JUMLAH
NO URAIAN PEKERJAAN
HARGA (Rp)
I PEKERJAAN PERSIAPAN,GALIAN,DAN URUGAN
II PEKERJAAN PONDASI DAN BETON
III PEKERJAAN PASANGAN DAN PLESTERAN
IV PEKERJAAN LANTAI DAN DINDING
V PEKERJAAN ATAP
VI PEKERJAAN PLAFON
VII PEKERJAAN KUSEN PINTU DAN JENDELA
VIII PEKERJAAN PERLENGKAPAN PINTU DAN JENDELA
IX PEKERJAAN PERLENGKAPAN KAMAR MANDI
X PEKERJAAN INSTALASI AIR
XI PEKERJAAN INSTALASI LISTRIK
XII PEKERJAAN PENGECATAN
XIII FINISING
JUMLAH Rp -
DIBULATKAN Rp -
TERBILANG : SERATUS SEMBILAN PULUH EMPAT JUTA SEMBILAN RATUS EMPAT RIBU TIGA RATUS LIMA
PULUH DELAPAN
LAMPIRAN : RA-PERATURAN WALIKOTA YOGYAKARTA
NOMOR : ......................
TANGGAL : ......................
Bahan - 2
NO. URAIAN TENAGA SATUAN
Bahan - 3
ATURAN WALIKOTA YOGYAKARTA
................
................
63,000.00
65,000.00
58,000.00
63,000.00
61,000.00
63,000.00
62,000.00
69,000.00
55,500.00
58,000.00
42,500.00
45,000.00
50,000.00
55,000.00
45,000.00
45,000.00
40,000.00
55,500.00
65,000.00
105,000.00
100,000.00
85,000.00
50,000.00
55,000.00
42,500.00
45,000.00
42,500.00
45,000.00
40,000.00
42,500.00
40,000.00
35,750.00
35,750.00
37,500.00
35,750.00
35,750.00
40,000.00
45,000.00
40,000.00
45,000.00
40,000.00
Bahan - 4
HARGA SATUAN (Rp.)
45,000.00
35,750.00
100,000.00
47,500.00
105,000.00
40,000.00
40,000.00
40,000.00
40,000.00
Bahan - 5
DAFTAR HARGA SATUAN BAHAN BANGUNAN TERTINGGI
CAT
1 Cat kayu se kualitas Patna kg
2 Cat kayu se kualitas Emco biasa kg
3 Cat kayu se kualitas Emco Bintang kg
4 Cat kayu se kualitas Par kg
5 Cat besi se kualitas Patna kg
6 Cat besi se kualitas Emco biasa kg
7 Cat besi se kualitas Emco Bintang kg
8 Cat kayu se kualitas Avian kg
9 Cat tembok/cat semen Maxilite kg
10 Cat tembok/cat emulsi dasar minyak Express kg
11 Cat tembok/cat polivynyl asetat Dulux kg
12 Cat tembok/cat kilap/cat acrilyc Dulux kg
13 Cat ICI Catylac kg
14 Cat Tembok Catylac Biasa kg
15 Cat Tembok Catylac Bintang kg
16 Cat Tembok Mowilek Dalam kg
17 Cat Tembok Mowilek Luar kg
18 Cat Tembok Dulux Dalam kg
19 Cat Tembok Dulux Luar kg
20 Cat tembok se kualitas Decolith kg
21 Cat Sintex kg
22 Cat dasar meni besi type A (cepat kering) Jago kg
23 Cat dasar meni besi type A (cepat kering) Par kg
24 Cat dasar meni kayu Jago kg
25 Cat duco kg
26 Cat genteng air ICI weathershield kg
27 Cat dasar undercoat / alkali resisiting primer kg
28 Cat dinding weathershield Dulux kg
29 Cat dasar kayu, besi dan genteng kg
30 Cat meni kayu, besi dan genteng kg
31 Cat Besi kg
32 Cat Brom kg
33 Dempul kayu typa A (putih) Jago kg
34 Dempul lilin / kayu bj
35 Dempul Kayu unit
36 Plamur Fuji kg
37 Plamur kayu Jago kg
38 Plamur tembok acrilyc kg
39 Plamur jenis sirlak kuning ltr
40 Sirlak putih batangan kg
41 Sirlak kuning serbuk kg
42 Oker kuning kg
43 Oker hitam kg
44 Oker pewarna politur merah / coklat bks
45 Kalkarium kg
Bahan - 6
NO. URAIAN BAHAN SATUAN
Bahan - 7
NO. URAIAN BAHAN SATUAN
KUAS
1 Kuas roll bh
2 Kuas ukuran 3,5" bh
3 Kuas ukuran 2,5" bh
4 Kuas 5" bh
5 Kuas 2" bh
6 Kuas ukuran kecil 1" bh
BAHAN LAINNYA
1 Soda api kg
2 Sabun deterjen kg
3 Amplas lbr
4 Prodo Mas m2
5 Kertas 100 x 100 cm lbr
6 Karbon lbr
7 Alumunium C kg
8 Alumunium B kg
PERALATAN SANITASI
A. BAK MANDI
1 Bak mandi teraso uk. 50x50x50 cm bh
2 Bak mandi teraso uk. 60x60x60 cm bh
3 Bak mandi teraso uk. 90x80x80 cm bh
4 Bak mandi (bathtube) dengan shower lux bh
5 Bak mandi (bathtube) standar bh
6 Bak mandi fiber glass 0,30 m3 bh
7 Bak mandi fiber glass 0,50 m3 bh
B. KLOSET
1 Kloset jongkok porselin type CE7 standar bh
2 Kloset jongkok porselin type CE8 standar bh
3 Kloset jongkok putih INA bh
4 Kloset jongkok warna INA bh
5 Kloset duduk standar / porselin ( dengan tangki KIA standart) "Lolo" bh
6 Kloset duduk porselin lux ( dengan tangki "Toto" ) bh
7 Kloset duduk putih dengan tangki "Toto" set
8 Kloset duduk warna dengan tangki "Toto" set
9 Kloset duduk putih dengan tangki "KIA" set
10 Kloset duduk warna dengan tangki "KIA" set
11 Kloset duduk lengkap INA bh
12 Kloset jongkok bh
13 Kloset jongkok standar / keramik bh
14 Kloset jongkok teraso bh
C. WASTAFEL
1 Wastafel standar INA bh
2 Wastafel lux INA bh
3 Wastafel putih (KIA) set
4 Wastafel warna (KIA) set
Bahan - 8
NO. URAIAN BAHAN SATUAN
5 Badkip bh
6 Bak cuci stainless steel bh
7 Water drain + asesories set
D. URINOIR
1 Urinoir standar TOTO U 57 set
2 Urinoir putih set
4 Urinoir warna (KIA) set
5 Meja cuci dapur 125 x 50 cm bh
6 Tempat sabun tunggal bh
7 Kran air diameter 3/4" atau 1/2" bh
8 Seal tape bh
9 Floordrain bh
Bahan - 9
NO. URAIAN BAHAN SATUAN
ATAP
A. ASBES
1 Asbes plat ( 100 x 100 x 0,3 ) lbr
2 Asbes plat ( 200 x 100 x 0,3 ) lbr
3 Asbes plat ( 100 x 100 x 0,6 ) lbr
4 Asbes plat ( 100 x 100 x 0,5 ) lbr
5 Asbes plat ( 100 x 100 x 0,4 ) lbr
6 Asbes plat ( 100 x 100 x 0,35 ) lbr
7 Asbes plat ( 100 x 100 x 0,32 ) lbr
8 Asbes gelombang besar ( 300 x 110 x 0,5 ) lbr
9 Asbes gelombang besar ( 250 x 110 x 0,5 ) lbr
10 Asbes gelombang besar ( 225 x 110 x 0,5 ) lbr
11 Asbes gelombang besar ( 200 x 110 x 0,5 ) lbr
12 Asbes gelombang besar ( 180 x 110 x 0,5 ) lbr
13 Asbes gelombang besar ( 150 x 110 x 0,5 ) lbr
14 Asbes gelombang besar ( 100 x 100 x 0,28 ) lbr
15 Asbes gelombang besar ( 100 x 200 x 0,28 ) lbr
16 Asbes gelombang besar ( 0,06 x 200 x 0,28 ) lbr
17 Asbes gelombang besar ( 0,05 x 200 x 0,28 ) lbr
18 Asbes gelombang besar ( 0,04 x 200 x 0,28 ) lbr
19 Asbes gelombang besar ( 0,03 x 200 x 0,28 ) lbr
20 Asbes gelombang besar ( 300 x 92 x 0,5 ) lbr
21 Asbes gelombang besar ( 250 x 92 x 0,5 ) lbr
22 Asbes gelombang besar ( 225 x 92 x 0,5 ) lbr
23 Asbes gelombang besar ( 200 x 92 x 0,5 ) lbr
24 Asbes gelombang besar ( 180 x 92 x 0,5 ) lbr
25 Asbes gelombang besar ( 300 x 108 x 0,6 ) lbr
26 Asbes gelombang besar ( 270 x 108 x 0,6 ) lbr
27 Asbes gelombang besar ( 240 x 108 x 0,6 ) lbr
28 Asbes gelombang besar ( 210 x 108 x 0,6 ) lbr
29 Asbes gelombang besar ( 180 x 108 x 0,6 ) lbr
30 Asbes gelombang kecil ( 300 x 105 x 0,4 ) lbr
31 Asbes gelombang kecil ( 270 x 105 x 0,4 ) lbr
32 Asbes gelombang kecil ( 210 x 105 x 0,4 ) lbr
33 Asbes gelombang kecil ( 180 x 105 x 0,4 ) lbr
34 Asbes gelombang kecil ( 150 x 105 x 0,4 ) lbr
35 Asbes gelombang kecil ( 240 x 105 x 0,4 ) lbr
36 Asbes nok gelombang besar psg
37 Asbes nok gelombang kecil psg
38 Nok paten lbr
39 Nok stel rata lbr
40 Asbes Penutup langit-langut 3 mm, 100 x 100 lbr
41 Nok Stel Gelombang 0.92 m lbr
42 Nok Stel Gelombang 1.05 m lbr
43 Nok Stel Gelombang 1.08 m lbr
44 Nok Paten 0.92 m lbr
45 Nok Paten 1.05 m lbr
46 Nok Paten 1.08 m lbr
Bahan - 10
NO. URAIAN BAHAN SATUAN
B. GENTENG
1 Genteng beton besar natural 1m 9 biji bh
2 Genteng beton besar warna 1m 9 biji bh
3 Genteng beton kecil natural 1m 11 biji bh
4 Genteng beton kecil warna 1m 11 biji bh
5 Genteng beton kecil natural 1m 20 biji bh
6 Genteng beton kecil warna 1m 20 biji bh
7 Genteng bubungan beton bh
8 Genteng Wuwung warna bh
9 Nok press beton bh
10 Genteng Beton Besar bh
11 Genteng Beton Kecil bh
12 Genteng Aspal lbr
Bahan - 11
NO. URAIAN BAHAN SATUAN
Bahan - 12
NO. URAIAN BAHAN SATUAN
49 Nok cabang tiga genteng keramik (KIA, Kanmuri, M-Class) berglasir warna bh
50 Badongan wuwung ex. Kasongan bh
Bahan - 13
NO. URAIAN BAHAN SATUAN
LANTAI
A. KERAMIK BERMOTIF
1 Tegel keramik Roman Bella (20 x 25) dos
2 Tegel keramik Roman Bella (10 x 25) dos
3 Tegel keramik Roman Alice (20 x 20) dos
4 Tegel keramik Roman Latanza (20 x 25) dos
5 Tegel keramik Roman Latanza (8 x 20) bj
6 Tegel keramik Roman Tulip (20 x 25) dos
7 Tegel keramik Roman Tulip (8 x 20) bj
8 Tegel keramik Roman Milano (20 x 25) dos
9 Tegel keramik Roman Milano (8 x 20) bj
10 Sablon/Antik 20/20 m2
11 Marblon/Kembang ukuran tipe 20/20 m2
12 Marblon/Kembang ukuran tipe 30/30 m2
13 Marblon/Kembang plint ukuran tipe 20/20 bh
14 Marblon/Kembang plint ukuran tipe 15/20 bh
15 Marblon/Kembang plint ukuran tipe 10/20 bh
16 Marblon/Kembang plint ukuran tipe 30/30 bh
17 Marblon/Kembang plint ukuran tipe 15/30 bh
Bahan - 14
NO. URAIAN BAHAN SATUAN
Bahan - 15
NO. URAIAN BAHAN SATUAN
C. ZENITH
1 Tegel Keramik Essensa (40x40) m2
(Celestial White, Luna Grey, Solar Gold)
2 Tegel Keramik Essensa (30x60) m2
(Celestial White, Luna Grey, Solar Gold)
3 Tegel Keramik Essensa (80x60) m2
(Celestial White, Luna Grey, Solar Gold)
4 Tegel Keramik Essensa (40x40) m2
(Aurora Green, Eclipse Black, Horizon Blue, Meteor Brown,
Nova Red)
5 Tegel Keramik Essensa (30x60) m2
(Aurora Green, Eclipse Black, Horizon Blue, Meteor Brown,
Nova Red)
6 Tegel Keramik Essensa (80x60) m2
(Aurora Green, Eclipse Black, Horizon Blue, Meteor Brown,
Nova Red)
D. TRAVERTINE
1 Tegel Keramik Essensa (40x40) m2
(Daisy, Gladiola, Lily, Salvia)
2 Tegel Keramik Essensa (30x60) m2
(Daisy, Gladiola, Lily, Salvia)
3 Tegel Keramik Essensa (60x60) m2
(Daisy, Gladiola, Lily, Salvia)
4 Tegel Keramik Essensa (40x40) m2
(Ebony, Maple, Rosemary)
5 Tegel Keramik Essensa (30x60) m2
(Ebony, Maple, Rosemary)
6 Tegel Keramik Essensa (60x60) m2
(Ebony, Maple, Rosemary)
E. MARBLE
1 Tegel Keramik Essensa (40x40) m2
(Alexandra, Calamus)
2 Tegel Keramik Essensa (60x60) m2
(Alexandra, Calamus)
F. LAVAGNA
1 Tegel Keramik Essensa (30x60) m2
(Magnetite, Pietra di Luna)
2 Tegel Keramik Essensa (30x60) m2
(Adameello, Gran Sasso, Marmolada, Monte Rosa, Pardoi)
G. DOMUS
1 Tegel Keramik Essensa (40x40) m2
(Crono, Eros, Zeus)
2 Tegel Keramik Essensa (30x60) m2
(Crono, Eros, Zeus)
Bahan - 16
NO. URAIAN BAHAN SATUAN
H. GRANITI IMPERIALI
1 Tegel Keramik Essensa (40x40) m2
(Balmoral Red, Beola Grey, Bianco Crystal, Green Forest,
Grigorio Perla, Impala Black, Kashmir White)
2 Tegel Keramik Essensa (30x60) m2
(Balmoral Red, Beola Grey, Bianco Crystal, Green Forest,
Grigorio Perla, Impala Black, Kashmir White)
Bahan - 17
NO. URAIAN BAHAN SATUAN
I. ISOLATOR
1 Isolator keramik bentuk rol bh
2 Isolator keramik bentuk T - I bh
3 Isolator keramik bentuk sungkup bh
J. TEGEL / KERAMIK
1 Tegel/Ubin teraso 30/30 m2
2 Tegel abu-abu 11/11 m2
3 Tegel abu-abu 15/15 m2
4 Tegel abu-abu 20/20 m2
5 Ubin semen kelabu rata 20/20 m2
6 Ubin semen kelabu rata 30/30 m2
7 Ubin semen berwarna satu rata 20/20 m2
8 Tegel warna 11/11 m2
9 Tegel warna 15/15 m2
10 Tegel warna 20/20 m2
11 Tegel abu-abu 30/30 m2
12 Plint tegel abu-abu 15/20 bh
13 Tegel warna 20/20 m2
14 Tegel warna 30/30 m2
15 Plint tegel abu-abu 11/11 bh
16 Plint tegel abu-abu 15/15 bh
17 Plint tegel abu-abu 20/20 bh
18 Plint tegel abu-abu 30/30 bh
19 Plint tegel abu-abu 15/30 bh
20 Plint tegel abu-abu 10/20 bh
21 Plint tegel abu-abu 10/30 bh
22 Plint tegel warna 10/20 bh
23 Plint tegel warna 10/30 bh
24 Plint tegel warna 11/11 bh
25 Plint tegel warna 15/15 bh
26 Plint tegel warna 20/20 bh
27 Plint tegel warna 15/20 bh
28 Plint tegel warna 30/30 bh
29 Plint tegel warna 15/30 bh
30 Tegel porselin 11/11 m2
31 Tegel keramik 10/20 berglasir m2
32 Tegel keramik 20/20 berglasir m2
33 Tegel keramik 30/30 berglasir m2
34 Tegel keramik 20/25 m2
35 Tegel keramik 40/40 berglasir m2
36 Keramik Putih 30/30 m2
37 Tegel keramik standar ( MULIA) 20/20 dan 30/30 m2
38 Tegel keramik mosaik m2
39 Stepnosing granito bh
40 List keramik dinding motif 5/20 bh
41 Plint keramik 10 x 30 bh
42 Keramik dinding 20/25 m2
Bahan - 18
NO. URAIAN BAHAN SATUAN
Bahan - 19
NO. URAIAN BAHAN SATUAN
PIPA
1 Pipa beton 20 x 30 panjang 1 m m
2 Pipa beton tanpa tulangan dia. 20 cm panjang 1 m m
3 Pipa beton tanpa tulangan dia. 30 cm panjang 1 m m
4 Pipa beton tanpa tulangan dia. 60 cm panjang 0,5 m m
5 Pipa beton tanpa tulangan dia. 80 cm panjang 0,5 m m
6 Pipa beton tanpa tulangan 1/2 dia. 20 cm m
Bahan - 20
NO. URAIAN BAHAN SATUAN
Bahan - 21
NO. URAIAN BAHAN SATUAN
Bahan - 22
NO. URAIAN BAHAN SATUAN
Bahan - 23
NO. URAIAN BAHAN SATUAN
KERB TAMAN
1 Devider Mutiara m
2 Devider /kans teen tebal 30 Mutiara m
3 Devider /kans teen tebal 25 Mutiara m
4 Devider /kans teen tebal 20 Mutiara bh
5 Devider /kans teen tebal 15 Mutiara bh
Bahan - 24
NO. URAIAN BAHAN SATUAN
Bahan - 25
NO. URAIAN BAHAN SATUAN
KAYU
A. KAYU JATI
1 Kayu jati balok 8/12 ( klas plitur ) m3
2 Kayu jati papan m3
3 Balok kayu kelas I ukuran 8/12 m1
4 Balok kayu kelas I ukuran 8/10 m1
5 Balok kayu kelas I ukuran 6/12 m1
6 Balok kayu kelas I ukuran 6/10 m1
7 Balok kayu kelas I ukuran 6/8 m1
8 Bingkai kayu kelas I ukuran 5/7 m1
9 Bingkai kayu kelas I ukuran 4/6 m1
10 Bingkai kayu kelas I ukuran 3/4, 3/5 m1
11 Bingkai kayu kelas I ukuran 2/3 m1
12 Papan kayu kelas I ukuran 3/20 m1
13 Papan kayu kelas I ukuran 3/18 m1
14 Papan kayu kelas I ukuran 2/25 m1
15 Papan kayu kelas I ukuran 2/20 m1
16 Papan kayu kelas I ukuran 2/15 m1
17 Lis Dan jalusi kayu kelas I ukuran 2/6 m1
18 Lis Dan jalusi kayu kelas I ukuran 2/4 m1
19 Lis Dan jalusi kayu kelas I ukuran 1/5 m1
20 Lis Dan jalusi kayu kelas I ukuran 1/3 m1
21 Kayu jati balok 8/12 (lokal) m3
22 Kayu jati papan (lokal) m3
23 Kaui jati lokal ukuran 5/7 m1
24 Kayu jati lokal ukuran 2/3 m1
25 Kayu jati lokal ukuran 3/4 m1
26 Kayu Jati Papan Kelas I m3
27 Kayu Jati Balok Kelas I m3
28 Kayu Jati Papan Kelas II m3
29 Kayu Jati Balok Kelas II m3
30 Kayu Jati Papan Kelas III m3
31 Kayu Jati Balok Kelas III m3
32 Kayu Jati Reng Kelas III m3
B. KAYU KAMPER
1 Kayu kamper balok m3
2 Kayu kamper papan m3
3 Balok kayu kelas I ukuran 8/12 m1
4 Balok kayu kelas I ukuran 8/10 m1
5 Balok kayu kelas I ukuran 6/12 m1
Bahan - 26
NO. URAIAN BAHAN SATUAN
Bahan - 27
NO. URAIAN BAHAN SATUAN
C. KAYU BENGKIRAI
1 Kayu bengkirai balok m3
2 Kayu bengkirai papan m3
3 Balok kayu kelas I ukuran 8/12 m1
4 Balok kayu kelas I ukuran 8/10 m1
5 Balok kayu kelas I ukuran 6/12 m1
6 Balok kayu kelas I ukuran 6/10 m1
7 Balok kayu kelas I ukuran 6/8 m1
8 Bingkai reng & kaso kayu kelas I ukuran 5/7 m1
9 Bingkai reng & kaso kayu kelas I ukuran 4/6 m1
10 Bingkai reng & kaso kayu kelas I ukuran 3/4 m1
11 Bingkai reng & kaso kayu kelas I ukuran 2/3 m1
12 Papan kayu kelas I ukuran 2/15 m1
13 Papan kayu kelas I ukuran 2/20 m1
14 Papan kayu kelas I ukuran 2/25 m1
15 Papan kayu kelas I ukuran 3/18 m1
16 Papan kayu kelas I ukuran 3/20 m1
17 Papan kayu kelas I ukuran 3/30 m1
18 Lis Dan jalusi kayu kelas I ukuran 1/3 m1
19 Lis Dan jalusi kayu kelas I ukuran 1/5 m1
20 Lis Dan jalusi kayu kelas I ukuran 2/4 m1
D. KAYU KRUING
1 Kayu kruing balok m3
2 Kayu kruing papan m3
3 Balok kayu kelas I ukuran 8/12 m1
4 Balok kayu kelas I ukuran 8/10 m1
5 Balok kayu kelas I ukuran 6/12 m1
6 Balok kayu kelas I ukuran 6/10 m1
7 Balok kayu kelas I ukuran 6/8 m1
8 Bingkai reng & kaso kayu kelas I ukuran 5/7 m1
9 Bingkai reng & kaso kayu kelas I ukuran 4/6 m1
10 Bingkai reng & kaso kayu kelas I ukuran 3/4 m1
11 Bingkai reng & kaso kayu kelas I ukuran 2/3 m1
12 Papan kayu kelas I ukuran 2/15 m1
13 Papan kayu kelas I ukuran 2/20 m1
14 Papan kayu kelas I ukuran 2/25 m1
15 Papan kayu kelas I ukuran 2/30 m1
16 Papan kayu kelas I ukuran 3/18 m1
17 Papan kayu kelas I ukuran 3/20 m1
18 Papan kayu kelas I ukuran 3/25 m1
Bahan - 28
NO. URAIAN BAHAN SATUAN
Bahan - 29
NO. URAIAN BAHAN SATUAN
G. KAYU LAPIS
1 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,3 cm lbr
2 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,4 cm lbr
Kayu lapis mutu I AA 3 lapis uk. 122x244x0,6 cm lbr
3 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,9 cm lbr
4 Kayu lapis mutu I AA 3 lapis uk. 122x244x1,2 cm lbr
5 Akustik soft board 60 x 120 lbr
6 Akustik soft board 40 x 60 lbr
7 Akustik soft board 30 x 60 lbr
8 Melamin wood 90 x 120 cm lbr
9 Melamin wood 120 x 240 cm lbr
10 Formika 4" x 8" x 0,3 cm lbr
11 Formika 120 x 240 cm lbr
12 Teak wood ( 90 x 240 ) lbr
13 Kayu Lapis 4 mm UK 8"x4" lbr
14 Atap sirap m2
15 Akustik soft board 30 x 30 lbr
BAHAN TUMBUHAN
1 Bambu petung btg
2 Bambu wulung btg
3 Bambu apus btg
4 Gedek bambu kulit m2
5 Gedek bambu daging m2
6 Ijuk m3
7 Ijuk kg
8 Alang-alang ikat
Bahan - 30
NO. URAIAN BAHAN SATUAN
BAJA RINGAN
1 Profil C 100x35 tebal 0.6 mm Zincalume m1
2 Profil C 75x35 tebal 0.6 mm Zincalume m1
3 Profil C 64x35 tebal 0.6 mm Zincalume m1
4 Profil C 100x35 tebal 0.75 mm Zincalume m1
5 Profil C 75x35 tebal 0.75 mm Zincalume m1
6 Profil C 64x35 tebal 0.75 mm Zincalume m1
7 Profil R 30x45x40x15 mm tebal 0.6 mm Zincalume m1
8 Profil K 100x80x50 tebal1.5 mm Zincalume bh
9 Sekrup 12 - 14 x 20 mm bh
10 Dyna bolt M 10 x 80 mm bh
B. KAWAT
1 Kawat beton / bindrat kg
2 Kawat ayakan m2
3 Kawat bronjong kg
4 Kawat nyamuk m2
5 Kawat las kg
6 Kawat galvanis kg
7 Kawat anyam galvanis kg
8 Kawat duri kg
9 Besi jaring kawat baja kg
Bahan - 31
NO. URAIAN BAHAN SATUAN
Bahan - 32
NO. URAIAN BAHAN SATUAN
SENG BJLS
1 Seng BJLS 0,20 gelombang P = 180 cm lbr
2 Seng BJLS 0,20 gelombang P = 200 cm (merk Fumira) lbr
3 Seng BJLS 0,20 gelombang P = 240 cm lbr
4 Seng BJLS 0,20 gelombang P = 300 cm lbr
5 Seng BJLS 0,28 lembaran 40 cm lebar m1
6 Seng BJLS 0,28 lembaran 50 cm lebar m1
7 Seng BJLS 0,20 lembaran 90 cm lebar m1
8 Seng BJLS 0,30 lembaran 40 cm lebar m1
9 Seng BJLS 0,30 lembaran 50 cm lebar m1
10 Seng BJLS 0,30 lembaran 60 cm lebar m1
11 Seng BJLS 0,30 lembaran 90 cm lebar m1
Bahan - 33
NO. URAIAN BAHAN SATUAN
Bahan - 34
NO. URAIAN BAHAN SATUAN
PAKU
1 Paku gording 125 x 5,1 mm kg
2 Paku gording 100 x 4,2 mm kg
3 Paku usuk 80 x 3,8 mm kg
4 Paku reng 55 x 3,1 mm kg
5 Paku plepet 40 x 2,1 mm kg
6 Paku eternit 20 x 1,5 mm kg
7 Angkur / baut bh
8 Baut Baja kg
9 Paku besar, sedang kg
10 Paku Payung kg
11 Paku Beton 5 cm bh
12 Paku kait bh
13 Paku pancing bh
14 Paku pancing kg
15 Paku asbes bh
16 Paku sumbat bh
17 Paku sekrup 3.5" bh
18 Paku skrup kg
19 Paku gypsum kg
20 Paku hak panjang 15 cm kg
PENGGANTUNG / PENGUNCI
1 Engsel pintu bh
2 Engsel jendela bh
3 Grendel bh
4 Hak angin bh
5 Selot pintu Union kecil bh
6 Selot pintu Union besar bh
7 Engsel angin bh
8 Kait angin bh
9 Door holder bh
10 Door stop bh
11 Penggantung + rel pintu dorong bh
12 Kunci tanam bh
13 Kunci tanam antik bh
14 Kunci tanam biasa bh
15 Kunci Tanam Besar bh
16 Kunci Tanam Kecil bh
17 Kunci Pintu Air bh
18 Kunci kamar mandi bh
19 Kunci selot bh
20 Kunci selot merk "SES" bh
21 Kunci silinder bh
22 Kunci lemari bh
23 Spring knip bh
24 Door closer bh
25 Floor hinge ps
Bahan - 35
NO. URAIAN BAHAN SATUAN
Bahan - 36
NO. URAIAN BAHAN SATUAN
B. AGREGAT
1 Agregat hakus/pasir klas A ( Uk. butir 5 mm ) m3
2 Agregat kasar/krikil/pasir klas B ( Uk. 20 - 40 ) m3
3 Agregat kasar/krikil/pasir klas B ( Uk. 4½ - 19 ) m3
4 Batu pecah 2/3 ( split ) m3
5 Batu Split 1/2 m3
6 Batu Jagung 0,5/1,00 m3
7 Batu pecah 2/3 m3
8 Batu pecah 10/15 m3
9 Batu pecah 3/4 m3
10 Batu pecah 4/6 m3
11 Batu pecah 5/7 m3
12 Batu pecah 1/2 m3
13 Batu belah 15/20 m3
14 Batu belah hitam m3
15 Batu belah putih m3
16 Sirtu Klas A lewat ayakan 1" m3
17 Sirtu klas B lewat ayakan 2½" m3
18 Pasir urug darat m3
19 Pasir pasang ( progo ) m3
20 Pasir pasang ( krasak ) m3
21 Krikil beton biasa m3
22 Kerikil beton pecah m3
23 Kerikil tidak tersaring m3
24 Split D 30 - 40 mm m3
25 Split D 10 - 20 mm m3
26 Split D 1 - 2 cm m3
27 Batu merah ( 5x11x23 ) bj
28 Batu merah ( 4x9x19 ) bj
29 Krokos 0,2/0,4 m3
30 Tanah urug m3
Bahan - 37
NO. URAIAN BAHAN SATUAN
31 Sirtu m3
32 Batako bh
33 Roster 25/25 bh
34 Roster 20/20 bh
35 Roster 10/20 bh
36 Roster terawang 12 x 11 x 24 bh
37 Bata berongga expose 5 x 11 x 24 bh
38 Hollow block 20 bh
39 Hollow block 15 bh
40 Hollow block 10 bh
41 Tanah liat m3
42 Pasir Silika kg
43 Bata pelapis dinding 3x7x24 cm bh
44 Panel beton pracetak lbr
45 Kolom beton pracetak btg
Bahan - 38
NO. URAIAN BAHAN SATUAN
ASPAL
1 Aspal curah kg
2 Aspal drum kg
3 Aspal modifer / asphalt joint kg
4 Drum aspal bekas bh
5 Rubber Filler m1
6 Mata Kucing bh
7 Filler kg
8 Aspal Emulsi Type CRS-2 kg
9 Aspal Emulsi Type CRS-1 kg
10 Aspal Emulsi Type CRS-1 Polymer kg
11 Aspal Panas kg
4 Solar ltr
5 Minyak pelumas ltr
6 Vet kg
7 Gas Elpiji 3 Kg kg
8 Gas Elpiji 12 Kg kg
9 Minyak bekisting ltr
Bahan - 40
NO. URAIAN BAHAN SATUAN
BAHAN KACA
1 Genteng kaca lengkung cekung 3 mm bh
2 Genteng kaca lengkung cekung 5 mm bh
3 Genteng kaca lengkung rata 3 mm bh
4 Genteng kaca lengkung rata 5 mm bh
5 Genteng kaca 3 mm bh
6 Genteng kaca 5 mm bh
7 Kaca buram/kaca es 3 mm m2
8 Kaca buram/kaca es 5 mm m2
9 Genteng Kaca Paris bh
10 Genteng Kaca Kodok bh
11 Genteng Kaca Beton bh
12 Kaca bening 3 mm m2
13 Kaca bening 5 mm m2
14 Kaca riben 3 mm m2
15 Kaca riben 5 mm m2
16 Kaca cermin 3 mm m2
17 Kaca cermin 5 mm m2
18 Kaca patri m2
19 Fiber glass lbr
20 Roof Light Fiberglass lbr
21 Kaca bening 8 mm m2
22 Kaca buram/kaca es 12 mm m2
23 Kaca cermin 6 mm m2
24 Kaca cermin 8 mm m2
25 Kaca wire glass m2
26 Sticker kaca m2
27 Sandblasting kaca m2
BAHAN PLASTIK
1 Pipa PVC abu-abu dia. 1/2" Wavin btg
2 Pipa PVC abu-abu dia. 3/4" Wavin btg
3 Pipa PVC abu-abu dia. 1" Wavin btg
4 Pipa PVC abu-abu dia. 1 1/2" Wavin btg
5 Pipa PVC abu-abu dia. 2" Wavin btg
6 Pipa PVC abu-abu dia. 2 1/2" Wavin btg
7 Pipa PVC abu-abu dia. 3" Wavin btg
8 Pipa PVC abu-abu dia. 4" Wavin btg
9 Pipa PVC putih dia. 1/2" Wavin/magalone btg
10 Pipa PVC putih dia. 3/4" Wavin/mgalone btg
11 Pipa PVC putih dia. 1" Wavin btg
12 Pipa PVC putih medium dia. 3" Wavin btg
13 Pipa PVC putih tebal dia. 3" Wavin btg
14 Pipa PVC putih medium dia. 4" Wavin btg
15 Pipa PVC putih tebal dia. 4" Wavin btg
Bahan - 41
NO. URAIAN BAHAN SATUAN
Bahan - 42
NO. URAIAN BAHAN SATUAN
PENUTUP ATAP
1 Atap genteng keramik M-Class warna Natural bh
Asesories Atap genteng M-Class warna natural :
2 Hiasan akhir M-1HA bh
3 Pemanas air M-1PA bh
4 Nok M-2 bh
5 Penangkal petir M-2PP bh
6 Lisplank kiri M-3 bh
7 Lisplank kiri hiasan akhir M-3HA bh
8 Lisplank kanan M-4 bh
9 Lisplank kanan hiasan akhir M-4HA bh
10 Ujung jurai M-6 bh
11 Ujung Nok Kanan M-7A bh
12 Ujung nok kiri M-7B bh
13 Nok 3 arah kanan M-8A bh
14 Nok 3 arah kiri M-8B bh
15 Hiasan ujung jurai M-9 & M-9A bh
16 Nok 2 arah M-10A bh
17 Nok 2 arah kanan M-10B bh
18 Nok 2 arah kiri M-10C bh
19 Nok 4 arah jurai M-11 bh
20 Exhaust tiles bawah + atas M-12 bh
21 Exhaust tiles bawah + atas M-12A bh
Bahan - 43
NO. URAIAN BAHAN SATUAN
Bahan - 44
NO. URAIAN BAHAN SATUAN
Nusaboard (Imperial)
1 Nusaboard (Imperial) 2400x1200x3,5 mm lbr
2 Nusaboard (Imperial) 1800X1200X3,5 mm lbr
3 Nusaboard (Imperial) 2400x1200x4,5 mm lbr
4 Nusaboard (Imperial) 1800x1200x4,5 mm lbr
5 Nusaboard (Imperial) 2400x1200x6 mm lbr
6 Nusaboard (Imperial) 1800x1200x6 mm lbr
7 Nusaboard (Imperial) 2400x1200x9 mm lbr
8 Nusaboard (Imperial) 1800x1200x9 mm lbr
9 Nusaboard (Imperial) 2400x1200x12xmm lbr
10 Nusaboard (Imperial) 1800x1200x12 mm lbr
NUSAPLANK
1 Nusaplank 4050x200x8 mm lbr
2 Nusaplank 4050x200x12 lbr
3 Nusaplank 2400x200x8 mm lbr
4 Nusaplank 2400x200x12 mm lbr
5 Nusaplank 4050x300x8 lbr
6 Nusaplank 4050x300x12 mm lbr
7 Nusaplank 2400x300x8 mm lbr
8 Nusaplank 2400x300x12 mm lbr
Bahan - 45
NO. URAIAN BAHAN SATUAN
Bahan - 46
NO. URAIAN BAHAN SATUAN
GENTENG KERAMIK
TERREAL TERRACOTA
Jenis Romane Canal
1 Roman Canal Unglazed 12 bj/m2 bh
Natural bh
Tropical bh
2 Romane 12 Unglazed 12 bj/m2 bh
Natural bh
Tropical bh
3 Nok Unglazed bh
Natural bh
Tropical bh
4 Lisplank kiri Unglazed bh
Natural bh
Tropical bh
5 Lisplank kanan Unglazed bh
Natural bh
Tropical bh
6 Double lengkung lisplank kanan Unglazed bh
Natural bh
Tropical bh
7 Ujung jurai Unglazed bh
Natural bh
Tropical bh
8 Ujung nok Unglazed bh
Natural bh
Tropical bh
9 Nok 3 arah Unglazed bh
Natural bh
Tropical bh
Bahan - 47
NO. URAIAN BAHAN SATUAN
Bahan - 48
NO. URAIAN BAHAN SATUAN
Bahan - 49
NO. URAIAN BAHAN SATUAN
BAHAN PEMBANTU
1 Pasir putih m3
2 Pewarna khusus (Jade Green) kg
3 Pewarna Standart (Red, Yellow, Brawn, Black) kg
4 WBM Bonding Mix ltr
5 Waterproof ltr
6 Coating Heritage / Doff ltr
7 Coating Gloss / Semi Gloss ltr
8 Bahan Pembersih Batu/Wax Removal ltr
Bahan - 50
NO. URAIAN BAHAN SATUAN
Pintu Klasik
1 Single Pintu ukiran tembaga m2
Pintu ukiran aluminium m2
Bahan - 51
NO. URAIAN BAHAN SATUAN
Bahan - 52
NO. URAIAN BAHAN SATUAN
LAIN-LAIN
1 Tiang bendera
-Pondasi umpak buah
-Ompak ornamen buah
-Tiang galvanis 3" m1
-Bendera 120 x 180 buah
2 Rambu lalu lintas (terpasang) buah
3 Papan nama jalan (terpasang) buah
4 Sumur peresapan 5 m buah
5 Air minum, instalasi dalam dengan pipa pralon 1" medium, acesories dihitung sendiri m1
6 Air minum, instalasi luar dengan pipa pralon 1" medium, acesoris dihitung sendiri m1
7 Minyak Flux liter
8 Asbuton kg
9 Tumpuan konstruksi m
10 Kerikil sungai - royalty m3
11 Batu gunung - royalty m3
12 Uji test besi ( 3 sampel tiap jenis diameter benda uji ) set
13 Uji test aspal ttk
14 Sewa alat sondir hr
15 Sewa Scaffolding unit
16 Benda uji silinder beton bh
17 Biaya tes beton per benda uji bh
18 Biaya analisis tes beton perbenda uji bh
19 Bambu batangan (apus) batang
20 Air ltr
21 Strorox kg
22 Waterstop lebar 150 mm m1
23 Waterstop lebar 200 mm m1
24 Waterstop lebar 230 mm - 320 mm m1
25 Gas oksigen 5 kg tb
26 Nipel bh
27 Pipa dia. 3/8" - 15 cm bh
28 Nitobond EC kg
29 Conbextra EP kg
30 Cebex 100 kg
31 Sewa Compressor untuk pekerjaan grouting hr
32 Sewa Mesin Grouting hr
33 Sewa mesin gerinda untuk pekerjaan grouting hr
34 Sewa mixer untuk pekerjaan grouting hr
35 Alat bantu pekerjaan grouting ls
36 Alat bantu pekerjaan pekerjaan expantion joint ls
37 Pelapisan kedap air lantai dengan coating ( terpasang ) m2
38 Pelapisan kedap air lantai dengan membran ( terpasang ) m2
39 Sewa alat perakitan baja Jam
40 Sewa Alat Ukur hr
41 Sewa Alat Las Jam
42 Sewa Mobil Tanki hr
Bahan - 53
NO. URAIAN BAHAN SATUAN
Bahan - 54
NO. URAIAN BAHAN SATUAN
ALAT UKUR
1 Lux Meter Digital bh
2 Meger Analog bh
3 Meteran bulat Esen 5m bh
4 Multitester Analog sekualitas Sanwa bh
5 Multitester Digital bh
6 Tang Ampere Digital bh
7 OK meter bh
ARMATURE
1 Armature Kotak Sorot (Kosong) unit
2 Armature Simbat 40 W unit
3 Kap Aluminium E.27 bh
4 Kap Aluminium E.40 bh
5 Spot + F.MP bh
6 Armature Broadway MGP268/ 1XHPI-T 250W unit
7 Armature Broadway MGP268/ 1XHPI-T 400W unit
8 Armature Broadway SGP268/ 1XSON-T 150W unit
9 Armature Broadway SGP268/ 1XSON-T 250W unit
10 Armature Broadway SGP268/ 1XSON-T 400W unit
11 Armature CDM TT 150W / 83 unit
12 Armature con Tempo RVP250 MHN-TD 150W IC 220V-50HZ S Sp unit
13 Armature con Tempo RVP250 MHN-TD 70W IC 220V-50HZ S Sp unit
14 Armature con Tempo RVP250 SON-T 150W IC 220V-50HZ A Sp unit
15 Armature con Tempo RVP250 SON-T 70W IC 220V-50HZ A Sp unit
16 Armature con Tempo RVP250 SON-TD 150W IC 220V-50HZ S Sp unit
17 Armature con Tempo RVP250 SON-TD 70W IC 220V-50HZ S Sp unit
18 Armature con Tempo RVP350 HPI-T 250W IC 220V-50HZ A Sp unit
19 Armature con Tempo RVP350 HPI-T 250W IC 220V-50HZ S Sp unit
20 Armature con Tempo RVP350 HPI-T 400W IC 220V-50HZ A Sp unit
21 Armature con Tempo RVP350 HPI-T 400W IC 220V-50HZ S Sp unit
22 Armature con Tempo RVP350 SON-T 250W IC 220V-50HZ A Sp unit
23 Armature con Tempo RVP350 SON-T 250W IC 220V-50HZ S Sp unit
24 Armature con Tempo RVP350 SON-T 400W IC 220V-50HZ A Sp unit
25 Armature con Tempo RVP350 SON-T 400W IC 220V-50HZ S Sp unit
26 Armature ECOStreet HRX066 1XHPLN 125W unit
27 Armature ECOStreet HRX086 1XHPLN 250W unit
28 Armature ECOStreet SRX066 1XSON 100W unit
29 Armature ECOStreet SRX066 1XSON-I 70W IG unit
30 Armature ECOStreet SRX086 1XSON 250W unit
31 Armature ECOStreet SRX0861XSON 150W unit
32 Armature EKOROLA TRX800 118 IC / TLD 18 W unit
33 Armature EKOROLA TRX800 136 IC PLL unit
34 Armature HPIT 100W (DVP 311) unit
35 Armature HRP810 1XHPLN 125W BG unit
Bahan - 55
NO. URAIAN BAHAN SATUAN
Bahan - 56
NO. URAIAN BAHAN SATUAN
Bahan - 57
NO. URAIAN BAHAN SATUAN
Bahan - 58
NO. URAIAN BAHAN SATUAN
ASESORIS JARINGAN
1 Banded bh
2 BC 6 mm /m
3 Cover MCB bh
4 Ground Road btg
5 Service Link dan Clamp bh
6 Stainlees Steel 0,70 x 20 m
7 Stoping Buckle bh
8 Terminal Kabel bh
9 Wadge Type bh
10 Box MCB set
11 Rel MCB m1
12 Terminal Nol Besar buah
13 Beugel bh
14 Knee pipa PVC 1.5" bh
15 Klem pipa bh
16 Pipa spiral 1.5" m1
17 Angkur bh
18 Spener set
19 Kawat 6 mm m1
20 Klem PVC 1/2" bh
BALAST / TRAFO
1 Balast Mercury 80W 220V bh
2 Balast Mercury 125W 220V bh
3 Balast Mercury 250W 220V bh
4 Balast Mercury 400W 220V bh
5 Balast Metal Halide 70W 220V bh
6 Balast Metal Halide 100W 220V bh
7 Balast Metal Halide 150W 220V bh
8 Balast Metal Halide 250W 220V bh
9 Balast Natrium 250W 220V bh
Bahan - 59
NO. URAIAN BAHAN SATUAN
Bahan - 60
NO. URAIAN BAHAN SATUAN
BOHLAM / LAMPU
1 Lampu Halogin 500W 220V bh
2 Lampu Halogin 1.000W 220V bh
3 Lampu HPIT 150W 220V bh
4 Lampu HPIT 250W 220V bh
5 Lampu HPIT 400W 220V bh
6 Lampu HPIT 1.000W 220V bh
7 Lampu Mercury 80W 220V "Philips" bh
8 Lampu Mercury 125W 220V "Philips" bh
9 Lampu Mercury 250W 220V "Philips" bh
10 Lampu Mercury 400W 220V "Philips" bh
11 Lampu Metal Halide 70W 220V bh
12 Lampu Metal Halide 100W 220V bh
13 Lampu Metal Halide 150W 220V bh
14 Lampu Metal Halide 250W 220V bh
15 Lampu Natal isi 50 "Philips" set
16 Lampu Natal isi 100 "Philips" set
17 Lampu Natrium 250W 220V "Philips" bh
18 Lampu Natrium 400W 220V "Philips" bh
19 Lampu PH Esensial 8W "Philips" bh
20 Lampu PH Esensial 14W "Philips" bh
21 Lampu PH Esensial 18W "Philips" bh
22 Lampu PH Esensial 23W "Philips" bh
23 Lampu PH Esensial 40W "Philips" bh
24 Lampu Pijar 5W "Philips" bh
25 Lampu Pijar 10W "Philips" bh
26 Lampu Pijar 25W "Philips" bh
27 Lampu Pijar 40W "Philips" bh
28 Lampu Pijar 100W "Philips" bh
29 Lampu Pijar 150W "Philips" bh
30 Lampu Pijar 200W "Philips" bh
31 Lampu Pijar 60W "Philips" bh
32 Lampu Pijar 75W "Philips" bh
33 Lampu SL 8W/9W/10W bh
34 Lampu SLE 11W "Philips" bh
35 Lampu SLE 15W bh
36 Lampu SLE 20W bh
37 Lampu Softone 100W/220V "Philips" bh
38 Lampu SON 70W 220V bh
39 Lampu SON 150W 220V bh
40 Lampu SON 250W 220V bh
41 Lampu SON-T 70W 220V bh
42 Lampu SON-T 150W 220V bh
43 Lampu SON-T 250W 220V bh
44 Lampu Sport 80W pk (m) unit
45 Lampu TL 10 Watt "Philips" bh
46 Lampu TL 18 Watt bh
47 Lampu TL 20 Watt bh
Bahan - 61
NO. URAIAN BAHAN SATUAN
48 Lampu TL 36 Watt bh
49 Lampu TL 40 Watt bh
50 Lampu Pilot / Pilot lamp bh
51 Lampu PL 20/25 wat Tornado bh
52 lampu Hias TO-2 bh
53 Lampu MVF 606 M 150 Mc bh
54 Lampu TWG 128/830 HF P.CCE2 bh
55 Lampu Led Sreng Standar 15 meter cool white set
56 Led Power Driver Out Door bh
57 Lampu sekualitas MBF 504 CDM-T70W WBI unit
58 Glare Shield Lamp unit
59 Lampu Gantung Bulat unit
60 Lampu sekualitas SVF616WB 100 Son TPP 100 wat unit
61 Lampu sekualitas mini deco flood unit
62 Lampu BCS703 12x LED unit
63 Power Supply ps 300 m
64 Lampu sekualitas SVF606N070 Son TPP 70 Wat unit
Bahan - 62
NO. URAIAN BAHAN SATUAN
BOX PANEL
1 Box Panel 20 x 11 x 9 bh
2 Box Panel 20 x 15 x 9 bh
3 Box Panel 20 x 40 x 50 bh
4 Box Panel 25 x 25 x 12 bh
5 Box Panel 25 x 25 x 20 bh
6 Box Panel 30 x 40 x 15 bh
7 Box Panel 30 x 40 x 20 bh
8 Box Panel KWH Meter 20 x 40 x 50 bh
9 Box Panel KWH Meter 20 x 40 x 60 bh
10 Box Panel KWH Meter 25 x 35 x 20 bh
11 Tutup Panel 30 x 30 bh
FITTING
1 Fitting duduk bh
2 Fitting Gantung Plastik Gantung bh
3 Fitting Goliath E.27 gantung bh
4 Fitting Goliath E.40 gantung bh
5 Fitting kecil lampu 2,5W bh
6 Fitting Plastik hitam bh
7 Fitting Sport Par 38 (1) Oog bh
8 Fitting Spot duduk bh
9 Fitting Spot taman bh
10 Fitting WD E.27 duduk bh
11 Fitting WD E.40 duduk bh
FLASHER
1 Flasher Lampu Hias Buterfly bh
2 Flasher Lampu Hias Kembang Api besar bh
3 Flasher Lampu Hias Kembang Api kecil bh
4 Flasher Lampu Hias Kipas bh
Bahan - 63
NO. URAIAN BAHAN SATUAN
Bahan - 64
NO. URAIAN BAHAN SATUAN
KABEL
1 Kabel DX 2 x 10 Sqmm m1
2 Kabel DX 2 x 16 Sqmm m1
3 Kabel DX 2 x 25 Sqmm m1
4 Kabel NYA 1,5 Sqmm m1
5 Kabel NYA 2,5 Sqmm m1
6 Kabel NYFG by 3 x 4 Sqmm sekualitas Eterna m1
7 Kabel NYFG by 3 x 6 Sqmm sekualitas Eterna m1
8 Kabel NYFG by 3 x 10 Sqmm sekualitas Supreme m1
9 Kabel NYFG by 4 x 6 Sqmm sekualitasEterna m1
10 Kabel NYFG by 4 x 10 Sqmm sekualitas Supreme m1
11 Kabel NYM 2 x 1,5 Sqmm sekualitas Supreme m1
12 Kabel NYM 2 x 2,5 Sqmm sekualitas Supreme m1
13 Kabel NYM 2 x 4 Sqmm sekualitas Supreme m1
14 Kabel NYM 3 x 1,5 Sqmm sekualitas Supreme m1
15 Kabel NYM 3 x 2,5 Sqmm sekualitas Supreme m1
16 Kabel NYM 3 x 4 Sqmm sekualitas Supreme m1
17 Kabel NYY 3 x 1,5 Sqmm sekualitas Supreme m1
18 Kabel NYY 3 x 2,5 Sqmm sekualitas Supreme m1
19 Kabel NYY 3 x 4 Sqmm sekualitas Supreme m1
20 Kabel NYY 3 x 6 Sqmm sekualitas Supreme m1
21 Kabel NYY 3 x 10 Sqmm sekualitas Supreme m1
22 Kabel NYY 4 x 6 Sqmm sekualitas Supreme m1
23 Kabel NYY 4 x 10 Sqmm sekualitas Supreme m1
24 Kabel Snoor 2 x 0,23 m1
Bahan - 65
NO. URAIAN BAHAN SATUAN
KAPASITOR
1 Kapasitor 4 mF "Philips" bh
2 Kapasitor 8 mF bh
3 Kapasitor 12,5 mF bh
4 Kapasitor 20 mF bh
5 Kapasitor 25 mF bh
6 Kapasitor Metal Halide 70W 220V bh
7 Kapasitor Metal Halide 100W 220V bh
8 Kapasitor Metal Halide 150W 220V bh
9 Kapasitor Metal Halide 250W 220V bh
Bahan - 66
NO. URAIAN BAHAN SATUAN
LAMPU HIAS
1 Lampu Anggur isi 100 pcs
2 Lampu Anggur isi 140 pcs
3 Lampu Capsul isi 100 pcs
4 Lampu Capsul isi 140 pcs
5 Lampu Rice Light 10 m bh
6 Lampu Rice Light isi 100 pcs
7 Lampu Rice Light isi 140 pcs
8 Lampu Slang 2 Jalur (sekualitas Sinyoku) roll
9 Lampu Slang 3 Jalur (sekualitas Sinyoku) roll
10 Lampu Tirai 2 x 2 m bh
11 LH - Butterfly Lamp (DC-009) pcs
12 LH - Chrismast Lamp (DC-008) pcs
13 LH - Cottonrose Lamp (DC-004) pcs
14 LH - Double Piled Fountain Lamp (DC-019) pcs
15 LH - Dragon Flying Lamp (DC-016) pcs
16 LH - Dragon Phoenix (DC-013) pcs
17 LH - Fireworks Lamp (DC-001) 6 meter pcs
18 LH - Fireworks Lamp (DC-001) 8 meter pcs
19 LH - Floor Lamp (DC-017) pcs
20 LH - Flower Pot Lamp (DC-020+B47) pcs
21 LH - Fountain Lamp (DC-014) pcs
22 LH - Fountain Lamp Ball (DC-006) pcs
23 LH - Hepla Lamp (DC-011) pcs
24 LH - Logo Kota Besar unit
25 LH - Logo Kota Sedang unit
26 LH - Lucky Lamp (DC-005) pcs
27 LH - No. 1 Lamp (DC-010) pcs
28 LH - Octopus Lamp (DC-018) pcs
29 LH - Ornament Lingkungan 2D unit
30 LH - Ornament Lingkungan 3D unit
31 LH - Redbud Flower Lamp (DC-015) pcs
32 LH - Seplendiel Lamp (DC-002) pcs
33 LH - Star Flower Lamp (DC-007) pcs
34 LH - Windmill Lamp (DC-003) pcs
PERALATAN
1 Betel bh
2 Betel Mokuba bh
3 Box Tool Kit bh
4 Genset Tipe 5000 bh
5 Gergaji besi bh
6 Isolasi besar bh
7 Kompresor Multipro BE 075 PMOO unit
8 Kompresor Multipro BE 100 DMTR unit
9 Kunci Inggris bh
Bahan - 67
NO. URAIAN BAHAN SATUAN
10 Kunci L bh
11 Kunci T 8, 10, 12 bh
12 Mata Bur Besi set
13 Mata Bur Beton 8m bh
14 Mata Bur Beton 12m bh
15 Mesin Bor Tangan Bosch 10 GMB RZ bh
16 Mesin Gerinda bh
17 Obeng +/- bh
18 Obeng minus bh
19 Obeng plus bh
20 Obeng Tespen biasa bh
21 Obeng Tespen Sinyal bh
22 Palu Besi Bulat 1 LB Kecil bh
23 Palu Besi Bulat 2 11/2 LB Besar bh
24 Palu Besi New Zealand 11/2 LB Besar bh
25 Pengupas Kabel (Wire Stiper Sellert) bh
26 Sabuk Pengaman bh
27 Senter 4 batery bh
Bahan - 68
NO. URAIAN BAHAN SATUAN
PHOTO CELL
1 Photo Cell 3 Ampere bh
2 Photo Cell 6 Ampere bh
3 Photo Cell 10 Ampere bh
STANG LAMPU
1 Stang Ornament GIP dia 1,1" L = 3 m btg
2 Stang Ornament GIP dia 2" L = 1 m btg
3 Stang Ornament GIP dia 2" L = 2 m btg
4 Stang Ornament GIP dia 2" L = 2.2 m btg
5 Stang Ornament GIP dia 2" L = 3 m btg
6 Stang Ornament GIP dia 2" L = 4 m btg
7 Stang Ornament GIP dia 2" L = 6 m btg
TALI
1 Kabel Ties 10 Cm pcs
2 Kabel Ties 15 Cm pcs
3 Kabel Ties 20 Cm pcs
Bahan - 69
NO. URAIAN BAHAN SATUAN
TIANG
1 Tiang Galvanist Cb. 1, t = 5 m, type tanam dia 2" btg
2 Tiang Galvanist Cb. 1, t = 6 m, base plate btg
3 Tiang Galvanist Cb. 1, t = 7 m, base plate btg
4 Tiang Galvanist Cb. 1, t = 9 m, base plate btg
5 Tiang Galvanist Cb. 1, t = 11 m, baseplate bh
6 Tiang Galvanist Cb. 2, t = 6 m, baseplate btg
7 Tiang Galvanist Cb. 2, t = 9 m, baseplate btg
8 Tiang GIP Cb. 1 2",3",4", t = 7 m, tanam btg
9 Tiang GIP Cb. 1 2",3",4",5", t = 9 m, tanam btg
10 Tiang GIP Cb. 1 3",4",5", t = 9 m, tanam btg
11 Tiang Lampu Highmask Cb. 2, t = 20 m, hidrolik btg
12 Tiang Lampu Highmask Cb. 4, t = 20 m, hidrolik btg
Bahan - 70
NO. URAIAN BAHAN SATUAN
Bahan - 71
NO. URAIAN BAHAN SATUAN
Armatur
1 Armatur Downlight 4 in buah
2 Armatur Downlight 6 in buah
3 Armatur Downlight 8 in buah
4 Armatur Downlight 12 in buah
5 Armatur lampu RM 2 x 20 wat unit
6 Armatur lampu RM 2 x 40 wat unit
7 Armatur TKO 2 x 20 wat unit
8 Armatur TKO 2 x 40 wat unit
Bahan - 72
NO. URAIAN BAHAN SATUAN
TRAFFIC LIGHT/MARKA/RAMBU :
1 Modul LED Merah Lokal 20 cm buah
2 Modul LED Merah Import 20 cm buah
3 Modul LED Kuning Lokal 20 cm buah
4 Modul LED Kuning Import 20 cm buah
5 Modul LED Hijau Lokal 20 cm buah
6 Modul LED Hijau Import 20 cm buah
7 Modul LED Merah Lokal 30 cm buah
8 Modul LED Merah Import 30 cm buah
9 Modul LED Kuning Lokal 30 cm buah
10 Modul LED Kuning Import 30 cm buah
11 Modul LED Hijau Lokal 30 cm buah
12 Modul LED Hijau Import 30 cm buah
13 Bolam Lampu Pijar 75 Watt buah
14 Reflektor & Fiting 20 cm buah
15 Reflektor & Fiting 30 cm buah
16 Housing Lamp 1 Asp 20 cm set
17 Housing Lamp 2 Asp 20 cm set
18 Housing Lamp 3 Asp 20 cm set
19 Housing Lamp 1 Asp 30 cm set
20 Housing Lamp 2 Asp 30 cm set
21 Housing Lamp 3 Asp 30 cm set
22 Karet 20 cm buah
23 Karet 30 cm buah
24 Lensa Polycarbonat 20 cm buah
25 Lensa Polycarbonat 30 cm buah
26 Lensa Kaca 20 cm buah
27 Lensa Kaca 30 cm buah
28 Box Lamp Pijar 1 Asp 20 cm set
29 Box Lamp Pijar 2 Asp 20 cm set
30 Box Lamp Pijar 3 Asp 20 cm set
31 Box Lamp Pijar 1 Asp 30 cm set
32 Box Lamp Pijar 2 Asp 30 cm set
33 Box Lamp Pijar 3 Asp 30 cm set
34 Box Lamp LED 1 Asp 20 cm set
35 Box Lamp LED 2 Asp 20 cm set
36 Box Lamp LED 3 Asp 20 cm set
37 Box Lamp LED 1 Asp 30 cm set
38 Box Lamp LED 2 Asp 30 cm set
39 Box Lamp LED 3 Asp 30 cm set
40 Flsher LED 1 Asp 20 cm set
41 Flsher LED 2 Asp 30 cm set
42 Flsher LED 1 Asp 20 cm set
43 Flsher LED 2 Asp 30 cm set
44 Controller Microprossesor 4 Signal Group unit
Bahan - 73
NO. URAIAN BAHAN SATUAN
Bahan - 74
NO. URAIAN BAHAN SATUAN
MARKA
1 Thermoplastik kg
2 Glassbead kg
3 Pengecatan Marka Jalan thermo 2,2mm m2
4 Pengecatan Marka Jalan coolplastik m2
5 Pembuatan pita pengaduh 15mmx120mm m2
6 Aplikator marka jalan penghampar unit
7 Preheater pemasak/pemanas unit
RAMBU
1 Daun Rambu Lalu Lintas 60 x 60 cm lembar
2 Daun Rambu Lalu Lintas dengan Tiang 60 x 60 cm unit
3 Daun RPPJ 120 x 120 cm lembar
4 Daun RPPJ 120 x 180 cm lembar
5 Daun RPPJ 120 x 240 cm lembar
6 Daun RPPJ 120 x 300 cm lembar
7 Break Tester Portable kanan-kiri
8 Alumunium 60cmx60cm lembar
9 Scotchlite 100cmx60cm meter
10 Alat timbang portabel 1 tapak 1x25ton
11 Alat timbang portabel 2 tapak 2x25ton
12 Cermin tikungan polycarbonat 100cmx60cm terpasang
13 Alumunium tebal 1.5 mm m2
14 Skotlight Reflektive Sheet m2
15 Besi cor ceper (melati) Buah
16 Besi cor tiang + frame Set
17 Mur dan baut Buah
18 Pemotongan, pengeboran Unit
19 Perakitan dan penyetelan Unit
20 Tutup besi dia 2.5" Buah
21 Angkur baut dia. 19 mm Buah
22 Box panel kontrol APILL 60x90x120 Buah
23 Box panel kontrol APILL 35x70x90 Buah
24 Kontroller multi program 6 Signal group Unit
25 Gembok bh
26 Tiang GIP 3" h = 3 m Batang
27 Tiang GIP 3" h = 6 m Batang
28 Lighting Box 3 Lampu Unit
Bahan - 75
NO. URAIAN BAHAN SATUAN
Bahan - 76
NO. URAIAN BAHAN SATUAN
1 Arit buah
2 Bendo buah
3 Cangkul dan Doran buah
4 Cengkrong buah
5 Cethok buah
6 Deklit Plastik buah
7 Garan sapu buah
8 Garpu Tanah buah
9 Gathol buah
10 Gunting Kactup buah
11 Gunting Pangkas buah
12 Hareg 1 M' buah
13 Hareg 3 M' buah
14 Kampak buah
15 Kaos Tangan buah
16 Karung palstik buah
17 Keranjang buah
18 Kerok buah
19 Kikir/Wungkal buah
20 Linggis buah
21 Loading buah
22 Pacul dan Doran buah
23 Para/ Jala buah
24 Sapu Lidi buah
25 Sekop buah
26 Serok buah
27 Serok Tanah buah
28 Sprater Gendong buah
29 Tomblok buah
30 Seragam bh
31 Masker bh
32 Gerobak (alat baru) bh
33 Gerobak (sewa) bh
34 Mesin potong rumput bh
35 Gerobak celeng bh
36 Sepatu ps
37 Ember bh
38 Bagor bh
39 Irus bh
40 Martil bh
41 Betel bh
42 Betel Mokuba bh
43 Helm bh
44 Tali / tambang bh
45 Gergaji bh
46 Tangga bh
Bahan - 77
NO. URAIAN BAHAN SATUAN
47 Gobang bh
48 Carabinet/sabuk pengaman bh
49 Urea kg
50 Kompos kg
51 Pestisida kg
52 Sprayer bh
53 Terpal bh
54 Tangkai Sapu bh
Bahan - 78
NO. URAIAN BAHAN SATUAN
Bahan - 79
NO. URAIAN BAHAN SATUAN
Peralatan
1 Bottle Sprayer Buah
2 Tangga lipat Buah
3 Kain pell Buah
4 Selang plastik Meter
5 Grenda Buah
6 Gunting Besar Buah
7 Gunting Dahan Buah
8 Sabit Buah
9 Sapu lidi Buah
10 Tali tampar Buah
11 Safety belt Buah
12 Glass cloth Lembar
13 Ember kecil Buah
14 Cover window washer Set
15 Stick brush Buah
16 Hand brush Buah
17 Extention handle Set
18 Rack bowl Buah
19 Window wipper 35cm Set
20 Stick hand brush Buah
21 Gelas ukur Buah
22 Kain lobby duster 60cm Buah
23 Kain lobby duster 80cm Buah
24 Double bucket chrome Set
25 Dustbin Round Set
26 Floor wipper 50cm Buah
27 Stick lobby duster 60 cm Set
28 Stick lobby duster 80 cm Set
29 Sapu ijuk Buah
30 Appron/celemek Buah
31 Kape Buah
32 Toilet bowl brush Buah
33 Toilet cop Buah
34 Ember plastik 3 galon Buah
35 Trolly Dorong Buah
36 Wet floor sign Buah
37 Wep mop holder plastik Set
38 Window washer Set
39 Dust pan buka Buah
40 Gembor plastik Buah
41 Kentucky mop 400gr Buah
42 Nylon broom Buah
43 Cloth/Kain Buah
44 Vacuum Cleaner Buah
45 Linggis Buah
Bahan - 80
NO. URAIAN BAHAN SATUAN
46 Pacul Buah
47 Tempat Sampah pasar Buah
48 Cethok Buah
49 Gerobag Buah
50 Drim Buah
51 Skrap Buah
Bahan - 81
NO. URAIAN BAHAN SATUAN
Bahan - 82
GGI
HARGA
SATUAN (Rp.)
