DAFTAR
Kegiatan :
Pekerjaan :
Lokasi :
Tahun Anggaran :
NO. URAIAN
1 2
1 Mandor
2 Kepala tukang batu
3 Kepala tukang besi
4 Kepala tukang kayu
5 Kepala tukang cat
6 Kepala tukang pancang
7 Tukang batu
8 Tukang besi
9 Tukang kayu
10 Tukang cat
11 Tukang pancang
12 Pekerja
13 Operator/Sopir
14 Pembantu Operator/Sopir
B Bahan Atap
1 Genteng Metal (setara sakuraroof)
2 Nok Genteng Metal
Daftar Harga Upah dan Bahan - 3
C Bahan Kaca
1 Kaca Bening t= 5 mm
2 Kaca Rayben t= 5 mm
D Bahan Listrik
1 Titik Lampu + Instalasi
2 Stop Kontak + Instalasi
3 Saklar Tunggal
4 Saklar Doubel
5 Saklar Tripel
6 Zekering Kas Lokal 3 Group
7 Zekering Box 3 phase
8 Bola Lampu 11 Watt (SL)
9 Bola Lampu 14 Watt (SL)
10 Bola Lampu 18 Watt (SL)
Daftar Harga Upah dan Bahan - 4
1 2
E Bahan Penggantung
1 Engsel 3"
2 Engsel 4"
3 Hak Angin
4 Kait Angin
5 Grendel Pintu
6 Grendel Jendela
7 Espagnolet lengkap
8 Kunci Tanam Yalle 2 x slash
9 Kunci Silinder
F Bahan Langit-Langit
1 Teakwood
2 Lem Aibon
3 Kalsibord
4 Gypsum
G Bahan Pipa
1 Pipa paralon 1/2" - 4 m
2 Pipa paralon 1" - 4 m
3 Pipa Paralon 2" - 4 m
4 Pipa Paralon 3" - 4 m
5 Pipa Paralon 4" - 4 m
H Bahan Besi
1 Besi Beton Polos
2 Kawat Bendrat
3 Kawat Nyamuk Aluminium
4 Kawat Wiremesh M6
5 Besi Strip
6 Formite/penjaga jarak bekisting/spacer
7 Pagar Besi
I Bahan Lantai
1 Keramik 40 x 40 cm (biasa)
2 Keramik 40 x 40 cm (motif)
3 Keramik 20 x 20 cm
4 Keramik 20 x 25 cm
5 Keramik 20 x 40 cm (Motif)
J Bahan Sanitair
1 Kloset Jongkok
2 Kloset Duduk
Daftar Harga Upah dan Bahan - 5
K Bahan Paku
1 Paku Kayu
2 Paku ulin
3 Paku Seng
4 Paku Gypsum
5 Paku Genteng Metal
Daftar Harga Upah dan Bahan - 6
1 2
L Bahan Kayu
1 Balok Kayu Ulin
2 Papan Kayu Ulin
3 Balok Kayu Bengkirai
4 Papan Kayu Bengkirai
5 Balok Kayu Meranti
6 Papan Kayu Meranti (molding)
6 Papan Kayu Meranti
7 Balok Kayu Kruing
8 Papan Bouwplank
9 Papan Listplank Kayu Bengkirai
10 Papan Bekisting Kayu Meranti
11 Rangka Plafond Kayu Bengkirai
12 Rangka Plafond Kayu Kruing
13 Rangka Plafond Kayu Meranti
14 Reng 3/4 - 4 m Kayu Bengkirai
15 Kayu Lumbersiring
16 Kayu Kasau 5/7 (meranti)
17 List Gypsum
18 Dolken Kayu Galam
19 Daun Pintu Panel Kayu Bengkirai
20 Daun Pintu Panel Kayu Ulin
21 Daun Jendela Kaca Rayben t=5 mm
M Bahan Finishing
1 Amplas Kayu/Besi
2 Meni Besi
3 Meni Kayu
4 Dempul Kayu
5 Plamir Tembok
6 Minyak Cat
7 Cat Tembok sekelas Paragon
8 Tinner
9 Cat Dasar
10 Cat Mowilek Interior
11 Cat Mowilek Eksterior
12 Lem Kayu
13 Minyak Bekisting
14 Bensin
15 Solar
16 Minyak Tanah/Kerosin
17 Minyak Pelumas
18 Cat Kilap
Daftar Harga Upah dan Bahan - 7
N Bahan Tanah
1 Tanah Urug
2 Sirtu Gunung
Daftar Harga Upah dan Bahan - 8
SATUAN
I. UPAH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
ator/Sopir OH
II. BAHAN
dan Pondasi
M3
M3
M3
M3
M3
M3
gi empat 21x10.5x6 cm K225 (natural) Bh
Kg
Kg
Kg
as 15x30 Bh
aja ringan + Atap Genteng Metal (setara sakura roof ) + Nok + Talang seng M2
M'
M2
M2
Ttk
Ttk
Bh
Bh
Bh
kal 3 Group Bh
Bh
Bh
Bh
Bh
Daftar Harga Upah dan Bahan - 10
Psg
Psg
Bh
Bh
Bh
Bh
Bh
e 2 x slash Bh
Bh
Lbr
Kg
Lbr
Lbr
M'
M'
M'
M'
M'
Kg
Kg
Aluminium M'
M2
Kg
jarak bekisting/spacer M'
M'
cm (biasa) Bh
cm (motif) Bh
Bh
Bh
cm (Motif) Bh
Bh
Bh
Daftar Harga Upah dan Bahan - 11
Bh
Stenless Steel Bh
nal (Listrik) Bh
Bh
Bh
Bh
Bh
Bh
Kg
Kg
Kg
Kg
Kg
Daftar Harga Upah dan Bahan - 12
M3
M3
M3
M3
M3
anti (molding) M'
M3
M3
M3
Kayu Bengkirai M3
Kayu Meranti M3
Kayu Bengkirai M3
Kayu Kruing M3
Kayu Meranti M3
ayu Bengkirai M3
Btg
(meranti) M3
M'
Btg
l Kayu Bengkirai Bh
l Kayu Ulin Bh
ca Rayben t=5 mm Bh
Lbr
Kg
Kg
Kg
Kg
Ltr
elas Paragon Ltr
Ltr
Kg
Ltr
Ltr
Kg
Ltr
Ltr
Ltr
Ltr
Ltr
Kg
Daftar Harga Upah dan Bahan - 13
M3
M3
Daftar Harga Upah dan Bahan - 14
AH & BAHAN
HARGA
SATUAN KET
( Rp.)
