A. UPAH
1 Pekerja Org/hari
2 Tukang Gali / Batu / Tembok / Kayu /Besi / Cat / Pipa / Cor / Semen / Listrik / Pancang Org/hari
3 Kepala Tukang Org/hari
4 Mandor Org/hari
5 Ahli alat berat (mekanik) Org/hari
6 Operator Alat Berat Org/hari
7 Pembantu Operator Org/hari
8 Supir Truk Org/hari
9 Kenek truk Org/hari
10 Pembantu Mekanik Org/hari
WALIKOTA
SUTA
OTA PONTIANAK
2015
HARGA SATUAN DASAR UPAH DAN BAHAN
HARGA SATUAN
DASAR (TIDAK
KODE
TERMASUK PROFIT
& OVERHEAD) (Rp)
L. 01 85,000.00
L. 02 100,000.00
L. 03 125,000.00
L. 04 135,000.00
L. 07 110,000.00
L. 08 150,000.00
L. 09 80,000.00
L. 10 100,000.00
L. 11 70,000.00
L. 16 100,000.00
WALIKOTA PONTIANAK,
SUTARMIDJI
LAMPIRAN II
PERATURAN WALIKOTA PONTIANAK
NOMOR 67 TAHUN 2015
TENTANG STANDAR HARGA SATUAN DASAR UPA
KOTA PONTIANAK
NO MATERIAL
B. BAHAN PENGISI
1 Batu Kong
2 Batu Sap Pinang
3 Batu pecah 15-20 cm
4 Batu pecah 10-15 cm
5 Batu pecah 5-7 cm
6 Batu pecah 3-5 cm
7 Batu pecah 2-3 cm
8 Batu pecah 1-2 cm
9 Batu pecah 1-1 cm
10 Batu pecah 0,5 cm
11 Stone Dust
12 Aspal
13 Aspal Sealent
14 Pasir Kasar
15 Pasir Halus
16 Semen PC
17 Semen PC
18 Tanah Ex. Peniraman
19 Tanah Pilihan (Paladis/Tanah Bukit Tokok)
20 Paving Block
21 Paving Stone
22 Batu Bata 5 x 11 x 22cm
23 Bataco 15 x 30 x 7 cm
24 Bataco 15 x 30 x 6 cm
25 Bataco 20 x 40 x 9 cm ( press )
26 Bataco 20 x 40 x 7 cm ( press )
27 Kerawang ( roster ) 18 x 18 cm
28 Kerawang press ( roster ) 30 x 30 cm
29 Keramik 20 x 20 cm Polished ex Roman
30 Keramik 20 x 20 cm Unpolished ex Roman
31 Keramik 30 x 30 cm Polished ex Roman
NO MATERIAL
C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M
4 Ky. Belian tdk ketam Uk. 8/16 - 4 M
5 Ky. Belian tdk ketam Uk. 9/9 - 4 M
6 Ky. Belian tdk ketam Uk. 10/10 - 4 M
7 Ky. Belian tdk ketam Uk. 12/12 - 4 M
8 Ky. Belian tdk ketam Uk. 18/18 - 4 M
9 Ky. Belian tdk ketam Uk. 5/10 - 4 M
NO MATERIAL
D. BAHAN CAT
1 Amplas
2 Minyak cat
3 Cat kilat setara Dulux
4 Cat kilat setara Avian
5 Plamur
6 Cat Dasar Setara Dulux
7 Cat Akhir Interior setara Dulux
8 Cat Akhir Eksterior (weather shield) setara Dulux
9 Cat Dasar setara Mowilex
10 Cat Akhir Interior setara Mowilex
11 Cat Akhir Eksterior (weather shield) setara Mowilex
12 Cat Dasar setara Vinilex
13 Cat Akhir Interior setara Vinilex
14 Cat seng (Zinc Chromate)
15 Plitur
16 Thiner
17 Melamic
18 Vernis
19 Meni
NO MATERIAL
F. BAHAN PENGGANTUNG
1 Pintu PVC untuk WC
2 Kait angin
3 Handle Jendela
4 Handle Pintu
5 Engsel jendela
6 Engsel pintu
7 Slot pintu
8 Slot jendela
9 Kunci tanam 2 slag (setaraf Belluci)
10 Kunci tanam 1 slag
11 Kunci tanam antik
12 Kunci tanam biasa
13 Kunci silinder
14 Door Closer
15 Door Stoper
16 Paku Seng
17 Paku campuran 1" - 5 "
18 Paku beton
19 Paku triplek
NO MATERIAL
20 Paku GRC
21 Paku Zincalum
22 Paku Onduline
23 Sekrup Onduline
24 Sekrup Gibsum
25 Sekrup Fixer
26 Sekrup Steel Sheet uk. 5 x 15 mm
27 Sekrup Steel Sheet uk. 5 x 25 mm
28 Sekrup Steel Sheet uk. 5 x 35 mm
29 Sekrup Steel Sheet uk. 5 x 45 mm
30 Sekrup Steel Sheet uk. 5 x 50 mm
31 Sekrup Steel Sheet uk. 5 x 55 mm
32 Sekrup Steel Sheet uk. 5 x 65 mm
33 Sekrup Ulir Kayu
34 Paku asbes
35 Sekrup Zincalume
36 Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm
37 Pintu Alumunium + Engsel Tanam - uk. 90 x 215 cm
38 Pintu Alumunium + Engsel Kupu-kupu - uk. 90 x 215 cm
39 Jendela Casement - uk. 60 x 120 cm (Lengkap - Tanpa Kaca)
G. BAHAN ATAP
1 Sirap belian
2 Asbes
3 Eternit
4 Genteng Metal Type Permata 0.30
5 Genteng Metal Type Prima 0.30
6 Genteng Metal Type Royal 0.30
7 Genteng Metal Type Classic 0.30
8 Genteng Metal Type Permata 0.25
9 Genteng Metal Type Classic 0.25
10 Genteng Metal Type Royal 0.25
11 Atap Genteng Onduline Transparan 2 x 0,95 m
12 Atap Genteng Onduline Warna 2 x 0,95 m (merah,hijau,coklat & hitam)
13 Atap Genteng Onduline Warna 2 x 0,95 m (Biru /Premium)
14 Atap Genteng Onduvilla Warna 1,06 x 0,4 m (merah,hijau,coklat & hitam)
15 Atap Genteng Onduvilla Warna 1,06 x 0,4 m (teracota 3D & florentino)
16 Perabung Onduline Warna 90 x 50 cm (merah, coklat, hijau & hitam)
17 Perabung Onduline Warna 90 x 50 cm (biru/premium)
18 Perabung Onduline Warna 90 x 50 cm (florentino)
19 Siku Onduline Warna 110 x 40 cm (merah,coklat,hijau & hitam)
20 Apron Piece Onduvilla 102 x 14 cm
21 Verge Piece Onduline/Onduvilla 104 x 10,5 cm tinggi 11,4 cm
NO MATERIAL
22 Onduband
23 Atap Seng Metal Soka Abadi
24 Atap Seng Metal Soka Jempol
25 Atap Seng Metal Soka Tiara
26 Genteng Metal Stone ( Type Classic 0.35 )
27 Genteng Metal Stone ( Type Prima 0.35 )
28 Atap Metal Supersheet 0.35 (polos)
29 Atap Metal Supersheet 0.35 (colour)
30 Atap Metal Supersheet 0.25 (polos)
31 Atap Metal Supersheet 0.25 (colour)
32 Atap Trim Deck 0.3 (polos)
33 Atap Trim Deck 0.35 (color)
34 Atap polycarbonat
35 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm)
36 Nok bubungan genteng metal stone 1/2 lingkaran 0.35 (pj 40cm)
37 Nok bubungan genteng metal kotak 0.35
38 Nok bubungan genteng metal stone kotak 0.35
39 Nok bubungan Trim Deck (polos)
40 Nok bubungan Trim Deck (color)
41 Seng Gelombang Bjls 30
42 Seng Gelombang Bjls 20
43 Seng Plat Bjls 20
44 Seng Plat Bjls 30
45 Seng Plat Bjls 30 (lebar 45 cm)
46 Plat Datar Color 0.35
NO MATERIAL
H. BAHAN KACA
1 Kaca Polos, t = 3 mm
NO MATERIAL
2 Kaca Polos, t = 5 mm
3 Kaca Polos, t = 8 mm
4 Kaca Polos, t = 12 mm
5 Kaca Rayben, t = 3 mm
6 Kaca Rayben, t = 5 mm
7 Kaca Rayben, t = 8 mm
8 Kaca Rayben, t = 12 mm
9 Kaca Cermin t = 3 mm
10 Kaca Cermin t = 5 mm
11 Kaca Cermin t = 8 mm
12 Kaca Repsol, t = 5 mm
13 Kaca Patri, t = 5 mm
14 Sealent
15 Nako + Bingkai (80 x 15) x 10 daun polos
16 Nako + Bingkai (80 x 15) x 10 daun rayben
17 Kaca Es, t = 3 mm
18 Kaca Es, t = 5 mm
19 Kaca Raindown, t = 3 mm
20 Kaca Raindown, t = 5 mm
I. BAHAN TRIPLEK
1 Triplek t = 3 mm
2 Triplek t = 6 mm
3 Triplek t =9 mm
4 Triplex t = 12 mm
NO MATERIAL
5 Teakwood t = 3 mm
6 Formika t = 0,03 mm
7 Multiplex t = 6 mm
8 Multiplex t = 9 mm
9 Multiplex t = 10 mm
10 Multiplek t = 12 mm
11 Plywood 4' x 8' x 4mm
12 Panel GRC 120 x 240 x 40
13 GypsumBoard t = 9 mm
14 Super Plank 10 x 240 x 9 cm
15 Super Plank 20 x 240 x 9 cm
16 Super Plank 30 x 240 x 9 cm
J. BAHAN SANITASI
1 Wastafel setara Toto
2 Kloset duduk monoblok
3 Kloset duduk putih (setaraf TOTO)
4 Kloset duduk warna (setaraf TOTO)
5 Kloset jongkok (setaraf TOTO)
6 Kloset jongkok (setaraf INA)
7 Urinoir setaraf Toto
8 Bak air fibreglass uk. 55x55x60 cm
9 Shower Spray setara Toto
10 Sliding rail setara Toto
11 Floordrain stainless steel setara Toto
12 Floordrain PVC
13 Tempat Sabun Setara Toto
14 Kran zink setara Toto
15 Kitchenzink stainless steel 1 lubang
16 Kran dinding setara Toto
17 Kran air uk 1/2"
18 Pipa paralon dia 1/2"
19 Pipa paralon dia 3/4"
20 Pipa paralon dia 1"
21 Pipa paralon dia 2"
22 Pipa paralon dia 3"
23 Pipa paralon dia 4"
24 Pipa paralon dia 8"
25 Pipa PVC dia 1/2" AW ex Wavin
