LAPORAN KEMAJUAN PELAKSANAAN PEKERJAAN

MINGGU KE 8 ( DELAPAN )

Minggu Ke : 8 ( Delapan )

PEKERJAAN : Pembangunan Gedung BDRS Tanggal : 16 Agustus 2020


LOKASI : RSUD - BOLAANG MONGONDOW SELATAN
VOLUME : 1 ( SATU ) PAKET S/D : 22 Agustus 2020
TAHUN ANGGARAN : 2020

PENYEDIA JASA : CV.BHAKTI MEGA MULIA Bulan Ke : 2 ( Dua )

KEMAJUAN PEKERJAAN BOBOT


HARGA SATUAN JUMLAH BOBOT THDP
NO. URAIAN VOLUME SAT MINGGU LALU MINGGU INI S/D MINGGU INI MASING -
MASING
( Rp. ) ( Rp. ) (%) Volume Bobot Volume Bobot Volume Bobot
PEKERJAAN
1 2 3 4 5 6 5 6 7=(6/4)X5 8 9=(8/4)X5 10=6+8 11=7+9 12=(10/4)X100

I PEKERJAAN PERSIAPAN 50,647,381.02 2.831 2.524 - 2.524


1 Pembuatan Papan Proyek 1.00 Ls 750,000.00 750,000.00 0.042 1.000 0.042 - - 1.000 0.042 100.000
2 Kantor Sementara / Direksi Keet 9.00 M2 1,038,486.55 9,346,378.93 0.522 9.000 0.522 - - 9.000 0.522 100.000
3 Pengukuran dan Pasang bouwplank 42.00 M' 63,696.36 2,675,247.04 0.150 42.000 0.150 - - 42.000 0.150 100.000
4 Perlengkapan K-3 1.00 Ls 15,000,000.00 15,000,000.00 0.838 1.000 0.838 - - 1.000 0.838 100.000
5 Pagar Sementara 44.00 M' 269,903.52 11,875,755.06 0.664 44.000 0.664 - - 44.000 0.664 100.000
6 Mobilisasi dan Demobilisasi 1.00 Ls 11,000,000.00 11,000,000.00 0.615 0.500 0.307 - - 0.500 0.307 50.000
-
II PEKERJAAN PONDASI BATU KALI 41,070,814.64 2.296 - 0.164 2.108 2.272
1 Pek. Galian Tanah 25.06 M3 116,985.00 2,931,644.10 0.164 25.060 0.164 - - 25.060 0.164 100.000
2 Pek. Urugan Pasir Bawah Pondasi 2.49 M3 350,317.00 872,289.33 0.049 - - 2.490 0.049 2.490 0.049 100.000
3 Pas. Batu Kosong 7.47 M3 585,148.52 4,371,059.44 0.244 - - 7.470 0.244 7.470 0.244 100.000
4 Pas. Pondasi Batu Kali 1:4 30.21 M3 1,071,339.83 32,365,176.26 1.809 - - 30.210 1.809 30.210 1.809 100.000
5 Pek. Urugan kembali Galian 6.27 M3 84,700.00 530,645.50 0.030 - - 1.253 0.006 1.253 0.006 20.000

III PEK. POER PLAT DAN KOLOM PEDESTAL 125,916,683.56 7.039 4.657 2.258 6.915
A. POER PLAT
1 Type P-1
a Pek. Galian Tanah Biasa 74.56 M3 116,985.00 8,722,401.60 0.488 74.560 0.488 - - 74.560 0.488 100.000
b Pek. Urugan Pasir Bawah Pondasi 1.73 M3 350,317.00 606,048.41 0.034 1.730 0.034 - - 1.730 0.034 100.000
c Pak. Cor Lantai Kerja Tbl. 10 cm sp. 1:3:5 3.47 M3 1,326,729.71 4,603,752.10 0.257 3.470 0.257 - - 3.470 0.257 100.000
d Pas. Batako 21.60 M2 205,937.40 4,448,247.76 0.249 21.600 0.249 - - 21.600 0.249 100.000
e Cor Poer Plat Beton K-250 8.10 M3 2,015,962.95 16,329,299.88 0.913 - - 8.100 0.913 8.100 0.913 100.000
f Pembesian Dengan Besi Ulir 1,370.58 Kg 29,460.08 40,377,395.08 2.257 1,370.580 2.257 - - 1,370.580 2.257 100.000
g Urugan Kembali 26.10 M3 84,700.00 2,210,331.20 0.124 - - - - - - -