4 5
177,000.00
150,000.00
150,000.00
150,000.00
150,000.00
150,000.00
127,000.00
127,000.00
127,000.00
127,000.00
127,000.00
115,000.00
120,000.00
95,000.00
600,000.00
400,000.00
482,000.00
150,000.00
100,000.00
1,500.00
6,000.00
2,000.00
2,890.00
2,050.00
9,360.00
36,000.00
54,000.00
Daftar Harga Upah dan Bahan - 15
400,000.00
30,000.00
154,000.00
168,400.00
235,000.00
235,000.00
21,600.00
21,600.00
24,000.00
265,000.00
100,000.00
30,000.00
60,000.00
42,600.00
Daftar Harga Upah dan Bahan - 16
4 5
30,000.00
36,000.00
30,000.00
30,000.00
20,400.00
18,000.00
96,000.00
295,000.00
240,000.00
134,400.00
19,200.00
90,000.00
85,000.00
3,800.00
9,000.00
11,500.00
21,000.00
30,000.00
19,000.00
25,000.00
24,000.00
32,804.23
30,000.00
27,600.00
660,000.00
8,746.78
11,000.00
3,900.00
4,600.00
7,500.00
168,000.00
1,920,000.00
Daftar Harga Upah dan Bahan - 17
420,000.00
804,000.00
900,000.00
30,000.00
30,000.00
300,000.00
1,440,000.00
2,940,000.00
18,000.00
22,000.00
33,600.00
38,400.00
28,800.00
Daftar Harga Upah dan Bahan - 18
4 5
3,805,000.00
3,805,000.00
4,000,000.00
4,000,000.00
2,280,000.00
2,760,000.00
2,040,000.00
2,280,000.00
1,920,000.00
2,800,000.00
2,040,000.00
2,800,000.00
2,280,000.00
2,280,000.00
2,760,000.00
36,000.00
2,280,000.00
40,000.00
15,000.00
860,000.00
1,080,000.00
520,000.00
9,600.00
39,600.00
33,600.00
33,600.00
30,000.00
33,600.00
30,000.00
60,000.00
40,800.00
110,000.00
107,000.00
50,400.00
6,000.00
9,000.00
7,500.00
14,400.00
54,000.00
54,000.00
Daftar Harga Upah dan Bahan - 19
48,000.00
106,000.00
Analisa Biaya Konstruksi - 20
ANALIS
Nomor
Uraian Pekerjaan
Kode
1 2
A. PEKERJAAN PERSIAPAN
1 1 m' Pengukuran dan pemasangan bouwplank
0.012 M3 Balok Kayu Meranti
0.020 Kg Paku Kayu
0.007 M3 Papan Bouwplank
0.100 Oh Tukang kayu
0.100 Oh Pekerja
0.010 Oh Kepala tukang
0.005 Oh Mandor
2 1 m3 Urugan kembali
0.192 Oh Pekerja
0.019 Oh Mandor
3 1 m3 Urugan pasir
1.200 M3 Pasir urug
0.300 Oh Pekerja
0.010 Oh Mandor
4 1 m3 Urugan tanah
1.200 M3 Tanah urug
0.250 Oh Pekerja
0.025 Oh Mandor
C PEKERJAAN PONDASI
1 1 m3 Pasang pondasi batu gunung, 1 Pc : 4 Ps
1.200 M3 Batu belah 15/20 cm
163.00 Kg Semen Pc
Analisa Biaya Konstruksi - 21
1 2
D PEKERJAAN DINDING
1 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps
50.000 Bh Bata merah
11.500 Kg Semen Pc
0.043 M3 Pasir pasang
0.300 Oh Pekerja
0.100 Oh Tukang batu
0.010 Oh Kepala tukang
0.015 Oh Mandor
3 1 m2 Acian
3.200 Kg Semen portland
0.150 Oh Pekerja
0.100 Oh Tukang batu
0.010 Oh Kepala tukang
0.010 Oh Mandor
E PEKERJAAN KAYU
1 1 m3 Pasang kusen pintu dan jendela kayu bengkirai
1.100 M3 Kayu bengkirai balok
7.000 Oh Pekerja
21.000 Oh Tukang kayu
2.100 Oh Kepala tukang
0.350 Oh Mandor
F PEKERJAAN BETON
1 1 m3 Membuat beton bertulang 1pc : 2psr : 3krl
336.000 Kg Semen Pc
0.400 M3 Pasir pasangan
0.820 M3 Batu pecah/split 2/3
6.000 Oh Pekerja
1.000 Oh Tukang batu
0.100 Oh Kepala tukang
0.300 Oh Mandor
Analisa Biaya Konstruksi - 23