11,250
45,000
52,500
11,000
10,500
40,000
51,000
38,000
8,800
9,500
27,000
36,850
18,000
18,000
18,500
70,000
90,000
65,000
85,000
15,000
8,200
19,300
22,500
18,500
65,500
44,850
28,700
60,000
35,000
18,500
45,000
35,000
15,000
10,250
30,000
12,000
18,250
18,600
18,000
70,300
78,000
15,000
13,200
2,000
6,500
Bahan - 83
HARGA
SATUAN (Rp.)
33,800
28,500
17,000
13,200
54,000
53,200
14,100
15,000
17,500
8,300
8,400
28,250
62,000
62,000
62,000
Bahan - 84
HARGA
SATUAN (Rp.)
15,000
9,100
5,600
14,500
4,200
2,500
15,000
12,600
3,500
3,050,000
2,000
3,800
-
-
162,300
187,800
240,900
3,697,000
2,700,250
290,750
903,000
205,000
190,000
110,000
115,000
1,095,000
1,950,000
2,040,000
2,250,000
892,500
1,155,000
1,072,500
126,500
65,000
32,000
282,000
282,500
185,000
271,340
Bahan - 85
HARGA
SATUAN (Rp.)
225,000
702,000
76,000
902,000
1,090,000
550,000
319,000
30,000
25,700
3,300
60,000
Bahan - 86
HARGA
SATUAN (Rp.)
12,500
23,750
18,250
17,400
13,300
12,200
11,450
62,200
75,750
68,000
76,000
60,000
52,500
10,000
20,250
15,500
12,500
9,000
7,000
78,500
66,300
58,200
52,450
48,000
113,000
105,500
91,300
82,300
70,000
75,000
70,000
60,000
45,000
38,200
62,500
30,000
26,000
50,500
25,500
17,000
52,500
26,250
-
52,500.00
-
-
Bahan - 87
HARGA
SATUAN (Rp.)
26,250.00
-
4,000
4,550
3,000
4,000
2,500
3,000
5,250
5,500
5,250
3,000
3,000
55,000
Bahan - 88
HARGA
SATUAN (Rp.)
750
600
1,800
5,000
2,500
900
4,900
3,500
6,500
6,150
2,000
14,300
25,500
22,000
45,000
1,000
5,500
1,800
2,040
2,500
1,600
1,800
2,300
8,700
11,550
12,375
1,600
1,100
1,600
1,100
4,200
5,640
9,000
5,400
3,400
3,500
5,000
8,000
5,000
2,500
12,000
16,200
18,000
13,000
17,200
19,000
13,000
17,200
Bahan - 89
HARGA
SATUAN (Rp.)
19,000
97,000
93,758
76,275
61,750
36,000
27,000
24,000
25,000
20,000
20,000
Bahan - 90
HARGA
SATUAN (Rp.)
40,000
38,000
28,000
38,000
32,000
27,000
20,500
225,000
1,250
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
48,000
40,000
39,000
39,000
21,250
37,500
15,250
38,500
21,700
128,250
45,700
52,300
2,200
1,700
1,200
5,200
2,840
Bahan - 91
HARGA
SATUAN (Rp.)
2,000
450,000
500,500
Bahan - 92
HARGA
SATUAN (Rp.)
350,000
370,000
370,000
400,000
412,000
412,500
300,000
340,000
337,350
330,000
378,000
377,500
260,000
350,000
250,000
250,000
195,500
225,000
Bahan - 93
HARGA
SATUAN (Rp.)
240,500
205,000
240,000
248,000
195,900
226,250
Bahan - 94
HARGA
SATUAN (Rp.)
7,150
2,000
2,150
33,750
47,900
44,800
23,100
22,800
34,750
26,400
57,900
52,000
27,250
29,500
1,000
27,950
40,000
1,500
2,300
1,700
4,100
2,750
750
1,500
1,100
1,200
1,750
2,200
2,750
2,000
5,100
3,150
42,000
42,000
42,000
48,000
42,350
50,100
31,000
43,750
61,200
11,200
10,000
3,000
45,900
Bahan - 95
HARGA
SATUAN (Rp.)
40,500
35,400
35,400
1,800
1,440
Bahan - 96
HARGA
SATUAN (Rp.)
9,818
-
12,000
117,500
137,500
47,500
10,000
12,000
285,000
250,000
130,000
37,500
140,000
290,000
360,000
80,000
130,000
3,750
29,250
24,750
25,000
28,000
32,000
13,750
Bahan - 97
HARGA
SATUAN (Rp.)
9,000
26,250
39,250
9,000
18,500
21,000
26,250
31,500
38,500
42,000
50,000
90,000
45,000
Bahan - 98
HARGA
SATUAN (Rp.)
50,000
60,000
65,000
34,000
40,000
51,500
75,000
57,000
40,000
43,000
54,000
63,000
52,000
50,000
49,000
50,000
50,000
42,000
49,000
50,000
42,000
8,500
3,000
3,000
6,800
49,350
41,500
41,500
45,150
41,500
58,000
38,000
45,000
38,500
38,500
46,500
46,500
39,000
47,000
37,000
45,000
37,500
37,000
37,000
50,000
Bahan - 99
HARGA
SATUAN (Rp.)
47,000
37,500
37,500
37,500
46,500
37,500
37,500
37,500
37,500
41,000
44,000
49,850
58,275
64,103
Bahan - 100
HARGA
SATUAN (Rp.)
64,103
66,990
50,400
67,200
67,100
67,500
58,250
45,500
60,000
58,000
44,100
57,750
58,000
44,500
55,000
4,000
64,250
49,000
48,000
58,000
48,250
48,000
55,000
46,500
54,500
46,500
55,500
55,200
46,250
55,250
46,700
56,250
46,700
56,300
56,250
45,300
45,250
53,000
54,000
74,000
24,000
21,000
17,000
12,500
Bahan - 101
HARGA
SATUAN (Rp.)
33,000
29,000
33,000
31,250
30,500
34,000
15,500
15,500
14,000
6,700
28,000
12,700
36,500
15,500
Bahan - 102
HARGA
SATUAN (Rp.)
31,000,000
35,100,000
288,000
250,000
216,500
181,000
144,000
105,000
73,000
37,000
18,500
211,000
190,000
176,000
141,000
106,000
37,500
24,700
15,900
10,000
289,000
21,000,000
64,000
10,000
20,100
46,450,000
40,900,000
35,500,000
31,000,000
21,000,000
18,120,000
16,200,000
6,750,000
7,500,000
63,200
52,100
52,500
Bahan - 103
HARGA
SATUAN (Rp.)
41,000
32,400
22,900
16,000
8,100
4,000
23,000
31,000
38,200,000
41,200
47,000
68,000
2,100
4,000
6,500
Bahan - 104
HARGA
SATUAN (Rp.)
7,600,000
8,620,000
74,000
61,000
55,000
46,000
37,000
27,000
18,100
10,000
4,700
26,000
34,000
43,000
46,100
52,000
76,500
3,500
5,200
7,000
6,000,000
6,200,000
54,000
41,000
37,000
31,200
25,000
18,000
13,500
7,000
3,500
19,000
25,000
31,000
36,500
33,000
37,000
46,000
Bahan - 105
HARGA
SATUAN (Rp.)
54,300
3,000
4,500
5,000
6,000
2,000
Bahan - 106
HARGA
SATUAN (Rp.)
1,580,000
7,000
3,555,000
3,550,000
3,000,000
1,050,000
1,100,000
11,000
95,000
79,000
81,000
85,000
121,000
150,000
128,000
75,000
55,000
50,000
65,000
65,000
92,500
73,900
45,000
50,000
15,000
8,000
75,000
27,000
75,000
10,000
500
Bahan - 107
HARGA
SATUAN (Rp.)
11,600
12,500
13,600
14,000
18,000
1,405,000
725,000
350,000
57,900
85,700
192,000
15,500
13,650
13,900
14,500
14,000
14,500
14,900
17,500
-
-
175,000
1,000
19,100
15,000
34,000
19,500
25,500
17,500
72,500
10,900
12,500
Bahan - 108
HARGA
SATUAN (Rp.)
22,500
12,000
15,700
36,500
26,500
1,000
23,500
20,000
21,600
27,000
41,000
77,500
111,500
135,000
232,500
63,000
Bahan - 109
HARGA
SATUAN (Rp.)
80,600
38,900
11,500
135,000
25,000
847,500
825,000
1,630,000
170,000
500,000
250,000
270,000
45,000
300,000
35,000
19,950
43,300
51,500
60,750
72,000
12,550
16,400
25,500
22,000
22,500
23,000
30,500
Bahan - 110
HARGA
SATUAN (Rp.)
47,000
42,000
27,000
81,000
25,000
27,000
39,000
53,000
75,000
64,500
27,000
32,000
17,000
17,000
59,000
Bahan - 111
HARGA
SATUAN (Rp.)
17,500
17,500
17,500
16,000
20,000
20,000
11,000
13,000
18,000
21,000
350
9,000
700
10,000
500
400
750
10,000
20,000
10,000
17,000
14,000
5,000
8,250
75,000
95,000
6,000
5,000
15,500
15,000
200,000
35,000
250,000
130,000
170,000
120,000
500,000
50,000
50,000
150,000
75,000
12,000
7,500
162,500
1,275,000
Bahan - 112
HARGA
SATUAN (Rp.)
20,000
Bahan - 113
HARGA
SATUAN (Rp.)
110,000
90,000
148,000
105,000
457,500
150,000
105,000
102,000
134,000
136,380
162,500
187,500
165,000
167,500
137,500
155,000
155,000
162,500
225,000
90,000
110,000
86,250
68,000
68,000
90,000
100,000
97,500
127,000
200,000
91,850
200,000
200,000
225,000
450
350
91,850
45,000
Bahan - 114
HARGA
SATUAN (Rp.)
75,000
2,500
3,000
3,000
2,000
3,000
850
47,250
5,000
231,000
330,000
Bahan - 115
HARGA
SATUAN (Rp.)
10,500
11,183
70,350
9,529
11,340
248,325
866
7,277
7,277
8,316
6,815
68,750
55,000
70,000
56,000
55,000
2,500
9,000
81,500
20,000
62,000
21,500
38,000
83,375
9,200
158,700
600
92,000
4,500
46,000
55,775
12,000
7,500
10,000
17,250
54,625
100,000
27,500
4,500
6,000
Bahan - 116
HARGA
SATUAN (Rp.)
6,000
23,750
13,500
6,000
7,250
5,800
44,250
33,500
13,250
4,050
39,200
Bahan - 117
HARGA
SATUAN (Rp.)
7,500
9,000
8,500
9,500
8,300
9,300
75,000
90,000
7,300
9,250
42,300
65,000
75,000
75,000
85,000
90,000
150,000
100,000
500,000
32,000
130,000
120,000
120,000
15,000
22,500
26,000
64,000
65,750
89,150
118,000
197,000
16,800
23,600
30,000
60,000
115,000
150,000
205,000
Bahan - 118
HARGA
SATUAN (Rp.)
76,000
195,000
Bahan - 119
HARGA
SATUAN (Rp.)
6,000
24,500
12,500
15,200
33,500
14,500
25,000
14,000
22,000
36,000
36,000
36,000
50,000
50,000
50,000
50,000
50,000
50,000
166,250
397,000
397,000
547,000
465,000
94,000
26,000
28,000
90,000
101,000
79,000
722,000
176,000
55,000
19,000
145,000
143,000
44,000
17,000
51,000
18,000
134,000
30,000
126,500
Bahan - 120
HARGA
SATUAN (Rp.)
10,000
50,600
92,400
27,500
182,600
65,560
214,500
187,000
103,950
990,000
Bahan - 121
HARGA
SATUAN (Rp.)
48,400
36,300
62,425
47,000
116,350
65,000
137,000
103,000
183,000
137,000
51,000
38,500
66,000
49,500
88,000
66,000
144,650
109,000
194,000
145,000
486,000
50,000
25,000
1,100,000
113,850
73,700
38,500
57,750
23,100
34,650
58,300
86,900
35,200
52,250
35,000
31,000
27,000
23,000
Bahan - 122
HARGA
SATUAN (Rp.)
17,000
71,000
64,000
57,000
50,000
43,000
36,000
28,000
24,000
Bahan - 123
HARGA
SATUAN (Rp.)
82,500
76,000
73,000
64,000
61,000
55,000
46,000
99,000
92,000
88,000
77,000
73,000
66,000
55,000
43,000
8,000
10,000
12,000
8,000
10,000
12,000
20,000
22,000
24,200
20,350
22,000
24,000
20,350
22,000
24,200
20,350
22,000
24,200
55,000
60,500
67,100
55,000
60,500
67,100
66,000
72,600
82,500
Bahan - 124
HARGA
SATUAN (Rp.)
66,000
72,600
82,500
99,000
110,000
126,500
Bahan - 125
HARGA
SATUAN (Rp.)
255,000
268,000
321,000
292,400
307,450
361,200
212,850
225,750
255,000
245,000
260,150
293,000
88,150
98,900
146,200
225,750
255,000
71,000
85,000
229,000
130,000
229,000
Bahan - 126
HARGA
SATUAN (Rp.)
270,000
247,250
247,250
256,100
160,000
61,000
18,000
18,000
126,000
66,000
66,000
Bahan - 127
HARGA
SATUAN (Rp.)
5,697,500
5,697,500
5,697,500
5,025,625
5,025,625
5,025,625
5,025,625
5,025,625
5,697,500
5,697,500
2,633,750
2,633,750
2,633,750
2,633,750
2,633,750
2,633,750
2,633,750
2,633,750
1,773,750
13,437,500
22,575,000
26,875,000
5,375,000
6,987,500
2,956,250
3,225,000
3,601,250
4,031,250
3,225,000
Bahan - 128
HARGA
SATUAN (Rp.)
3,117,500
7,148,750
6,342,500
3,225,000
4,031,250
3,977,500
2,257,500
Bahan - 129
HARGA
SATUAN (Rp.)
32,550
69,090
24,544
41,816
500,000
262,500
519,750
18,113
17,325
12,600
2,468
70,035
6,038
6,038
157,500
105,000
105,000
21,000
3,150
5,250
15,750
5,313
38
-
-
-
-
15,750
10,500
1,575
105,000
210,000
157,500
262,500
157,500
105,000
6,300
5,250
136,500
42,000
63,000
-
-
-
-
Bahan - 130
HARGA
SATUAN (Rp.)
Bahan - 131
HARGA
SATUAN (Rp.)
3,206,280
1,957,500
12,840
224,820
614,280
790,440
325,000
650,000
93,000
41,000
56,500
94,000
4,200,000
4,410,000
4,500,000
4,450,000
5,200,000
700,000
1,700,000
1,600,000
1,550,000
1,300,000
1,600,000
1,300,000
1,800,000
1,750,000
2,100,000
1,950,000
1,750,000
1,800,000
2,250,000
2,280,000
1,300,000
1,900,000
2,100,000
1,500,000
2,300,000
2,300,000
600,000
650,000
53,200
2,500,000
Bahan - 132
HARGA
SATUAN (Rp.)
2,600,000
4,100,000
4,300,000
29,300,000
3,500,000
3,800,000
14,980,000
14,982,000
14,500,000
14,500,000
2,700,000
22,100,000
2,400,000
2,500,000
2,650,000
2,800,000
2,850,000
2,600,000
Bahan - 133
HARGA
SATUAN (Rp.)
3,300,000
2,800,000
3,100,000
8,800,000
8,000,000
7,600,000
7,600,000
10,500,000
400,500
18,100,000
17,600,000
850,000
570,000
1,000,000
810,000
1,210,000
1,120,000
1,200,000
800,000
1,300,000
1,100,000
1,490,000
1,400,000
14,400,000
14,450,000
13,900,000
13,950,000
14,500,000
17,540,000
32,000,000
3,400,000
3,477,000
3,567,000
4,440,000
4,330,500
5,100,000
300,000
650,000
2,870,000
2,987,000
2,900,000
3,300,000
2,700,000
2,300,000
2,250,000
2,400,000
2,350,000
2,400,000
2,200,000
Bahan - 134
HARGA
SATUAN (Rp.)
2,800,000
2,780,000
2,550,000
2,800,000
3,500,000
2,250,000
2,100,000
2,800,000
2,780,000
2,790,000
3,500,000
1,900,000
3,700,000
4,100,000
4,100,000
4,100,000
4,400,000
4,600,000
Bahan - 135
HARGA
SATUAN (Rp.)
4,950,000
4,990,000
4,985,000
4,450,000
4,550,000
5,300,000
5,350,000
3,300,000
3,400,000
3,700,000
3,850,000
3,899,000
4,100,000
4,150,000
533,138
3,869,500
7,000
10,000
7,100
39,000
7,000
15,000
3,500
30,000
8,500
7,000
52,500
45,000
-
500
150
4,500
12,500
-
500
129,100
141,500
225,000
310,000
176,500
340,000
250,000
450,000
287,000
Bahan - 136
HARGA
SATUAN (Rp.)
210,000
165,000
220,000
356,000
40,000
38,000
41,000
Bahan - 137
HARGA
SATUAN (Rp.)
51,000
85,000
327,900
367,500
389,000
1,500,000
61,000
125,500
127,500
156,000
193,700
250,500
197,500
446,000
30,500
137,850
261,500
277,900
35,500
39,000
46,000
53,000
225,000
3,100
5,100
12,500
15,500
15,500
15,700
18,600
15,400
15,800
85,000
91,750
95,750
92,500
9,500
174,500
278,000
288,000
129,000
197,000
305,000
65,000
9,500
14,000
14,500
Bahan - 138
HARGA
SATUAN (Rp.)
17,500
18,700
12,500
51,500
150,000
8,532,000
265,000
7,865,000
1,100,000
11,910,000
2,925,000
2,910,000
6,610,000
7,350,000
4,710,000
9,900,000
6,380,000
Bahan - 139
HARGA
SATUAN (Rp.)
25,000
3,000
3,500
80,000
98,000
62,000
400,000
114,500
156,000
280,000
320,700
400,000
650,000
180,000
37,200
7,000
3,000
27,500
34,000
1,000
5,000
168,000
204,900
204,950
12,000
24,000
3,800,000
3,850,000
3,850,000
3,810,000
50,000
5,000
45,000
47,500
50,500
56,000
56,500
57,000
58,900
96,000
96,500
Bahan - 140
HARGA
SATUAN (Rp.)
104,000
195,000
168,000
62,000
3,500
3,000
2,000
9,000
23,600
Bahan - 141
HARGA
SATUAN (Rp.)
87,500
88,000
88,000
95,000
145,000
259,000
125,000
325,000
298,000
6,000
140,000
220,000
1,300,000
700,000
710,000
1,200,000
850,000
35,000
55,000
70,000
4,000
7,000
95,000
150,000
190,000
240,000
142,000
10,900
15,500
21,000
13,500
19,500
26,500
19,500
23,500
32,100
45,100
70,500
56,500
89,500
5,500
Bahan - 142
HARGA
SATUAN (Rp.)
13,000
46,000
30,000
34,000
63,000
65,000
89,500
85,000
89,500
200,000
Bahan - 143
HARGA
SATUAN (Rp.)
46,778
61,793
85,000
98,000
260,000
280,000
100,000
78,000
94,000
3,100,000
3,500,000
650,000
22,900,000
17,500,000
20,800,000
20,900,000
17,954,112
19,654,269
18,867,250
21,256,758
13,600,456
21,250,000
20,000,000
18,000,000
21,000,000
12,950,000
7,200,000
15,950,000
20,500,000
20,800,000
7,200,000
12,950,000
20,700,000
22,500,000
20,800,000
21,750,000
30,000
58,000
350,000
9,700,000
20,000
8,000
1,100,000
1,200,000
75,000
Bahan - 144
HARGA
SATUAN (Rp.)
77,500
31,000
118,500
27,000
41,000
587,500
885,700
31,000
10,000
11,000
25,000
28,500
25,200
32,000
25,500
45,000
3,300,000
89,900
Bahan - 145
HARGA
SATUAN (Rp.)
3,500,000
67,000
46,500
34,000
1,900,000
2,900,000
7,200,000
300,000
85,500
119,000
142,000
17,825
17,900
18,000
23,000
24,000
18,500
18,300
9,000
9,500
8,000
8,500
10,000
45,000
30,000
39,000
49,000
49,500
125,000
150,000
202,800
240,800
265,800
278,900
400,000
9,000
13,000
15,500
Bahan - 146
HARGA
SATUAN (Rp.)
18,900
14,000
900,000
3,400,000
3,410,000
4,600,000
5,400,000
4,420,000
4,300,000
2,800,000
3,100,000
2,900,000
17,250,000
16,550,000
Bahan - 147
HARGA
SATUAN (Rp.)
2,300,000
3,450,000
2,600,000
3,100,000
3,600,000
4,300,000
4,600,000
4,800,000
5,800,000
6,400,000
6,950,000
7,600,000
6,150,000
7,200,000
6,250,000
7,350,000
3,250,000
3,650,000
4,400,000
6,550,000
7,300,000
7,650,000
8,100,000
8,500,000
3,300,000
3,950,000
-
1,868,520
30,000
1,000
1,000
12,500
120,000
18,000
85,000
290,000
17,000
295,000
85,000
285,000
90,000
300,000
350,000
17,500
57,500
40,000
13,800
Bahan - 148
HARGA
SATUAN (Rp.)
12,600
12,000
12,000
125,000
58,000
370,000
289,000
125,000
150,000
175,000
165,000
195,000
175,000
197,000
Bahan - 149
HARGA
SATUAN (Rp.)
1,550,000
2,450,000
1,575,000
2,450,000
2,100,000
2,650,000
1,520,000
2,650,000
2,100,000
2,750,000
2,500,000
2,900,000
65,000
200,000
210,000
41,000
810,000
950,000
520,000
1,100,000
1,250,000
51,000
66,000
126,000
176,000
226,000
310,000
670,000
1,320,000
1,850,000
920,000
1,850,000
2,650,000
1,750,000
3,100,000
4,650,000
2,100,000
4,100,000
5,860,000
1,670,000
3,250,000
2,100,000
3,910,000
2,100,000
Bahan - 150
HARGA
SATUAN (Rp.)
3,200,000
1,450,000
1,750,000
3,550,000
8,100,000
7,100,000
5,150,000
5,210,000
1,520,000
3,250,000
1,650,000
350,000
12,500,000
13,500,000
150,000,000
195,000,000
2,850,000
Bahan - 151
HARGA
SATUAN (Rp.)
31,000,000
31,000,000
200,000
250,000
310,000
150,000
360,000
265,000
557,000
950,000
16,000
16,500
95,000
-
100,000
35,100,000
35,125,000
250,000
550,000
1,560,000
2,540,000
3,100,000
4,520,000
196,000,000
110,500
110,000
92,000,000
157,000,000
6,000,000
-
-
-
-
-
-
-
-
-
-
-
-
20,000
-
-
-
Bahan - 152
HARGA
SATUAN (Rp.)
-
5,000
5,000
5,000
Bahan - 153
HARGA
SATUAN (Rp.)
26,250
35,000
36,750
35,000
26,250
125,000
7,875
31,500
7,825
50,000
50,000
47,250
70,875
35,000
10,000
2,000
5,000
7,825
15,000
31,500
25,000
36,750
50,000
5,000
35,000
10,000
10,000
75,000
10,000
200,000
10,000
1,575,000
5,000
3,150,000
420,000
78,750
10,000
2,000
10,500
20,000
20,000
25,000
20,000
25,000
40,000
20,000
Bahan - 154
HARGA
SATUAN (Rp.)
35,000
100,000
500,000
150,000
7,875
Bahan - 155
HARGA
SATUAN (Rp.)
123,900
9,000
9,500
10,000
9,000
13,000
13,500
12,500
9,500
9,000
9,500
110,000
36,000
Bahan - 156
HARGA
SATUAN (Rp.)
10,000
2,000,000
10,000
15,000
250,000
20,000
30,000
35,000
5,000
15,000
100,000
10,000
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
15,000
25,000
100,000
25,000
31,500
Bahan - 157
HARGA
SATUAN (Rp.)
36,750
Bahan - 158
HARGA
SATUAN (Rp.)
40,000
17,500
13,000
-
-
-
-
-
-
-
-
Bahan - 159
HARGA ALAT UNTUK PEKERJAAN ANALISA - E
HARGA ALAT
1 Mesin penyampur aspal (AMP) E01 Unit
2 Aspahlt Finisher E02 Unit
3 Mesin penyemprot aspal 800 liter (Asphlt Sprayer) E03 Unit
4 Buldozer 100 - 150 HP E04 Unit
5 Compressor 4000 - 6500 L/M E05 Unit
6 Concrette Mixer 0,3 - 0,6 m3 E06 Unit
7 Crane 10 - 15 Ton E07 Unit
8 Dump Truck 3 - 4 M3 E08 Unit
9 Dump Truck 8 ton 125 HP E09 Unit
10 Excavator 80 - 140 HP E10 Unit
11 Flat Bed Truck (Truk Bak Terbuka) 3 - 4 m3 E11 Unit
12 Genset 125 KVA E12 Unit
13 Motor Grader > 100 HP E13 Unit
14 Track Loader 75 - 100 HP E14 Unit
15 Wheel Loader 105 HP E15 Unit
16 Mesin Gilas 3 Roda 8 - 10 ton (Three Wheel Roller) E16 Unit
17 Mesin Gilas Tandem 6 - 8 ton (Tandem Roller) E17 Unit
18 Mesin Roda Karet 8 - 10 ton (Pneumatic Tyre Roller) E18 Unit
19 Mesin Gilas getar otomatis 5 - 8 T E19 Unit
20 Alat penggetar beton 4 HP (Concrette Vibrator) E20 Unit
21 Pemecah batu 220 HP (Stone Crusher) E21 Unit
22 Water Pump / Pompa Air 70 - 100 mm E22 Unit
23 Truk tangki air 100 HP 4000 L (Water Tank Truck ) E23 Unit
24 Stamper 5 HP E25 Unit
25 Jack Hammer E26 Unit
26 Fulvi Mixer E27 Unit
SEWA ALAT
1 Mesin penyaring 8 HP jam
2 Chip Spreader jam
3 Mesin penghampar 1820 MM 30 HP jam
4 Thriller gandeng 1 ton jam
5 Dump Truck 3,5 ton 44 HP jam
6 Pompa air (D 5 cm) 30 m3 / jam jam
7 Thriller 1ton jam
8 Traktor jam
9 Alat Bor jam
10 Alat Ukur jam
11 Beton Molen jam
12 Mata Cutter bh
13 Mesin Cutter jam
14 Motor Walls jam
15 Peralatan Las jam
16 Sprayer jam
17 Alat bantu untuk pekerjaan analisa - E ls
HARGA KETERANGAN
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Alat Baru
- Sewa
- Sewa
- Sewa
- Sewa
- Sewa
- Sewa
- Sewa
- Sewa
- Sewa
- Sewa
- Sewa
- baru
- Sewa
- Sewa
- Sewa
- Sewa
-
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT MI
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan BULLDOZER
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan COMPRESSOR
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan WHEEL LOAD
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan TANDEM RO
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru a Umur Ekonomis A
b Jam Kerja dalam 1 Tahun W
c Harga Alat B
5 Alat yang dipakai a Umur Ekonomis A'
b Jam Kerja dalam 1 Tahun W'
c Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan PNEUMATIC TYRE
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru a Umur Ekonomis A
b Jam Kerja dalam 1 Tahun W
c Harga Alat B
5 Alat yang dipakai a Umur Ekonomis A'
b Jam Kerja dalam 1 Tahun W'
c Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan DUMP
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan GENERA
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan MOTOR GRA
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru a Umur Ekonomis A
b Jam Kerja dalam 1 Tahun W
c Harga Alat B
5 Alat yang dipakai a Umur Ekonomis A'
b Jam Kerja dalam 1 Tahun W'
c Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan VIBRATORY R
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru Umur Ekonomis A
Jam Kerja dalam 1 Tahun W
Harga Alat B
5 Alat yang dipakai a Umur Ekonomis A'
b Jam Kerja dalam 1 Tahun W'
c Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan WATER TANK TR
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan JACK H
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan STAM
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan STONE C
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan THREE WHEEL
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan CONCRETE
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan CONCRETE MI
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan CRANE 10
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan DUMP TRU
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan EXCAVATOR
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan FLAT BED TR
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan WATER PUM
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan FULVI
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
No URAIAN KODE
I URAIAN PERALATAN
1 Jenis Peralatan TRACK LOAD
2 Tenaga Pw
3 Kapasitas Cp
4 Alat Baru : a. Umur Ekonomis A
b. Jam Kerja dalam 1 Tahun W
c. Harga Alat B
5 Alat Yang Dipakai : a. Umur Ekonomis A'
b. Jam Kerja dalam 1 Tahun W'
c. Harga Alat B'
V LAIN LAIN
1 Tingkat suku bunga (i)
2 Upah Operator / Sopir U1
3 Upah Pembantu Operator / Pembantu Sopir U2
4 Bahan bakar bensin Mb
5 Bahan bakar solar Ms
6 Minyak Pelumas Mp
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT
150.00 HP
50.00 Ton/jam
10.00 Tahun
1,500.00 Jam
- Rupiah
10.00 Tahun Alat Baru
1,500.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.24 -
- Rupiah
- Rupiah
- Rupiah
112,500.00 Rupiah
2,520,000.00 Rupiah Khusus AMP
35,625.00 Rupiah
- Rupiah
5,625.00 Rupiah
15,937.50 Rupiah
2,689,687.50 Rp
2,689,687.50 Rp
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
47.00 HP
6.00 Ton
6.00 Tahun
2,000.00 Jam
- Rupiah
6.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.30 -
- Rupiah
- Rupiah
- Rupiah
35,250.00 Rupiah
11,162.50 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
57,350.00 Rupiah
57,350.00 Rupiah
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
15.00 HP
800.00 Liter
5.00 Tahun
2,000.00 Jam
- Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.33 -
- Rupiah
- Rupiah
- Rupiah
11,250.00 Rupiah
3,562.50 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
25,750.00 Rupiah
25,750.00 Rupiah
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
140.00 HP
Ton
5.00 Tahun
2,000.00 Jam
- Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.33 -
- Rupiah
- Rupiah
- Rupiah
105,000.00 Rupiah
33,250.00 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
149,187.50 Rupiah
149,187.50 Rupiah
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
80.00 HP
Ton
5.00 Tahun
2,000.00 Jam
- Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.33 -
- Rupiah
- Rupiah
- Rupiah
60,000.00 Rupiah
19,000.00 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
89,937.50 Rupiah
89,937.50 Rupiah
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
105.00 HP
1.50 Ton
5.00 Tahun
2,000.00 Jam
- Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.33 -
- Rupiah
- Rupiah
- Rupiah
78,750.00 Rupiah
24,937.50 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
114,625.00 Rupiah
114,625.00 Rupiah
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
50.00 HP
8.00 Ton
5.00 Tahun
2,000.00 Jam
- Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.33 -
- Rupiah
- Rupiah
- Rupiah
37,500.00 Rupiah
11,875.00 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
60,312.50 Rupiah
60,312.50 Rupiah
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
60.00 HP
10.00 Ton
5.00 Tahun
1,800.00 Jam
- Rupiah
5.00 Tahun Alat Baru
1,800.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.33 -
- Rupiah
- Rupiah
- Rupiah
45,000.00 Rupiah
14,250.00 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
70,187.50 Rupiah
70,187.50 Rupiah
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
125.00 HP
8.00 Ton
5.00 Tahun
2,000.00 Jam
- Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.33 -
- Rupiah
- Rupiah
- Rupiah
93,750.00 Rupiah
29,687.50 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
134,375.00 Rupiah
134,375.00 Rupiah
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
175.00 HP
125.00 KVA
5.00 Tahun
2,000.00 Jam
- Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.33 -
- Rupiah
- Rupiah
- Rupiah
131,250.00 Rupiah
41,562.50 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
183,750.00 Rupiah
183,750.00 Rupiah
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
125.00 HP
- -
5.00 Tahun
2,000.00 Jam
- Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.33 -
- Rupiah
- Rupiah
- Rupiah
93,750.00 Rupiah
29,687.50 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
134,375.00 Rupiah
134,375.00 Rupiah
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
75.00 HP
7.00 Ton
4.00 Tahun
2,000.00 Jam
- Rupiah
4.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.39 -
- Rupiah
- Rupiah
- Rp
56,250.00 Rupiah
17,812.50 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
85,000.00 Rp
85,000.00 Rp
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
100.00 HP
4,000.00 Liter
5.00 Tahun
2,000.00 Jam
- Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.33 -
- Rupiah
- Rupiah
- Rp
75,000.00 Rupiah
23,750.00 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
109,687.50 Rp
109,687.50 Rp
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
3.00 HP
- Liter
4.00 Tahun
1,000.00 Jam
- Rupiah
4.00 Tahun Alat Baru
1,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.39 -
- Rupiah
- Rupiah
- Rp
2,250.00 Rupiah
712.50 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
13,900.00 Rp
13,900.00 Rp
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
STAMPER E25
5.00 HP
0.17 Ton
4.00 Tahun
1,000.00 Jam
- Rupiah
4.00 Tahun Alat Baru
1,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.39 -
- Rupiah
- Rupiah
- Rp
3,750.00 Rupiah
1,187.50 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
15,875.00 Rp
15,875.00 Rp
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
220.00 HP
50.00 Ton/Jam
5.00 Tahun
2,000.00 Jam
- Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.33 -
- Rupiah
- Rupiah
- Rp
165,000.00 Rupiah
52,250.00 Rupiah
- Rupiah
5,625.00 Rupiah
10,625.00 Rupiah
233,500.00 Rp
233,500.00 Rp
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
55.00 HP
8.00 Ton
5.00 Tahun
2,000.00 Jam
- Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.33 -
- Rupiah
- Rupiah
- Rp
41,250.00 Rupiah
13,062.50 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
65,250.00 Rp
65,250.00 Rp
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
10.00 HP
- -
4.00 Tahun
1,000.00 Jam
- Rupiah
4.00 Tahun Alat Baru
1,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.39 -
- Rupiah
- Rupiah
- Rp
7,500.00 Rupiah
2,375.00 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
20,812.50 Rp
20,812.50 Rp
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
15.00 HP
500.00 Liter
4.00 Tahun
2,000.00 Jam
- Rupiah
4.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.39 -
- Rupiah
- Rupiah
- Rp
11,250.00 Rupiah
3,562.50 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
25,750.00 Rp
25,750.00 Rp
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
150.00 HP
15.00 Ton
5.00 Tahun
2,000.00 Jam
- Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.33 -
- Rupiah
- Rupiah
- Rp
112,500.00 Rupiah
35,625.00 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
159,062.50 Rp
159,062.50 Rp
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
100.00 HP
6.00 Ton
5.00 Tahun
2,000.00 Jam
- Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.33 -
- Rupiah
- Rupiah
- Rupiah
75,000.00 Rupiah
23,750.00 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
109,687.50 Rupiah
109,687.50 Rupiah
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
80.00 HP
0.50 M3
5.00 Tahun
2,000.00 Jam
- Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.33 -
- Rupiah
- Rupiah
- Rupiah
60,000.00 Rupiah
19,000.00 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
89,937.50 Rupiah
89,937.50 Rupiah
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
100.00 HP
4.00 M3
5.00 Tahun
2,000.00 Jam
- Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.33 -
- Rupiah
- Rupiah
- Rupiah
75,000.00 Rupiah
23,750.00 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
109,687.50 Rupiah
109,687.50 Rupiah
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
6.00 HP
- -
2.00 Tahun
2,000.00 Jam
- Rupiah
2.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.65 -
- Rupiah
- Rupiah
- Rupiah
4,500.00 Rupiah
1,425.00 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
16,862.50 Rupiah
16,862.50 Rupiah
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
75.00 HP
- -
5.00 Tahun
2,000.00 Jam
- Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.33 -
- Rupiah
- Rupiah
- Rupiah
56,250.00 Rupiah
17,812.50 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
85,000.00 Rupiah
85,000.00 Rupiah
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
URAIAN ANALISA ALAT
90.00 HP
1.60 M3
5.00 Tahun
2,000.00 Jam
- Rupiah
5.00 Tahun Alat Baru
2,000.00 Jam Alat Baru
- Rupiah Alat Baru
- Rupiah
0.33 -
- Rupiah
- Rupiah
- Rupiah
67,500.00 Rupiah
21,375.00 Rupiah
- Rupiah
5,625.00 Rupiah
5,312.50 Rupiah
99,812.50 Rupiah
99,812.50 Rupiah
20.00 % / Tahun
5,625.00 Rp / Jam
5,312.50 Rp / Jam
6,000.00 Liter
6,000.00 Liter
23,750.00 Liter
REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN
ANALISA KONSTRUKSI
PEKERJAAN PERSIAPAN
1 1.00 m1 Pek. Pengukuran & Pemasangan Bowplank
2 1.00 m2 Pekerjaan Pengukuran Gedung
3 1.00 m2 Membersihkan Lapangan dan Perataan
4 1.00 m2 Pembuatan jalan sementara, tebal 25 cm
5 1.00 m2 Pembuatan Jalan Sementara
6 1.00 m2 Pek. Kantor Direksi Keet , dengan lantai plesteran
7 1.00 m1 Pagar Sementara dari Seng Gelombang tinggi 2 m
8 1.00 m1 Pagar Sementara dari Kawat Duri tinggi 1.8 m
9 1.00 m1 Pagar Sementara dari Kayu tinggi 2 m
10 1.00 m1 Pasang pagar kawat jaring galvanis, tinggi 1,00 m
11 1.00 m2 Pembuatan Gudang Semen dan Alat - alat
12 1.00 m2 Pembuatan Rumah Jaga / Konstruksi Kayu
13 1.00 m2 Pembuatan Bedeng Buruh
14 1.00 m2 Pembuatan Bak Adukan ( 40 x 50 x 20 ) cm
15 1.00 m2 Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm
16 1.00 m1 Pasang pagar beton pracetak ( 5 x 50 x 213 ) cm
17 1.00 bh Membuat Papan Nama Proyek 80x120 cm (bahan seng)
18 1.00 bh Membuat Papan Nama Proyek 80x120 cm (bahan flexi)
PEKERJAAN BONGKARAN
1 1.00 m3 Membongkar pasangan batu kali
2 1.00 m3 Membongkar pasangan batu merah dan membersihkan
3 1.00 m3 Membongkar beton bertulang dan membersihkan
4 1.00 m2 Pekerjaan bongkar lantai tegel untuk dipergunakan lagi
5 1.00 m2 Mengupas plesteran lama
6 1.00 m2 Membongkar genteng / sirap untuk dipergunakan lagi
7 1.00 m2 Membongkar atap seng
8 1.00 m2 Membongkar usuk / reng dipakai lagi
9 1.00 m2 Membongkar usuk / reng tidak dipakai lagi
10 1.00 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunaka
11 1.00 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digunakan
12 1.00 m3 Mengerjakan kembali bangunan kayu yang telah dibongkar
PEKERJAAN TANAH
1 1.00 m3 Menggali tanah biasa sedalam 1 meter
2 1.00 m3 Menggali tanah biasa sedalam 2 meter
3 1.00 m3 Menggali tanah biasa sedalam 3 meter
4 1.00 m3 Menggali tanah keras sedalam 1 meter
5 1.00 m3 Menggali tanah cadas sedalam 1 meter
6 1.00 m3 Menggali tanah lumpur sedalam 1 meter
7 1.00 m2 Mengerjakan stripping tebing setinggi 1 meter
8 1.00 m3 Urug kembali bekas galian
9 1.00 m3 Membuang tanah sejauh 30 meter
Rekapitulasi - 266
NO. SATUAN JENIS PEKERJAAN
PEKERJAAN PONDASI
1 1.00 m3 Pasangan pondasi 1 Pc : 1 Ps
2 1.00 m3 Pasangan pondasi 1 Pc : 2 Ps
3 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 3 PP
4 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 4 PP
5 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 5 PP
6 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 6 PP
7 1.00 m3 Memasang pondasi batu belah, campuran 1 PC : 8 PP
8 1.00 m3 Pasangan pondasi 1 Kp : 1 Sm : 1 Ps
9 1.00 m3 Memasang pondasi batu belah, campuran 1 KP : 1 SM : 2 PP
10 1.00 m3 Pasangan pondasi 1 Pc : 3 Kp : 5 Ps
Rekapitulasi - 267
NO. SATUAN JENIS PEKERJAAN
PEKERJAAN DINDING
1 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran
2 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran
3 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran
4 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran
5 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran
6 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran
7 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campura
8 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campura
9 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campura
10 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campura
11 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campura
12 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) tebal 1/2 bata, campuran sp
13 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campura
14 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campur
15 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campura
16 1.00 m2 Memasang dinding HB 20, campuran spesi 1 PC : 3 PP
17 1.00 m2 Memasang dinding HB 20, campuran spesi 1 PC : 4 PP
18 1.00 m2 Memasang dinding HB 15, campuran spesi 1 PC : 3 PP
19 1.00 m2 Memasang dinding HB 15, campuran spesi 1 PC : 4 PP
20 1.00 m2 Memasang dinding HB 10, campuran spesi 1 PC : 3 PP
21 1.00 m2 Memasang dinding HB 10, campuran spesi 1 PC : 4 PP
22 1.00 m2 Memasang dinding terawang (roster) ukuran 25 x 25 cm, campuran spesi 1 PC
23 1.00 m2 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spes
24 1.00 m2 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spes
25 1.00 m2 Memasang dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran
26 1.00 m2 Pasangan dinding batako
27 1.00 m1 Memasang rollag bata , campuran spesi 1 PC : 3 PP
PEKERJAAN BETON
1 1.00 m3 Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
2 1.00 m3 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0
3 1.00 m3 Membuat beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72
4 1.00 m3 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c =
5 1.00 m3 Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
6 1.00 m3 Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
7 1.00 m3 Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
8 1.00 m3 Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
9 1.00 m3 Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
10 1.00 m3 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
11 1.00 m3 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49
12 1.00 m3 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48
Rekapitulasi - 268
NO. SATUAN JENIS PEKERJAAN
Rekapitulasi - 269
NO. SATUAN JENIS PEKERJAAN
PEKERJAAN PLESTERAN
1 1.00 m2 Memasang plesteran 1 PC : 1 PP, tebal 15 mm
2 1.00 m2 Memasang plesteran 1 PC : 2 PP, tebal 15 mm
3 1.00 m2 Memasang plesteran 1 PC : 3 PP, tebal 15 mm
4 1.00 m2 Memasang plesteran 1 PC : 4 PP, tebal 15 mm
5 1.00 m2 Memasang plesteran 1 PC : 5 PP, tebal 15 mm
6 1.00 m2 Memasang plesteran 1 PC : 6 PP, tebal 15 mm
7 1.00 m2 Memasang plesteran 1 PC : 7 PP, tebal 15 mm
8 1.00 m2 Memasang plesteran 1 PC : 8 PP, tebal 15 mm
9 1.00 m2 Memasang plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm
10 1.00 m2 Memasang plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm
11 1.00 m2 Memasang plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm
12 1.00 m2 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm
13 1.00 m2 Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm
14 1.00 m2 Memasang plesteran 1 PC : 2 PP, tebal 20 mm
15 1.00 m2 Memasang plesteran 1 PC : 3 PP, tebal 20 mm
16 1.00 m2 Memasang plesteran 1 PC : 4 PP, tebal 20 mm
17 1.00 m2 Memasang plesteran 1 PC : 5 PP, tebal 20 mm
18 1.00 m2 Memasang plesteran 1 PC : 6 PP, tebal 20 mm
19 1.00 m2 Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm
20 1.00 m2 Memasang Berapen 1 PC : 5 PP, tebal 15 mm
21 1.00 m1 Plesteran skoneng 1 Pc : 2 Ps ( untuk gedung )
22 1.00 m1 Sponengan (untuk saluran dan sejenisnya)
23 1.00 m2 Memasang Plesteran Granit , 1 PC : 2 Granit, tebal 10 mm
24 1.00 m2 Memasang Plesteran Teraso , 1 PC : 2 Batu Teraso, tebal 10 mm
25 1.00 m2 Memasang Plesteran Ciprat 1 PC : 2 PP
26 1.00 m2 Memasang finishing siar pasangan dinding bata merah (=20 m’)
27 1.00 m2 Memasang finishing siar pasangan dinding conblock ekspose (=8 m’)
28 1.00 m2 Plesteran siar adukan 1 Pc : 2 Ps
29 1.00 m2 Memasang acian
30 1.00 m2 Plesteran beton 1 Pc : 3 Ps, tebal 15 mm
31 1.00 m2 Plesteran batu kali 1pc:1/2kp:5ps tebal 10 mm
32 1.00 m2 Plesteran batu kali 1pc:3ps
33 1.00 m2 Plesteran batu kali 1pc:4ps
34 1.00 m2 Plesteran K- 50, tebal 20 mm
Rekapitulasi - 271
NO. SATUAN JENIS PEKERJAAN
PEKERJAAN CONBLOCK
1 1.00 m2 Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 8 cm, K-400
2 1.00 m2 Pasang conblock tipe uni, segi-empat abu-abu 8 cm, K-300
3 1.00 m2 Pasang conblock tipe segi-empat abu-abu 6 cm, K-200
4 1.00 m2 Pasang conblock tipe segi-empat abu-abu 8 cm, K-200
5 1.00 m2 Pasang conblock tipe segi-enam abu-abu 6 cm, K-200
6 1.00 m2 Pasang conblock tipe segi-enam abu-abu 8 cm, K-200
7 1.00 m2 Pasang conblock tipe segi-empat, uni, segi-enam warna 8 cm, K-400
8 1.00 m2 Pasang conblock tipe uni, segi-empat warna 8 cm, K-300
9 1.00 m2 Pasang conblock tipe segi-empat warna 6 cm, K-200
10 1.00 m2 Pasang conblock tipe segi-empat warna 8 cm, K-200
11 1.00 m2 Pasang conblock tipe segi-enam warna 6 cm, K-200
12 1.00 m2 Pasang conblock tipe segi-enam warna 8 cm, K-200
Rekapitulasi - 272
NO. SATUAN JENIS PEKERJAAN
Rekapitulasi - 273
NO. SATUAN JENIS PEKERJAAN
21 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu jati (klas plitur)
22 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu jati (lokal)
23 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu kamper
24 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu bengkirai
25 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu kruing
26 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu jati lo
27 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kamp
28 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu beng
29 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kruin
30 1.00 m2 Memasang jalusi kusen, kayu jati (klas plitur)
31 1.00 m2 Memasang jalusi kusen, kayu jati (lokal)
32 1.00 m2 Memasang jalusi kusen, kayu kamper
33 1.00 m2 Memasang jalusi kusen, kayu bengkirai
34 1.00 m2 Memasang jalusi kusen, kayu kruing
35 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu jati (lokal)
36 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu kamper
37 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu bengkirai
38 1.00 m2 Pasang pintu teakwood rangkap, rangka kayu kruing
39 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu kamper
40 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu bengkirai
41 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu kruing
42 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu jati (klas plitur) bentang 6
43 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu jati (lokal) bentang 6 met
44 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu kamper bentang 6 meter
45 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu bengkirai bentang 6 mete
46 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu kruing bentang 6 meter
47 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu glugu bentang 6 meter
48 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu jati (klas plitur)
49 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu jati lokal
50 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu kamper
51 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu kruing
52 1.00 m3 Memasang konstruksi kuda-kuda expose, kayu bengkirai
53 1.00 m3 Memasang konstruksi gordeng, kayu jati (klas plitur)
54 1.00 m3 Memasang konstruksi gordeng, kayu jati lokal
55 1.00 m3 Memasang konstruksi gordeng, kayu kamper
56 1.00 m3 Memasang konstruksi gordeng, kayu bengkirai
57 1.00 m3 Memasang konstruksi gordeng, kayu kruing
58 1.00 m3 Memasang konstruksi gordeng, kayu glugu
59 1.00 m2 Memasang usuk jati (lokal) 5/7, reng jati (lokal) 2/3
60 1.00 m2 Memasang usuk kamper 5/7, reng jati (lokal) 2/3
61 1.00 m2 Memasang usuk kamper 5/7, reng kamper 2/3
62 1.00 m2 Memasang usuk bengkirai 5/7, reng jati (lokal) 2/3
63 1.00 m2 Memasang usuk bengkirai 5/7, reng bengkirai 2/3
64 1.00 m2 Memasang usuk kruing 5/7, reng jati (lokal) 2/3
65 1.00 m2 Memasang usuk kruing 5/7, reng kruing 2/3
66 1.00 m2 Memasang usuk jati 5/7 (klas 1), reng jati 3/4 (klas 1)
67 1.00 m2 Memasang usuk kamper 5/7, reng jati (lokal) 3/4
68 1.00 m2 Memasang usuk kamper 5/7, reng kamper 3/4
69 1.00 m2 Memasang usuk bengkirai 5/7, reng jati (lokal) 3/4
Rekapitulasi - 274
NO. SATUAN JENIS PEKERJAAN
Rekapitulasi - 275
NO. SATUAN JENIS PEKERJAAN
98 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu jati (klas plitur)
99 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu ati (lokal)
100 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kamper
101 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kelas bengkirai
102 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kruing
103 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (klas plitur)
104 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (lokal)
105 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu kamper
106 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu bengkirai
107 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu kruing
108 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (klas plitur)
109 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (lokal)
110 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu kamper
111 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu bengkirai
112 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu kruing
113 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu jati (klas plitur)
114 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu jati (lokal
115 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu kamper
116 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu bengkirai
117 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu kruing
118 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu jati (klas plitur)
119 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu jati (lokal)
120 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu kamper
121 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu bengkirai
122 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu kruing
123 1.00 m2 Membuat listplank asbes plat ram kayu jati (lokal)
124 1.00 m2 Membuat listplank asbes plat ram kayu kamper
125 1.00 m2 Membuat listplank asbes plat ram kayu bengkirai
126 1.00 m2 Membuat listplank asbes plat ram kayu kruing
127 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu jati (lokal)
128 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu kamper
129 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu bengkirai
130 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu kruing
131 1.00 m2 Memasangdinding pemisah teakwood rangkap, rangka kayu jati (lokal)
132 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu kamper
133 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu bengkirai
134 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu kruing
135 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu kamper
136 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu bengkirai
137 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu kruing
138 1.00 m2 Memasang dinding lambriziring dari papan kayu jati (klas plitur)
139 1.00 m2 Memasang dinding lambriziring dari papan kayu jati (lokal)
140 1.00 m2 Memasang dinding lambriziring dari papan kayu kamper
141 1.00 m2 Memasang dinding lambriziring dari papan kayu bengkirai
142 1.00 m2 Memasang dinding lambriziring dari papan kayu kruing
143 1.00 m2 Memasang dinding lambriziring dari plywood ukuran (120 x 240) cm
144 1.00 m2 Memasang dinding bilik, rangka kayu kruing
145 1 m1 Mengerjakan papan ruiter kayu jati 2/20 (lokal)
146 1.00 m1 Mengerjakan papan ruiter kayu kamper 2/20
Rekapitulasi - 276
NO. SATUAN JENIS PEKERJAAN
Rekapitulasi - 277
NO. SATUAN JENIS PEKERJAAN
Rekapitulasi - 279
NO. SATUAN JENIS PEKERJAAN
PEKERJAAN PENGECATAN
1 1.00 m2 Mengikis / Mengerok Permukaan Cat Tembok Lama
2 1.00 m2 Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual
3 1.00 m2 Mendempul dan Menggosok Kayu
4 1.00 m2 Pengecatan Bidang Kayu Lama
5 1.00 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis C
6 1.00 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis C
7 1.00 m2 Pelaburan Bidang Kayu dengan Teak Oil
8 1.00 m2 Pelaburan Bidang Kayu dengan Pelitur
9 1.00 m2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
10 1.00 m2 Pelaburan Bidang Kayu dengan Vernis
11 1.00 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
12 1.00 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
13 1.00 m2 Melabur tembok dengan kalkarium
14 1.00 m2 Melabur Tembok dengan Kapur Sirih
15 1.00 m2 Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan )
16 1.00 m2 Pengecatan Permukaan Baja dengan Meni Besi
17 1.00 m2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah
18 1.00 m2 Pemasangan Wall Paper
19 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 La
tebal 200 um
20 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 La
200 um
21 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 La
tebal 200 um
22 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Sp
Cat Mutakhir, tebal 200 um
23 1.00 m2 Mencuci Bidang Permukaan Tembok yang Pernah dicat
24 1.00 m2 Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting
Sa 2½.
