Satuan Kerja : Kantor Wilayah Kementerian Agama Provinsi Maluku MINGGU KE : 11 ( Sebelas )
Pekerjaan : Pembangunan Ruang Kelas Baru (RKB) MIN 5 Maluku Tengah PERIODE : 29 AGUSTUS - 4 NOVEMBER 2022
Lokasi : Desa Tulehu, Kec. Salahutu, Kab. Maluku Tengah REALISASI : 21,59
Tahun Anggaran : 2022 RENCANA 16,17
DEFIASI : 5,42
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
II. PEKERJAAN STRUKTUR 913.831.851,99
I. PEKERJAAN STRUKTUR BAWAH 253.844.218,75
A. PEKERJAAN PONDASI BATU KALI 3.436.300,55
1 Galian Tanah Pondasi Batu Kali M³ 4,49 75.680,00 339.803,20 0,0130 - - 4,49 0,0130 4,49 339.803,20 0,0130 100
2 Urug Tanah Kembali Bekas Galian M³ 1,50 56.760,00 85.140,00 0,0033 - - 1,50 0,0033 1,50 85.140,00 0,0033 100
3 Pondasi Batu Kosong (Anstamping), t = 15 cm M³ 1,22 542.681,70 662.071,67 0,0254 - - 1,22 0,0254 1,22 662.071,67 0,0254 100
4 Pondasi Batu Kali 1 PC : 4 Psr M³ 2,55 921.288,50 2.349.285,68 0,0902 - - 2,55 0,0902 2,55 2.349.285,68 0,0902 100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
B. PEKERJAAN KOLOM 81.934.518,03
1 Kolom K1 300 x 300 mm
Beton Mutu Fc = 19,3 MPa (K-225) M³ 11,29 201.872,00 2.279.134,88 0,0875 11,29 0,0875 - 11,29 2.279.134,88 0,0875 100
Pembesian Kg 2.579,32 18.396,95 47.451.621,07 1,8219 2.579,32 1,8219 - 2.579,32 47.451.621,07 1,8219 100
Bekisting Kolom (2x Pakai) M² 150,48 214.006,93 32.203.762,07 1,2365 150,48 1,2365 - 150,48 32.203.762,07 1,2365 100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
C. PEKERJAAN PLAT LANTAI, CANOPY & MEJA 204.384.541,74
1 Plat Lantai, t = 12 cm
Beton Mutu Fc = 19,3 MPa (K-225) M³ 27,00 1.207.944,10 32.614.490,70 1,2522 - - - - - - -
Pembesian Kg 3.622,91 18.396,95 66.650.494,12 2,5590 - - - - - - -
Bekisting Plat Lantai (1x Pakai) M² 224,96 441.659,90 99.355.811,10 3,8148 - - 44,99 0,7630 44,99 19.871.162,22 0,7630 20
2 Plat Canopy Beton, t = 10 cm, Lebar = 40 cm
Beton Mutu Fc = 19,3 MPa (K-225) M³ 1,01 1.207.944,10 1.220.023,54 0,0468 - - - - - - -
Pembesian Kg 67,23 18.396,95 1.236.826,95 0,0475 - - - - - - -
Bekisting Plat Canopy (2x Pakai) M² 13,08 230.066,93 3.009.275,38 0,1155 - - - - - - -
3 Meja Wastafel, t = 8 cm, Lebar = 60 cm
Beton Mutu Fc' = 14,5 MPa (K-175) M³ 0,06 1.151.540,50 69.092,43 0,0027 - - - - - - -
Pembesian Kg 3,95 18.396,95 72.667,95 0,0028 - - - - - - -
Bekisting Meja Wastafel (2x Pakai) M² 0,78 199.819,95 155.859,56 0,0060 - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
B. PEKERJAAN PENUTUP LANTAI 90.598.750,26
1 Lantai Homogenous Tile 60 x 60 cm Polished M² 161,95 282.437,10 45.740.688,35 1,7562 - - - - - - -
2 Lantai Homogenous Tile Selasar 60 x 60 cm Unpolished M² 84,95 265.387,10 22.544.634,15 0,8656 - - - - - - -