2 1 m2 Pasang bekisting
0.0264 M3 Papan Bekisting Kayu Meranti
0.300 Kg Paku biasa
1.000 ltr Dolken Kayu Galam
0.150 Oh Pekerja
0.050 Oh Tukang Kayu
0.005 Oh Kepala tukang
0.007 Oh Mandor
1 2
0.0035 Oh Mandor
4 ListPlank Kayu
0.011 M' Papan Kayu Meranti
0.050 Kg Paku kayu
0.100 Oh Pekerja
0.200 Oh Tukang kayu
0.020 Oh Kepala tukang
0.0050 Oh Mandor
Analisa Biaya Konstruksi - 26
1 2
I PEKERJAAN SANITASI
1 Memasang 1 buah kloset jongkok
1.000 Bh Kloset jongkok
6.000 Kg Semen Pc
0.010 M3 Pasir pasang
1.000 Oh Pekerja
1.500 Oh Tukang batu
1.500 Oh Kepala tukang
0.160 Oh Mandor
1 2
5 1 Bh Kunci Silinder
1.000 Bh Kunci silinder
35% Hrg Perlengkapan
0.015 Oh Pekerja
0.150 Oh Tukang kayu
0.015 Oh Kepala tukang
0.00075 Oh Mandor
1 2
L PEKERJAAN PENGECATAN
1 1 m2 Pengecatan bidang kayu baru ( 1 lapis plamir ),
1 lapis cat dasar, 3 lapis cat penutup
0.200 Kg Meni Kayu
0.150 Kg Dempul kayu
0.170 Kg Cat dasar
0.350 Kg Cat penutup 3 kali (cat kilap)
0.070 Oh Pekerja
0.105 Oh Tukang
0.004 Oh Kepala tukang
0.0025 Oh Mandor
Analisa Biaya Konstruksi - 31
1 2
M PEKERJAAN TAMBAHAN
1 1 m2 Pasang paving blok/paving stone
36.50 Bh Paving stone segi empat 21x10.5x6 cm (
0.320 Oh Pekerja
0.100 Oh Tukang batu
0.010 Oh Kepala tukang
0.015 Oh Mandor
ERSIAPAN
n dan pemasangan bouwplank
Balok Kayu Meranti 2,280,000.00 27,360.00
Paku Kayu 18,000.00 360.00
Papan Bouwplank 1,920,000.00 13,440.00
Tukang kayu 127,000.00
115,000.00
Kepala tukang 150,000.00
177,000.00
41,160.00
ANAH DAN URUGAN
ah biasa sedalam 1 meter
115,000.00
177,000.00
115,000.00
177,000.00
2 3 4
1,224,000.00
2 3 4
NUTUP ATAP
ap kayu bengkirai
Reng 3/4 - 4 m Kayu Bengkirai 2,760,000.00 35,880.00
Paku kayu 18,000.00 4,680.00
Kepala tukang 115,000.00
127,000.00
150,000.00
40,560.00
tap seng gelombang
Seng gelombang BJLS 27 KI 400,000.00 280,000.00
Paku seng 33,600.00 672.00
115,000.00
Tukang kayu 127,000.00
Kepala Tukang 150,000.00
177,000.00
280,672.00
ap nok seng
Plat seng L=60 cm 30,000.00 33,000.00
Paku seng 33,600.00 1,344.00
115,000.00
Tukang kayu 127,000.00
Kepala Tukang 150,000.00
177,000.00
34,344.00
NGIT - LANGIT
ngit Gypsum tebal + rangka Gypsum
Rangka plafond Gypsum 2,280,000.00 52,440.00
Paku kayu 18,000.00 1,080.00
85,000.00 31,875.00
Paku Gypsum 38,400.00 1,152.00
115,000.00
Tukang kayu 127,000.00
Kepala tukang 150,000.00
177,000.00
86,547.00
ngit Kalsibord + rangka
Rangka plafond 2,280,000.00 52,440.00
Paku kayu 18,000.00 1,080.00
90,000.00 33,750.00
Paku kalsibord 38,400.00 1,152.00
115,000.00
Tukang kayu 127,000.00
Kepala tukang 150,000.00
Analisa Biaya Konstruksi - 38
177,000.00
88,422.00
2 3 4
ah kloset jongkok
Kloset jongkok 168,000.00 168,000.00
Semen Pc 2,000.00 12,000.00
Pasir pasang 150,000.00 1,500.00
115,000.00
Tukang batu 127,000.00
Kepala tukang 150,000.00
177,000.00
181,500.00
pipa PVC tipe AW dia. 4"
Pipa paralon 4" 30,000.00 36,000.00
Perlengkapan 10,500.00 3,675.00
115,000.00
Tukang batu 127,000.00
Kepala tukang 150,000.00
177,000.00
