Anda di halaman 1dari 33

PEMERINTAH KABUPATEN ACEHBARAT

DINAS PENDIDIKAN
Jalan Ujong Beurasok No. 101 Desa Lapang
MEULABOH

LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : REHABILITASI RUANG BELAJAR/ RUANG PENUNJANG LAINNYA SD NEGERI MON PASONG
LOKASI : KECAMATAN WOYLA BARAT
NO. SPPB : 421 /011 /SPPB/DAK REGULER/ 2018
NILAI SPPB : RP. 150.000.000,-
TANGGAL SPPB : 11 JULI 2018
SUMBER DANA : DAK REGULER
TERBILANG : Seratus Lima Puluh Juta Rupiah
SWAKELOLA

SD NEGERI MON PASONG


MAJUAN PEKERJAAN
AKELOLA

I MON PASONG
REKAPITULASI LAPORAN KEMAJUAN PEKERJAAN
PEKERJAAN : REHABILITASI RUANG BELAJAR/ RUANG PENUNJANG LAINNYA SD NEGERI MON PASO
LOKASI : KECAMATAN WOYLA BARAT
NO. SPPB : 421 /011 /SPPB/DAK REGULER/ 2018
NILAI SPPB : RP. 150.000.000,-
TANGGAL SPPB : 11 JULI 2018
SUMBER DANA : DAK REGULER
SWAKELOLA : SD NEGERI MON PASONG
TAHUN ANGGARAN : 2018

NO JENIS PEKERJAAN

1 2

A PEKERJAAN PERSIAPAN
B PEKERJAAN PASANGAN & PLESTERAN
C PEKERJAAN PINTU & VENTILASI
D PEKERJAAN KUDA-KUDA DAN ATAP
E PEKERJAAN PLAFOND
F PEKERJAAN LANTAI
G PEKERJAAN PENGECATAN
H PEKERJAAN PENGUNCI & PENGGANTUNG
I PEKERJAAN INSTALASI LISTRIK

Jumlah Bobot
Kemajuan Realisasi Pekerjaan ( % )
Kemajuan Realisasi Keuangan ( Rp)

Jumlah Nilai Fisik --------------------------------------------------------------


Dibulatkan --------------------------------------------------------------
EKERJAAN
SD NEGERI MON PASONG

REKAPITULASI REALISASI KEMAJUAN


BULAN LALU BULAN INI S/D BULAN INI
Jumlah Harga Bobot
(Rp) (%) Bobot Realisasi Bobot Realisasi Bobot Realisasi
Terhadap Seluruh Terhadap Seluruh Terhadap Seluruh
Item Pek. ( % ) Item Pek. ( % ) Item Pek. ( % )

3 4 5 7 9

7,757,000.00 5.17 - 2.18 2.18


1,212,962.75 0.81 - 0.81 0.81
3,400,000.00 2.27 - - -
52,348,358.85 34.90 - 32.04 32.04
42,716,569.22 28.48 - 23.07 23.07
14,370,046.74 9.58 - 7.22 7.22
21,977,994.42 14.65 - 6.59 6.59
800,000.00 0.53 - - -
5,418,000.00 3.61 - - -

100.00
- 71.92 71.92

150,000,931.98
150,000,000.00
PEKERJAAN : REHABILITASI RUANG BELAJAR/ RUANG PENUNJANG LAINNYA SD NEGERI MON PASONG
LOKASI : KECAMATAN WOYLA BARAT
NO. SPPB : 421 /011 /SPPB/DAK REGULER/ 2018
NILAI SPPB : RP. 150.000.000,-
TANGGAL SPPB : 11 JULI 2018
SUMBER DANA : DAK REGULER
SWAKELOLA : SD NEGERI MON PASONG
TAHUN ANGGARAN : 2018