B. KOLOM PEDESTAL
1 PD-1
a Cor Kolom Pedestal Beton K-250 3.53 M3 2,015,962.95 7,116,349.21 0.398 - - 3.530 0.398 3.530 0.398 100.000
b Pembesian Dengan Besi Ulir 658.80 Kg 29,460.08 19,408,300.05 1.085 658.800 1.085 - - 658.800 1.085 100.000
c Pembesian Dengan Besi Polos 192.25 Kg 26,794.34 5,151,211.67 0.288 192.250 0.288 - - 192.250 0.288 100.000
d Bekisting Kolom Pedestal 40.32 M2 375,396.89 15,136,002.60 0.846 - - 40.320 0.846 40.320 0.846 100.000
e Bongkaran Bekisting 40.32 M2 44,825.00 1,807,344.00 0.101 - - 40.320 0.101 40.320 0.101 100.000

IV PEK. SLOOF, KOLOM, BALOK, PLAT LANTAI dan TANGGA 469,071,012.69 26.221 - 2.209 2.209
A. PEKERJAAN SLOOF BETON
1 Pek. Sloof Beton S-1
a Bekisting Sloof 7.04 M2 250,436.56 1,763,073.38 0.099 - - 7.040 0.099 7.040 0.099 100.000
b Bongkaran Bekisting 7.04 M2 44,825.00 315,568.00 0.018 - - - - - - -
c Cor Beton K-250 0.88 M3 2,015,962.95 1,774,047.39 0.099 - - - - - - -
d Pembesian Dengan Besi Ulir 89.11 Kg 29,460.08 2,625,187.64 0.147 - - 89.110 0.147 89.110 0.147 100.000
e Pembesian Dengan Besi Polos 46.27 Kg 26,794.34 1,239,774.07 0.069 - - 46.270 0.069 46.270 0.069 100.000
-
2 Pek. Sloof Beton S-2 -
a Bekisting Sloof 43.64 M2 250,436.56 10,929,051.48 0.611 - - 43.640 0.611 43.640 0.611 100.000
b Bongkaran Bekisting 43.64 M2 44,825.00 1,956,163.00 0.109 - - - - - - -
c Cor Beton K-250 4.36 M3 2,015,962.95 8,789,598.45 0.491 - - - - - - -
d Pembesian Dengan Besi Ulir 518.17 Kg 29,460.08 15,265,329.14 0.853 - - 518.170 0.853 518.170 0.853 100.000
e Pembesian Dengan Besi Polos 286.99 Kg 26,794.34 7,689,707.35 0.430 - - 286.990 0.430 286.990 0.430 100.000
-
B. PEKERJAAN KOLOM LANTAI - 1 -
1 Kolom K-1 -
a Cor Beton K-250 5.88 M3 2,015,962.95 11,853,862.13 0.663 - - - - - - -
b Pembesian Dengan Besi Ulir 737.86 Kg 29,460.08 21,737,413.89 1.215 - - - - - - -
c Pembesian Dengan Besi Polos 270.34 Kg 26,794.34 7,243,581.61 0.405 - - - - - - -
d Bekisting Kolom 67.20 M2 375,396.89 25,226,671.01 1.410 - - - - - - -
e Bongkaran Bekisting 67.20 M2 44,825.00 3,012,240.00 0.168 - - - - - - -
-
2 Kolom K-3 -
a Cor Beton K-250 0.16 M3 2,015,962.95 322,554.07 0.018 - - - - - - -
b Pembesian Dengan Besi Ulir 15.55 Kg 29,460.08 458,104.23 0.026 - - - - - - -
c Pembesian Dengan Besi Polos 9.56 Kg 26,794.34 256,153.88 0.014 - - - - - - -
d Bekisting Kolom 4.00 M2 375,396.89 1,501,587.56 0.084 - - - - - - -
e Bongkaran Bekisting 4.00 M2 44,825.00 179,300.00 0.010 - - - - - - -
-
3 Kolom Praktis 107.30 M' 155,798.55 16,717,184.48 0.934 - - - - - - -
-
C. PEKERJAAN KOLOM LANTAI - 2 -
1 Kolom K-1 -
KEMAJUAN PEKERJAAN BOBOT
HARGA SATUAN JUMLAH BOBOT THDP
NO. URAIAN VOLUME SAT MINGGU LALU MINGGU INI S/D MINGGU INI MASING -
MASING
( Rp. ) ( Rp. ) (%) Volume Bobot Volume Bobot Volume Bobot
PEKERJAAN
1 2 3 4 5 6 5 6 7=(6/4)X5 8 9=(8/4)X5 10=6+8 11=7+9 12=(10/4)X100