25 1.00 m2 Menyabun Permukaan Tembok Lama
26 1.00 m2 Pengecatan tembok tidak terlindung dari panas dan hujan
27 1.00 m2 Pengecatan bidang besi ( 3 x )
28 1.00 m2 Pengetiran kayu ( 2 x )
29 1.00 m2 Pekerjaan cat duco 3 x
30 1.00 m2 Mengecat genteng
31 10.00 m2 Mengecat kerb 3 kali
32 1.00 m2 Memasang Prodo Mas 24 karat
33 1.00 m2 Mengerjakan Cat Sungging
PEKERJAAN SANITASI
1 1.00 bh Memasang Kloset Duduk / Monoblok
2 1.00 bh Memasang 1Kloset Jongkok Porselen
3 1.00 bh Memasang Kloset Jongkok Teraso
4 1.00 bh Memasang Urinoir
5 1.00 bh Memasang Wastafel
6 1.00 bh Memasang Bak Mandi Fiberglass, volume 0.30 m³
7 1.00 bh Memasang Badkip Porselen
8 1.00 bh Memasang Bak Fiberglass volume 1 m³ air
Rekapitulasi - 280
NO. SATUAN JENIS PEKERJAAN
9 1.00 m1 Memasang Pipa Penyalur Air limbah jenis Pipa Tanah Ø15 cm
10 1.00 m1 Memasang Pipa Penyalur Air limbah jenis Pipa Tanah Ø 20 cm
11 1.00 m1 Memasang Pipa Beton Ø 5 cm - 20 cm
12 1.00 m1 Memasang Pipa Beton Ø 30 cm - 100 cm
13 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35 cm
14 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50 cm
15 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65 cm
16 1.00 m1 Memasang Pipa Galvanis Ø ½"
17 1.00 m1 Memasang Pipa Galvanis Ø ¾"
18 1.00 m1 Memasang Pipa Galvanis Ø 1"
19 1.00 m1 Memasang Pipa Galvanis Ø 1½"
20 1.00 m1 Memasang Pipa Galvanis Ø 3"
21 1.00 m1 Memasang Pipa Galvanis Ø 4"
22 1.00 m1 Memasang Pipa PVC tipe AW Ø ½"
23 1.00 m1 Memasang Pipa PVC tipe AW Ø ¾"
24 1.00 m1 Memasang Pipa PVC tipe AW Ø 1"
25 1.00 m1 Memasang Pipa PVC tipe AW Ø 1½"
26 1.00 m1 Memasang Pipa PVC tipe AW Ø 2"
27 1.00 m1 Memasang Pipa PVC tipe AW Ø 2½"
28 1.00 m1 Memasang Pipa PVC tipe AW Ø 3"
29 1.00 m1 Memasang Pipa PVC tipe AW Ø 4"
30 1.00 bh Memasang Bak Cuci Piring Stainles Steel
31 1.00 bh Memasang Bak Cuci Piring Teraso
32 1.00 bh Memasang Kran Ø ¾" atau ½"
33 1.00 bh Memasang Floor Drain
Rekapitulasi - 281
NO. SATUAN JENIS PEKERJAAN
Rekapitulasi - 283
NO. SATUAN JENIS PEKERJAAN
Rekapitulasi - 284
NO. SATUAN JENIS PEKERJAAN
Bongkar armatur pada stang ornamen existing + pasang Lampu SRP 822/150 W
Pemda
48 1.00 Set Bongkar armatur pada stang ornamen existing + pasang Lampu SRP 822/250 W
Pemda
49 1.00 Set Bongkar komponen lama existing + pasang Lampu SRP 822/250 Watt SON + r
50 1.00 Batang Pasang Stang ornamen 1 m + Lampu sekualitas SRP 810 SON 70 W
51 1.00 Batang Pasang Stang ornamen 3 m + Armature IP 65 (sekualitas SGP 328 SON=T 150
52 1.00 Batang Pasang Stang ornamen 3 m + Armature IP 65 (sekualitas SGP 328 SON-T 250
53 1.00 Batang Upah Pasang Tiang PJU Bulat ( 6m / 7m / 9m ) GIP Cb.1
54 1.00 Batang Pasang Tiang Bantu 7 meter (bulat)
55 1.00 Batang Pasang Tiang GIP Cb.1 2",3", 3", 4", h = 9 m / Tiang Bulat 7 m Cb.1 + Umpak
56 1.00 Batang Pasang Tiang GIP Cb.1 2",3", 3", 4", h = 9 m / Tiang Bulat 9 m Cb.1 + Umpak
57 1.00 Batang Pasang Kembali Tiang Bulat 7 m Cb.1 (GIP cb.1 2", 3", 4" h = 7 m) + Umpak
58 1.00 Batang Pasang Kembali Tiang Bulat 9 m Cb.1 (GIP cb.1 2", 3", 4" h = 7 m) + Umpak
59 1.00 Unit Pasang Tiang Octogonal Cb.1, t=9 + Armature komplit
60 1.00 Batang Bongkar Tiang PJU bulat ( 6m / 7m / 9m ) GIP Cb. 1
61 1.00 Set Bongkar Lampu Hias Kincir Besar DC 010
62 1.00 Unit Bongkar Lampu Hias
63 1.00 Unit Upah Pasang Lampu Hias
64 1.00 Set Pasang Lp sorot Tango SMF 383 SON-T 150 Watt
65 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 1300 VA
66 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 2200 VA
67 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 3500 VA
68 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 4400 VA
69 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 7700 VA
70 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 11000 VA
71 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 11000 VA (2 Unit Box P
Rekapitulasi - 286
NO. SATUAN JENIS PEKERJAAN
Rekapitulasi - 287
NO. SATUAN JENIS PEKERJAAN
Rekapitulasi - 288
NO. SATUAN JENIS PEKERJAAN
ANALISA KPUT
1 1 m2 Menghampar dan mengisi bahan perkerasan
2 1 m3 Menyawur pasir
3 1 hari Menggilas dengan motor walls
4 1 m2 Perkerasan lapis pondasi bawah (sub base) tebal 20 cm padat
5 1 m2 Pembuatan lapis pondasi bawah (sub base) tebal 15 cm padat
6 1 m2 Pembuatan lapis pondasi atas (base) tebal 10 cm padat
Pembuatan lapis pondasi atas (base) tebal 8 cm padat
Pembuatan lapis pondasi atas (base) tebal 7 cm padat
7 1 m2 Lapisan Penetrasi 4 cm padat
8 1 m2 Aspal sand sheet 2 cm jereng (1 cm padat)
Aspal sand sheet 3 cm jereng (2 cm padat)
9 1 m2 Aspal sand sheet 2 cm jereng (1 cm padat) tanpa aspal
Aspal sand sheet 3 cm jereng (2 cm padat) tanpa aspal
10 10 m2 Mengecat marka jalan dengan Rettar
11 1 m2 Mengecat marka jalan dengan Thermoplastic
12 350 m1 Pemotongan aspal dengan mesin potong (cutter), 2 sisi
Pemotongan aspal dengan mesin potong (cutter), 1 sisi
13 1 m2 Pembongkaran aspal dengan Jack Hammer
ANALISA - E
1 1 M2 LATASTON ( HRS )
2 1 M2 LASTON ( AC )
3 1 M3 ASPHALT TREATED BASE ( ATB )
4 1 LITER
LAPIS RESAP PENGIKAT (PRIME COAT)
5 1 M3 LAPIS PONDASI AGREGAT KLAS A
UNTUK 1 M2 TEBAL 20 CM
UNTUK 1 M2 TEBAL 15 CM
UNTUK 1 M2 TEBAL 10 CM
6 1 M3 LAPIS PONDASI AGREGAT KLAS B
UNTUK 1 M2 TEBAL 20 CM
UNTUK 1 M2 TEBAL 15 CM
UNTUK 1 M2 TEBAL 10 CM
7 1 LITER LAPIS PEREKAT (TACK COAT)
8 1 M2 PENYIAPAN BADAN JALAN (PEMADATAN DAN PERATAAN)
Rekapitulasi - 289
NO. SATUAN JENIS PEKERJAAN
ANALISA PENYAPUAN
Pengangkutan dengan Dump Truck per Bulan
Pengangkutan dengan Arm Roll Truck per Bulan
Pengangkutan dengan Compactor per Bulan
1.00 m2 Penyapuan Jalan
Jalan Kategori Berat
Jalan Kategori Sedang
Jalan Kategori Ringan
1.00 m2 Sweeping
Jalan Kategori Berat
Jalan Kategori Sedang
Jalan Kategori Ringan
1.00 bt Pemangkasan Pohon
Asumsi Dengan Menyewa Alat Berat
Asumsi Dengan Tidak Menyewa Alat Berat
1.00 m2 Penyapuan Taman
1.00 m2 Penyiraman tanaman
1.00 m2 Pemupukan tanaman
1.00 m2 Pengendalian Hama tanaman
1.00 m2 Pemangkasan dan penyiangan pohon kecil
1.00 bh Pembersihan pot
Rekapitulasi - 290
NO. SATUAN JENIS PEKERJAAN
Rekapitulasi - 291
NO. SATUAN JENIS PEKERJAAN
Rekapitulasi - 292
NO. SATUAN JENIS PEKERJAAN
Rekapitulasi - 293
NO. SATUAN JENIS PEKERJAAN
ANALISA ALAT
Rekapitulasi - 294
KERJAAN
Rekapitulasi - 295
JENIS PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 296
JENIS PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 298
JENIS PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 300
JENIS PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 301
JENIS PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 302
JENIS PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 303
JENIS PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 304
JENIS PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 305
JENIS PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 306
JENIS PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 308
JENIS PEKERJAAN HARGA SATUAN HALAMAN
( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir, tebal 11,328.00 Analisa Konstruksi - 109
( Galbani ) secara Manual Sistem 3 Lapis Cat Konvensional, 129,415.00 Analisa Konstruksi - 110
( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem 1 Lapis 105,765.00 Analisa Konstruksi - 110
Rekapitulasi - 310
JENIS PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 312
JENIS PEKERJAAN HARGA SATUAN HALAMAN
M GEDUNG
12,900.00 Analisa Listrik Gedung - 1
17,960.00 Analisa Listrik Gedung - 1
24,010.00 Analisa Listrik Gedung - 1
22,360.00 Analisa Listrik Gedung - 1
26,760.00 Analisa Listrik Gedung - 1
36,220.00 Analisa Listrik Gedung - 1
50,520.00 Analisa Listrik Gedung - 2
78,460.00 Analisa Listrik Gedung - 2
910.00 Analisa Listrik Gedung - 2
910.00 Analisa Listrik Gedung - 2
63,060.00 Analisa Listrik Gedung - 2
99,360.00 Analisa Listrik Gedung - 2
15,760.00 Analisa Listrik Gedung - 3
22,360.00 Analisa Listrik Gedung - 3
30,060.00 Analisa Listrik Gedung - 3
910.00 Analisa Listrik Gedung - 3
910.00 Analisa Listrik Gedung - 3
4,855.00 Analisa Listrik Gedung - 3
8,155.00 Analisa Listrik Gedung - 4
455.00 Analisa Listrik Gedung - 4
102,272.00 Analisa Listrik Gedung - 4
102,272.00 Analisa Listrik Gedung - 4
137,626.00 Analisa Listrik Gedung - 4
90,530.00 Analisa Listrik Gedung - 4
72,521.00 Analisa Listrik Gedung - 5
33,418.00 Analisa Listrik Gedung - 5
51,287.00 Analisa Listrik Gedung - 5
144,980.00 Analisa Listrik Gedung - 5
47,767.00 Analisa Listrik Gedung - 5
nel Kontrol + KWH 1300 VA 2,960,420.00 Analisa Listrik Gedung - 6
nel Kontrol + KWH 2200 VA 3,969,120.00 Analisa Listrik Gedung - 6
nel Kontrol + KWH 3500 VA 5,401,320.00 Analisa Listrik Gedung - 7
nel Kontrol + KWH 4400 VA 6,395,060.00 Analisa Listrik Gedung - 7
nel Kontrol + KWH 7700 VA 10,072,690.00 Analisa Listrik Gedung - 8
nel Kontrol + KWH 11000 VA 13,835,020.00 Analisa Listrik Gedung - 8
nel Kontrol + KWH 11000 VA (2 Unit Box Panel) 14,675,155.00 Analisa Listrik Gedung - 9
48,513.00 Analisa Listrik Gedung - 9
45,732.00 Analisa Listrik Gedung - 9
Rekapitulasi - 313
JENIS PEKERJAAN HARGA SATUAN HALAMAN
GEDUNG (PJU)
910.00 Analisa Listrik PJU - 1
910.00 Analisa Listrik PJU - 1
910.00 Analisa Listrik PJU - 1
455.00 Analisa Listrik PJU - 1
910.00 Analisa Listrik PJU - 1
ories (Gawang) untuk Lampu Ekorola 2,064,837.00 Analisa Listrik PJU - 1
ories (Gawang) untuk Lampu Ekorola 3,168,137.00 Analisa Listrik PJU - 2
ories (Gawang) untuk Lampu Ekorola 1,371,837.00 Analisa Listrik PJU - 2
ories (Gawang) untuk Lampu PJU 2,559,837.00 Analisa Listrik PJU - 2
78,460.00 Analisa Listrik PJU - 2
17,960.00 Analisa Listrik PJU - 2
8,155.00 Analisa Listrik PJU - 3
32,593.00 Analisa Listrik PJU - 3
26,760.00 Analisa Listrik PJU - 3
329,033.00 Analisa Listrik PJU - 3
53,543.00 Analisa Listrik PJU - 3
61,898.00 Analisa Listrik PJU - 3
76,198.00 Analisa Listrik PJU - 4
104,138.00 Analisa Listrik PJU - 4
46,492.00 Analisa Listrik PJU - 4
43,158.00 Analisa Listrik PJU - 5
Aspal dengan sistem bor 428,370.00 Analisa Listrik PJU - 5
PVC tanpa galian 45,086.00 Analisa Listrik PJU - 5
102,272.00 Analisa Listrik PJU - 5
103,592.00 Analisa Listrik PJU - 5
573,314.00 Analisa Listrik PJU - 5
431,475.00 Analisa Listrik PJU - 6
108,212.00 Analisa Listrik PJU - 6
137,626.00 Analisa Listrik PJU - 6
90,530.00 Analisa Listrik PJU - 6
72,521.00 Analisa Listrik PJU - 6
431,475.00 Analisa Listrik PJU - 6
573,497.00 Analisa Listrik PJU - 7
51,287.00 Analisa Listrik PJU - 7
144,980.00 Analisa Listrik PJU - 7
47,767.00 Analisa Listrik PJU - 7
13,200.00 Analisa Listrik PJU - 7
Lampu SRP 822/250 Watt Son 274,862.00 Analisa Listrik PJU - 7
+ Lampu SRP 822/250 Watt Son 274,862.00 Analisa Listrik PJU - 7
Lampu SRP 822/250 Watt Son 433,400.00 Analisa Listrik PJU - 8
, h= 7 meter + lampu SRP 822/250 Watt Son 1,649,857.00 Analisa Listrik PJU - 8
, h= 9 meter + lampu SRP 822/250 Watt Son 1,749,393.00 Analisa Listrik PJU - 8
, h= 9 meter + lampu SRP 822/250 Watt Son 1,782,917.00 Analisa Listrik PJU - 8
, h= 9 meter + lampu SRP 822/250 Watt Son 1,850,597.00 Analisa Listrik PJU - 8
, h= 11 meter + lampu SRP 822/250 Watt Son 1,932,040.00 Analisa Listrik PJU - 8
isting + pasang Lampu SRP 822/70 Watt SON + retur ke gudang 302,372.00 Analisa Listrik PJU - 9
isting + pasang Lampu SRP 822/150 Watt SON + retur ke gudang 313,955.00 Analisa Listrik PJU - 9
Rekapitulasi - 314
JENIS PEKERJAAN HARGA SATUAN HALAMAN
isting + pasang Lampu SRP 822/250 Watt SON + retur ke gudang 313,955.00 Analisa Listrik PJU - 9
ang Lampu SRP 822/250 Watt SON + retur ke gudang Pemda 309,694.00 Analisa Listrik PJU - 9
kualitas SRP 810 SON 70 W 32,879,192.00 Analisa Listrik PJU - 9
IP 65 (sekualitas SGP 328 SON=T 150 W) 9,863,122.00 Analisa Listrik PJU - 10
IP 65 (sekualitas SGP 328 SON-T 250 W) 5,588,522.00 Analisa Listrik PJU - 10
/ 9m ) GIP Cb.1 261,662.00 Analisa Listrik PJU - 10
3,659,562.00 Analisa Listrik PJU - 10
= 9 m / Tiang Bulat 7 m Cb.1 + Umpak 3,659,562.00 Analisa Listrik PJU - 11
= 9 m / Tiang Bulat 9 m Cb.1 + Umpak 3,989,562.00 Analisa Listrik PJU - 11
GIP cb.1 2", 3", 4" h = 7 m) + Umpak 621,912.00 Analisa Listrik PJU - 11
GIP cb.1 2", 3", 4" h = 7 m) + Umpak 621,912.00 Analisa Listrik PJU - 11
11,740,465.00 Analisa Listrik PJU - 12
212,162.00 Analisa Listrik PJU - 12
1,136,118.00 Analisa Listrik PJU - 12
260,287.00 Analisa Listrik PJU - 12
274,862.00 Analisa Listrik PJU - 12
2,994,612.00 Analisa Listrik PJU - 13
ontrol + KWH 1300 VA 5,492,575.00 Analisa Listrik PJU - 13
ontrol + KWH 2200 VA 6,501,275.00 Analisa Listrik PJU - 14
ontrol + KWH 3500 VA 7,933,475.00 Analisa Listrik PJU - 14
ontrol + KWH 4400 VA 8,927,215.00 Analisa Listrik PJU - 15
ontrol + KWH 7700 VA 12,604,845.00 Analisa Listrik PJU - 15
ontrol + KWH 11000 VA 16,367,175.00 Analisa Listrik PJU - 16
ontrol + KWH 11000 VA (2 Unit Box Panel) 19,631,480.00 Analisa Listrik PJU - 16
Rekapitulasi - 315
JENIS PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 316
JENIS PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 317
JENIS PEKERJAAN HARGA SATUAN HALAMAN
137,236.00 Analisa - E 1
160,710.00 Analisa - E 5
4,097,233.00 Analisa - E 9
11,355.00 Analisa - E 13
209,191.00 Analisa - E 16
41,838.00 Analisa - E 16
31,378.00 Analisa - E 16
20,919.00 Analisa - E 16
207,079.00 Analisa - E 20
41,415.00 Analisa - E 20
31,061.00 Analisa - E 20
20,707.00 Analisa - E 20
13,525.00 Analisa - E 24
ADATAN DAN PERATAAN) 2,176.00 Analisa - E 27
Rekapitulasi - 318
JENIS PEKERJAAN HARGA SATUAN HALAMAN
Area Non Pasar (Termasuk lantai, dinding, pintu/jendela dan prabo 5,892.34 Analisa Cleaning Service - 1
g (Termasuk lantai, dinding, pintu/jendela dan prabot) 4,341.60 Analisa Cleaning Service - 2
n (Termasuk lantai, dinding, pintu/jendela dan prabot) 2,893.62 Analisa Cleaning Service - 3
18,485.65 Analisa Cleaning Service - 3
7,660.58 Analisa Cleaning Service - 4
Rekapitulasi - 319
JENIS PEKERJAAN HARGA SATUAN HALAMAN
ANGAN MARKA
Rekapitulasi - 320
JENIS PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 321
JENIS PEKERJAAN HARGA SATUAN HALAMAN
N PELUMPURAN
n dan saluran irigasi terbuka Analisa Pelumpuran - 1
76,470.00 Analisa Pelumpuran - 1
r pada saluran terbuka 95,150.00 Analisa Pelumpuran - 1
20,860.00 Analisa Pelumpuran - 1
Analisa Pelumpuran - 1
32,980.00 Analisa Pelumpuran - 1
Rekapitulasi - 322
JENIS PEKERJAAN HARGA SATUAN HALAMAN
Rekapitulasi - 323
ANALISA HARGA SATUAN PEKERJAAN KONSTRUKSI
PEKERJAAN PERSIAPAN
PEKERJAAN BONGKARAN
10 1.00 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan
AK 6.0000 oh Tukang kayu @ Rp. 63,000.00 378,000.00
0.6000 oh Kep. Tk. Kayu @ Rp. 65,000.00 39,000.00
4.0000 oh Pekerja @ Rp. 55,500.00 222,000.00
0.2000 oh Mandor @ Rp. 65,000.00 13,000.00
JUMLAH ( BELUM PPN ) 652,000.00
JASA 10 %
JUMLAH
DIBULATKAN
11 1.00 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digunakan l
AK 1.0000 oh Pekerja @ Rp. 55,500.00 55,500.00
0.2000 oh Mandor @ Rp. 65,000.00 13,000.00
JUMLAH ( BELUM PPN ) 68,500.00
JASA 10 %
JUMLAH
DIBULATKAN
PEKERJAAN TANAH
PEKERJAAN PONDASI
14 1.00 m3 Memasang pondasi siklop, 60% beton campuran 1 PC:2 PB:3 KR dan 40% batu b
SNI-2007 0.4800 m3 Batu belah 15 cm/20 cm @ Rp. 110,000.00
194.0000 kg Portland Cement @ Rp. 1,400.00
0.3120 m3 Pasir beton @ Rp. 100,000.00
0.4680 m3 Koral Beton @ Rp. 127,000.00
126.0000 kg Besi beton @ Rp. 11,600.00
1.8000 kg Kawat beton @ Rp. 19,100.00
3.4000 oh Pekerja @ Rp. 55,500.00 188,700.00
0.8500 oh Tukang batu @ Rp. 58,000.00 49,300.00
0.0850 oh Kepala tukang @ Rp. 63,000.00 5,355.00
0.1700 oh Mandor @ Rp. 65,000.00 11,050.00
JUMLAH ( BELUM PPN ) 254,405.00
JASA 10 %
JUMLAH
DIBULATKAN
15 1.00 m3 Memasang pondasi siklop, 60% beton campuran 1 PC:2 PB:3 KR dan 40% batu b
SNI-2007 0.4800 m3 Batu belah 15 cm/20 cm @ Rp. 110,000.00
194.0000 kg Portland Cement @ Rp. 1,400.00
0.3120 m3 Pasir beton @ Rp. 100,000.00
0.4680 m3 Koral Beton @ Rp. 127,000.00
3.4000 oh Pekerja @ Rp. 55,500.00 188,700.00
0.8500 oh Tukang batu @ Rp. 58,000.00 49,300.00
0.0850 oh Kepala tukang @ Rp. 63,000.00 5,355.00
0.1700 oh Mandor @ Rp. 65,000.00 11,050.00
JUMLAH ( BELUM PPN ) 254,405.00
JASA 10 %
JUMLAH
DIBULATKAN
PEKERJAAN DINDING
1 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spe
SNI-2007 140.0000 bh Bata merah @ Rp. 450.00
43.5000 kg Portland Cement @ Rp. 1,400.00
0.0800 m3 Pasir Pasang @ Rp. 97,500.00
0.6000 oh Pekerja @ Rp. 55,500.00 33,300.00
0.2000 oh Tukang batu @ Rp. 58,000.00 11,600.00
0.0200 oh Kepala tukang @ Rp. 63,000.00 1,260.00
0.0300 oh Mandor @ Rp. 65,000.00 1,950.00
JUMLAH ( BELUM PPN ) 48,110.00
JASA 10 %
JUMLAH
DIBULATKAN
2 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spe
SNI-2007 140.0000 bh Bata merah @ Rp. 450.00
32.9500 kg Portland Cement @ Rp. 1,400.00
0.0910 m3 Pasir Pasang @ Rp. 97,500.00
0.6000 oh Pekerja @ Rp. 55,500.00 33,300.00
0.2000 oh Tukang batu @ Rp. 58,000.00 11,600.00
0.0200 oh Kepala tukang @ Rp. 63,000.00 1,260.00
0.0300 oh Mandor @ Rp. 65,000.00 1,950.00
JUMLAH ( BELUM PPN ) 48,110.00
JASA 10 %
JUMLAH
DIBULATKAN
3 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spe
SNI-2007 140.0000 bh Bata merah @ Rp. 450.00
26.5500 kg Portland Cement @ Rp. 1,400.00
0.0930 m3 Pasir Pasang @ Rp. 97,500.00
0.6000 oh Pekerja @ Rp. 55,500.00 33,300.00
0.2000 oh Tukang batu @ Rp. 58,000.00 11,600.00
0.0200 oh Kepala tukang @ Rp. 63,000.00 1,260.00
0.0300 oh Mandor @ Rp. 65,000.00 1,950.00
JUMLAH ( BELUM PPN ) 48,110.00
JASA 10 %
JUMLAH
DIBULATKAN
4 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spe
SNI-2007 140.0000 bh Bata merah @ Rp. 450.00
22.2000 kg Portland Cement @ Rp. 1,400.00
0.1020 m3 Pasir Pasang @ Rp. 97,500.00
0.6000 oh Pekerja @ Rp. 55,500.00 33,300.00
0.2000 oh Tukang batu @ Rp. 58,000.00 11,600.00
0.0200 oh Kepala tukang @ Rp. 63,000.00 1,260.00
5 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spe
SNI-2007 140.0000 bh Bata merah @ Rp. 450.00
18.5000 kg Portland Cement @ Rp. 1,400.00
0.1220 m3 Pasir Pasang @ Rp. 97,500.00
0.6000 oh Pekerja @ Rp. 55,500.00 33,300.00
0.2000 oh Tukang batu @ Rp. 58,000.00 11,600.00
0.0200 oh Kepala tukang @ Rp. 63,000.00 1,260.00
0.0300 oh Mandor @ Rp. 65,000.00 1,950.00
JUMLAH ( BELUM PPN ) 48,110.00
JASA 10 %
JUMLAH
DIBULATKAN
6 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spe
SNI-2007 140.0000 bh Bata merah @ Rp. 450.00
10.0800 kg Portland Cement @ Rp. 1,400.00
0.0925 m3 Pasir Pasang @ Rp. 83,375.00
0.0275 m3 Kapur padam @ Rp. 97,500.00
0.6000 oh Pekerja @ Rp. 55,500.00 33,300.00
0.2000 oh Tukang batu @ Rp. 58,000.00 11,600.00
0.0200 oh Kepala tukang @ Rp. 63,000.00 1,260.00
0.0300 oh Mandor @ Rp. 65,000.00 1,950.00
JUMLAH ( BELUM PPN ) 48,110.00
JASA 10 %
JUMLAH
DIBULATKAN
7 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran s
SNI-2007 70.0000 bh Bata merah @ Rp. 450.00
18.9500 kg Portland Cement @ Rp. 1,400.00
0.0380 m Pasir Pasang
3
@ Rp. 97,500.00
0.3000 oh Pekerja @ Rp. 55,500.00 16,650.00
0.1000 oh Tukang batu @ Rp. 58,000.00 5,800.00
0.0100 oh Kepala tukang @ Rp. 63,000.00 630.00
0.0150 oh Mandor @ Rp. 65,000.00 975.00
JUMLAH ( BELUM PPN ) 24,055.00
JASA 10 %
JUMLAH
DIBULATKAN
8 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran s
SNI-2007 70.0000 bh Bata merah @ Rp. 450.00
14.3700 kg Portland Cement @ Rp. 1,400.00
0.0400 m Pasir Pasang
3
@ Rp. 97,500.00
0.3000 oh Pekerja @ Rp. 55,500.00 16,650.00
0.1000 oh Tukang batu @ Rp. 58,000.00 5,800.00
0.0100 oh Kepala tukang @ Rp. 63,000.00 630.00
0.0150 oh Mandor @ Rp. 65,000.00 975.00
JUMLAH ( BELUM PPN ) 24,055.00
JASA 10 %
JUMLAH
DIBULATKAN
9 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran s
SNI-2007 70.0000 bh Bata merah @ Rp. 450.00
11.5000 kg Portland Cement @ Rp. 1,400.00
0.0430 m Pasir Pasang
3
@ Rp. 97,500.00
0.3000 oh Pekerja @ Rp. 55,500.00 16,650.00
0.1000 oh Tukang batu @ Rp. 58,000.00 5,800.00
0.0100 oh Kepala tukang @ Rp. 63,000.00 630.00
0.0150 oh Mandor @ Rp. 65,000.00 975.00
10 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran s
SNI-2007 70.0000 bh Bata merah @ Rp. 450.00
9.6800 kg Portland Cement @ Rp. 1,400.00
0.0450 m3 Pasir Pasang @ Rp. 97,500.00
0.3000 oh Pekerja @ Rp. 55,500.00 16,650.00
0.1000 oh Tukang batu @ Rp. 58,000.00 5,800.00
0.0100 oh Kepala tukang @ Rp. 63,000.00 630.00
0.0150 oh Mandor @ Rp. 65,000.00 975.00
JUMLAH ( BELUM PPN ) 24,055.00
JASA 10 %
JUMLAH
DIBULATKAN
11 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran s
SNI-2007 70.0000 bh Bata merah @ Rp. 450.00
8.3200 kg Portland Cement @ Rp. 1,400.00
0.0490 m3 Pasir Pasang @ Rp. 97,500.00
0.3000 oh Pekerja @ Rp. 55,500.00 16,650.00
0.1000 oh Tukang batu @ Rp. 58,000.00 5,800.00
0.0100 oh Kepala tukang @ Rp. 63,000.00 630.00
0.0150 oh Mandor @ Rp. 65,000.00 975.00
JUMLAH ( BELUM PPN ) 24,055.00
JASA 10 %
JUMLAH
DIBULATKAN
12 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) tebal 1/2 bata, campuran spes
SNI-2007 70.0000 bh Bata merah @ Rp. 450.00
6.5000 kg Portland Cement @ Rp. 1,400.00
0.0500 m3 Pasir Pasang @ Rp. 97,500.00
0.3000 oh Pekerja @ Rp. 55,500.00 16,650.00
0.1000 oh Tukang batu @ Rp. 58,000.00 5,800.00
0.0100 oh Kepala tukang @ Rp. 63,000.00 630.00
0.0150 oh Mandor @ Rp. 65,000.00 975.00
JUMLAH ( BELUM PPN ) 24,055.00
JASA 10 %
JUMLAH
DIBULATKAN
13 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran s
SNI-2007 70.0000 bh Bata merah @ Rp. 450.00
4.5000 kg Portland Cement @ Rp. 1,400.00
0.0500 m3 Pasir Pasang @ Rp. 97,500.00
0.0150 m3 Kapur padam @ Rp. 83,375.00
0.3000 oh Pekerja @ Rp. 55,500.00 16,650.00
0.1000 oh Tukang batu @ Rp. 58,000.00 5,800.00
0.0100 oh Kepala tukang @ Rp. 63,000.00 630.00
0.0150 oh Mandor @ Rp. 65,000.00 975.00
JUMLAH ( BELUM PPN ) 24,055.00
JASA 10 %
JUMLAH
DIBULATKAN
14 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran
SNI-2007 70.0000 bh Bata merah @ Rp. 450.00
0.0180 m Semen Merah
3
@ Rp. 92,000.00
0.0180 m3 Pasir Pasang @ Rp. 97,500.00
0.0180 m3 Kapur padam @ Rp. 83,375.00
0.3000 oh Pekerja @ Rp. 55,500.00 16,650.00
0.1000 oh Tukang batu @ Rp. 58,000.00 5,800.00
0.0100 oh Kepala tukang @ Rp. 63,000.00 630.00
Analisa Konstruksi - 353
No. Macam Pekerjaan Upah
(1) (2) (3)
0.0150 oh Mandor @ Rp. 65,000.00 975.00
JUMLAH ( BELUM PPN ) 24,055.00
JASA 10 %
JUMLAH
DIBULATKAN
15 1.00 m2 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran s
SNI-2007 70.0000 bh Bata merah @ Rp. 450.00
0.0140 m3 Semen Merah @ Rp. 92,000.00
0.0280 m3 Pasir Pasang @ Rp. 97,500.00
0.0140 m3 Kapur padam @ Rp. 83,375.00
0.3000 oh Pekerja @ Rp. 55,500.00 16,650.00
0.1000 oh Tukang batu @ Rp. 58,000.00 5,800.00
0.0100 oh Kepala tukang @ Rp. 63,000.00 630.00
0.0150 oh Mandor @ Rp. 65,000.00 975.00
JUMLAH ( BELUM PPN ) 24,055.00
JASA 10 %
JUMLAH
DIBULATKAN
23 1.00 m2 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 P
SNI-2007 30.0000 Buah Terawang (roster) @ Rp. 3,000.00
14.0000 kg Portland Cement @ Rp. 1,400.00
0.0320 m Pasir Pasang
3
@ Rp. 97,500.00
0.3000 oh Pekerja @ Rp. 55,500.00 16,650.00
0.1000 oh Tukang batu @ Rp. 58,000.00 5,800.00
0.0100 oh Kepala tukang @ Rp. 63,000.00 630.00
0.0150 oh Mandor @ Rp. 65,000.00 975.00
JUMLAH ( BELUM PPN ) 24,055.00
JASA 10 %
JUMLAH
DIBULATKAN
24 1.00 m2 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 P
SNI-2007 30.0000 Buah Terawang (roster) @ Rp. 3,000.00
11.0000 kg Portland Cement @ Rp. 1,400.00
0.0350 m Pasir Pasang
3
@ Rp. 97,500.00
0.3000 oh Pekerja @ Rp. 55,500.00 16,650.00
0.1000 oh Tukang batu @ Rp. 58,000.00 5,800.00
0.0100 oh Kepala tukang @ Rp. 63,000.00 630.00
0.0150 oh Mandor @ Rp. 65,000.00 975.00
JUMLAH ( BELUM PPN ) 24,055.00
JASA 10 %
JUMLAH
DIBULATKAN
25 1.00 m2 Memasang dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spes
SNI-2007 70.0000 Buah Bata berongga ekspose @ Rp. 850.00
14.0000 kg Portland Cement @ Rp. 1,400.00
0.0320 m Pasir Pasang
3
@ Rp. 97,500.00
0.3000 oh Pekerja @ Rp. 55,500.00 16,650.00
0.1500 oh Tukang batu @ Rp. 58,000.00 8,700.00
0.0150 oh Kepala tukang @ Rp. 63,000.00 945.00
0.0150 oh Mandor @ Rp. 65,000.00 975.00
JUMLAH ( BELUM PPN ) 27,270.00
JASA 10 %
JUMLAH
DIBULATKAN
PEKERJAAN BETON
1 1.00 m3 Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
SNI-2007 247.0000 kg Portland Cement @ Rp. 1,400.00
0.6207 m3 Pasir beton @ Rp. 100,000.00
0.7400 m3 Koral beton @ Rp. 127,000.00
215.0000 Liter Air @ Rp. 37.71 8,107.65
1.6500 oh Pekerja @ Rp. 55,500.00 91,575.00
0.2750 oh Tukang batu @ Rp. 58,000.00 15,950.00
0.0280 oh Kepala tukang @ Rp. 63,000.00 1,764.00
0.0830 oh Mandor @ Rp. 65,000.00 5,395.00
JUMLAH ( BELUM PPN ) 122,791.65
JASA 10 %
JUMLAH
DIBULATKAN
2 1.00 m3 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78
SNI-2007 276.0000 kg Portland Cement @ Rp. 1,400.00
0.5914 m3 Pasir beton @ Rp. 100,000.00
0.7496 m3 Koral beton @ Rp. 127,000.00
215.0000 Liter Air @ Rp. 37.71 8,107.65
1.6500 oh Pekerja @ Rp. 55,500.00 91,575.00
0.2750 oh Tukang batu @ Rp. 58,000.00 15,950.00
0.0280 oh Kepala tukang @ Rp. 63,000.00 1,764.00
0.0830 oh Mandor @ Rp. 65,000.00 5,395.00
JUMLAH ( BELUM PPN ) 122,791.65
JASA 10 %
JUMLAH
DIBULATKAN
3 1.00 m3 Membuat beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72
SNI-2007 299.0000 kg Portland Cement @ Rp. 1,400.00
0.5707 m3 Pasir beton @ Rp. 100,000.00
0.7533 m3 Koral beton @ Rp. 127,000.00
215.0000 Liter Air @ Rp. 37.71 8,107.65
1.6500 oh Pekerja @ Rp. 55,500.00 91,575.00
0.2750 oh Tukang batu @ Rp. 58,000.00 15,950.00
0.0280 oh Kepala tukang @ Rp. 63,000.00 1,764.00
0.0830 oh Mandor @ Rp. 65,000.00 5,395.00
JUMLAH ( BELUM PPN ) 122,791.65
JASA 10 %
JUMLAH
DIBULATKAN
4 1.00 m3 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,8
SNI-2007 230.0000 kg Portland Cement @ Rp. 1,400.00
0.6379 m3 Pasir beton @ Rp. 100,000.00
0.7607 m3 Koral beton @ Rp. 127,000.00
5 1.00 m3 Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
SNI-2007 326.0000 kg Portland Cement @ Rp. 1,400.00
0.5429 m3 Pasir beton @ Rp. 100,000.00
0.7622 m3 Koral beton @ Rp. 127,000.00
215.0000 Liter Air @ Rp. 37.71 8,107.65
1.6500 oh Pekerja @ Rp. 55,500.00 91,575.00
0.2750 oh Tukang batu @ Rp. 58,000.00 15,950.00
0.0280 oh Kepala tukang @ Rp. 63,000.00 1,764.00
0.0830 oh Mandor @ Rp. 65,000.00 5,395.00
JUMLAH ( BELUM PPN ) 122,791.65
JASA 10 %
JUMLAH
DIBULATKAN
6 1.00 m3 Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
SNI-2007 352.0000 kg Portland Cement @ Rp. 1,400.00
0.5221 m3 Pasir beton @ Rp. 100,000.00
0.7637 m3 Koral beton @ Rp. 127,000.00
215.0000 Liter Air @ Rp. 37.71 8,107.65
1.6500 oh Pekerja @ Rp. 55,500.00 91,575.00
0.2750 oh Tukang batu @ Rp. 58,000.00 15,950.00
0.0280 oh Kepala tukang @ Rp. 63,000.00 1,764.00
0.0830 oh Mandor @ Rp. 65,000.00 5,395.00
JUMLAH ( BELUM PPN ) 122,791.65
JASA 10 %
JUMLAH
DIBULATKAN
7 1.00 m3 Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
SNI-2007 371.0000 kg Portland Cement @ Rp. 1,400.00
0.4986 m3 Pasir beton @ Rp. 100,000.00
0.7756 m3 Koral beton @ Rp. 127,000.00
215.0000 Liter Air @ Rp. 37.71 8,107.65
1.6500 oh Pekerja @ Rp. 55,500.00 91,575.00
0.2750 oh Tukang batu @ Rp. 58,000.00 15,950.00
0.0280 oh Kepala tukang @ Rp. 63,000.00 1,764.00
0.0830 oh Mandor @ Rp. 65,000.00 5,395.00
JUMLAH ( BELUM PPN ) 122,791.65
JASA 10 %
JUMLAH
DIBULATKAN
8 1.00 m3 Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
SNI-2007 384.0000 kg Portland Cement @ Rp. 1,400.00
0.4943 m3 Pasir beton @ Rp. 100,000.00
0.7696 m3 Koral beton @ Rp. 127,000.00
215.0000 Liter Air @ Rp. 37.71 8,107.65
1.6500 oh Pekerja @ Rp. 55,500.00 91,575.00
0.2750 oh Tukang batu @ Rp. 58,000.00 15,950.00
9 1.00 m3 Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
SNI-2007 406.0000 kg Portland Cement @ Rp. 1,400.00
0.4886 m3 Pasir beton @ Rp. 100,000.00
0.7600 m3 Koral beton @ Rp. 127,000.00
215.0000 Liter Air @ Rp. 37.71 8,107.65
1.6500 oh Pekerja @ Rp. 55,500.00 91,575.00
0.2750 oh Tukang batu @ Rp. 58,000.00 15,950.00
0.0280 oh Kepala tukang @ Rp. 63,000.00 1,764.00
0.0830 oh Mandor @ Rp. 65,000.00 5,395.00
JUMLAH ( BELUM PPN ) 122,791.65
JASA 10 %
JUMLAH
DIBULATKAN
10 1.00 m3 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
SNI-2007 413.0000 kg Portland Cement @ Rp. 1,400.00
0.4864 m3 Pasir beton @ Rp. 100,000.00
0.7563 m3 Koral beton @ Rp. 127,000.00
215.0000 Liter Air @ Rp. 37.71 8,107.65
1.6500 oh Pekerja @ Rp. 55,500.00 91,575.00
0.2750 oh Tukang batu @ Rp. 58,000.00 15,950.00
0.0280 oh Kepala tukang @ Rp. 63,000.00 1,764.00
0.0830 oh Mandor @ Rp. 65,000.00 5,395.00
JUMLAH ( BELUM PPN ) 122,791.65
JASA 10 %
JUMLAH
DIBULATKAN
11 1.00 m3 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49
SNI-2007 439.0000 kg Portland Cement @ Rp. 1,400.00
0.4786 m3 Pasir beton @ Rp. 100,000.00
0.7452 m3 Koral beton @ Rp. 127,000.00
215.0000 Liter Air @ Rp. 37.71 8,107.65
2.1000 oh Pekerja @ Rp. 55,500.00 116,550.00
0.3500 oh Tukang batu @ Rp. 58,000.00 20,300.00
0.0350 oh Kepala tukang @ Rp. 63,000.00 2,205.00
0.1050 oh Mandor @ Rp. 65,000.00 6,825.00
JUMLAH ( BELUM PPN ) 153,987.65
JASA 10 %
JUMLAH
DIBULATKAN
12 1.00 m3 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48
SNI-2007 448.0000 kg Portland Cement @ Rp. 1,400.00
0.4764 m3 Pasir beton @ Rp. 100,000.00
0.7407 m3 Koral beton @ Rp. 127,000.00
215.0000 Liter Air @ Rp. 37.71 8,107.65
2.1000 oh Pekerja @ Rp. 55,500.00 116,550.00
0.3500 oh Tukang batu @ Rp. 58,000.00 20,300.00
PEKERJAAN PLESTERAN
26 1.00 m2 Memasang finishing siar pasangan dinding bata merah (=20 m’)
SNI-2007 3.1080 kg Portland Cement @ Rp. 1,400.00
0.1500 oh Pekerja @ Rp. 55,500.00 8,325.00
0.0750 oh Tukang batu @ Rp. 58,000.00 4,350.00
0.0080 oh Kepala tukang @ Rp. 63,000.00 504.00
0.0080 oh Mandor @ Rp. 65,000.00 520.00
JUMLAH ( BELUM PPN ) 13,699.00
JASA 10 %
JUMLAH
DIBULATKAN
27 1.00 m2 Memasang finishing siar pasangan dinding conblock ekspose (=8 m’)
SNI-2007 1.6000 kg Portland Cement @ Rp. 1,400.00
0.0700 oh Pekerja @ Rp. 55,500.00 3,885.00
0.0350 oh Tukang batu @ Rp. 58,000.00 2,030.00
0.0040 oh Kepala tukang @ Rp. 63,000.00 252.00
0.0040 oh Mandor @ Rp. 65,000.00 260.00
JUMLAH ( BELUM PPN ) 6,427.00
JASA 10 %
JUMLAH
DIBULATKAN
34 1.00 m2 Memasang lantai keramik artistik ukuran (10 x 10) cm atau (5 x 20) cm
SNI-2007 1.0600 m2 Ubin keramik artistik @ Rp. -
8.1900 kg Portland Cement @ Rp. 1,400.00
0.0450 m3 Pasir Pasang @ Rp. 97,500.00
3.2000 kg Semen warna @ Rp. 9,000.00
0.7000 oh Pekerja @ Rp. 55,500.00 38,850.00
0.3500 oh Tukang batu @ Rp. 58,000.00 20,300.00
0.0350 oh Kepala tukang @ Rp. 63,000.00 2,205.00
0.0350 oh Mandor @ Rp. 65,000.00 2,275.00
JUMLAH ( BELUM TERMASUK PPN ) 63,630.00
39 1.00 m2 Memasang lantai mosaik ukuran (30 x 30) cm, campuran spesi 1 PC : 3 PP
SNI-2007 1.0683 m2 Mosaik @ Rp. 47,500.00
14.1500 kg Portland Cement @ Rp. 1,400.00
0.0390 m3 Pasir Pasang @ Rp. 97,500.00
2.0000 kg Semen warna @ Rp. 9,000.00
0.7000 oh Pekerja @ Rp. 55,500.00 38,850.00
0.3500 oh Tukang batu @ Rp. 58,000.00 20,300.00
PEKERJAAN CONBLOCK
1 1.00 m2 Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 8 cm, K-400
AK 1.0000 m2 Conblock @ Rp. 64,102.50
0.0500 m3
Pasir urug @ Rp. 90,000.00
0.5000 oh Pekerja @ Rp. 55,500.00 27,750.00
0.2500 oh Tukang batu @ Rp. 58,000.00 14,500.00
0.0250 oh Kep. Tk. Batu @ Rp. 63,000.00 1,575.00
0.0250 oh Mandor @ Rp. 65,000.00 1,625.00
JUMLAH ( BELUM PPN ) 45,450.00
JASA 10 %
JUMLAH
DIBULATKAN
7 1.00 m2 Pasang conblock tipe segi-empat, uni, segi-enam warna 8 cm, K-400
AK 1.0000 m2 Conblock @ Rp. 67,200.00
0.0500 m3 Pasir urug @ Rp. 90,000.00
0.5000 oh Pekerja @ Rp. 55,500.00 27,750.00
0.2500 oh Tukang batu @ Rp. 58,000.00 14,500.00
0.0250 oh Kep. Tk. Batu @ Rp. 63,000.00 1,575.00
0.0250 oh Mandor @ Rp. 65,000.00 1,625.00
JUMLAH ( BELUM PPN ) 45,450.00
JASA 10 %
JUMLAH
DIBULATKAN
1 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu jati (klas plitur)
SNI-2007 1.1000 m3 Balok kayu jati (klas plitur) @ Rp. 31,000,000.00
1.2500 kg Paku 10 cm @ Rp. 17,500.00
1.0000 kg Lem kayu @ Rp. 20,000.00
7.0000 oh Pekerja @ Rp. 55,500.00 388,500.00
21.0000 oh Tukang kayu @ Rp. 63,000.00 1,323,000.00
2.1000 oh Kepala tukang @ Rp. 65,000.00 136,500.00
0.3500 oh Mandor @ Rp. 65,000.00 22,750.00
JUMLAH ( BELUM PPN ) 1,870,750.00
JASA 10 %
JUMLAH
DIBULATKAN
2 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu jati lokal
SNI-2007 1.1000 m3 Balok kayu jati (lokal) @ Rp. 18,120,000.00
1.2500 kg Paku 10 cm @ Rp. 17,500.00
1.0000 kg Lem kayu @ Rp. 20,000.00
7.0000 oh Pekerja @ Rp. 55,500.00 388,500.00
21.0000 oh Tukang kayu @ Rp. 63,000.00 1,323,000.00
2.1000 oh Kepala tukang @ Rp. 65,000.00 136,500.00
0.3500 oh Mandor @ Rp. 65,000.00 22,750.00
JUMLAH ( BELUM PPN ) 1,870,750.00
JASA 10 %
JUMLAH
DIBULATKAN
3 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kamper
SNI-2007 1.2000 m3 Balok kayu kamper @ Rp. 6,750,000.00
1.2500 kg Paku 10 cm @ Rp. 17,500.00
1.0000 kg Lem kayu @ Rp. 20,000.00
6.0000 oh Pekerja @ Rp. 55,500.00 333,000.00
18.0000 oh Tukang kayu @ Rp. 63,000.00 1,134,000.00
1.8000 oh Kepala tukang @ Rp. 65,000.00 117,000.00
0.3000 oh Mandor @ Rp. 65,000.00 19,500.00
JUMLAH ( BELUM PPN ) 1,603,500.00
JASA 10 %
JUMLAH
DIBULATKAN
4 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu bengkirai
SNI-2007 1.2000 m3 Balok kayu bengkirai @ Rp. 7,600,000.00
1.2500 kg Paku 10 cm @ Rp. 17,500.00
1.0000 kg Lem kayu @ Rp. 20,000.00
6.0000 oh Pekerja @ Rp. 55,500.00 333,000.00
18.0000 oh Tukang kayu @ Rp. 63,000.00 1,134,000.00
1.8000 oh Kepala tukang @ Rp. 65,000.00 117,000.00
0.3000 oh Mandor @ Rp. 65,000.00 19,500.00
Analisa Konstruksi - 427
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH ( BELUM PPN ) 1,603,500.00
JASA 10 %
JUMLAH
DIBULATKAN
5 1.00 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kruing
SNI-2007 1.2000 m3 Balok kayu kruing @ Rp. 6,000,000.00
1.2500 kg Paku 10 cm @ Rp. 17,500.00
1.0000 kg Lem kayu @ Rp. 20,000.00
6.0000 oh Pekerja @ Rp. 55,500.00 333,000.00
18.0000 oh Tukang kayu @ Rp. 63,000.00 1,134,000.00
1.8000 oh Kepala tukang @ Rp. 65,000.00 117,000.00
0.3000 oh Mandor @ Rp. 65,000.00 19,500.00
JUMLAH ( BELUM PPN ) 1,603,500.00
JASA 10 %
JUMLAH
DIBULATKAN
6 1.00 m2 Membuat dan memasang pintu klamp, kayu jati (klas plitur)
SNI-2007 0.0400 m3 Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.0500 kg Paku 5 cm - 7 cm @ Rp. 17,500.00
0.3500 oh Pekerja @ Rp. 55,500.00 19,425.00
1.0500 oh Tukang kayu @ Rp. 63,000.00 66,150.00
0.1050 oh Kepala tukang @ Rp. 65,000.00 6,825.00
0.0180 oh Mandor @ Rp. 65,000.00 1,170.00
JUMLAH ( BELUM PPN ) 93,570.00
JASA 10 %
JUMLAH
DIBULATKAN
11 1.00 m2 Membuat dan memasang daun pintu panel, kayu jati (klas plitur)
SNI-2007 0.0400 m3 Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.5000 kg Lem kayu @ Rp. 20,000.00
1.0000 oh Pekerja @ Rp. 55,500.00 55,500.00
3.0000 oh Tukang kayu @ Rp. 63,000.00 189,000.00
0.3000 oh Kepala tukang @ Rp. 65,000.00 19,500.00
0.0500 oh Mandor @ Rp. 65,000.00 3,250.00
JUMLAH ( BELUM PPN ) 267,250.00
JASA 10 %
JUMLAH
DIBULATKAN