26 Pipa PVC dia 3/4" AW ex Wavin
27 Pipa PVC dia 1" AW ex Wavin
28 Pipa PVC dia 2" AW ex Wavin
29 Pipa PVC dia 3" AW ex Wavin
NO MATERIAL
L. BATU ALAM
1 Batu Andesit Ukuran 10 x 20 cm
2 Batu Andesit Ukuran 15 x 30 cm
3 Batu Andesit Ukuran 20 x 40 cm
4 Batu Andesit Ukuran 30 x 60 cm
5 Batu Candi Ukuran 10 x 20 cm
6 Batu Candi Ukuran 15 x 30 cm
7 Batu Candi Ukuran 20 x 40 cm
8 Batu Pacitoroso Ukuran 10 x 20 cm
9 Batu Pacitoroso Ukuran 15 x 30 cm
10 Batu Pacitoroso Ukuran 20 x 40 cm
11 Batu Bali Green Ukuran 10 x 20 cm
12 Batu Bali Green Ukuran 15 x 30 cm
13 Batu Bali Green Ukuran 20 x 40 cm
14 Batu Prasasti Peresmian (batu hitam) ukuran 40 x 60
15 Batu Prasasti Peresmian (batu hitam) ukuran 60 x 80
16 Batu Koral (batu taman)
17 Batu Granit Ukuran Lebar 60 cm
24 Pijar 75 Watt
25 Pijar 100 Watt
26 Pijar 200 Watt
27 Neon 40 Watt
28 Neon 20 Watt
29 Neon 10 Watt
30 Lampu XL 14 Watt
31 Lampu Sorot 300 Watt
32 Lampu Superlox 25 Watt
33 Lampu Superlox 40 Watt
34 Lampu Fisikom 25 Watt
35 Lampu Fisikom 23 Watt
36 Lampu Fisikom 18 Watt
37 Lampu Mercury 125 Watt
38 Lampu Mercury 250 Watt
39 Lampu Sunyco 45 Watt
40 Lampu Matsuka 8 Watt
41 Lampu Matsuka 14 Watt
42 Lampu Matsuka 18 Watt
43 Lampu Matsuka 20 Watt
44 Lampu Matsuka 25 Watt
45 Lampu Par 38 Watt
46 SL 14 Watt
47 SL 18 Watt
48 SL 23 Watt
NO MATERIAL
49 TL Rina 32 Watt
50 Bola Lampu Sorot 300 Watt
51 Hologen 500 Watt
52 Hologen 1.000 Watt
53 NYY 1 x 1.5 mm
54 NYY 1 x 2.5 mm
55 NYY 1 x 4 mm
56 NYY 1 x 6 mm
57 NYY 2 x 2.5 mm
58 NYY 2 x 4 mm
59 NYY 2 x 6 mm
60 NYY 2 x 10 mm
61 NYY 3 x 4 mm
62 NYY 4 x 2.5 mm
63 NYY 4 x 4 mm
64 NYY 4 x 6 mm
65 NYY 4 x 10 mm
66 NYY 4 x 16 mm
67 NYY 4 x 25 mm
68 NYY 4 x 35 mm
69 NYY 4 x 50 mm
70 NYN 2 x 2,5 mm
71 NYN 3 x 1,5 mm
72 NYN 3 x 2,5 mm
73 NYA 1 x 1,5 mm
74 NYA 1 x 2,5 mm
75 NYA 1 x 4 mm
76 NYA 1 x 6 mm
77 NYM 3 x 4 mm
78 NYM 2 x 4 mm
79 NYM 2 x 2,5 mm
80 NYM 2 x 1,5 mm
81 NYM 3 x 1,5 mm
82 NYM 3 x 2,5 mm
83 NYM 4 x 2,5 mm
84 NYM 4 x 4 mm
85 NYMHYM 2 x 0,75 mm
86 NYMHYM 2 x 1,5 mm
87 Kabel 3 x 2,5 mm
88 Kabel TC 2 x 10 mm
89 Kabel TC 2 x 16 mm
90 Box MCB 1 Group
91 Box Time Swich ( Lengkap pipa optic 1,5 +Klem + Kunci )
NO MATERIAL
WALIKOTA P
SUTARM
ALIKOTA PONTIANAK
AHUN 2015
NDAR HARGA SATUAN DASAR UPAH DAN BAHAN
AK
M³ 251,400.00
M³ 319,400.00
M³ 336,700.00
M³ 421,200.00
M³ 371,000.00
M³ 393,100.00
M³ 418,700.00
M³ 458,100.00
M³ 467,500.00
M³ 581,900.00
M³ 469,100.00
Kg 13,900.00
Kg 30,000.00
M³ 100,100.00
M³ 100,100.00
Zak 76,000.00
Kg 1,520.00
M³ 235,000.00
M³ 320,200.00
Bh 3,000.00
Bh 3,500.00
Bh 1,500.00
Bh 1,600.00
Bh 1,000.00
Bh 2,500.00
Bh 2,100.00
Bh 17,500.00
Bh 54,100.00
Kotak 72,000.00
Kotak 75,500.00
Kotak 90,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
SATUAN
PROFIT & OVERHEAD)
(Rp)
Kotak 90,000.00
Kotak 100,000.00
Kotak 111,000.00
Kotak 243,000.00
Kotak 243,000.00
Kotak 154,400.00
Kotak 155,000.00
Kotak 319,500.00
Kotak 323,000.00
Kotak 76,000.00
Kotak 89,000.00
M² 1,393,600.00
M² 297,000.00
Bh 11,600.00
Bh 61,000.00
Kg 16,600.00
M³ 944,000.00
M³ 991,300.00
M³ 1,025,000.00
M³ 1,059,300.00
M³ 1,134,000.00
M³ 1,189,300.00
M³ 1,225,000.00
M³ 1,240,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
SATUAN
PROFIT & OVERHEAD)
(Rp)
M³ 1,266,700.00
M³ 1,306,500.00
M³ 1,341,500.00
M³ 1,377,500.00
M³ 1,406,500.00
M³ 1,432,500.00
M³ 1,467,500.00
M³ 1,504,000.00
M³ 1,536,500.00
Liter 38,300.00
Lembar 11,300.00
Btg 960,000.00
Btg 1,060,400.00
Btg 1,200,000.00
Btg 1,379,400.00
Btg 1,716,000.00
Btg 780,000.00
Btg 896,500.00
Btg 900,000.00
Btg 1,024,100.00
Btg 1,620,000.00
Btg 2,160,000.00
Btg 2,970,000.00
Btg 1,300,000.00
Btg 1,625,000.00
Btg 1,950,000.00
M³ 27,500.00
M² 4,000.00
bh 50,000.00
bh 35,000.00
M² 425,000.00
M² 375,000.00
M³ 10,142,500.00
M³ 9,621,000.00
M³ 7,936,100.00
M³ 7,617,200.00
M³ 9,567,900.00
M³ 9,412,000.00
M³ 13,020,900.00
M³ 10,416,700.00
M³ 10,000,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
SATUAN
PROFIT & OVERHEAD)
(Rp)
M³ 11,154,500.00
M³ 10,058,300.00
M³ 11,015,700.00
M³ 10,928,600.00
M³ 10,273,400.00
M³ 6,699,200.00
M³ 6,510,400.00
M³ 5,227,600.00
M³ 5,739,800.00
M³ 8,100,000.00
M³ 19,500,000.00
M³ 15,000,000.00
M³ 11,500,000.00
M³ 3,828,100.00
M³ 3,971,400.00
M³ 4,024,900.00
M³ 4,153,700.00
M³ 2,924,400.00
M³ 3,135,000.00
M³ 3,789,700.00
M³ 4,583,300.00
M³ 4,108,800.00
M³ 4,199,200.00
M³ 3,993,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
SATUAN
PROFIT & OVERHEAD)
(Rp)
M³ 4,557,300.00
M³ 2,225,000.00
M³ 1,963,500.00
M³ 13,252,300.00
M³ 12,682,300.00
M³ 6,250,000.00
M³ 6,377,300.00
M³ 10,819,800.00
M³ 11,188,300.00
M³ 2,113,100.00
M³ 1,064,800.00
Btg 18,000.00
Btg 30,700.00
Btg 5,600.00
Btg 8,300.00
Btg 9,500.00
Btg 75,000.00
Btg 91,200.00
M³ 266,700.00
Btg 11,000.00
M' 62,500.00
Btg 10,000.00
Lbr 3,000.00
Kg 27,200.00
Kg 58,000.00
Kg 54,000.00
Kg 31,500.00
Kg 92,600.00
Kg 99,500.00
Kg 98,300.00
Kg 52,000.00
Kg 70,400.00
Kg 86,000.00
Kg 23,700.00
Kg 26,600.00
Kg 43,900.00
Kg 50,600.00
Ltr 22,100.00
Ltr 62,400.00
Ltr 32,000.00
Kg 48,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
SATUAN
PROFIT & OVERHEAD)
(Rp)
Kg 13,100.00
Kg 17,100.00
Kg 35,900.00
Kg 21,100.00
Kg 15,700.00
Ltr 60,000.00
Ltr 58,400.00
Bh 22,500.00
Kg 65,000.00
Kg 95,000.00
Kg 30,000.00
Kg 39,000.00
Kg 78,500.00
Kg 10,600.00
Kg 12,600.00
Kg 9,400.00
Kg 9,300.00
Kg 9,100.00
Kg 20,000.00
Kg 17,900.00
Kg 15,500.00
Btg 5,000.00
bh 16,000.00
bh 15,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
SATUAN
PROFIT & OVERHEAD)
(Rp)
Bh 310,000.00
Kg 13,500.00
Btg 5,300.00
Kg 28,500.00
M² 26,300.00
M² 16,000.00
Btg 118,300.00
Btg 93,100.00
Btg 139,800.00
Btg 205,000.00
Btg 246,300.00
Btg 302,900.00
Btg 390,000.00
Btg 582,500.00
Btg 925,000.00
Btg 1,071,300.00
Btg 1,721,700.00
M² 621,700.00
Meter 85,000.00
Meter 95,000.00
Unit 1,500,000.00
Meter 120,000.00
Meter 65,000.00
Meter 65,000.00
M² 235,200.00
M² 272,500.00
M² 250,000.00
M² 304,100.00
M² 175,000.00
M² 225,400.00
M² 193,900.00
M² 257,000.00
btg 52,500.00
btg 82,000.00
btg 75,000.00
bh 5,700.00
bh 6,000.00
bh 800.00
bh 800.00
bh 800.00
M² 908,700.00
Lbr 1,339,100.00
M² 129,100.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
SATUAN
PROFIT & OVERHEAD)
(Rp)
btg 119,600.00
btg 69,600.00
Bh 254,000.00
Bh 14,400.00
Bh 15,400.00
Bh 135,000.00
Bh 18,800.00
Bh 27,500.00
Bh 17,000.00
Bh 6,400.00
Bh 179,100.00
Bh 162,500.00
Bh 47,500.00
Bh 55,000.00
Bh 60,800.00
Bh 175,500.00
Bh 52,500.00
Kg 20,900.00
Kg 20,500.00
Kg 31,400.00
Kg 18,100.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
SATUAN
PROFIT & OVERHEAD)
(Rp)
Kg 21,300.00
Kg 10,700.00
Bh 1,300.00
Bh 1,500.00
Kg 48,300.00
Bh 2,500.00
Bh 300.00
Bh 300.00
Bh 400.00
Bh 500.00
Bh 500.00
Bh 500.00
Bh 700.00
Bh 700.00
Bh 600.00
Bh 500.00
Unit 4,208,700.00
Unit 2,104,300.00
Unit 1,578,300.00
Unit 631,300.00
Lbr 5,300.00
Lbr 57,200.00
M² 68,400.00
Lbr 63,000.00
Lbr 66,600.00
Lbr 66,600.00
Lbr 66,600.00
Lbr 51,800.00