a Cor Beton K-250 1.86 M3 2,015,962.95 3,749,691.08 0.210 - - - - - - -


b Pembesian Dengan Besi Ulir 133.65 Kg 29,460.08 3,937,339.56 0.220 - - - - - - -
c Pembesian Dengan Besi Polos 85.61 Kg 26,794.34 2,293,863.36 0.128 - - - - - - -
d Bekisting Kolom 21.28 M2 375,396.89 7,988,445.82 0.447 - - - - - - -
e Bongkaran Bekisting 21.28 M2 44,825.00 953,876.00 0.053 - - - - - - -
-
2 Kolom K-2 -
a Cor Beton K-250 1.67 M3 2,015,962.95 3,366,658.12 0.188 - - - - - - -
b Pembesian Dengan Besi Ulir 162.49 Kg 29,460.08 4,786,968.24 0.268 - - - - - - -
c Pembesian Dengan Besi Polos 99.99 Kg 26,794.34 2,679,165.96 0.150 - - - - - - -
d Bekisting Kolom 33.48 M2 375,396.89 12,568,287.88 0.703 - - - - - - -
e Bongkaran Bekisting 33.48 M2 44,825.00 1,500,741.00 0.084 - - - - - - -
-
3 Kolom K-3 -
a Cor Beton K-250 0.13 M3 2,015,962.95 262,075.18 0.015 - - - - - - -
b Pembesian Dengan Besi Ulir 12.23 Kg 29,460.08 360,296.77 0.020 - - - - - - -
c Pembesian Dengan Besi Polos 7.53 Kg 26,794.34 201,761.37 0.011 - - - - - - -
d Bekisting Kolom 3.15 M2 375,396.89 1,182,500.20 0.066 - - - - - - -
e Bongkaran Bekisting 3.15 M2 44,825.00 141,198.75 0.008 - - - - - - -
-
4 Kolom Praktis 94.90 M' 155,798.55 14,785,282.45 0.826 - - - - - - -
-
D. PEKERJAAN BALOK LANTAI DAN RING BALOK -
1 Balok Latey Lantai Satu 31.03 M' 281,945.13 8,748,757.23 0.489 - - - - - - -
-
2 Balok Lantai Dua -
a Balok B-1 -
Cor Beton K-250 2.04 M3 2,015,962.95 4,112,564.41 0.230 - - - - - - -
Pembesian Dengan Besi Ulir 229.56 Kg 29,460.08 6,762,855.74 0.378 - - - - - - -
Pembesian Dengan Besi Polos 105.05 Kg 26,794.34 2,814,745.31 0.157 - - - - - - -
Bekisting Balok 16.49 M2 368,606.48 6,078,320.86 0.340 - - - - - - -
Bongkaran Bekisting 16.49 M2 44,825.00 739,164.25 0.041 - - - - - - -
-
b Balok B-2 -
Cor Beton K-250 7.28 M3 2,015,962.95 14,676,210.26 0.820 - - - - - - -
Pembesian Dengan Besi Ulir 730.38 Kg 29,460.08 21,517,052.50 1.203 - - - - - - -
Pembesian Dengan Besi Polos 454.05 Kg 26,794.34 12,165,969.62 0.680 - - - - - - -
Bekisting Balok 59.11 M2 368,606.48 21,788,329.03 1.218 - - - - - - -
Bongkaran Bekisting 59.11 M2 44,825.00 2,649,605.75 0.148 - - - - - - -
-
c Balok B-3 -
Cor Beton K-250 0.31 M3 2,015,962.95 624,948.51 0.035 - - - - - - -
Pembesian Dengan Besi Ulir 37.39 Kg 29,460.08 1,101,512.35 0.062 - - - - - - -
Pembesian Dengan Besi Polos 24.85 Kg 26,794.34 665,839.32 0.037 - - - - - - -
Bekisting Balok 2.91 M2 368,606.48 1,072,644.86 0.060 - - - - - - -
Bongkaran Bekisting 2.91 M2 44,825.00 130,440.75 0.007 - - - - - - -
-