12 1.00 m2 Membuat dan memasang daun pintu panel, kayu jati (lokal)
SNI-2007 0.0400 m3 Papan kayu jati (lokal) @ Rp. 21,000,000.00
0.5000 kg Lem kayu @ Rp. 20,000.00
1.0000 oh Pekerja @ Rp. 55,500.00 55,500.00
3.0000 oh Tukang kayu @ Rp. 63,000.00 189,000.00
0.3000 oh Kepala tukang @ Rp. 65,000.00 19,500.00
0.0500 oh Mandor @ Rp. 65,000.00 3,250.00
JUMLAH ( BELUM PPN ) 267,250.00
JASA 10 %
JUMLAH
DIBULATKAN
16 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu jati (klas plitur)
SNI-2007 0.0240 m3 Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.3000 kg Lem kayu @ Rp. 20,000.00
0.8000 oh Pekerja @ Rp. 55,500.00 44,400.00
2.4000 oh Tukang kayu @ Rp. 63,000.00 151,200.00
0.2400 oh Kepala tukang @ Rp. 65,000.00 15,600.00
0.0400 oh Mandor @ Rp. 65,000.00 2,600.00
JUMLAH ( BELUM PPN ) 213,800.00
JASA 10 %
JUMLAH
DIBULATKAN
17 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu jati (lokal)
SNI-2007 0.0240 m3 Papan kayu jati (lokal) @ Rp. 21,000,000.00
0.3000 kg Lem kayu @ Rp. 20,000.00
0.8000 oh Pekerja @ Rp. 55,500.00 44,400.00
2.4000 oh Tukang kayu @ Rp. 63,000.00 151,200.00
0.2400 oh Kepala tukang @ Rp. 65,000.00 15,600.00
0.0400 oh Mandor @ Rp. 65,000.00 2,600.00
JUMLAH ( BELUM PPN ) 213,800.00
JASA 10 %
JUMLAH
DIBULATKAN
18 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu kamper
SNI-2007 0.0240 m3 Papan kayu kamper @ Rp. 7,500,000.00
0.3000 kg Lem kayu @ Rp. 20,000.00
0.8000 oh Pekerja @ Rp. 55,500.00 44,400.00
2.4000 oh Tukang kayu @ Rp. 63,000.00 151,200.00
0.2400 oh Kepala tukang @ Rp. 65,000.00 15,600.00
0.0400 oh Mandor @ Rp. 65,000.00 2,600.00
JUMLAH ( BELUM PPN ) 213,800.00
JASA 10 %
JUMLAH
DIBULATKAN
19 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu bengkirai
SNI-2007 0.0240 m3 Papan kayu bengkirai @ Rp. 8,620,000.00
0.3000 kg Lem kayu @ Rp. 20,000.00
0.8000 oh Pekerja @ Rp. 55,500.00 44,400.00
2.4000 oh Tukang kayu @ Rp. 63,000.00 151,200.00
0.2400 oh Kepala tukang @ Rp. 65,000.00 15,600.00
0.0400 oh Mandor @ Rp. 65,000.00 2,600.00
JUMLAH ( BELUM PPN ) 213,800.00
JASA 10 %
JUMLAH
DIBULATKAN
20 1.00 m2 Membuat dan memasang pintu dan jendela kaca, kayu kruing
21 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu jati (klas plitur)
SNI-2007 0.0640 m3 Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.5000 kg Lem kayu @ Rp. 20,000.00
1.0000 oh Pekerja @ Rp. 55,500.00 55,500.00
3.0000 oh Tukang kayu @ Rp. 63,000.00 189,000.00
0.3000 oh Kepala tukang @ Rp. 65,000.00 19,500.00
0.0500 oh Mandor @ Rp. 65,000.00 3,250.00
JUMLAH ( BELUM PPN ) 267,250.00
JASA 10 %
JUMLAH
DIBULATKAN
22 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu jati (lokal)
SNI-2007 0.0640 m3 Papan kayu jati (lokal) @ Rp. 21,000,000.00
0.5000 kg Lem kayu @ Rp. 20,000.00
1.0000 oh Pekerja @ Rp. 55,500.00 55,500.00
3.0000 oh Tukang kayu @ Rp. 63,000.00 189,000.00
0.3000 oh Kepala tukang @ Rp. 65,000.00 19,500.00
0.0500 oh Mandor @ Rp. 65,000.00 3,250.00
JUMLAH ( BELUM PPN ) 267,250.00
JASA 10 %
JUMLAH
DIBULATKAN
23 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu kamper
SNI-2007 0.0640 m3 Papan kayu kamper @ Rp. 7,500,000.00
0.5000 kg Lem kayu @ Rp. 20,000.00
1.0000 oh Pekerja @ Rp. 55,500.00 55,500.00
3.0000 oh Tukang kayu @ Rp. 63,000.00 189,000.00
0.3000 oh Kepala tukang @ Rp. 65,000.00 19,500.00
0.0500 oh Mandor @ Rp. 65,000.00 3,250.00
JUMLAH ( BELUM PPN ) 267,250.00
JASA 10 %
JUMLAH
DIBULATKAN
24 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu bengkirai
SNI-2007 0.0640 m3 Papan kayu bengkirai @ Rp. 8,620,000.00
0.5000 kg Lem kayu @ Rp. 20,000.00
1.0000 oh Pekerja @ Rp. 55,500.00 55,500.00
3.0000 oh Tukang kayu @ Rp. 63,000.00 189,000.00
0.3000 oh Kepala tukang @ Rp. 65,000.00 19,500.00
0.0500 oh Mandor @ Rp. 65,000.00 3,250.00
JUMLAH ( BELUM PPN ) 267,250.00
JASA 10 %
JUMLAH
DIBULATKAN
25 1.00 m2 Membuat dan memasang pintu dan jendela jalusi kayu kruing
26 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu jati lok
SNI-2007 0.0250 m3 Papan kayu jati (lokal) @ Rp. 21,000,000.00
0.0300 kg Paku 1 cm - 2,5 cm @ Rp. 16,000.00
0.5000 kg Lem kayu @ Rp. 20,000.00
1.0000 lbr Plywood tebal 4 mm Ukuran (90 x 220 @ Rp. 73,900.00
0.7000 oh Pekerja @ Rp. 55,500.00 38,850.00
2.1000 oh Tukang kayu @ Rp. 63,000.00 132,300.00
0.2100 oh Kepala tukang @ Rp. 65,000.00 13,650.00
0.0350 oh Mandor @ Rp. 65,000.00 2,275.00
JUMLAH ( BELUM PPN ) 187,075.00
JASA 10 %
JUMLAH
DIBULATKAN
27 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kamper
SNI-2007 0.0250 m3 Papan kayu kamper @ Rp. 7,500,000.00
0.0300 kg Paku 1 cm - 2,5 cm @ Rp. 16,000.00
0.5000 kg Lem kayu @ Rp. 20,000.00
1.0000 lbr Plywood tebal 4 mm Ukuran (90 x 220 @ Rp. 73,900.00
0.7000 oh Pekerja @ Rp. 55,500.00 38,850.00
2.1000 oh Tukang kayu @ Rp. 63,000.00 132,300.00
0.2100 oh Kepala tukang @ Rp. 65,000.00 13,650.00
0.0350 oh Mandor @ Rp. 65,000.00 2,275.00
JUMLAH ( BELUM PPN ) 187,075.00
JASA 10 %
JUMLAH
DIBULATKAN
28 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu bengkir
SNI-2007 0.0250 m3 Papan kayu bengkirai @ Rp. 8,620,000.00
0.0300 kg Paku 1 cm - 2,5 cm @ Rp. 16,000.00
0.5000 kg Lem kayu @ Rp. 20,000.00
1.0000 lbr Plywood tebal 4 mm Ukuran (90 x 220 @ Rp. 73,900.00
0.7000 oh Pekerja @ Rp. 55,500.00 38,850.00
2.1000 oh Tukang kayu @ Rp. 63,000.00 132,300.00
0.2100 oh Kepala tukang @ Rp. 65,000.00 13,650.00
0.0350 oh Mandor @ Rp. 65,000.00 2,275.00
JUMLAH ( BELUM PPN ) 187,075.00
JASA 10 %
JUMLAH
DIBULATKAN
29 1.00 m2 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kruing
SNI-2007 0.0250 m3 Papan kayu kruing @ Rp. 6,200,000.00
0.0300 kg Paku 1 cm - 2,5 cm @ Rp. 16,000.00
0.5000 kg Lem kayu @ Rp. 20,000.00
1.0000 lbr Plywood tebal 4 mm Ukuran (90 x 220 @ Rp. 73,900.00
0.7000 oh Pekerja @ Rp. 55,500.00 38,850.00
2.1000 oh Tukang kayu @ Rp. 63,000.00 132,300.00
39 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu kamper
SNI-2007 0.0250 m3 Papan kayu kamper @ Rp. 7,500,000.00
0.0300 kg Paku 1 cm - 2,5 cm @ Rp. 16,000.00
0.8000 kg Lem kayu @ Rp. 20,000.00
1.0000 lbr Teakwood tebal 4 mm ukuran (90 x 22 @ Rp. 73,900.00
0.5000 lbr Formika @ Rp. 65,000.00
0.8500 oh Pekerja @ Rp. 55,500.00 47,175.00
40 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu bengkirai
SNI-2007 0.0250 m3 Papan kayu bengkirai @ Rp. 8,620,000.00
0.0300 kg Paku 1 cm - 2,5 cm @ Rp. 16,000.00
0.8000 kg Lem kayu @ Rp. 20,000.00
1.0000 lbr Teakwood tebal 4 mm ukuran (90 x 22 @ Rp. 73,900.00
0.5000 lbr Formika @ Rp. 65,000.00
0.8500 oh Pekerja @ Rp. 55,500.00 47,175.00
2.5500 oh Tukang kayu @ Rp. 63,000.00 160,650.00
0.2550 oh Kepala tukang @ Rp. 65,000.00 16,575.00
0.0430 oh Mandor @ Rp. 65,000.00 2,795.00
JUMLAH ( BELUM PPN ) 227,195.00
JASA 10 %
JUMLAH
DIBULATKAN
41 1.00 m2 Memasang teakwood rangkap lapis formika, rangka expose kayu kruing
SNI-2007 0.0250 m3 Papan kayu kruing @ Rp. 6,200,000.00
0.0300 kg Paku 1 cm - 2,5 cm @ Rp. 16,000.00
0.8000 kg Lem kayu @ Rp. 20,000.00
1.0000 lbr Teakwood tebal 4 mm ukuran (90 x 22 @ Rp. 73,900.00
0.5000 lbr Formika @ Rp. 65,000.00
0.8500 oh Pekerja @ Rp. 55,500.00 47,175.00
2.5500 oh Tukang kayu @ Rp. 63,000.00 160,650.00
0.2550 oh Kepala tukang @ Rp. 65,000.00 16,575.00
0.0430 oh Mandor @ Rp. 65,000.00 2,795.00
JUMLAH ( BELUM PPN ) 227,195.00
JASA 10 %
JUMLAH
DIBULATKAN
42 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu jati (klas plitur) bentang 6 m
SNI-2007 1.1000 m3 Kayu jati (klas plitur) balok @ Rp. 31,000,000.00
15.0000 kg Besi strip @ Rp. 18,000.00
5.6000 kg Paku biasa 2" - 5" @ Rp. 17,500.00
4.0000 oh Pekerja @ Rp. 55,500.00 222,000.00
12.0000 oh Tukang kayu @ Rp. 63,000.00 756,000.00
1.2000 oh Kepala tukang @ Rp. 65,000.00 78,000.00
0.2000 oh Mandor @ Rp. 65,000.00 13,000.00
JUMLAH ( BELUM PPN ) 1,069,000.00
JASA 10 %
JUMLAH
DIBULATKAN
43 1.00 m3 Memasang konstruksi kuda-kuda konvensional, kayu jati (lokal) bentang 6 meter
SNI-2007 1.1000 m3 Kayu jati (lokal) balok @ Rp. 18,120,000.00
15.0000 kg Besi strip @ Rp. 18,000.00
5.6000 kg Paku biasa 2" - 5" @ Rp. 17,500.00
4.0000 oh Pekerja @ Rp. 55,500.00 222,000.00
12.0000 oh Tukang kayu @ Rp. 63,000.00 756,000.00
59 1.00 m2 Memasang usuk jati (lokal) 5/7, reng jati (lokal) 2/3
AK 2.2000 m1 Usuk kayu jati (lokal) 5/7 @ Rp. 64,000.00
5.0000 m1 Reng jati (lokal) 2/3 @ Rp. 18,500.00
0.1500 kg Paku usuk @ Rp. 17,500.00
0.1000 kg Paku reng @ Rp. 16,000.00
0.1000 oh Pekerja @ Rp. 55,500.00 5,550.00
0.1000 oh Tukang kayu @ Rp. 63,000.00 6,300.00
0.0100 oh Kep. Tk. Kayu @ Rp. 65,000.00 650.00
0.0050 oh Mandor @ Rp. 65,000.00 325.00
JUMLAH ( BELUM PPN ) 12,825.00
JASA 10 %
JUMLAH
DIBULATKAN
66 1.00 m2 Memasang usuk jati 5/7 (klas 1), reng jati 3/4 (klas 1)
AK 2.2000 m1 Usuk kayu jati 5/7 (klas 1) @ Rp. 105,000.00
5.0000 m1 Reng jati 3/4 (klas 1) @ Rp. 37,000.00
0.1500 kg Paku usuk @ Rp. 17,500.00
0.1000 kg Paku reng @ Rp. 16,000.00
0.1000 oh Pekerja @ Rp. 55,500.00 5,550.00
0.1000 oh Tukang kayu @ Rp. 63,000.00 6,300.00
0.0100 oh Kep. Tk. Kayu @ Rp. 65,000.00 650.00
0.0050 oh Mandor @ Rp. 65,000.00 325.00
JUMLAH ( BELUM PPN ) 12,825.00
JASA 10 %
JUMLAH
DIBULATKAN
77 1.00 m2 Memasang rangka langit-langit (50 x 100) cm, kayu jati (lokal)
SNI-2007 0.0154 m3 Kaso-kaso (5 x 7) cm jati lokal @ Rp. 18,120,000.00
0.2000 kg Paku 7 cm – 10 cm @ Rp. 17,500.00
0.1500 oh Pekerja @ Rp. 55,500.00 8,325.00
0.3000 oh Tukang kayu @ Rp. 63,000.00 18,900.00
0.0300 oh Kepala tukang @ Rp. 65,000.00 1,950.00
0.0750 oh Mandor @ Rp. 65,000.00 4,875.00
JUMLAH ( BELUM PPN ) 34,050.00
JASA 10 %
JUMLAH
DIBULATKAN
81 1.00 m2 Memasang rangka langit-langit (60 x 60) cm, kayu jati (lokal)
85 1.00 m2 Memasang rangka langit-langit (60 x 120) cm, kayu jati (lokal)
AK 0.0130 m3 Kayu jati (lokal) balok @ Rp. 18,120,000.00
0.1200 kg Paku @ Rp. 17,500.00
0.1700 oh Pekerja @ Rp. 55,500.00 9,435.00
0.2700 oh Tukang kayu @ Rp. 63,000.00 17,010.00
0.0270 oh Kepala tukang kayu @ Rp. 65,000.00 1,755.00
0.0085 oh Mandor @ Rp. 65,000.00 552.50
JUMLAH ( BELUM PPN ) 28,752.50
JASA 10 %
JUMLAH
DIBULATKAN
93 1.00 m2 Memasang lisplank ukuran (3 x 20) cm, kayu jati (klas plitur)
SNI-2002 0.0072 m3 Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.0500 kg Paku biasa 2" - 5" @ Rp. 16,000.00
0.1000 oh Pekerja @ Rp. 55,500.00 5,550.00
0.2000 oh Tukang kayu @ Rp. 63,000.00 12,600.00
0.0250 oh Kepala tukang kayu @ Rp. 65,000.00 1,625.00
0.0050 oh Mandor @ Rp. 65,000.00 325.00
JUMLAH ( BELUM PPN ) 20,100.00
JASA 10 %
JUMLAH
DIBULATKAN
98 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu jati (klas plitur)
SNI-2007 0.0110 m3 Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.0500 kg Paku 5 cm dan 7 cm @ Rp. 16,000.00
0.1000 oh Pekerja @ Rp. 55,500.00 5,550.00
0.2000 oh Tukang kayu @ Rp. 63,000.00 12,600.00
0.0200 oh Kepala tukang @ Rp. 65,000.00 1,300.00
0.0050 oh Mandor @ Rp. 65,000.00 325.00
JUMLAH ( BELUM PPN ) 19,775.00
JASA 10 %
JUMLAH
DIBULATKAN
101 1.00 m1 Memasang lisplank ukuran (3 x 30) cm, kayu kelas bengkirai
103 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (klas plitur)
SNI-2002 0.0145 m3 Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 16,000.00
0.1500 oh Pekerja @ Rp. 55,500.00 8,325.00
0.2500 oh Tukang kayu @ Rp. 63,000.00 15,750.00
0.0250 oh Kepala tukang kayu @ Rp. 65,000.00 1,625.00
0.0075 oh Mandor @ Rp. 65,000.00 487.50
JUMLAH ( BELUM PPN ) 26,187.50
JASA 10 %
JUMLAH
DIBULATKAN
104 1.00 m1 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (lokal)
SNI-2002 0.0145 m3 Papan kayu jati (lokal) @ Rp. 21,000,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 16,000.00
0.1500 oh Pekerja @ Rp. 55,500.00 8,325.00
0.2500 oh Tukang kayu @ Rp. 63,000.00 15,750.00
0.0250 oh Kepala tukang kayu @ Rp. 65,000.00 1,625.00
0.0075 oh Mandor @ Rp. 65,000.00 487.50
JUMLAH ( BELUM PPN ) 26,187.50
JASA 10 %
JUMLAH
DIBULATKAN
108 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (klas plitur)
SNI-2002 0.0086 m3 Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 16,000.00
0.1000 oh Pekerja @ Rp. 55,500.00 5,550.00
0.1000 oh Tukang kayu @ Rp. 63,000.00 6,300.00
0.0100 oh Kepala tukang kayu @ Rp. 65,000.00 650.00
0.0050 oh Mandor @ Rp. 65,000.00 325.00
JUMLAH ( BELUM PPN ) 12,825.00
JASA 10 %
JUMLAH
DIBULATKAN
109 1.00 m1 Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (lokal)
SNI-2002 0.0086 m3 Papan kayu jati (lokal) @ Rp. 21,000,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 16,000.00
0.1000 oh Pekerja @ Rp. 55,500.00 5,550.00
0.1000 oh Tukang kayu @ Rp. 63,000.00 6,300.00
0.0100 oh Kepala tukang kayu @ Rp. 65,000.00 650.00
0.0050 oh Mandor @ Rp. 65,000.00 325.00
JUMLAH ( BELUM PPN ) 12,825.00
JASA 10 %
JUMLAH
DIBULATKAN
113 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu jati (klas plitur)
AK 0.0060 m3 Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 16,000.00
0.1000 oh Pekerja @ Rp. 55,500.00 5,550.00
0.1000 oh Tukang kayu @ Rp. 63,000.00 6,300.00
0.0100 oh Kepala tukang kayu @ Rp. 65,000.00 650.00
0.0050 oh Mandor @ Rp. 65,000.00 325.00
JUMLAH ( BELUM PPN ) 12,825.00
JASA 10 %
JUMLAH
DIBULATKAN
114 1.00 m1 Memasang lisplank ukuran (2 x 25) cm, kayu jati (lokal
AK 0.0060 m3 Papan kayu jati (lokal) @ Rp. 21,000,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 16,000.00
0.1000 oh Pekerja @ Rp. 55,500.00 5,550.00
0.1000 oh Tukang kayu @ Rp. 63,000.00 6,300.00
0.0100 oh Kepala tukang kayu @ Rp. 65,000.00 650.00
0.0050 oh Mandor @ Rp. 65,000.00 325.00
JUMLAH ( BELUM PPN ) 12,825.00
JASA 10 %
JUMLAH
DIBULATKAN
118 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu jati (klas plitur)
AK 0.0048 m3 Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 16,000.00
0.1000 oh Pekerja @ Rp. 55,500.00 5,550.00
0.1000 oh Tukang kayu @ Rp. 63,000.00 6,300.00
0.0100 oh Kepala tukang kayu @ Rp. 65,000.00 650.00
0.0050 oh Mandor @ Rp. 65,000.00 325.00
JUMLAH ( BELUM PPN ) 12,825.00
JASA 10 %
JUMLAH
DIBULATKAN
119 1.00 m1 Memasang lisplank ukuran (2 x 20) cm, kayu jati (lokal)
AK 0.0048 m3 Papan kayu jati (lokal) @ Rp. 21,000,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 16,000.00
0.1000 oh Pekerja @ Rp. 55,500.00 5,550.00
0.1000 oh Tukang kayu @ Rp. 63,000.00 6,300.00
0.0100 oh Kepala tukang kayu @ Rp. 65,000.00 650.00
0.0050 oh Mandor @ Rp. 65,000.00 325.00
JUMLAH ( BELUM PPN ) 12,825.00
JASA 10 %
JUMLAH
DIBULATKAN
123 1.00 m2 Membuat listplank asbes plat ram kayu jati (lokal)
AK 0.0250 m3 Ram kayu jati (lokal) @ Rp. 18,120,000.00
1.0000 m2 Asbes plat @ Rp. 12,500.00
0.3000 kg Paku reng @ Rp. 16,000.00
0.6000 oh Pekerja @ Rp. 55,500.00 33,300.00
1.8000 oh Tukang kayu @ Rp. 63,000.00 113,400.00
0.1800 oh Kep. Tk. Kayu @ Rp. 65,000.00 11,700.00
0.0300 oh Mandor @ Rp. 65,000.00 1,950.00
JUMLAH ( BELUM PPN ) 160,350.00
JASA 10 %
JUMLAH
DIBULATKAN
127 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu jati (lokal)
SNI-2007 0.0280 m3 Balok kayu jati (lokal) @ Rp. 18,120,000.00
0.1500 kg Paku 5 cm dan 7 cm @ Rp. 16,000.00
0.1500 oh Pekerja @ Rp. 55,500.00 8,325.00
0.4500 oh Tukang kayu @ Rp. 63,000.00 28,350.00
0.0450 oh Kepala tukang @ Rp. 65,000.00 2,925.00
0.0080 oh Mandor @ Rp. 65,000.00 520.00
JUMLAH ( BELUM PPN ) 40,120.00
JASA 10 %
JUMLAH
DIBULATKAN
128 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu kamper
SNI-2007 0.0280 m3 Balok kayu kamper @ Rp. 6,750,000.00
0.1500 kg Paku 5 cm dan 7 cm @ Rp. 16,000.00
0.1500 oh Pekerja @ Rp. 55,500.00 8,325.00
0.4500 oh Tukang kayu @ Rp. 63,000.00 28,350.00
0.0450 oh Kepala tukang @ Rp. 65,000.00 2,925.00
0.0080 oh Mandor @ Rp. 65,000.00 520.00
JUMLAH ( BELUM PPN ) 40,120.00
JASA 10 %
JUMLAH
DIBULATKAN
129 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu bengkirai
SNI-2007 0.0280 m3 Balok kayu bengkirai @ Rp. 7,600,000.00
0.1500 kg Paku 5 cm dan 7 cm @ Rp. 16,000.00
0.1500 oh Pekerja @ Rp. 55,500.00 8,325.00
0.4500 oh Tukang kayu @ Rp. 63,000.00 28,350.00
0.0450 oh Kepala tukang @ Rp. 65,000.00 2,925.00
0.0080 oh Mandor @ Rp. 65,000.00 520.00
JUMLAH ( BELUM PPN ) 40,120.00
JASA 10 %
JUMLAH
DIBULATKAN
130 1.00 m2 Memasang rangka dinding pemisah (60 x 120) cm kayu kruing
SNI-2007 0.0280 m3 Balok kayu kruing @ Rp. 6,000,000.00
0.1500 kg Paku 5 cm dan 7 cm @ Rp. 16,000.00
0.1500 oh Pekerja @ Rp. 55,500.00 8,325.00
0.4500 oh Tukang kayu @ Rp. 63,000.00 28,350.00
0.0450 oh Kepala tukang @ Rp. 65,000.00 2,925.00
0.0080 oh Mandor @ Rp. 65,000.00 520.00
JUMLAH ( BELUM PPN ) 40,120.00
JASA 10 %
JUMLAH
DIBULATKAN
132 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu kamper
SNI-2007 0.0280 m3 Balok kayu kamper @ Rp. 6,750,000.00
0.1500 kg Paku 5 cm dan 10 cm @ Rp. 17,500.00
0.8600 lbr Teakwood tebal 4 mm, Ukuran 120 cm @ Rp. 73,900.00
0.5600 kg Lem kayu @ Rp. 20,000.00
0.1500 oh Pekerja @ Rp. 55,500.00
0.4500 oh Tukang kayu @ Rp. 63,000.00 28,350.00
0.0450 oh Kepala tukang @ Rp. 65,000.00 2,925.00
0.0080 oh Mandor @ Rp. 65,000.00 520.00
JUMLAH ( BELUM PPN ) 31,795.00
JASA 10 %
JUMLAH
DIBULATKAN
133 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu bengkirai
SNI-2007 0.0280 m3 Balok kayu bengkirai @ Rp. 7,600,000.00
0.1500 kg Paku 5 cm dan 10 cm @ Rp. 17,500.00
0.8600 lbr Teakwood tebal 4 mm, Ukuran 120 cm @ Rp. 73,900.00
0.5600 kg Lem kayu @ Rp. 20,000.00
0.1500 oh Pekerja @ Rp. 55,500.00
0.4500 oh Tukang kayu @ Rp. 63,000.00 28,350.00
0.0450 oh Kepala tukang @ Rp. 65,000.00 2,925.00
0.0080 oh Mandor @ Rp. 65,000.00 520.00
JUMLAH ( BELUM PPN ) 31,795.00
JASA 10 %
JUMLAH
DIBULATKAN
134 1.00 m2 Memasang dinding pemisah teakwood rangkap, rangka kayu kruing
SNI-2007 0.0280 m3 Balok kayu kruing @ Rp. 6,000,000.00
0.1500 kg Paku 5 cm dan 10 cm @ Rp. 17,500.00
0.8600 lbr Teakwood tebal 4 mm, Ukuran 120 cm @ Rp. 73,900.00
0.5600 kg Lem kayu @ Rp. 20,000.00
0.1500 oh Pekerja @ Rp. 55,500.00
0.4500 oh Tukang kayu @ Rp. 63,000.00 28,350.00
0.0450 oh Kepala tukang @ Rp. 65,000.00 2,925.00
0.0080 oh Mandor @ Rp. 65,000.00 520.00
JUMLAH ( BELUM PPN ) 31,795.00
JASA 10 %
JUMLAH
DIBULATKAN
135 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu kamper
SNI-2007 0.0280 m3 Balok kayu kamper @ Rp. 6,750,000.00
0.1500 kg Paku 5 cm dan 10 cm @ Rp. 17,500.00
0.8600 lbr Plywood tebal 4 mm, ukuran 120 cm x @ Rp. 81,000.00
0.5600 kg Lem kayu @ Rp. 20,000.00
0.2000 oh Pekerja @ Rp. 55,500.00
0.6000 oh Tukang kayu @ Rp. 63,000.00 37,800.00
136 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu bengkirai
SNI-2007 0.0280 m3 Balok kayu bengkirai @ Rp. 7,600,000.00
0.1500 kg Paku 5 cm dan 10 cm @ Rp. 17,500.00
0.8600 lbr Plywood tebal 4 mm, ukuran 120 cm x @ Rp. 81,000.00
0.5600 kg Lem kayu @ Rp. 20,000.00
0.2000 oh Pekerja @ Rp. 55,500.00
0.6000 oh Tukang kayu @ Rp. 63,000.00 37,800.00
0.0600 oh Kepala tukang @ Rp. 65,000.00 3,900.00
0.0100 oh Mandor @ Rp. 65,000.00 650.00
JUMLAH ( BELUM PPN ) 42,350.00
JASA 10 %
JUMLAH
DIBULATKAN
137 1.00 m2 Memasang dinding pemisah plywood rangkap, rangka kayu kruing
SNI-2007 0.0280 m3 Balok kayu kruing @ Rp. 6,000,000.00
0.1500 kg Paku 5 cm dan 10 cm @ Rp. 17,500.00
0.8600 lbr Plywood tebal 4 mm, ukuran 120 cm x @ Rp. 81,000.00
0.5600 kg Lem kayu @ Rp. 20,000.00
0.2000 oh Pekerja @ Rp. 55,500.00
0.6000 oh Tukang kayu @ Rp. 63,000.00 37,800.00
0.0600 oh Kepala tukang @ Rp. 65,000.00 3,900.00
0.0100 oh Mandor @ Rp. 65,000.00 650.00
JUMLAH ( BELUM PPN ) 42,350.00
JASA 10 %
JUMLAH
DIBULATKAN
138 1.00 m2 Memasang dinding lambriziring dari papan kayu jati (klas plitur)
SNI-2007 0.0070 m3 Papan kayu jati (klas plitur) @ Rp. 35,100,000.00
0.1000 kg Paku 5 cm dan 10 cm @ Rp. 17,500.00
0.1500 kg Paku skrup 10 cm @ Rp. 17,500.00
0.6000 oh Pekerja @ Rp. 55,500.00
1.8000 oh Tukang kayu @ Rp. 63,000.00 113,400.00
0.1800 oh Kepala tukang @ Rp. 65,000.00 11,700.00
0.0300 oh Mandor @ Rp. 65,000.00 1,950.00
JUMLAH ( BELUM PPN ) 127,050.00
JASA 10 %
JUMLAH
DIBULATKAN
139 1.00 m2 Memasang dinding lambriziring dari papan kayu jati (lokal)
SNI-2007 0.0070 m3 Papan kayu jati (lokal) @ Rp. 21,000,000.00
0.1000 kg Paku 5 cm dan 10 cm @ Rp. 17,500.00
0.1500 kg Paku skrup 10 cm @ Rp. 17,500.00
0.6000 oh Pekerja @ Rp. 55,500.00
1.8000 oh Tukang kayu @ Rp. 63,000.00 113,400.00
0.1800 oh Kepala tukang @ Rp. 65,000.00 11,700.00
0.0300 oh Mandor @ Rp. 65,000.00 1,950.00
143 1.00 m2 Memasang dinding lambriziring dari plywood ukuran (120 x 240) cm
SNI-2007 0.4000 lbr Plywood tebal 4 mm @ Rp. 75,000.00
0.0500 kg Paku 1 cm dan 2,5 cm @ Rp. 16,000.00
0.0250 oh Pekerja @ Rp. 63,000.00
0.0750 oh Tukang kayu @ Rp. 65,000.00
0.0080 oh Kepala tukang @ Rp. 55,500.00 444.00
0.0010 oh Mandor @ Rp. 65,000.00 65.00
JUMLAH ( BELUM PPN ) 509.00
JASA 10 %
JUMLAH
DIBULATKAN
151 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper tanpa plepet
AK 0.0120 m3 Kayu kamper balok @ Rp. 6,750,000.00
0.0600 kg Paku biasa @ Rp. 20,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 12,500.00
0.1800 oh Pekerja @ Rp. 55,500.00 9,990.00
0.3200 oh Tukang kayu @ Rp. 63,000.00 20,160.00
0.0320 oh Kepala tukang kayu @ Rp. 65,000.00 2,080.00
0.0090 oh Mandor @ Rp. 65,000.00 585.00
JUMLAH ( BELUM PPN ) 32,815.00
JASA 10 %
JUMLAH
DIBULATKAN
152 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkirai tanpa plepet
AK 0.0120 m3 Kayu bengkirai balok @ Rp. 7,600,000.00
0.0600 kg Paku biasa @ Rp. 20,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 12,500.00
0.1800 oh Pekerja @ Rp. 55,500.00 9,990.00
0.3200 oh Tukang kayu @ Rp. 63,000.00 20,160.00
0.0320 oh Kepala tukang kayu @ Rp. 65,000.00 2,080.00
0.0090 oh Mandor @ Rp. 65,000.00 585.00
JUMLAH ( BELUM PPN ) 32,815.00
JASA 10 %
JUMLAH
DIBULATKAN
153 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing tanpa plepet
AK 0.0120 m3 Kayu kruing balok @ Rp. 6,000,000.00
0.0600 kg Paku biasa @ Rp. 20,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 12,500.00
0.1800 oh Pekerja @ Rp. 55,500.00 9,990.00
0.3200 oh Tukang kayu @ Rp. 63,000.00 20,160.00
0.0320 oh Kepala tukang kayu @ Rp. 65,000.00 2,080.00
0.0090 oh Mandor @ Rp. 65,000.00 585.00
JUMLAH ( BELUM PPN ) 32,815.00
JASA 10 %
JUMLAH
DIBULATKAN
154 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati (lokal) memakai plepet
AK 0.0120 m3 Kayu jati (lokal) balok @ Rp. 18,120,000.00
0.0600 kg Paku biasa @ Rp. 20,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 12,500.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 20,000.00
0.0100 kg Paku plepet @ Rp. 20,000.00
0.1800 oh Pekerja @ Rp. 55,500.00 9,990.00
0.3200 oh Tukang kayu @ Rp. 63,000.00 20,160.00
155 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper memakai plepet
AK 0.0120 m3 Kayu kamper balok @ Rp. 6,750,000.00
0.0600 kg Paku biasa @ Rp. 20,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 12,500.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 20,000.00
0.0100 kg Paku plepet @ Rp. 20,000.00
0.1800 oh Pekerja @ Rp. 55,500.00 9,990.00
0.3200 oh Tukang kayu @ Rp. 63,000.00 20,160.00
0.0320 oh Kepala tukang kayu @ Rp. 65,000.00 2,080.00
0.0090 oh Mandor @ Rp. 65,000.00 585.00
JUMLAH ( BELUM PPN ) 32,815.00
JASA 10 %
JUMLAH
DIBULATKAN
156 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkirai memakai plepet
AK 0.0120 m3 Kayu bengkirai balok @ Rp. 7,600,000.00
0.0600 kg Paku biasa @ Rp. 20,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 12,500.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 20,000.00
0.0100 kg Paku plepet @ Rp. 20,000.00
0.1800 oh Pekerja @ Rp. 55,500.00 9,990.00
0.3200 oh Tukang kayu @ Rp. 63,000.00 20,160.00
0.0320 oh Kepala tukang kayu @ Rp. 65,000.00 2,080.00
0.0090 oh Mandor @ Rp. 65,000.00 585.00
JUMLAH ( BELUM PPN ) 32,815.00
JASA 10 %
JUMLAH
DIBULATKAN
157 1.00 m2 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing memakai plepet
AK 0.0120 m3 Kayu kruing balok @ Rp. 6,000,000.00
0.0600 kg Paku biasa @ Rp. 20,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 12,500.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 20,000.00
0.0100 kg Paku plepet @ Rp. 20,000.00
0.1800 oh Pekerja @ Rp. 55,500.00 9,990.00
0.3200 oh Tukang kayu @ Rp. 63,000.00 20,160.00
0.0320 oh Kepala tukang kayu @ Rp. 65,000.00 2,080.00
0.0090 oh Mandor @ Rp. 65,000.00 585.00
JUMLAH ( BELUM PPN ) 32,815.00
JASA 10 %
JUMLAH
DIBULATKAN
159 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kamper
AK 0.0130 m3 Kayu kamper balok @ Rp. 6,750,000.00
0.3600 lbr Gypsum board 9 mm @ Rp. 55,775.00
0.0500 roll Kasa gypsum @ Rp. 12,000.00
0.4500 kg Tepung gypsum @ Rp. 4,500.00
0.0030 kg Alkasit @ Rp. 46,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 17,500.00
0.2400 oh Pekerja @ Rp. 55,500.00 13,320.00
0.3700 oh Tukang kayu @ Rp. 63,000.00 23,310.00
0.0370 oh Kepala tukang kayu @ Rp. 65,000.00 2,405.00
0.0120 oh Mandor @ Rp. 65,000.00 780.00
JUMLAH ( BELUM PPN ) 39,815.00
JASA 10 %
JUMLAH
DIBULATKAN
160 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu bengkirai
AK 0.0130 m3 Kayu bengkirai balok @ Rp. 7,600,000.00
0.3600 lbr Gypsum board 9 mm @ Rp. 55,775.00
0.0500 roll Kasa gypsum @ Rp. 12,000.00
0.4500 kg Tepung gypsum @ Rp. 4,500.00
0.0030 kg Alkasit @ Rp. 46,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 17,500.00
0.2400 oh Pekerja @ Rp. 55,500.00 13,320.00
0.3700 oh Tukang kayu @ Rp. 63,000.00 23,310.00
0.0370 oh Kepala tukang kayu @ Rp. 65,000.00 2,405.00
0.0120 oh Mandor @ Rp. 65,000.00 780.00
JUMLAH ( BELUM PPN ) 39,815.00
JASA 10 %
JUMLAH
DIBULATKAN
161 1.00 m2 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kruing
AK 0.0130 m3 Kayu kruing balok @ Rp. 6,000,000.00
0.3600 lbr Gypsum board 9 mm @ Rp. 55,775.00
0.0500 roll Kasa gypsum @ Rp. 12,000.00
0.4500 kg Tepung gypsum @ Rp. 4,500.00
0.0030 kg Alkasit @ Rp. 46,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 17,500.00
0.2400 oh Pekerja @ Rp. 55,500.00 13,320.00
0.3700 oh Tukang kayu @ Rp. 63,000.00 23,310.00
0.0370 oh Kepala tukang kayu @ Rp. 65,000.00 2,405.00
0.0120 oh Mandor @ Rp. 65,000.00 780.00
JUMLAH ( BELUM PPN ) 39,815.00
JASA 10 %
JUMLAH
163 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu jati (lokal)
AK 0.0130 m3 Kayu jati (lokal) balok @ Rp. 18,120,000.00
0.3600 lbr Kalsiboard 3.5 mm @ Rp. 54,625.00
0.0500 roll Kasa gypsum @ Rp. 12,000.00
0.4500 kg Tepung gypsum @ Rp. 4,500.00
0.0030 kg Alkasit @ Rp. 46,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 17,500.00
0.2400 oh Pekerja @ Rp. 55,500.00 13,320.00
0.3700 oh Tukang kayu @ Rp. 63,000.00 23,310.00
0.0370 oh Kepala tukang kayu @ Rp. 65,000.00 2,405.00
0.0120 oh Mandor @ Rp. 65,000.00 780.00
JUMLAH ( BELUM PPN ) 39,815.00
JASA 10 %
JUMLAH
DIBULATKAN
164 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kamper
AK 0.0130 m3 Kayu kamper balok @ Rp. 6,750,000.00
0.3600 lbr Kalsiboard 3.5 mm @ Rp. 54,625.00
0.0500 roll Kasa gypsum @ Rp. 12,000.00
0.4500 kg Tepung gypsum @ Rp. 4,500.00
0.0030 kg Alkasit @ Rp. 46,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 17,500.00
0.2400 oh Pekerja @ Rp. 55,500.00 13,320.00
0.3700 oh Tukang kayu @ Rp. 63,000.00 23,310.00
0.0370 oh Kepala tukang kayu @ Rp. 65,000.00 2,405.00
0.0120 oh Mandor @ Rp. 65,000.00 780.00
JUMLAH ( BELUM PPN ) 39,815.00
JASA 10 %
JUMLAH
DIBULATKAN
165 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu bengkirai
AK 0.0130 m3 Kayu bengkirai balok @ Rp. 7,600,000.00
0.3600 lbr Kalsiboard 3.5 mm @ Rp. 54,625.00
0.0500 roll Kasa gypsum @ Rp. 12,000.00
0.4500 kg Tepung gypsum @ Rp. 4,500.00
0.0030 kg Alkasit @ Rp. 46,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 17,500.00
0.2400 oh Pekerja @ Rp. 55,500.00 13,320.00
0.3700 oh Tukang kayu @ Rp. 63,000.00 23,310.00
0.0370 oh Kepala tukang kayu @ Rp. 65,000.00 2,405.00
0.0120 oh Mandor @ Rp. 65,000.00 780.00
JUMLAH ( BELUM PPN ) 39,815.00
JASA 10 %
JUMLAH
166 1.00 m2 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kruing
AK 0.0130 m3 Kayu kruing balok @ Rp. 6,000,000.00
0.3600 lbr Kalsiboard 3.5 mm @ Rp. 54,625.00
0.0500 roll Kasa gypsum @ Rp. 12,000.00
0.4500 kg Tepung gypsum @ Rp. 4,500.00
0.0030 kg Alkasit @ Rp. 46,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 17,500.00
0.2400 oh Pekerja @ Rp. 55,500.00 13,320.00
0.3700 oh Tukang kayu @ Rp. 63,000.00 23,310.00
0.0370 oh Kepala tukang kayu @ Rp. 65,000.00 2,405.00
0.0120 oh Mandor @ Rp. 65,000.00 780.00
JUMLAH ( BELUM PPN ) 39,815.00
JASA 10 %
JUMLAH
DIBULATKAN
178 1.00 m2 Memasang langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
SNI-2007 0.3640 lbr Gypsum board @ Rp. 55,775.00
0.1100 kg Paku skrup @ Rp. 10,000.00
0.1000 oh Pekerja @ Rp. 55,500.00 5,550.00
0.0500 oh Tukang kayu @ Rp. 63,000.00 3,150.00
0.0050 oh Kepala tukang @ Rp. 65,000.00 325.00
0.0050 oh Mandor @ Rp. 65,000.00 325.00
JUMLAH ( BELUM PPN ) 9,350.00
JASA 10 %
JUMLAH
DIBULATKAN
179 1.00 m2 Memasang langit-langit akustik ukuran (60 x 120) cm + rangka alluminium
SNI-2007 3.6000 m’ Profil Alluminium "T" @ Rp. 23,500.00
0.1500 kg Kawat diameter 4 mm @ Rp. 22,500.00
1.0500 bh Ramset @ Rp. 20,000.00
1.5000 lbr Akustik Uk. 60 cm x 120 cm @ Rp. 128,000.00
0.5000 oh Pekerja @ Rp. 55,500.00 27,750.00
0.5000 oh Tukang kayu @ Rp. 63,000.00 31,500.00
0.0500 oh Kepala tukang @ Rp. 65,000.00 3,250.00
0.0250 oh Mandor @ Rp. 65,000.00 1,625.00
JUMLAH ( BELUM PPN ) 64,125.00
JASA 10 %
JUMLAH
DIBULATKAN
183 1.00 m1 Pasang list profil cornees gypsum lebar lebih dari 10 cm
AK 1.1000 m1 List profil cornees gypsum @ Rp. 17,250.00
1.0500 kg Tepung gypsum @ Rp. 4,500.00
0.0053 kg Alkasit @ Rp. 46,000.00
0.1125 oh Pekerja @ Rp. 55,500.00 6,243.75
0.0400 oh Tukang kayu @ Rp. 63,000.00 2,520.00
0.0040 oh Kepala tukang kayu @ Rp. 65,000.00 260.00
0.0065 oh Mandor @ Rp. 65,000.00 422.50
JUMLAH ( BELUM PPN ) 9,446.25
JASA 10 %
JUMLAH
DIBULATKAN
184 1.00 m2 Mengerjakan Ukiran Gaya Yogyakarta dengan kedalaman 1 cm, tidak berlubang
AK Membuat pola ukir dan memindahkan pola
1.0000 lb Kertas 100 x 100 cm @ Rp. 2,000.00
15.0000 lbr Kerta karbon @ Rp. 3,800.00
2.0000 org Tukang gambar @ Rp. 35,750.00 71,500.00
JUMLAH ( A ) 71,500.00
Mengukir
16.0000 org Tukang Ukir @ Rp. 40,000.00 640,000.00
1.0000 org Kepala Tk, Ukir @ Rp. 45,000.00 45,000.00
JUMLAH ( B ) 685,000.00
46 1.00 m2 Pasang genteng beton besar Natural ( isi 9 / m2 ) untuk rumah tingkat
AK 9.0000 bh Genteng beton natural @ Rp. 4,000.00
0.3000 oh Pekerja @ Rp. 55,500.00 16,650.00
0.1000 oh Tukang batu @ Rp. 58,000.00 5,800.00
0.0100 oh Kep. Tk. Batu @ Rp. 63,000.00 630.00
0.0150 oh Mandor @ Rp. 65,000.00 975.00
JUMLAH ( BELUM PPN ) 24,055.00
JASA 10 %
JUMLAH
DIBULATKAN
48 1.00 m2 Pasang genteng beton besar Warna ( isi 9 / m2 ) untuk rumah tingkat
AK 9.0000 bh Genteng beton Warna @ Rp. 4,550.00
0.3000 oh Pekerja @ Rp. 55,500.00 16,650.00
0.1000 oh Tukang batu @ Rp. 58,000.00 5,800.00
0.0100 oh Kep. Tk. Batu @ Rp. 63,000.00 630.00
0.0150 oh Mandor @ Rp. 65,000.00 975.00
JUMLAH ( BELUM PPN ) 24,055.00
JASA 10 %
JUMLAH
DIBULATKAN
50 1.00 m2 Pasang genteng keramik berglasir KIA, Kanmuri Natural untuk rumah tingkat
AK 14.5000 bh Genteng beton natural @ Rp. 5,000.00
0.3000 oh Pekerja @ Rp. 55,500.00 16,650.00
0.1000 oh Tukang batu @ Rp. 58,000.00 5,800.00
0.0100 oh Kep. Tk. Batu @ Rp. 63,000.00 630.00
PEKERJAAN PENGECATAN
2 1.00 m2 Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual
SNI-2002 0.0500 kg Sabun @ Rp. 12,600.00
0.1500 oh Pekerja @ Rp. 55,500.00 8,325.00
0.0025 oh Mandor @ Rp. 65,000.00 162.50
JUMLAH ( BELUM TERMASUK PPN ) 8,487.50
JASA 10 %
JUMLAH
DIBULATKAN
5 1.00 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat P
SNI-2002 0.2000 kg Cat meni @ Rp. 18,500.00
0.1500 kg Plamir @ Rp. 18,250.00
Analisa Konstruksi - 527
No. Macam Pekerjaan Upah
(1) (2) (3)
0.1700 kg Cat dasar @ Rp. 45,000.00
0.2600 kg Cat penutup @ Rp. 45,000.00
0.0700 oh Pekerja @ Rp. 55,500.00 3,885.00
0.0090 oh Tukang Cat @ Rp. 55,500.00 499.50
0.0060 oh Kepala tukang @ Rp. 58,000.00 348.00
0.0025 oh Mandor @ Rp. 65,000.00 162.50
JUMLAH ( BELUM TERMASUK PPN ) 4,895.00
JASA 10 %
JUMLAH
DIBULATKAN
6 1.00 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat P
SNI-2002 0.2000 kg Cat meni @ Rp. 18,500.00
0.1500 kg Plamir @ Rp. 18,250.00
0.1700 kg Cat dasar @ Rp. 45,000.00
0.3500 kg Cat penutup @ Rp. 45,000.00
0.0700 oh Pekerja @ Rp. 55,500.00 3,885.00
0.1050 oh Tukang Cat @ Rp. 55,500.00 5,827.50
0.0040 oh Kepala tukang @ Rp. 58,000.00 232.00
0.0025 oh Mandor @ Rp. 65,000.00 162.50
JUMLAH ( BELUM TERMASUK PPN ) 10,107.00
JASA 10 %
JUMLAH
DIBULATKAN
11 1.00 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
SNI-2002 0.1000 Kg Plamir tembok @ Rp. 12,000.00
0.1000 Kg Cat dasar @ Rp. 15,000.00
0.2600 Kg Cat penutup 2 x @ Rp. 15,000.00
0.0200 oh Pekerja @ Rp. 55,500.00 1,110.00
0.0630 oh Tukang Cat @ Rp. 55,500.00 3,496.50
0.0063 oh Kepala tukang @ Rp. 58,000.00 365.40
0.0025 oh Mandor @ Rp. 65,000.00 162.50
JUMLAH ( BELUM TERMASUK PPN ) 5,134.40
JASA 10 %
JUMLAH
DIBULATKAN
12 1.00 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
SNI-2002 0.1200 kg Cat dasar @ Rp. 15,000.00
0.1800 lbr Cat penutup 2 x @ Rp. 15,000.00
0.0280 oh Pekerja @ Rp. 55,500.00 1,554.00
0.0420 oh Tukang Cat @ Rp. 55,500.00 2,331.00
0.0042 oh Kepala tukang @ Rp. 58,000.00 243.60
0.0025 oh Mandor @ Rp. 65,000.00 162.50
JUMLAH ( BELUM TERMASUK PPN ) 4,291.10
JASA 10 %
JUMLAH
DIBULATKAN
19 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis
SNI-2002 200 um
0.1000 Kg Meni ( Read Lead ) A @ Rp. 22,500.00
0.1000 Kg Meni ( Read Lead ) B @ Rp. 18,500.00
0.0400 Kg Alluminium C @ Rp. -
0.0400 Kg Alluminium B @ Rp. -
0.0100 Ltr Pengencer @ Rp. 17,500.00
0.0020 m3 Perancah Kayu @ Rp. 1,100,000.00
0.0060 oh Pekerja @ Rp. 55,500.00 333.00
0.0060 oh Tukang Cat @ Rp. 55,500.00 333.00
0.0225 oh Kepala tukang @ Rp. 58,000.00 1,305.00
0.0075 oh Mandor @ Rp. 65,000.00 487.50
20 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis
SNI-2002 um
0.3000 Kg Meni Besi @ Rp. 18,500.00
0.0060 oh Pekerja @ Rp. 55,500.00 333.00
0.0600 oh Tukang Cat @ Rp. 55,500.00 3,330.00
0.0120 oh Kepala tukang @ Rp. 58,000.00 696.00
0.0060 oh Mandor @ Rp. 65,000.00 390.00
JUMLAH ( BELUM TERMASUK PPN ) 4,749.00
JASA 10 %
JUMLAH
DIBULATKAN
21 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis
SNI-2002 200 um
0.1100 Kg Cat Dasar @ Rp. 35,000.00
0.1700 Kg Cat Antara @ Rp. 45,000.00
0.0800 Kg Cat Penutup @ Rp. 45,000.00
0.5000 oh Pekerja @ Rp. 55,500.00 27,750.00
0.8000 oh Tukang Cat @ Rp. 55,500.00 44,400.00
0.3000 oh Kepala tukang @ Rp. 58,000.00 17,400.00
0.2000 oh Mandor @ Rp. 65,000.00 13,000.00
JUMLAH ( BELUM TERMASUK PPN ) 102,550.00
JASA 10 %
JUMLAH
DIBULATKAN
22 1.00 m2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spra
SNI-2002 Mutakhir, tebal 200 um
0.3000 Kg Cat Dasar @ Rp. 35,000.00
0.4000 oh Pekerja @ Rp. 55,500.00 22,200.00
0.7000 oh Tukang Cat @ Rp. 55,500.00 38,850.00
0.2000 oh Kepala tukang @ Rp. 58,000.00 11,600.00
0.2000 oh Mandor @ Rp. 65,000.00 13,000.00
JUMLAH ( BELUM TERMASUK PPN ) 85,650.00
JASA 10 %
JUMLAH
DIBULATKAN
24 1.00 m2 Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting
SNI-2002 Sa 2½.