Lbr 51,800.00
Lbr 51,800.00
Lbr 270,000.00
Lbr 154,000.00
Lbr 193,000.00
Lbr 48,500.00
Lbr 54,000.00
Lbr 94,500.00
Lbr 95,000.00
Lbr 96,000.00
Lbr 85,000.00
Lbr 89,500.00
Lbr 89,500.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
SATUAN
PROFIT & OVERHEAD)
(Rp)
M 55,000.00
Lbr 92,000.00
Lbr 64,000.00
Lbr 53,000.00
Lbr 80,000.00
Lbr 80,000.00
M² 81,300.00
M² 111,900.00
M² 47,000.00
M² 64,000.00
M² 100,000.00
M² 112,300.00
M² 78,300.00
Bh 46,000.00
Bh 70,000.00
M' 50,000.00
M' 96,900.00
M' 109,500.00
M' 123,100.00
Lbr 64,000.00
Lbr 47,400.00
Lbr 49,900.00
Lbr 66,300.00
M' 20,000.00
Lbr 54,300.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
SATUAN
PROFIT & OVERHEAD)
(Rp)
M² 75,900.00
M² 120,100.00
M² 70,000.00
M² 83,800.00
M² 80,000.00
M² 55,000.00
Lbr 46,500.00
M² 52,600.00
Lbr 15,200.00
M 55,000.00
M 60,000.00
M 65,000.00
M 50,000.00
M 57,000.00
M 67,000.00
M 72,000.00
M 77,000.00
M 60,500.00
M 66,000.00
M 71,500.00
M 62,700.00
M 73,700.00
M 79,200.00
M 84,700.00
M 22,000.00
M 24,000.00
M 26,000.00
M 20,000.00
M 22,800.00
M 26,800.00
M 28,800.00
M 30,800.00
M 33,000.00
M 36,000.00
M 39,000.00
M 30,000.00
M 34,200.00
M 40,200.00
M 43,200.00
M 46,200.00
M² 80,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
SATUAN
PROFIT & OVERHEAD)
(Rp)
M² 82,500.00
M² 140,000.00
M² 260,000.00
M² 65,000.00
M² 62,500.00
M² 125,000.00
M² 241,800.00
M² 85,000.00
M² 125,000.00
M² 190,000.00
M² 450,000.00
M² 2,350,000.00
Kg 106,900.00
Bh 250,000.00
Bh 300,000.00
M² 85,000.00
M² 145,000.00
M² 85,000.00
M² 145,000.00
Lbr 70,000.00
Lbr 120,000.00
Lbr 220,000.00
Lbr 300,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
SATUAN
PROFIT & OVERHEAD)
(Rp)
Lbr 140,000.00
Lbr 110,000.00
Lbr 102,000.00
Lbr 210,000.00
Lbr 278,000.00
Lbr 282,100.00
Lbr 115,000.00
Lbr 79,700.00
Lbr 74,600.00
Lbr 65,000.00
Lbr 65,000.00
Lbr 65,000.00
Bh 966,100.00
Bh 2,962,700.00
Bh 2,246,800.00
Bh 2,401,200.00
Bh 294,800.00
Bh 191,000.00
Unit 1,878,300.00
Bh 280,000.00
Unit 230,400.00
Unit 328,700.00
Bh 319,100.00
Bh 18,500.00
Bh 65,200.00
Bh 307,000.00
Unit 650,000.00
Bh 150,000.00
Bh 32,500.00
Btg 21,100.00
Btg 27,100.00
Btg 40,000.00
Btg 66,500.00
Btg 114,000.00
Btg 187,700.00
Btg 655,200.00
Btg 21,300.00
Btg 28,500.00
Btg 40,500.00
Btg 79,600.00
Btg 156,400.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
SATUAN
PROFIT & OVERHEAD)
(Rp)
Btg 252,500.00
Btg 17,100.00
Btg 22,500.00
Btg 45,400.00
Btg 77,000.00
Btg 116,900.00
Bh 39,700.00
Bh 51,200.00
Bh 115,500.00
Bh 1,397,500.00
Bh 813,300.00
Bh 75,000.00
Bh 75,000.00
Unit 115,000.00
Unit 1,440,000.00
Unit 550,000.00
Ltr 8,100.00
Ltr 7,400.00
Ltr 28,800.00
Ltr 9,600.00
Kg 28,800.00
Set 66,400.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
SATUAN
PROFIT & OVERHEAD)
(Rp)
M² 170,000.00
M² 200,000.00
M² 220,000.00
M² 260,000.00
M² 170,000.00
M² 200,000.00
M² 220,000.00
M² 170,000.00
M² 200,000.00
M² 220,000.00
M² 170,000.00
M² 200,000.00
M² 220,000.00
buah 2,500,000.00
buah 4,000,000.00
kg 7,500.00
M² 1,200,000.00
Buah 240,000.00
Buah 208,000.00
Buah 123,000.00
Buah 1,978,000.00
Buah 470,000.00
Buah 267,200.00
Buah 184,300.00
Buah 166,000.00
Buah 130,300.00
Buah 37,000.00
Buah 37,000.00
Buah 65,000.00
Buah 37,500.00
Buah 690,000.00
Buah 145,000.00
Buah 136,000.00
Buah 118,800.00
Buah 117,500.00
Buah 240,000.00
Buah 2,500.00
Buah 4,800.00
Buah 4,800.00
Buah 5,800.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
SATUAN
PROFIT & OVERHEAD)
(Rp)
Buah 5,800.00
Buah 7,000.00
Buah 12,000.00
Buah 15,200.00
Buah 11,700.00
Buah 8,800.00
Buah 30,000.00
Buah 40,500.00
Buah 9,200.00
Buah 9,900.00
Buah 39,000.00
Buah 33,000.00
Buah 31,000.00
Buah 34,300.00
Buah 62,000.00
Buah 84,000.00
Buah 23,500.00
Buah 27,000.00
Buah 31,000.00
Buah 36,000.00
Buah 39,000.00
Buah 98,000.00
Buah 29,500.00
Buah 36,500.00
Buah 39,500.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
SATUAN
PROFIT & OVERHEAD)
(Rp)
Buah 33,900.00
Buah 31,500.00
Buah 34,800.00
Buah 46,000.00
roll 176,000.00
Meter 2,800.00
Meter 4,500.00
Meter 6,700.00
Meter 15,000.00
Meter 20,000.00
Meter 25,000.00
Meter 38,800.00
Meter 24,000.00
Meter 22,000.00
Meter 30,000.00
Meter 37,900.00
Meter 64,000.00
Meter 88,500.00
Meter 136,000.00
Meter 180,000.00
Meter 244,000.00
Meter 8,000.00
Meter 7,200.00
Meter 10,200.00
Meter 4,200.00
Meter 6,300.00
Meter 8,600.00
Meter 12,800.00
Meter 22,000.00
Meter 16,000.00
Meter 10,000.00
Meter 8,000.00
Meter 11,000.00
Meter 13,000.00
Meter 18,000.00
Meter 26,000.00
Meter 6,000.00
Meter 9,000.00
Meter 510,000.00
Meter 6,000.00
Meter 6,500.00
Buah 4,000.00
Set 2,695,700.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
SATUAN
PROFIT & OVERHEAD)
(Rp)
Buah 781,700.00
Buah 3,800.00
Buah 11,800.00
Buah 3,500.00
Buah 11,000.00
Buah 24,800.00
Buah 47,500.00
Buah 8,300.00
Buah 63,000.00
Buah 73,500.00
Buah 59,200.00
Buah 11,800.00
Buah 17,000.00
Buah 7,000.00
Buah 900.00
Buah 11,000.00
Buah 38,500.00
Buah 33,000.00
Buah 159,000.00
Buah 31,500.00
Buah 159,000.00
Buah 39,500.00
Buah 44,800.00
Buah 33,000.00
Buah 33,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
SATUAN
PROFIT & OVERHEAD)
(Rp)
Buah 2,000.00
Buah 94,500.00
Buah 484,500.00
Buah 670,000.00
Buah 28,000.00
Buah 89,000.00
Buah 13,000.00
Buah 13,000.00
Buah 44,300.00
Buah 48,000.00
Buah 10,500.00
Buah 16,500.00
Buah 17,000.00
Buah 19,000.00
Buah 25,000.00
Buah 17,000.00
Buah 21,000.00
Buah 38,500.00
Buah 20,000.00
Buah 62,000.00
Buah 10,500.00
Buah 23,500.00
Bungkus 7,000.00
Bungkus 8,000.00
Bungkus 8,000.00
Bungkus 9,500.00
Bungkus 10,500.00
Bungkus 14,500.00
Bungkus 21,000.00
Bungkus 26,000.00
Buah 6,500.00
Buah 1,024,000.00
Buah 38,000.00
Buah 48,000.00
Buah 388,500.00
Buah 16,000.00
Buah 21,000.00
Buah 21,000.00
Set 3,856,500.00
Set 3,304,300.00
Btg 530,400.00
Btg 667,800.00
Btg 739,300.00
Btg 848,700.00
Btg 934,700.00
Buah 5,800.00
Buah 21,600.00
Buah 181,200.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
SATUAN
PROFIT & OVERHEAD)
(Rp)
Buah 598,100.00
Buah 460,300.00
Buah 383,500.00
WALIKOTA PONTIANAK,
SUTARMIDJI
DAFTAR HARGA SATUAN BAHAN + UP
1 2 3
1 Kusen Aluminium 3" Putih Meter
2 Daun Pintu Double Multiplek 9 mm Unit
3 Rangka Plafond Metal Furing + Pemasangan M²
4 Engsel Tanam Bh
5 Handle Pintu Stainles Khusus Tempered Bh
6 Slot pintu Bh
7 Finishing Lantai Efoxi Err:509
8 Pagar Balkon Besi Hollow Stainless 4 x 8 cm+ 4 x 4 cm m
9 Reiling Pagar Tangga Besi Hollow Stainless 4 x 8 cm+ 4 x 4 cm m
10 Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm Unit
11 Pintu Alumunium + Engsel Tanam - uk. 90 x 215 cm Unit
12 Pintu Alumunium + Engsel Kupu-kupu - uk. 90 x 215 cm Unit
13 Jendela Casement - uk. 60 x 120 cm (Lengkap - Tanpa Kaca) Unit
U & B (2) 43
RGA SATUAN BAHAN + UPAH
U & B (2) 44
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
ENGINEER ESTIMATE'S (EE)
NO URAIAN PEKERJAAN
1 2
D. JUMLAH TOTAL (A
E. PPN 10% (
G.