No Uraian Pekerjaan Sat

1 2 3

A PEKERJAAN PERSIAPAN
1 Pembersihan & Pembongkaran Ls
2 Pengukuran dan Pemasangan Bowplank Ls
3 Papan Nama Proyek Ls
4 Batu Nama Prasasti Ls
5 Adm, Dokumentasi & P3K Ls
Jumlah
B PEKERJAAN PASANGAN & PLESTERAN
1 Pasangan Dinding Bata 1 Pc : 4 Ps M²
2 Plesteran 1 Pc : 4 Ps, tebal 15 Mm M²
Jumlah
C PEKERJAAN PINTU & VENTILASI
1 Sisip Papan Ventilasi Ls
2 Daun Pintu Panel P1 Unt
Jumlah
D PEKERJAAN KUDA-KUDA DAN ATAP
1 Sisip Rangka Kuda-Kuda Kayu Pkt
2 Gording Atap M³
3 Penutup Seng Gelombang BJLS Cat Pabrik 0,30 Mm M²
4 Rabung Seng BJLS 30 Cat Pabrik 0,30 Mm M¹
5 Papan Lisplank 3/30 Cm, Kayu Kelas II M¹
Jumlah
E PEKERJAAN PLAFOND
1 Plafond Tryplek 4 Mm M²
No Uraian Pekerjaan Sat

1 2 3

2 Sisip Rangka Plafond M²


3 List Profil Plafond M¹
Jumlah
F PEKERJAAN LANTAI
1 Lantai Beton Tumbuk T = 7 Cm (Teras) M³
2 Lantai Keramik Ukr. 40 x 40 Cm Anti Selip ( Teras ) M²
Jumlah
G PEKERJAAN PENGECATAN
1 Cat Dinding M²
2 Cat Plafond M²
3 Cat Minyak (Kusen, Pintu, Jendela, Listplank dan Ventilasi) M²
Jumlah
H PEKERJAAN PENGUNCI & PENGGANTUNG
1 Kunci Tanam 2 Slag (terpasang) Bh
2 Engsel Pintu (Terpasang) Bh
Jumlah
No Uraian Pekerjaan Sat

1 2 3

I PEKERJAAN INSTALASI LISTRIK


1 Instalasi titik penerangan, instalasi termasuk kabel NYA 3 x 2,5 mm pipa PVC fiting Ttk
lampu dan kelengkapan instalasi terpasang

2 Instalasi titik Kontak, instalasi termasuk kabel NYA 3 x 2,5 mm pipa PVC , Stop Ttk
kontak dan kelengkapan Instalasi terpasang

3 Lampu Hemat Energi (HE) 25 Watt ( Terpasang ) Bh


4 Saklar Seri Bh
5 Saklar Ganda Bh
6 Stop Kontak Bh
7 Box Zekering Bh
Jumlah
Kemajuan Realisasi Bulan ini ( % )
Deviasi Terhadap Kemajuan Rencana Komulatif ( % )
Rencana ( % )
Deviasi Komulatif ( % )

Jumlah Nilai Fisik …………………………………………………


Dibulatkan …………………………………………………
LAPORAN KEMAJUAN PEKERJAAN
RI MON PASONG
PEMERINTAH K
DINAS
Jalan Ujong Beurasok

REALISASI K
NILAI KONTRAK
KEMAJUAN BULAN LALU KEMA

Bobot (%)
Bobot Realisasi Bobot Realisasi
Jumlah Harga volume Volume Terhadap Masing2 Terhadap Seluruh Volume
Item Pek. ( % ) Item Pek. ( % )

4 3 5 6 7 8 9

4,307,000.00 1.00 2.87 - - - 0.47


800,000.00 1.00 0.53 - - - 1.00
350,000.00 1.00 0.23 - - - -
500,000.00 1.00 0.33 - - - -
1,800,000.00 1.00 1.20 - - - 0.25
7,757,000.00 5.17 -

634,523.18 4.68 0.42 - - - 4.68


578,439.58 9.36 0.39 - - - 9.36
1,212,962.75 0.81 -

200,000.00 1.00 0.13 - - - -


3,200,000.00 4.00 2.13 - - - -
3,400,000.00 2.27 -

3,000,000.00 1.00 2.00 - - - 1.00


10,486,389.38 1.63 6.99 - - - 1.63
33,466,138.97 374.17 22.31 - - - 374.17
1,111,830.50 31.00 0.74 - - - 31.00
4,284,000.00 85.68 2.86 - - - -
52,348,358.85 34.90 -