d Balok Latey 24.10 M' 281,945.13 6,794,877.51 0.380 - - - - - - -
-
e Ring Balok Praktis 12/15 93.77 M' 281,945.13 26,437,994.37 1.478 - - - - - - -
-
E. PEKERJAAN PLAT LANTAI -
1 Plat Kanopi Lantai Satu -
a Cor Beton K-250 1.62 M3 2,015,962.95 3,265,859.98 0.183 - - - - - - -
b Pembesian Dengan Besi Polos 158.19 Kg 26,794.34 4,238,596.49 0.237 - - - - - - -
c Pekerjaan Bekisting 14.25 M2 452,576.41 6,449,213.84 0.361 - - - - - - -
d Bongkaran Bekisting 14.25 M2 44,825.00 638,756.25 0.036 - - - - - - -
-
2 Plat Lantai Dua -
a Cor Beton K-250 8.82 M3 2,015,962.95 17,780,793.20 0.994 - - - - - - -
b Pembesian Dengan Waremesh M-8 554.19 Kg 33,666.95 18,657,884.25 1.043 - - - - - - -
c Pas. Bondek 73.51 M2 385,419.10 28,332,158.04 1.584 - - - - - - -
-
3 Plat Dudukan Tandon Air -
a Cor Beton K-250 1.00 M3 2,015,962.95 2,015,962.95 0.113 - - - - - - -
b Pembesian Dengan Waremesh M-8 62.76 Kg 33,666.95 2,112,937.47 0.118 - - - - - - -
c Pas. Bondek 8.30 M2 385,419.10 3,198,978.53 0.179 - - - - - - -
-
4 Plat Meja Beton -
a Cor Beton K-250 0.37 M3 2,015,962.95 745,906.29 0.042 - - - - - - -
b Pembesian Dengan Besi Polos 20.70 Kg 26,794.34 554,642.82 0.031 - - - - - - -
c Pekerjaan Bekisting 3.71 M2 452,576.41 1,679,058.48 0.094 - - - - - - -
d Bongkaran Bekisting 3.71 M2 44,825.00 166,300.75 0.009 - - - - - - -
-
5 Plat Kanopi Di Atas Jendela Lantai Dua -
a Cor Beton K-250 0.54 M3 2,015,962.95 1,088,619.99 0.061 - - - - - - -
b Pembesian Dengan Besi Polos 54.35 Kg 26,794.34 1,456,272.32 0.081 - - - - - - -
c Pekerjaan Bekisting 4.87 M2 452,576.41 2,204,047.12 0.123 - - - - - - -
d Bongkaran Bekisting 4.87 M2 44,825.00 218,297.75 0.012 - - - - - - -
-
F. PEKERJAAN STRUKTUR TANGGA -
Galian Tanah Pondasi Tangga 3.15 M3 116,985.00 368,502.75 0.021 - - - - - - -
Urugan Tanah Bekas Galian 0.79 M3 84,700.00 66,701.25 0.004 - - - - - - -
Urugan Pasir Di Bawah Pondasi 0.11 M3 350,317.00 38,534.87 0.002 - - - - - - -
Pas. Bt. Bata SP 1 : 3 Pada Anak Tangga 1.60 M2 234,825.93 375,721.49 0.021 - - - - - - -
Plesteran SP 1 : 3 Pada Anak Tangga 3.20 M2 100,170.90 320,546.87 0.018 - - - - - - -
Cor Lantai Kerja 0.21 M3 1,326,729.71 278,613.24 0.016 - - - - - - -
Cor Poer Plat K-250 0.47 M3 2,015,962.95 947,502.59 0.053 - - - - - - -
Pembesian Poer Plat 79.33 Kg 29,460.08 2,337,068.07 0.131 - - - - - - -
KEMAJUAN PEKERJAAN BOBOT
HARGA SATUAN JUMLAH BOBOT THDP
NO. URAIAN VOLUME SAT MINGGU LALU MINGGU INI S/D MINGGU INI MASING -
MASING
( Rp. ) ( Rp. ) (%) Volume Bobot Volume Bobot Volume Bobot
PEKERJAAN
1 2 3 4 5 6 5 6 7=(6/4)X5 8 9=(8/4)X5 10=6+8 11=7+9 12=(10/4)X100