Terbilang : Sembilan puluh satu juta sembilan ratus enam puluh empat
Diperiksa Oleh :
TIM PENGELOLA TEKNIS
KEMENTRIAN LINGKUNGAN HIDUP DAN KEHUTANAN
DITJEN PENGELOLAAN HUTAN PRODUKSI LESTARI
1 ................................... (……………………………)
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
ENGINEER ESTIMATE'S (EE)
NO URAIAN PEKERJAAN
1 2
2 .................................... (……………………………)
3 ................................... (……………………………)
Disetujui Oleh :
PERTEMUAN PERMANEN
2 3
Rp 1,601,422.70
Rp 25,290,553.10
Rp 1,518,559.90
Rp 5,192,787.60
Rp 1,373,370.68
Rp 48,627,577.87
PEMBULATAN Rp 91,964,000.00
PERTEMUAN PERMANEN
2 3
Disetujui Oleh :
I. PEKERJAAN PERSIAPAN
1 Papan Nama Kegiatan - 1.00 Lsm 300,000.00 300,000.00
2 Pembongkaran Atap A.2.2.1.14b 180.18 M2 4,015.00 723,422.70
3 Pembersihan Lokasi - 1.00 Lsm 578,000.00 578,000.00
IV PEKERJAAN ATAP
1 Atap roof light fibreglass A.4.5.2.7 180.18 M2 28,820.00 5,192,787.60
V. PEKERJAAN PENGECATAN
1 Pengecatan Bidang Kolom
a. Kolom kanopi A.4.7.1.10 24.80 M2 55,377.85 1,373,370.68
Propinsi :
Kabupaten / Kota :
Tahun Anggaran :
1 2
A. UPAH
1 Pekerja
2 Tukang Gali / Batu / Tembok / Kayu /Besi / Cat / Pipa / Cor / S
3 Kepala Tukang
4 Mandor
5 Ahli alat berat (mekanik)
6 Operator Alat Berat
7 Pembantu Operator
8 Supir Truk
9 Kenek truk
DAFTAR HARG
Propinsi :
Kabupaten :
Tahun Anggaran :
No Uraian Bahan
1 2
B. BAHAN PENGISI
1 Batu Kong
2 Batu Sap Pinang
3 Batu pecah 15-20 cm
4 Batu pecah 10-15 cm
5 Batu pecah 5-7 cm
6 Batu pecah 3-5 cm
7 Batu pecah 2-3 cm
8 Batu pecah 1-2 cm
Page 50 of 404
No Uraian Bahan
1 2
Page 51 of 404
No Uraian Bahan
1 2
46 Wood Flooring
47 List Keramik WC. 8 x 20 cm
48 Plint Kayu uk. 2 x 10 cm
49 Floor Hardener
50 Beton Ready Mix B 0
51 Beton Ready Mix 125
52 Beton Ready Mix 150
53 Beton Ready Mix 175
54 Beton Ready Mix 200
55 Beton Ready Mix 225
56 Beton Ready Mix 250
57 Beton Ready Mix 275
58 Beton Ready Mix 300
59 Beton Ready Mix 325
60 Beton Ready Mix 350
61 Beton Ready Mix 375
62 Beton Ready Mix 400
63 Beton Ready Mix 425
64 Beton Ready Mix 450
65 Beton Ready Mix 475
66 Beton Ready Mix 500
67 Additive Ready Mix
68 Karung Goni Curing Beton ( 0.7m² )
69 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 300 -
70 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 350 -
71 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 450 -
72 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K 300 -
73 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K 350 -
75 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 30 x 30, K 450 -
76 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 3
77 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 3
79 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 3
80 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 3
81 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 4
82 Minipile 0,2 x 0,2 x 6 meter K.350 (Besi Ulir D 13 Polos D 6)
83 Minipile 0,2 x 0,2 x 8 meter K.350 (Besi Ulir D 13 Polos D 6)
84 Minipile 0,25 x 0,25 x 9 meter K.350 (Besi Ulir D 16 Polos D 6
Page 52 of 404
No Uraian Bahan
1 2
C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M
4 Ky. Belian tdk ketam Uk. 8/16 - 4 M
5 Ky. Belian tdk ketam Uk. 9/9 - 4 M
6 Ky. Belian tdk ketam Uk. 10/10 - 4 M
7 Ky. Belian tdk ketam Uk. 12/12 - 4 M
8 Ky. Belian tdk ketam Uk. 18/18 - 4 M
9 Ky. Belian tdk ketam Uk. 5/10 - 4 M
10 Ky. Belian ketam Uk. 6/6 - 4 M
11 Ky. Belian ketam Uk. 7/7 - 4 M
12 Ky. Belian ketam Uk. 8/8 - 4 M
13 Ky. Belian ketam Uk. 5/10 - 4 M
14 Ky. Belian ketam Uk. 4/8 - 4 M
15 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam )
16 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam )
17 Ky. klas I Bengkirai uk. 7/7 - 4 M ( tdk ketam )
18 Ky. klas I Bengkirai uk. 7/7 - 4 M ( ketam )
19 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam / untuk kusen )
20 Kusen Ky Belian uk. 5/10
21 Kusen Ky Kelas I Bangkirai uk. 5/10
Page 53 of 404
No Uraian Bahan
1 2
Page 54 of 404
No Uraian Bahan
1 2
D. BAHAN CAT
1 Amplas
2 Minyak cat
3 Cat kilat setara Dulux
4 Cat kilat setara Avian
5 Plamur
6 Cat Dasar Alkali
7 Cat Dasar Emulsion Setara Dulux
8 Cat Akhir Interior setara Dulux
9 Cat Akhir Eksterior (weather shield) setara Dulux
10 Cat Dasar setara Mowilex
11 Cat Akhir Interior setara Mowilex
12 Cat Akhir Eksterior (weather shield) setara Mowilex
13 Cat Dasar setara Vinilex
14 Cat Akhir Interior setara Vinilex
15 Cat seng (Zinc Chromate)
16 Cat Alkali (Undercoat)
17 Plitur
18 Thiner
19 Thiner ND
20 Melamic
21 Vernis
22 Meni
23 Oker
24 Lem Kayu
25 Sealent
26 Soda Api
27 Sabun / cream pembersih kotoran
28 Teak Oil
29 Ter / Residu
30 Kuas 4"
31 Road Line Paint ( Cat Marka )
32 Cat Marka (Thermoplastic)
33 Cat Kansteen (ex. Matex)
34 Cat Trotoar (ex. Tenokote)
35 Glass Bit
36 Weatherbond Emulsion ( cat kerb )
Page 55 of 404
No Uraian Bahan
1 2
37 Water Proofing
Page 56 of 404
No Uraian Bahan
1 2
F. BAHAN PENGGANTUNG
1 Pintu PVC untuk WC
2 Kait angin
3 Handle Jendela
4 Handle Pintu
5 Engsel jendela
6 Engsel pintu
7 Slot pintu
8 Slot jendela
9 Kunci tanam 2 slag (setaraf Belluci)
10 Kunci tanam 1 slag
11 Kunci tanam antik
12 Kunci tanam biasa
13 Kunci silinder
Page 57 of 404
No Uraian Bahan
1 2
14 Door Closer
15 Door Stoper
16 Paku Seng
17 Paku campuran 1" - 5 "
18 Paku beton
19 Paku triplek
20 Paku GRC
21 Paku Zincalum
22 Paku Onduline
23 Sekrup Onduline
24 Sekrup Gibsum
25 Sekrup Fixer
26 Sekrup Steel Sheet uk. 5 x 15 mm
27 Sekrup Steel Sheet uk. 5 x 25 mm
28 Sekrup Steel Sheet uk. 5 x 35 mm
29 Sekrup Steel Sheet uk. 5 x 45 mm
30 Sekrup Steel Sheet uk. 5 x 50 mm
31 Sekrup Steel Sheet uk. 5 x 55 mm
32 Sekrup Steel Sheet uk. 5 x 65 mm
33 Sekrup Ulir Kayu
34 Paku asbes
35 Sekrup Zincalume
36 Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm
37 Pintu Alumunium + Engsel Tanam - uk. 90 x 215 cm
38 Pintu Alumunium + Engsel Kupu-kupu - uk. 90 x 215 cm
39 Jendela Casement - uk. 60 x 120 cm (Lengkap - Tanpa Kaca)
G. BAHAN ATAP
1 Sirap belian
2 Asbes
3 Eternit
4 Genteng Metal Type Permata 0.35
5 Genteng Metal Type Prima 0.35
6 Genteng Metal Type Royal 0.35
7 Genteng Metal Type Classic 0.35
8 Genteng Metal Type Permata 0.25
9 Genteng Metal Type Classic 0.25
Page 58 of 404
No Uraian Bahan
1 2
Page 59 of 404
No Uraian Bahan
1 2
Page 60 of 404
No Uraian Bahan
1 2
H. BAHAN KACA
1 Kaca Polos, t = 3 mm
2 Kaca Polos, t = 5 mm
3 Kaca Polos, t = 8 mm
4 Kaca Polos, t = 12 mm
5 Kaca Rayben, t = 3 mm
6 Kaca Rayben, t = 5 mm
7 Kaca Rayben, t = 8 mm
8 Kaca Rayben, t = 12 mm
9 Kaca Cermin t = 3 mm
10 Kaca Cermin t = 5 mm
11 Kaca Cermin t = 8 mm
12 Kaca Repsol, t= 5mm
13 Kaca Patri
14 Sealent
15 Nako + Bingkai (80 x 15) x 10 daun polos
16 Nako + Bingkai (80 x 15) x 10 daun rayben
17 Kaca Es
18 Kaca Polos, t = 8 mm
19 Kaca Raindown, t = 5 mm
20 Kaca Buram, t = 5 mm
Page 61 of 404
No Uraian Bahan
1 2
I. BAHAN TRIPLEK
1 Triplek t = 3 mm
2 Triplek t = 6 mm
3 Triplek t =9 mm
4 Triplex t = 12 mm
5 Teakwood t = 3 mm
6 Formika t = 0,03 mm
7 Multiplex t = 6 mm
8 Multiplex t = 9 mm
9 Multiplex t = 10 mm
10 Multiplek t = 12 mm
11 Plywood 4' x 8' x 4mm
12 Panel GRC 120 x 240 x 40
13 GypsumBoard t = 9 mm
14 Super Plank 10 x 240 x 9 cm
15 Super Plank 20 x 240 x 9 cm
16 Super Plank 30 x 240 x 9 cm
17 HPL
18 List Profil Gypsum
J. BAHAN SANITASI
1 Wastafel setara Toto
2 Kloset Duduk Monoblok
3 Kloset Duduk Putih
4 Kloset Duduk Warna
5 Kloset Jongkok (Setaraf Ina)
6 Kloset Jongkok (Setaraf Toto)
7 Urinoir setaraf Toto
8 Bak air fibreglass uk. 55x55x60 cm
9 Shower Spray setara Toto
10 Sliding rail setara Toto
11 Floordrain stainless steel setara Toto
12 Floordrain PVC
13 Tempat Sabun Setara Toto
14 Kran zink setara Toto
15 Kitchenzink stainless steel 1 lubang
16 Kran dinding setara Toto
Page 62 of 404
No Uraian Bahan
1 2
Page 63 of 404
No Uraian Bahan
1 2
L. BATU ALAM
1 Batu Andesit Ukuran 10 x 20 cm
2 Batu Andesit Ukuran 15 x 30 cm
3 Batu Andesit Ukuran 20 x 40 cm
4 Batu Andesit Ukuran 30 x 60 cm
5 Batu Candi Ukuran 10 x 20 cm
6 Batu Candi Ukuran 15 x 30 cm
7 Batu Candi Ukuran 20 x 40 cm
8 Batu Pacitoroso Ukuran 10 x 20 cm
9 Batu Pacitoroso Ukuran 15 x 30 cm
10 Batu Pacitoroso Ukuran 20 x 40 cm