18,503,531.28 310.80 12.34 - - - 264.18


REALISASI K
NILAI KONTRAK
KEMAJUAN BULAN LALU KEMA

Bobot (%)
Bobot Realisasi Bobot Realisasi
Jumlah Harga volume Volume Terhadap Masing2 Terhadap Seluruh Volume
Item Pek. ( % ) Item Pek. ( % )

4 3 5 6 7 8 9

19,359,775.80 155.40 12.91 - - - 132.09


4,853,262.15 278.10 3.24 - - - 139.05
42,716,569.22 28.48 -

2,573,301.51 3.29 1.72 - - - 3.29


11,796,745.23 46.98 7.86 - - - 32.89
14,370,046.74 9.58 -

10,511,836.37 630.69 7.01 - - - 189.21


7,919,877.20 310.80 5.28 - - - 264.18
3,546,280.85 171.48 2.36 - - - -
21,977,994.42 14.65 -

640,000.00 4.00 0.43 - - - -


160,000.00 8.00 0.11 - - - -
800,000.00 0.53 -
REALISASI K
NILAI KONTRAK
KEMAJUAN BULAN LALU KEMA

Bobot (%)
Bobot Realisasi Bobot Realisasi
Jumlah Harga volume Volume Terhadap Masing2 Terhadap Seluruh Volume
Item Pek. ( % ) Item Pek. ( % )

4 3 5 6 7 8 9

3,040,000.00 19.00 2.03 - - - -

1,280,000.00 8.00 0.85 - - - -

760,000.00 19.00 0.51 - - - -


30,000.00 1.00 0.02 - - - -
78,000.00 3.00 0.05 - - - -
80,000.00 4.00 0.05 - - - -
150,000.00 1.00 0.10 - - - -
5,418,000.00 3.61 -
n ini ( % ) 100.00 -
latif ( % )

150,000,931.98
150,000,000.00
PEMERINTAH KABUPATEN ACEHBARAT
DINAS PENDIDIKAN
Jalan Ujong Beurasok No. 101 Desa Lapang-Meulaboh

REALISASI KEMAJUAN PEKERJAAN


KEMAJUAN BULAN INI KEMAJUAN S/D BULAN INI

Bobot Realisasi Bobot Realisasi Bobot Realisasi Bobot Realisasi


Terhadap Masing2 Terhadap Seluruh Volume Terhadap Masing2 Terhadap Seluruh
Item Pek. ( % ) Item Pek. ( % ) Item Pek. ( % ) Item Pek. ( % )

10 11 12 13 14

47.00 1.35 0.47 47.00 1.35


100.00 0.53 1.00 100.00 0.53
- - - - -
- - - - -
25.00 0.30 0.25 25.00 0.30
2.18 2.18

100.00 0.42 4.68 100.00 0.42


100.00 0.39 9.36 100.00 0.39
0.81 0.81

- - - - -
- - - - -
- -

100.00 2.00 1.00 100.00 2.00


100.00 6.99 1.63 100.00 6.99
100.00 22.31 374.17 100.00 22.31
100.00 0.74 31.00 100.00 0.74
- - - - -
32.04 32.04

85.00 10.49 264.18 85.00 10.49


REALISASI KEMAJUAN PEKERJAAN
KEMAJUAN BULAN INI KEMAJUAN S/D BULAN INI

Bobot Realisasi Bobot Realisasi Bobot Realisasi Bobot Realisasi


Terhadap Masing2 Terhadap Seluruh Volume Terhadap Masing2 Terhadap Seluruh
Item Pek. ( % ) Item Pek. ( % ) Item Pek. ( % ) Item Pek. ( % )

10 11 12 13 14

85.00 10.97 132.09 85.00 10.97


50.00 1.62 139.05 50.00 1.62
23.07 23.07

100.00 1.72 3.29 100.00 1.72


70.00 5.51 32.89 70.00 5.51
7.22 7.22

30.00 2.10 189.21 30.00 2.10


85.00 4.49 264.18 85.00 4.49
- - - - -
6.59 6.59

- - - - -
- - - - -
- -
REALISASI KEMAJUAN PEKERJAAN
KEMAJUAN BULAN INI KEMAJUAN S/D BULAN INI

Bobot Realisasi Bobot Realisasi Bobot Realisasi Bobot Realisasi


Terhadap Masing2 Terhadap Seluruh Volume Terhadap Masing2 Terhadap Seluruh
Item Pek. ( % ) Item Pek. ( % ) Item Pek. ( % ) Item Pek. ( % )

