Anda di halaman 1dari 2

BAHAN BANGUNAN PEMBANGUNAN BURUNG PUYUH

NO BARANG SAT Harga @


Tebang pohon kelapa 40 15,000
Atap 750 1,400
Tepas 20 53,000
Kandang burung 15 350,000
Bibit 3,200 2,200
Semen 10 50,000
Pasir 1 500,000
Tukang 7 120,000
Pakan 3,000 0.2 600
Lampu 35
Tmpt minum
Pekerja 2 bln 1,000,000
Pekerja tambahan 2 600,000

Koperasi 15,000,000
tabungan] 4,000,000

Pekerja 110,000
Pakan 338,000
448,000

Hasil 575,000
127,000 3,810,000
Total
600,000
1,050,000
1,060,000
5,250,000
7,040,000
500,000
500,000
840,000
1,000 60 5,600 6,720,000 750,000
600,000
700,000
2,000,000
1,200,000

28,060,000