1 2 3 4 5 6 7 8 9
0.529
0.265 1.858
0.101
1.267 0.950
0.065
1.321 1.321
0.609 0.609
0.081 0.285 0.204
0.292
2.111 2.111 2.823 2.889 6.704 8.979 11.448 11.096 4.879
2.111 4.221 7.044 9.933 16.637 25.616 37.064 48.160 53.039
0.481 0.481 0.481 0.481 0.481 0.481 100% 1 Minggu = 7 Hari Kerja
1 Hari = 7 Jam Kerja
1.858
90%
80%
1.373
70%
60%
0.765
0.249 50%
2.155 5.389 2.155
9.107 9.107 3.903
1.276
1.321
30%
0.018
20%
0.053
0.007
0.320 0.384 10%
0.013
0.565 0.565
0.107
00%
5.353 4.164 14.374 15.226 6.873 0.972
58.392 62.556 76.930 92.156 99.028 100.000
7.210 ###
0.529 99,215,719
3.981 747,192,498
4.191 786,547,611
0.160 29,957,607
1.040 195,111,446
1.820 341,463,975
1.411 264,800,905
1.373 257,739,781
0.101 19,019,033
2.218 416,207,293
11.662 ###
18.670 ###
0.765 143,551,400
0.249 46,726,692
9.699 ###
22.118 ###
3.386 635,405,955
0.065 12,192,757
1.276 239,425,790
3.964 743,905,013
1.219 228,741,102
0.570 107,036,583
0.292 54,743,646
0.018 3,374,708
0.053 9,873,284
0.007 1,347,500
0.704 132,134,146
0.013 2,509,313
1.130 212,033,155
0.107 20,149,618
100.000
###
Hari
No. Mata Uraian Satuan Volume
(Waktu)
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.0 105
DIVISI 2. DRAINASE
2.1 Galian untuk Selokan Drainase dan Saluran Air M3 3,646.7 4
2.2 Pasangan Batu dengan Mortar M3 1,555.3 15
- Batu (M02) M 3 1,679.7
- Semen PC (M12) Kg 250,403.3
- Pasir (M01) M3 751.0
DIVISI 3. PEKERJAAN TANAH
3.1 (1) Galian Biasa M3 13,340.0 18
3.1 (3) Galian Struktur dengan kedalaman 0 - 2 meter M 3 322.6 1
- Urugan Pilihan M3 161.3
3.1 (4) Galian Struktur dengan kedalaman 2 - 4 meter M3 325.1 1
- Urugan Pilihan M 3 325.1
3.1 (5) Galian Struktur dengan kedalaman 4 - 6 meter M 3 633.0 2
- Urugan Pilihan M3 379.8
3.2 (1) Timbunan Biasa dari selain Galian Sumber Bahan M3 1,668.8 7
- Bahan Timbunan (M08) M 3 2,002.5
3.2 (2) Timbunan Pilihan M 3 1,562.3 2
- Bahan Pilihan (M09) M 3 1,874.8
3.3 Penyiapan Badan Jalan M 2 25,875.0 5
DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN
4.2 (2) Lapis Pondasi Agregat Kelas B M3 1,035.0 7
- Agregat Kelas B (M27) M 3 1,302.7
DIVISI 5. PERKERASAN BERBUTIR
5.1 (1) Lapis Pondasi Agregat Kelas A M3 5,175.0 14
- Agregat Kelas A (M26) M3 6,513.3
5.1 (2) Lapis Pondasi Agregat Kelas B M 3 9,056.3 21
- Agregat Kelas B (M27) M 3 11,398.3
DIVISI 6. PERKERASAN ASPAL
6.1 (1) Lapis Resap Pengikat Liter 20,700.0 2
- Aspal (M10) Kg 14,054.8
- Kerosen (M11) Ltr 7,675.6
6.1 (2) Lapis Perekat Liter 6,468.8 2
- Aspal (M10) Kg 5,490.2
- Kerosen (M11) Ltr 1,332.6
6.3(5a) Laston Lapis Aus (AC-WC) M 2 25,875.0 9
- Agregat 5-10 &10-15 (M92) M3 793.7
- Agregat 0-5 (M91) M3 770.8
- Semen (M05) Kg 47,903.9
- Aspal (M10) Kg 133,554.7
6.3(7a) Laston Lapis Pondasi (AC-Base) M3 2,587.5 17
- Agregat 20-30 (M93) M3 799.0
- Agregat 5-10 &10-15 (M92) M 3 2,232.7
- Agregat 0-5 (M91) M 3 1,055.9
- Semen (M05) Kg 56,728.4
- Aspal (M10) Kg 278,239.1
