Owner
Kegiatan
Kontraktor b3 b4 b4'
Konsultan 2 2 2
3 2 3 2 2
STR.B.03.01.01 8 6 4 4 5
Tulangan Panjang (cm)
Dimensi (cm) Jarak Tiap Jumlah Batang
No. SB
Nama Tot. Bentuk Posisi Dia. a b c d e f g Tot. Batang Real
P L T
Gedung Utama
K1 10.00 20.00
K2 10.00 20.00
K4 10.00 20.00
No. Revisi
Tanggal
Kebutuhan Potongan Tersisa
Jumlah Tot.
Potong Btg Jumlah Berat (Kg) Sumber Panjang Jumlah
Batang (cm)
2852
{Tiebeam} Lembar 7
Tie Besi Tul.
Besi
Beugel TB 22 470 30 50 Beugel D 10 3 44 24 44 24 4 4 144 33 726 91 645.04 Logistik
2 - 13
2
2 Tie Beam
Tipe 1 Tul.
4 6840 45 75 Pokok 2 D 22 3 13 1187 1200 9 36 36 1,289.52 Logistik
- 13
Tie Beam
Tipe 1 Tul.
20 6840 45 75 Pokok 2 D 22 3 1200 1200 9 180 180 6,447.60 Logistik
- 13
Tie Beam
Tipe 1 Tul.
4 6840 45 75 Pokok 2 D 22 3 13 181 194 9 36 6 208.69 Logistik
- 13
Tie Beam
Tipe 1 Tul.
4 6840 45 75 Tengah D 13 3 5 1195 1200 4 16 16 199.68 Logistik
2 - 13
Tie Beam
Tipe 1 Tul.
16 6840 45 75 Tengah D 13 3 1200 1200 4 64 64 798.72 Logistik
2 - 13
Tie Beam
Tipe 1 Tul.
4 6840 45 75 Tengah D 13 3 5 1095 1100 4 16 16 183.07 Logistik
2 - 13
{Tiebeam} Lembar 8
3 Tie Beam
Tipe 1 Tul.
4 6840 45 75 Pokok D 22 3 13 1187 1200 9 36 36 1,289.52 Logistik
A-I
Tie Beam
Tipe 1 Tul.
20 6840 45 75 Pokok D 22 3 1200 1200 9 180 180 6,447.60 Logistik
A-I
Tie Beam
Tipe 1 Tul.
4 6840 45 75 Pokok D 22 3 13 181 194 9 36 6 208.69 Logistik
A-I
Tie Beam
Tipe 1 Tul.
4 6840 45 75 Pokok D 13 3 5 1195 1200 4 16 16 199.68 Logistik
A-I
Tie Beam
Tipe 1 Tul.
16 6840 45 75 Pokok D 13 3 1200 1200 4 64 64 798.72 Logistik
A-I
Tie Beam
Tipe 1 Tul.
4 6840 45 75 Pokok D 13 3 5 1095 1100 4 16 16 183.07 Logistik
A-I
Tul.
Tie Besi Beugel
Besi 24 40 45 75 A - B D 10 3 69 39 69 39 4 4 224 4 96 19 132.68 Logistik
Beugel TB1 dan
H-I
{Tiebeam} Lembar 10
E PEMBESIAN TIEBEAM
Potongan Tersisa
Panjang Jumlah
(cm)
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
200.00 4
{Tiebeam} Lembar 11
48.00 91
0.00 0
0.00 0
35.00 6
0.00 0
0.00 0
100.00 16
80.00 110
{Tiebeam} Lembar 12
0.00 0
0.00 0
35.00 6
0.00 0
0.00 0
100.00 16
80.00 19
80.00 281
Dibuat Oleh :
Kontraktor Pelaksana {Tiebeam} Lembar 13
PT. Anugrah Citra Abadi
Dibuat Oleh :
Kontraktor Pelaksana
PT. Anugrah Citra Abadi
{Tiebeam} Lembar 14
RENCANA PEMBESIAN GOR SANGIHE
Owner 0
Kegiatan 0
Kontraktor 0
Konsultan 0
1
STR.B.03.01.02
No. Revisi :0
Beton Mutu K400 0.18 0.2 Tanggal : -421dd mmmm yyyy
Ukuran (meter) Luas Vol. (m3) Toleransi Vol. Total Unit Mixer
No. Nama Total
P L T m2 ( 0% ) (m3)
Bangunan Utama
1 TB 1 44 5.20 0.00 -0.18 0.00 0.00 0.00 0.00
2 TB 2 33 5.50 0.00 -0.18 0.00 0.00 0.00 0.00
3 TB 2 6 6.35 0.00 -0.18 0.00 0.00 0.00 0.00
4 TB 2 6 4.20 0.00 -0.18 0.00 0.00 0.00 0.00