40.0000 Kg Pasir Silika @ Rp. 5,000.00
10.0000 Ltr BBM @ Rp. 6,000.00
Peralatan @ Rp.
Kompresor, Blasting Pot , Selang Dan Nozzle
1.6000 oh Pekerja @ Rp. 55,500.00 88,800.00
1.6000 oh Tukang Cat @ Rp. 55,500.00 88,800.00
0.8000 oh Kepala tukang @ Rp. 58,000.00 46,400.00
0.5000 oh Mandor @ Rp. 65,000.00 32,500.00
JUMLAH ( BELUM TERMASUK PPN ) 256,500.00
JASA 10 %
JUMLAH
DIBULATKAN
PEKERJAAN SANITASI
9 1.00 m1 Memasang Pipa Penyalur Air limbah jenis Pipa Tanah Ø15 cm
SNI-2002 1.6000 bh Pipa tanah @ Rp. 26,250.00
0.6800 kg PC @ Rp. 1,400.00
0.0130 m3 Pasir pasang @ Rp. 97,500.00
0.0110 m3 Pasir urug @ Rp. 90,000.00
0.0600 oh Pekerja @ Rp. 55,500.00 3,330.00
0.0300 oh Tukang batu @ Rp. 58,000.00 1,740.00
0.0030 oh Kepala tukang batu @ Rp. 63,000.00 189.00
0.0025 oh Mandor @ Rp. 65,000.00 162.50
JUMLAH ( BELUM TERMASUK PPN ) 5,421.50
JASA 10 %
JUMLAH
DIBULATKAN
13 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35 cm
SNI-2002 87.0000 bh Batu bata @ Rp. 450.00
44.0000 kg PC @ Rp. 1,400.00
0.0700 m3 Pasir pasang @ Rp. 97,500.00
0.0700 m3 Batu kerikil @ Rp. 91,850.00
1.6000 kg Besi beton @ Rp. 11,600.00
0.0600 m3 Pasir beton @ Rp. 100,000.00
3.2000 oh Pekerja @ Rp. 55,500.00 177,600.00
1.0150 oh Tukang batu @ Rp. 58,000.00 58,870.00
0.0015 oh Kepala tukang batu @ Rp. 63,000.00 94.50
0.0160 oh Mandor @ Rp. 65,000.00 1,040.00
JUMLAH ( BELUM TERMASUK PPN ) 237,604.50
JASA 10 %
JUMLAH
DIBULATKAN
14 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50 cm
SNI-2002 150.0000 bh Batu bata @ Rp. 450.00
77.0000 kg PC @ Rp. 1,400.00
15 1.00 bh Memasang Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65 cm
SNI-2002 222.0000 bh Batu bata @ Rp. 450.00
114.0000 kg PC @ Rp. 1,400.00
0.1840 m3 Pasir pasang @ Rp. 97,500.00
0.0330 m3 Batu kerikil @ Rp. 91,850.00
4.8500 kg Besi beton @ Rp. 11,600.00
0.1200 m3 Pasir beton @ Rp. 100,000.00
2.1600 oh Pekerja @ Rp. 55,500.00 119,880.00
0.7200 oh Tukang batu @ Rp. 58,000.00 41,760.00
0.0720 oh Kepala tukang batu @ Rp. 63,000.00 4,536.00
0.1080 oh Mandor @ Rp. 65,000.00 7,020.00
0.1000 oh Tukang Gali @ Rp. 55,500.00 5,550.00
JUMLAH ( BELUM TERMASUK PPN ) 173,196.00
JASA 10 %
JUMLAH
DIBULATKAN
3 1.00 m2 Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
SNI-2007 15.0000 kg Besi siku L 30.30.3 @ Rp. 13,600.00
32.8000 kg Besi plat baja @ Rp. 15,500.00
0.0500 kg kawat las @ Rp. 25,500.00
1.0500 oh Pekerja @ Rp. 55,500.00 58,275.00
1.0500 oh Tukang besi @ Rp. 61,000.00 64,050.00
0.1050 oh Kepala tukang @ Rp. 63,000.00 6,615.00
0.0520 oh Mandor @ Rp. 65,000.00 3,380.00
JUMLAH ( BELUM PPN ) 132,320.00
JASA 10 %
JUMLAH
DIBULATKAN
18 1.00 m1 Memasang talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
SNI-2007 1.0500 m Seng plat @ Rp. 22,500.00
0.0100 kg Paku 1 cm - 2,5 cm @ Rp. 16,000.00
0.5000 kg Besi strip @ Rp. 18,000.00
0.1500 oh Pekerja @ Rp. 55,500.00
0.3000 oh Tukang besi @ Rp. 61,000.00 18,300.00
0.0300 oh Kepala tukang @ Rp. 63,000.00 1,890.00
0.0080 oh Mandor @ Rp. 65,000.00 520.00
JUMLAH ( BELUM PPN ) 20,710.00
JASA 10 %
JUMLAH
DIBULATKAN
19 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu jati
SNI-2002 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 47,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 16,000.00
0.0096 m3 Kayu jati papan @ Rp. 35,100,000.00
0.2500 kg Flincoat @ Rp. 39,200.00
0.1500 oh Pekerja @ Rp. 55,500.00 8,325.00
0.4000 oh Tukang kayu @ Rp. 63,000.00 25,200.00
0.0250 oh Kepala tukang kayu @ Rp. 65,000.00 1,625.00
0.0013 oh Mandor @ Rp. 65,000.00 81.25
20 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu jati (lokal)
SNI-2002 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 47,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 16,000.00
0.0096 m3 Kayu jati (lokal) papan @ Rp. 21,000,000.00
0.2500 kg Flincoat @ Rp. 39,200.00
0.1500 oh Pekerja @ Rp. 55,500.00 8,325.00
0.4000 oh Tukang kayu @ Rp. 63,000.00 25,200.00
0.0250 oh Kepala tukang kayu @ Rp. 65,000.00 1,625.00
0.0013 oh Mandor @ Rp. 65,000.00 81.25
JUMLAH ( BELUM PPN ) 35,231.25
JASA 10 %
JUMLAH
DIBULATKAN
21 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu kamper
SNI-2002 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 47,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 16,000.00
0.0096 m3 Kayu kamper papan @ Rp. 7,500,000.00
0.2500 kg Flincoat @ Rp. 39,200.00
0.1500 oh Pekerja @ Rp. 55,500.00 8,325.00
0.4000 oh Tukang kayu @ Rp. 63,000.00 25,200.00
0.0250 oh Kepala tukang kayu @ Rp. 65,000.00 1,625.00
0.0013 oh Mandor @ Rp. 65,000.00 81.25
JUMLAH ( BELUM PPN ) 35,231.25
JASA 10 %
JUMLAH
DIBULATKAN
22 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu kruing
SNI-2002 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 47,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 16,000.00
0.0096 m3 Kayu kruing papan @ Rp. 6,200,000.00
0.2500 kg Flincoat @ Rp. 39,200.00
0.1500 oh Pekerja @ Rp. 55,500.00 8,325.00
0.4000 oh Tukang kayu @ Rp. 63,000.00 25,200.00
0.0250 oh Kepala tukang kayu @ Rp. 65,000.00 1,625.00
0.0013 oh Mandor @ Rp. 65,000.00 81.25
JUMLAH ( BELUM PPN ) 35,231.25
JASA 10 %
JUMLAH
DIBULATKAN
23 1.00 m1 Pasang talang datar, seng BJLS 28, papan kayu bengkirai
SNI-2002 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 47,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 16,000.00
0.0096 m3 Kayu bengkirai papan @ Rp. 8,620,000.00
0.2500 kg Flincoat @ Rp. 39,200.00
0.1500 oh Pekerja @ Rp. 55,500.00 8,325.00
0.4000 oh Tukang kayu @ Rp. 63,000.00 25,200.00
0.0250 oh Kepala tukang kayu @ Rp. 65,000.00 1,625.00
0.0013 oh Mandor @ Rp. 65,000.00 81.25
JUMLAH ( BELUM PPN ) 35,231.25
JASA 10 %
JUMLAH
DIBULATKAN
24 1.00 m1 Pasang talang miring, seng BJLS 28 papan kayu jati (klas 1)
SNI-2002 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 47,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 16,000.00
0.0190 m3 Kayu jati papan (klas 1) @ Rp. 35,100,000.00
0.3000 kg Flincoat @ Rp. 39,200.00
0.0400 oh Pekerja @ Rp. 55,500.00 2,220.00
25 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu jati (lokal)
SNI-2002 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 47,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 16,000.00
0.0190 m3 Kayu jati (lokal) papan @ Rp. 21,000,000.00
0.2500 kg Flincoat @ Rp. 39,200.00
0.0400 oh Pekerja @ Rp. 55,500.00 2,220.00
0.4000 oh Tukang kayu @ Rp. 63,000.00 25,200.00
0.0250 oh Kepala tukang kayu @ Rp. 65,000.00 1,625.00
0.0013 oh Mandor @ Rp. 65,000.00 81.25
JUMLAH ( BELUM PPN ) 29,126.25
JASA 10 %
JUMLAH
DIBULATKAN
26 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu kamper
SNI-2002 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 47,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 16,000.00
0.0190 m3 Kayu kamper papan @ Rp. 7,500,000.00
0.2500 kg Flincoat @ Rp. 39,200.00
0.0400 oh Pekerja @ Rp. 55,500.00 2,220.00
0.4000 oh Tukang kayu @ Rp. 63,000.00 25,200.00
0.0250 oh Kepala tukang kayu @ Rp. 65,000.00 1,625.00
0.0013 oh Mandor @ Rp. 65,000.00 81.25
JUMLAH ( BELUM PPN ) 29,126.25
JASA 10 %
JUMLAH
DIBULATKAN
27 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu kruing
SNI-2002 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 47,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 16,000.00
0.0190 m3 Kayu kruing papan @ Rp. 6,200,000.00
0.2500 kg Flincoat @ Rp. 39,200.00
0.0400 oh Pekerja @ Rp. 55,500.00 2,220.00
0.4000 oh Tukang kayu @ Rp. 63,000.00 25,200.00
0.0250 oh Kepala tukang kayu @ Rp. 65,000.00 1,625.00
0.0013 oh Mandor @ Rp. 65,000.00 81.25
JUMLAH ( BELUM PPN ) 29,126.25
JASA 10 %
JUMLAH
DIBULATKAN
28 1.00 m1 Pasang talang miring, seng BJLS 28, papan kayu bengkirai
SNI-2002 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 47,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 16,000.00
0.0190 m3 Kayu bengkirai papan @ Rp. 8,620,000.00
0.2500 kg Flincoat @ Rp. 39,200.00
0.0400 oh Pekerja @ Rp. 55,500.00 2,220.00
42,660.00
24,885.00
320.00
67,865.00 80,690.00
8,069.00
88,759.00
88,759.00
- 796,500.00
79,650.00
876,150.00
876,150.00
- 8,761.50
- 8,800.00
880.00
9,680.00
9,680.00
30,250.00
3,810.00
4,875.00
38,935.00 100,935.00
10,093.50
16,500.00
11,430.00
975.00
28,905.00 87,655.00
8,765.50
96,420.50
96,420.00
13,750.00
639,900.00
14,875.00
14,960.00
49,000.00
14,625.00
10,000.00
19,050.00
13,500.00
10,500.00
12,500.00
6,000.00
5,250.00
4,860.00
828,770.00 1,146,520.00
114,652.00
1,261,172.00
1,261,172.00
13,750.00
3,500.00
32,400.00
500.00
1,143.00
255,960.00
1,050.00
8,685.00
316,988.00 354,388.00
35,438.80
389,826.80
389,826.00
11,000.00
2,800.00
272,500.00
500.00
288,993.00 320,843.00
32,084.30
352,927.30
352,927.00
13,750.00
3,500.00
500.00
1,143.00
255,960.00
1,050.00
275,903.00 314,923.00
31,492.30
346,415.30
346,415.00
15,841.00
15,841.00 18,785.00
1,878.50
20,663.50
20,663.00
18,700.00
746,550.00
5,250.00
14,700.00
3,000.00
6,350.00
64,950.00
859,500.00 1,057,250.00
105,725.00
1,162,975.00
1,162,975.00
33,000.00
981,180.00
12,250.00
1,091,380.00 1,254,380.00
125,438.00
1,379,818.00
1,379,818.00
13,750.00
661,230.00
5,250.00
25,200.00
3,000.00
6,350.00
64,950.00
109,350.00
889,080.00 1,086,830.00
108,683.00
1,195,513.00
1,195,513.00
127,980.00
1,400.00
18,000.00
147,380.00 149,367.50
14,936.75
164,304.25
164,304.00
15,000.00
2,500.00
17,500.00 35,744.50
3,574.45
39,318.95
39,318.00
227,766.00
173,250.00
7,400.00
23,725.00
63,000.00
495,141.00 525,194.50
52,519.45
577,713.95
577,713.00
124,425.00
35,700.00
12,000.00
60,000.00
23,520.00
2,700.00
5,143.50
263,488.50 564,878.50
56,487.85
621,366.35
621,366.00
124,425.00
25,500.00
12,000.00
23,520.00
2,700.00
5,143.50
193,288.50 319,303.50
31,930.35
351,233.85
351,233.00
- 254,200.00
25,420.00
279,620.00
279,620.00
- 121,550.00
12,155.00
133,705.00
133,705.00
- 462,100.00
46,210.00
508,310.00
508,310.00
- 11,750.00
1,175.00
12,925.00
12,925.00
- 7,750.00
775.00
8,525.00
8,525.00
- 11,750.00
1,175.00
12,925.00
Analisa Konstruksi - 588
Bahan Jumlah
(4) (5)
12,925.00
- 8,600.00
860.00
9,460.00
9,460.00
- 15,920.00
1,592.00
17,512.00
17,512.00
- 11,750.00
1,175.00
12,925.00
12,925.00
- 652,000.00
65,200.00
717,200.00
717,200.00
- 68,500.00
6,850.00
75,350.00
75,350.00
- 1,069,000.00
106,900.00
1,175,900.00
1,175,900.00
- 43,250.00
4,325.00
47,575.00
47,575.00
- 52,875.00
5,287.50
58,162.50
58,162.00
- 62,630.00
6,263.00
68,893.00
68,893.00
- 57,580.00
5,758.00
63,338.00
63,338.00
- 87,150.00
8,715.00
95,865.00
95,865.00
- 69,525.00
6,952.50
76,477.50
76,477.00
Analisa Konstruksi - 591
Bahan Jumlah
(4) (5)
- 3,100.00
310.00
3,410.00
3,410.00
11,891.00
1,189.10
13,080.10
13,080.00
18,965.00
1,896.50
20,861.50
20,861.00
- 31,888.00
3,188.80
35,076.80
35,076.00
31,000.00
3,100.00
34,100.00
34,100.00
14,525.00
1,452.50
15,977.50
15,977.00
108,000.00
108,000.00 125,300.00
12,530.00
137,830.00
137,830.00
10,125.00
39,000.00
44,793.00
18,600.00
58,590.00
77,190.00 152,510.00
15,251.00
167,761.00
167,761.00
60,000.00
60,000.00 69,300.00
6,930.00
76,230.00
76,230.00
90,000.00
90,000.00 99,300.00
9,930.00
109,230.00
109,230.00
90,000.00
90,000.00 105,500.00
10,550.00
116,050.00
116,050.00
54,000.00
54,000.00 71,300.00
7,130.00
78,430.00
78,430.00
14,525.00
1,452.50
15,977.50
15,977.00
120,000.00
120,000.00 201,320.00
20,132.00
221,452.00
221,452.00
1,600.00
-
1,600.00 30,975.00
3,097.50
34,072.50
34,072.00
121,000.00
548,800.00
30,615.00
700,415.00 836,765.00
83,676.50
920,441.50
920,441.00
121,000.00
373,800.00
41,632.50
536,432.50 672,782.50
67,278.25
740,060.75
740,060.00
132,000.00
282,800.00
47,287.50
462,087.50 598,437.50
59,843.75
658,281.25
658,281.00
132,000.00
228,200.00
50,700.00
410,900.00 547,250.00
54,725.00
601,975.00
601,975.00
132,000.00
190,400.00
53,040.00
375,440.00 511,790.00
51,179.00
562,969.00
562,969.00
132,000.00
163,800.00
54,697.50
350,497.50 486,847.50
48,684.75
535,532.25
535,532.00
132,000.00
127,400.00
56,940.00
316,340.00 452,690.00
45,269.00
497,959.00
497,959.00
121,000.00
19,092.88
21,068.00
53,040.00
214,200.88 350,550.88
35,055.09
385,605.96
385,605.00
132,000.00
14,173.75
15,640.00
33,150.00
194,963.75 331,313.75
33,131.38
364,445.13
364,445.00
132,000.00
133,588.00
19,092.88
37,245.00
321,925.88 458,275.88
45,827.59
504,103.46
504,103.00
132,000.00
85,400.00
12,256.13
47,970.00
277,626.13 413,976.13
41,397.61
455,373.74
455,373.00
132,000.00
57,400.00
10,922.13
50,992.50
251,314.63 387,664.63
38,766.46
426,431.09
426,431.00
132,000.00
38,880.00
170,880.00 241,782.00
24,178.20
265,960.20
265,960.00
1,911,016.00 2,165,421.00
216,542.10
2,381,963.10
2,381,963.00
415,036.00 669,441.00
66,944.10
736,385.10
736,385.00
49,500.00
271,600.00
31,200.00
59,436.00
411,736.00 604,111.00
60,411.10
664,522.10
664,522.00
131,700.00 179,810.00
17,981.00
197,791.00
197,791.00
118,002.50 166,112.50
16,611.25
182,723.75
182,723.00
109,237.50 157,347.50
15,734.75
173,082.25
173,082.00
104,025.00 152,135.00
15,213.50
167,348.50
167,348.00
100,795.00 148,905.00
14,890.50
163,795.50
163,795.00
87,505.44 135,615.44
13,561.54
149,176.98
149,176.00
61,735.00 85,790.00
8,579.00
94,369.00
94,369.00
55,518.00 79,573.00
7,957.30
87,530.30
87,530.00
49,439.50 73,494.50
7,349.45
80,843.95
80,843.00
47,925.50 71,980.50
7,198.05
79,178.55
79,178.00
a, campuran spesi 1 PC : 8 PP
31,500.00
9,100.00
4,875.00
45,475.00 69,530.00
6,953.00
76,483.00
76,483.00
43,925.63 67,980.63
6,798.06
74,778.69
74,778.00
36,411.75 60,466.75
6,046.68
66,513.43
66,513.00
36,685.25 60,740.25
6,074.03
66,814.28
66,814.00
-
42,448.00
70,980.00
3,248.00
116,676.00 143,946.00
14,394.60
158,340.60
158,340.00
-
33,964.00
75,270.00
3,248.00
112,482.00 139,752.00
13,975.20
153,727.20
153,727.00
-
31,836.00
53,625.00
3,248.00
88,709.00 117,575.00
11,757.50
129,332.50
129,332.00
-
25,480.00
56,745.00
3,248.00
85,473.00 114,339.00
11,433.90
125,772.90
125,772.00
-
21,224.00
35,490.00
3,248.00
59,962.00 84,017.00
8,401.70
92,418.70
92,418.00
-
16,982.00
37,830.00
3,248.00
58,060.00 82,115.00
8,211.50
90,326.50
90,326.00
an spesi 1 PC : 3 PP
48,000.00
19,600.00
3,120.00
70,720.00 94,775.00
9,477.50
104,252.50
104,252.00
ampuran spesi 1 PC : 3 PP
90,000.00
19,600.00
3,120.00
112,720.00 136,775.00
13,677.50
150,452.50
150,452.00
ampuran spesi 1 PC : 4 PP
90,000.00
15,400.00
3,412.50
108,812.50 132,867.50
13,286.75
146,154.25
146,154.00
m, campuran spesi 1 PC : 3 PP
59,500.00
19,600.00
3,120.00
82,220.00 109,490.00
10,949.00
120,439.00
120,439.00
31,250.00
17,500.00
3,900.00
52,650.00 88,455.00
8,845.50
97,300.50
97,300.00
7,650.00
6,919.50
1,335.75
15,905.25 23,121.75
2,312.18
Analisa Konstruksi - 614
Bahan Jumlah
(4) (5)
25,433.93
25,433.00
345,800.00
62,070.00
93,980.00
501,850.00 624,641.65
62,464.17
687,105.82
687,105.00
540,739.20 663,530.85
66,353.09
729,883.94
729,883.00
418,600.00
57,070.00
95,669.10
571,339.10 694,130.75
69,413.08
763,543.83
763,543.00
482,398.90 573,300.90
57,330.09
630,630.99
630,630.00
456,400.00
54,290.00
96,799.40
607,489.40 730,281.05
73,028.11
803,309.16
803,309.00
492,800.00
52,210.00
96,989.90
641,999.90 764,791.55
76,479.16
841,270.71
841,270.00
519,400.00
49,860.00
98,501.20
667,761.20 790,552.85
79,055.29
869,608.14
869,608.00
537,600.00
49,430.00
97,739.20
684,769.20 807,560.85
80,756.09
888,316.94
888,316.00
568,400.00
48,860.00
96,520.00
713,780.00 836,571.65
83,657.17
920,228.82
920,228.00
578,200.00
48,640.00
96,050.10
722,890.10 845,681.75
84,568.18
930,249.93
930,249.00
614,600.00
47,860.00
94,640.40
757,100.40 911,088.05
91,108.81
1,002,196.86
1,002,196.00
627,200.00
47,640.00
94,068.90
768,908.90 922,896.55
92,289.66
1,015,186.21
1,015,186.00
560,000.00
48,000.00
101,600.00
709,600.00 855,480.00
85,548.00
941,028.00
941,028.00
121,800.00
2,865.00
124,665.00 133,521.00
13,352.10
146,873.10
146,873.00
121,800.00
2,865.00
124,665.00 133,521.00
13,352.10
146,873.10
146,873.00
121,800.00
1,910.00
123,710.00 130,045.00
13,004.50
143,049.50
143,049.00
127,500.00
955.00
128,455.00 132,932.50
13,293.25
146,225.75
146,225.00
60,435.00
25,200.00
6,400.00
92,035.00 138,535.00
13,853.50
152,388.50
152,388.00
60,435.00
41,987.00
6,400.00
108,822.00 155,322.00
15,532.20
170,854.20
170,854.00
- 222,000.00
22,200.00
244,200.00
244,200.00
770,000.00
770,000.00 1,705,375.00
170,537.50
1,875,912.50
1,875,912.00
672,000.00
672,000.00 1,045,150.00
104,515.00
1,149,665.00
1,149,665.00
, 100 kg besi
869,608.00
1,468,730.00
1,523,880.00
244,200.00
4,106,418.00 4,106,418.00
4,106,418.00
n, 125 kg besi
869,608.00
1,835,912.50
1,523,880.00
244,200.00
4,473,600.50 4,473,600.50
4,473,600.00
n, 150 kg besi
869,608.00
2,203,095.00
1,523,880.00
244,200.00
4,840,783.00 4,840,783.00
4,840,783.00
n, 175 kg besi
869,608.00
2,570,277.50
1,523,880.00
244,200.00
5,207,965.50 5,207,965.50
5,207,965.00
n, 200 kg besi
869,608.00
2,937,460.00
1,523,880.00
244,200.00
5,575,148.00 5,575,148.00
5,575,148.00
1,710.00
9,400.00
24,375.00
84,700.00
522,000.00
17,190.00
192,000.00
1,920.00
522.00
4,464.00
858,281.00 960,112.00
1,440.00
8,000.00
20,312.50
68,600.00
400,200.00
13,370.00
162,000.00
1,920.00
522.00
3,720.00
680,084.50 759,234.50
75,923.45
835,157.95
835,157.00
-
3,330.00
1,740.00
5,070.00 5,454.00
545.40
5,999.40
5,999.00
-
3,885.00
2,030.00
5,915.00 6,622.00
662.20
7,284.20
7,284.00
-
4,440.00
2,320.00
6,760.00 7,272.00
727.20
7,999.20
7,999.00
21,420.00
2,369.25
4,686.30
2,835.00
435.20
31,745.75 43,154.35
4,315.44
47,469.79
47,469.00
42,840.00
4,738.50
9,372.60
2,835.00
435.20
60,221.30 79,229.55
7,922.96
87,152.51
87,152.00
21,705.60
1,560.00
23,265.60 50,535.60
5,053.56
55,589.16
55,589.00
14,313.60
1,950.00
16,263.60 43,533.60
4,353.36
47,886.96
47,886.00
10,886.40
2,242.50
13,128.90 40,398.90
4,039.89
44,438.79
44,438.00
8,736.00
2,340.00
11,076.00 38,346.00
3,834.60
42,180.60
42,180.00
Analisa Konstruksi - 634
Bahan Jumlah
(4) (5)
7,257.60
2,535.00
9,792.60 37,062.60
3,706.26
40,768.86
40,768.00
6,182.40
2,632.50
8,814.90 36,084.90
3,608.49
39,693.39
39,693.00
5,510.40
2,730.00
8,240.40 35,510.40
3,551.04
39,061.44
39,061.00
4,838.40
2,827.50
7,665.90 34,935.90
3,493.59
38,429.49
38,429.00
8,064.00
250.13
1,267.50
9,581.63 38,447.63
3,844.76
42,292.39
42,292.00
4,200.00
416.88
1,950.00
6,566.88 35,432.88
3,543.29
38,976.16
38,976.00
750.38
828.00
877.50
2,455.88 31,321.88
3,132.19
34,454.06
34,454.00
583.63
644.00
1,462.50
2,690.13 31,556.13
3,155.61
34,711.74
34,711.00
2,576.00
500.25
1,365.00
4,441.25 33,307.25
3,330.73
36,637.98
36,637.00
19,084.80
2,632.50
21,717.30 58,207.30
5,820.73
64,028.03
Analisa Konstruksi - 638
Bahan Jumlah
(4) (5)
64,028.00
14,515.20
3,022.50
17,537.70 45,672.70
4,567.27
50,239.97
50,239.00
11,648.00
3,120.00
14,768.00 51,258.00
5,125.80
56,383.80
56,383.00
9,676.80
3,412.50
13,089.30 49,579.30
4,957.93
54,537.23
54,537.00
8,243.20
3,510.00
11,753.20 48,243.20
4,824.32
53,067.52
53,067.00
750.38
828.00
1,755.00
3,333.38 43,329.38
4,332.94
47,662.31
47,662.00
7,257.60
2,535.00
9,792.60 23,491.60
2,349.16
25,840.76
25,840.00
700.00
195.00
895.00 8,786.50
878.65
9,665.15
9,665.00
504.00
83.85
587.85 7,804.35
780.44
8,584.79
8,584.00
14,000.00
56,250.00
70,250.00 111,219.00
11,121.90
122,340.90
122,340.00
14,000.00
-
14,000.00 54,969.00
5,496.90
60,465.90
60,465.00
6,588.00 30,643.00
3,064.30
33,707.30
33,707.00
4,351.20
4,351.20 18,050.20
1,805.02
19,855.22
19,855.00
2,240.00
2,240.00 8,667.00
866.70
9,533.70
9,533.00
6,048.00
1,560.00
7,608.00 20,954.00
2,095.40
23,049.40
23,049.00
4,550.00
4,550.00 22,730.00
2,273.00
25,003.00
25,003.00
9,898.00
2,047.50
11,945.50 40,080.50
4,008.05
44,088.55
44,088.00
7,140.00
116.73
1,326.00
8,582.73 44,942.73
4,494.27
49,437.00
49,436.00
11,424.00
1,891.50
13,315.50 49,675.50
4,967.55
54,643.05
54,643.00
9,115.40
2,037.75
11,153.15 47,513.15
4,751.32
52,264.47
52,264.00
15,568.00
2,925.00
18,493.00 51,217.00
5,121.70
56,338.70
56,338.00
31,293.60
13,720.00
4,387.50
49,401.10 72,190.10
7,219.01
79,409.11
79,409.00
31,514.85
14,000.00
4,387.50
49,902.35 73,536.35
7,353.64
80,889.99
80,889.00
24,486.00
14,560.00
4,387.50
43,433.50 68,040.50
6,804.05
74,844.55
74,844.00
42,432.00
13,720.00
4,387.50
11,700.00
72,239.50 95,028.50
9,502.85
104,531.35
104,531.00
42,732.00
14,000.00
4,387.50
13,500.00
74,619.50 98,253.50
9,825.35
108,078.85
108,078.00
28,885.00
867,100.00
4,387.50
14,580.00
914,952.50 939,559.50
93,955.95
1,033,515.45
1,033,515.00
35,802.00
13,720.00
4,387.50
11,700.00
65,609.50 88,398.50
8,839.85
97,238.35
97,238.00
36,055.13
14,000.00
4,387.50
13,500.00
67,942.63 91,576.63
9,157.66
100,734.29
100,734.00
302,328.00
13,720.00
4,387.50
11,700.00
332,135.50 354,924.50
35,492.45
390,416.95
390,416.00
267,075.00
14,000.00
4,387.50
13,500.00
298,962.50 322,596.50
32,259.65
354,856.15
354,856.00
-
13,720.00
4,387.50
11,700.00
29,807.50 52,596.50
5,259.65
57,856.15
57,856.00
-
14,000.00
4,387.50
13,500.00
31,887.50 55,521.50
5,552.15
61,073.65
61,073.00
-
13,440.00
4,387.50
13,500.00
31,327.50 53,143.50
5,314.35
58,457.85
58,457.00
-
13,720.00
4,387.50
11,700.00
29,807.50 52,596.50
5,259.65
57,856.15
57,856.00
-
14,000.00
4,387.50
13,500.00
31,887.50 55,521.50
5,552.15
61,073.65
61,073.00
5,830.00
2,310.00
390.00
8,530.00 19,637.00
1,963.70
21,600.70
21,600.00
5,295.00
1,736.00
292.50
7,323.50 18,430.50
1,843.05
20,273.55
20,273.00
2,915.00
1,736.00
292.50
4,943.50 16,050.50
1,605.05
17,655.55
17,655.00
3,975.00
2,184.00
292.50
6,451.50 17,558.50
1,755.85
19,314.35
19,314.00
5,830.00
1,596.00
292.50
900.00
8,618.50 19,725.50
1,972.55
21,698.05
21,698.00
4,236.00
1,596.00
292.50
900.00
2,915.00
1,596.00
292.50
900.00
5,703.50 16,810.50
1,681.05
18,491.55
18,491.00
-
1,596.00
292.50
900.00
2,788.50 13,895.50
1,389.55
15,285.05
15,285.00
-
1,596.00
292.50
900.00
2,788.50 13,895.50
1,389.55
15,285.05
15,285.00
-
1,596.00
292.50
900.00
2,788.50 13,895.50
1,389.55
15,285.05
15,285.00
-
1,596.00
292.50
900.00
2,788.50 13,895.50
1,389.55
15,285.05
15,285.00
-
1,596.00
292.50
900.00
2,788.50 13,895.50
1,389.55
15,285.05
15,285.00
-
1,596.00
292.50
900.00
2,788.50 13,895.50
1,389.55
15,285.05
15,285.00
-
1,596.00
292.50
900.00
2,788.50 13,895.50
1,389.55
15,285.05
15,285.00
-
1,596.00
292.50
900.00
2,788.50 13,895.50
1,389.55
15,285.05
15,285.00
-
1,596.00
292.50
900.00
2,788.50 13,895.50
1,389.55
15,285.05
15,285.00
-
19,980.00
10,440.00
1,134.00
31,554.00 64,278.00
6,427.80
70,705.80
70,705.00
-
11,466.00
4,387.50
24,750.00
40,603.50 104,233.50
10,423.35
114,656.85
114,656.00
-
11,466.00
4,387.50
28,800.00
44,653.50 108,283.50
127,957.50
11,466.00
4,387.50
14,580.00
158,391.00 222,021.00
22,202.10
244,223.10
244,223.00
51,264.00
14,000.00
4,387.50
13,500.00
83,151.50 146,781.50
14,678.15
161,459.65
161,459.00
44,520.00
14,560.00
4,387.50
14,580.00
78,047.50 141,677.50
14,167.75
155,845.25
155,845.00
149,737.50
13,720.00
4,387.50
39,330.00
207,175.00 302,684.00
30,268.40
332,952.40
332,952.00
50,744.25
19,810.00
3,802.50
18,000.00
92,356.75 155,986.75
15,598.68
171,585.43
171,585.00
-
1,596.00
292.50
225.00
2,113.50 13,220.50
1,322.05
14,542.55
14,542.00
-
1,596.00
292.50
450.00
2,338.50 13,445.50
1,344.55
14,790.05
14,790.00
-
798.00
146.25
117.00
1,061.25 12,168.25
1,216.83
13,385.08
13,385.00
31,800.00
1,680.00
292.50
900.00
34,672.50 45,779.50
4,577.95
50,357.45
50,357.00
10,590.00
2,310.00
312.00
900.00
14,112.00 25,219.00
2,521.90
27,740.90
27,740.00
-
1,596.00
292.50
900.00
2,788.50 13,895.50
1,389.55
15,285.05
15,285.00
111,300.00
11,466.00
4,387.50
5,850.00
133,003.50 196,633.50
19,663.35
216,296.85
216,296.00
136,500.00
13,300.00
39,375.00
13,300.00
52,675.00 68,065.00
6,806.50
74,871.50
74,871.00
147,000.00
22,800.00
169,800.00 235,250.00
23,525.00
258,775.00
258,775.00
304,500.00
22,800.00
327,300.00 392,750.00
39,275.00
432,025.00
432,025.00
43,932.00
13,020.00
1,755.00
13,500.00
72,207.00 163,107.00
16,310.70
179,417.70
179,417.00
-
13,020.00
1,755.00
24,750.00
39,525.00 121,335.00
12,133.50
-
13,020.00
1,755.00
17,460.00
32,235.00 114,045.00
11,404.50
125,449.50
125,449.00
44,520.00
13,020.00
1,755.00
24,750.00
84,045.00 165,855.00
16,585.50
182,440.50
182,440.00
111,300.00
1,051.05
17,416.00
2,437.50
5,850.00
138,054.55 256,224.55
25,622.46
281,847.01
281,847.00
-
17,416.00
2,437.50
24,750.00
44,603.50 135,503.50
13,550.35
149,053.85
149,053.00
88,000.00
16,450.00
3,412.50
107,862.50 171,492.50
17,149.25
188,641.75
188,641.00
99,000.00
16,450.00
3,412.50
118,862.50 182,492.50
18,249.25
200,741.75
200,741.00
1,543,100.00
21,700.00
1,564,800.00 1,584,070.00
158,407.00
1,742,477.00
1,742,477.00
-
5,375.00
5,375.00 37,060.00
3,706.00
40,766.00
40,766.00
18,750.00
6,660.00
25,410.00 34,140.00
3,414.00
37,554.00
37,554.00
23,000.00 38,390.00
3,839.00
42,229.00
42,229.00
40,320.00
571.20
87.75
150.00
41,128.95 50,496.45
5,049.65
55,546.10
55,546.00
50,000.00
571.20
87.75
150.00
50,808.95 60,176.45
6,017.65
66,194.10
66,194.00
53,000.00
1,596.00
292.50
225.00
55,113.50 66,220.50
6,622.05
72,842.55
72,842.00
42,360.00
1,596.00
292.50
225.00
44,473.50 55,580.50
5,558.05
61,138.55
61,138.00
64,102.50
4,500.00
68,602.50 114,052.50
11,405.25
125,457.75
125,457.00
50,400.00
4,500.00
54,900.00 100,350.00
10,035.00
110,385.00
110,385.00
38,000.00
4,500.00
42,500.00 87,950.00
8,795.00
96,745.00
96,745.00
45,000.00
4,500.00
49,500.00 94,950.00
38,500.00
4,500.00
43,000.00 88,450.00
8,845.00
97,295.00
97,295.00
46,500.00
4,500.00
51,000.00 96,450.00
9,645.00
106,095.00
106,095.00
67,200.00
4,500.00
71,700.00 117,150.00
11,715.00
128,865.00
128,865.00
58,250.00
4,500.00
62,750.00 108,200.00
10,820.00
119,020.00
119,020.00
46,500.00
4,500.00
51,000.00 96,450.00
9,645.00
106,095.00
106,095.00
Analisa Konstruksi - 679
Bahan Jumlah
(4) (5)
54,500.00
4,500.00
59,000.00 104,450.00
10,445.00
114,895.00
114,895.00
46,500.00
4,500.00
51,000.00 96,450.00
9,645.00
106,095.00
106,095.00
55,200.00
4,500.00
59,700.00 105,150.00
10,515.00
115,665.00
115,665.00
45,300.00
4,500.00
49,800.00 95,250.00
9,525.00
104,775.00
104,775.00
45,250.00
4,500.00
49,750.00 95,200.00
9,520.00
104,720.00
104,720.00
Analisa Konstruksi - 681
Bahan Jumlah
(4) (5)
ti (klas plitur)
34,100,000.00
21,875.00
20,000.00
34,141,875.00 36,012,625.00
3,601,262.50
39,613,887.50
39,613,887.00
19,932,000.00
21,875.00
20,000.00
19,973,875.00 21,844,625.00
2,184,462.50
24,029,087.50
24,029,087.00
8,100,000.00
21,875.00
20,000.00
8,141,875.00 9,745,375.00
974,537.50
10,719,912.50
10,719,912.00
9,120,000.00
21,875.00
20,000.00
7,200,000.00
21,875.00
20,000.00
7,241,875.00 8,845,375.00
884,537.50
9,729,912.50
9,729,912.00
1,404,000.00
875.00
1,404,875.00 1,498,445.00
149,844.50
1,648,289.50
1,648,289.00
840,000.00
875.00
840,875.00 934,445.00
93,444.50
1,027,889.50
1,027,889.00
300,000.00
875.00
300,875.00 394,445.00
39,444.50
433,889.50
433,889.00
344,800.00
875.00
345,675.00 439,245.00
43,924.50
483,169.50
483,169.00
248,875.00 342,445.00
34,244.50
376,689.50
376,689.00
1,404,000.00
10,000.00
1,414,000.00 1,681,250.00
168,125.00
1,849,375.00
1,849,375.00
840,000.00
10,000.00
850,000.00 1,117,250.00
111,725.00
1,228,975.00
1,228,975.00
300,000.00
10,000.00
310,000.00 577,250.00
57,725.00
634,975.00
634,975.00
344,800.00
10,000.00
354,800.00 622,050.00
62,205.00
684,255.00
684,255.00
258,000.00 525,250.00
52,525.00
577,775.00
577,775.00
842,400.00
6,000.00
848,400.00 1,062,200.00
106,220.00
1,168,420.00
1,168,420.00
504,000.00
6,000.00
510,000.00 723,800.00
72,380.00
796,180.00
796,180.00
180,000.00
6,000.00
186,000.00 399,800.00
39,980.00
439,780.00
439,780.00
206,880.00
6,000.00
212,880.00 426,680.00
42,668.00
469,348.00
469,348.00
154,800.00 368,600.00
36,860.00
405,460.00
405,460.00
2,246,400.00
10,000.00
2,256,400.00 2,523,650.00
252,365.00
2,776,015.00
2,776,015.00
1,344,000.00
10,000.00
1,354,000.00 1,621,250.00
162,125.00
1,783,375.00
1,783,375.00
480,000.00
10,000.00
490,000.00 757,250.00
75,725.00
832,975.00
832,975.00
551,680.00
10,000.00
561,680.00 828,930.00
82,893.00
911,823.00
911,823.00
406,800.00 674,050.00
67,405.00
741,455.00
741,455.00
609,380.00 796,455.00
79,645.50
876,100.50
876,100.00
271,880.00 458,955.00
45,895.50
504,850.50
504,850.00
299,880.00 486,955.00
48,695.50
535,650.50
535,650.00
239,380.00 426,455.00
42,645.50
469,100.50
469,100.00
2,106,000.00
3,000.00
2,109,000.00 2,306,960.00
230,696.00
2,537,656.00
2,537,656.00
1,260,000.00
3,000.00
1,263,000.00 1,460,960.00
146,096.00
1,607,056.00
1,607,056.00
450,000.00
3,000.00
453,000.00 650,960.00
65,096.00
716,056.00
716,056.00
517,200.00
3,000.00
520,200.00 718,160.00
71,816.00
789,976.00
789,976.00
372,000.00
3,000.00
375,000.00 572,960.00
57,296.00
630,256.00
630,256.00
491,980.00 666,230.00
66,623.00
732,853.00
732,853.00
147,000.00
480.00
6,000.00
73,900.00
227,380.00 401,630.00
40,163.00
441,793.00
441,793.00
168,952.00
480.00
6,000.00
73,900.00
249,332.00 423,582.00
42,358.20
465,940.20
465,940.00
121,520.00
480.00
6,000.00
73,900.00
201,900.00 376,150.00
37,615.00
413,765.00
413,765.00
187,500.00
480.00
16,000.00
73,900.00
32,500.00
310,380.00 537,575.00
53,757.50
591,332.50
591,332.00
215,500.00
480.00
16,000.00
73,900.00
32,500.00
338,380.00 565,575.00
56,557.50
622,132.50
622,132.00
155,000.00
480.00
16,000.00
73,900.00
32,500.00
277,880.00 505,075.00
50,507.50
555,582.50
555,582.00
34,468,000.00 35,537,000.00
3,553,700.00
39,090,700.00
39,090,700.00
bentang 6 meter
19,932,000.00
270,000.00
98,000.00
20,300,000.00 21,369,000.00
2,136,900.00
23,505,900.00
23,505,900.00
ntang 6 meter
7,425,000.00
270,000.00
98,000.00
7,793,000.00 8,862,000.00
886,200.00
9,748,200.00
9,748,200.00
bentang 6 meter
8,360,000.00
270,000.00
98,000.00
8,728,000.00 9,797,000.00
979,700.00
10,776,700.00
10,776,700.00
tang 6 meter
6,600,000.00
270,000.00
98,000.00
6,968,000.00 8,037,000.00
803,700.00
8,840,700.00
8,840,700.00
ang 6 meter
1,738,000.00
270,000.00
98,000.00
2,106,000.00 3,175,000.00
317,500.00
3,492,500.00
3,492,500.00
37,200,000.00
270,000.00
98,000.00
37,568,000.00 39,358,575.00
3,935,857.50
21,744,000.00
270,000.00
98,000.00
22,112,000.00 23,902,575.00
2,390,257.50
26,292,832.50
26,292,832.00
8,100,000.00
270,000.00
98,000.00
8,468,000.00 10,258,575.00
1,025,857.50
11,284,432.50
11,284,432.00
7,200,000.00
270,000.00
98,000.00
7,568,000.00 9,358,575.00
935,857.50
10,294,432.50
10,294,432.00
9,120,000.00
270,000.00
98,000.00
9,488,000.00 11,278,575.00
1,127,857.50
12,406,432.50
12,406,432.00
34,100,000.00
270,000.00
52,500.00
34,422,500.00 35,063,900.00
3,506,390.00
19,932,000.00
270,000.00
52,500.00
20,254,500.00 20,895,900.00
2,089,590.00
22,985,490.00
22,985,490.00
7,425,000.00
270,000.00
52,500.00
7,747,500.00 8,388,900.00
838,890.00
9,227,790.00
9,227,790.00
8,360,000.00
270,000.00
52,500.00
8,682,500.00 9,323,900.00
932,390.00
10,256,290.00
10,256,290.00
6,600,000.00
270,000.00
52,500.00
6,922,500.00 7,563,900.00
756,390.00
8,320,290.00
8,320,290.00
1,738,000.00
270,000.00
52,500.00
2,060,500.00 2,701,900.00
270,190.00
140,800.00
92,500.00
2,625.00
1,600.00
237,525.00 250,350.00
25,035.00
275,385.00
275,385.00
50,380.00
50,000.00
2,625.00
1,600.00
104,605.00 117,430.00
11,743.00
129,173.00
129,173.00
50,380.00
20,000.00
2,625.00
1,600.00
74,605.00 87,430.00
8,743.00
96,173.00
96,173.00
59,400.00
50,000.00
2,625.00
1,600.00
113,625.00 126,450.00
12,645.00
139,095.00
139,095.00
59,400.00
23,500.00
2,625.00
1,600.00
87,125.00 99,950.00
9,995.00
109,945.00
109,945.00
39,600.00
50,000.00
2,625.00
1,600.00
93,825.00 106,650.00
10,665.00
117,315.00
117,315.00
39,600.00
17,500.00
2,625.00
1,600.00
61,325.00 74,150.00
7,415.00
81,565.00
81,565.00
231,000.00
185,000.00
2,625.00
1,600.00
420,225.00 433,050.00
43,305.00
476,355.00
476,355.00
50,380.00
100,500.00
2,625.00
1,600.00
155,105.00 167,930.00
16,793.00
184,723.00
184,723.00
50,380.00
40,500.00
2,625.00
1,600.00
95,105.00 107,930.00
10,793.00
118,723.00
118,723.00
59,400.00
100,500.00
2,625.00
1,600.00
164,125.00 176,950.00
17,695.00
194,645.00
194,645.00
59,400.00
50,000.00
2,625.00
1,600.00
113,625.00 126,450.00
12,645.00
139,095.00
139,095.00
39,600.00
100,500.00
2,625.00
1,600.00
144,325.00 157,150.00
15,715.00
172,865.00
172,865.00
39,600.00
35,000.00
2,625.00
1,600.00
78,825.00 91,650.00
9,165.00
100,815.00
100,815.00
2,989,800.00
3,200.00
7,560.00
7,800.00
3,008,360.00 3,009,416.00
300,941.60
3,310,357.60
3,310,357.00
1,113,750.00
3,200.00
7,560.00
7,800.00
1,132,310.00 1,133,366.00
113,336.60
1,246,702.60
1,246,702.00
1,254,000.00
3,200.00
7,560.00
7,800.00
1,272,560.00 1,273,616.00
127,361.60
1,400,977.60
1,400,977.00
990,000.00
3,200.00
7,560.00
7,800.00
1,008,560.00 1,009,616.00
100,961.60
1,110,577.60
1,110,577.00
279,048.00
3,500.00
282,548.00 316,598.00
31,659.80
348,257.80
348,257.00
103,950.00
3,500.00
107,450.00 141,500.00
14,150.00
155,650.00
155,650.00
117,040.00
3,500.00
120,540.00 154,590.00
15,459.00
170,049.00
170,049.00
92,400.00
3,500.00
95,900.00 129,950.00
12,995.00
142,945.00
142,945.00
299,731.00 332,331.00
33,233.10
365,564.10
365,564.00
110,025.00
4,375.00
114,400.00 147,000.00
14,700.00
161,700.00
161,700.00
123,880.00
4,375.00
128,255.00 160,855.00
16,085.50
176,940.50
176,940.00
97,800.00
4,375.00
102,175.00 134,775.00
13,477.50
148,252.50
148,252.00
235,560.00
2,100.00
237,660.00 266,412.50
26,641.25
293,053.75
293,053.00
89,850.00 118,602.50
11,860.25
130,462.75
130,462.00
98,800.00
2,100.00
100,900.00 129,652.50
12,965.25
142,617.75
142,617.00
78,000.00
2,100.00
80,100.00 108,852.50
10,885.25
119,737.75
119,737.00
217,440.00
1,750.00
219,190.00 245,377.50
24,537.75
269,915.25
269,915.00
81,000.00
1,750.00
82,750.00 108,937.50
10,893.75
119,831.25
119,831.00
91,200.00
1,750.00
92,950.00 119,137.50
11,913.75
131,051.25
131,051.00
72,000.00
1,750.00
73,750.00 99,937.50
9,993.75
109,931.25
109,931.00
252,720.00
800.00
253,520.00 273,620.00
27,362.00
300,982.00
300,982.00
151,200.00
800.00
152,000.00 172,100.00
17,210.00
189,310.00
189,310.00
54,000.00
800.00
54,800.00 74,900.00
7,490.00
82,390.00
82,390.00
62,064.00
800.00
62,864.00 82,964.00
8,296.40
91,260.40
91,260.00
44,640.00
800.00
45,440.00 65,540.00
6,554.00
72,094.00
72,094.00
386,100.00
800.00
386,900.00 406,675.00
40,667.50
447,342.50
447,342.00
231,000.00
800.00
231,800.00 251,575.00
25,157.50
276,732.50
276,732.00
82,500.00
800.00
83,300.00 103,075.00
10,307.50
113,382.50
113,382.00
95,620.00 115,395.00
11,539.50
126,934.50
126,934.00
68,200.00
800.00
69,000.00 88,775.00
8,877.50
97,652.50
97,652.00
508,950.00
960.00
509,910.00 536,097.50
53,609.75
589,707.25
589,707.00
304,500.00
960.00
305,460.00 331,647.50
33,164.75
364,812.25
364,812.00
108,750.00
960.00
109,710.00 135,897.50
13,589.75
149,487.25
149,487.00
124,990.00
960.00
125,950.00 152,137.50
15,213.75
167,351.25
167,351.00
89,900.00
960.00
90,860.00 117,047.50
11,704.75
128,752.25
128,752.00
301,860.00
960.00
302,820.00 315,645.00
31,564.50
347,209.50
347,209.00
180,600.00
960.00
181,560.00 194,385.00
19,438.50
213,823.50
213,823.00
64,500.00
960.00
65,460.00 78,285.00
7,828.50
86,113.50
86,113.00
74,132.00
960.00
75,092.00 87,917.00
8,791.70
96,708.70
96,708.00
53,320.00
960.00
54,280.00 67,105.00
6,710.50
73,815.50
73,815.00
210,600.00
960.00
211,560.00 224,385.00
22,438.50
246,823.50
246,823.00
126,000.00
960.00
126,960.00 139,785.00
13,978.50
153,763.50
153,763.00
45,000.00
960.00
45,960.00 58,785.00
5,878.50
64,663.50
64,663.00
51,720.00
960.00
52,680.00 65,505.00
6,550.50
72,055.50
72,055.00
37,200.00
960.00
38,160.00 50,985.00
5,098.50
56,083.50
56,083.00
168,480.00
960.00
169,440.00 182,265.00
18,226.50
200,491.50
200,491.00
100,800.00
960.00
101,760.00 114,585.00
11,458.50
126,043.50
126,043.00
36,000.00
960.00
36,960.00 49,785.00
4,978.50
54,763.50
54,763.00
41,376.00
960.00
42,336.00 55,161.00
5,516.10
60,677.10
60,677.00
29,760.00
960.00
30,720.00 43,545.00
4,354.50
47,899.50
47,899.00
453,000.00
12,500.00
4,800.00
470,300.00 630,650.00
63,065.00
693,715.00
693,715.00
168,750.00
12,500.00
4,800.00
186,050.00 346,400.00
34,640.00
381,040.00
381,040.00
190,000.00
12,500.00
4,800.00
207,300.00 400,950.00
Analisa Konstruksi - 732
Bahan Jumlah
(4) (5)
40,095.00
441,045.00
441,045.00
150,000.00
12,500.00
4,800.00
167,300.00 327,650.00
32,765.00
360,415.00
360,415.00
507,360.00
2,400.00
509,760.00 549,880.00
54,988.00
604,868.00
604,868.00
189,000.00
2,400.00
191,400.00 231,520.00
23,152.00
254,672.00
254,672.00
212,800.00
2,400.00
215,200.00 255,320.00
25,532.00
280,852.00
280,852.00
168,000.00
2,400.00
170,400.00 210,520.00
21,052.00
231,572.00
231,572.00
507,360.00
2,625.00
63,554.00
11,200.00
584,739.00 616,534.00
61,653.40
678,187.40
678,187.00
189,000.00
2,625.00
63,554.00
11,200.00
266,379.00 298,174.00
29,817.40
327,991.40
327,991.00
212,800.00
2,625.00
63,554.00
11,200.00
290,179.00 321,974.00
32,197.40
354,171.40
354,171.00
168,000.00
2,625.00
63,554.00
11,200.00
245,379.00 277,174.00
27,717.40
304,891.40
304,891.00
189,000.00
2,625.00
69,660.00
11,200.00
11,100.00
283,585.00 325,935.00
32,593.50
358,528.50
358,528.00
212,800.00
2,625.00
69,660.00
11,200.00
11,100.00
307,385.00 349,735.00
34,973.50
384,708.50
384,708.00
168,000.00
2,625.00
69,660.00
11,200.00
11,100.00
262,585.00 304,935.00
30,493.50
335,428.50
335,428.00
245,700.00
1,750.00
2,625.00
33,300.00
283,375.00 410,425.00
41,042.50
451,467.50
451,467.00
147,000.00
1,750.00
2,625.00
33,300.00
52,500.00
1,750.00
2,625.00
33,300.00
90,175.00 217,225.00
21,722.50
238,947.50
238,947.00
60,340.00
1,750.00
2,625.00
33,300.00
98,015.00 225,065.00
22,506.50
247,571.50
247,571.00
43,400.00
1,750.00
2,625.00
33,300.00
81,075.00 208,125.00
20,812.50
228,937.50
228,937.00
30,000.00
800.00
1,575.00
4,875.00
37,250.00 37,759.00
3,775.90
41,534.90
41,534.00
112,500.00
84,000.00
18,000.00
210.00
214,710.00 224,060.00
22,406.00
84,000.00
320.00
84,320.00 91,525.00
9,152.50
100,677.50
100,677.00
30,000.00
320.00
30,320.00 37,525.00
3,752.50
41,277.50
41,277.00
34,480.00
320.00