DIVISI 7. STRUKTUR
7.1 (4) Beton K300 M3 581.2 14
- Semen (M12) Kg 272,969.6
- Pasir beton (M01a) M3 296.2
- Agregat Kasar (M03) M 3 432.4
- Kayu Perancah (M19) M 3 116.2
- Paku (M18) Kg 929.9
7.1 (8) Beton K125 M3 16.6 2
- Semen (M12) Kg 5,177.0
- Pasir beton (M01a) M 3 8.5
- Agregat Kasar (M03) M3 15.1
- Kayu Perancah (M19) M3 0.8
- Paku (M18) Kg 6.7
7.2 (1) Unit Pracetak Gelagar Tipe I bentang 16 m Buah 10.0 3
7.3 (3) Baja Tulangan U32 Ulir Kg 55,341.8 21
- Baja Tulangan (Ulir) D32 (M39b) Kg 60,876.0
- Kawat beton (M14) Kg 1,106.8
7.6 (10) Penyediaan Tiang Pancang Beton Pratekan Pracetak M 3 206.0 12
- TP.Btn. Pratekan (M50) M3 206.0
7.6 (16) Pemancangan Tiang Pancang Beton Pracetak :40 cm x 40 cm a M1 1,600.0 14
7.9 Pasangan Batu M 3 89.6 1
- Batu (M02) M 3 104.9
- Semen PC (M12) Kg 15,774.0
- Pasir (M01) M3 45.6
7.11 (1) Expansion Joint Tipe Asphaltic Plug M 1 37.0 2
- Expansion Joint tipe Asphaltic Plug M 1
37.0
7.13 Sandaran (Railing) M 1 32.0 2
- Pipa Galvanis Dia 3" (M24a) M 32.0
- Dudukan, mur, baut dll, diasumsikan 75 % pipa 24.0
- Beton K-300 (M59) M 3 0.8
7.14 Papan Nama Jembatan Buah 2.0 2
- Marmer (M76) M2 1.5
- Adukan Semen (M102) Ls 0.2
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.4.(1) Marka Jalan Termoplastik M2 1,038.8 11
- Cat Marka Thermoplastic (M17b) Kg 2,025.7
- Minyak Pencair (Thinner) (M33) Ltr 1,090.8
- Blass Bead (M34) Kg 467.5
8.4.(3) .(a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer G Buah 6.0 1
- Pelat Rambu (M35a) BH 6.0
- Pipa Galvanis Dia.1,6" (M24) Btg 6.0
- Beton K-175 (M60) M 3
0.1
Pe Ls 6.0
8.4.(10) Kerb Pracetak M1 1,725.0 14
- Beton K-300 (M59) M3 135.8
8.7(4) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Buah 17.0 1
Jumlah
Prosentase Tiap Minggu (%)
Rencana
Prosentase Komulatif (%)
Prestasi Tiap Minggu (%)
Realisasi
Prestasi Komulatif (%)
TIME SCHEDULE
RENCANA PEMBANGUNAN RUAS JALAN
PALUR - SRAGEN STA 10 + 000 - STA 11+ 725
PROVINSI JAWA TENGAH
1 2 3 4 5 6 7 8 9
0.529
0.265 1.858
111.98 783.87
16693.55 116854.87
50.07 350.47
0.101
1.267 0.950
744.377 558.283
1.321 1.321
20292.008 20292.008
368.946 368.946
0.609 0.609
102.992 102.992
0.081 0.285 0.204
0.292
2.111 2.111 2.823 1088.439 3806.131 4841.870 6084.967 41464.374 ###
2.111 4.221 7.044 1095.483 4901.614 9743.484 15828.451 57292.826 ###
Progres
10 11 12 13 14 15 (%)
1.858
783.87
116854.87
350.47
90%
1.373
80%
70%
0.765
14054.803
7675.560
0.249
5490.158
1332.563
2.155 5.389 2.155
176.370 440.925 176.370 60%
171.296 428.239 171.296
10645.320 26613.300 10645.320
29678.832 74197.080 29678.832
9.107 9.107 3.903
328.996 328.996 140.998
919.362 919.362 394.012
434.773 434.773 186.331
23358.732 23358.732 10010.885
114569.021 114569.021 49101.009 50%
1.693 1.693
136484.781 136484.781
148.101 148.101
216.200 216.200
58.118 58.118
464.946 464.946
40%
1.276
1.321
20292.008
368.946
30%
0.018
0.053 20%
0.007
0.320 0.384