11 Batu Bali Green Ukuran 10 x 20 cm
12 Batu Bali Green Ukuran 15 x 30 cm
Page 64 of 404
No Uraian Bahan
1 2
Page 65 of 404
No Uraian Bahan
1 2
Page 66 of 404
No Uraian Bahan
1 2
68 NYY 4 x 35 mm
69 NYY 4 x 50 mm
70 NYN 2 x 2,5 mm
71 NYN 3 x 1,5 mm
72 NYN 3 x 2,5 mm
73 NYA 1 x 1,5 mm
74 NYA 1 x 2,5 mm
75 NYA 1 x 4 mm
76 NYA 1 x 6 mm
77 NYM 3 x 4 mm
78 NYM 2 x 4 mm
79 NYM 2 x 2,5 mm
80 NYM 2 x 1,5 mm
81 NYM 3 x 1,5 mm
82 NYM 3 x 2,5 mm
83 NYM 4 x 2,5 mm
84 NYM 4 x 4 mm
85 NYMHYM 2 x 0,75 mm
86 NYMHYM 2 x 1,5 mm
87 Kabel 3 x 2,5 mm
88 Kabel TC 2 x 10 mm
89 Kabel TC 2 x 16 mm
90 Box MCB 1 Group
91 Box Time Swich ( Lengkap pipa optic 1,5 +Klem + Kunci )
92 Box KWH Meter Uk. L 35 cm x T 50 cm x LS 25 cm
93 Fitting Gantung
94 Fitting Duduk
95 Fitting Atom
96 Fitting Gantung E 27
97 Fitting Duduk E 27
98 Full Breket
99 Isolasi Unibel
100 Icnitor SN 58
101 Inector
102 Ignator
103 Kap Hijau E 27
104 Kap Hijau E 40
Page 67 of 404
No Uraian Bahan
1 2
Page 68 of 404
No Uraian Bahan
1 2
Page 69 of 404
DAFTAR HARGA SATUAN UPAH
Kalimantan Barat
Kota Pontianak
2018
2 3
Orang/Hari
i / Batu / Tembok / Kayu /Besi / Cat / Pipa / Cor / Semen / Listrik / Pancang Orang/Hari
Orang/Hari
Orang/Hari
Orang/Hari
Orang/Hari
Orang/Hari
Orang/Hari
Orang/Hari
Kalimantan Barat
Kota Pontianak
2018
2 3
M³
M³
M³
M³
M³
M³
M³
M³
Page 70 of 404
Uraian Bahan Satuan
2 3
M³
M³
M³
Kg
lsi (Teak Coat) Kg
lsi (Prime Coat) Kg
Kg
M³
M³
Zak
Kg
M³
han (Paladis/Tanah Bukit Tokok) M³
Bh
Bh
5 x 11 x 22cm Bh
Bh
Bh
x 40 x 9 cm ( press ) Bh
x 40 x 7 cm ( press ) Bh
( roster ) 18 x 18 cm Bh
press ( roster ) 30 x 30 cm Bh
0 x 20 cm Polished ex Roman Kotak
0 x 20 cm Unpolished ex Roman Kotak
0 x 30 cm Polished ex Roman Kotak
0 x 30 cm Unpolished ex Roman Kotak
0 x 40 cm Polished ex Roman Kotak
0 x 40 cm Unpolished ex Roman Kotak
0 x 60 cm Polished (setaraf Indogress) Kotak
0 x 60 cm Unpolished (setaraf Indogress) Kotak
0 x 40 cm Polished (setaraf Indogress) Kotak
0 x 40 cm Unpolished (setaraf Indogress) Kotak
0 x 60 cm Polished Kotak
0 x 60 cm Unpolished (setaraf Indogress) Kotak
nding 20 x 20 cm ex Roman Kotak
nding 20 x 25 cm ex Roman Kotak
M²
Page 71 of 404
Uraian Bahan Satuan
2 3
M²
ik WC. 8 x 20 cm Bh
uk. 2 x 10 cm Bh
Kg
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
M³
Liter
ni Curing Beton ( 0.7m² ) Lembar
cang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 300 - 6m Btg
cang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 350 - 6m Btg
cang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 450 - 6m Btg
cang (Mini Pile / Ready Mix) uk. Π 25 x 25, K 300 - 6m Btg
cang (Mini Pile / Ready Mix) uk. Π 25 x 25, K 350 - 6m Btg
cang (Mini Pile / Ready Mix) uk. Π 30 x 30, K 450 - 6m Btg
cang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 300 - 6m Btg
cang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 350 - 6m Btg
cang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 300 - 6m Btg
cang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 350 - 6m Btg
cang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 450 - 6m Btg
2 x 0,2 x 6 meter K.350 (Besi Ulir D 13 Polos D 6) Btg
2 x 0,2 x 8 meter K.350 (Besi Ulir D 13 Polos D 6) Btg
25 x 0,25 x 9 meter K.350 (Besi Ulir D 16 Polos D 6) Btg
Page 72 of 404
Uraian Bahan Satuan
2 3
Page 73 of 404
Uraian Bahan Satuan
2 3
Page 74 of 404
Uraian Bahan Satuan
2 3
Lbr
Kg
Kg
Kg
Kg
Kg
Emulsion Setara Dulux Kg
nterior setara Dulux Kg
Eksterior (weather shield) setara Dulux Kg
setara Mowilex Kg
nterior setara Mowilex Kg
Eksterior (weather shield) setara Mowilex Kg
setara Vinilex Kg
nterior setara Vinilex Kg
Zinc Chromate) Kg
Kg
Kg
Ltr
Ltr
Ltr
Ltr
Kg
Kg
Kg
Tube
Kg
eam pembersih kotoran Kg
Ltr
Ltr
Bh
Paint ( Cat Marka ) Kg
(Thermoplastic) Kg
en (ex. Matex) Kg
r (ex. Tenokote) Kg
Kg
ond Emulsion ( cat kerb ) Kg
Page 75 of 404
Uraian Bahan Satuan
2 3
M²
Page 76 of 404
Uraian Bahan Satuan
2 3
ENGGANTUNG
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
m 2 slag (setaraf Belluci) Bh
Bh
Bh
Bh
Bh
Page 77 of 404
Uraian Bahan Satuan
2 3
Bh
Bh
Kg
Kg
Kg
Kg
Kg
Kg
Bh
Bh
Kg
Bh
el Sheet uk. 5 x 15 mm Bh
el Sheet uk. 5 x 25 mm Bh
el Sheet uk. 5 x 35 mm Bh
el Sheet uk. 5 x 45 mm Bh
el Sheet uk. 5 x 50 mm Bh
el Sheet uk. 5 x 55 mm Bh
el Sheet uk. 5 x 65 mm Bh
Bh
Bh
Bh
pered Polos 12 mm - uk. 87 x 213,5 cm Unit
munium + Engsel Tanam - uk. 90 x 215 cm Unit
munium + Engsel Kupu-kupu - uk. 90 x 215 cm Unit
asement - uk. 60 x 120 cm (Lengkap - Tanpa Kaca) Unit
Lbr
Lbr
M²
etal Type Permata 0.35 Lbr
etal Type Prima 0.35 Lbr
etal Type Royal 0.35 Lbr
etal Type Classic 0.35 Lbr
etal Type Permata 0.25 Lbr
etal Type Classic 0.25 Lbr
Page 78 of 404
Uraian Bahan Satuan
2 3
Page 79 of 404
Uraian Bahan Satuan
2 3
Page 80 of 404
Uraian Bahan Satuan
2 3
ng Steel Sheet 0.35 lebar 500 mm (coklat, biru, merah, hijau muda) M
ng Steel Sheet 0.40 lebar 500 mm (biru) M
ng Steel Sheet 0.45 lebar 500 mm (biru, merah, hijau muda) M
an utk Atap uk. 1/15 pj. 50 cm Lbr
mbang Bitumen Warna Lbr
mbang Bitumen Bening Lbr
M²
M²
M²
M²
en, t = 3 mm M²
en, t = 5 mm M²
en, t = 8 mm M²
en, t = 12 mm M²
M²
M²
M²
M²
M²
Kg
ngkai (80 x 15) x 10 daun polos Bh
ngkai (80 x 15) x 10 daun rayben Bh
M²
M²
down, t = 5 mm M²
m, t = 5 mm M²
Page 81 of 404
Uraian Bahan Satuan
2 3
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
120 x 240 x 40 Lbr
ard t = 9 mm Lbr
k 10 x 240 x 9 cm Lbr
k 20 x 240 x 9 cm Lbr
k 30 x 240 x 9 cm Lbr
Lbr
M
Bh
Bh
Bh
Bh
gkok (Setaraf Ina) Bh
gkok (Setaraf Toto) Bh
Unit
eglass uk. 55x55x60 cm Bh
ray setara Toto Unit
Unit
stainless steel setara Toto Bh
Bh
bun Setara Toto Bh
Bh
k stainless steel 1 lubang Unit
ng setara Toto Bh
Page 82 of 404
Uraian Bahan Satuan
2 3
Bh
ia 1/2" AW ex Wavin Btg
ia 3/4" AW ex Wavin Btg
ia 1" AW ex Wavin Btg
ia 2" AW ex Wavin Btg
ia 3" AW ex Wavin Btg
ia 4" AW ex Wavin Btg
ia 8" AW ex Wavin Btg
ia 3/4" D ex Wavin Btg
ia 1" D ex Wavin Btg
ia 2" D ex Wavin Btg
ia 3" D ex Wavin Btg
ia 4" D ex Wavin Btg
dia 1/2" ex onda Bh
dia 3/4" ex onda Bh
dia 1" ex onda Bh
Bh
Bh
Bh
Bh
k Biosel kap. 6,00 m3 Unit
Pump kap.250 watt Unit
pa tekan kap. 150 watt Unit
Page 83 of 404
Uraian Bahan Satuan
2 3
sit Ukuran 10 x 20 cm M²
sit Ukuran 15 x 30 cm M²
sit Ukuran 20 x 40 cm M²
sit Ukuran 30 x 60 cm M²
Ukuran 10 x 20 cm M²
Ukuran 15 x 30 cm M²
Ukuran 20 x 40 cm M²
oroso Ukuran 10 x 20 cm M²
oroso Ukuran 15 x 30 cm M²
oroso Ukuran 20 x 40 cm M²
Green Ukuran 10 x 20 cm M²
Green Ukuran 15 x 30 cm M²
Page 84 of 404
Uraian Bahan Satuan
2 3
Green Ukuran 20 x 40 cm M²
sti Peresmian (batu hitam) ukuran 40 x 60 buah
sti Peresmian (batu hitam) ukuran 60 x 80 buah
(batu taman) kg
t Ukuran Lebar 60 cm M²
LAT-ALAT LISTRIK
HPL 400 Watt Buah
HPL 250 Watt Buah
HPL 125 Watt Buah
SON T 1000 Watt Buah
SON T 400 Watt Buah
SON T 250 Watt Buah
SON T 150 Watt Buah
SON T 125 Watt Buah
SON T 70 Watt Buah
Neon 40 Watt Buah
Neon 20 Watt Buah
250 Watt Buah
125 Watt Buah
Buah
Buah
Buah
Buah
u SON 70 Watt Buah
u HPIT 400 Watt Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Page 85 of 404
Uraian Bahan Satuan
2 3
Buah
Buah
Buah
Buah
Buah
Buah
cury 125 Watt Buah
cury 250 Watt Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
u Sorot 300 Watt Buah
Buah
Buah
1 x 1.5 mm roll
1 x 2.5 mm Meter
1 x 4 mm Meter
1 x 6 mm Meter
2 x 2.5 mm Meter
2 x 4 mm Meter
2 x 6 mm Meter
2 x 10 mm Meter
3 x 4 mm Meter
4 x 2.5 mm Meter
4 x 4 mm Meter
4 x 6 mm Meter
4 x 10 mm Meter
4 x 16 mm Meter
4 x 25 mm Meter
Page 86 of 404
Uraian Bahan Satuan
2 3
4 x 35 mm Meter
4 x 50 mm Meter
2 x 2,5 mm Meter
3 x 1,5 mm Meter
3 x 2,5 mm Meter
1 x 1,5 mm Meter
1 x 2,5 mm Meter
1 x 4 mm Meter
1 x 6 mm Meter
3 x 4 mm Meter
2 x 4 mm Meter
2 x 2,5 mm Meter
2 x 1,5 mm Meter
3 x 1,5 mm Meter
3 x 2,5 mm Meter
4 x 2,5 mm Meter
4 x 4 mm Meter
Meter
Meter
Meter
Meter
Meter
Buah
wich ( Lengkap pipa optic 1,5 +Klem + Kunci ) Set
Meter Uk. L 35 cm x T 50 cm x LS 25 cm Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Page 87 of 404
Uraian Bahan Satuan
2 3
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
ontactor 100 A Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
ggal setara Broco Buah
ggal setara Panasonic Buah