39,675.00
pipa PVC tipe AW dia. 2"
Pipa paralon 2" 11,500.00 13,800.00
Perlengkapan 4,025.00 1,408.75
115,000.00
Tukang batu 127,000.00
Kepala tukang 150,000.00
177,000.00
15,208.75
pipa PVC tipe AW dia. 1/2"
Pipa paralon 1/2" 3,800.00 4,560.00
Perlengkapan 1,330.00 465.50
115,000.00
Tukang batu 127,000.00
Kepala tukang 150,000.00
177,000.00
5,025.50
Floor Drain
Floor drain 30,000.00 30,000.00
Perlengkapan 30,000.00 10,500.00
115,000.00
Tukang batu 127,000.00
Kepala tukang 150,000.00
177,000.00
40,500.00
Analisa Biaya Konstruksi - 40
30,000.00 30,000.00
Perlengkapan 10,500.00 3,675.00
115,000.00
Tukang batu 127,000.00
Kepala tukang 150,000.00
177,000.00
33,675.00
Analisa Biaya Konstruksi - 41
2 3 4
CA DAN PENGGANTUNG
30,000.00 30,000.00
Perlengkapan 10,500.00 3,675.00
115,000.00
Tukang kayu 127,000.00
Kepala tukang 150,000.00
177,000.00
33,675.00
36,000.00 36,000.00
Perlengkapan 12,600.00 4,410.00
115,000.00
Tukang kayu 127,000.00
Kepala tukang 150,000.00
177,000.00
40,410.00
ndel Jendela
Grendel jendela 18,000.00 18,000.00
Perlengkapan 6,300.00 2,205.00
115,000.00
Tukang kayu 127,000.00
Kepala tukang 150,000.00
177,000.00
20,205.00
2 3 4
2 3 4
AMBAHAN
ving blok/paving stone
Paving stone segi empat 21x10.5x6 cm (natural) 6,000.00 219,000.00
115,000.00
Tukang batu 127,000.00
Kepala tukang 150,000.00
177,000.00
219,000.00
dengan Wiremesh M6
Wiremesh M6 32,804.23 32,804.23
Alat bantu 1,000.00 1,000.00
115,000.00
Tukang besi 127,000.00
Kepala tukang 150,000.00
177,000.00
33,804.23
Analisa Biaya Konstruksi - 46
STRUKSI
12,700.00
11,500.00
1,500.00
885.00
26,585.00 67,745.00
46,000.00
7,080.00
53,080.00 53,080.00
22,080.00
3,363.00
25,443.00 25,443.00
34,500.00
1,770.00
36,270.00 156,270.00
28,750.00
4,425.00
33,175.00 90,775.00
Analisa Biaya Konstruksi - 47
172,500.00
95,250.00
11,250.00
13,275.00
292,275.00 1,176,275.00
690,000.00
127,000.00
15,000.00
53,100.00
885,100.00 2,012,340.00
805.00
889.00
105.00
53.10
1,852.10 22,177.10
59,800.00
33,020.00
3,900.00
4,602.00
101,322.00 188,922.00
Analisa Biaya Konstruksi - 48
5 6
34,500.00
12,700.00
1,500.00
2,655.00
51,355.00 155,805.00
34,500.00
19,050.00
2,250.00
2,655.00
58,455.00 74,535.00
17,250.00
12,700.00
1,500.00
1,770.00
33,220.00 39,620.00
805,000.00
2,667,000.00
315,000.00
61,950.00
3,848,950.00 8,248,950.00
690,000.00
127,000.00
15,000.00
53,100.00
Analisa Biaya Konstruksi - 49
885,100.00 2,109,100.00
6,350.00
750.00
1,239.00
8,339.00 99,845.00
805.00
889.00
105.00
53.10
1,852.10 22,177.10
Analisa Biaya Konstruksi - 50
5 6
1,725.00
19,050.00
18,000.00
38,775.00 79,335.00
13,800.00
7,620.00
900.00
1,062.00
23,382.00 304,054.00
17,250.00
8,890.00
1,200.00
1,062.00
28,402.00 62,746.00
8,050.00
12,700.00
1,500.00
619.50
22,869.50 109,416.50
8,050.00
12,700.00
1,500.00
Analisa Biaya Konstruksi - 51
619.50
22,869.50 111,291.50
2,415.00
2,667.00
30.00
17.70
5,129.70 50,209.70
11,500.00
25,400.00
3,000.00
885.00
40,785.00 64,125.00
