Owner
Kegiatan
Kontraktor b3 b4 b4'
Konsultan 2 2 2
3 2 3 2 2
STR.B.03.01.01 8 6 4 4 5
Tulangan Panjang (cm)
Dimensi (cm) Jarak Tiap Jumlah Batang
No. SB
Nama Tot. Bentuk Posisi Dia. a b c d e f g Tot. Batang Real
P L T
Gedung Utama
Tul.
RB1A 20 500 20 50 D 19 2.5 100 15 115 4.00
Tumpuan
Tul.
RB1A 20 500 20 50 D 19 2.5 400 15 15 430 2.00
Lapangan
15.00 35.00
10.00 51.00
Tul.
RB1B 8 600 20 50 D 19 2.5 120 15 135 4.00
Tumpuan
Tul.
RB1B 8 600 20 50 D 19 2.5 480 15 15 510 2.00
Lapangan
15.00 41.00
10.00 61.00
Tul.
RB1C 4 650 20 50 D 19 2.5 130 15 145 4.00
Tumpuan
Tul.
RB1C 4 650 20 50 D 19 2.5 520 15 15 550 2.00
Lapangan
15.00 45.00
10.00 66.00
No. Revisi
Tanggal
Kebutuhan Potongan Tersisa
Jumlah Tot.
Potong Btg Jumlah Berat (Kg) Sumber Panjang Jumlah
Batang (cm)
{Tiebeam} Lembar 9
Tie Besi Tul.
Besi
Beugel TB 22 470 30 50 Beugel D 10 3 44 24 44 24 4 4 144 33 726 91 645.04 Logistik
2 - 13
2
2 Tie Beam
Tipe 1 Tul.
4 6840 45 75 Pokok 2 D 22 3 13 1187 1200 9 36 36 1,289.52 Logistik
- 13
Tie Beam
Tipe 1 Tul.
20 6840 45 75 Pokok 2 D 22 3 1200 1200 9 180 180 6,447.60 Logistik
- 13
Tie Beam
Tipe 1 Tul.
4 6840 45 75 Pokok 2 D 22 3 13 181 194 9 36 6 208.69 Logistik
- 13
Tie Beam
Tipe 1 Tul.
4 6840 45 75 Tengah D 13 3 5 1195 1200 4 16 16 199.68 Logistik
2 - 13
Tie Beam
Tipe 1 Tul.
16 6840 45 75 Tengah D 13 3 1200 1200 4 64 64 798.72 Logistik
2 - 13
Tie Beam
Tipe 1 Tul.
4 6840 45 75 Tengah D 13 3 5 1095 1100 4 16 16 183.07 Logistik
2 - 13
{Tiebeam} Lembar 10
3 Tie Beam
Tipe 1 Tul.
4 6840 45 75 Pokok D 22 3 13 1187 1200 9 36 36 1,289.52 Logistik
A-I
Tie Beam
Tipe 1 Tul.
20 6840 45 75 Pokok D 22 3 1200 1200 9 180 180 6,447.60 Logistik
A-I
Tie Beam
Tipe 1 Tul.
4 6840 45 75 Pokok D 22 3 13 181 194 9 36 6 208.69 Logistik
A-I
Tie Beam
Tipe 1 Tul.
4 6840 45 75 Pokok D 13 3 5 1195 1200 4 16 16 199.68 Logistik
A-I
Tie Beam
Tipe 1 Tul.
16 6840 45 75 Pokok D 13 3 1200 1200 4 64 64 798.72 Logistik
A-I
Tie Beam
Tipe 1 Tul.
4 6840 45 75 Pokok D 13 3 5 1095 1100 4 16 16 183.07 Logistik
A-I
Tul.