ble setara Broco Buah
ble setara Panasonic Buah
kel setara Broco Buah
el setara Broco Buah
el setara Panasonic Buah
Buah
Buah
Buah
Buah
Bungkus
Bungkus
Bungkus
Page 88 of 404
Uraian Bahan Satuan
2 3
Bungkus
Bungkus
Bungkus
Bungkus
Bungkus
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
mpu Son T 250 Watt (lengkap) Set
mpu Son T 150 Watt (lengkap) Set
men Uk 2 x 1,5 meter ( lengkap Klim Tiang) Btg
men Uk 2 x 2 meter ( lengkap Klim Tiang) Btg
men Uk 2 x 3 meter ( lengkap Klim Tiang) Btg
men Uk 2 x 4 meter ( lengkap Klim Tiang) Btg
men Uk 2 x 6 meter ( lengkap Klim Tiang) Btg
Buah
Buah
Buah
Buah
Buah
Buah
Page 89 of 404
SATUAN UPAH
Harga Upah
105,000.00
125,000.00
145,000.00
155,000.00
125,000.00
170,000.00
100,000.00
115,000.00
80,000.00
ATUAN BAHAN
Harga Bahan
275,000.00
320,000.00
335,000.00
350,000.00
371,000.00
405,000.00
435,000.00
475,000.00
Page 90 of 404
Harga Bahan
467,500.00
500,000.00
350,000.00
13,500.00
13,500.00
13,500.00
35,000.00
120,000.00
120,000.00
75,000.00
1,500.00
300,000.00
350,000.00
3,750.00
4,000.00
2,000.00
1,800.00
1,000.00
2,500.00
2,300.00
20,000.00
60,500.00
81,600.00
98,000.00
95,000.00
95,000.00
100,000.00
111,000.00
243,000.00
243,000.00
154,000.00
155,000.00
320,000.00
323,000.00
98,750.00
102,000.00
1,400,000.00
Page 91 of 404
Harga Bahan
420,000.00
11,600.00
61,000.00
16,600.00
1,072,500.00
1,108,250.00
1,025,000.00
1,194,050.00
1,134,000.00
1,329,800.00
1,372,800.00
1,240,000.00
1,430,000.00
1,306,500.00
1,530,100.00
1,377,500.00
1,601,600.00
1,432,500.00
1,673,100.00
1,504,000.00
1,536,500.00
38,300.00
11,300.00
1,260,000.00
1,440,000.00
1,056,000.00
1,650,000.00
1,770,000.00
2,340,000.00
3,825,000.00
1,122,000.00
900,000.00
1,024,100.00
1,158,300.00
1,620,000.00
2,160,000.00
2,970,000.00
Page 92 of 404
Harga Bahan
1,380,000.00
1,725,000.00
2,070,000.00
33,000.00
3,000.00
60,000.00
50,000.00
30,000.00
40,000.00
50,000.00
65,000.00
425,000.00
375,000.00
200,790.00
11,805,000.00
11,700,000.00
8,950,000.00
8,750,000.00
9,567,900.00
10,000,000.00
13,020,900.00
10,416,700.00
11,500,000.00
12,800,000.00
12,500,000.00
11,015,700.00
11,000,000.00
11,718,750.00
7,800,000.00
7,421,875.00
7,500,000.00
7,840,000.00
9,050,000.00
120,000.00
80,000.00
Page 93 of 404
Harga Bahan
65,000.00
4,440,000.00
4,531,000.00
4,716,717.69
5,600,000.00
5,070,000.00
4,755,000.00
3,355,000.00
3,576,000.00
4,224,000.00
5,468,750.00
4,589,000.00
4,634,000.00
2,500,000.00
2,083,000.00
14,814,000.00
13,880,000.00
7,060,000.00
8,300,000.00
10,819,800.00
11,188,300.00
2,558,000.00
1,064,800.00
18,000.00
35,000.00
5,600.00
9,000.00
12,000.00
85,000.00
150,000.00
266,700.00
11,000.00
77,500.00
12,000.00
Page 94 of 404
Harga Bahan
3,500.00
36,000.00
70,000.00
70,000.00
31,500.00
140,000.00
109,500.00
104,000.00
107,000.00
70,000.00
84,000.00
104,000.00
27,000.00
28,000.00
44,000.00
27,500.00
64,000.00
25,000.00
22,100.00
67,000.00
45,000.00
52,000.00
14,000.00
18,500.00
35,900.00
24,500.00
15,700.00
60,000.00
58,400.00
24,000.00
65,000.00
95,000.00
53,750.00
41,250.00
30,000.00
39,000.00
Page 95 of 404
Harga Bahan
78,500.00
12,000.00
13,500.00
13,000.00
13,000.00
13,000.00
23,000.00
17,900.00
15,500.00
5,000.00
16,000.00
15,000.00
310,000.00
13,500.00
5,300.00
28,500.00
35,000.00
16,000.00
140,000.00
110,000.00
169,000.00
227,000.00
287,000.00
375,000.00
450,000.00
582,500.00
925,000.00
1,071,300.00
1,721,700.00
715,000.00
85,000.00
95,000.00
1,500,000.00
120,000.00
85,000.00
Page 96 of 404
Harga Bahan
75,000.00
235,200.00
272,500.00
250,000.00
304,100.00
175,000.00
225,400.00
193,900.00
257,000.00
52,500.00
82,000.00
75,000.00
5,700.00
6,000.00
800.00
800.00
800.00
908,700.00
1,339,100.00
130,000.00
145,000.00
69,600.00
266,000.00
14,400.00
15,400.00
135,000.00
18,800.00
29,000.00
18,900.00
8,800.00
179,100.00
162,500.00
47,500.00
57,500.00
78,800.00
Page 97 of 404
Harga Bahan
190,000.00
88,750.00
20,900.00
20,500.00
31,400.00
20,500.00
21,300.00
10,700.00
1,300.00
1,500.00
53,000.00
2,500.00
300.00
300.00
400.00
500.00
500.00
500.00
700.00
700.00
600.00
500.00
5,500,000.00
2,500,000.00
1,750,000.00
850,000.00
5,300.00
57,200.00
68,400.00
63,000.00
66,600.00
66,600.00
66,600.00
51,800.00
51,800.00
Page 98 of 404
Harga Bahan
51,800.00
275,000.00
173,000.00
200,000.00
59,000.00
54,000.00
100,000.00
110,000.00
110,000.00
93,000.00
89,500.00
89,500.00
57,000.00
92,000.00
65,000.00
59,000.00
80,000.00
80,000.00
81,300.00
111,900.00
47,000.00
64,000.00
100,000.00
112,300.00
78,300.00
46,000.00
75,000.00
50,000.00
96,900.00
109,500.00
123,100.00
72,000.00
47,400.00
55,000.00
68,000.00
20,000.00
55,000.00
Page 99 of 404
Harga Bahan
75,900.00
73,000.00
70,000.00
83,800.00
80,000.00
55,000.00
46,500.00
55,000.00
15,200.00
55,000.00
60,000.00
65,000.00
50,000.00
57,000.00
67,000.00
72,000.00
55,000.00
60,500.00
66,000.00
71,500.00
62,700.00
73,700.00
79,200.00
84,700.00
22,000.00
24,000.00
26,000.00
20,000.00
22,800.00
26,800.00
28,800.00
30,800.00
33,000.00
36,000.00
39,000.00
30,000.00
34,200.00
40,200.00
43,200.00
46,200.00
24,150.00
209,484.00
420,624.00
150,000.00
200,000.00
398,000.00
640,000.00
200,000.00
200,000.00
550,000.00
900,000.00
275,000.00
418,000.00
190,000.00
550,000.00
2,350,000.00
35,000.00
400,000.00
469,000.00
275,000.00
267,500.00
550,000.00
145,000.00
70,000.00
120,000.00
220,000.00
300,000.00
140,000.00
115,000.00
111,000.00
220,000.00
278,000.00
282,000.00
120,000.00
79,700.00
74,600.00
65,000.00
70,000.00
78,000.00
348,360.00
17,500.00
1,000,000.00
2,962,700.00
2,246,800.00
2,500,000.00
330,000.00
191,000.00
2,000,000.00
280,000.00
230,000.00
500,000.00
319,100.00
18,500.00
65,200.00
307,000.00
650,000.00
150,000.00
32,500.00
11,500.00
22,000.00
30,000.00
45,000.00
82,000.00
164,000.00
254,000.00
23,500.00
30,000.00
48,000.00
86,000.00
130,000.00
43,000.00
51,200.00
115,500.00
2,500,000.00
2,000,000.00
75,000.00
75,000.00
115,000.00
1,440,000.00
550,000.00
10,320.00
8,100.00
7,400.00
28,800.00
76,320.00
9,600.00
28,800.00
170,000.00
70,000.00
70,000.00
66,400.00
101,760.00
84,000.00
480,000.00
36,000.00
18,000.00
60,000.00
30,000.00
240,000.00
26,400.00
180,000.00
6,480.00
180,000.00
210,000.00
230,000.00
260,000.00
180,000.00
210,000.00
230,000.00
180,000.00
210,000.00
230,000.00
180,000.00
200,000.00
220,000.00
2,500,000.00
4,000,000.00
15,000.00
2,000,000.00
298,500.00
228,000.00
155,350.00
1,687,000.00
462,000.00
311,930.00
179,000.00
180,000.00
120,000.00
40,000.00
40,000.00
170,500.00
117,750.00
690,000.00
145,000.00
136,000.00
118,800.00
117,500.00
240,000.00
2,500.00
4,800.00
4,800.00
5,800.00
5,800.00
7,000.00
12,000.00
15,200.00
11,700.00
8,800.00
30,000.00
250,000.00
9,200.00
9,900.00
39,000.00
33,000.00
31,000.00
34,300.00
62,000.00
84,000.00
23,500.00
27,000.00
31,000.00
36,000.00
39,000.00
98,000.00
29,500.00
36,500.00
39,500.00
33,900.00
32,000.00
35,500.00
51,250.00
176,000.00
2,800.00
4,500.00
6,700.00
15,000.00
20,000.00
25,000.00
38,800.00
24,000.00
22,000.00
30,000.00
37,900.00
64,000.00
88,500.00
136,000.00
180,000.00
244,000.00
8,000.00
7,200.00
10,200.00
4,200.00
6,300.00
8,600.00
12,800.00
22,000.00
16,000.00
10,000.00
8,000.00
11,000.00
13,000.00
18,000.00
26,000.00
6,000.00
9,000.00
510,000.00
6,000.00
6,500.00
3,500.00
2,695,650.00
781,700.00
3,800.00
13,300.00
3,500.00
11,000.00
41,000.00
17,500.00
8,300.00
51,500.00
73,500.00
35,000.00
12,000.00
16,000.00
7,000.00
1,000.00
35,000.00
31,600.00
33,000.00
62,000.00
29,000.00
62,000.00
37,500.00
44,800.00
33,000.00
33,000.00
2,500.00
110,000.00
484,500.00
672,000.00
495,000.00
89,000.00
13,000.00
13,000.00
50,000.00
45,000.00
15,000.00
16,500.00
17,000.00
19,000.00
25,000.00
17,000.00
21,000.00
38,500.00
45,000.00
56,000.00
10,500.00
20,000.00
6,500.00
7,000.00
7,350.00
8,000.00
9,500.00
12,600.00
18,100.00
19,100.00
5,500.00
1,024,000.00
38,000.00
35,000.00
334,250.00
16,266.00
24,233.00
17,500.00
3,856,500.00
3,304,300.00
530,400.00
667,800.00
739,300.00
848,700.00
934,700.00
5,800.00
21,600.00
181,200.00
598,100.00
460,300.00
383,500.00
KELOMPOK PEKERJAAN
LEVEL 1 JEN
(LEVEL 2)
Divisi 2 2.2.1
Pek. Persiapan
A.2.2.1.2 2
A.2.2.1.4.a 4.a.
