No. Uraian
JUMLAH TOTAL
DIBULATKAN
Terbilang : Empat Ratus Tiga Puluh Lima Juta Enam Ratus Tiga Puluh Tiga Ribu Rupiah,-
Jumlah Total
(Rp)
427,833,000.00
7,800,000.00
435,633,000.00
435,633,000.00
BURHAN. L
RENCANA ANGGARAN BIAYA (RAB)
Jumlah - a
B Bahan
1 Semen PC 40 kg Zak 980.00 68,000.00
2 Besi Polos 6 Ø Btg 259.00 30,000.00
3 Besi Polos 8 Ø Btg 678.00 50,000.00
4 Besi Polos 10 Ø Btg 381.00 70,000.00
5 Kawat Beton Kg 75.00 22,000.00
6 Kerikil M3 50.00 106,000.00
7 Pasir Beton M3 62.00 106,000.00
8 Pasir Pasang M3 82.00 100,000.00
9 Pasir Urug M3 43.00 100,000.00
10 Batu Koral/Batu Belah 15 -20 cm M3 199.00 300,000.00
11 Papan Bekisting 2/20 cm Lembar 88.00 45,000.00
12 Paku 5 - 10 cm Kg 120.00 17,000.00
13 Minyak Bekesting Ltr 84.00 13,000.00
14 Cat Dasar Kg 88.00 25,000.00
15 Cat Beton (Setara Polymix) Kg 157.00 25,000.00
16 BRC uk. 240 x 120 cm Keping 396.00 175,000.00
Jumlah - b
C Peralatan
1 Benang Bh 20.00 7,500.00
2 Cangkul Bh 10.00 95,000.00
3 Sekop Bh 12.00 80,000.00
4 Timba Plastik Bh 25.00 18,000.00
5 Sendok Semen Bh 10.00 20,500.00
6 Meteran (10 m) Bh 12.00 30,000.00
7 Martil (palu) Bh 6.00 45,000.00
8 Gergaji Kayu Bh 7.00 95,000.00
9 Selang Air M 100.00 7,500.00
10 Ruskam Bh 8.00 13,000.00
11 Kereta sorong Unit 4.00 400,000.00
Jumlah - c
D Upah
1 Pekerja HOK 610.00 90,000.00
2 Tukang HOK 410.00 120,000.00
3 Kepala Tukang HOK 45.00 150,000.00
4 Mandor HOK 35.00 120,000.00
Jumlah - d
Sub Total - I
II HONORIUM TPK
1 Ketua TPK Org/Bulan 1x4 500,000.00
2 Sekretaris TKK Org/Bulan 1x4 400,000.00
3 Anggota TPK Org/Bulan 3x4 350,000.00
Sub Total - III
ANGGARAN BIAYA (RAB)
Jumlah Harga
(Rp)
800,000.00
1,000,000.00
800,000.00
500,000.00
3,100,000.00
66,640,000.00
7,770,000.00
33,900,000.00
26,670,000.00
1,650,000.00
5,300,000.00
6,572,000.00
8,200,000.00
4,300,000.00
59,700,000.00
3,960,000.00
2,040,000.00
1,092,000.00
2,200,000.00
3,925,000.00
69,300,000.00
303,219,000.00
150,000.00
950,000.00
960,000.00
450,000.00
205,000.00
360,000.00
270,000.00
665,000.00
750,000.00
104,000.00
1,600,000.00
6,464,000.00
54,900,000.00
49,200,000.00
6,750,000.00
4,200,000.00
115,050,000.00
427,833,000.00
2,000,000.00
1,600,000.00
4,200,000.00
7,800,000.00
DAFTAR ANALISA BAHAN DAN UPAH
BERDASARKAN PERATURAN MENTERI PEKERJAAN UMUM NO. 11/PRT/M/2013
B BAHAN
Pasir urug 20.800 m3 1.2000
B BAHAN
Batu belah 124.800 m3 1.200
Semen Porlant 124.800 Kg 163.000
Pasir pasang 124.800 m3 0.520
Pemasangan 1 m3 pondasi batu kosong (anstamping)
No Uraian Volume Satuan Koefisien
A TENAGA
Pekerja 41.600 OH 0.7800
Tukang batu 41.600 OH 0.3900
Kepala Tukang 41.600 OH 0.039
Mandor 41.600 OH 0.0390
B BAHAN
Batu belah 41.600 m3 1.2000
Pasir urug 41.600 m3 0.432
Membuat 1 m3 beton mutu Fc=14.5 Mpa (K 175), Slump (12±2) cm, w/c = 0.66