Analisa Biaya Konstruksi - 52
5 6
115,000.00
190,500.00
225,000.00
28,320.00
558,820.00 740,320.00
9,315.00
17,145.00
2,025.00
725.70
29,210.70 68,885.70
9,315.00
17,145.00
2,025.00
725.70
29,210.70 44,419.45
9,315.00
17,145.00
2,025.00
725.70
29,210.70 34,236.20
1,150.00
12,700.00
1,500.00
885.00
16,235.00 56,735.00
Analisa Biaya Konstruksi - 53
1,150.00
12,700.00
1,500.00
885.00
16,235.00 49,910.00
Analisa Biaya Konstruksi - 54
5 6
1,725.00
19,050.00
2,250.00
132.75
23,157.75 43,362.75
1,725.00
19,050.00
2,250.00
132.75
23,157.75 56,832.75
1,725.00
19,050.00
2,250.00
132.75
23,157.75 63,567.75
1,725.00
19,050.00
2,250.00
132.75
23,157.75 43,362.75
1,725.00
19,050.00
2,250.00
132.75
23,157.75 292,557.75
Analisa Biaya Konstruksi - 55
1,725.00
19,050.00
2,250.00
132.75
23,157.75 211,422.75
2,875.00
31,750.00
3,750.00
221.25
38,596.25 244,465.25
Analisa Biaya Konstruksi - 56
5 6
71,300.00
44,450.00
5,250.00
5,310.00
126,310.00 225,787.46
71,300.00
44,450.00
5,250.00
5,310.00
126,310.00 262,060.00
69,000.00
12,700.00
6,750.00
5,310.00
93,760.00 210,135.00
8,050.00
13,335.00
600.00
442.50
22,427.50 60,023.50
Analisa Biaya Konstruksi - 57
2,300.00
8,001.00
945.00
442.50
11,688.50 26,568.50
2,300.00
8,001.00
945.00
442.50
11,688.50 47,368.50
Analisa Biaya Konstruksi - 58
5 6
36,800.00
12,700.00
1,500.00
2,655.00
53,655.00 272,655.00
29,900.00
2,540.00
9,450.00
1,115.10
43,005.10 76,809.33
REKAPITULASI ANALISA BIAYA SEWA PERALATAN PERJAM KERJA
UMUR JAM
TENAGA KAPASITAS BIAYA PASTI
EKONOM HARGA ALAT KERJA 1
KODE ALAT TENAGA ALAT PERJAM
No. JENIS PERALATAN IS TAHUN
ALAT
(A) (B) (W) (E)
( HP ) ( Cp )
(Tahun) (Rp.) (Jam) (Rp.)
1 EXCAVATOR PC 80 -140 HP E06 80 0.50 Ton 5.00 1,000,000,000 2,000 ###
IAYA SEWA PERALATAN PERJAM KERJA
A. URAIAN PERALATAN
1 Jenis Peralatan EXCAVATOR
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru - Umur Ekonomis A
- Jam Operasional Dalam 1 Tahun W
- Harga Alat B
5 Alat yang dipakai - Umur Ekonomis A'
- Jam Operasional Dalam 1 Tahun W'
- Harga Alat B'
100,000,000.00 Rupiah
0.31256
140,653.74 Rupiah
1,000.00 Rupiah
141,653.74 Rupiah
105,000.00 Rupiah
86,400.00 Rupiah
87,500.00 Rupiah
- Rupiah
- Rupiah
278,900.00 Rupiah
420,553.74 Rupiah
420,553.74 Rupiah
17.00 %/Tahun
- Rp/Jam
- Rp/Jam
9,000.00 Liter
7,500.00 Liter
54,000.00 Liter
URAIAN ANALISA
Item Pembayaran No :
Jenis Pekerjaan : GALIAN TANAH MEKANIS (Cut &
Satuan Pembayaran : M3
No. U R A I A N
I ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : area galian
3 Kondisi lahan : sedang / baik
4 Jam kerja efektif per - hari
5 Faktor pengembangan bahan
II URUTAN KERJA
1 Tanah yang dipotong berupa tanah biasa
2 Penggalian dilakukan dengan menggunakan Excavator
3 Selanjutnya Excavator menimbun hasil galian ke lokasi urugan
2 ALAT
2.a EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Manggali / memuat
- Lain-lain
= V x Fb x Fa x 60
Kap. Prod./Jam
Ts1 x Fh
Koefisien Alat/M3 = 1 : Q1
2.b ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang + Sapu