A.2.2.1.5 5
A.2.2.1.7 7
A.2.2.1.9 9
A.2.2.1.13 13
A.2.2.1.14 14
Divisi 2 2.3.1
Pek. Tanah
A.2.3.1.1 1
A.2.3.1.2 2
A.2.3.1.9 9
A.2.3.1.10 10
A.2.3.1.11 11
A.2.3.1.14 14
Divisi 4 4.1.1
Pek. Beton
A.4.1.1.1 1
A.4.1.1.2 2
A.4.1.1.3 3
A.4.1.1.4 4
A.4.1.1.5 5
A.4.1.1.6 6
A.4.1.1.7 7
A.4.1.1.8 8
A.4.1.1.9 9
A.4.1.1.10 10
A.4.1.1.11 11
A.4.1.1.12 12
A.4.1.1.13 13
A.4.1.1.17 17
A.4.1.1.18 18
A.4.1.1.19 19
A.4.1.1.20 20
KELOMPOK PEKERJAAN
LEVEL 1 JEN
(LEVEL 2)
A.4.1.1.20.a 20.a
A.4.1.1.21 21
A.4.1.1.21.a 21.a.
A.4.1.1.22 22
A.4.1.1.22.a 22.a.
A.4.1.1.22.a.1 22.a.1.
A.4.1.1.23 23
A.4.1.1.23.a 23.a.
A.4.1.1.23.a.1 23.a.1.
A.4.1.1.24 24
A.4.1.1.24.a 24.a.
A.4.1.1.24.a.1 24.a.1.
A.4.1.1.25 25
A.4.1.1.25.a 25.a
A.4.1.1.26 26
B.22.a B.22.a.
B.22.b B.22.b.
B.22.c B.22.c.
A.4.1.1.35 35
A.4.1.1.36 36
Divisi 4 4.2.1
Pek. Besi & Aluminium
A.4.2.1.5 5
A.4.2.1.11 11
A.4.2.1.13 13
A.4.2.1.18 18
A.4.2.1.19 19
A.4.2.1.21 21
Divisi 4 4.4.1
Pek. Dinding Pasangan
A.4.4.1.21.a 21.a.
A.4.4.1.21.b 21.b.
KELOMPOK PEKERJAAN
LEVEL 1 JEN
(LEVEL 2)
Divisi 4 4.4.2
Pek. Plesteran
A.4.4.2.1 1
A.4.4.2.2 2
A.4.4.2.3 3
A.4.4.2.4 4
A.4.4.2.13 13
A.4.4.2.14 14
A.4.4.2.15 15
A.4.4.2.16 16
A.4.4.2.17 17
A.4.4.2.27 27
Divisi 4 4.4.3
Pek. Penutup Lantai &
Penutup Dinding
A.4.4.3.4.a 4.a.
A.4.4.3.6 6
A.4.4.3.8 8
A.4.4.3.13 13
A.4.4.3.13.a 13.a
A.4.4.3.35 35
A.4.4.3.36 36
A.4.4.3.39 39
A.4.4.3.40 40
A.4.4.3.46 46
A.4.4.3.54 54
A.4.4.3.54.a 54.a
A.4.4.3.54.b 54.b
A.4.4.3.54.c 54.C
A.4.4.3.60 60
Divisi 4 4.5.1
Pek. Plafond
A.4.5.1.7 7
A.4.5.1.7.a 7.a.
A.4.5.1.9.a 9.a.
Divisi 4 4.5.2
Pek. Penutup Atap
A.4.5.2.32.a 32.a.
A.4.5.2.36 36
KELOMPOK PEKERJAAN
LEVEL 1 JEN
(LEVEL 2)
A.4.5.2.39 39
A.4.5.2.39.a 39.a
Divisi 4 4.6.1
Pekerjaan Kayu
A.4.6.1.1 1
A.4.6.1.2 2
A.4.6.1.5 5
A.4.6.1.5.a 5.a.
A.4.6.1.5.b 5.b.
A.4.6.1.6 6
A.4.6.1.6.a 6.a.
A.4.6.1.7 7
A.4.6.1.8 8
A.4.6.1.9 9
A.4.6.1.10 10
A.4.6.1.13 13
A.4.6.1.14 14
A.4.6.1.15 15
A.4.6.1.15.a 15.a.
A.4.6.1.15.b 15.b.
A.4.6.1.16.a 16.a
A.4.6.1.19 19
A.4.6.1.20 20
A.4.6.1.20.a 20.a.
A.4.6.1.21 21
A.4.6.1.22 22
A.4.6.1.22.a 22.a
A.4.6.1.22.b 22.b.
A.4.6.1.23 23
A.4.6.1.24 24
A.4.6.1.25 25
A.4.6.1.27.a 27.a
KELOMPOK PEKERJAAN
LEVEL 1 JEN
(LEVEL 2)
Divisi 4 4.6.2
Pek. Kunci & Kaca
A.4.6.2.1 1
A.4.6.2.1.a 1.a.
A.4.6.2.2 2
A.4.6.2.5 5
A.4.6.2.6 6
A.4.6.2.9 9
A.4.6.2.10 10
A.4.6.2.11 11
A.4.6.2.11.a 11.a.
A.4.6.2.13 13
A.4.6.2.16 16
A.4.6.2.17 17
A.4.6.2.18 18
A.4.6.2.19 19
A.4.6.2.20 20
Divisi 4 4.7.1
Pek. Pengecatan
A.4.7.1.4 4
A.4.7.1.5 5
A.4.7.1.10 10
A.4.7.1.16 16
Divisi 5 5.1.1
Pek. Sanitasi Gedung
A.5.1.1.1 1
A.5.1.1.2 2
A.5.1.1.4 4
A.5.1.1.5 5
A.5.1.1.10 10
A.5.1.1.14 14
A.5.1.1.15 15
A.5.1.1.16 16
A.5.1.1.17 17
A.5.1.1.18 18
A.5.1.1.19 19
A.5.1.1.20 20
A.5.1.1.21 21
A.5.1.1.22 22
A.5.1.1.23 23
KELOMPOK PEKERJAAN
LEVEL 1 JEN
(LEVEL 2)
A.5.1.1.24 24
A.5.1.1.25 25
A.5.1.1.26 26
A.5.1.1.27 27
A.5.1.1.29 29
A.5.1.1.31 31
A.5.1.1.32 32
LINGKUP PEKERJAAN BERDASARKAN SUB LEVEL 2
Pengecatan 1 m² bidang kayu baru (1 lapis plamur, 1 lapis cat dasar 2 lapis cat penutup)
Pengecatan 1 m² bidang kayu baru (1 lapis plamur,1 lapis cat dasar, 3 lapis cat penutup)
Pengecatan 1 m² tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
Pengecatan 1 m² permukaan baja dengan menie
HARGA (Rp.)
365,322.10
57,795.10
1,515,420.50
1,082,048.00
20,075.00
1,653,630.00
826,815.00
90,887.50
111,622.50
66,275.00
66,275.00
194,755.00
429,137.50
1,143,489.29
1,192,769.87
1,230,022.62
1,061,624.55
1,275,784.37
1,316,764.89
1,351,521.98
1,369,147.01
1,399,396.43
1,408,626.53
1,511,533.28
1,523,655.98
1,477,520.00
17,922.85
155,089.00
15,760.80
202,807.00
HARGA (Rp.)
198,382.80
214,263.50
162,709.25
448,540.40
341,771.10
241,643.05
446,923.40
348,645.00
245,080.00
482,992.40
397,384.90
262,548.39
446,094.00
346,328.40
399,811.50
222,941.40
179,527.92
172,293.00
100,711.60
128,258.90
3,760.02
164,992.30
2,415,955.30
280,399.35
150,918.90
145,326.50
114,361.50
105,176.50
HARGA (Rp.)
87,918.60
79,734.60
76,091.40
73,689.00
106,697.80
84,135.70
98,593.00
96,665.80
95,108.20
45,512.50
292,436.83
216,683.50
275,339.17
357,060.00
360,360.00
298,830.00
283,718.60
99,495.00
167,508.00
637,835.00
323,417.60
301,988.50
459,288.50
301,988.50
229,927.50
56,357.84
54,564.18
34,908.50
177,923.90
110,896.50
HARGA (Rp.)
52,431.50
107,744.45
4,235,962.50
7,983,387.50
1,086,835.20
1,246,366.00
959,750.00
768,976.12
692,725.00
1,382,206.32
780,164.00
925,414.03
1,183,212.80
6,746,080.00
4,394,692.50
8,557,422.50
9,341,502.50
8,290,012.50
104,357.00
161,207.20
161,734.65
113,825.69
178,264.50
179,598.43
80,740.00
118,387.50
247,280.00
212,660.80
355,314.30
50,886.00
HARGA (Rp.)
151,761.50
296,521.50
141,982.50
56,786.40
37,265.25
41,954.00
292,011.50
53,960.50
42,850.50
114,977.50
208,311.40
268,811.40
512,478.45
818,566.65
531,894.00
75,391.80
95,202.80
55,377.85
39,410.25
3,831,977.29
467,458.75
3,148,695.00
1,615,350.00
451,220.00
37,702.50
29,108,717.00
886,902.50
1,112,025.75
55,909.33
51,734.38
64,434.33
72,675.17
122,503.33
216,919.08
HARGA (Rp.)