10 11 12 13 14

- - - - -

- - - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- -
71.92 71.92
PEKERJAAN : REHABILITASI RUANG BELAJAR/ RUANG PENUNJANG LAINNYA SD NEGERI MON PASONG
LOKASI : KECAMATAN WOYLA BARAT
NO. SPPB : 421 /011 /SPPB/DAK REGULER/ 2018
NILAI SPPB : RP. 150.000.000,-
TANGGAL SPPB : 11 JULI 2018
SUMBER DANA : DAK REGULER
SWAKELOLA : SD NEGERI MON PASONG
TAHUN ANGGARAN : 2018

No Uraian Pekerjaan Sat

1 2 3

A PEKERJAAN PERSIAPAN
1 Pembersihan & Pembongkaran Ls
2 Pengukuran dan Pemasangan Bowplank Ls
3 Papan Nama Proyek Ls
4 Batu Nama Prasasti Ls
5 Adm, Dokumentasi & P3K Ls
Jumlah
B PEKERJAAN PASANGAN & PLESTERAN
1 Pasangan Dinding Bata 1 Pc : 4 Ps M²
2 Plesteran 1 Pc : 4 Ps, tebal 15 Mm M²
Jumlah
C PEKERJAAN PINTU & VENTILASI
1 Sisip Papan Ventilasi Ls
2 Daun Pintu Panel P1 Unt
Jumlah
D PEKERJAAN KUDA-KUDA DAN ATAP
1 Sisip Rangka Kuda-Kuda Kayu Pkt
2 Gording Atap M³
3 Penutup Seng Gelombang BJLS Cat Pabrik 0,30 Mm M²
4 Rabung Seng BJLS 30 Cat Pabrik 0,30 Mm M¹
5 Papan Lisplank 3/30 Cm, Kayu Kelas II M¹
Jumlah
E PEKERJAAN PLAFOND
1 Plafond Tryplek 4 Mm M²
No Uraian Pekerjaan Sat

1 2 3

2 Sisip Rangka Plafond M²


3 List Profil Plafond M¹
Jumlah
F PEKERJAAN LANTAI
1 Lantai Beton Tumbuk T = 7 Cm (Teras) M³
2 Lantai Keramik Ukr. 40 x 40 Cm Anti Selip ( Teras ) M²
Jumlah
G PEKERJAAN PENGECATAN
1 Cat Dinding M²
2 Cat Plafond M²
3 Cat Minyak (Kusen, Pintu, Jendela, Listplank dan Ventilasi) M²
Jumlah
H PEKERJAAN PENGUNCI & PENGGANTUNG
1 Kunci Tanam 2 Slag (terpasang) Bh
2 Engsel Pintu (Terpasang) Bh
Jumlah
No Uraian Pekerjaan Sat

1 2 3

I PEKERJAAN INSTALASI LISTRIK


1 Instalasi titik penerangan, instalasi termasuk kabel NYA 3 x 2,5 mm pipa PVC fiting Ttk
lampu dan kelengkapan instalasi terpasang

2 Instalasi titik Kontak, instalasi termasuk kabel NYA 3 x 2,5 mm pipa PVC , Stop Ttk
kontak dan kelengkapan Instalasi terpasang

3 Lampu Hemat Energi (HE) 25 Watt ( Terpasang ) Bh


4 Saklar Seri Bh
5 Saklar Ganda Bh
6 Stop Kontak Bh
7 Box Zekering Bh
Jumlah
Kemajuan Realisasi Bulan ini ( % )
Deviasi Terhadap Kemajuan Rencana Komulatif ( % )
Rencana ( % )
Deviasi Komulatif ( % )

Jumlah Nilai Fisik …………………………………………………


Dibulatkan …………………………………………………
LAPORAN KEMAJUAN PEKERJAAN
RI MON PASONG
PEMERINTAH K
DINAS
Jalan Ujong Beurasok