920.772 1104.927 10%
495.800 594.961
212.486 254.983
0.013
0.565 0.565
67.922 67.922 00%
0.107
4.191 786,547,611
0.160 29,957,607
1.040 195,111,446
1.820 341,463,975
1.411 264,800,905
1.373 257,739,781
0.101 19,019,033
2.218 416,207,293
11.662 2,188,553,379
18.670 3,503,764,650
0.765 143,551,400
0.249 46,726,692
9.699 1,820,257,243
22.118 4,150,826,773
3.386 635,405,955
0.065 12,192,757
1.276 239,425,790
3.964 743,905,013
1.219 228,741,102
0.570 107,036,583
0.292 54,743,646
0.018 3,374,708
0.053 9,873,284
0.007 1,347,500
0.704 132,134,146
0.013 2,509,313
1.130 212,033,155
0.107 20,149,618
100.000
###
Waktu
No Uraian Bahan Kode Satuan
(Minggu) 1
1 Pasir Pasang (Sedang) M01b M3
Pasangan Batu dengan Mortar 751.014 M-8/M-10
Pasangan Batu 45.605 M-8
2 Pasir Beton (Kasar) M01a M3
Beton K300 296.202 M-10/M-11
Beton K125 8.509 M-9
3 Batu Kali M02 M3
Pasangan Batu dengan Mortar 1679.724 M-8/M-10
Pasangan Batu 104.861 M-8
4 Agregat Kasar M03 M3
Beton K300 432.399 M-10/M-11
Beton K125 15.066 M-9
5 Filler M05 Kg
Laston Lapis Aus (AC-WC) 47903.94 M-12/M-14
Laston Lapis Pondasi (AC-Base) 56728.35 M-12/M-14
6 Bahan Tanah Timbunan M08 M3
Timbunan Biasa dari selain Galian Sumber Bahan 2002.50 M-3
7 Bahan Pilihan M09 M3
Timbunan Pilihan 1874.79 M-11
Galian Struktur dengan kedalaman 0 - 2 meter 161.29 M-08
Galian Struktur dengan kedalaman 2 - 4 meter 325.07 M-08
Galian Struktur dengan kedalaman 4 - 6 meter 379.81 M-08
8 Aspal M10 KG
Lapis Resap Pengikat 14054.803 M-12
Lapis Perekat 5490.158 M-13
Laston Lapis Aus (AC-WC) 133554.744 M-12/M-14
Laston Lapis Pondasi (AC-Base) 278239.050 M-12/M-14
9 Kerosen / Minyak Tanah M11 LITER
Lapis Resap Pengikat 7675.56 M-12
Lapis Perekat 1332.56 M-13
10 Semen / PC (kg) M12 Kg
Pasangan Batu dengan Mortar 250403.300 M-8/M-10
Beton K300 272969.56 M-10/M-11
Beton K125 5176.97 M-9
Pasangan Batu 15774.000 M-8
11 Kawat Beton M14 Kg
Baja Tulangan U32 Ulir 1106.84 M-8/M-10
12 Cat Marka (Thermoplastic) M17b Kg
Marka Jalan Termoplastik 2025.70 M-14/M-15
13 Paku M18 Kg
Beton K300 929.89 M-10/M-11
Beton K125 6.66 M-9
14 Kayu Perancah M19 M3
Beton K300 116.24 M-10/M-11
Beton K125 0.83 M-9
15 Pipa Galvanis Dia. 1.6" M24 Batang
nggal dengan Permukaan Pemantul Engineer Grade 6.0 M-14
16 Bahan Agr.Base Kelas A M26 M3
Lapis Pondasi Agregat Kelas A 6513.30 M-6/M-8
17 Bahan Agr.Base Kelas B M27 M3
Lapis Pondasi Agregat Kelas B 1302.66 M-8/M-9
Lapis Pondasi Agregat Kelas B 11398.28 M-4/M-7
18 Thinner M33 LITER
Marka Jalan Termoplastik 1090.76 M-14/M-15
19 Glass Bead M34 Kg
Marka Jalan Termoplastik 467.47 M-14/M-15
20 Pelat Rambu (Eng. Grade) M35a BH
nggal dengan Permukaan Pemantul Engineer Grade 6.00 M-14
21 Baja Tulangan (Ulir) D32 M39b Kg
Baja Tulangan U32 Ulir 60876.02 M-8/M-10
22 Tiang Pancang Beton Pratekan M50 M3
Penyediaan Tiang Pancang Beton Pratekan Pracetak 206.0 M-6/M-7
23 PCI Girder L=17m M58a Buah
Unit Pracetak Gelagar Tipe I bentang 16 m 10 M-11