3 TENAGA
Prduksi menentukan : EXCAVATOR
Produksi Galian / hari = Tk x Q1
Kebutuhan Tenaga :
- Pekerja
- Mandor
Koefesien tenaga / M3 :
- Pekerja
- Mandor
URAIAN ANALISA HARGA SATUAN
Analisa EI - 19
R A I A N KODE KOEF. SATUAN
Tk 7.00 jam
Fk 1.20 -
menggunakan Excavator
un hasil galian ke lokasi urugan
E06
V 0.50 M3
Fb 0.90 -
Fa 0.83 -
Ts1 menit
T1 0.500 menit
T2 0.500 menit
Ts1 1.00 menit
V x Fb x Fa x 60 Q1 18.68 M3 / jam
Ts1 x Fh
1 : Q1 E06 0.0535 Jam
Q1 18.68 M3/Jam
Tk x Q1 Qt 130.73 M3
P 4.00 Orang
M 1.00 Orang
Analisa EI - 19
KETERANGAN
Lump Sump
FORMULIR STANDAR UNTU
ANALISA HARGA SATUAN ITEM PE
A. TENAGA
1 Pekerja Jam
2 Mandor Jam
B. BAHAN
C. PERALATAN
1 Excavator Jam
2 Alat Bantu Ls
Jumlah Harga Peralatan
0.1071 - -
0.0535 - -
h Harga Tenaga -
h Harga Bahan -
AN (A+B+C) 23,519.61
10 % x D 2,351.96
(D+E) 25,871.57
i untuk Tenaga Kerja dan Peralata, Volume dan/ atau ukuran berat untuk bahan - bahan
mponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
uk bahan bakar, bahan habis dipakai untuk operator
untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPNyang dibayarkan dari kontrak)
Rencana Anggaran Biaya - 75
RENCANA ANGGARAN B
No Uraian Pekerjaan
1 2
A PEKERJAAN PERSIAPAN
1 Pengukuran & pemasangan bouwplank
2 Papan nama proyek
3 Pembersihan lokasi pekerjaan
4 Serobong Kerja & Gudang Material
5 Dokumentasi & administrasi
B PEKERJAAN PONDASI
1 Galian tanah pondasi
2 Mengurug tanah kembali
3 Pondasi batu gunung camp. 1pc : 4psr
5 Urugan pasir bawah pondasi
6 Pekerjaan pemadatan tanah
7 Pondasi Beton 80 x 80
8 Bekisting
9 Pembesian 75 x 75
10 Plesteran pondasi
C PEKERJAAN BETON
1 Beton sloof 20/20
2 Beton Kolom 15/20
3 Beton ring balk 15/20
4 Bekisting Sloof 20/20
5 Bekisting Kolom 15/20
6 Bekisting Ring Balk 15/20
7 Pembesian Sloof 20/20
8 Pembesian Kolom 15/20
9 Pembesian ringbalk 15/20
1 2
H PEKERJAAN PENGECATAN
1 Cat dinding
2 Cat plafond kasibord
3 Cat kilap kusen pintu, jendela
4 Cat kilap daun pintu, jendela
5 Cat kilap lisplank
6 Cat List Gypsum
7 Cat Layar
I PEKERJAAN LISTRIK
1 Pemasangan Instalasi Lampu
2 Bola Lampu 14 Watt (SL)
Rencana Anggaran Biaya - 78
J PEKERJAAN SANITASI
1 Instalasi air bersih (Pipa PVC 1/2")
2 Kran air
3 Instalsi air kotor (Pipa PVC 4")
4 Klosed Jongkok
5 Floor drain
6 Septic tank lengkap dengan peresapan
K PEKERJAAN LAIN-LAIN
1 Rabat Keliling Bangunan
- Cor rabat cp. 1pc : 3psr : 5krl
- Urugan pasir
2 Saluran air keliling bangunan
- Pasangan dinding batu bata cp. 1pc:4psr
- Plesteran dinding, cp. 1pc:4psr
'- Cor beton cp. 1pc : 2psr : 3kr
- Urugan pasir
3 Rabat Jalan Masuk
- Cor beton cp. 1pc : 2psr : 3kr
- Urugan pasir
Rencana Anggaran Biaya - 79
NA ANGGARAN BIAYA
3 4 5 6 7
3 4 5 6 7
1. Pekerjaan Persiapan
Gambar Sketsa
Keliling Bowplank = 3 + 4 + 3
4 + 2
= 16 m
2. Pekerjaan Pondasi
A. Pekerjan Galian Tanah Sedalaman 1 m3
Gambar Sketsa
Panjang Bangunan = 5 + 10 + 5
10 + 5 + 2
= 37 m
Gambar Sketsa
Panjang = 37 m