REALISASI K
NILAI KONTRAK
KEMAJUAN BULAN LALU KEMA

Bobot (%)
Bobot Realisasi Bobot Realisasi
Jumlah Harga volume Volume Terhadap Masing2 Terhadap Seluruh Volume
Item Pek. ( % ) Item Pek. ( % )

4 3 5 6 7 8 9

4,307,000.00 1.00 2.87 0.47 47.00 1.35 0.53


800,000.00 1.00 0.53 1.00 100.00 0.53 -
350,000.00 1.00 0.23 - - - 1.00
500,000.00 1.00 0.33 - - - -
1,800,000.00 1.00 1.20 0.25 25.00 0.30 -
7,757,000.00 5.17 2.18

634,523.18 4.68 0.42 4.68 100.00 0.42 -


578,439.58 9.36 0.39 9.36 100.00 0.39 -
1,212,962.75 0.81 0.81

200,000.00 1.00 0.13 - - - -


3,200,000.00 4.00 2.13 - - - -
3,400,000.00 2.27 -

3,000,000.00 1.00 2.00 1.00 100.00 2.00 -


10,486,389.38 1.63 6.99 1.63 100.00 6.99 -
33,466,138.97 374.17 22.31 374.17 100.00 22.31 -
1,111,830.50 31.00 0.74 31.00 100.00 0.74 -
4,284,000.00 85.68 2.86 - - - 85.68
52,348,358.85 34.90 32.04

18,503,531.28 310.80 12.34 264.18 85.00 10.49 46.62


REALISASI K
NILAI KONTRAK
KEMAJUAN BULAN LALU KEMA

Bobot (%)
Bobot Realisasi Bobot Realisasi
Jumlah Harga volume Volume Terhadap Masing2 Terhadap Seluruh Volume
Item Pek. ( % ) Item Pek. ( % )

4 3 5 6 7 8 9

19,359,775.80 155.40 12.91 132.09 85.00 10.97 23.31


4,853,262.15 278.10 3.24 139.05 50.00 1.62 -
42,716,569.22 28.48 23.07

2,573,301.51 3.29 1.72 3.29 100.00 1.72 -


11,796,745.23 46.98 7.86 32.89 70.00 5.51 14.09
14,370,046.74 9.58 7.22

10,511,836.37 630.69 7.01 189.21 30.00 2.10 378.41


7,919,877.20 310.80 5.28 264.18 85.00 4.49 15.54
3,546,280.85 171.48 2.36 - - - 137.19
21,977,994.42 14.65 6.59

640,000.00 4.00 0.43 - - - -


160,000.00 8.00 0.11 - - - -
800,000.00 0.53 -
REALISASI K
NILAI KONTRAK
KEMAJUAN BULAN LALU KEMA

Bobot (%)
Bobot Realisasi Bobot Realisasi
Jumlah Harga volume Volume Terhadap Masing2 Terhadap Seluruh Volume
Item Pek. ( % ) Item Pek. ( % )

4 3 5 6 7 8 9

3,040,000.00 19.00 2.03 - - -


-

1,280,000.00 8.00 0.85 - - -


-

760,000.00 19.00 0.51 - - - -


30,000.00 1.00 0.02 - - - -
78,000.00 3.00 0.05 - - - -
80,000.00 4.00 0.05 - - - -
150,000.00 1.00 0.10 - - - -
5,418,000.00 3.61 -
n ini ( % ) 100.00 71.92
latif ( % )

150,000,931.98
150,000,000.00
PEMERINTAH KABUPATEN ACEHBARAT
DINAS PENDIDIKAN
Jalan Ujong Beurasok No. 101 Desa Lapang-Meulaboh

REALISASI KEMAJUAN PEKERJAAN


KEMAJUAN BULAN INI KEMAJUAN S/D BULAN INI

Bobot Realisasi Bobot Realisasi Bobot Realisasi Bobot Realisasi


Terhadap Masing2 Terhadap Seluruh Volume Terhadap Masing2 Terhadap Seluruh
Item Pek. ( % ) Item Pek. ( % ) Item Pek. ( % ) Item Pek. ( % )