34,800.00 42,005.00
4,200.50
46,205.50
46,205.00
24,800.00
320.00
25,120.00 32,325.00
3,232.50
35,557.50
35,557.00
32,400.00
875.00
33,275.00 39,959.50
3,995.95
43,955.45
43,955.00
217,440.00
1,200.00
13,750.00
232,390.00 265,205.00
26,520.50
291,725.50
291,725.00
81,000.00
1,200.00
13,750.00
95,950.00 128,765.00
12,876.50
141,641.50
141,641.00
91,200.00
1,200.00
13,750.00
106,150.00 138,965.00
13,896.50
152,861.50
152,861.00
72,000.00
1,200.00
13,750.00
86,950.00 119,765.00
11,976.50
131,741.50
131,741.00
akai plepet
217,440.00
1,200.00
13,750.00
5,200.00
200.00
200.00
237,990.00 270,805.00
27,080.50
297,885.50
297,885.00
81,000.00
1,200.00
13,750.00
5,200.00
200.00
200.00
101,550.00 134,365.00
13,436.50
147,801.50
147,801.00
91,200.00
1,200.00
13,750.00
5,200.00
200.00
200.00
111,750.00 144,565.00
14,456.50
159,021.50
159,021.00
72,000.00
1,200.00
13,750.00
5,200.00
200.00
200.00
92,550.00 125,365.00
12,536.50
137,901.50
137,901.00
235,560.00
20,079.00
600.00
2,025.00
138.00
1,000.00
2,100.00
261,502.00 301,317.00
30,131.70
331,448.70
331,448.00
87,750.00
20,079.00
600.00
2,025.00
138.00
1,000.00
2,100.00
113,692.00 153,507.00
15,350.70
168,857.70
168,857.00
98,800.00
20,079.00
600.00
2,025.00
138.00
1,000.00
2,100.00
124,742.00 164,557.00
16,455.70
181,012.70
181,012.00
78,000.00
20,079.00
600.00
2,025.00
138.00
1,000.00
2,100.00
103,942.00 143,757.00
14,375.70
158,132.70
51,750.00
20,079.00
600.00
2,025.00
138.00
1,500.00
5,000.00
81,092.00 120,907.00
12,090.70
132,997.70
132,997.00
235,560.00
19,665.00
600.00
2,025.00
138.00
1,000.00
2,100.00
261,088.00 300,903.00
30,090.30
330,993.30
330,993.00
87,750.00
19,665.00
600.00
2,025.00
138.00
1,000.00
2,100.00
113,278.00 153,093.00
15,309.30
168,402.30
168,402.00
98,800.00
19,665.00
600.00
2,025.00
138.00
1,000.00
2,100.00
124,328.00 164,143.00
16,414.30
180,557.30
78,000.00
19,665.00
600.00
2,025.00
138.00
1,000.00
2,100.00
103,528.00 143,343.00
14,334.30
157,677.30
157,677.00
51,750.00
19,665.00
600.00
2,025.00
138.00
1,500.00
5,000.00
80,678.00 120,493.00
12,049.30
132,542.30
132,542.00
13,750.00
200.00
13,950.00 20,740.00
2,074.00
22,814.00
22,814.00
19,140.00
200.00
19,340.00 26,130.00
2,613.00
28,743.00
28,743.00
20,075.00
200.00
-
1,000.00
1,000.00 16,390.00
1,639.00
18,029.00
18,029.00
319,000.00
1,000.00
320,000.00 332,825.00
33,282.50
366,107.50
366,107.00
192,000.00
1,000.00
193,000.00 205,825.00
20,582.50
226,407.50
226,407.00
29,625.00
600.00
30,225.00 43,050.00
4,305.00
47,355.00
47,355.00
30,375.00
600.00
30,975.00 43,800.00
4,380.00
48,180.00
48,180.00
32,475.00 45,300.00
4,530.00
49,830.00
49,830.00
112,500.00
200.00
112,700.00 215,300.00
21,530.00
236,830.00
236,830.00
tebal 9 mm
20,302.10
1,100.00
21,402.10 30,752.10
3,075.21
33,827.31
33,827.00
84,600.00
3,375.00
21,000.00
192,000.00
300,975.00 365,100.00
36,510.00
401,610.00
401,610.00
6,300.00
200.00
6,500.00 12,945.00
1,294.50
14,239.50
14,239.00
Analisa Konstruksi - 756
Bahan Jumlah
(4) (5)
8,250.00
3,150.00
161.00
11,561.00 20,830.25
2,083.03
22,913.28
22,913.00
11,000.00
3,937.50
202.40
15,139.90 24,409.15
2,440.92
26,850.07
26,850.00
18,975.00
4,725.00
243.80
23,943.80 33,390.05
3,339.01
36,729.06
36,729.00
tidak berlubang
2,000.00
57,000.00
59,000.00 130,500.00
- 685,000.00
70,000.00
1,200.00
71,200.00 260,200.00
130,200.00 1,075,700.00
107,570.00
1,183,270.00
1,183,270.00
42,120,000.00
21,875.00
20,000.00
42,161,875.00 44,032,625.00
4,403,262.50
48,435,887.50
48,435,887.00
40,000.00
40,000.00 54,090.00
5,409.00
59,499.00
59,499.00
40,000.00
40,000.00 58,180.00
5,818.00
63,998.00
63,998.00
36,000.00
36,000.00 54,180.00
5,418.00
59,598.00
59,598.00
17,000.00
11,200.00
3,120.00
22,200.00
53,520.00 67,550.00
6,755.00
74,305.00
74,305.00
15,164.80 61,564.80
6,156.48
67,721.28
67,721.00
17,000.00
1,267.30
1,482.00
2,133.60
21,882.90 58,242.90
5,824.29
64,067.19
64,067.00
33,150.00
1,200.00
34,350.00 47,885.00
4,788.50
52,673.50
52,673.00
34,920.00
1,200.00
36,120.00 49,655.00
4,965.50
54,620.50
54,620.00
31,470.00
1,200.00
32,670.00 45,760.00
4,576.00
50,336.00
50,336.00
36,000.00
1,200.00
37,200.00 50,290.00
5,029.00
55,319.00
55,319.00
26,250.00
1,200.00
27,450.00 40,540.00
4,054.00
44,594.00
44,594.00
29,400.00
1,200.00
30,600.00 43,690.00
4,369.00
48,059.00
48,059.00
27,500.00
1,200.00
28,700.00 41,601.00
4,160.10
45,761.10
45,761.00
30,600.00
1,200.00
31,800.00 44,701.00
4,470.10
49,171.10
49,171.00
31,760.00 44,661.00
4,466.10
49,127.10
49,127.00
41,810.00
1,200.00
43,010.00 55,911.00
5,591.10
61,502.10
61,502.00
40,090.00
1,200.00
41,290.00 54,191.00
5,419.10
59,610.10
59,610.00
41,998.00
1,200.00
43,198.00 56,099.00
5,609.90
61,708.90
61,708.00
40,327.00
1,200.00
41,527.00 54,428.00
5,442.80
59,870.80
59,870.00
41,100.00 54,001.00
5,400.10
59,401.10
59,401.00
126,000.00
4,500.00
130,500.00 144,142.00
14,414.20
158,556.20
158,556.00
55,125.00
4,500.00
59,625.00 73,267.00
7,326.70
80,593.70
80,593.00
-
4,500.00
4,500.00 18,142.00
1,814.20
19,956.20
19,956.00
63,000.00
4,500.00
67,500.00 81,142.00
8,114.20
89,256.20
89,256.00
4,500.00 18,142.00
1,814.20
19,956.20
19,956.00
-
4,500.00
4,500.00 17,976.50
1,797.65
19,774.15
19,774.00
28,875.00
4,500.00
33,375.00 49,480.00
4,948.00
54,428.00
54,428.00
-
4,500.00
4,500.00 18,142.00
1,814.20
19,956.20
19,956.00
14,100.00
640.00
14,740.00 20,892.50
2,089.25
22,981.75
22,981.00
85,250.00 91,717.50
9,171.75
100,889.25
100,889.00
32,400.00
400.00
32,800.00 102,650.00
10,265.00
112,915.00
112,915.00
26,250.00
26,250.00 38,570.00
3,857.00
42,427.00
42,427.00
379,500.00
28,350.00
480.00
-
408,330.00 439,175.00
43,917.50
483,092.50
483,092.00
36,720.00
3,500.00
40,220.00 58,335.00
5,833.50
64,168.50
64,168.00
100,000.00
100,000.00 114,090.00
11,409.00
125,499.00
125,499.00
48,000.00
48,000.00 61,015.00
6,101.50
67,116.50
67,116.00
-
3,500.00
9,213.00
15,750.00
28,463.00 30,608.00
3,060.80
33,668.80
33,668.00
26,250.00
11,200.00
3,120.00
22,200.00
62,770.00 76,800.00
7,680.00
84,480.00
84,480.00
21,000.00
11,200.00
3,120.00
22,200.00
57,520.00 71,550.00
7,155.00
78,705.00
78,705.00
19,200.00
875.00
20,075.00 32,976.00
3,297.60
36,273.60
36,273.00
110,000.00
875.00
26,250.00
137,125.00 161,827.50
16,182.75
178,010.25
178,010.00
-
875.00
875.00 26,020.00
2,602.00
28,622.00
28,622.00
18,800.00
960.00
800.00
30,000.00
50,560.00 75,262.50
7,526.25
82,788.75
82,788.00
32,900.00
320.00
6,660.00
3,780.00
43,660.00 44,440.00
4,444.00
48,884.00
40,000.00
40,000.00 64,055.00
6,405.50
70,460.50
70,460.00
36,000.00
36,000.00 60,055.00
6,005.50
66,060.50
66,060.00
40,950.00
40,950.00 59,130.00
5,913.00
65,043.00
65,043.00
40,950.00
40,950.00 65,005.00
6,500.50
71,505.50
71,505.00
72,500.00
72,500.00 90,680.00
9,068.00
99,748.00
99,748.00
rumah tingkat
72,500.00
72,500.00 96,555.00
9,655.50
106,210.50
106,210.00
22,000.00
1,267.30
1,482.00
2,133.60
26,882.90 63,242.90
6,324.29
69,567.19
69,567.00
57,200.00
1,267.30
1,482.00
2,133.60
62,082.90 98,442.90
9,844.29
108,287.19
108,287.00
25,500.00
4,000.00
29,500.00 47,615.00
4,761.50
52,376.50
52,376.00
22,000.00
50.00
22,050.00 47,195.00
4,719.50
51,914.50
51,914.00
236,250.00
95,200.00
11,250.00
342,700.00 404,262.50
40,426.25
444,688.75
750.00
750.00 9,237.50
923.75
10,161.25
10,161.00
630.00
630.00 9,117.50
911.75
10,029.25
10,029.00
1,200.00
300.00
84.00
1,584.00 6,418.50
641.85
7,060.35
7,060.00
2,737.50
7,650.00
7,650.00
18,037.50 26,682.50
2,668.25
29,350.75
29,350.00
25,787.50 30,682.50
3,068.25
33,750.75
33,750.00
29,837.50 39,944.50
3,994.45
43,938.95
43,938.00
10,260.00
10,260.00 19,793.00
1,979.30
21,772.30
21,772.00
5,070.00
12,573.60
7,000.00
24,643.60 29,064.10
2,906.41
31,970.51
31,970.00
1,417.50
1,417.50 7,357.50
735.75
8,093.25
8,093.00
2,550.00
750.00
3,741.00 22,591.50
2,259.15
24,850.65
24,850.00
Cat Penutup )
1,200.00
1,500.00
3,900.00
6,600.00 11,734.40
1,173.44
12,907.84
12,907.00
1,800.00
2,700.00
4,500.00 8,791.10
879.11
9,670.21
9,670.00
650.00
650.00 4,941.10
494.11
5,435.21
5,435.00
350.00
125.00
2,200.00
90.00
2,765.00 11,313.80
1,131.38
12,445.18
12,445.00
2,200.00
180.00
2,380.00 5,069.00
506.90
5,575.90
5,575.00
1,850.00
91.00
1,941.00 15,961.00
1,596.10
17,557.10
17,557.00
1,850.00
91.00
2,200.00
4,141.00 32,296.00
3,229.60
35,525.60
35,525.00
42,000.00
4,300.00
46,300.00 58,788.50
5,878.85
64,667.35
64,667.00
2,250.00
1,850.00
-
-
175.00
2,200.00
5,550.00
5,550.00 10,299.00
1,029.90
11,328.90
11,328.00
3,850.00
7,650.00
3,600.00
15,100.00 117,650.00
11,765.00
129,415.00
129,415.00
10,500.00
10,500.00 96,150.00
9,615.00
105,765.00
105,765.00
630.00
630.00 9,117.50
911.75
10,029.25
10,029.00
200,000.00
60,000.00
-
260,000.00 516,500.00
51,650.00
568,150.00
568,150.00
630.00
630.00 9,117.50
911.75
10,029.25
10,029.00
2,870.00
21,600.00
24,470.00 29,604.40
2,960.44
32,564.84
32,564.00
3,223.10
8,000.00
2,625.00
13,848.10 23,955.10
2,395.51
26,350.61
26,350.00
4,637.50
4,637.50 10,512.50
1,051.25
11,563.75
11,563.00
27,837.50
997.50
28,835.00 59,325.00
5,932.50
65,257.50
65,257.00
16,146.00
16,146.00 21,280.40
2,128.04
23,408.44
23,408.00
170,000.00
8,550.00
178,550.00 479,950.00
17,855.00 47,995.00
4,799.50
52,794.50
52,794.00
11,903.33 31,996.67
3,199.67
35,196.33
35,196.00
5,951.67 15,998.33
1,599.83
17,598.17
17,598.00
3,660,000.00
4,800.00
3,664,800.00 4,035,350.00
403,535.00
4,438,885.00
4,438,885.00
2,220.00
2,220.00 8,588.35
17,000.00
1,500.00
18,500.00 252,750.00
1,950,000.00
117,000.00
2,067,000.00 2,324,413.00
232,441.30
2,556,854.30
2,556,854.00
205,000.00
8,400.00
975.00
214,375.00 461,775.00
46,177.50
507,952.50
507,952.00
32,000.00
3,150.00
8,400.00
975.00
44,525.00 213,075.00
21,307.50
234,382.50
234,382.00
902,000.00
270,600.00
8,400.00
975.00
1,181,975.00 1,308,275.00
130,827.50
1,439,102.50
1,439,102.00
271,340.00
32,560.80
8,400.00
975.00
313,275.80 479,925.80
47,992.58
527,918.38
527,918.00
290,750.00
52,335.00
343,085.00 640,755.00
64,075.50
704,830.50
704,830.00
225,000.00
45,000.00
270,000.00 337,850.00
33,785.00
371,635.00
371,635.00
903,000.00
108,360.00
1,011,360.00 1,554,060.00
155,406.00
1,709,466.00
1,709,466.00
42,000.00
952.00
1,267.50
990.00
45,209.50 50,631.00
5,063.10
55,694.10
55,694.00
62,800.00
1,218.00
1,365.00
1,260.00
66,643.00 74,110.00
7,411.00
81,521.00
81,521.00
27,225.00
7,200.00
5,488.00
5,460.00
2,160.00
47,533.00 60,259.00
6,025.90
66,284.90
66,284.00
27,500.00
148,500.00
14,420.00
5,947.50
6,210.00
202,577.50 237,119.50
23,711.95
260,831.45
260,831.00
m, t = 35 cm
39,150.00
61,600.00
6,825.00
6,429.50
18,560.00
6,000.00
138,564.50 376,169.00
37,616.90
413,785.90
413,785.00
m, t = 50 cm
67,500.00
107,800.00
228,972.00 342,792.00
34,279.20
377,071.20
377,071.00
m, t = 65 cm
99,900.00
159,600.00
17,940.00
3,031.05
56,260.00
12,000.00
348,731.05 521,927.05
52,192.71
574,119.76
574,119.00
25,920.00
7,560.00
33,480.00 44,019.00
4,401.90
48,420.90
48,420.00
32,400.00
9,450.00
41,850.00 52,389.00
5,238.90
57,627.90
57,627.00
49,200.00
14,350.00
63,550.00 74,089.00
93,000.00
27,125.00
120,125.00 138,044.00
13,804.40
151,848.40
151,848.00
133,800.00
39,025.00
172,825.00 190,744.00
19,074.40
209,818.40
209,818.00
162,000.00
47,250.00
209,250.00 231,652.00
23,165.20
254,817.20
254,817.00
4,500.00
1,312.50
5,812.50 11,785.50
1,178.55
12,964.05
12,964.00
6,750.00
1,968.75
8,718.75 14,691.75
1,469.18
16,160.93
16,160.00
10,075.00 16,048.00
1,604.80
17,652.80
17,652.00
19,200.00
5,600.00
24,800.00 30,773.00
3,077.30
33,850.30
33,850.00
19,725.00
5,753.13
25,478.13 34,459.83
3,445.98
37,905.81
37,905.00
26,745.00
7,800.63
34,545.63 40,518.63
4,051.86
44,570.49
44,570.00
35,400.00
10,325.00
45,725.00 59,167.50
5,916.75
65,084.25
65,084.00
76,337.50 89,780.00
8,978.00
98,758.00
98,758.00
702,000.00
76,000.00
778,000.00 799,052.50
79,905.25
878,957.75
878,957.00
319,000.00
76,000.00
28,000.00
4,875.00
427,875.00 462,962.50
46,296.25
509,258.75
509,258.00
25,700.00
82.50
25,782.50 33,092.50
3,309.25
36,401.75
36,401.00
60,000.00
60,000.00 67,310.00
6,731.00
74,041.00
74,041.00
240,900.00
8,400.00
975.00
250,275.00 421,885.00
42,188.50
464,073.50
464,073.00
108,000.00
168,000.00
29,250.00
182,952.00
54,000.00
542,202.00 1,087,602.00
108,760.20
1,196,362.20
1,196,362.00
769,932.00
2,088,000.00
168,000.00
210,000.00
93,008.00
3,328,940.00 3,899,390.00
389,939.00
4,289,329.00
4,289,329.00
15,640.00
3,330.00
18,970.00 23,299.00
2,329.90
25,628.90
25,628.00
6,000.00
2,375.00
8,375.00 20,413.00
2,041.30
22,454.30
22,454.00
204,000.00
508,400.00
1,275.00
713,675.00 845,995.00
84,599.50
930,594.50
930,594.00
10,200.00
1,800.00
950.00
12,950.00 16,646.00
Analisa Konstruksi - 811
Bahan Jumlah
(4) (5)
1,664.60
18,310.60
18,310.00
-
-
36,620.00
36,620.00 118,520.00
11,852.00
130,372.00
130,372.00
170,000.00
170,000.00 317,750.00
31,775.00
349,525.00
349,525.00
500,000.00
500,000.00 555,462.00
55,546.20
611,008.20
611,008.00
250,000.00
250,000.00 308,540.00
30,854.00
339,394.00
339,394.00
270,000.00
270,000.00 396,050.00
39,605.00
435,655.00
435,655.00
148,500.00
-
-
148,500.00 153,916.90
15,391.69
169,308.59
169,308.00
594,000.00
-
4,717.50
598,717.50 604,711.00
60,471.10
665,182.10
665,182.00
198,000.00
-
-
198,000.00 208,794.50
20,879.45
229,673.95
229,673.00
300,000.00
300,000.00 344,150.00
34,415.00
378,565.00
378,565.00
111,186.00
111,186.00 371,240.48
37,124.05
408,364.53
408,364.00
72,680.41 85,285.41
8,528.54
93,813.95
93,813.00
21,450.00
400.00
13,500.00
35,350.00 47,882.50
4,788.25
52,670.75
52,670.00
110,000.00
7,500.00
126,000.00
243,500.00 268,125.00
26,812.50
294,937.50
294,937.00
23,625.00
160.00
9,000.00
8,325.00
41,110.00 61,820.00
6,182.00
68,002.00
68,002.00
23,500.00
240.00
336,960.00
9,800.00
23,500.00
240.00
201,600.00
9,800.00
235,140.00 270,371.25
27,037.13
297,408.38
297,408.00
23,500.00
240.00
72,000.00
9,800.00
105,540.00 140,771.25
14,077.13
154,848.38
154,848.00
23,500.00
240.00
59,520.00
9,800.00
93,060.00 128,291.25
12,829.13
141,120.38
141,120.00
23,500.00
240.00
82,752.00
9,800.00
116,292.00 151,523.25
15,152.33
166,675.58
166,675.00
23,500.00
240.00
666,900.00
11,760.00
702,400.00 731,526.25
73,152.63
804,678.88
804,678.00
23,500.00
240.00
399,000.00
9,800.00
432,540.00 461,666.25
46,166.63
507,832.88
507,832.00
23,500.00
240.00
142,500.00
9,800.00
176,040.00 205,166.25
20,516.63
225,682.88
225,682.00
23,500.00
240.00
117,800.00
9,800.00
151,340.00 180,466.25
18,046.63
198,512.88
198,512.00
23,500.00
240.00
163,780.00
9,800.00
197,320.00 226,446.25
22,644.63
249,090.88
249,090.00
230,000.00
90,000.00
320,000.00 704,400.00
32,000.00 70,440.00
7,044.00
77,484.00
77,484.00
825,000.00
825,000.00 954,281.25
95,428.13
1,049,709.38
1,049,709.00
1,630,000.00
1,630,000.00 1,767,871.00
176,787.10
1,944,658.10
1,944,658.00
45,000.00
45,000.00 174,278.00
17,427.80
191,705.80
191,705.00
29,150.00
43,050.00 55,582.50
5,558.25
61,140.75
61,140.00
13,200.00
400.00
13,500.00
27,100.00 39,632.50
3,963.25
43,595.75
43,595.00
17,270.00
400.00
13,500.00
31,170.00 43,702.50
4,370.25
48,072.75
48,072.00
250,000.00
250,000.00 295,225.00
29,522.50
324,747.50
324,747.00
130,000.00
130,000.00 163,030.00
16,303.00
179,333.00
179,333.00
50,000.00
50,000.00 82,265.00
8,226.50
90,491.50
90,491.00
75,000.00
75,000.00 107,118.75
10,711.88
117,830.63
117,830.00
17,000.00
17,000.00 28,306.25
2,830.63
31,136.88
31,136.00
14,000.00
14,000.00 21,537.50
2,153.75
23,691.25
23,691.00
6,000.00
6,000.00 21,660.00
2,166.00
23,826.00
23,826.00
7,500.00
7,500.00 18,806.25
1,880.63
20,686.88
20,686.00
5,000.00
5,000.00 16,306.25
1,630.63
17,936.88
17,936.00
162,500.00
162,500.00 200,187.50
20,018.75
220,206.25
220,206.00
50,000.00
50,000.00 65,075.00
6,507.50
71,582.50
71,582.00
15,500.00
15,500.00 53,187.50
5,318.75
58,506.25
58,506.00
15,000.00
15,000.00 22,537.50
2,253.75
24,791.25
24,791.00
200,000.00
200,000.00 245,225.00
24,522.50
269,747.50
269,747.00
12,000.00
12,000.00 30,843.75
3,084.38
33,928.13
33,928.00
71,500.00
71,500.00 82,806.25
8,280.63
91,086.88
91,086.00
82,500.00
82,500.00 93,806.25
9,380.63
103,186.88
103,186.00
143,000.00
143,000.00 155,435.25
15,543.53
170,978.78
170,978.00
- 18,843.75
1,884.38
20,728.13
20,728.00
165,000.00
165,000.00 176,306.25
17,630.63
193,936.88
193,936.00
- 11,306.25
1,130.63
12,436.88
12,436.00
- 12,435.25
1,243.53
13,678.78
13,678.00
- 11,306.25
1,130.63
12,436.88
12,436.00
110,000.00
110,000.00 121,306.25
12,130.63
133,436.88
133,436.00
21 1.00 Unit Upah Pasang Box Panel dan Panel Kontrol 1 Unit
0.5000 org Tukang Listrik @ Rp. 45,000.00 22,500.00
0.7500 org Pekerja @ Rp. 55,500.00 41,625.00
0.2500 org Mandor @ Rp. 65,000.00 16,250.00
1.0000 ls Pasang Panel Kontrol @ Rp. 12,600.00 12,600.00
JUMLAH 92,975.00
JASA 10 %
JUMLAH
DIBULATKAN
28 1.00 Buah Pasang MCB Ampere + box tutup panel ukuran 30x30
1.0000 bh MCB 10 Ampere @ Rp. 56,000.00
1.0000 bh Tutup panel 30x30 @ Rp. 37,200.00
0.2500 org Tukang Listrik @ Rp. 45,000.00 11,250.00
0.2000 org Pekerja @ Rp. 55,500.00 11,100.00
0.2500 org Mandor @ Rp. 65,000.00 16,250.00
JUMLAH 38,600.00
JASA 10 %
JUMLAH
DIBULATKAN
30 1.00 Unit Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 1300 VA
1.0000 Unit Box Panel 20x40x50 @ Rp. 400,000.00
3.0000 bh MCB 6 A @ Rp. 50,500.00
1.0000 bh MCB 10 A @ Rp. 56,000.00
0.3000 m1 Rel MCB @ Rp. 52,500.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00
3.0000 bh Pilot Lamp @ Rp. 12,500.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00
3.4100 m1 Kabel NYY 3 x 6 Sqmm @ Rp. 45,100.00
3.0000 org Pekerja @ Rp. 55,500.00 166,500.00
0.2500 org Tenaga Ahli @ Rp. 105,000.00 26,250.00
1.5000 org Tukang Listrik @ Rp. 45,000.00 67,500.00
0.5000 org Mandor @ Rp. 65,000.00 32,500.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
1,300.00 VA Administrasi 900 - 2200 VA @ Rp. 1,000.00 1,300,000.00
JUMLAH 1,687,250.00
JASA 10 %
JUMLAH
DIBULATKAN
31 1.00 Unit Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 2200 VA
1.0000 Unit Box Panel 20x40x50 @ Rp. 400,000.00
3.0000 bh MCB 10 A @ Rp. 56,000.00
1.0000 bh MCB 16 A @ Rp. 56,500.00
0.3000 m1 Rel MCB @ Rp. 52,500.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00
3.0000 bh Pilot Lamp @ Rp. 12,500.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00
3.4100 m1 Kabel NYY 3 x 6 Sqmm @ Rp. 45,100.00
3.0000 org Pekerja @ Rp. 55,500.00 166,500.00
0.2500 org Tenaga Ahli @ Rp. 105,000.00 26,250.00
1.5000 org Tukang Listrik @ Rp. 45,000.00 67,500.00
0.5000 org Mandor @ Rp. 65,000.00 32,500.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
2,200.00 VA Administrasi 900 - 2200 VA @ Rp. 1,000.00 2,200,000.00
JUMLAH 2,587,250.00
JASA 10 %
JUMLAH
32 1.00 Unit Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 3500 VA
1.0000 Unit Box Panel 20x40x50 @ Rp. 400,000.00
3.0000 bh MCB 16 A @ Rp. 56,500.00
1.0000 bh MCB 20 A @ Rp. 57,000.00
0.3000 m1 Rel MCB @ Rp. 52,500.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00
3.0000 bh Pilot Lamp @ Rp. 12,500.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00
3.4100 m1 Kabel NYY 3 x 6 Sqmm @ Rp. 45,100.00
3.0000 org Pekerja @ Rp. 55,500.00 166,500.00
0.2500 org Tenaga Ahli @ Rp. 105,000.00 26,250.00
1.5000 org Tukang Listrik @ Rp. 45,000.00 67,500.00
0.5000 org Mandor @ Rp. 65,000.00 32,500.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
3,500.00 VA Administrasi 3500 - 11000 VA @ Rp. 1,000.00 3,500,000.00
JUMLAH 3,887,250.00
JASA 10 %
JUMLAH
DIBULATKAN
33 1.00 Unit Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 4400 VA
1.0000 Unit Box Panel 20x40x50 @ Rp. 400,000.00
3.0000 bh MCB 20 A @ Rp. 57,000.00
1.0000 bh MCB 25 A @ Rp. 58,900.00
0.3000 m1 Rel MCB @ Rp. 52,500.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00
3.0000 bh Pilot Lamp @ Rp. 12,500.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00
3.4100 m1 Kabel NYY 3 x 6 Sqmm @ Rp. 45,100.00
3.0000 org Pekerja @ Rp. 55,500.00 166,500.00
0.2500 org Tenaga Ahli @ Rp. 105,000.00 26,250.00
1.5000 org Tukang Listrik @ Rp. 45,000.00 67,500.00
0.5000 org Mandor @ Rp. 65,000.00 32,500.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
4,400.00 VA Administrasi 3500 - 11000 VA @ Rp. 1,000.00 4,400,000.00
JUMLAH 4,787,250.00
JASA 10 %
JUMLAH
34 1.00 Unit Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 7700 VA
1.0000 Unit Box Panel 20x40x50 @ Rp. 400,000.00
3.0000 bh MCB 25 A @ Rp. 58,900.00
1.0000 bh MCB 35 A @ Rp. 96,500.00
0.3000 m1 Rel MCB @ Rp. 52,500.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00
3.0000 bh Pilot Lamp @ Rp. 12,500.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00
3.4100 m1 Kabel NYY 3 x 6 Sqmm @ Rp. 45,100.00
3.0000 org Pekerja @ Rp. 55,500.00 166,500.00
0.2500 org Tenaga Ahli @ Rp. 105,000.00 26,250.00
1.5000 org Tukang Listrik @ Rp. 45,000.00 67,500.00
0.5000 org Mandor @ Rp. 65,000.00 32,500.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
7,700.00 VA Administrasi 3500 - 11000 VA @ Rp. 1,000.00 7,700,000.00
JUMLAH 8,087,250.00
JASA 10 %
JUMLAH
DIBULATKAN
35 1.00 Unit Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 11000 VA
1.0000 Unit Box Panel 20x40x50 @ Rp. 400,000.00
3.0000 bh MCB 35 A @ Rp. 96,500.00
1.0000 bh MCB 40 A @ Rp. 104,000.00
0.3000 m1 Rel MCB @ Rp. 52,500.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00
3.0000 bh Pilot Lamp @ Rp. 12,500.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00
3.4100 m1 Kabel NYY 3 x 6 Sqmm @ Rp. 45,100.00
3.0000 org Pekerja @ Rp. 55,500.00 166,500.00
0.2500 org Tenaga Ahli @ Rp. 105,000.00 26,250.00
1.5000 org Tukang Listrik @ Rp. 45,000.00 67,500.00
0.5000 org Mandor @ Rp. 65,000.00 32,500.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
11,000.00 VA Administrasi 3500 - 11000 VA @ Rp. 1,000.00 11,000,000.00
JUMLAH 11,387,250.00
JASA 10 %
JUMLAH
36 1.00 Unit Pekerjaan Pasang Baru Box Panel & Panel Kontrol + KWH 11000 VA (2 Unit Box
2.0000 Unit Box Panel 20x40x50 @ Rp. 400,000.00
4.0000 bh MCB 35 A @ Rp. 96,500.00
2.0000 bh MCB 40 A @ Rp. 104,000.00
0.6000 m1 Rel MCB @ Rp. 52,500.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00
5.0000 bh Pilot Lamp @ Rp. 12,500.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00
2.0000 bh Terminal Nol @ Rp. 45,000.00
4.0000 bh Sekering kecil @ Rp. 9,000.00
3.0000 m1 Kabel NYY 3 x 6 Sqmm @ Rp. 45,100.00
4.0000 org Pekerja @ Rp. 55,500.00 222,000.00
0.2500 org Tenaga Ahli @ Rp. 105,000.00 26,250.00
2.0000 org Tukang Listrik @ Rp. 45,000.00 90,000.00
0.5000 org Mandor @ Rp. 65,000.00 32,500.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
11,000.00 VA Administrasi 3500 - 11000 VA @ Rp. 1,000.00 11,000,000.00
JUMLAH 11,465,250.00
JASA 10 %
JUMLAH
DIBULATKAN
10,900.00
10,900.00 11,727.50
1,172.75
12,900.25
12,900.00
15,500.00
15,500.00 16,327.50
1,632.75
17,960.25
17,960.00
21,000.00
21,000.00 21,827.50
2,182.75
24,010.25
24,010.00
19,500.00
19,500.00 20,327.50
2,032.75
22,360.25
22,360.00
23,500.00
32,100.00
32,100.00 32,927.50
3,292.75
36,220.25
36,220.00
45,100.00
45,100.00 45,927.50
4,592.75
50,520.25
50,520.00
70,500.00
70,500.00 71,327.50
7,132.75
78,460.25
78,460.00
- 827.50
82.75
910.25
910.00
- 827.50
82.75
910.25
910.00
56,500.00
56,500.00 57,327.50
5,732.75
89,500.00
89,500.00 90,327.50
9,032.75
99,360.25
99,360.00
13,500.00
13,500.00 14,327.50
1,432.75
15,760.25
15,760.00
19,500.00
19,500.00 20,327.50
2,032.75
22,360.25
22,360.00
26,500.00
26,500.00 27,327.50
2,732.75
30,060.25
30,060.00
- 827.50
82.75
910.25
910.00
- 827.50
82.75
4,000.00
4,000.00 4,413.75
441.38
4,855.13
4,855.00
7,000.00
7,000.00 7,413.75
741.38
8,155.13
8,155.00
- 413.75
41.38
455.13
455.00
92,975.00
9,297.50
102,272.50
102,272.00
92,975.00
9,297.50
102,272.50
102,272.00
125,115.00
12,511.50
137,626.50
82,300.00
8,230.00
90,530.00
90,530.00
65,929.00
6,592.90
72,521.90
72,521.00
29,500.00
29,500.00 30,380.00
3,038.00
33,418.00
33,418.00
37,200.00
37,200.00 46,625.00
4,662.50
51,287.50
51,287.00
56,000.00
37,200.00
93,200.00 131,800.00
13,180.00
144,980.00
144,980.00
34,000.00
34,000.00 43,425.00
4,342.50
47,767.50
400,000.00
151,500.00
56,000.00
15,750.00
39,000.00
30,000.00
37,500.00
57,500.00
45,000.00
18,000.00
153,791.00
1,004,041.00 2,691,291.00
269,129.10
2,960,420.10
2,960,420.00
400,000.00
168,000.00
56,500.00
15,750.00
39,000.00
30,000.00
37,500.00
57,500.00
45,000.00
18,000.00
153,791.00
1,021,041.00 3,608,291.00
360,829.10
3,969,120.10
400,000.00
169,500.00
57,000.00
15,750.00
39,000.00
30,000.00
37,500.00
57,500.00
45,000.00
18,000.00
153,791.00
1,023,041.00 4,910,291.00
491,029.10
5,401,320.10
5,401,320.00
400,000.00
171,000.00
58,900.00
15,750.00
39,000.00
30,000.00
37,500.00
57,500.00
45,000.00
18,000.00
153,791.00
1,026,441.00 5,813,691.00
581,369.10
6,395,060.10
400,000.00
176,700.00
96,500.00
15,750.00
39,000.00
30,000.00
37,500.00
57,500.00
45,000.00
18,000.00
153,791.00
1,069,741.00 9,156,991.00
915,699.10
10,072,690.10
10,072,690.00
400,000.00
289,500.00
104,000.00
15,750.00
39,000.00
30,000.00
37,500.00
57,500.00
45,000.00
18,000.00
153,791.00
1,190,041.00 12,577,291.00
1,257,729.10
13,835,020.10
1,875,800.00 13,341,050.00
1,334,105.00
14,675,155.00
14,675,155.00
387.50
32,100.00
3,750.00
1,917.30
1,136.50
586.72
39,878.02 44,103.02
4,410.30
48,513.32
48,513.00
32,100.00
3,750.00
1,500.00
37,350.00 41,575.00
4,157.50
45,732.50
45,732.00
6 1.00 Gawang Pasang Kabel DX 2x10 Sqmm + Accessories (Gawang) untuk Lampu Ekorola
Analisa Listrik PJU - 870
No. Macam Pekerjaan
(1) (2)
50.0000 m1 Kabel DX 2x10 Sqmm @ Rp. 35,000.00
2.0000 bh Stoping Buckle @ Rp. 3,500.00
2.0000 bh Wadge tape @ Rp. 8,500.00
0.3000 m1 Stainless Steel @ Rp. 15,000.00
1.0000 set Service Link dan Clamp @ Rp. 7,000.00
0.1250 org Tenaga Ahli @ Rp. 105,000.00
0.5000 org Tukang Listrik @ Rp. 45,000.00
0.5000 org Pekerja @ Rp. 55,500.00
0.2500 org Mandor @ Rp. 65,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
7 1.00 Gawang Pasang Kabel DX 2x16 Sqmm + Accessories (Gawang) untuk Lampu Ekorola
50.0000 m1 Kabel DX 2x16 Sqmm @ Rp. 55,000.00
2.0000 bh Stoping Buckle @ Rp. 3,500.00
2.0000 bh Wadge tape @ Rp. 8,500.00
0.5000 m1 Stainless Steel @ Rp. 15,000.00
1.0000 set Service Link dan Clamp @ Rp. 7,000.00
0.1250 org Tenaga Ahli @ Rp. 105,000.00
0.5000 org Tukang Listrik @ Rp. 45,000.00
0.5000 org Pekerja @ Rp. 55,500.00
0.2500 org Mandor @ Rp. 65,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
8 32.00 m1 Pasang Kabel DX 2x10 Sqmm + Accessories (Gawang) untuk Lampu Ekorola
32.0000 m1 Kabel DX 2x10 Sqmm @ Rp. 35,000.00
2.0000 bh Stoping Buckle @ Rp. 3,500.00
2.0000 bh Wadge tape @ Rp. 8,500.00
0.3000 m1 Stainless Steel @ Rp. 15,000.00
1.0000 set Service Link dan Clamp @ Rp. 7,000.00
0.1250 org Tenaga Ahli @ Rp. 105,000.00
0.5000 org Tukang Listrik @ Rp. 45,000.00
0.5000 org Pekerja @ Rp. 55,500.00
0.2500 org Mandor @ Rp. 65,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
9 40.00 m1 Pasang Kabel DX 2x16 Sqmm + Accessories (Gawang) untuk Lampu PJU
40.0000 m1 Kabel DX 2x16 Sqmm @ Rp. 55,000.00
2.0000 bh Stoping Buckle @ Rp. 3,500.00
2.0000 bh Wadge tape @ Rp. 8,500.00
0.3000 m1 Stainless Steel @ Rp. 15,000.00
1.0000 set Service Link dan Clamp @ Rp. 7,000.00
0.1250 org Tenaga Ahli @ Rp. 105,000.00
0.5000 org Tukang Listrik @ Rp. 45,000.00
0.5000 org Pekerja @ Rp. 55,500.00
0.2500 org Mandor @ Rp. 65,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
22 1.00 m1 Pasang Kabel NYY 3x4 Sqmm dibawah Aspal dengan sistem bor
1.0000 m1 Pipa PVC 1" @ Rp. 6,500.00
1.0000 m1 Kabel NYY 3x4 Sqmm @ Rp. 32,100.00
1.0000 m1 Bor lubang dibawah aspal @ Rp. 350,000.00
0.0050 org Tukang Listrik @ Rp. 45,000.00
0.0050 org Pekerja @ Rp. 55,500.00
0.0050 org Mandor @ Rp. 65,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
23 1.00 m1 Pasang Kabel NYY 3x4 Sqmm dengan PVC tanpa galian
1.0000 m1 Kabel NYY 3x4 Sqmm @ Rp. 32,100.00
1.0000 m1 Pipa PVC 1" @ Rp. 6,500.00
0.0150 org Tukang Listrik @ Rp. 45,000.00
0.0250 org Pekerja @ Rp. 55,500.00
0.0050 org Mandor @ Rp. 65,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
24 1.00 Unit Upah Pasang Box Panel dan Panel Kontrol 1 Unit
0.5000 org Tukang Listrik @ Rp. 45,000.00
0.7500 org Pekerja @ Rp. 55,500.00
0.2500 org Mandor @ Rp. 65,000.00
1.0000 ls Pasang Panel Kontrol @ Rp. 12,600.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
35 1.00 Buah Pasang MCB Ampere + box tutup panel ukuran 30x30
1.0000 bh MCB 10 Ampere @ Rp. 56,000.00
1.0000 bh Tutup panel 30x30 @ Rp. 37,200.00
0.2500 org Tukang Listrik @ Rp. 45,000.00
0.2000 org Pekerja @ Rp. 55,500.00
0.2500 org Mandor @ Rp. 65,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
38 1.00 Set Upah Pasang Stang Ornamen 2 meter + Lampu SRP 822/250 Watt Son
0.1250 org Tenaga Ahli @ Rp. 105,000.00
0.5000 org Tukang Listrik @ Rp. 45,000.00
2.0000 org Pekerja @ Rp. 55,500.00
0.2500 org Mandor @ Rp. 65,000.00
0.2500 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
39 1.00 Set Upah Pasang Stang Ornamen 2.2 meter + Lampu SRP 822/250 Watt Son
0.1250 org Tenaga Ahli @ Rp. 105,000.00
0.5000 org Tukang Listrik @ Rp. 45,000.00
2.0000 org Pekerja @ Rp. 55,500.00
0.2500 org Mandor @ Rp. 65,000.00
0.2500 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
40 1.00 Set Upah Pasang Stang Ornamen 6 meter + Lampu SRP 822/250 Watt Son
0.2500 org Tenaga Ahli @ Rp. 105,000.00
0.6500 org Tukang Listrik @ Rp. 45,000.00
2.5000 org Pekerja @ Rp. 55,500.00
0.3500 org Mandor @ Rp. 65,000.00
0.5500 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
41 1.00 Set Upah Pasang Tiang Octogonal Cabang 1, h= 7 meter + lampu SRP 822/250 Watt Son
0.4200 m 3
Pondasi tiang beton bertulang @ Rp. 2,203,948.00
2.8500 org Pekerja @ Rp. 55,500.00
2.8500 org Tukang Listrik @ Rp. 45,000.00
2.0075 org Pengawas @ Rp. 105,000.00
1.0000 org Mandor @ Rp. 65,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
42 1.00 Set Upah Pasang Tiang Octogonal Cabang 1, h= 9 meter + lampu SRP 822/250 Watt Son
0.4200 m 3
Pondasi tiang beton bertulang @ Rp. 2,203,948.00
3.1000 org Pekerja @ Rp. 55,500.00
3.1000 org Tukang Listrik @ Rp. 45,000.00
2.5000 org Pengawas @ Rp. 105,000.00
1.2100 org Mandor @ Rp. 65,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
43 1.00 Set Upah Pasang Tiang Octogonal Cabang 2, h= 9 meter + lampu SRP 822/250 Watt Son
0.4200 m 3
Pondasi tiang beton bertulang @ Rp. 2,203,948.00
3.3000 org Pekerja @ Rp. 55,500.00
3.3000 org Tukang Listrik @ Rp. 45,000.00
2.5782 org Pengawas @ Rp. 105,000.00
1.2433 org Mandor @ Rp. 65,000.00
1.0000 ls Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
45 1.00 Set Upah Pasang Tiang Octogonal Cabang 3, h= 11 meter + lampu SRP 822/250 Watt Son
0.4200 m3 Pondasi tiang beton bertulang @ Rp. 2,203,948.00
4.2500 org Pekerja @ Rp. 55,500.00
4.2500 org Tukang Listrik @ Rp. 45,000.00
2.9287 org Pengawas @ Rp. 105,000.00
1.2939 org Mandor @ Rp. 65,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
46 1.00 Set Bongkar armatur pada stang ornamen existing + pasang Lampu SRP 822/70 Watt SO
0.7500 org Pengawas @ Rp. 105,000.00
0.8750 org Tukang Listrik @ Rp. 45,000.00
1.6995 org Pekerja @ Rp. 55,500.00
0.6798 org Mandor @ Rp. 65,000.00
0.0500 unit Retur material existing ke gudang Pemda @ Rp. 125,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
47 1.00 Set Bongkar armatur pada stang ornamen existing + pasang Lampu SRP 822/150 Watt SO
0.7500 org Pengawas @ Rp. 105,000.00
0.8750 org Tukang Listrik @ Rp. 45,000.00
1.6995 org Pekerja @ Rp. 55,500.00
0.8418 org Mandor @ Rp. 65,000.00
0.0500 unit Retur material existing ke gudang Pemda @ Rp. 125,000.00
1.0000 ls Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
48 1.00 Set Bongkar armatur pada stang ornamen existing + pasang Lampu SRP 822/250 Watt SO
0.7500 org Pengawas @ Rp. 105,000.00
0.8750 org Tukang Listrik @ Rp. 45,000.00
1.6995 org Pekerja @ Rp. 55,500.00
0.8418 org Mandor @ Rp. 65,000.00
0.0500 unit Retur material existing ke gudang Pemda @ Rp. 125,000.00
1.0000 ls Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
49 1.00 Set Bongkar komponen lama existing + pasang Lampu SRP 822/250 Watt SON + retur ke
0.7500 org Pengawas @ Rp. 105,000.00
0.8750 org Tukang Listrik @ Rp. 45,000.00
1.6995 org Pekerja @ Rp. 55,500.00
0.7822 org Mandor @ Rp. 65,000.00
0.0500 unit Retur material existing ke gudang Pemda @ Rp. 125,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
55 1.00BatangPasang Tiang GIP Cb.1 2",3", 3", 4", h = 9 m / Tiang Bulat 7 m Cb.1 + Umpak
1.0000 btg Tiang GIP Cb. 2 2", 3", 4", t = 7 m, tanam @ Rp. 2,800,000.00
1.0000 bh Umpak @ Rp. 289,000.00
0.1250 org Tenaga Ahli @ Rp. 105,000.00
0.5000 org Tukang Listrik @ Rp. 45,000.00
2.0000 org Pekerja @ Rp. 55,500.00
0.2500 org Mandor @ Rp. 65,000.00
0.2500 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
56 1.00BatangPasang Tiang GIP Cb.1 2",3", 3", 4", h = 9 m / Tiang Bulat 9 m Cb.1 + Umpak
1.0000 btg Tiang GIP Cb. 2 2", 3", 4", t = 9 m, tanam @ Rp. 3,100,000.00
1.0000 bh Umpak @ Rp. 289,000.00
0.1250 org Tenaga Ahli @ Rp. 105,000.00
0.5000 org Tukang Listrik @ Rp. 45,000.00
2.0000 org Pekerja @ Rp. 55,500.00
0.2500 org Mandor @ Rp. 65,000.00
0.2500 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
57 1.00BatangPasang Kembali Tiang Bulat 7 m Cb.1 (GIP cb.1 2", 3", 4" h = 7 m) + Umpak
2.0000 bh Wadge tape @ Rp. 8,500.00
0.5000 m1 Stainless Steel @ Rp. 15,000.00
2.0000 bh Banded @ Rp. 7,000.00
1.0000 bh Umpak @ Rp. 289,000.00
0.1250 org Tenaga Ahli @ Rp. 105,000.00
0.5000 org Tukang Listrik @ Rp. 45,000.00
2.0000 org Pekerja @ Rp. 55,500.00
0.2500 org Mandor @ Rp. 65,000.00
0.2500 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
58 1.00BatangPasang Kembali Tiang Bulat 9 m Cb.1 (GIP cb.1 2", 3", 4" h = 7 m) + Umpak
2.0000 bh Wadge tape @ Rp. 8,500.00
0.5000 m1 Stainless Steel @ Rp. 15,000.00
2.0000 bh Banded @ Rp. 7,000.00
1.0000 bh Umpak @ Rp. 289,000.00
0.1250 org Tenaga Ahli @ Rp. 105,000.00
0.5000 org Tukang Listrik @ Rp. 45,000.00
64 1.00 Set Pasang Lp sorot Tango SMF 383 SON-T 150 Watt
1.0000 unit Armature Tango SMF 383 1xSON-T 150W SYMETRIC @ Rp. 2,550,000.00
1.0000 m1 Kabel NYM 2 x 2.5 Sqmm @ Rp. 15,500.00
1.0000 bh MCB 4 A @ Rp. 47,500.00
0.5000 org Tukang Listrik @ Rp. 45,000.00
0.7500 org Pekerja @ Rp. 55,500.00
0.2500 org Mandor @ Rp. 65,000.00
1.0000 set Alat Bantu Pasang/Bongkar - (Lampu, Armature, Stang) @ Rp. 17,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
65 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 1300 VA
1.0000 Unit Box Panel 20x40x60 @ Rp. 180,000.00
4.0000 bh Beugel @ Rp. -
6.0000 m1 Pipa Galvanis 1.5" @ Rp. 77,500.00
21.0000 m 1
Kabel DX 2 x 16 Sqmm @ Rp. 55,000.00
2.0000 bh Knee pipa PVC 1.5" @ Rp. 500.00
1.0000 bh Magnetik Kontraktor SN-20 @ Rp. 325,000.00
1.0000 bh Invoring @ Rp. 17,500.00
3.0000 bh MCB 6 A @ Rp. 50,500.00
1.0000 bh MCB 10 A @ Rp. 56,000.00
0.3000 m1 Rel MCB @ Rp. 52,500.00
1.0000 bh Timer TB 388 @ Rp. 710,000.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00
3.0000 bh Pilot Lamp @ Rp. 12,500.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00
0.5000 m1 Pipa Spiral 1.5" @ Rp. 4,500.00
3.0000 org Pekerja @ Rp. 55,500.00
0.2500 org Tenaga Ahli @ Rp. 105,000.00
1.5000 org Tukang Listrik @ Rp. 45,000.00
0.5000 org Mandor @ Rp. 65,000.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel Box @ Rp. 85,000.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00
1,300.00 VA Adminatrasi 900 - 2200 VA @ Rp. 1,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
66 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 2200 VA
1.0000 Unit Box Panel 20x40x60 @ Rp. 180,000.00
4.0000 bh Beugel @ Rp. -
6.0000 m1 Pipa Galvanis 1.5" @ Rp. 77,500.00
21.0000 m1 Kabel DX 2 x 16 Sqmm @ Rp. 55,000.00
2.0000 bh Knee pipa PVC 1.5" @ Rp. 500.00
1.0000 bh Magnetik Kontraktor SN-20 @ Rp. 325,000.00
1.0000 bh Invoring @ Rp. 17,500.00
3.0000 bh MCB 10 A @ Rp. 56,000.00
1.0000 bh MCB 16 A @ Rp. 56,500.00
0.3000 m1 Rel MCB @ Rp. 52,500.00
1.0000 bh Timer TB 388 @ Rp. 710,000.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00
3.0000 bh Pilot Lamp @ Rp. 12,500.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00
0.5000 m1 Pipa Spiral 1.5" @ Rp. 4,500.00
3.0000 org Pekerja @ Rp. 55,500.00
0.2500 org Tenaga Ahli @ Rp. 105,000.00
1.5000 org Tukang Listrik @ Rp. 45,000.00
0.5000 org Mandor @ Rp. 65,000.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel Box @ Rp. 85,000.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00
2,200.00 VA Adminatrasi 900 - 2200 VA @ Rp. 1,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
67 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 3500 VA
1.0000 Unit Box Panel 20x40x60 @ Rp. 180,000.00
4.0000 bh Beugel @ Rp. -
6.0000 m1 Pipa Galvanis 1.5" @ Rp. 77,500.00
21.0000 m 1
Kabel DX 2 x 16 Sqmm @ Rp. 55,000.00
2.0000 bh Knee pipa PVC 1.5" @ Rp. 500.00
1.0000 bh Magnetik Kontraktor SN-20 @ Rp. 325,000.00
1.0000 bh Invoring @ Rp. 17,500.00
3.0000 bh MCB 16 A @ Rp. 56,500.00
1.0000 bh MCB 20 A @ Rp. 57,000.00
0.3000 m1 Rel MCB @ Rp. 52,500.00
1.0000 bh Timer TB 388 @ Rp. 710,000.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00
3.0000 bh Pilot Lamp @ Rp. 12,500.00
68 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 4400 VA
1.0000 Unit Box Panel 20x40x60 @ Rp. 180,000.00
4.0000 bh Beugel @ Rp. -
6.0000 m1 Pipa Galvanis 1.5" @ Rp. 77,500.00
21.0000 m1 Kabel DX 2 x 16 Sqmm @ Rp. 55,000.00
2.0000 bh Knee pipa PVC 1.5" @ Rp. 500.00
1.0000 bh Magnetik Kontraktor SN-20 @ Rp. 325,000.00
1.0000 bh Invoring @ Rp. 17,500.00
3.0000 bh MCB 20 A @ Rp. 57,000.00
1.0000 bh MCB 25 A @ Rp. 58,900.00
0.3000 m1 Rel MCB @ Rp. 52,500.00
1.0000 bh Timer TB 388 @ Rp. 710,000.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00
3.0000 bh Pilot Lamp @ Rp. 12,500.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00
0.5000 m1 Pipa Spiral 1.5" @ Rp. 4,500.00
3.0000 org Pekerja @ Rp. 55,500.00
0.2500 org Tenaga Ahli @ Rp. 105,000.00
1.5000 org Tukang Listrik @ Rp. 45,000.00