24 Beton K-300 M59 M3
Sandaran (Railing) 0.84 M-12
Kerb Pracetak 135.84 M-11/M-12
25 Beton K-175 M60 M3
nggal dengan Permukaan Pemantul Engineer Grade 0.10 M-14
26 Expansion Tipe Joint Asphaltic Plug M75d M
Expansion Joint Tipe Asphaltic Plug 37.00 M-13
27 Marmer M76 Buah
Papan Nama Jembatan 1.50 M-12
28 Pipa Galvanis Dia 3" M24a M
Sandaran (Railing) 32.00 M-12
29 Agregat Pecah Mesin 0-5 mm M91 M3
Laston Lapis Aus (AC-WC) 770.83 M-12/M-14
Laston Lapis Pondasi (AC-Base) 1055.88 M-12/M-14
30 Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3
Laston Lapis Aus (AC-WC) 793.66 M-12/M-14
Laston Lapis Pondasi (AC-Base) 2232.74 M-12/M-14
31 Agregat Pecah Mesin 20-30 mm M93 M3
Laston Lapis Pondasi (AC-Base) 799.0 M-12/M-14
32 Dudukan, Mur baut, dll M101 Ls
Sandaran (Railing) 24.00 M-12
33 Adukan Semen M102 Ls
Papan Nama Jembatan 0.2 M-12
TIME SCHEDULE BAHAN
RENCANA PEMBANGUNAN RUAS JALAN
PALUR - SRAGEN STA 10 + 000 - STA 11+ 725
PROVINSI JAWA TENGAH
2002.500
2002.500
866.166
161.291
325.069
379.806
6.66 464.95
464.95
6.66
0.83 58.118
58.118
0.83
148.101
148.101
216.200
216.200
1874.794
1874.794
136484.78
920.77 1104.93
920.77 1104.93
464.95
464.95
58.118
58.118
6.0
6.0
495.80 594.96
495.80 594.96
212.49 254.98
212.49 254.98
6.00
6.00
10
10
67.92 68.76
0.84
67.92 67.92
0.10
0.10
37.00
37.00
1.50
1.50
32.00
32.00
606.07 863.01 357.63
171.30 428.24 171.30
434.77 434.77 186.33
1095.73 1360.29 570.38
176.37 440.92 176.37
919.36 919.36 394.01
329.00 329.00 141.00
329.00 329.00 141.00
24.00
24.00
0.2
0.2
Waktu
No Uraian Bahan Kode Satuan
(Minggu)
1 Pasir Pasang (Sedang) M01b M3
Pasangan Batu dengan Mortar 751.014 M-8/M-10
Pasangan Batu 45.605 M-8
2 Pasir Beton (Kasar) M01a M3
Beton K300 296.202 M-10/M-11
Beton K125 8.509 M-9
3 Batu Kali M02 M3
Pasangan Batu dengan Mortar 1679.724 M-8/M-10
Pasangan Batu 104.861 M-8
4 Agregat Kasar M03 M3
Beton K300 432.399 M-10/M-11
Beton K125 15.066 M-9
5 Filler M05 Kg
Laston Lapis Aus (AC-WC) 47903.94 M-12/M-14
Laston Lapis Pondasi (AC-Base) 56728.35 M-12/M-14
6 Bahan Tanah Timbunan M08 M3
Timbunan Biasa dari selain Galian Sumber Bahan 2002.50 M-3
7 Bahan Pilihan M09 M3
Timbunan Pilihan 1874.79 M-11
8 Aspal M10 KG
Lapis Resap Pengikat 14054.803 M-12
Lapis Perekat 5490.158 M-13
Laston Lapis Aus (AC-WC) 133554.744 M-12/M-14
Laston Lapis Pondasi (AC-Base) 278239.050 M-12/M-14
9 Kerosen / Minyak Tanah M11 LITER
Lapis Resap Pengikat 7675.56 M-12
Lapis Perekat 1332.56 M-13
10 Semen / PC (kg) M12 Kg
Pasangan Batu dengan Mortar 250403.300 M-8/M-10
Beton K300 272969.562 M-10/M-11
Beton K125 5176.972 M-9
Pasangan Batu 15774.000 M-8
11 Kawat Beton M14 Kg
Baja Tulangan U32 Ulir 1106.837 M-8/M-10
12 Cat Marka (Thermoplastic) M17b Kg
Marka Jalan Termoplastik 2025.70 M-14/M-15
13 P a k u M18 Kg
Beton K300 929.89 M-10/M-11
Beton K125 6.66 M-9
14 Kayu Perancah M19 M3
Beton K300 116.24 M-10/M-11