10 11 12 13 14

53.00 1.52 1.00 100.00 2.87


- - 1.00 100.00 0.53
100.00 0.23 1.00 100.00 0.23
- - - - -
- - 0.25 25.00 0.30
1.76 3.94

- - 4.68 100.00 0.42


- - 9.36 100.00 0.39
- 0.81

- - - - -
- - - - -
- -

- - 1.00 100.00 2.00


- - 1.63 100.00 6.99
- - 374.17 100.00 22.31
- - 31.00 100.00 0.74
100.00 2.86 85.68 100.00 2.86
2.86 34.90

15.00 1.85 310.80 100.00 12.34


REALISASI KEMAJUAN PEKERJAAN
KEMAJUAN BULAN INI KEMAJUAN S/D BULAN INI

Bobot Realisasi Bobot Realisasi Bobot Realisasi Bobot Realisasi


Terhadap Masing2 Terhadap Seluruh Volume Terhadap Masing2 Terhadap Seluruh
Item Pek. ( % ) Item Pek. ( % ) Item Pek. ( % ) Item Pek. ( % )

10 11 12 13 14

15.00 1.94 155.40 100.00 12.91


- - 139.05 50.00 1.62
3.79 26.86

- - 3.29 100.00 1.72


30.00 2.36 46.98 100.00 7.86
2.36 9.58

60.00 4.20 567.62 90.00 6.31


5.00 0.26 279.72 90.00 4.75
80.00 1.89 137.19 80.00 1.89
6.36 12.95

- - - - -
- - - - -
- -
REALISASI KEMAJUAN PEKERJAAN
KEMAJUAN BULAN INI KEMAJUAN S/D BULAN INI

Bobot Realisasi Bobot Realisasi Bobot Realisasi Bobot Realisasi


Terhadap Masing2 Terhadap Seluruh Volume Terhadap Masing2 Terhadap Seluruh
Item Pek. ( % ) Item Pek. ( % ) Item Pek. ( % ) Item Pek. ( % )

10 11 12 13 14

- - - - -

- - - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- -
17.12 89.04
PEKERJAAN : REHABILITASI RUANG BELAJAR/ RUANG PENUNJANG LAINNYA SD NEGERI MON PASONG
LOKASI : KECAMATAN WOYLA BARAT
NO. SPPB : 421 /011 /SPPB/DAK REGULER/ 2018
NILAI SPPB : RP. 150.000.000,-
TANGGAL SPPB : 11 JULI 2018
SUMBER DANA : DAK REGULER
SWAKELOLA : SD NEGERI MON PASONG
TAHUN ANGGARAN : 2018

No Uraian Pekerjaan Sat

1 2 3

A PEKERJAAN PERSIAPAN
1 Pembersihan & Pembongkaran Ls
2 Pengukuran dan Pemasangan Bowplank Ls
3 Papan Nama Proyek Ls
4 Batu Nama Prasasti Ls
5 Adm, Dokumentasi & P3K Ls
Jumlah
B PEKERJAAN PASANGAN & PLESTERAN
1 Pasangan Dinding Bata 1 Pc : 4 Ps M²
2 Plesteran 1 Pc : 4 Ps, tebal 15 Mm M²
Jumlah
C PEKERJAAN PINTU & VENTILASI
1 Sisip Papan Ventilasi Ls
2 Daun Pintu Panel P1 Unt
Jumlah
D PEKERJAAN KUDA-KUDA DAN ATAP
1 Sisip Rangka Kuda-Kuda Kayu Pkt
2 Gording Atap M³
3 Penutup Seng Gelombang BJLS Cat Pabrik 0,30 Mm M²
4 Rabung Seng BJLS 30 Cat Pabrik 0,30 Mm M¹
5 Papan Lisplank 3/30 Cm, Kayu Kelas II M¹
Jumlah
E PEKERJAAN PLAFOND
1 Plafond Tryplek 4 Mm M²
No Uraian Pekerjaan Sat