Membuat 1 m3 beton mutu Fc=19.3 Mpa (K 100), Slump (12±2) cm, w/c = 0.58
B BAHAN
Semen portland 40.253 Kg 247.0000
Pasir beton 40.253 Kg 698.0000
Kerikil 40.253 Kg 1047.0000
Air 40.253 Ltr 215.0000
B BAHAN
Besi polos 487.155 Kg 10.5000
Kawat beton 487.155 Kg 0.1500
Membuat 1 m2 bekisting untuk sloof
No Uraian Volume Satuan Koefisien
A TENAGA
Pekerja 380.540 OH 0.5200
Tukang Kayu 380.540 OH 0.2600
Kepala Tukang 380.540 OH 0.0260
Mandor 380.540 OH 0.0260
B BAHAN
Kayu kelas III 380.540 m3 0.0230
Paku 5 - 10 cm 380.540 Kg 0.3000
Minyak bekisting 380.540 Ltr 0.1000
B BAHAN
Kayu kelas III 388.440 m3 0.0130
Paku 5 - 10 cm 388.440 Kg 0.4000
Minyak bekisting 388.440 Ltr 0.2000
Balok kayu kelas II 388.440 m3 0.0050
Plywood tebal 9 mm 388.440 Lbr 0.1167
Dolken kayu φ 8-10cm/400 cm 388.440 Batang 0.6670
B BAHAN
Semen portland 873.629 kg 10.2240
Pasir pasang 873.629 m3 0.0200
Mengecat Tembok Baru 1 Lapis Plamir, 1 lapis Cat dasar 2 lapis cat penutup
B BAHAN
Plamir 873.629 Kg 0.1000
Cat Tembok Dasar 873.629 Kg 0.1000
Cat Tembok Penutup 873.629 Kg 0.1800
BURHAN. L
Ketua
AN DAN UPAH
AAN UMUM NO. 11/PRT/M/2013
156.000
26.000
2.600
6.240
0.208
24.960
187.200
93.600
9.360
9.360
149.760
20,342.400
64.896
SNI : A.3219 : 2013
Jumlah Kapasitas Bahan dan Upah
32.448
16.224
1.622
1.622
49.920
17.971
66.417
11.070
1.127
3.341
9,942.479
28,096.559
42,144.839
8,654.384
34.101
34.101
3.410
1.949
5,115.122
73.073
SNI : A.411121 : 2013
Jumlah Kapasitas Bahan dan Upah
197.881
98.940
9.894
9.894
8.752
114.162
38.054
256.370
128.185
12.819
12.819
5.050
155.376
77.688
1.942
45.331
259.089
262.089
131.044
13.104
13.104
8,931.978
17.473
SNI : A.47110 : 2013
Jumlah Kapasitas Bahan dan Upah
17.473
55.039
5.504
2.621
87.363
87.363
157.253
BURHAN. L
Ketua
DAFTAR HARGA BAHAN, UPAH DAN PERALATAN
KABUPATEN ACEH BARAT TAHUN 2017
A. UPAH KERJA
1 Pekerja OH 90,000.00
2 Tukang OH 120,000.00
3 Kepala Tukang OH 150,000.00
4 Mandor OH 120,000.00
B. HARGA BAHAN
B. HARGA PERALATAN
1 Benang Bh 7,500.00
2 Cangkul Bh 95,000.00
3 Sekop Bh 80,000.00
4 Timba Plastik Bh 18,000.00
5 Sendok Semen Bh 20,500.00
6 Meteran (10 m) Bh 30,000.00
7 Martil (palu) Bh 45,000.00
8 Gergaji Kayu Bh 95,000.00
9 Selang Air M 7,500.00
10 Ruskam Bh 13,000.00
11 Kereta sorong Unit 400,000.00
BURHAN. L
Ketua
Ket
Ket
Ket
pril 2017
IATAN (TPK)
tan Arongan Lambalek
h Barat
BACK UP DATA ( DATA PENDUKUNG)
`
1. Galian Tanah Pondasi
7. Kolom 15/15
= P x
= 1.30 x
= 0.03
Volume = 14.57 M3
L x T
0.40 x 0.50
L x T
0.40 x 0.05
L x T
0.40 x 0.10
(L1+L2)/2 x T
0.30 x 0.40
L x T
0.15 x 0.18
498.00 Bh
L x T
0.15 x 0.15
x 498.00
Jumlah Kolom
498.00
Jumlah Sloof
951.35
Keping
BURHAN. L
Ketua
17.128
10.12
27.248
4.5413333
6
600000
1200000