GEMETRIK JALAN

Patok P54 - PC
Sta 4 + 450
Jarak sta 4 + 500 adalah 0 m
A. Timbunan
X 0 4 6.5 8 8 7.8 6.7 6.5 4
Y 7.00 3.50 1.3 0 6.70 6.00 6.00 6.805 6.88

X = 0 + 5.2 + 0 + 53.6 48 + 46.8 + 45.594 + 44.72 + 0 + 0 = 243.9135


Y = 28 + 22.75 + 10.4 + 0 52.26 + 40.2 + 39 + 27.22 + 0 + 0 = 219.83

1 1
luas = X Y = 243.9135 219.83
2 2
1
= x 24.084
2
= 12.04175 M2

Volume timbunan = Luas x Jarak (Sta 4 + 450 s/d Sta 4 + 500)


= 12.04175 x 0
= 0 M3

B. Galiang
X 0 4 6.5 6.7 7.8 8 8 6.5 4
Y 7 6.88 6.805 6 6 6.7 14 12.7 10.5

X = 0 + 27.22 + 39 + 40.2 52.26 + 112 + 101.6 + 68.25 + 0 = 440.53


Y = 28 + 44.72 + 45.594 + 46.8 48 + 53.6 + 91 + 50.8 + 0 = 408.5135

1 1
luas = X Y = 440.53 408.5135
2 2
1
= x 32.017
2
= 16.00825 M2

Volume galiang = Luas x Jarak (Sta 2 + 250 s/d Sta 2 + 450)


= 16.00825 x 0
= 0 M 3
P17 St 1 + 550
140
130
120
110
100
90
78.3333333333 79.2535333333 78.3341333333 78.3255333333 78.3181333333
80
70
60
50
40
30
20
10
60
50
40
30
20
10
0
PLV 1/4LV PV 3/4LV PEV
0 91.50 91.47 91.38 91.29 91.01
1 92.39 111.52 92.08 91.94 91.91
2 92.09 96.51
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
NO PATOK VOLUME TIMBUNAN VOLUME GALIAN
1 PA 1187 M³ 1541.342 M³
2 P1 1187 M³ 1541.342 M³
3 P2 1187 M³ 1541.342 M³
4 P3 1187 M³ 1541.342 M³
5 P4 1187 M³ 1541.342 M³
6 P5 1187 M³ 1541.342 M³
7 P6 1187 M³ 1541.342 M³
8 P7 1187 M³ 1541.342 M³
9 P8 1187 M³ 1541.342 M³
10 P9 1187 M³ 1541.342 M³
11 P10 1187 M³ 1541.342 M³
12 P11 1187 M³ 1541.342 M³
13 P12 1187 M³ 1541.342 M³
14 P13 1187 M³ 1541.342 M³
15 P14 1187 M³ 1541.342 M³
16 P15 1187 M³ 1541.342 M³
17 P16 527.478 M³ 898.922 M³
18 P17 527.478 M³ 898.922 M³
19 P18 527.478 M³ 898.922 M³
20 P19 498.224 M³ 859.938 M³
21 P20 519.905 M³ 886.015 M³
22 P21 519.905 M³ 886.015 M³
23 P22 519.905 M³ 886.015 M³
24 P23 519.905 M³ 886.015 M³
25 P24 519.905 M³ 886.015 M³
26 P25 0.000 M³ 0.000 M³
27 P26 0.000 M³ 0.000 M³
28 P27 0.000 M³ 0.000 M³
29 P28 0.000 M³ 0.000 M³
30 P29 0.000 M³ 0.000 M³
31 P30 0.000 M³ 0.000 M³
32 P31 0.000 M³ 0.000 M³
33 P32 0.000 M³ 0.000 M³
34 P33 0.000 M³ 0.000 M³
35 P34 0.000 M³ 0.000 M³
36 PB 0.000 M³ 0.000 M³
37 P36 0.000 M³ 0.000 M³
38 P37 0.000 M³ 0.000 M³
39 P38 0.000 M³ 0.000 M³
40 P39 0.000 M³ 0.000 M³
41 P40 0.000 M³ 0.000 M³
42 P41 0.000 M³ 0.000 M³
43 P42 0.000 M³ 0.000 M³
44 P43 0.000 M³ 0.000 M³
45 P44 0.000 M³ 0.000 M³
46 P45 0.000 M³ 0.000 M³
47 P46 0.000 M³ 0.000 M³
48 P47 0.000 M³ 0.000 M³
49 P48 0.000 M³ 0.000 M³
50 P49 0.000 M³ 0.000 M³
51 P50 0.000 M³ 0.000 M³
52 P51 0.000 M³ 0.000 M³
53 P52 0.000 M³ 0.000 M³
54 P53 0.000 M³ 0.000 M³
55 P54 0.000 M³ 0.000 M³
56 PC 0.000 M³ 0.000 M³
TOTAL 23665.433 M³ 32648.250 M³
DAFTAR ANALISA BIAYA KONSTRUKSI (ABK)