1 2 3

2 Sisip Rangka Plafond M²


3 List Profil Plafond M¹
Jumlah
F PEKERJAAN LANTAI
1 Lantai Beton Tumbuk T = 7 Cm (Teras) M³
2 Lantai Keramik Ukr. 40 x 40 Cm Anti Selip ( Teras ) M²
Jumlah
G PEKERJAAN PENGECATAN
1 Cat Dinding M²
2 Cat Plafond M²
3 Cat Minyak (Kusen, Pintu, Jendela, Listplank dan Ventilasi) M²
Jumlah
H PEKERJAAN PENGUNCI & PENGGANTUNG
1 Kunci Tanam 2 Slag (terpasang) Bh
2 Engsel Pintu (Terpasang) Bh
Jumlah
No Uraian Pekerjaan Sat

1 2 3

I PEKERJAAN INSTALASI LISTRIK


1 Instalasi titik penerangan, instalasi termasuk kabel NYA 3 x 2,5 mm pipa PVC fiting Ttk
lampu dan kelengkapan instalasi terpasang

2 Instalasi titik Kontak, instalasi termasuk kabel NYA 3 x 2,5 mm pipa PVC , Stop Ttk
kontak dan kelengkapan Instalasi terpasang

3 Lampu Hemat Energi (HE) 25 Watt ( Terpasang ) Bh


4 Saklar Seri Bh
5 Saklar Ganda Bh
6 Stop Kontak Bh
7 Box Zekering Bh
Jumlah
Kemajuan Realisasi Bulan ini ( % )
Deviasi Terhadap Kemajuan Rencana Komulatif ( % )
Rencana ( % )
Deviasi Komulatif ( % )

Jumlah Nilai Fisik …………………………………………………


Dibulatkan …………………………………………………
LAPORAN KEMAJUAN PEKERJAAN
RI MON PASONG
PEMERINTAH K
DINAS
Jalan Ujong Beurasok

REALISASI K
NILAI KONTRAK
KEMAJUAN BULAN LALU KEMA

Bobot (%)
Bobot Realisasi Bobot Realisasi
Jumlah Harga volume Volume Terhadap Masing2 Terhadap Seluruh Volume
Item Pek. ( % ) Item Pek. ( % )

4 3 5 6 7 8 9

4,307,000.00 1.00 2.87 1.00 100.00 2.87 -


800,000.00 1.00 0.53 1.00 100.00 0.53 -
350,000.00 1.00 0.23 1.00 100.00 0.23 -
500,000.00 1.00 0.33 - - - -
1,800,000.00 1.00 1.20 0.25 25.00 0.30 0.75
7,757,000.00 5.17 3.94

634,523.18 4.68 0.42 4.68 100.00 0.42 -


578,439.58 9.36 0.39 9.36 100.00 0.39 -
1,212,962.75 0.81 0.81

200,000.00 1.00 0.13 - - - 1.00


3,200,000.00 4.00 2.13 - - - 4.00
3,400,000.00 2.27 -

3,000,000.00 1.00 2.00 1.00 100.00 2.00 -


10,486,389.38 1.63 6.99 1.63 100.00 6.99 -
33,466,138.97 374.17 22.31 374.17 100.00 22.31 -
1,111,830.50 31.00 0.74 31.00 100.00 0.74 -
4,284,000.00 85.68 2.86 85.68 100.00 2.86 -
52,348,358.85 34.90 34.90

18,503,531.28 310.80 12.34 310.80 100.00 12.34 -


REALISASI K
NILAI KONTRAK
KEMAJUAN BULAN LALU KEMA

Bobot (%)
Bobot Realisasi Bobot Realisasi
Jumlah Harga volume Volume Terhadap Masing2 Terhadap Seluruh Volume
Item Pek. ( % ) Item Pek. ( % )

4 3 5 6 7 8 9

19,359,775.80 155.40 12.91 155.40 100.00 12.91 -


4,853,262.15 278.10 3.24 139.05 50.00 1.62 139.05
42,716,569.22 28.48 26.86

2,573,301.51 3.29 1.72 3.29 100.00 1.72 -


11,796,745.23 46.98 7.86 46.98 100.00 7.86 -
14,370,046.74 9.58 9.58

10,511,836.37 630.69 7.01 567.62 90.00 6.31 63.07


7,919,877.20 310.80 5.28 279.72 90.00 4.75 31.08
3,546,280.85 171.48 2.36 137.19 80.00 1.89 34.30
21,977,994.42 14.65 12.95