0.5000 org Mandor @ Rp. 65,000.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel Box @ Rp. 85,000.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00
4,400.00 VA Adminatrasi 3500 - 11000 VA @ Rp. 1,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
69 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 7700 VA
1.0000 Unit Box Panel 20x40x60 @ Rp. 180,000.00
4.0000 bh Beugel @ Rp. -
6.0000 m1 Pipa Galvanis 1.5" @ Rp. 77,500.00
21.0000 m 1
Kabel DX 2 x 16 Sqmm @ Rp. 55,000.00
2.0000 bh Knee pipa PVC 1.5" @ Rp. 500.00
1.0000 bh Magnetik Kontraktor SN-20 @ Rp. 325,000.00
1.0000 bh Invoring @ Rp. 17,500.00
3.0000 bh MCB 25 A @ Rp. 58,900.00
1.0000 bh MCB 35 A @ Rp. 96,500.00
0.3000 m1 Rel MCB @ Rp. 52,500.00
1.0000 bh Timer TB 388 @ Rp. 710,000.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00
3.0000 bh Pilot Lamp @ Rp. 12,500.00
70 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 11000 VA
1.0000 Unit Box Panel 20x40x60 @ Rp. 180,000.00
4.0000 bh Beugel @ Rp. -
6.0000 m1 Pipa Galvanis 1.5" @ Rp. 77,500.00
21.0000 m1 Kabel DX 2 x 16 Sqmm @ Rp. 55,000.00
2.0000 bh Knee pipa PVC 1.5" @ Rp. 500.00
1.0000 bh Magnetik Kontraktor SN-20 @ Rp. 325,000.00
1.0000 bh Invoring @ Rp. 17,500.00
3.0000 bh MCB 35 A @ Rp. 96,500.00
1.0000 bh MCB 40 A @ Rp. 104,000.00
0.3000 m1 Rel MCB @ Rp. 52,500.00
1.0000 bh Timer TB 388 @ Rp. 710,000.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00
3.0000 bh Pilot Lamp @ Rp. 12,500.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00
0.5000 m1 Pipa Spiral 1.5" @ Rp. 4,500.00
3.0000 org Pekerja @ Rp. 55,500.00
0.2500 org Tenaga Ahli @ Rp. 105,000.00
1.5000 org Tukang Listrik @ Rp. 45,000.00
0.5000 org Mandor @ Rp. 65,000.00
0.5000 set Alat Bantu Pasang/Bongkar - Panel Box @ Rp. 85,000.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00
11,000.00 VA Adminatrasi 3500 - 11000 VA @ Rp. 1,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
71 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 11000 VA (2 Unit Box Panel)
2.0000 Unit Box Panel 20x40x50 @ Rp. 400,000.00
8.0000 bh Beugel @ Rp. -
12.0000 m1 Pipa Galvanis 1.5" @ Rp. 77,500.00
27.0000 m 1
Kabel DX 2 x 16 Sqmm @ Rp. 55,000.00
2.0000 bh Knee pipa PVC 1.5" @ Rp. 500.00
2.0000 bh Magnetik Kontraktor SN-20 @ Rp. 325,000.00
1.0000 bh Invoring @ Rp. 17,500.00
4.0000 bh MCB 35 A @ Rp. 96,500.00
2.0000 bh MCB 40 A @ Rp. 104,000.00
0.6000 m1 Rel MCB @ Rp. 52,500.00
2.0000 bh Timer TB 388 @ Rp. 710,000.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00
5.0000 bh Pilot Lamp @ Rp. 12,500.00
79 1.00 Buah Bongkar lampu dan balast + Pasang Lampu SON-T 250W dan balast
1.0000 bh Lampu SON-T 250W 220V @ Rp. 305,000.00
1.0000 bh Balast SON 250w 220V @ Rp. 356,000.00
1.0000 bh Ignitor Metal Halide 250W 220V @ Rp. 145,000.00
0.0625 org Pengawas @ Rp. 105,000.00
0.1250 org Mandor @ Rp. 65,000.00
0.1750 org Tukang Listrik @ Rp. 45,000.00
0.3750 org Pekerja @ Rp. 55,500.00
0.1200 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00
0.1250 jam Alat angkut @ Rp. 12,500.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
81 1.00 Unit Pasang Tiang Oktagonal Cb. 1, t=11m + Armature Komplit (sekualitas SGP 328 SON-
1xSON-T 250 Symmetric - Kabel Udara
1.0000 btg Tiang lampu Octagonal Cb. 1, t=11m @ Rp. 4,800,000.00
1.0000 unit Armature IP 65 Komplit (sekualitas SGP 822 SON 250W) @ Rp. 4,300,000.00
1.0000 bh Armature Tango SMF 383 1xSON-T 250W Symmetric @ Rp. 2,800,000.00
2.0000 bh MCB 6 A @ Rp. 50,500.00
0.2000 m1 Rel MCB @ Rp. 52,500.00
30.0000 m1 Kabel NYM 2 x 2.5 Sqmm @ Rp. 15,500.00
4.0000 bh Banded @ Rp. 7,000.00
0.4200 m3 Pondasi tiang beton bertulang @ Rp. 2,203,948.00
4.2500 org Pekerja @ Rp. 55,500.00
4.2500 org Tukang Listrik @ Rp. 45,000.00
2.9287 org Pengawas @ Rp. 105,000.00
1.2939 org Mandor @ Rp. 65,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
82 1.00 Unit Pasang Tiang Oktagonal Cb. 1, t=11m + Armature Komplit (sekualitas SGP 328 SON-
1.0000 btg Tiang lampu Octagonal Cb. 1, t=11m @ Rp. 4,800,000.00
1.0000 unit Armature IP 65 Komplit (sekualitas SGP 822 SON 250W) @ Rp. 3,800,000.00
1.0000 bh MCB 6 A @ Rp. 50,500.00
0.1000 m1 Rel MCB @ Rp. 52,500.00
12.0000 m1 Kabel NYM 2 x 2.5 Sqmm @ Rp. 15,500.00
0.4200 m 3
Pondasi tiang beton bertulang @ Rp. 2,203,948.00
4.2500 org Pekerja @ Rp. 55,500.00
4.2500 org Tukang Listrik @ Rp. 45,000.00
2.9287 org Pengawas @ Rp. 105,000.00
1.2939 org Mandor @ Rp. 65,000.00
83 1.00 Set Pasang Lampu Spot MMF 283 MHN TD 150W + Pondasi
1.0000 bh Armature Tango MMF 283 1xMHN-TD 70W Symmetric @ Rp. 2,200,000.00
1.0000 m1 Kabel NYM 2 x 2.5 Sqmm @ Rp. 15,500.00
1.0000 bh Cover MCB @ Rp. 7,100.00
1.0000 bh MCB 4 A @ Rp. 47,500.00
1.0000 bh Pondasi / Umpak @ Rp. 58,000.00
0.5000 org Tukang Listrik @ Rp. 45,000.00
0.7500 org Pekerja @ Rp. 55,500.00
0.2500 org Mandor @ Rp. 65,000.00
0.0600 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
84 1.00 Set Pasang Lampu Sorot Tango SMF 383 SON-T 150 Watt + Pondasi
1.0000 bh Armature Tango SMF 383 1x SON-T 150W Symmetric @ Rp. 2,550,000.00
1.0000 m1 Kabel NYM 2 x 2.5 Sqmm @ Rp. 15,500.00
1.0000 bh MCB 4 A @ Rp. 47,500.00
1.0000 bh Cover MCB @ Rp. 7,100.00
1.0000 bh Pondasi / Umpak @ Rp. 58,000.00
0.5000 org Tukang Listrik @ Rp. 45,000.00
0.7500 org Pekerja @ Rp. 55,500.00
0.2500 org Mandor @ Rp. 65,000.00
0.0600 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
93 1.00 Unit Pasang Tiang Oktagonal Cb. 1, t=11m + Armature Komplit (sekualitas SGP 328 HPIT
1.0000 btg Tiang lampu Octagonal Cb. 1, t=11m @ Rp. 4,800,000.00
1.0000 unit Armature IP 65 Komplit (sekualitas SGP 822 HPIT 250W) @ Rp. 3,869,500.00
1.0000 bh MCB 6 A @ Rp. 50,500.00
0.1000 m1 Rel MCB @ Rp. 52,500.00
12.0000 m1 Kabel NYM 2 x 2.5 Sqmm @ Rp. 15,500.00
0.4200 m 3
Pondasi tiang beton bertulang @ Rp. 2,203,948.00
4.2500 org Pekerja @ Rp. 55,500.00
4.2500 org Tukang Listrik @ Rp. 45,000.00
2.9287 org Pengawas @ Rp. 105,000.00
1.2939 org Mandor @ Rp. 65,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
98 1.00 Unit Pasang Armatur lampu saja (sekualitas SGP 328 SON 150W)
1.0000 bh MCB 4 A @ Rp. 47,500.00
1.0000 bh Cover MCB @ Rp. 7,100.00
0.5000 org Pengawas @ Rp. 105,000.00
0.5000 org Tukang Listrik @ Rp. 45,000.00
2.0000 org Pekerja @ Rp. 55,500.00
0.2500 org Mandor @ Rp. 65,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
100 1.00 Unit Bongkar dan Ganti Komponen lama pada Armature IP 65 (sekualitas SGP 326) komp
1.0000 bh Lampu SON-T 150W 220V @ Rp. 197,000.00
1.0000 bh Balast SON 150W 220V @ Rp. 220,000.00
1.0000 bh Kapasitor 20 mF @ Rp. 63,000.00
1.0000 bh Ignitor Metal Halide 150W 220V @ Rp. 95,000.00
0.0625 org Pengawas @ Rp. 105,000.00
0.1250 org Mandor @ Rp. 65,000.00
0.1750 org Tukang Listrik @ Rp. 45,000.00
106 1.00BatangPasang Lampu Sorot Tango SMF 383 Symetric CDMT-D 400 W
1.0000 Unit Armature Tango SMF 383 1xHPI-T 400W Symmetric @ Rp. 2,780,000.00
2.0000 bh Beugel @ Rp. -
1.0000 bh MCB 4 A @ Rp. 47,500.00
1.0000 bh Cover MCB @ Rp. 7,100.00
4.0000 m1 Kabel NYM 2 x 2.5 Sqmm @ Rp. 15,500.00
2.0000 bh Banded @ Rp. 7,000.00
0.4000 org Pengawas @ Rp. 105,000.00
0.5000 org Tukang Listrik @ Rp. 45,000.00
2.0000 org Pekerja @ Rp. 55,500.00
0.2500 org Mandor @ Rp. 65,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
107 1.00BatangPasang Lampu Sorot Tango SMF 383 Symetric CDMT-D 150 W
1.0000 Unit Armature Tango SMF 383 1xHPI-T 400W Symmetric @ Rp. 2,250,000.00
2.0000 bh Beugel @ Rp. -
1.0000 bh MCB 4 A @ Rp. 47,500.00
1.0000 bh Cover MCB @ Rp. 7,100.00
4.0000 m1 Kabel NYM 2 x 2.5 Sqmm @ Rp. 15,500.00
2.0000 bh Banded @ Rp. 7,000.00
0.4000 org Pengawas @ Rp. 105,000.00
0.5000 org Tukang Listrik @ Rp. 45,000.00
2.0000 org Pekerja @ Rp. 55,500.00
0.2500 org Mandor @ Rp. 65,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
108 1.00 Bh Bongkar lampu dan balast + pasang lampu SON 70W (setipe) dan balast
1.0000 bh Lampu SON 70W 220V @ Rp. 174,500.00
1.0000 bh Balast SON 70W 220V @ Rp. 165,000.00
1.0000 bh Kapasitor 12.5 mF @ Rp. 34,000.00
0.0625 org Pengawas @ Rp. 105,000.00
0.1250 org Mandor @ Rp. 65,000.00
0.1750 org Tukang Listrik @ Rp. 45,000.00
0.3750 org Pekerja @ Rp. 55,500.00
0.1200 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00
0.1250 jam Alat angkut @ Rp. 12,500.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
110 1.00 Set Upah Pasang stang Ornamen 3 meter + Lampu SRP 822/250 Watt Son
0.1250 org Tenaga Ahli @ Rp. 105,000.00
0.5000 org Tukang Listrik @ Rp. 45,000.00
2.0000 org Pekerja @ Rp. 55,500.00
0.2500 org Mandor @ Rp. 65,000.00
0.2500 set Alat Bantu Pasang/Bongkar - Tiang PJU @ Rp. 300,000.00
1.0000 ttk Pengetesan dan Penyalaan @ Rp. 12,000.00
JUMLAH
JASA 10 %
JUMLAH
DIBULATKAN
118 1.00 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
0.1000 Kg Plamir tembok @ Rp. 12,000.00
0.1000 Kg Cat dasar @ Rp. 15,000.00
0.2600 Kg Cat penutup 2 x @ Rp. 15,000.00
0.0200 oh Pekerja @ Rp. 55,500.00
0.0630 oh Tukang Cat @ Rp. 55,500.00
0.0063 oh Kepala tukang @ Rp. 58,000.00
0.0025 oh Mandor @ Rp. 65,000.00
JUMLAH
DIBULATKAN
225.00
277.50
325.00
827.50 827.50
82.75
910.25
910.00
225.00
277.50
325.00
827.50 827.50
82.75
910.25
910.00
225.00
277.50
325.00
827.50 827.50
82.75
910.25
910.00
112.50
138.75
162.50
413.75 413.75
41.38
455.13
455.00
225.00
277.50
325.00
827.50 827.50
82.75
910.25
910.00
2,750,000.00
7,000.00
17,000.00
7,500.00
7,000.00
13,125.00
22,500.00
27,750.00
16,250.00
12,000.00
91,625.00 2,788,500.00 2,880,125.00
288,012.50
3,168,137.50
3,168,137.00
1,120,000.00
7,000.00
17,000.00
4,500.00
7,000.00
13,125.00
22,500.00
27,750.00
16,250.00
12,000.00
91,625.00 1,155,500.00 1,247,125.00
124,712.50
1,371,837.50
1,371,837.00
2,200,000.00
7,000.00
17,000.00
4,500.00
7,000.00
13,125.00
22,500.00
27,750.00
16,250.00
12,000.00
91,625.00 2,235,500.00 2,327,125.00
232,712.50
2,559,837.50
2,559,837.00
70,500.00
225.00
277.50
325.00
827.50 70,500.00 71,327.50
7,132.75
78,460.25
78,460.00
15,500.00
225.00
277.50
325.00
827.50 15,500.00 16,327.50
1,632.75
17,960.25
17,960.00
7,000.00
112.50
138.75
162.50
413.75 7,000.00 7,413.75
741.38
8,155.13
8,155.00
28,750.00
555.00
325.00
880.00 28,750.00 29,630.00
2,963.00
32,593.00
32,593.00
23,500.00
225.00
277.50
325.00
827.50 23,500.00 24,327.50
2,432.75
26,760.25
26,760.00
240,000.00
2,700.00
41,000.00
10,364.40
1,783.65
435.75
1,125.00
1,387.50
325.00
2,837.50 296,283.80 299,121.30
29,912.13
329,033.43
329,033.00
10,364.40
10,364.40
2,700.00
32,100.00
6,500.00
1,783.65
435.75
675.00
1,387.50
325.00
2,387.50 53,883.80 56,271.30
5,627.13
61,898.43
61,898.00
10,364.40
2,700.00
45,100.00
6,500.00
1,783.65
435.75
675.00
1,387.50
325.00
2,387.50 66,883.80 69,271.30
6,927.13
76,198.43
76,198.00
10,364.40
2,700.00
70,500.00
6,500.00
1,783.65
435.75
675.00
1,387.50
325.00
2,387.50 92,283.80 94,671.30
9,467.13
104,138.43
104,138.00
387.50
32,100.00
3,750.00
1,917.30
1,136.50
586.70
675.00
1,387.50
325.00
2,387.50 39,878.00 42,265.50
4,226.55
46,492.05
46,492.00
32,100.00
3,750.00
1,500.00
450.00
1,110.00
325.00
1,885.00 37,350.00 39,235.00
3,923.50
43,158.50
43,158.00
6,500.00
32,100.00
350,000.00
225.00
277.50
325.00
350,827.50 38,600.00 389,427.50
38,942.75
428,370.25
428,370.00
32,100.00
6,500.00
675.00
1,387.50
325.00
2,387.50 38,600.00 40,987.50
4,098.75
45,086.25
45,086.00
22,500.00
41,625.00
16,250.00
12,600.00
92,975.00 92,975.00
9,297.50
102,272.50
102,272.00
22,500.00
38,280.00
29,700.00
295,815.00
43,290.00
56,610.00
57,500.00
521,195.00 521,195.00
52,119.50
573,314.50
573,314.00
29,000.00
22,500.00
222,000.00
32,500.00
42,500.00
43,750.00
392,250.00 392,250.00
39,225.00
431,475.00
431,475.00
22,500.00
41,625.00
16,250.00
18,000.00
98,375.00 98,375.00
9,837.50
108,212.50
108,212.00
29,970.00
55,500.00
21,645.00
18,000.00
125,115.00 125,115.00
12,511.50
137,626.50
137,626.00
18,000.00
33,300.00
13,000.00
18,000.00
82,300.00 82,300.00
8,230.00
90,530.00
90,530.00
14,850.00
27,750.00
10,829.00
12,500.00
65,929.00 65,929.00
6,592.90
29,000.00
22,500.00
222,000.00
32,500.00
42,500.00
43,750.00
392,250.00 392,250.00
39,225.00
431,475.00
431,475.00
38,280.00
29,700.00
295,981.50
43,290.00
56,610.00
57,500.00
521,361.50 521,361.50
52,136.15
573,497.65
573,497.00
37,200.00
2,250.00
5,550.00
1,625.00
9,425.00 37,200.00 46,625.00
4,662.50
51,287.50
51,287.00
56,000.00
37,200.00
11,250.00
11,100.00
16,250.00
38,600.00 93,200.00 131,800.00
13,180.00
144,980.00
144,980.00
34,000.00
2,250.00
5,550.00
1,625.00
9,425.00 34,000.00 43,425.00
4,342.50
47,767.50
47,767.00
12,000.00
12,000.00 - 12,000.00
1,200.00
13,200.00
13,200.00
13,125.00
22,500.00
111,000.00
16,250.00
75,000.00
12,000.00
249,875.00 - 249,875.00
24,987.50
274,862.50
274,862.00
13,125.00
22,500.00
111,000.00
16,250.00
75,000.00
12,000.00
249,875.00 - 249,875.00
24,987.50
274,862.50
274,862.00
26,250.00
29,250.00
138,750.00
22,750.00
165,000.00
12,000.00
394,000.00 - 394,000.00
39,400.00
433,400.00
433,400.00
xisting + pasang Lampu SRP 822/70 Watt SON + retur ke gudang Pemda
78,750.00
39,375.00
94,322.25
44,187.00
6,250.00
12,000.00
274,884.25 - 274,884.25
27,488.43
302,372.68
302,372.00
xisting + pasang Lampu SRP 822/150 Watt SON + retur ke gudang Pemda
78,750.00
39,375.00
94,322.25
54,717.00
6,250.00
12,000.00
285,414.25 - 285,414.25
28,541.43
313,955.68
313,955.00
xisting + pasang Lampu SRP 822/250 Watt SON + retur ke gudang Pemda
78,750.00
39,375.00
94,322.25
54,717.00
6,250.00
12,000.00
285,414.25 - 285,414.25
28,541.43
313,955.68
313,955.00
13,125.00
22,500.00
111,000.00
16,250.00
75,000.00
237,875.00 - 237,875.00
23,787.50
261,662.50
261,662.00
2,800,000.00
289,000.00
13,125.00
22,500.00
111,000.00
16,250.00
75,000.00
237,875.00 3,089,000.00 3,326,875.00
332,687.50
3,659,562.50
3,659,562.00
17,000.00
7,500.00
14,000.00
289,000.00
13,125.00
22,500.00
111,000.00
16,250.00
75,000.00
237,875.00 327,500.00 565,375.00
56,537.50
621,912.50
621,912.00
17,000.00
7,500.00
14,000.00
289,000.00
13,125.00
22,500.00
4,300,000.00
4,300,000.00
50,500.00
5,250.00
186,000.00
925,658.16
235,875.00
191,250.00
307,513.50
84,103.50
75,000.00
12,000.00
905,742.00 9,767,408.16 10,673,150.16
1,067,315.02
11,740,465.18
11,740,465.00
13,125.00
22,500.00
111,000.00
16,250.00
30,000.00
192,875.00 - 192,875.00
19,287.50
212,162.50
212,162.00
38,280.00
29,700.00
295,815.00
43,290.00
73,750.00
552,000.00
1,032,835.00 - 1,032,835.00
103,283.50
1,136,118.50
1,136,118.00
13,125.00
22,500.00
111,000.00
16,250.00
73,750.00
236,625.00 - 236,625.00
13,125.00
22,500.00
111,000.00
16,250.00
75,000.00
12,000.00
249,875.00 - 249,875.00
24,987.50
274,862.50
274,862.00
2,550,000.00
15,500.00
47,500.00
22,500.00
41,625.00
16,250.00
17,000.00
12,000.00
109,375.00 2,613,000.00 2,722,375.00
272,237.50
2,994,612.50
2,994,612.00
180,000.00
-
465,000.00
1,155,000.00
1,000.00
325,000.00
17,500.00
151,500.00
56,000.00
15,750.00
710,000.00
39,000.00
30,000.00
37,500.00
57,500.00
45,000.00
18,000.00
2,250.00
166,500.00
26,250.00
67,500.00
32,500.00
42,500.00
40,000.00
12,000.00
1,300,000.00
1,687,250.00 3,306,000.00 4,993,250.00
499,325.00
5,492,575.00
5,492,575.00
180,000.00
-
465,000.00
1,155,000.00
1,000.00
325,000.00
17,500.00
168,000.00
56,500.00
15,750.00
710,000.00
39,000.00
30,000.00
37,500.00
57,500.00
45,000.00
18,000.00
2,250.00
166,500.00
26,250.00
67,500.00
32,500.00
42,500.00
40,000.00
12,000.00
2,200,000.00
2,587,250.00 3,323,000.00 5,910,250.00
591,025.00
6,501,275.00
6,501,275.00
180,000.00
-
465,000.00
1,155,000.00
1,000.00
325,000.00
17,500.00
169,500.00
57,000.00
15,750.00
710,000.00
39,000.00
30,000.00
37,500.00
180,000.00
-
465,000.00
1,155,000.00
1,000.00
325,000.00
17,500.00
171,000.00
58,900.00
15,750.00
710,000.00
39,000.00
30,000.00
37,500.00
57,500.00
45,000.00
18,000.00
2,250.00
166,500.00
26,250.00
67,500.00
32,500.00
42,500.00
40,000.00
12,000.00
4,400,000.00
4,787,250.00 3,328,400.00 8,115,650.00
811,565.00
8,927,215.00
8,927,215.00
180,000.00
-
465,000.00
1,155,000.00
1,000.00
325,000.00
17,500.00
176,700.00
96,500.00
15,750.00
710,000.00
39,000.00
30,000.00
37,500.00
180,000.00
-
465,000.00
1,155,000.00
1,000.00
325,000.00
17,500.00
289,500.00
104,000.00
15,750.00
710,000.00
39,000.00
30,000.00
37,500.00
57,500.00
45,000.00
18,000.00
2,250.00
166,500.00
26,250.00
67,500.00
32,500.00
42,500.00
40,000.00
12,000.00
11,000,000.00
11,387,250.00 3,492,000.00 14,879,250.00
1,487,925.00
16,367,175.00
16,367,175.00
533,137.50
1,868,520.00
300.00
23,250.00
1,120,000.00
17,000.00
4,500.00
7,000.00
7,000.00
14,000.00
47,500.00
7,100.00
58,000.00
111,000.00
26,250.00
22,500.00
14,500.00
3,250.00
42,500.00
62,500.00
12,000.00
294,500.00 3,707,307.50 4,001,807.50
400,180.75
4,401,988.25
4,401,988.00
1,868,520.00
1,760,000.00
17,000.00
4,500.00
7,000.00
7,000.00
58,000.00
111,000.00
26,250.00
22,500.00
14,500.00
3,250.00
42,500.00
62,500.00
282,500.00 3,722,020.00 4,004,520.00
400,452.00
4,404,972.00
4,404,972.00
4,300,000.00
-
47,500.00
7,100.00
62,000.00
14,000.00
52,500.00
22,500.00
111,000.00
16,250.00
12,000.00
214,250.00 4,430,600.00 4,644,850.00
464,485.00
5,109,335.00
5,109,335.00
47,500.00
7,100.00
1,387.50
1,125.00
975.00
4,250.00
25,000.00
32,737.50 54,600.00 87,337.50
8,733.75
96,071.25
96,071.00
197,000.00
6,562.50
8,125.00
5,625.00
20,812.50
30,000.00
1,562.50
72,687.50 197,000.00 269,687.50
26,968.75
296,656.25
296,656.00
305,000.00
6,562.50
8,125.00
5,625.00
20,812.50
305,000.00
356,000.00
145,000.00
6,562.50
8,125.00
7,875.00
20,812.50
36,000.00
1,562.50
12,000.00
92,937.50 806,000.00 898,937.50
89,893.75
988,831.25
988,831.00
142,000.00
2,700.00
41,000.00
10,364.40
1,783.65
435.75
675.00
1,387.50
325.00
2,387.50 198,283.80 200,671.30
20,067.13
220,738.43
220,738.00
Armature Komplit (sekualitas SGP 328 SON-T 250W) + Lampu Tango SMF 383
4,800,000.00
4,300,000.00
2,800,000.00
101,000.00
10,500.00
465,000.00
28,000.00
925,658.16
235,875.00
191,250.00
307,513.50
84,103.50
12,000.00
830,742.00 13,430,158.16 14,260,900.16
1,426,090.02
15,686,990.18
15,686,990.00
2,200,000.00
15,500.00
7,100.00
47,500.00
58,000.00
22,500.00
41,625.00
16,250.00
18,000.00
12,000.00
110,375.00 2,328,100.00 2,438,475.00
243,847.50
2,682,322.50
2,682,322.00
2,550,000.00
15,500.00
47,500.00
7,100.00
58,000.00
22,500.00
41,625.00
16,250.00
18,000.00
12,000.00
110,375.00 2,678,100.00 2,788,475.00
278,847.50
3,067,322.50
3,067,322.00
2,325,000.00
24,700.00
9,000.00
27,750.00
180,000.00
32,500.00
44,250.00
420,000.00
27,750.00
180,000.00
32,500.00
147,500.00
432,000.00
1,524,250.00 2,358,700.00 3,882,950.00
388,295.00
4,271,245.00
4,271,245.00
2,325,000.00
24,700.00
9,000.00
27,750.00
157,500.00
32,500.00
44,250.00
360,000.00
27,750.00
3,800,000.00
138,750.00
90,000.00
57,750.00
48,750.00
335,250.00 3,800,000.00 4,135,250.00
413,525.00
4,548,775.00
4,548,775.00
3,850,000.00
138,750.00
90,000.00
57,750.00
48,750.00
335,250.00 3,850,000.00 4,185,250.00
418,525.00
4,603,775.00
4,603,775.00
2,300,000.00
174,500.00
-
165,000.00
30,000.00
370,000.00
50,500.00
114,500.00
166,500.00
22,500.00
29,000.00
16,250.00
42,750.00
43,750.00
12,000.00
332,750.00 3,204,500.00 3,537,250.00
353,725.00
3,890,975.00
3,890,975.00
11,250.00
27,750.00
16,250.00
15,750.00
71,000.00 - 71,000.00
7,100.00
78,100.00
78,100.00
320,700.00
56,000.00
325,000.00
710,000.00
15,750.00
114,500.00
56,000.00
325,000.00
220,000.00
15,750.00
205,000.00
192,600.00
27,750.00
11,250.00
3,250.00
21,250.00
63,500.00 1,128,850.00 1,192,350.00
119,235.00
1,311,585.00
1,311,585.00
22,500.00
166,500.00
32,500.00
147,500.00
360,000.00
729,000.00 - 729,000.00
72,900.00
801,900.00
801,900.00
1,860,000.00
35,910.00
14,000.00
6,000.00
2,250.00
5,550.00
32,500.00
40,300.00 20,000.00 60,300.00
6,030.00
66,330.00
66,330.00
14,850.00
27,750.00
10,790.00
12,500.00
65,890.00 - 65,890.00
6,589.00
72,479.00
72,479.00
47,500.00
7,100.00
52,500.00
22,500.00
111,000.00
16,250.00
12,000.00
214,250.00 54,600.00 268,850.00
26,885.00
295,735.00
295,735.00
278,900.00
8,200,000.00
-
47,500.00
7,100.00
62,000.00
13,125.00
22,500.00
111,000.00
16,250.00
75,000.00
12,000.00
249,875.00 8,595,500.00 8,845,375.00
884,537.50
9,729,912.50
9,729,912.00
-
174,500.00
30,000.00
165,000.00
30,000.00
370,000.00
50,500.00
114,500.00
29,000.00
22,500.00
222,000.00
32,500.00
42,500.00
43,750.00
12,000.00
404,250.00 934,500.00 1,338,750.00
133,875.00
1,472,625.00
1,472,625.00
3,950,000.00
523,500.00
90,000.00
495,000.00
30,000.00
370,000.00
50,500.00
114,500.00
38,280.00
29,700.00
295,815.00
43,290.00
56,610.00
57,500.00
12,000.00
533,195.00 5,623,500.00 6,156,695.00
615,669.50
6,772,364.50
6,772,364.00
22,500.00
41,625.00
16,250.00
12,000.00
92,375.00 - 92,375.00
9,237.50
13,125.00
22,500.00
111,000.00
16,250.00
59,500.00
222,375.00 - 222,375.00
22,237.50
244,612.50
244,612.00
18,000.00
33,300.00
13,000.00
12,750.00
77,050.00 - 77,050.00
7,705.00
84,755.00
84,755.00
2,780,000.00
-
47,500.00
7,100.00
62,000.00
14,000.00
42,000.00
22,500.00
111,000.00
16,250.00
12,000.00
203,750.00 2,910,600.00 3,114,350.00
311,435.00
3,425,785.00
3,425,785.00
2,250,000.00
-
47,500.00
7,100.00
62,000.00
14,000.00
42,000.00
22,500.00
111,000.00
16,250.00
12,000.00
203,750.00 2,380,600.00 2,584,350.00
258,435.00
2,842,785.00
2,842,785.00
174,500.00
165,000.00
34,000.00
6,562.50
8,125.00
7,875.00
20,812.50
36,000.00
1,562.50
12,000.00
92,937.50 373,500.00 466,437.50
46,643.75
513,081.25
111,000.00
26,250.00
22,500.00
14,500.00
3,250.00
4,500.00
62,500.00
12,000.00
256,500.00 - 256,500.00
25,650.00
282,150.00
282,150.00
13,125.00
22,500.00
111,000.00
16,250.00
75,000.00
12,000.00
249,875.00 - 249,875.00
24,987.50
274,862.50
274,862.00
13,125.00
22,500.00
111,000.00
16,250.00
75,000.00
237,875.00 - 237,875.00
23,787.50
261,662.50
261,662.00
142,000.00
8,750.00
1,160.00
913,500.00
21,487.50
470,400.00
54,000.00
102,870.00
294,150.00
15,950.00
81,900.00
64,050.00
16,506.00
17,225.00
489,781.00 1,714,167.50 2,203,948.50
2,203,948.00
55,500.00
2,080.00
57,580.00 - 57,580.00
57,580.00
13,875.00
650.00
14,525.00 14,525.00
14,525.00
6,937.50
812.50
7,750.00 - 7,750.00
7,750.00
8,736.00
2,340.00
16,650.00
8,700.00
945.00
975.00
27,270.00 11,076.00 38,346.00
38,346.00
4,550.00
11,100.00
5,800.00
630.00
650.00
18,180.00 4,550.00 22,730.00
22,730.00
V PEKERJAAN ATAP
1 Pasangan kuda-kuda kayu kamper 8/12 0.52
2 Pasangan gording,nok,dan murplat 8/12 0.47
3 Pasangan rangka atap usuk 5/7 dan reng 3/4 181.25
4 pasangan listplank kayu kamper 38
5 Pasangan atap genteng beton 181.25
6 Pasangan genteng kerpus 29.5
VI PEKERJAAN PLAFON
1 Pasangan rangka plafon kayu kamper 69.75
2 Pasangan plafon eternit 100X100 69.75
XIII FINISING
1 Pembersihan lahan akhir 156
ANGGARAN BIAYA
m2 Rp 9,680Rp 1,067,220
m1 Rp 88,759Rp 2,662,770
m3 Rp 47,575Rp 3,729,880
m3 Rp 13,080Rp 1,025,472
m3 Rp 137,830Rp 1,080,587
m3 Rp 137,830Rp 1,317,655
JUMLAH I Rp 10,883,584
m3 Rp 504,103 Rp 10,888,625
m3 Rp 2,201,866 Rp 6,473,486
m3 Rp 2,201,866 Rp 5,878,982
m3 Rp 2,201,866 Rp 6,473,486
JUMLAH II Rp 29,714,579
m2 Rp 504,103 Rp 2,923,797
m2 Rp 87,530 Rp 15,645,988
m2 Rp 38,976 Rp 13,933,920
m2 Rp 25,003 Rp 8,938,573
JUMLAH III Rp 41,442,277
m2 Rp -Rp -
m2 Rp 1,033,515Rp 3,100,545
m2 Rp -Rp -
m2 Rp -Rp -
JUMLAH IV Rp 3,100,545
m3 Rp 9,748,200
Rp 5,069,064
m3 Rp 9,227,790
Rp 4,337,061
m3 Rp 96,173
Rp 17,431,356
m1 Rp 82,390
Rp 3,130,820
m2 Rp 59,598
Rp 10,802,138
m2 Rp 67,721
Rp 1,997,770
JUMLAH V Rp 42,768,209
m2 Rp 155,650 Rp 10,856,588
m2 Rp 141,641 Rp 9,879,460
JUMLAH VI Rp 20,736,047
m3 Rp 10,719,912
Rp 2,465,580
m3 Rp 10,719,912
Rp 3,001,575
m2 Rp 634,975
Rp 7,467,306
m2 Rp 634,975
Rp 5,714,775
JUMLAH VII Rp 13,182,081
bh Rp 179,333 Rp 1,255,331
bh Rp 31,136 Rp 747,264
bh Rp 23,691 Rp 568,584
bh Rp 23,826 Rp 285,912
m2 Rp 91,086 Rp 1,093,032
JUMLAH VIII Rp 3,950,123
bh Rp 1,709,466 Rp 1,709,466
bh Rp 507,952 Rp 507,952
JUMLAH IX Rp 2,217,418
m1 Rp 16,160 Rp 985,760
m1 Rp 98,758 Rp 691,306
JUMLAH X Rp 1,677,066
bh Rp 37,000Rp 74,000
bh Rp 47,000Rp 423,000
bh Rp -Rp -
m1 Rp -Rp -
bh Rp 15,000Rp 135,000
bh Rp 15,000Rp 120,000
JUMLAH XI Rp 752,000
m2 Rp 65,257Rp 195,118
m2 Rp 65,257Rp 4,355,905
m2 Rp 33,750Rp 1,282,500
m2 Rp 33,750Rp 114,750
m2 Rp 33,750Rp 396,900
m2 Rp 33,750Rp 303,750
JUMLAH XII Rp 6,648,923
m2 Rp 9,680 Rp 1,510,080
JUMLAH XIII Rp 1,510,080
RENCANA ANGGARAN BIA
II PEKERJAAN PONDASI
1 Pekerjaan pengukuran dan pasangan bouw plank
2 Pekerjaan galian tanah untuk pondasi
3 Pekerjaan urugan pasir di bawah pondasi
4 Pekerjaan urugan pasir di bawah lantai (Peninggian elevasi)
5 Urugan tanah kembali sisi galian pondasi
6 Pasangan pondasi batu kali 1 : 3 : 5
7 Pas. Pondasi Rollag Teras Depan 1Pc : 3Ps
V PEKERJAAN ATAP
1 Pasangan kuda-kuda Baja Ringan + Genteng Metal Pasir
2 Pembuatan Talang Beton
VI PEKERJAAN PLAFON
1 Pasangan plafon rangka hollow gypsum T=9 mm (Area Kering)
2 Pasangan rangka plafon rangka hollow gypsum T=9 mm
XIII FINISING
Pembersihan lahan akhir
A ANGGARAN BIAYA
Yogyakarta, 6 Agustus 2018
Vol./Sat H.Satuan Jumlah
3 4 5
Rp -
Rp -
Rp -
Rp -
JUMLAH
Rp 91,086.0
Rp 31,136.0
Rp 179,333.0
Rp 23,691.0
Rp 23,826.0 Rp -
Rp 20,686.0
Rp 90,491.0
JUMLAH Rp -
1 Unit Rp 1,709,466.0
1 Unit Rp 2,556,854.0
1
1 Rp 36,401.0
JUMLAH
1 Unit 878,957.00
Unit 36,401.00
Unit 16,160.00
Unit 98,758.00
JUMLAH
10
JUMLAH
JUMLAH
Rp -
H
ANALISA PEKERJAAN PEMASANGAN MARKA
PEMASANGAN MARKA
1 1.00 bh Membuat Papan Nama Proyek 80x120 cm (bahan seng)
0.0350 m3 Kayu meranti @ Rp. 3,555,000.00
1.4000 m1 Seng plat lebar 90 cm @ Rp. 25,500.00
0.6000 kg Paku @ Rp. 20,000.00
1.5000 kg Cat kayu @ Rp. 40,000.00
16.8000 kg PC @ Rp. 1,400.00
0.0270 m3 Pasir beton @ Rp. 100,000.00
0.0405 m3 Kerikil beton @ Rp. 127,000.00
2.1000 oh Pekerja @ Rp. 55,500.00 116,550.00
0.0175 oh Tukang batu @ Rp. 58,000.00 1,015.00
1.0000 oh Tukang kayu @ Rp. 63,000.00 63,000.00
1.0000 oh Tukang cat @ Rp. 55,500.00 55,500.00
1.0050 oh Mandor @ Rp. 65,000.00 65,325.00
JUMLAH ( BELUM PPN ) 301,390.00
JASA 10 %
JUMLAH
DIBULATKAN
8 1.00 m2 Acian
3.2500 kg Portland Cement @ Rp. 1,400.00
0.2000 oh Pekerja @ Rp. 55,500.00 11,100.00
0.1000 oh Tukang batu @ Rp. 58,000.00 5,800.00
0.0100 oh Kepala tukang @ Rp. 63,000.00 630.00
0.0100 oh Mandor @ Rp. 65,000.00 650.00
JUMLAH ( BELUM PPN ) 18,180.00
JASA 10 %
JUMLAH
DIBULATKAN
9 1.00 m3 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78
276.0000 kg Portland Cement @ Rp. 1,400.00
0.5914 m3 Pasir beton @ Rp. 100,000.00
0.7496 m3 Koral beton @ Rp. 127,000.00
215.0000 Liter Air @ Rp. 37.71 8,107.65
1.6500 oh Pekerja @ Rp. 55,500.00 91,575.00
0.2750 oh Tukang batu @ Rp. 58,000.00 15,950.00
0.0280 oh Kepala tukang @ Rp. 63,000.00 1,764.00
0.0830 oh Mandor @ Rp. 65,000.00 5,395.00
JUMLAH ( BELUM PPN ) 122,791.65
JASA 10 %
JUMLAH
DIBULATKAN
Upah :
1.00 m1 Pengeboran melintas di bawah aspal
0.8250 org Pekerja @ Rp. 55,500.00 45,787.50
0.0825 org Mandor @ Rp. 65,000.00 5,362.50
JUMLAH 51,150.00
JASA 10 %
JUMLAH
DIBULATKAN
8 1.00 Unit Pekerjaan Pasang Box Panel & Panel Kontrol + KWH 1300 VA
Bahan :
1.0000 Unit Box Panel 20x40x60 @ Rp. 180,000.00
4.0000 bh Beugel @ Rp. -
6.0000 m1 Pipa Galvanis 1.5" @ Rp. 77,500.00
21.0000 m 1
Kabel DX 2 x 16 Sqmm @ Rp. 55,000.00
2.0000 bh Knee pipa PVC 1.5" @ Rp. 500.00
1.0000 bh Invoring @ Rp. 17,500.00
3.0000 bh MCB 6 A @ Rp. 50,500.00
1.0000 bh MCB 10 A @ Rp. 56,000.00
0.3000 m1 Rel MCB @ Rp. 52,500.00
1.0000 btg Ground Rod (Galvanist) @ Rp. 39,000.00
3.0000 m1 BC 6 mm @ Rp. 10,000.00
3.0000 bh Pilot Lamp @ Rp. 12,500.00
1.0000 ls Kabel Pengawatan Panel @ Rp. 57,500.00
1.0000 bh Terminal Nol @ Rp. 45,000.00
2.0000 bh Sekering kecil @ Rp. 9,000.00
0.5000 m1 Pipa Spiral 1.5" @ Rp. 4,500.00
Upah :
3.0000 org Pekerja @ Rp. 55,500.00 166,500.00
0.2500 org Tenaga Ahli @ Rp. 105,000.00 26,250.00
1.5000 org Tukang Listrik @ Rp. 45,000.00 67,500.00
0.5000 org Mandor @ Rp. 65,000.00 32,500.00
No. Macam Pekerjaan Upah
(1) (2) (3)
0.5000 set Alat Bantu Pasang/Bongkar - Panel Box @ Rp. 85,000.00 42,500.00
1.0000 ls Pasang Instalasi Panel @ Rp. 40,000.00 40,000.00
1.0000 ls Penyambungan Beban @ Rp. 12,000.00 12,000.00
1,300.00 VA Adminatrasi 900 - 2200 VA @ Rp. 1,000.00 ###
JUMLAH ###
JASA 10 %
JUMLAH
DIBULATKAN
No. Macam Pekerjaan Upah
(1) (2) (3)
124,425.00
35,700.00
12,000.00
60,000.00
23,520.00
2,700.00
5,143.50
263,488.50 564,878.50
56,487.85
621,366.35
621,366.00
124,425.00
25,500.00
12,000.00
23,520.00
2,700.00
5,143.50
193,288.50 319,303.50
31,930.35
351,233.85
351,233.00
- 43,250.00
4,325.00
47,575.00
47,575.00
Bahan Jumlah
(4) (5)
- 57,580.00
5,758.00
63,338.00
63,338.00
11,891.00
1,189.10
13,080.10
13,080.00
Bahan Jumlah
(4) (5)
108,000.00
108,000.00 125,300.00
12,530.00
137,830.00
137,830.00
10,886.40
2,242.50
13,128.90 40,398.90
4,039.89
44,438.79
44,438.00
4,550.00
4,550.00 22,730.00
2,273.00
25,003.00
25,003.00
386,400.00
59,140.00
95,199.20
540,739.20 663,530.85
66,353.09
729,883.94
729,883.00
3,223.10
8,000.00
Bahan Jumlah
(4) (5)
2,625.00
13,848.10 23,955.10
2,395.51
26,350.61
26,350.00
Bahan Jumlah
(4) (5)
3,223.10
8,000.00
2,200.00
13,423.10 41,578.10
4,157.81
45,735.91
45,735.00
93,000.00
27,125.00
120,125.00 138,044.00
13,804.40
151,848.40
151,848.00
96,720.00
28,210.00
124,930.00 142,849.00
14,284.90
157,133.90
157,133.00
15,640.00
3,330.00
18,970.00 23,299.00
2,329.90
25,628.90
25,628.00
Bahan Jumlah
(4) (5)
10,200.00
1,800.00
950.00
12,950.00 16,646.00
1,295.00
1,295.00 1,664.60
166.46
1,831.06
1,831.00
Bahan Jumlah
(4) (5)
22,610.00
855.00
23,465.00 48,386.50
4,838.65
53,225.15
53,225.00
102,765.00
5,940.00
18,375.00
6,745.31
8,226.56
-
142,051.88 192,714.38
19,271.44
211,985.81
211,985.00
102,765.00
5,940.00
18,375.00
6,745.31
8,226.56
-
142,051.88 192,714.38
19,271.44
211,985.81
211,985.00
102,765.00
5,940.00
18,375.00
6,745.31
8,226.56
-
Bahan Jumlah
(4) (5)
142,051.88 192,714.38
19,271.44
211,985.81
211,985.00
Bahan Jumlah
(4) (5)
-
-
-
-
-
4,751.01
23,979.06
-
-
8,708.98
1,722.88
39,413.73
9,332.15
5,250.63
93,158.43
93,158.00
-
-
417,583.10
20,913.18
30,754.68
-
-
8,890.70
-
22,613.59
-
8,708.98
1,722.88
39,413.73
9,332.15
5,250.63
565,183.61
565,183.00
-
-
455,545.20
41,826.36
-
-
Bahan Jumlah
(4) (5)
7,454.59
-
22,613.59
-
12,540.92
17,228.75
7,298.84
31,462.66
17,702.12
613,673.04
613,673.00
Bahan Jumlah
(4) (5)
6,000,000.00
502,828.48
1,500.00
20,913.18
-
-
-
22,613.59
-
8,708.98
1,722.88
39,413.73
9,332.15
5,250.63
6,612,283.61
6,612,283.00
Bahan Jumlah
(4) (5)
-
2,700.00
16,437.50
19,137.50 19,137.50
1,913.75
21,051.25
21,051.00
- 51,150.00
5,115.00
56,265.00
56,265.00
- 57,580.00
5,758.00
63,338.00
63,338.00
827.50
82.75
910.25
910.00
11,891.00
1,189.10
13,080.10
13,080.00
Bahan Jumlah
(4) (5)
14,525.00
1,452.50
15,977.50
15,977.00
Bahan Jumlah
(4) (5)
10,000.00
-
90,000.00
100,000.00 321,000.00
321,000.00
285.71
285.71 917.14
91.71
1,008.86
1,008.00
142.86
142.86 458.57
45.86
504.43
504.00
1,750,000.00
7,000.00
17,000.00
4,500.00
7,000.00
1,785,500.00 1,877,125.00
187,712.50
2,064,837.50
2,064,837.00
925,658.16
2,800,000.00
Bahan Jumlah
(4) (5)
3,725,658.16 3,963,533.16
396,353.32
4,359,886.48
4,359,886.00
Bahan Jumlah
(4) (5)
925,658.16
925,658.16 1,163,533.16
116,353.32
1,279,886.48
1,279,886.00
- 192,875.00
19,287.50
212,162.50
212,162.00
50,500.00
56,000.00
-
3,200,000.00
1,237,600.00
406,000.00
279,000.00
20,000.00
144,109.30
95,865.00
263,505.00
5,752,579.30 6,495,154.30
649,515.43
7,144,669.73
Bahan Jumlah
(4) (5)
7,144,669.00
Bahan Jumlah
(4) (5)
50,500.00
56,000.00
-
-
1,088,000.00
348,000.00
232,500.00
20,000.00
109,978.15
76,692.00
263,505.00
2,245,175.15 2,987,750.15
298,775.02
3,286,525.17
3,286,525.00
180,000.00
-
465,000.00
1,155,000.00
1,000.00
17,500.00
151,500.00
56,000.00
15,750.00
39,000.00
30,000.00
37,500.00
57,500.00
45,000.00
18,000.00
2,250.00
Bahan Jumlah
(4) (5)
2,271,000.00 3,958,250.00
395,825.00
4,354,075.00
4,354,075.00
Bahan Jumlah
(4) (5)
162,406.66
-
-
162,406.66 400,281.66
40,028.17
440,309.83
440,309.00
162,406.66
-
-
162,406.66 400,281.66
40,028.17
440,309.83
440,309.00
126,000.00
116,250.00
242,250.00 480,125.00
48,012.50
528,137.50
528,137.00
Bahan Jumlah
(4) (5)
62,464.10
350,000.00
412,464.10 462,499.10
46,249.91
508,749.01
508,749.00
Bahan Jumlah
(4) (5)
- 343,250.00
34,325.00
377,575.00
377,575.00
- 343,250.00
34,325.00
377,575.00
377,575.00
8,100,000.00
8,100,000.00 8,593,250.00
859,325.00
9,452,575.00
9,452,575.00
5,000.00
Bahan Jumlah
(4) (5)
5,000.00 35,487.50
3,548.75
39,036.25
39,036.00
Bahan Jumlah
(4) (5)
345,800.00
62,070.00
93,980.00
501,850.00 624,641.65
624,641.00
142,000.00
8,750.00
1,160.00
913,500.00
21,487.50
470,400.00
54,000.00
102,870.00
1,714,167.50 2,203,948.50
2,203,948.00
31,500.00
16,100.00
4,192.50
51,792.50 75,847.50
75,847.00
8,736.00
2,340.00
Bahan Jumlah
(4) (5)
11,076.00 38,346.00
38,346.00
Bahan Jumlah
(4) (5)
3,223.10
8,000.00
2,625.00
13,848.10 23,955.10
23,955.00
3,223.10
7,000.00
2,625.00
12,848.10 22,955.10
22,955.00
ANALISA UNTUK PEKERJAAN PELUMPURAN
a x (L + 75)
k =
275
k = Biaya yang dicari per m3
a = Upah pekerja per hari
L = Jarak pengangkutan dalam m1
Dalam perhitungan biaya diatas sudah termasuk harga alat yang dipakai
Dalam perhitungan biaya diatas sudah termasuk harga alat yang dipakai
Dalam perhitungan biaya diatas sudah termasuk harga alat yang dipakai
Dalam perhitungan biaya diatas sudah termasuk harga alat yang dipakai
69,525.00
6,952.50
76,477.50
76,470.00
86,500.00
8,650.00
95,150.00
95,150.00
- 18,965.00
1,896.50
20,861.50
20,860.00
- 29,990.00
2,999.00
32,989.00
32,980.00
Bahan Jumlah
(4) (5)
18,484.00
1,848.40
20,332.40
20,330.00
69,525.00
6,952.50
76,477.50
76,470.00
86,500.00
8,650.00
95,150.00
95,150.00
- 18,965.00
1,896.50
20,861.50
20,860.00
- 29,990.00
2,999.00
32,989.00
32,980.00
Bahan Jumlah
(4) (5)
12,208.00
2,080.00
4,419.60
18,707.60 35,621.60
3,562.16
39,183.76
39,180.00
Bahan Jumlah
(4) (5)
11,750.00
1,175.00
12,925.00
12,920.00
69,525.00
6,952.50
76,477.50
76,470.00
173,000.00
17,300.00
190,300.00
190,300.00
- 18,965.00
1,896.50
20,861.50
20,860.00
- 29,990.00
2,999.00
32,989.00
32,980.00
38,850.00
20,300.00
2,205.00
2,275.00
63,630.00 146,781.50
14,678.15
161,459.65
161,450.00
Bahan Jumlah
(4) (5)
69,525.00
6,952.50
76,477.50
76,470.00
- 18,965.00
1,896.50
20,861.50
20,860.00
12,390.00
12,390.00 29,990.00
2,999.00
32,989.00
32,980.00
-
-
65,960.00
65,960.00 153,960.00
15,396.00
169,356.00
169,350.00
ANALISA CLEANING SERVICE
1 1.00 m2 Membersihkan Ruangan Kategori Berat Area Non Pasar (Termasuk lanta
prabot)
0.0027246952 OH Pekerja @ Rp. 55,500 151.2206
0.0005454900 OH Kepala Regu @ Rp. 47,500 25.9108
0.0002727450 OH Supervisor @ Rp. 105,000 28.6382
0.0000105887 Buah Bottle Sprayer @ Rp. 10,000
0.0000007352 Buah Ember kecil @ Rp. 10,000
0.0000003134 Buah Gelas ukur @ Rp. -
0.0000188042 Buah Kain lobby duster 60cm @ Rp. -
0.0000002123 Buah Ember plastik 3 galon @ Rp. 100,000
0.0000010878 Buah Kain lobby duster 80cm @ Rp. -
0.0000101893 Buah Nylon broom @ Rp. -
0.0000078322 Buah Kain pell @ Rp. 10,000
0.0000032634 Buah Floor wipper 50cm @ Rp. -
0.0000005439 Set Stick lobby duster 80 cm @ Rp. -
0.0000003263 Buah Wet floor sign @ Rp. -
0.0000001874 Buah Dust pan buka @ Rp. -
0.0000135858 Buah Kentucky mop 400gr+Stick @ Rp. -
0.0001708157 Liter Karbol Wangi @ Rp. -
0.0000211846 Liter Metal Shine @ Rp. 40,000
0.0000976953 Liter Power Pell @ Rp. -
0.0000113683 gram Scrub powder @ Rp. -
0.0000056774 Liter Dry Dust Cleaner @ Rp. -
0.0000065269 Buah Sapu ijuk @ Rp. 15,000
0.0000004468 Buah Vacuum Cleaner @ Rp. -
0.0000743900 Liter Furniture Polish @ Rp. -
0.0000607050 Liter Glass cleaner @ Rp. -
0.0000002578 Buah Tangga lipat @ Rp. 2,000,000
0.0000044242 Buah Safety belt @ Rp. 100,000
0.0000036869 Set Extention handle @ Rp. -
0.0004908664 Buah Masker kain @ Rp. 13,000
0.0000022482 Set Cover window washer @ Rp. -
0.0000168615 Set Window washer @ Rp. -
0.0000073737 Set Window wipper 35cm @ Rp. -
0.0000469296 Liter MPC @ Rp. -
JUMLAH (BELUM PPN) 205.7696
JASA 10%
JUMLAH
BIAYA 1 BULAN (DIHITUNG 25 HARI)
DIBULATKAN
No Macam Pekerjaan Upah
(1) (2) (3)
an Kategori Berat Area Non Pasar (Termasuk lantai, dinding, pintu/jendela dan
0.1059
0.0074
-
-
0.0212
-
-
0.0783
-
-
-
-
-
-
0.8474
-
-
-
0.0979
-
-
-
0.5156
0.4424
-
6.3813
-
-
-
-
8.4974 214.2669
21.4267
235.6936
5,892.3411
5,892.34
Bahan Jumlah
(4) (5)
0.1059
0.0074
-
-
0.0212
-
-
0.0783
-
-
-
-
-
-
0.8474
-
-
-
0.0979
-
-
-
0.5156
0.4424
-
6.3813
-
-
-
-
-
8.4974 157.8764
15.7876
173.6640
4,341.5999
4,341.60
Bahan Jumlah
(4) (5)
0.0688
0.0048
-
-
0.0138
-
-
0.0509
-
-
-
-
-
-
0.5508
-
-
-
0.0979
0.5156
0.4424
-
6.3813
-
8.1263 105.2227
10.5223
115.7449
2,893.6229
2,893.62
-
-
-
-
-
-
-
-
-
-
-
Bahan Jumlah
(4) (5)
-
-
-
-
-
-
-
-
-
-
- 672.2055
67.2206
739.4261
18,485.6513
18,485.65
Bahan Jumlah
(4) (5)
0.1059
0.0074
-
-
0.0212
-
-
0.0783
-
-
-
-
-
-
-
-
-
-
-
-
0.0979
-
-
-
0.5156
0.4424
-
6.3813
0.4202
-
-
-
-
8.0702 232.1387
23.2139
255.3526
7,660.5778
7,660.58
ANALISA HARGA SATUAN PEKERJAAN PENGANGKUTAN
1.00 m2 Sweeping
0.00002500 bh Sapu lidi 5,000.00
0.00000093 bh Tangkai sapu 7,875.00
0.00000556 bh Tomblok 10,000.00
0.00000023 bh Hareg 47,250.00
0.00000278 bh Keruk 7,825.00
0.00000023 bh Gerobak 1,575,000.00
0.00000046 bh Seragam 200,000.00
0.00000556 bh Sarung tangan 10,000.00
0.00000046 bh Sepatu 78,750.00
0.00000023 bh Helm 20,000.00
0.00001111 bh Masker 10,000.00
0.00000556 bh Serok 10,000.00
0.00008333 org Pekerja 55,500.00 4.62
0.00000833 org Mandor 65,000.00 0.54
JUMLAH (BELUM PPN) 5.17
JASA 10%
JUMLAH
3,600,000.00
24,999.90
75.00
36.00
6.52
2.76
110.40
133.32
66.72
43.47
3,625,474.09 9,029,474.09
902,947.41
9,932,421.50
5,400,000.00
37.50
18.00
3.26
1.38
27.60
33.33
16.68
10.87
5,400,148.62 7,801,148.62
780,114.86
8,581,263.48
0.23
0.02
0.10
0.02
0.04
0.36
0.17
0.10
0.07
0.01
0.21
0.10
1.43 11.12
1.11
12.23
12.23
9.66
8.81
0.13
0.01
0.06
0.01
0.02
0.36
0.09
0.06
0.04
0.00
0.11
0.06
0.94 6.10
0.61
6.71
6.71
5.30
4.83
Alat Rp. Jumlah Rp.