Tinggi = 0.3 m
Lebar = 0.8 m
Volume Galian = 8.88 m3
Gambar Sketsa
Panjang 1 Besi
= 12
Berat Besi 12
= 0.89
Berat Besi 10
= 0.62
Berat besi 8
= 0.37
G. Plesteran Pondasi
Panjang = 10 + 5.0 + 10 +
= 30.0 m
Tinggi = 0.7 m
Luas = 21 m2
3. Pekerjaan Beton
A. Pekerjaan Beton Sloof 20/20
Gambar Sketsa
Panjang = 37 m
Lebar = 0.2 m
Tinggi = 0.2 m
Volume = 1.48 m3
Gambar Sketsa
Panjang = 0.2 m
Lebar = 0.15 m
Tinggi = 3.24 m
Volume = 0.10 m3
Jumlah Kolom = 11 bh
Total Volume KL = 1.07 m3
Gambar Sketsa
Panjang = 37 m
Lebar = 0.15 m
Tinggi = 0.2 m
Volume = 1.11 m3
Panjang = 37 m
Lebar = 0.2 m
Luas = 7.4 m2
Luas = 7.4 x 2 = 14.8 m2
Panjang = 0.2 m
Tinggi = 3.24 m
Luas = 0.648 m2
Jumlah Kolom = 11 Bh
Luas Total KL = 7.13 m2
Luas Total KL = 7.13 x 4 = 28.512
F. Pekerjaan Bekisting Ring Balk 15/20
Panjang = 37 m
Lebar = 0.2 m
Luas = 7.4 m2
Luas = 7.4 x 3 = 22.2 m2
Besi Ø 10 = 2 buah
Panjang = 37 m
Besi Tul Pokok = 2 x 37 = 74.0
Jumlah Besi Pokok = 74.0 / 12 = 6.17
Volume Besi 12 = 74.0 x 0.62
= 45.9 kg
Gambar Sketsa
Bagian 1
Panjang = 7 m
Lebar = 5 m
Tinggi = 0.05 m
Volume = 1.75 m3
Bagian 2
Panjang = 1 m
Lebar = 1.5 m
Tinggi = 0.05 m
Volume = 0.075 m3
Bagian 3
Panjang = 3 m
Lebar = 3.5 m
Tinggi = 0.05 m
Volume = 0.525 m3
Bagian 4
Panjang = 2 m
Lebar = 1.5 m
Tinggi = 0.05 m
Volume = 0.15 m3
Bagian 1
Panjang = 7 m
Lebar = 5 m
Tinggi = 0.55 m
Volume = 19.25 m3
Bagian 2
Panjang = 1 m
Lebar = 1.5 m
Tinggi = 0.55 m
Volume = 0.83 m3
Bagian 3
Panjang = 3 m
Lebar = 3.5 m
Tinggi = 0.55 m
Volume = 5.78 m3
Bagian 4
Panjang = 2 m
Lebar = 1.5 m
Tinggi = 0.55 m
Volume = 1.65 m3
C. Cor Lantai Cp . 1 pc : 3 ps : 5 kr t = 10 cm
Gambar Sketsa
Bagian 1
Panjang = 7 m
Lebar = 5 m
Tinggi = 0.1 m
Volume = 3.5 m3
Bagian 2
Panjang = 1 m
Lebar = 1.5 m
Tinggi = 0.1 m
Volume = 0.15 m3
Bagian 3
Panjang = 3 m
Lebar = 3.5 m
Tinggi = 0.1 m
Volume = 1.05 m3
Bagian 4
Panjang = 2 m
Lebar = 1.5 m
Tinggi = 0.1 m
Volume = 0.3 m3
Bagian 1
Panjang = 7 m
Lebar = 5 m
Luas = 35 m2
Bagian 2
Panjang = 1 m
Lebar = 1.5 m
Luas = 1.5 m2
Bagian 3
Panjang = 3 m
Lebar = 3.5 m
Luas = 10.5 m2
Bagian 1
Panjang = 2 m
Lebar = 1.5 m
Luas = 3 m2
Bagian 1
Panjang = 1 m
Lebar = 1 m
Luas = 1 m2
Bagian 2
Panjang = 1 m
Lebar = 1.5 m
Luas = 1.5 m2
Bagian 3
Panjang = 1 m
Lebar = 2 m
Luas = 2 m2
Bagian 4
Panjang = 1 m
Lebar = 1.5 m
Luas = 1.5 m2
Gambar Sketsa
Dinding Kantor
Bagian 1
Panjang = 3.04 m
Lebar = 3.5 m
Luas = 10.64 m2
Luas DD = 10.64 x 2
= 21.28 m2
Bagian 2
Panjang = 3.04 m
Lebar = 3 m
Luas = 9.12 m2
Luas DD = 9.12 x 2
= 18.24 m2
Gambar Sketsa
Dinding WC
Bagian 1
Panjang = 3.04 m
Lebar = 2 m
Luas = 6.08 m2
Bagian 2
Panjang = 3.04 m
Lebar = 1.5 m
Luas = 4.56 m2
Luas DD = 4.56 x 2
= 9.12 m2
Gambar Sketsa
Panjang = 2.52 m
Lebar = 0.79 m
Luas = 1.99 m2
Panjang = 1.85 m
Lebar = 1.29 m
Luas = 2.39 m2
Panjang = 10 m
Lebar = 5 m
OverStek = 1 m
Panjang = 10 + 1 + 1
= 12 m
Lebar = 5 + 1 + 1
= 7 m
Cos 30 = 0.866
Gambar Sketsa
Bagian 1
Panjang = 7 m
Lebar = 5 m
Luas = 35 m2