Cor Pedestal Tangga K-250 0.64 M3 2,015,962.95 1,290,216.29 0.072 - - - - - - -


Pembesian Pedestal Tangga 124.78 Kg 29,460.08 3,676,028.66 0.205 - - - - - - -
Bekisting Pedestal Tangga 7.37 M2 323,732.31 2,385,907.12 0.133 - - - - - - -
Cor Tangga Beton K-250 2.29 M3 2,015,962.95 4,616,555.15 0.258 - - - - - - -
Pembesian Tangga Dengan Besi Ulir 308.81 Kg 29,460.08 9,097,567.00 0.509 - - - - - - -
Pembesian Tangga Dengan Besi Polos 160.13 Kg 26,794.34 4,290,577.50 0.240 - - - - - - -
Bekisting Tangga 9.09 M2 323,732.31 2,942,726.70 0.164 - - - - - - -
Bongkaran Bekisting 16.46 M2 44,825.00 737,819.50 0.041 - - - - - - -
-
V PEKERJAAN PASANGAN, PLESTERAN dan ACIAN 288,904,569.35 16.150 - - - - -
1 Lantai Satu -
a Pas. Dinding Bt. Bata SP 1 : 3 19.36 M2 234,825.93 4,546,230.02 0.254 - - - - - - -
b Pas. Dinding Bt. Bata Sp 1 : 4 195.37 M2 229,059.68 44,751,389.97 2.502 - - - - - - -
c Plesteran Dinding SP 1 : 3 38.72 M2 100,170.90 3,878,617.14 0.217 - - - - - - -
d Plesteran Dinding SP 1 : 4 390.74 M2 96,939.64 37,878,194.74 2.117 - - - - - - -
e Pekerjaan Acian 410.10 M2 60,931.89 24,988,167.06 1.397 - - - - - - -
-
2 Lantai Dua -
a Pas. Dinding Bt. Bata SP 1 : 3 23.46 M2 234,825.93 5,509,016.34 0.308 - - - - - - -
b Pas. Dinding Bt. Bata Sp 1 : 4 295.93 M2 229,059.68 67,785,631.53 3.789 - - - - - - -
c Plesteran Dinding SP 1 : 3 46.92 M2 100,170.90 4,700,018.50 0.263 - - - - - - -
d Plesteran Dinding SP 1 : 4 591.86 M2 96,939.64 57,374,695.03 3.207 - - - - - - -
e Pekerjaan Acian 615.32 M2 60,931.89 37,492,609.02 2.096 - - - - - - -
-
VI PEKERJAAN LANTAI / KERAMIK 198,599,065.53 11.102 - - - - -
1 Lantai Satu -
a Pek. Timbunan tanah di bawah Lantai 90.04 M3 203,238.20 18,299,567.53 1.023 - - - - - - -
b Pek. Urugan Pasir di Bawah Lantai 5.55 M3 350,317.00 1,944,259.35 0.109 - - - - - - -
c Pek. Cor Beton Tumbuk Di Bawah Lantai Sp.1:3:5 Tbl. 7 cm 7.77 M3 1,326,729.71 10,308,689.86 0.576 - - - - - - -
d Pas. Lantai Granit Tile 60 x 60 93.27 M2 650,379.83 60,660,926.65 3.391 - - - - - - -
e Pas. Lantai Granit Tile 60 x 60 cm Antislip 14.34 M2 636,416.43 9,126,211.59 0.510 - - - - - - -
f Pas. Plint Granit Tile Lebar = 10 cm 84.67 M1 107,856.05 9,132,171.33 0.510 - - - - - - -
g Pas. Granit Tila Pada Tangga 8.87 M2 650,379.83 5,768,869.08 0.322 - - - - - - -
h Pas. Step Noising Tangga 23.75 M1 117,986.25 2,802,173.51 0.157 - - - - - - -
i Pas. Keramik Meja Beton 30 x 30 6.83 M1 317,747.80 2,170,217.50 0.121 - - - - - - -
j Pas. Keramik Lantai Toilet Unpolish 30 x 30 3.37 M2 301,135.60 1,014,826.99 0.057 - - - - - - -
k Pas. Keramik Dinding Toilet 30 x 60 17.82 M2 348,912.22 6,217,615.81 0.348 - - - - - - -
-
2 Lantai Dua -
a Pas. Lantai Granit Tile 60 x 60 cm 81.65 M2 650,379.83 53,103,513.04 2.968 - - - - - - -
b Pas. Plint Homogeneus Tile Lebar = 10 cm 83.15 M1 107,856.05 8,968,230.14 0.501 - - - - - - -
c Pas. Keramik Lantai Toilet Unpolish 30 x 30 4.39 M2 301,135.60 1,321,985.30 0.074 - - - - - - -
d Pas. Keramik Dinding Toilet 30 x 60 22.24 M2 348,912.22 7,759,807.84 0.434 - - - - - - -
-