(4) (5)
-
-
-
41.68
133.32
83.40
29.16
0.19
43.76
16.66
29.16
26.24
375.00
116.66
2,333.40
116.67
918.78
2,500.00
83.30
416.50
7,263.86 55,388.86
5,538.89
60,927.75
60,927.00
Alat Rp. Jumlah Rp.
(4) (5)
-
-
-
41.68
133.32
83.40
29.16
0.19
43.76
16.66
29.16
26.24
375.00
116.66
2,333.40
116.67
918.78
2,500.00
83.30
416.50
7,263.86 55,388.86
5,538.89
60,927.75
60,927.00
Alat Rp. Jumlah Rp.
(4) (5)
0.23
0.02
0.10
0.04
0.17
0.10
0.07
0.01
0.21
0.10
1.05 9.72
0.97
10.70
-
-
0.14
0.01
0.11
0.01
0.28 10.85
1.08
11.93
-
-
0.38
0.16
0.02
0.10
0.12
0.78 10.31
1.03
11.34
Alat Rp. Jumlah Rp.
(4) (5)
-
16.67
1.33
0.55
0.08
0.43
19.06 52.42
5.24
57.67
- 284.00
28.40
312.40
- 568.00
56.80
624.80
ANALISA KPUT
No. Macam Pekerjaan Upah
(1) (2) (3)
Tiap m2
1/100 x 2,648,620.00 + 4,090,000.00 26,486.20
Biaya menggilas
1/200 x 188,750.00 + 161,125.00 943.75
Sewa motor walls
1/200 x - -
JUMLAH ( BELUM TERMASUK PPN ) 27,429.95
JASA 10 %
JUMLAH
DIBULATKAN
Tiap m2
1/100 x 2,081,397.50 + 3,425,000.00 20,813.98
Biaya menggilas
1/200 x 188,750.00 + 161,125.00 943.75
Sewa motor walls
1/200 x - -
JUMLAH ( BELUM TERMASUK PPN ) 21,757.73
JASA 10 %
JUMLAH
DIBULATKAN
No. Macam Pekerjaan Upah
(1) (2) (3)
Tiap m2
1/100 x 1,324,310.00 + 2,390,000.00 13,243.10
Biaya menggilas
1/150 x 188,750.00 + 161,125.00 1,258.33
Sewa motor walls
1/150 x - -
JUMLAH ( BELUM TERMASUK PPN ) 14,501.43
JASA 10 %
JUMLAH
DIBULATKAN
Tiap m2
1/100 x 1,031,500.00 + 6,556,394.00 10,315.00
Biaya menggilas
4/12,5/200 x 188,750.00 + 161,125.00 302.00
Sewa motor walls
1/200 x - -
JUMLAH ( BELUM TERMASUK PPN ) 10,617.00
JASA 10 %
JUMLAH
DIBULATKAN
- 87,995.00
87,995.00
- 55,500.00
55,500.00
27,500.00
27,500.00
10,125.00
96,000.00
161,125.00 349,875.00
349,875.00
487,500.00
2,530,000.00
487,500.00
585,000.00
4,090,000.00 6,738,620.00
6,738,620.00
40,900.00
805.63
41,705.63 69,135.58
6,913.56
76,049.13
76,049.00
450,000.00
Bahan Jumlah
(4) (5)
1,925,000.00
465,000.00
585,000.00
3,425,000.00 5,506,397.50
5,506,397.00
34,250.00
805.63
35,055.63 56,813.35
5,681.34
62,494.69
62,494.00
Bahan Jumlah
(4) (5)
1,625,000.00
310,000.00
162,500.00
292,500.00
2,390,000.00 3,714,310.00
3,714,310.00
23,900.00
1,074.17
24,974.17 39,475.60
3,947.56
43,423.16
43,423.00
19,120.00
1,074.17
20,194.17 32,046.98
3,204.70
35,251.68
35,251.00
16,730.00
1,074.17
17,804.17 28,332.67
2,833.27
31,165.94
31,165.00
Bahan Jumlah
(4) (5)
22,044.00
108,000.00
700,000.00
240,000.00
118,750.00
4,473,000.00
894,600.00
-
6,556,394.00 7,587,894.00
7,587,894.00
65,563.94
257.80
65,821.74 76,438.74
7,643.87
84,082.61
84,082.00
1,397,812.50
97,500.00
85,500.00
1,580,812.50 2,065,737.50
2,065,737.00
31,616.25
322.25
5,591.25
Bahan Jumlah
(4) (5)
37,529.75 47,605.75
4,760.58
52,366.33
52,366.00
47,424.38
322.25
5,591.25
53,337.88 68,263.13
6,826.31
75,089.44
75,089.00
Bahan Jumlah
(4) (5)
-
97,500.00
85,500.00
183,000.00 667,925.00
667,925.00
3,660.00
322.25
-
3,982.25 14,058.25
1,405.83
15,464.08
15,464.00
5,490.00
322.25
-
5,812.25 20,737.50
2,073.75
22,811.25
22,811.00
226,100.00
8,550.00
234,650.00 483,865.00
483,865.00
23,465.00
23,465.00 48,386.50
Bahan Jumlah
(4) (5)
4,838.65
53,225.15
53,225.00
102,765.00
5,940.00
18,375.00
6,745.31
10,078.13
-
143,903.44 194,565.94
19,456.59
214,022.53
214,022.00
Bahan Jumlah
(4) (5)
10,000.00
-
90,000.00
100,000.00 321,000.00
321,000.00
285.71
285.71 917.14
91.71
1,008.86
1,008.00
142.86
142.86 458.57
45.86
504.43
504.00
45,870.00
7,920.00
53,790.00 73,960.00
7,396.00
81,356.00
81,356.00
1,301,475.00
74,800.00
11,340.00
3,375.00
39,000.00
6,950.00
91,875.00
44,968.75
7,937.50
500.00
-
Bahan Jumlah
(4) (5)
-
1,582,221.25 1,836,221.25
183,622.13
2,019,843.38
2,019,843.00
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0113
2 Mandor ( L 03 ) Jam 0.0016
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.0121
2 Agregat Halus ( M 04 ) M3 0.0232
3 Filler ( M 05 ) Kg 4.8004
4 Aspal ( M 10 ) Kg 5.2962
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0011
2 AMP ( E 01 ) Jam 0.0016
3 Genset ( E 12 ) Jam 0.0016
4 Dump Truck ( E 09 ) Jam 0.0143
5 Aspal Finisher ( E 02 ) Jam 0.0020
6 Tandem Roller ( E 17 ) Jam 0.0017
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0013
8 Alat Bantu Ls 1.0000
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran bera
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN y
dan biaya biaya lainnya
URAIAN ANALISA HARGA SATUAN LATASTON ( HRS )
SATUAN : M2
I ASUMSI
1 Menggunakan alat berat ( cara mekanik )
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0
5 Tebal lapisan padat t 0.03
6 Jam kerja efektif 1 hari Tk 7.00
7 Faktor kehilangan material
- Agregat Fh 1 1.10
- Aspal Fh 2 1.05
II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat
langsung ke dalam Dump Truck dan diangkut ke lokasi pekerjaan.
3 Campuran panas HRS dihampar dengan Finisher dan dipadatakan dengan
Tandem dan Peneumatic Tire Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50
Faktor bucket Fb 0.90
Faktor efisiensi alat Fa 0.83
Waktu siklus Ts 1
- Muat T1 1.50
- Lain lain T2 0.50
Ts 1 2.00
d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 8.00
Faktor efisiensi alat Fa 0.83
Kecepatan rata rata bermuatan v1 40.00
Kecepatan rata rata kosong v2 50.00
Kapasitas AMP batch Q2 b 0.50
Waktu menyiapkan 1 batch HRS Tb 1.00
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 16.00
- Angkut = ( L : v1 ) x 60 menit T2 30.00
- Tunggu + Dumping + Putar T3 15.00
- Kembali = ( L : v2 ) x 60 menit T4 24.00
Ts2 85.00
e Finisher ( E 02 )
Kapasitas produksi V 40.00
Faktor efisiensi alat Fa 0.83
f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 3.50
Lebar efektif pemadatan b 1.20
Jumlah lintasan n 6.00
Faktor efisiensi alat Fa 0.83
h Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan
3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 617.56
Produksi HRS / hari = Tk x Q2 Qt 4,322.92
Kebutuhan tenaga
- Pekerja P 7.00
- Mandor M 1.00
Rp 137,236.00 / M2
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0217
2 Mandor ( L 03 ) Jam 0.0022
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.0336
2 Agregat Halus ( M 04 ) M3 0.0149
3 Filler ( M 05 ) Kg 4.8015
4 Aspal ( M 10 ) Kg 6.6150
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0015
2 AMP ( E 01 ) Jam 0.0022
3 Genset ( E 12 ) Jam 0.0022
4 Dump Truck ( E 09 ) Jam 0.0348
5 Aspal Finisher ( E 02 ) Jam 0.0027
6 Tandem Roller ( E 17 ) Jam 0.0016
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0023
8 Alat Bantu Ls 1.0000
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran bera
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN y
dan biaya biaya lainnya
URAIAN ANALISA HARGA SATUAN LASTON ( AC )
SATUAN : M2
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0
5 Tebal lapisan ( AC ) padat t 0.04
6 Jam kerja efektif 1 hari Tk 7.00
7 Faktor kehilangan material
- Agregat Fh 1 1.10
- Aspal Fh 2 1.05
II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat
langsung ke dalam Dump Truck dan diangkut ke lapangan
3 Campuran panas AC dihampar dengan Finisher dan dipadatakan dengan
Tandem dan Tire Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50
Faktor bucket Fb 0.90
Faktor efisiensi alat Fa 0.83
Waktu siklus Ts 1
- Muat T1 1.50
- Lain lain T2 0.50
Ts 1 2.00
d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 4.00
Faktor efisiensi alat Fa 0.83
Kecepatan rata rata bermuatan v1 40.00
Kecepatan rata rata kosong v2 50.00
Kapasitas AMP batch Q2 b 0.50
Waktu menyiapkan 1 batch AC Tb 1.00
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 8.00
- Angkut = ( L : v1 ) x 60 menit T2 29.99
- Tunggu + Dumping + Putar T3 15.00
- Kembali = ( L : v2 ) x 60 menit T4 23.99
Ts2 76.98
e Finisher ( E 02 )
Kapasitas produksi V 40.00
Faktor efisiensi alat Fa 0.83
f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 2.50
Lebar efektif pemadatan b 1.20
Jumlah lintasan n 4.00
Faktor efisiensi alat Fa 0.83
h Alat Bantu
Diperlukan :
- Rambu = 2 bh
- Kereta dorong = 2 bh
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan
3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 461.11
Produksi AC / hari = Tk x Q2 Qt 3,227.78
Kebutuhan tenaga
- Pekerja P 10.00
- Mandor M 1.00
Rp 160,710.00 / M2
A TENAGA
1 Pekerja ( L 01 ) Jam 0.3880
2 Mandor ( L 03 ) Jam 0.0554
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7028
2 Agregat Halus ( M 04 ) M3 0.5341
3 Filler ( M 05 ) Kg 139.2
4 Aspal ( M 10 ) Kg 157.0
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0380
2 AMP ( E 01 ) Jam 0.0554
3 Genset ( E 12 ) Jam 0.0554
4 Dump Truck ( E 09 ) Jam 0.4906
5 Aspal Finisher ( E 02 ) Jam 0.0767
6 Tandem Roller ( E 17 ) Jam 0.0430
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0321
8 Alat Bantu Ls 1.0000
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran bera
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN y
dan biaya biaya lainnya
URAIAN ANALISA HARGA SATUAN ASPHALT TREATED BASE ( ATB )
SATUAN : M3
I ASUMSI
1 Menggunakan alat berat ( Cara mekanik )
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0
5 Tebal lapisan ( ATB ) padat t 0.04
6 Jam kerja efektif 1 hari Tk 7.00
7 Faktor kehilangan material
- Agregat Fh 1 1.10
- Aspal Fh 2 1.05
II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat
langsung ke dalam Dump truck dan diangkut ke lokasi pekerjaan
3 Campuran panas ATB dihampar dengan Finisher dan dipadatakan dengan
Tandem dan Pneumatic Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50
Faktor bucket Fb 0.90
Faktor efisiensi alat Fa 0.83
Waktu siklus Ts 1
- Muat T1 1.50
- Lain lain T2 0.50
Ts 1 2.00
d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 8.00
Faktor efisiensi alat Fa 0.83
Kecepatan rata rata bermuatan v1 40.00
Kecepatan rata rata kosong v2 50.00
Kapasitas AMP batch Q2 b 0.50
Waktu menyiapkan 1 batch ATB Tb 1.00
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 16.00
- Angkut = ( L : v1 ) x 60 menit T2 29.99
- Tunggu + Dumping + Putar T3 15.00
- Kembali = ( L : v2 ) x 60 menit T4 23.99
Ts2 84.99
e Finisher
Kapasitas produksi V 40.00
Faktor efisiensi alat Fa 0.75
f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 3.50
Lebar efektif pemadatan b 1.20
Jumlah lintasan n 6.00
Faktor efisiensi alat Fa 0.83
h Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan
3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 18.04
Produksi ATB / hari = Tk x Q2 Qt 126.30
Kebutuhan tenaga
- Pekerja P 7.00
- Mandor M 1.00
Rp 4,097,233.00 / M3
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0301
2 Mandor ( L 03 ) Jam 0.0060
B BAHAN
1 Aspal ( M 10 ) ( M 10 ) Kg 0.6417
2 Karosene ( M 11 ) ( M 11 ) Liter 0.4889
C PERALATAN
1 Asphalt Sprayer ( E 03 ) Jam 0.0030
2 Compresor ( E 05 ) Jam 0.0031
3 Dump Truck ( E 08 ) Jam 0.0030
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran bera
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN y
dan biaya biaya lainnya
URAIAN ANALISA HARGA SATUAN LAPIS RESAP PENGIKAT
SATUAN : L
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.00
4 Jam kerja efektif 1 hari Tk 7.00
5 Faktor kehilangan material Fh 1.10
6 Komposisi campuran AC ( Spesifikasi )
- Aspal AC - 10 atau AC - 20 AS 56
- Minyak Flux / pencair K 44
8 Bahan dasar ( aspal dan minyak pencair ) semuanya diterima di Lokasi Pekerjaan
II METODA KERJA
1 Aspal dan minyak Flux dicampur dan dipanaskan sehingga menjadi campuran aspal cair
2 Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dg air kompresor
3 Campuran aspal cair disemprotkan dg aspahalt sprayer ke atas permukaan yg akan dilapis
4 Angkutan aspal dan minyak Flux menggunakan Dump truck
2 ALAT
a Asphalt Sprayer ( E 03 )
Kapasitas alat V 800.00
Faktor efisiensi alat Fa 0.83
Waktu siklus ( termasuk proses pemanasan ) Ts 2.00
b Air Compresor ( E 05 )
Kapasitas alat -----------> Diambil V 400.00
Aplikasi Lapis Resap Pengikat Rata rata ( Spesifikasi ) Ap 0.80
c Dump Truk ( DT ) ( E 08 )
Sebagai alat pengangkut bahan di lokasi pekerjaan Dump Truck melayani alat
Asphalt Sprayer
3 TENAGA
Produksi menentukan : ASPALT FINISHER Q4 332.00
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 2,324.00
Kebutuhan tenaga
- Pekerja P 10.00
- Mandor M 2.00
Rp 11,355.00 / LITER
A TENAGA
1 Pekerja ( L 01 ) Jam 0.4373
2 Mandor ( L 03 ) Jam 0.0625
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7680
2 Agregat Halus ( M 04 ) M3 0.4320
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0625
2 Dump Truck ( E 09 ) Jam 0.1994
3 Motor Grader ( E 13 ) Jam 0.0117
4 Vibratory Roller ( E 19 ) Jam 0.0178
5 Pneumatic Tyre Roller ( E 18 ) Jam 0.0043
6 Water Tank Truck ( E 23 ) Jam 0.0211
7 Alat Bantu Ls 1.0000
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
UNTUK 1 M2 TEBAL 20 CM
UNTUK 1 M2 TEBAL 15 CM
UNTUK 1 M2 TEBAL 10 CM
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran bera
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN y
dan biaya biaya lainnya
URAIAN ANALISA HARGA SATUAN LAPIS PONDASI AGREGAT KLAS A
SATUAN : M3
I ASUMSI
1 Menggunakan alat berat Cara mekanik
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0
5 Tebal Agregat padat t 0.15
6 Faktor kembang material ( padat - lepas ) Fk 1.20
7 Jam kerja efektif per hari Tk 7.00
8 Proporsi campuran
- Agregat Kasar Ak 64.00
- Agregat halus Ah 36.00
II METODA KERJA
1 WHEEL LOADER mencampur dan memuat agregat ke dalam Dump Truck di
Base camp
2 Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dg motor
Grader
3 Hamparan Agregat di basahi dengan Water Tank Truck sebelum dipadatkan
dengan Tandem Roller & PTR
4 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan
level permukaan dengan menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50
Faktor bucket Fb 0.90
Faktor efisiensi alat Fa 0.83
Waktu siklus Ts 1
- Mencampur T1 2.50
- Memuat dan Lain lain T2 1.00
Ts 1 3.50
b Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 6.00
Faktor efisiensi alat Fa 0.83
Kecepatan rata rata bermuatan v1 45.00
Kecepatan rata rata kosong v2 60.00
Waktu Siklus Ts2
- Waktu tempuh isi = ( L : v1 ) x 60 menit T1 26.65
- Waktu tempuh kosong = ( L : v2 ) x 60 menit T2 19.99
- lain lain termasuk menurunkan Agregat T3 3.00
Ts2 49.65
No URAIAN KODE KOEF.
c Motor Grader ( E 13 )
Panjang hamparan Lh 50.00
Lebar efektif kerja blade b 2.40
Faktor Efisiensi alat Fa 0.83
Kecepatan rata rata alat v 4.00
Jumlah lintasan n 6.00
Waktu siklus Ts 3
- Perataan 1 Lintasan = Lh : ( v x 1000 x 60 menit ) T1 0.75
- Lain lain T2 1.00
Ts 3 1.75
d Vibratory Roller ( E 19 )
Kecepatan rata rata alat v 3.00
Lebar efektif pemadatan b 1.20
Jumlah lintasan n 8.00
Faktor efisiensi alat Fa 0.83
g Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh
- Skop = 3 bh
- Garpu = 2 bh
3 TENAGA
Produksi menentukan : WHEEL LOADER Q1 16.01
Produksi Agregat / hari = Tk x Q1 Qt 112.05
Kebutuhan tenaga
- Pekerja P 7.00
- Mandor M 1.00
Rp 209,191.00 / M2
A TENAGA
1 Pekerja ( L 01 ) Jam 0.4373
2 Mandor ( L 03 ) Jam 0.0625
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7080
2 Agregat Halus ( M 04 ) M3 0.4920
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0625
2 Dump Truck ( E 09 ) Jam 0.1994
3 Motor Grader ( E 13 ) Jam 0.0117
4 Vibratory Roller ( E 19 ) Jam 0.0178
5 Pneumatic Tyre Roller ( E 18 ) Jam 0.0043
6 Water Tank Truck ( E 23 ) Jam 0.0211
7 Alat Bantu Ls 1.0000
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
UNTUK 1 M2 TEBAL 20 CM
UNTUK 1 M2 TEBAL 15 CM
UNTUK 1 M2 TEBAL 10 CM
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran bera
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN y
dan biaya biaya lainnya
URAIAN ANALISA HARGA SATUAN LAPIS PONDASI AGREGAT KLAS B
SATUAN : M3
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0
5 Tebal Agregat padat t 0.15
6 Faktor kembang material ( padat - lepas ) Fk 1.20
7 Jam kerja efektif per hari Tk 7.00
8 Proporsi campuran
- Agregat Kasar Ak 59.00
- Agregat halus Ah 41.00
II METODA KERJA
1 WHEEL LOADER mencampur dan memuat agregat ke dalam Dump Truck di
Base camp
2 Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dengan
motor Grader
3 Hamparan Agregat di basahi dengan Water Tank Truck sebelum dipadatkan
dengan Tandem Roller & PTR
4 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan
level permukaan dengan menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50
Faktor bucket Fb 0.90
Faktor efisiensi alat Fa 0.83
Waktu siklus Ts 1
- Mencampur T1 2.50
- Memuat dan Lain lain T2 1.00
Ts 1 3.50
b Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 6.00
Faktor efisiensi alat Fa 0.83
Kecepatan rata rata bermuatan v1 45.00
Kecepatan rata rata kosong v2 60.00
Waktu Siklus Ts2
- Waktu tempuh isi = ( L : v1 ) x 60 menit T1 26.65
- Waktu tempuh kosong = ( L : v2 ) x 60 menit T2 19.99
- lain lain termasuk menurunkan Agregat T3 3.00
Ts2 49.65
No URAIAN KODE KOEF.
c Motor Grader ( E 13 )
Panjang hamparan Lh 50.00
Lebar efektif kerja blade b 2.40
Faktor Efisiensi alat Fa 0.83
Kecepatan rata rata alat v 4.00
Jumlah lintasan n 6.00
Waktu siklus Ts 3
- Perataan 1 Lintasan = ( Lh x 60 ) : ( v x 1000 ) T1 0.75
- Lain lain T2 1.00
Ts 3 1.75
d Vibratory Roller ( E 17 )
Kecepatan rata rata alat v 3.00
Lebar efektif pemadatan b 1.20
Jumlah lintasan n 8.00
Faktor efisiensi alat Fa 0.83
g Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh
- Skop = 3 bh
- Garpu = 2 bh
3 TENAGA
Produksi menentukan : WHEEL LOADER Q1 16.01
Produksi Agregat / hari = Tk x Q1 Qt 112.05
Kebutuhan tenaga
- Pekerja P 7.00
- Mandor M 1.00
Rp 207,079.00 / M2
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0301
2 Mandor ( L 03 ) Jam 0.0060
B BAHAN
1 Aspal ( M 10 ) Kg 0.8880
2 Kerosene ( M 11 ) Liter 0.2530
C PERALATAN
1 Asphalt Sprayer ( E 03 ) Jam 0.0030
2 Compresor ( E 05 ) Jam 0.0063
3 Dump Truck ( E 08 ) Jam 0.0030
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran bera
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN y
dan biaya biaya lainnya
URAIAN ANALISA HARGA SATUAN LAPIS PEREKAT
SATUAN : M3
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.00
4 Jam kerja efektif 1 hari Tk 7.00
5 Faktor kehilangan material Fh 1.10
6 Komposisi campuran ( Spesifikasi )
- Aspal AC - 10 atau AC - 20 AS 77
- Minyak Flux / pencair K 23
II METODA KERJA
1 Aspal dan minyak Flux dicampur dan dipanaskan sehingga menjadi campuran
aspal cair
2 Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dg air
kompresor
3 Campuran aspal cair disemprotkan dg aspahalt sprayer ke atas permukaan yg
akan dilapis
4 Angkutan aspal dan minyak Flux menggunakan Dump truck
2 ALAT
a Asphalt Sprayer ( E 03 )
Kapasitas alat V 800.00
Faktor efisiensi alat Fa 0.83
Waktu siklus ( termasuk proses pemanasan ) Ts 2.00
b Air Compresor ( E 05 )
Kapasitas alat . . . . . Diambil V 400.00
Aplikasi Lapis Resap Pengikat Rata rata ( Spesifikasi ) Ap 0.40
Kapasitas produksi / jam = V x Ap Q2 160.00
c Dump Truk ( DT ) ( E 08 )
Sebagai alat pengangkut bahan di lokasi pekerjaan Dump Truck melayani alat
Asphalt Sprayer
3 TENAGA
Produksi menentukan : ASPALT FINISHER Q4 332.00
Produksi Lapis Perekat / hari = Tk x Q4 Qt 2,324.00
Kebutuhan tenaga
- Pekerja P 10.00
- Mandor M 2.00
Rp 13,525.00 / Liter
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0161
2 Mandor ( L 02 ) Jam 0.0040
B BAHAN
C PERALATAN
1 Motor Grader ( E 13 ) Jam 0.0025
2 Vibratory Roller ( E 19 ) Jam 0.0040
3 Water Tank Truck ( E 23 ) Jam 0.0105
4 Alat Bantu Ls 1.0000
JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran bera
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN y
dan biaya biaya lainnya
URAIAN ANALISA HARGA SATUAN PENYIAPAN BADAN JALAN
( PEMADATAN DAN PERATAAN )
SATUAN : M2
I ASUMSI
1 Pekerjaan dilakukan pada hanya pada tanah galian
2 Pekerjaan dilakukan secara mekanis
3 Lokasi pekerjaan : sepanjang jalan
4 Kondisi jalan : jelek / belum padat
5 Jam kerja efektif per hari Tk 7.00
II URUTAN KERJA
1 Motor Grader meratakan permukaan hasil galian
2 Vibro Roller memadatkan permukaan jalan yang telah diratakan oleh Motor grader
3 Sekelompok pekerja akan membanru meratakan badan jalan dengan alat bantu
permukaan dengan menggunakan alat bantu
2 ALAT
a Motor Grader ( E 13 )
Panjang hamparan Lh 50.00
Lebar efektif kerja blade b 2.40
Faktor Efisiensi alat Fa 0.83
Kecepatan rata rata alat v 2.00
Jumlah lintasan n 6.00
Waktu siklus Ts 1
- Perataan 1 Lintasan = Lh : ( v x 1000 x 60 menit ) T1 1.50
- Lain lain T2 1.00
Ts 1 2.50
b Vibratory Roller ( E 19 )
Kecepatan rata rata alat v 2.00
Lebar efektif pemadatan b 1.20
Jumlah lintasan n 8.00
Faktor efisiensi alat Fa 0.83
g Alat Bantu
Diperlukan :
- Skop = 3 bh
3 TENAGA
Produksi menentukan : VIBRATORY ROLLER Q2 249.00
Produksi Pekerjaan / hari = Tk x Q2 Qt 1,743.00
Kebutuhan tenaga
- Pekerja P 4.00
- Mandor M 1.00
Rp 2,176.00 / M2
Analisa EI - 633
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,937.50 78.64
8,125.00 13.16
91.79
134,000.00 1,623.37
102,000.00 2,366.67
11,340.00 54,436.98
11,182.50 59,225.13
117,652.14
114,625.00 127.30
2,689,687.50 4,355.35
183,750.00 297.54
134,375.00 1,926.58
57,350.00 116.08
60,312.50 103.81
70,187.50 90.20
- -
7,016.87
124,760.81
12,476.08
137,236.89
137,236.00
naga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
luruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
A HARGA SATUAN LATASTON ( HRS )
Analisa EI - 633
SATUAN KET.
Km
m
Jam
-
-
%
%
%
%
t / m3
t / m3
t / m3
t / m3
m3
m3
Kg
Kg
m3
-
-
menit
menit
menit
m2
Jam
SATUAN KET.
ton / jam
-
m2
Jam
m2
Jam
ton
-
km / jam
km / jam
ton
menit
menit
menit
menit
menit
menit
m2
Jam
km / jam
-
m2
Jam
km/jam
m
lintasan
-
m2
Jam
SATUAN KET.
km / jam
m
lintasan
-
m2
Jam
Lump sum
m2 / jam
m2
orang
orang
jam
jam
NDAR UNTUK PEREKAMAN ANALISA
G MASING HARGA SATUAN
Analisa EI - 634
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,937.50 150.45
8,125.00 17.62
168.07
134,000.00 4,506.76
102,000.00 1,514.70
11,340.00 54,449.01
11,182.50 73,972.24
134,442.70
114,625.00 170.50
2,689,687.50 5,833.06
183,750.00 398.49
134,375.00 4,673.81
57,350.00 155.47
60,312.50 96.89
70,187.50 161.07
- -
11,489.28
146,100.06
14,610.01
160,710.07
160,710.00
naga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
luruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
ISA HARGA SATUAN LASTON ( AC )
Analisa EI - 634
SATUAN KET.
Km
m
Jam
-
-
%
%
%
%
t / m3
t / m3
t / m3
t / m3
m3
m3
Kg
Kg
m3
-
-
menit
menit
menit
m3
Jam
SATUAN KET.
ton / jam
-
m2
Jam
m2
Jam
m3
-
km / jam
km / jam
ton
menit
menit
menit
menit
menit
menit
m2
Jam
ton / jam
-
m2
Jam
km / jam
m
lintasan
-
m2
Jam
SATUAN KET.
km / jam
m
lintasan
-
m2
Jam
Lump sum
m2 / jam
m2
orang
orang
jam
jam
NDAR UNTUK PEREKAMAN ANALISA
G MASING HARGA SATUAN
Analisa EI - 635
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,937.50 2,691.42
8,125.00 450.30
3,141.72
134,000.00 94,172.22
102,000.00 54,479.33
11,340.00 1,578,527.63
11,182.50 1,755,652.45
3,482,831.63
114,625.00 4,357.14
2,689,687.50 149,067.02
183,750.00 10,183.73
134,375.00 65,929.07
57,350.00 4,396.83
60,312.50 2,595.20
70,187.50 2,255.02
- -
238,784.02
3,724,757.37
372,475.74
4,097,233.10
4,097,233.00
naga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
luruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
GA SATUAN ASPHALT TREATED BASE ( ATB )
Analisa EI - 635
SATUAN KET.
Km
m
Jam
-
-
%
%
%
%
t / m3
t/m3
t/m3
t/m3
m3
m3
Kg
Kg
m3
-
-
menit
menit
menit
m3
Jam
SATUAN KET.
ton / jam
-
m3
Jam
m3
Jam
ton
-
km / jam
km / jam
ton
menit
menit
menit
menit
menit
menit
m3
Jam
ton/jam
-
m3
Jam
km / jam
m
lintasan
-
m3
Jam
SATUAN KET.
km / jam
m
lintasan
-
m3
Jam
Lump sum
m3 / jam
m3
orang
orang
jam
jam
NDAR UNTUK PEREKAMAN ANALISA
G MASING HARGA SATUAN
Analisa EI - 611
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,937.50 208.96
8,125.00 48.95
257.91
11,182.50 7,176.01
4,500.00 2,200.03
9,376.04
25,750.00 77.56
89,937.50 281.05
109,687.50 330.38
689.00
10,322.94
1,032.29
11,355.24
11,355.00
naga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
luruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
HARGA SATUAN LAPIS RESAP PENGIKAT
Analisa EI - 611
SATUAN KET.
Km
Jam
-
% 100 Bagian
% 80 Bagian
Kg / Lt
Kg / Lt
liter Campuran
kg
liter
liter
-
jam
liter
jam
m2 / jam
liter / m2
liter
jam
SATUAN KET.
liter
jam
Liter
Liter
orang
orang
jam
jam
NDAR UNTUK PEREKAMAN ANALISA
G MASING HARGA SATUAN
Analisa EI - 511
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,937.50 3,033.80
8,125.00 507.59
3,541.39
134,000.00 102,912.00
102,000.00 44,064.00
146,976.00
114,625.00 7,160.87
134,375.00 26,791.71
134,375.00 1,574.00
85,000.00 1,517.18
70,187.50 300.67
109,687.50 2,312.69
- -
39,657.12
190,174.51
19,017.45
209,191.96
209,191.00
41,838.00
31,378.00
20,919.00
naga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
luruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
A SATUAN LAPIS PONDASI AGREGAT KLAS A
Analisa EI - 511
SATUAN KET.
Km
m
Jam
m3
m3
m3
-
-
menit
menit
menit
m3
Jam
m3
-
km / jam
km / jam
menit
menit
menit
menit
SATUAN KET.
m3
Jam
m
m
-
km / jam
Lintas 3 x pp
menit
menit
menit
m3
Jam
km / jam
m
lintasan
-
m3
Jam
km/jam
m
lintasan
-
m3
Jam
m3
m3
kali
-
m3
Jam
SATUAN KET.
Lump sum
m3 / jam
m3
orang
orang
jam
jam
NDAR UNTUK PEREKAMAN ANALISA
G MASING HARGA SATUAN
Analisa EI - 512
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,937.50 3,033.80
8,125.00 507.59
3,541.39
134,000.00 94,872.00
102,000.00 50,184.00
145,056.00
114,625.00 7,160.87
134,375.00 26,791.71
134,375.00 1,574.00
85,000.00 1,517.18
70,187.50 300.67
109,687.50 2,312.69
- -
39,657.12
188,254.51
18,825.45
207,079.96
207,079.00
41,415.00
31,061.00
20,707.00
naga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
luruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
A SATUAN LAPIS PONDASI AGREGAT KLAS B
Analisa EI - 512
SATUAN KET.
Km
m
Jam
m3
m3
m3
-
-
menit
menit
menit
m3
Jam
m3
-
km / jam
km / jam
menit
menit
menit
menit
SATUAN KET.
m3
Jam
m
m
-
km / jam
Lintas 3 x pp
menit
menit
menit
m3
Jam
km / jam
m
lintasan
-
m3
Jam
km / jam
m
lintasan
-
m3
Jam
km / jam
m3
lintasan
-
m3
Jam
SATUAN KET.
Lump sum
m3 / jam
m3 / jam
orang
orang
jam
jam
NDAR UNTUK PEREKAMAN ANALISA
G MASING HARGA SATUAN
Analisa EI - 612
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,937.50 208.96
8,125.00 48.95
257.91
11,182.50 9,929.66
4,500.00 1,138.50
11,068.16
25,750.00 77.56
89,937.50 562.11
109,687.50 330.38
970.05
12,296.12
1,229.61
13,525.73
13,525.00
naga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
luruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
SA HARGA SATUAN LAPIS PEREKAT
Analisa EI - 612
SATUAN KET.
Km
Jam
-
% 100 Bagian
% 30 Bagian
Kg / Lt
Kg / Lt
Liter Campuran
Kg
Liter
Liter
-
Jam
Liter
Jam
m2 / jam
Liter / m2
Liter
Jam
SATUAN KET.
Liter
Jam
Liter
Liter
orang
orang
jam
jam
NDAR UNTUK PEREKAMAN ANALISA
G MASING HARGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
6,937.50 111.45
8,125.00 32.63
144.08
134,375.00 337.29
85,000.00 341.37
109,687.50 1,156.34
- -
1,835.00
1,979.07
197.91
2,176.98
2,176.00
naga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
luruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
ARGA SATUAN PENYIAPAN BADAN JALAN
ADATAN DAN PERATAAN )
Analisa EI - 33
SATUAN KET.
Jam
m
m
-
km / jam
Lintas 3 x pp
menit
menit
menit
m3
Jam
km / jam
m
lintasan
-
m3
Jam
m3
m3
kali
-
SATUAN KET.
m3
Jam
Lump sum
m3 / jam
m3
orang
orang
jam
jam
DAFTAR HARGA TANAMAN HIAS/PERINDANG
I. TANAMAN PERINDANG
1 Angsana batang 50,000.00 # tinggi ± 2
2 Angsana batang 90,000.00 tinggi ± 3
3 Asem jawa batang 40,000.00 tinggi ± 1.5
4 Bauhmis(Orchid tree) batang 40,000.00 tinggi ± 2
5 Beringin batang 50,000.00 tinggi ± 1
6 Beringin batang 140,000.00 tinggi ± 2
7 Beringin batang 300,000.00 tinggi ± 3
8 Biola Cantik batang 300,000.00 tinggi ± 3
9 Biola Cantik batang 140,000.00 tinggi ± 2
10 Biola Cantik batang 75,000.00 tinggi ± 1.5
11 Filisium batang 40,000.00 tinggi ± 1.5
12 Gayam batang 40,000.00 tinggi ± 1.5
13 Glodogan Biasa batang 40,000.00 tinggi ± 1
14 Glodogan Biasa batang 50,000.00 tinggi ± 2.5
15 Kenari batang 30,000.00 tinggi ± 1.5
16 Kepel batang 60,000.00 tinggi ± 1.5
17 Ketepeng batang 40,000.00 tinggi ± 1.5
18 Mahoni batang 40,000.00 tinggi ± 1.5
19 Sawo kecik batang 60,000.00 tinggi ± 1.5
20 Sentul batang 40,000.00 tinggi ± 1.5
21 Tanjung batang 50,000.00 tinggi ± 1
22 Tanjung batang 80,000.00 tinggi ± 3
23 Glodogan Pecut batang 40,000.00 tinggi ± 2
24 Glodogan Pecut batang 100,000.00 tinggi ± 4
25 Bungur batang 50,000.00 tinggi ± 2
26 Bungur batang 70,000.00 tinggi ± 3
27 Merbau batang 50,000.00 tinggi ± 2
II TANAMAN HIAS
a. Rumput
1 Rumput Gajah m2 15,000.00 tanam
2 Rumput Gajah m2 18,000.00 gebalan
3 Rumput Gajah Mini m2 50,000.00 tanam
4 Rumput Manila m 2
15,000.00 gebalan
5 Rumput golf m2 - #
6 Rumput gebalan m2 - #
b. Perdu
1 Bambu Air rumpun 25,000.00 tinggi ± 1.5
2 Batavia/Jatropa batang 35,000.00 tinggi ± 0.5
3 Batavia/ Jatropa batang 130,000.00 tinggi ± 1.5
4 Bougenville batang 40,000.00 tinggi ± 0.5
5 Bougenville batang 75,000.00 tinggi ± 0,7
6 Bougenville varigata batang 150,000.00 tinggi ± 0,8
7 Classia planisicua batang 20,000.00 tinggi ± 0.5
No. URAIAN SATUAN HARGA ( Rp ) KETERANGA
c. Pohon
1 Cemara kipas batang 50,000.00 tinggi ± 0.5
2 Cemara kipas batang 75,000.00 tinggi ± 1.5
3 Cemara lilin batang 40,000.00 tinggi ± 1.5
4 Cemara Rantes batang 75,000.00 tinggi ± 1
5 Cemara Udang batang 600,000.00 tinggi ± 1 - 1,5
6 Cemara Norvox batang 50,000.00 tinggi ± 0.6
7 Cemara Norvox batang 80,000.00 tinggi ± 1.5
8 Cepoko Mulyo batang 15,000.00 tinggi ± 0.5
9 Cepoko Mulyo batang 40,000.00 tinggi ± 1
10 Ceplok Piring batang 7,500.00 tinggi ± 0.5
11 Ceplok Piring batang 20,000.00 tinggi ± 1
12 Kelapa gading batang 200,000.00 tinggi ± 3
13 Nusa Indah batang 10,000.00 tinggi ± 0.5
14 Nusa Indah batang 30,000.00 tinggi ± 1
15 Palem ekor tupai batang 100,000.00 tinggi ± 2
16 Palem ekor tupai batang 160,000.00 tinggi ± 2
17 Palem Jepang rumpun 50,000.00 tinggi ± 1
18 Palem Jepang rumpun 100,000.00 tinggi ± 2
19 Palem raja batang 200,000.00 tinggi ± 4
20 Palem raja batang 300,000.00 tinggi ± 6
21 Palem raja batang 1,500,000.00 tinggi ± 7
22 Glodogan Pecut batang - tinggi ± 1
23 Glodogan Pecut batang - tinggi ± 2
d. Semak
1 Alamanda rumpun 7,500.00 tinggi ± 0.2
2 Anthurium rumpun 25,000.00 tinggi ± 0.3
3 Bakung rumpun 5,000.00 tinggi ± 0.3
4 Bambu pangkas batang 12,500.00 tinggi ± 0.15
5 Canna holland rumpun 15,000.00 tinggi ± 0.3
6 Canna Lokal rumpun 7,500.00 tinggi ± 0.5
7 Cendrawasih batang 5,000.00 tinggi ± 0.15
8 Cantik manis batang 3,000.00 tinggi ± 0.2
9 Dieffenbachia batang 10,000.00 tinggi ± 0.2
10 Dracaena rumpun 50,000.00 tinggi ± 1
11 Ficus repens batang 7,500.00
No. URAIAN SATUAN HARGA ( Rp ) KETERANGA
h Pelengkap Taman
1 Kerb Taman tinggi 50 cm m 75,000.00 terpasang
2 Pengecatan Kerb Taman m2 17,500.00 terpasang
3 Para/ Jala m 17,500.00
4 Polybag kg 20,000.00
5 Pot Tanah kecil buah 10,000.00
6 Pot Tanah sedang buah 15,000.00
7 Pot Tanah besar buah 25,000.00
8 Pot Hias buah 75,000.00
KETERANGAN
m Ø 3.00 cm
m Ø 5.00 cm
m Ø 2.00 cm
m Ø 2.00 cm
m Ø 2.00 cm
m Ø 3.00 cm
m Ø 4.00 cm
m Ø 5.00 cm
m Ø 4.00 cm
m Ø 3.00 cm
m Ø 2.00 cm
m Ø 2.00 cm
m Ø 1.50 cm
m Ø 3.00 cm
m Ø 2.00 cm
m Ø 3.00 cm
m Ø 2.00 cm
m Ø 2.00 cm
m Ø 2.00 cm
m Ø 2.00 cm
m Ø 2.00 cm
m Ø 3.00 cm
m
m
m Ø 2.00 cm
m Ø 3.00 cm
m Ø 2.00 cm
m
m
m
m
m
m
m
KETERANGAN
m
m
m
m
m
m
m
m
m
m
m
KETERANGAN
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
KETERANGAN
m
m
m
m
m
m
m
m
m
m
m
m
KETERANGAN
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
KETERANGAN