640,000.00 4.00 0.43 - - - 4.00


160,000.00 8.00 0.11 - - - 8.00
800,000.00 0.53 -
REALISASI K
NILAI KONTRAK
KEMAJUAN BULAN LALU KEMA

Bobot (%)
Bobot Realisasi Bobot Realisasi
Jumlah Harga volume Volume Terhadap Masing2 Terhadap Seluruh Volume
Item Pek. ( % ) Item Pek. ( % )

4 3 5 6 7 8 9

3,040,000.00 19.00 2.03 - - 19.00


-

1,280,000.00 8.00 0.85 - - 8.00


-

760,000.00 19.00 0.51 - - - 19.00


30,000.00 1.00 0.02 - - - 1.00
78,000.00 3.00 0.05 - - - 3.00
80,000.00 4.00 0.05 - - - 4.00
150,000.00 1.00 0.10 - - - 1.00
5,418,000.00 3.61 -
n ini ( % ) 100.00 89.04
latif ( % )

150,000,931.98
150,000,000.00
PEMERINTAH KABUPATEN ACEHBARAT
DINAS PENDIDIKAN
Jalan Ujong Beurasok No. 101 Desa Lapang-Meulaboh

REALISASI KEMAJUAN PEKERJAAN


KEMAJUAN BULAN INI KEMAJUAN S/D BULAN INI

Bobot Realisasi Bobot Realisasi Bobot Realisasi Bobot Realisasi


Terhadap Masing2 Terhadap Seluruh Volume Terhadap Masing2 Terhadap Seluruh
Item Pek. ( % ) Item Pek. ( % ) Item Pek. ( % ) Item Pek. ( % )

10 11 12 13 14

- - 1.00 100.00 2.87


- - 1.00 100.00 0.53
- - 1.00 100.00 0.23
- - - - -
75.00 0.90 1.00 100.00 1.20
0.90 4.84

- - 4.68 100.00 0.42


- - 9.36 100.00 0.39
- 0.81

100.00 0.13 1.00 100.00 0.13


100.00 2.13 4.00 100.00 2.13
2.27 2.27

- - 1.00 100.00 2.00


- - 1.63 100.00 6.99
- - 374.17 100.00 22.31
- - 31.00 100.00 0.74
- - 85.68 100.00 2.86
- 34.90

- - 310.80 100.00 12.34


REALISASI KEMAJUAN PEKERJAAN
KEMAJUAN BULAN INI KEMAJUAN S/D BULAN INI

Bobot Realisasi Bobot Realisasi Bobot Realisasi Bobot Realisasi


Terhadap Masing2 Terhadap Seluruh Volume Terhadap Masing2 Terhadap Seluruh
Item Pek. ( % ) Item Pek. ( % ) Item Pek. ( % ) Item Pek. ( % )

10 11 12 13 14

- - 155.40 100.00 12.91


50.00 1.62 278.10 100.00 3.24
1.62 28.48

- - 3.29 100.00 1.72


- - 46.98 100.00 7.86
- 9.58

10.00 0.70 630.69 100.00 7.01


10.00 0.53 310.80 100.00 5.28
20.00 0.47 171.48 100.00 2.36
1.70 14.65

100.00 0.43 4.00 100.00 0.43


100.00 0.11 8.00 100.00 0.11
0.53 0.53
REALISASI KEMAJUAN PEKERJAAN
KEMAJUAN BULAN INI KEMAJUAN S/D BULAN INI

Bobot Realisasi Bobot Realisasi Bobot Realisasi Bobot Realisasi


Terhadap Masing2 Terhadap Seluruh Volume Terhadap Masing2 Terhadap Seluruh
Item Pek. ( % ) Item Pek. ( % ) Item Pek. ( % ) Item Pek. ( % )

10 11 12 13 14

100.00 2.03 19.00 100.00 2.03

100.00 0.85 8.00 100.00 0.85

100.00 0.51 19.00 100.00 0.51


100.00 0.02 1.00 100.00 0.02
100.00 0.05 3.00 100.00 0.05
100.00 0.05 4.00 100.00 0.05
100.00 0.10 1.00 100.00 0.10
3.61 3.61
10.63 99.67