Bagian 2
Panjang = 1 m
Lebar = 1.5 m
Luas = 1.5 m2
Bagian 3
Panjang = 3 m
Lebar = 3.5 m
Luas = 10.5 m2
Bagian 4
Panjang = 2 m
Lebar = 1.5 m
Luas = 3 m2
Alas = 5 m
Tinggi = 1.443 m
Luas = 7.215 m2
Total Luas = 7.215 x 2
= 14.43 m2
E. List plafond gypsum (m')
Panjang = 5 + 10 + 10 +
= 10 + 17.5
= 57.5 m
F. Lisplank kayu
Panjang = 5 + 10 + 5 +
= + 1 + 1 + 1
= 1
= 34 m
6. Pekerjaan Kusen Pintu Dan Jendela
Gambar Sketsa
Gambar Sketsa
Panjang = 0.52 m
Lebar = 0.38 m
Luas = 0.20 m2
B. Kaca Jendela (1bh)
Panjang = 0.385 m
Lebar = 0.98 m
Luas = 0.38 m2
Luas Total Kaca Jendela = 0.38 x 2
= 0.75
7. Pekerjaan Pengecatan
Bagian 1
Panjang = 7 m
Lebar = 5 m
Luas = 35 m2
Bagian 2
Panjang = 1 m
Lebar = 1.5 m
Luas = 1.5 m2
Bagian 3
Panjang = 3 m
Lebar = 3.5 m
Luas = 10.5 m2
Bagian 4
Panjang = 2 m
Lebar = 1.5 m
Luas = 3 m2
Total Luas Plafond = 50 m2
Bagian Atas
Panjang = 0.79 m
Lebar = 0.04 m
Luas = 0.03 m2
Daun Jendela
Panjang = 0.35 m
Lebar = 1 m
Luas = 0.35 m2
Luas Total Kaca Jendela = 0.35 x 2
= 0.7 m2
Panjang = 5 + 10 + 5 +
= + 1 + 1 + 1
= 1
= 34 m
Lebar = 0.2 m
Luas = 6.8 m2
Panjang = 5 + 10 + 10 +
10 + 17.5
57.5 m
Lebar = 0.1 m
Luas = 57.5 x 0.1 = 5.75 m2
G. Cat Kilap Layar Kalsibord
Alas = 2.5 m
Tinggi = 1.443 m
Luas = 3.61 m2
Total Luas = 3.61 + 3.61 = 13.01 m2
Total Luas = 13.01 x 2 = 26.03 m2
8. Pekerjaan Lain-Lain
Gambar Sketsa
Bagian Kiri
Panjang = 11 m
Lebar = 0.7 m
Tinggi = 0.1 m
Volume = 0.77 m3
Bagian Kanan
Panjang = 11 m
Lebar = 0.7 m
Tinggi = 0.1 m
Volume = 0.77 m3
Bagian Depan
Panjang = 5 m
Lebar = 1 m
Tinggi = 0.1 m
Volume = 0.5 m3
B. Urugan Pasir
Bagian Kiri
Panjang = 11 m
Lebar = 0.7 m
Tinggi = 0.05 m
Volume = 0.39 m3
Bagian Kanan
Panjang = 11 m
Lebar = 0.7 m
Tinggi = 0.05 m
Volume = 0.39 m3
Bagian Depan
Panjang = 5 m
Lebar = 1 m
Tinggi = 0.05 m
Volume = 0.25 m3
Gambar Sketsa
A. Pasangan dinding batu bata cp. 1pc:4psr
Bagian Samping
Bagian Kiri
Panjang = 20.78 m
Lebar = 0.2 m
Luas = 4.16 m2
Luas = 4.16 x 2
= 8.31 m2
Bagian Bawah
Panjang = 20.78 m
Lebar = 0.3 m
Tinggi = 0.05 m
Volume = 0.31 m2
Urugan Pasir
Panjang = 20.78 m
Lebar = 0.3 m
Tinggi = 0.05 m
Luas = 0.31 m3
Panjang = 9.78 m
Lebar = 3.03 m
Tinggi = 0.15 m
Volume = 4.45 m3
B. Urugan Pasir
Panjang = 9.78 m
Lebar = 3.03 m
Tinggi = 0.05 m
Volume = 1.48 m3
+
+
37
37
m
kg
kg
kg
m
bh
m
bh
bh
m
m
bh
11.1
5
m2
oof dan Ring Balk
m
kg
kg
kg
m
bh
bh
bh
m
m
bh
bh
m
bh
m
bh
m
bh
+
bh
bh
54.8
5
10
+
0.01
0.26
0.03
+
0.68
10
+
5
0.5
0.25
m2
M2
m2
REKAPTULASI BIAYA
JUMLAH Rp.
PPn 10% Rp.
TOTAL Rp.
DIBULATKAN Rp.
Mansur Tanca, S. TP
NIP. 19701231 199903 1 03
KAPTULASI BIAYA
TOTAL HARGA
5,333,920.00
24,806,636.70
26,413,897.39
21,189,648.30
63,472,411.46
4,790,238.79
1,756,622.23
9,374,472.25
3,404,800.00
3,499,735.00
16,358,554.26
180,400,936.38
18,040,093.64
198,441,030.02
198,441,000.00
Mansur Tanca, S. TP
NIP. 19701231 199903 1 036
Ruang Fungsional 4.5 5.5 24.75
10.5
40
20
15.75
15.75
10.5
12
124.5
15
3.5 4.5 15.75
3.5 3 10.5
3.5 3 10.5
3.5