VII PEK. KOSEN, PINTU, JENDELA, VENTILASI dan KACA 149,632,126.91 8.364 - - - - -
Untuk Lantai Satu sampai lantai Dua -
a Pek. Kosen Pintu Alumunium 4" (Putih) 289.48 M' 268,373.30 77,688,703.05 4.343 - - - - - - -
b Pek. Bingkai Daun Pintu Alluminium 23.98 M2 1,055,439.87 25,309,447.97 1.415 - - - - - - -
c Pek. Daun Pintu WPC Lebar 70 cm, Tinggi 220 Cm. 4.00 Unit 2,400,000.00 9,600,000.00 0.537 - - - - - - -
d Bingkai Jendela Alluminium 74.10 M' 268,929.90 19,927,705.63 1.114 - - - - - - -
e Pas. Kaca Bening 5 mm 68.32 M2 250,384.52 17,106,270.26 0.956 - - - - - - -
-
VIII PEK. PENGGANTUNG DAN PENGUNCI 13,631,842.60 0.762 - - - - -
1 Kunci Pintu Solid 10.00 Bh 387,211.00 3,872,110.00 0.216 - - - - - - -
2 Kunci Pintu Silinder 2.00 Bh 247,533.00 495,066.00 0.028 - - - - - - -
3 Kunci Pintu 2 Slaag Bulat Pintu Toilet 4.00 Bh 226,402.00 905,608.00 0.051 - - - - - - -
4 Engsel Pintu 4" 54.00 Bh 101,028.40 5,455,533.60 0.305 - - - - - - -
5 Engsel Jendela (Casement) 42.00 Bh 40,865.00 1,716,330.00 0.096 - - - - - - -
6 Tarikan Jendela 21.00 Bh 20,000.00 420,000.00 0.023 - - - - - - -
7 Grendel Jendela 21.00 Bh 24,783.00 520,443.00 0.029 - - - - - - -
8 Espanyolet Tanam 2.00 Ps 123,376.00 246,752.00 0.014 - - - - - - -
-
IX PEK. ATAP 64,032,985.95 3.579 - - - - -
1 Pek. Rangka Kuda - Kuda Kap Baja Ringan 143.80 M2 218,372.00 31,401,893.60 1.755 - - - - - - -
2 Pek. Penutup Atap Spandek 143.80 M2 200,887.28 28,887,590.86 1.615 - - - - - - -
3 Lisplank Kalsiplank 49.28 M' 75,963.91 3,743,501.48 0.209 - - - - - - -
-
X PEKERJAAN PLAFOND 72,448,751.90 4.050 - - - - -
1 Lantai Satu -
a Pek. Plafond GRC 4 mm 100.60 M2 115,603.19 11,629,681.41 0.650 - - - - - - -
b Pek. Rangka Plafond Hollow 35 x 35 mm. 100.60 M2 195,349.00 19,652,109.40 1.099 - - - - - - -
-
2 Lantai Dua -
a Pek. Plafond GRC 4 mm 132.39 M2 115,603.19 15,304,706.98 0.856 - - - - - - -
b Pek. Rangka Plafond Hollow 35 x 35 mm. 132.39 M2 195,349.00 25,862,254.11 1.446 - - - - - - -
-
XI PEKERJAAN FINISHING DAN PENGECATAN 100,544,766.77 5.620 - - - - -
1 Cat Dinding Exterior Tahan cuaca (termasuk alkali) 334.29 M2 83,216.76 27,818,530.70 1.555 - - - - - - -
2 Cat Dinding Interior 684.47 M2 73,543.93 50,338,615.14 2.814 - - - - - - -
3 Cat Plafond 232.99 M2 71,444.76 16,645,914.17 0.930 - - - - - - -
4 Cat Listplank 14.94 M' 59,587.99 890,244.57 0.050 - - - - - - -
5 Pekerjaan Waterprofing 17.89 M2 271,182.91 4,851,462.20 0.271 - - - - - - -
-
XII PEKERJAAN SANITAIR 55,945,704.12 3.13 - - - - -
1 Lantai Satu -
a Closed Duduk + Asesoris 2.00 Set 3,902,690.00 7,805,380.00 0.436 - - - - - - -
b Jet Spray 2.00 Bh 230,800.00 461,600.00 0.026 - - - - - - -
c Wastafel + asesoris 1.00 Set 2,370,483.94 2,370,483.94 0.133 - - - - - - -
d Kran Wastafel 1.00 Bh 267,412.42 267,412.42 0.015 - - - - - - -
KEMAJUAN PEKERJAAN BOBOT
HARGA SATUAN JUMLAH BOBOT THDP
NO. URAIAN VOLUME SAT MINGGU LALU MINGGU INI S/D MINGGU INI MASING -
MASING
( Rp. ) ( Rp. ) (%) Volume Bobot Volume Bobot Volume Bobot
PEKERJAAN
1 2 3 4 5 6 5 6 7=(6/4)X5 8 9=(8/4)X5 10=6+8 11=7+9 12=(10/4)X100