Beton K125 0.83 M-9
15 Pipa Galvanis Dia. 1.6" M24 Batang
bu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade 6.0 M-14
16 Bahan Agr.Base Kelas A M26 M3
Lapis Pondasi Agregat Kelas A 6513.30 M-6/M-8
17 Bahan Agr.Base Kelas B M27 M3
Lapis Pondasi Agregat Kelas B 1302.66 M-8/M-9
Lapis Pondasi Agregat Kelas B 11398.28 M-4/M-7
18 Thinner M33 LITER
Marka Jalan Termoplastik 1090.76 M-14/M-15
19 Glass Bead M34 Kg
Marka Jalan Termoplastik 467.47 M-14/M-15
20 Pelat Rambu (Eng. Grade) M35a BH
bu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade 6.00 M-14
21 Baja Tulangan (Ulir) D32 M39b Kg
Baja Tulangan U32 Ulir 60876.02 M-8/M-10
22 Tiang Pancang Beton Pratekan M50 M3
Penyediaan Tiang Pancang Beton Pratekan Pracetak 206.0 M-6/M-7
23 PCI Girder L=17m M58a Buah
Unit Pracetak Gelagar Tipe I bentang 16 m 10 M-11
24 Beton K-300 M59 M3
Sandaran (Railing) 0.84 M-12
Kerb Pracetak 135.84 M-11/M-12
25 Beton K-175 M60 M3
bu Jalan Tunggal dengan Permukaan Pemantul Engineer Grade 0.10 M-14
26 Expansion Tipe Joint Asphaltic Plug M75d M
Expansion Joint Tipe Asphaltic Plug 37.00 M-13
27 Marmer M76 Buah
Papan Nama Jembatan 1.50 M-12
28 Pipa Galvanis Dia 3" M24a M
Sandaran (Railing) 32.00 M-12
29 Agregat Pecah Mesin 0-5 mm M91 M3
Laston Lapis Aus (AC-WC) 770.83 M-12/M-14
Laston Lapis Pondasi (AC-Base) 1055.88 M-12/M-14
30 Agregat Pecah Mesin 5-10 & 10-20 mm M92 M3
Laston Lapis Aus (AC-WC) 793.66 M-12/M-14
Laston Lapis Pondasi (AC-Base) 2232.74 M-12/M-14
31 Agregat Pecah Mesin 20-30 mm M93 M3
Laston Lapis Pondasi (AC-Base) 799.0 M-12/M-14
32 Dudukan, Mur baut, dll M101 Ls
Sandaran (Railing) 24.00 M-12
33 Adukan Semen M102 Ls
Papan Nama Jembatan 0.2 M-12
TIME SCHEDULE BAHAN
RENCANA PEMBANGUNAN RUAS JALAN
PALUR - SRAGEN STA 10 + 000 - STA 11+ 725
PROVINSI JAWA TENGAH
216.843
111.982
104.861
2002.500
2002.500
32467.55
16693.55
15774.00
368.95
368.95
930.471854 3256.65149 2326.179636
1085.550497 3799.426738 3799.42674 2713.876242 744.3774834
744.3774834
1085.550497 3799.426738 3799.42674 2713.876242
20292.01
20292.01
102.992 102.992
102.992 102.992
elaksanaan (Minggu)
9 10 11 12 13 14 15
350.473 350.473
350.473 350.473
1874.794
1874.794
158302.656 194256.258 78779.84082
14054.803
5490.158
29678.832 74197.08 29678.832
114569.0206 114569.0206 49101.00882
7675.560 1332.563
7675.560
1332.563
122031.84 253339.65 136484.78
116854.87 116854.87
136484.78 136484.78
5176.97
368.95 368.95
368.95 368.95
920.77 1104.93
920.77 1104.93
6.66 464.95 464.95
464.95 464.95
6.66
0.83 58.118 58.118
58.118 58.118
0.83
6.0
6.0
558.2831126
558.2831126
495.80 594.96
495.80 594.96
212.49 254.98
212.49 254.98
6.00
6.00
20292.01 20292.01
20292.01 20292.01
10
10
37.00
37.00
1.50
1.50
32.00
32.00
606.07 863.01 357.63
171.30 428.24 171.30
434.77 434.77 186.33
1095.73 1360.29 570.38
176.37 440.92 176.37
919.36 919.36 394.01
329.00 329.00 141.00
329.00 329.00 141.00
24.00
24.00
0.2
0.2