3 Plint Lantai Homogenous Tile 10x60 cm (Polished) M¹ 181,93 69.028,30 12.558.318,62 0,4822 - - - - - - -
4 Lantai Homogenous Tile Area Toilet 60 x 60 cm Unpolished M² 16,06 265.387,10 4.262.116,83 0,1636 - - - - - - -
5 Homogenous Tile Tangga 30x60 & 60x60 cm Include StepnosingM² 18,99 289.257,10 5.492.992,33 0,2109 - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
B. PEKERJAAN PENUTUP LANTAI 79.171.661,31
1 Lantai Homogenous Tile 60 x 60 cm Polished M² 161,95 282.437,10 45.740.688,35 1,7562 - - - - - - -
2 Lantai Homogenous Tile Selasar 60 x 60 cm Unpolished M² 74,53 265.387,10 19.779.300,56 0,7594 - - - - - - -
3 Plint Lantai Homogenous Tile 10x60 cm (Polished) M¹ 165,09 69.028,30 11.395.882,05 0,4375 - - - - - - -
4 Lantai Homogenous Tile Area Toilet 60 x 60 cm Unpolished M² 8,50 265.387,10 2.255.790,35 0,0866 - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
E. PEKERJAAN ATAP 205.500.952,88
1 Rangka Atap Baja Ringan M² 403,38 323.095,30 130.330.182,11 5,0040 - - - - - - -
2 Penutup Atap Bitumen Selulosa Gelombang, h = 40 mm M² 409,81 135.736,70 55.626.257,03 2,1358 - - - - - - -
3 Flashing Atap M¹ 37,45 101.284,70 3.793.112,02 0,1456 - - - - - - -
4 Lisplank GRC Lebar 30 cm M¹ 172,55 79.948,00 13.795.027,40 0,5297 - - - - - - -
5 Pengecatan Lisplank dengan Roof Paint M² 51,77 37.789,73 1.956.374,32 0,0751 - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
C.2. LANTAI 2
1 Instalasi Titik Lampu dengan Kabel NYM 3 x 2,5 mm² Ttk 38,00 305.747,20 11.618.393,60 0,4461 - - - - - - -
2 Instalasi Stop Kontak dengan Kabel NYM 3 x 2,5 mm² Ttk 12,00 305.747,20 3.668.966,40 0,1409 - - - - - - -
3 Lampu RM 300 LED 2 x 18 Watt Komplit ex. Philips Bh 20,00 472.032,00 9.440.640,00 0,3625 - - - - - - -
4 Lampu Downlight Inbow LED 10 Watt ex. Philips Bh 18,00 158.532,00 2.853.576,00 0,1096 - - - - - - -
5 Saklar Tunggal ex. Panasonic, National Bh 3,00 67.232,00 201.696,00 0,0077 - - - - - - -
6 Saklar Double ex. Panasonic, National Bh 8,00 72.732,00 581.856,00 0,0223 - - - - - - -
7 Stop Kontak ex. Panasonic, National Bh 12,00 73.832,00 885.984,00 0,0340 - - - - - - -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
B.2. INSTALASI PIPA LANTAI 1
1 Pipa Air Kotor PVC AW 4" ke Septictank M¹ 12,00 173.038,25 2.076.459,00 0,0797 - - - - - - -
2 Pipa Air Kotor PVC AW 4" (Riser) Bh 5,00 173.038,25 865.191,25 0,0332 - - - - - - -
3 Pipa Air Kotor PVC AW 4" Bh 8,00 173.038,25 1.384.306,00 0,0532 - - - - - - -
4 Clean Out Stainless Steel dia. 4" Bh 1,00 145.343,00 145.343,00 0,0056 - - - - - - -
5 Fitting & Hanger Support Lot 1,00 432.595,63 432.595,63 0,0166 - - - - - - -