Tie Besi Beugel
Besi 24 40 45 75 A - B D 10 3 69 39 69 39 4 4 224 4 96 19 132.68 Logistik
Beugel TB1 dan
H-I
{Tiebeam} Lembar 12
E PEMBESIAN TIEBEAM
Potongan Tersisa
Panjang Jumlah
(cm)
0.00 0
0.00 0
0.00 0
0.00 0
0.00 0
200.00 4
{Tiebeam} Lembar 13
48.00 91
0.00 0
0.00 0
35.00 6
0.00 0
0.00 0
100.00 16
80.00 110
{Tiebeam} Lembar 14
0.00 0
0.00 0
35.00 6
0.00 0
0.00 0
100.00 16
80.00 19
80.00 281
Dibuat Oleh :
Kontraktor Pelaksana {Tiebeam} Lembar 15
PT. Anugrah Citra Abadi
Dibuat Oleh :
Kontraktor Pelaksana
PT. Anugrah Citra Abadi
{Tiebeam} Lembar 16
RENCANA PEMBESIAN GOR SANGIHE
Owner 0
Kegiatan 0
Kontraktor 0
Konsultan 0
1
STR.B.03.01.02
No. Revisi :0
Beton Mutu K400 0.18 0.2 Tanggal : -421dd mmmm yyyy
Ukuran (meter) Luas Vol. (m3) Toleransi Vol. Total Unit Mixer
No. Nama Total
P L T m2 ( 0% ) (m3)
Bangunan Utama
Err:50 Err:50 ###
1 TB 1 44 5.20 Err:509 Err:509 Err:509
9
Err:50 9
Err:50
2 TB 2 33 5.50 ### Err:509 Err:509 Err:509
9 9
6.35 Err:50 Err:50
3 TB 2 6 ### Err:509 Err:509 Err:509
9
Err:50 9
Err:50
4 TB 2 6 4.20 ### Err:509 Err:509 Err:509
9
Err:50 9
Err:50
5 TB 1 36 7.20 ### Err:509 Err:509 Err:509
9
Err:50 9
Err:50
6 TB 2 4 4.60 ### Err:509 Err:509 Err:509
9 9
4.78 Err:50 Err:50
7 TB 2 8 ### Err:509 Err:509 Err:509
9
Err:50 9
Err:50
8 TB 1 4 8.41 ### Err:509 Err:509 Err:509
9
Err:50 9
Err:50
9 TB 1 4 7.92 ### Err:509 Err:509 Err:509
9
Err:50 9
Err:50
10 TB 2 4 3.25 ### Err:509 Err:509 Err:509
9 9
2.20 Err:50 Err:50
11 TB 2 4 ### Err:509 Err:509 Err:509
9 9
Ramp
12 B3 4 12.24 Err:50 Err:50 ### Err:509 Err:509 Err:509
9
Err:50 9
Err:50
13 B3 4 4.20 ### Err:509 Err:509 Err:509
9 9
7.20 Err:50 Err:50
14 B3 2 ### Err:509 Err:509 Err:509
9
Err:50 9
Err:50
15 B1 4 11.29 ### Err:509 Err:509 Err:509
9
Err:50 9
Err:50
16 B3 8 5.60 ### Err:509 Err:509 Err:509
9
Err:50 9
Err:50
17 B1 8 8.39 ### Err:509 Err:509 Err:509
9 9
4.20 Err:50 Err:50
18 B1 6 ### Err:509 Err:509 Err:509
9
Err:50 9
Err:50
19 B3 8 3.52 ### Err:509 Err:509 Err:509
Err:50 9
Err:50 9
Err:50
20 SW 1 2 ### Err:509 Err:509 Err:509
9
Err:50 9
Err:50 9
Err:50
21 SW 2 2 ### Err:509 Err:509 Err:509
9
Err:50 9
Err:50 9
Err:50
22 SW 3 2 ### Err:509 Err:509 Err:509
9
Err:50 9
Err:50 9
Err:50
23 SW 4 2 ### Err:509 Err:509 Err:509
9 9 9
Total Err:509 Err:509
Owner 0
Kegiatan 0
Kontraktor 0
Konsultan :
STR.B.03.01.03
No. Revisi :0
Tanggal : -421dd mmmm yyyy
Bekisting 0.2
Ukuran (meter) 18
No. Nama Total Luas (m') Total Luasan (m2)
P L T1 T2
Gedung Utama
1 TB 1 44 5.20 ### ### ### Err:509 Err:509
2 TB 2 33 5.50 ### ### ### Err:509 Err:509
3 TB 2 6 6.35 ### ### ### Err:509 Err:509
4 TB 2 6 4.20 ### ### ### Err:509 Err:509
5 TB 1 36 7.20 ### ### ### Err:509 Err:509
6 TB 2 4 4.60 ### ### ### Err:509 Err:509
7 TB 2 8 4.78 ### ### ### Err:509 Err:509
8 TB 1 4 8.41 ### ### ### Err:509 Err:509
9 TB 1 4 7.92 ### ### ### Err:509 Err:509
10 TB 2 4 3.25 ### ### ### Err:509 Err:509
11 TB 2 4 2.20 ### ### ### Err:509 Err:509
Ramp
12 B3 4 12.24 ### ### ### Err:509 Err:509
13 B3 4 4.20 ### ### ### Err:509 Err:509
14 B3 2 7.20 ### ### ### Err:509 Err:509
15 B1 4 11.29 ### ### ### Err:509 Err:509
16 B3 8 5.60 ### ### ### Err:509 Err:509
17 B1 8 8.39 ### ### ### Err:509 Err:509
18 B1 6 4.20 ### ### ### Err:509 Err:509
19 B3 8 3.52 ### ### ### Err:509 Err:509
20 SW 1 2 ### ### ### ### Err:509 Err:509
21 SW 2 2 ### ### ### ### Err:509 Err:509
22 SW 3 2 ### ### ### ### Err:509 Err:509
23 SW 4 2 ### ### ### ### Err:509 Err:509
Owner 0
Kegiatan 0
Kontraktor 0
Konsultan 0
STR.B.03.02.04
RENCANA PEMBESIAN GOR SANGIHE
Diameter Tulangan Vol. Total Bekisting
No. Lokasi Sat. Beton
D 10 D 13 D 16 D 25 K400 Multiplex Batako
I Tie Beam Lantai 1
Tie Beam TB1 Err:504 Err:504 Err:504 Err:504 Err:509 Err:509
Tie Beam TB2 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
II Balok Ramp
Balok B1 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Balok B3 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
III Shearwall
SW Err:504 Err:504 Err:504 Err:504 Err:509 Err:509