e Kran Air 2.00 Bh 130,693.20 261,386.40 0.015 - - - - - - -


f Floor drain stainless 2.00 Bh 248,215.00 496,430.00 0.028 - - - - - - -
g Bioseptic 1 M3 + Instalasi + dinding, plat penutup 2.00 Unit 14,250,000.00 28,500,000.00 1.593 - - - - - - -
-
2 Lantai Dua -
a Closed Duduk + Asesoris 3.00 Set 3,902,690.00 11,708,070.00 0.654 - - - - - - -
b Jet Spray 3.00 Bh 230,800.00 692,400.00 0.039 - - - - - - -
c Wastafel + asesoris 1.00 Set 2,370,483.94 2,370,483.94 0.133 - - - - - - -
d Kran Wastafel 1.00 Bh 267,412.42 267,412.42 0.015 - - - - - - -
e Floor drain stainless 3.00 Bh 248,215.00 744,645.00 0.042 - - - - - - -
-
XIII PEKERJAAN INSTALASI AIR BERSIH dan AIR KOTOR 23,761,456.42 1.328 - - - - -
Lantai Satu Sampai Lantai Dua -
1 Pipa Air Bersih -
a Pipa Distribusi PVC Type AW dia 2 ". 12.30 M' 66,393.90 816,645.03 0.046 - - - - - - -
b Pipa PVC Type AW dia 1/2 ". 20.10 M' 29,461.98 592,185.82 0.033 - - - - - - -
c Getvalve dia 2 " Setara KITZ 2.00 Bh 1,150,000.00 2,300,000.00 0.129 - - - - - - -
d Mesin Pompa Air 1.00 Unit 2,950,000.00 2,950,000.00 0.165 - - - - - - -
e Tanki Air 1100 liter Stainless steel + Instalasi 2.00 Bh 5,250,000.00 10,500,000.00 0.587 - - - - - - -
-
2 Pipa Air Kotor -
a Pipa PVC type AW Ø 2 " 12.00 M' 66,393.90 796,726.85 0.045 - - - - - - -
b Pipa PVC type AW Ø 3 " 10.50 M' 113,572.25 1,192,508.63 0.067 - - - - - - -
c Pipa PVC type AW Ø 4 " 21.60 M' 213,582.88 4,613,390.10 0.258 - - - - - - -
-
XIV PEK. ELEKTRIKAL 58,223,717.65 3.255 - - - - -
1 Lantai Satu -
a Instalasi Listrik Penerangan 18.00 Ttk 197,627.65 3,557,297.70 0.199 - - - - - - -
b Instalasi Listrik Daya 26.00 Ttk 219,248.70 5,700,466.20 0.319 - - - - - - -
c Lampu Downlight LED 14 Watt 16.00 Bh 174,948.95 2,799,183.20 0.156 - - - - - - -
d Lampu Downligt LED 7,5 Watt 2.00 Bh 133,058.75 266,117.50 0.015 - - - - - - -
e Saklar Ganda 2.00 Bh 303,241.95 606,483.90 0.034 - - - - - - -
f Saklar Tunggal 6.00 Bh 296,894.95 1,781,369.70 0.100 - - - - - - -
g Stop Kontak 13.00 Bh 271,506.95 3,529,590.35 0.197 - - - - - - -
h Stop Kontak AC 5.00 Bh 303,241.95 1,516,209.75 0.085 - - - - - - -
i Panel Listrik -
Panel 80 x 60 x 20 cm wall mounted 1.00 Bh 3,500,000.00 3,500,000.00 0.196 - - - - - - -
Lampu Indikator + fuse 3.00 Bh 115,000.00 345,000.00 0.019 - - - - - - -
Ampere meter, Skala 400 A (GAE) 3.00 Bh 450,000.00 1,350,000.00 0.075 - - - - - - -
CT 100/5 3.00 Bh 1,300,000.00 3,900,000.00 0.218 - - - - - - -
Volt Meter AC 220 / 380 V (GAE) 3.00 Bh 775,000.00 2,325,000.00 0.130 - - - - - - -
Selector Switch, Auto-Manual 3.00 Bh 775,000.00 2,325,000.00 0.130 - - - - - - -
MCB C60a 10A/ 4.5 KA/3P 3.00 Bh 320,000.00 960,000.00 0.054 - - - - - - -
MCB C60a 16A/4.5KA/1P 3.00 Bh 185,000.00 555,000.00 0.031 - - - - - - -
MCCB NSX 100A/3P/36KA 3.00 Bh 2,700,000.00 8,100,000.00 0.453 - - - - - - -
Grounding Panel 1.00 Ls 333,000.00 333,000.00 0.019 - - - - - - -
-
2 Lantai Dua -
a Instalasi Listrik Penerangan 14.00 Ttk 197,627.65 2,766,787.10 0.155 - - - - - - -
b Instalasi Listrik Daya 19.00 Ttk 219,248.70 4,165,725.30 0.233 - - - - - - -
c Lampu Downlight LED 14 Watt 12.00 Bh 174,948.95 2,099,387.40 0.117 - - - - - - -
d Lampu Downligt LED 7,5 Watt 2.00 Bh 133,058.75 266,117.50 0.015 - - - - - - -
e Saklar Ganda 2.00 Bh 303,241.95 606,483.90 0.034 - - - - - - -
f Saklar Tunggal 5.00 Bh 296,894.95 1,484,474.75 0.083 - - - - - - -
g Stop Kontak 8.00 Bh 271,506.95 2,172,055.60 0.121 - - - - - - -
h Stop Kontak AC 4.00 Bh 303,241.95 1,212,967.80 0.068 - - - - - - -
-
XV PEK. INSTALASI PEMBUANGAN AIR HUJAN 28,501,401.89 1.593 - - - - -
1 Roof Drain 4" 2.00 Bh 423,054.50 846,109.00 0.047 - - - - - - -
2 Pipa PVC type AW Ø 3 " 22.50 M' 113,572.25 2,555,375.63 0.143 - - - - - - -
3 Saluran Air Hujan Keliling Bangunan 32.21 M' 650,000.00 20,936,500.00 1.170 - - - - - - -
4 Bak Kontrol Air Hujan 4.00 Bh 1,040,854.32 4,163,417.26 0.233 - - - - - - -
-
XVI PEKERJAAN PERLENGKAPAN DAN LAINNYA 18,750,000.00 1.048 - - - - -
1 Reyling Pada Lantai Satu 16.95 M' 1,000,000.00 16,950,000.00 0.947 - - - - - - -
2 Reyling Pada Lantai Dua 1.80 M' 1,000,000.00 1,800,000.00 0.101 - - - - - - -
-
XVII PEKERJAAN AKHIR 29,250,000.00 1.635 - - - - -
1 Pekerjaan Pembersihan 1.00 Ls 5,000,000.00 5,000,000.00 0.279 - - - - - - -
2 As Built Drawing 1.00 Ls 5,250,000.00 5,250,000.00 0.293 - - - - - - -
3 Administrasi dan Dokumentasi 1.00 Ls 6,500,000.00 6,500,000.00 0.363 - - - - - - -
4 Pembuatan Surat Layak Operasi (SLO) Listrik 1.00 Ls 12,500,000.00 12,500,000.00 0.699 - - - - - - -
7.345 13.920