ANALISA URAIAN PEKERJAAKOEFISIAN SATUAN HARGA SATUAN JML. HARGA


1 2 3 4 5 6
A 1M³ GALIAN TANAH DENGAN MENGGUNAKAN ALAT BERAT
TENAGA
PEKERJA 0.21 OH Rp 2,857.14 Rp 600.00
MANDOR 0.0525 OH Rp 3,214.29 Rp 168.75
ALAT
EXAVATOR 0.6 JAM Rp 502,500.00 Rp 301,500.00
BULDOZER 0.331 JAM Rp 458,500.00 Rp 151,763.50
DUMP TRUCK 0.1271 JAM Rp 292,300.00 Rp 37,151.33
JUMLAH Rp 491,183.58
B 1M³ TIMBUNAN TANAH DENGAN MENGGUNAKAN ALAT BERAT
TENAGA
PEKERJA 0.21 OH Rp 2,857.14 Rp 600.00
MANDOR 0.0525 OH Rp 3,214.29 Rp 168.75
ALAT
BULDOZER 0.331 JAM Rp 458,500.00 Rp 151,763.50
MOTOR GRADER 0.0088 JAM Rp 664,500.00 Rp 5,847.60
VIBRATOR ROLLE 0.0161 JAM Rp 267,100.00 Rp 4,300.31
JUMLAH Rp 162,680.16
C 1M³ PEKERJAAN LAPISAN PONDASI BAWAH
TENAGA
PEKERJA 0.21 OH Rp 2,857.14 Rp 600.00
MANDOR 0.0525 OH Rp 3,214.29 Rp 168.75
MATERIAL/BAHAN
AGREGAT KELAS 1.2 1M³ Rp 40,000.00 Rp 48,000.00
ALAT
WHEEL LOADER 0.0134 JAM Rp 52,854.00 Rp 708.244
DUMP TRUCK 0.1063 JAM Rp 292,300.00 Rp 31,071.49
MOTOR GRADER 0.0088 JAM Rp 664,500.00 Rp 5,847.60
VIBRATOR ROLLE 0.0161 JAM Rp 267,100.00 Rp 4,300.31
WATER TANKER 0.0383 JAM Rp 241,296.00 Rp 9,241.64
JUMLAH Rp 99,938.03

DAFTAR RINCIAN RENCANA ANGGARAN BIAYA

NO URAIAN KEGIATA VOLUME SAT. HARGA SATUAN JML. HARGA


1M³ GALIAN
TANAH DENGAN
1 23665.4 M³ Rp 491,183.58 Rp 11,624,072,067
MENGGUNAKAN
ALAT BERAT

1M³ TIMBUNAN
TANAH DENGAN
2 32648 M³ Rp 162,680.16 Rp 5,311,222,449
MENGGUNAKAN
ALAT BERAT

3 1M³ 0 M³ Rp 99,938.03 Rp -

JUMLAH Rp 16,935,294,516
DIBULATKAN Rp 36,612,000,000.00
TERBILANG :
TUJUH BELAS MILYAR TIGA RATUS DELAPAN PULUH TUJUH JUTA EMPAT RATUS RIBU RUPIAH

VOLUME PEKERJAAN LAPISAN PONDASI BAWAH ( LPB )

TEBAL RENCANA= 0.35 M ³


LEBAR = 16.00 M ³
PANJANG = 0 M³
VOLUME = 0 M³

Anda mungkin juga menyukai