5 TB 1 36 7.20 0.00 -0.18 0.00 0.00 0.00 0.00
6 TB 2 4 4.60 0.00 -0.18 0.00 0.00 0.00 0.00
7 TB 2 8 4.78 0.00 -0.18 0.00 0.00 0.00 0.00
8 TB 1 4 8.41 0.00 -0.18 0.00 0.00 0.00 0.00
9 TB 1 4 7.92 0.00 -0.18 0.00 0.00 0.00 0.00
10 TB 2 4 3.25 0.00 -0.18 0.00 0.00 0.00 0.00
11 TB 2 4 2.20 0.00 -0.18 0.00 0.00 0.00 0.00
Ramp
12 B3 4 12.24 0.00 -0.20 0.00 0.00 0.00 0.00
13 B3 4 4.20 0.00 -0.20 0.00 0.00 0.00 0.00
14 B3 2 7.20 0.00 -0.20 0.00 0.00 0.00 0.00
15 B1 4 11.29 0.00 -0.20 0.00 0.00 0.00 0.00
16 B3 8 5.60 0.00 -0.20 0.00 0.00 0.00 0.00
17 B1 8 8.39 0.00 -0.20 0.00 0.00 0.00 0.00
18 B1 6 4.20 0.00 -0.20 0.00 0.00 0.00 0.00
19 B3 8 3.52 0.00 -0.20 0.00 0.00 0.00 0.00
Err:50 Err:50 Err:50
20 SW 1 2 ### Err:509 Err:509 Err:509
9
Err:50 9
Err:50 9
Err:50
21 SW 2 2 ### Err:509 Err:509 Err:509
9
Err:50 9
Err:50 9
Err:50
22 SW 3 2 ### Err:509 Err:509 Err:509
9
Err:50 9
Err:50 9
Err:50
23 SW 4 2 ### Err:509 Err:509 Err:509
9 9 9
Total Err:509 Err:509
Owner 0
Kegiatan 0
Kontraktor 0
Konsultan :
STR.B.03.01.03
No. Revisi :0
Tanggal : -421dd mmmm yyyy
Bekisting 0.2
Ukuran (meter) 18
No. Nama Total Luas (m') Total Luasan (m2)
P L T1 T2
Gedung Utama
1 TB 1 44 5.20 0.00 -0.18 -0.18 -1.87 -82.37
2 TB 2 33 5.50 0.00 -0.18 -0.18 -1.98 -65.34
3 TB 2 6 6.35 0.00 -0.18 -0.18 -2.29 -13.72
4 TB 2 6 4.20 0.00 -0.18 -0.18 -1.51 -9.07
5 TB 1 36 7.20 0.00 -0.18 -0.18 -2.59 -93.31
6 TB 2 4 4.60 0.00 -0.18 -0.18 -1.66 -6.62
7 TB 2 8 4.78 0.00 -0.18 -0.18 -1.72 -13.75
8 TB 1 4 8.41 0.00 -0.18 -0.18 -3.03 -12.12
9 TB 1 4 7.92 0.00 -0.18 -0.18 -2.85 -11.40
10 TB 2 4 3.25 0.00 -0.18 -0.18 -1.17 -4.68
11 TB 2 4 2.20 0.00 -0.18 -0.18 -0.79 -3.17
Ramp
12 B3 4 12.24 0.00 -0.20 -0.20 -4.90 -19.59
13 B3 4 4.20 0.00 -0.20 -0.20 -1.68 -6.72
14 B3 2 7.20 0.00 -0.20 -0.20 -2.88 -5.76
15 B1 4 11.29 0.00 -0.20 -0.20 -4.51 -18.06
16 B3 8 5.60 0.00 -0.20 -0.20 -2.24 -17.91
17 B1 8 8.39 0.00 -0.20 -0.20 -3.36 -26.85
18 B1 6 4.20 0.00 -0.20 -0.20 -1.68 -10.08
19 B3 8 3.52 0.00 -0.20 -0.20 -1.41 -11.26
20 SW 1 2 ### ### ### ### Err:509 Err:509
21 SW 2 2 ### ### ### ### Err:509 Err:509
22 SW 3 2 ### ### ### ### Err:509 Err:509
23 SW 4 2 ### ### ### ### Err:509 Err:509
Owner 0
Kegiatan 0
Kontraktor 0
Konsultan 0
STR.B.03.02.04
RENCANA PEMBESIAN GOR SANGIHE
Diameter Tulangan Vol. Total Bekisting
No. Lokasi Sat. Beton
D 10 D 13 D 16 D 25 K400 Multiplex Batako
I Tie Beam Lantai 1
Tie Beam TB1 Err:504 Err:504 Err:504 Err:504 0.00 -4,869.32
Tie Beam TB2 Err:504 Err:504 Err:504 Err:504 0.00 -2,844.24
II Balok Ramp
Balok B1 Err:504 Err:504 Err:504 Err:504 0.00 -57.74
Balok B3 Err:504 Err:504 Err:504 Err:504 0.00 -64.30
III Shearwall
SW Err:504 Err:504 Err:504 Err:504 Err:509 Err:509