Bobot Sampai dengan Minngu Lalu 7.345


Bobot Sampai dengan Minggu Ini 13.920
Bobot Rencana Sampai dengan Minggu Ini 21.886
DEVIASI - 7.966 (-)

Disetujui Oleh : Diperika Oleh : Dibuat Oleh :


PEJABAT PEMBUAT KOMITMEN PEJABAT PELAKSANA TEKNIS KEGIATAN PEJABAT PELAKSANA TEKNIS KEGIATAN
RSUD - BOLAANG MONGONDOW SELATAN RSUD - BOLAANG MONGONDOW SELATAN RSUD - BOLAANG MONGONDOW SELATAN
KAB. BOLAANG MONGONDOW SELATAN KAB. BOLAANG MONGONDOW SELATAN KAB. BOLAANG MONGONDOW SELATAN
KEMAJUAN PEKERJAAN BOBOT
HARGA SATUAN JUMLAH BOBOT THDP
NO. URAIAN VOLUME SAT MINGGU LALU MINGGU INI S/D MINGGU INI MASING -
MASING
( Rp. ) ( Rp. ) (%) Volume Bobot Volume Bobot Volume Bobot
PEKERJAAN
1 2 3 4 5 6 5 6 7=(6/4)X5 8 9=(8/4)X5 10=6+8 11=7+9 12=(10/4)X100

Dr. SRI S. PAKAYA, MM.Kes Imelda Mokodongan, SST. Ir. Gerrel H. Tulungen, MMT
NIP. 19800721 200602 2 022 NIP. 19780609 200801 2 026 Direktur