314,246.17
18,607.88
23,083.50
26,493.50
39,740.25
65,705.75
100,658.25
KOEFISIEN TENAGA KERJA DAN KOEFISIEN BAHAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.2.2.1.4.a Pengukuran dan pemasangan 1 m' Bowplank (dengan kayu dolken dan papan
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.100 105,000.00
2 Tukang Kayu L.02 OH 0.100 125,000.00
3 Kepala Tukang L.03 OH 0.010 145,000.00
4 Mandor L.04 OH 0.005 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Kayu Pancang (Dolken) d = 6-8 cm, p = 4m btg 1.000 9,000.00
2 Paku 2" - 3" Kg 0.020 20,500.00
3 Kayu papan klas III m³ 0.007 2,558,000.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.2.2.1.5 Pembuatan 1 m² kantor sementara lantai plesteran
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 2.000 105,000.00
2 Tukang Kayu L.02 OH 2.000 125,000.00
3 Tukang Batu L.02 OH 1.000 125,000.00
4 Kepala Tukang L.03 OH 0.300 145,000.00
5 Mandor L.04 OH 0.050 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Dolken kayu Ø 8-10 / 400 cm Btg 1.250 12,000.00
2 Kayu m³ 0.180 2,083,000.00
3 Paku biasa Kg 0.080 20,500.00
4 Besi strip Kg 1.100 15,000.00
5 Semen portland Kg 35.000 1,500.00
6 Pasir pasang m³ 0.150 120,000.00
7 Pasir beton m³ 0.100 120,000.00
8 Koral beton m³ 0.150 475,000.00
9 Batako 15/30/7 Bh 30.000 1,800.00
10 Seng plat Lbr 0.250 55,000.00
11 Jendela nako Bh 0.200 400,000.00
12 Kaca polos m² 0.080 200,000.00
13 Kunci tanam Bh 0.150 57,500.00
14 Plywood 4 mm Lbr 0.060 120,000.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
AGA KERJA DAN KOEFISIEN BAHAN
Jumlah Harga
(Rp)
21,000.00
50,000.00
2,900.00
3,100.00
77,000.00
15,000.00
3,750.00
56,880.00
600.00
4,275.00
149,976.00
1,230.00
23,400.00
255,111.00
-
-
332,111.00
33,211.10
365,322.10
n 1 m' Bowplank (dengan kayu dolken dan papan kayu kelas III)
Jumlah Harga
(Rp)
10,500.00
12,500.00
1,450.00
775.00
25,225.00
9,000.00
410.00
17,906.00
27,316.00
-
-
52,541.00
5,254.10
57,795.10
Jumlah Harga
(Rp)
210,000.00
250,000.00
125,000.00
43,500.00
7,750.00
636,250.00
15,000.00
374,940.00
1,640.00
16,500.00
52,500.00
18,000.00
12,000.00
71,250.00
54,000.00
13,750.00
80,000.00
16,000.00
8,625.00
7,200.00
741,405.00
-
-
1,377,655.00
137,765.50
1,515,420.50
Jumlah Harga
(Rp)
105,000.00
250,000.00
29,000.00
7,750.00
391,750.00
20,400.00
437,430.00
6,150.00
15,750.00
3,600.00
23,750.00
71,100.00
13,750.00
591,930.00
-
-
983,680.00
98,368.00
1,082,048.00
Jumlah Harga
(Rp)
10,500.00
7,750.00
18,250.00
-
-
-
-
18,250.00
1,825.00
20,075.00
Jumlah Harga
(Rp)
1,400,070.00
103,230.00
1,503,300.00
-
-
-
-
1,503,300.00
150,330.00
1,653,630.00
Jumlah Harga
(Rp)
700,035.00
51,615.00
751,650.00
-
-
-
-
751,650.00
75,165.00
826,815.00
A.2.3.1 Pek. Tanah
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.2.3.1.10 Pemadatan tanah 1 m³ (per 20 cm)
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.500 105,000.00
2 Mandor L.04 OH 0.050 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp)
78,750.00
3,875.00
82,625.00
-
-
-
-
82,625.00
8,262.50
90,887.50
Jumlah Harga
(Rp)
94,500.00
6,975.00
101,475.00
-
-
-
-
101,475.00
10,147.50
111,622.50
Jumlah Harga
(Rp)
52,500.00
7,750.00
60,250.00
-
-
-
-
60,250.00
6,025.00
66,275.00
Jumlah Harga
(Rp)
52,500.00
7,750.00
60,250.00
-
-
-
-
60,250.00
6,025.00
66,275.00
Jumlah Harga
(Rp)
31,500.00
1,550.00
33,050.00
144,000.00
144,000.00
-
-
177,050.00
17,705.00
194,755.00
Jumlah Harga
(Rp)
26,250.00
3,875.00
30,125.00
360,000.00
360,000.00
-
-
390,125.00
39,012.50
429,137.50
A.4.1.1 Pek. Beton
A TENAGA
1 Pekerja L.01 OH 1.650
2 Tukang Batu L.02 OH 0.275
3 Kepala Tukang L.03 OH 0.028
4 Mandor L.04 OH 0.083
Jumlah Harga Tenaga Ke
B BAHAN
1 Semen portland Kg 247.000
2 Pasir beton Kg 869.000
3 kerikil (maks 30 mm) Kg 999.000
4 Air Ltr 215.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 1.650
2 Tukang Batu L.02 OH 0.275
3 Kepala Tukang L.03 OH 0.028
4 Mandor L.04 OH 0.083
Jumlah Harga Tenaga Ke
B BAHAN
1 Semen portland Kg 276.000
2 Pasir beton Kg 828.000
3 kerikil (maks 30 mm) Kg 1,012.000
4 Air Ltr 215.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 1.650
2 Tukang Batu L.02 OH 0.275
3 Kepala Tukang L.03 OH 0.028
4 Mandor L.04 OH 0.083
Jumlah Harga Tenaga Ke
B BAHAN
1 Semen portland Kg 299.000
2 Pasir beton Kg 799.000
3 kerikil (maks 30 mm) Kg 1,017.000
4 Air Ltr 215.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A.4.1.1.4 Pembuatan 1 m³ lantai kerja beton mutu fc 7,4 Mpa (K100)
A TENAGA
1 Pekerja L.01 OH 1.200
2 Tukang Batu L.02 OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.060
Jumlah Harga Tenaga Ke
B BAHAN
1 Semen portland Kg 230.000
2 Pasir beton Kg 893.000
3 kerikil (maks 30 mm) Kg 1,027.000
4 Air Ltr 200.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 1.650
2 Tukang Batu L.02 OH 0.275
3 Kepala Tukang L.03 OH 0.028
4 Mandor L.04 OH 0.083
Jumlah Harga Tenaga Ke
B BAHAN
1 Semen portland Kg 326.000
2 Pasir beton Kg 760.000
3 kerikil (maks 30 mm) Kg 1,029.000
4 Air Ltr 215.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 1.650
2 Tukang Batu L.02 OH 0.275
3 Kepala Tukang L.03 OH 0.028
4 Mandor L.04 OH 0.083
Jumlah Harga Tenaga Ke
B BAHAN
1 Semen portland Kg 352.000
2 Pasir beton Kg 731.000
3 kerikil (maks 30 mm) Kg 1,031.000
4 Air Ltr 215.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 1.650
2 Tukang Batu L.02 OH 0.275
3 Kepala Tukang L.03 OH 0.028
4 Mandor L.04 OH 0.083
Jumlah Harga Tenaga Ke
B BAHAN
1 Semen portland Kg 371.000
2 Pasir beton Kg 698.000
3 kerikil (maks 30 mm) Kg 1,047.000
4 Air Ltr 215.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 1.650
2 Tukang Batu L.02 OH 0.275
3 Kepala Tukang L.03 OH 0.028
4 Mandor L.04 OH 0.083
Jumlah Harga Tenaga Ke
B BAHAN
1 Semen portland Kg 384.000
2 Pasir beton Kg 692.000
3 kerikil (maks 30 mm) Kg 1,039.000
4 Air Ltr 215.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 1.650
2 Tukang Batu L.02 OH 0.275
3 Kepala Tukang L.03 OH 0.028
4 Mandor L.04 OH 0.083
Jumlah Harga Tenaga Ke
B BAHAN
1 Semen portland Kg 406.000
2 Pasir beton Kg 684.000
3 kerikil (maks 30 mm) Kg 1,026.000
4 Air Ltr 215.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 1.650
2 Tukang Batu L.02 OH 0.275
3 Kepala Tukang L.03 OH 0.028
4 Mandor L.04 OH 0.083
Jumlah Harga Tenaga Ke
B BAHAN
1 Semen portland Kg 413.000
2 Pasir beton Kg 681.000
3 kerikil (maks 30 mm) Kg 1,021.000
4 Air Ltr 215.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 2.100
2 Tukang Batu L.02 OH 0.350
3 Kepala Tukang L.03 OH 0.035
4 Mandor L.04 OH 0.105
Jumlah Harga Tenaga Ke
B BAHAN
1 Semen portland Kg 439.000
2 Pasir beton Kg 670.000
3 kerikil (maks 30 mm) Kg 1,006.000
4 Air Ltr 215.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 2.100
2 Tukang Batu L.02 OH 0.350
3 Kepala Tukang L.03 OH 0.035
4 Mandor L.04 OH 0.105
Jumlah Harga Tenaga Ke
B BAHAN
1 Semen portland Kg 448.000
2 Pasir beton Kg 667.000
3 kerikil (maks 30 mm) Kg 1,000.000
4 Air Ltr 215.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 2.100
2 Tukang Batu L.02 OH 0.350
3 Kepala Tukang L.03 OH 0.035
4 Mandor L.04 OH 0.105
Jumlah Harga Tenaga Ke
B BAHAN
1 Semen portland Kg 400.000
2 Pasir beton m³ 0.480
3 kerikil (maks 30 mm) m³ 0.800
4 Strorox - 100 Kg 1.200
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.070
2 Tukang Besi L.02 OH 0.070
3 Kepala Tukang L.03 OH 0.007
4 Mandor L.04 OH 0.004
Jumlah Harga Tenaga Ke
B BAHAN
1 Besi beton (polos/ulir) Kg 10.500
2 Kawat beton Kg 0.150
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
G Harga Satuan Pekerjaan Per 1 Kg
A TENAGA
1 Pekerja L.01 OH 0.050
2 Tukang Besi L.02 OH 0.050
3 Kepala Tukang L.03 OH 0.005
4 Mandor L.04 OH 0.003
Jumlah Harga Tenaga Ke
B BAHAN
1 Besi beton (polos/ulir) Kg 10.500
2 Kawat beton Kg 0.100
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh)
A TENAGA
1 Pekerja L.01 OH 0.025
2 Tukang Besi L.02 OH 0.025
3 Kepala Tukang L.03 OH 0.025
4 Mandor L.04 OH 0.001
Jumlah Harga Tenaga Ke
B BAHAN
1 Jaring kawat baja dilas Kg 10.200
2 Kawat beton Kg 0.050
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
G Harga Satuan Pekerjaan Per 1 Kg
A TENAGA
1 Pekerja L.01 OH 0.520
2 Tukang Kayu L.02 OH 0.260
3 Kepala Tukang L.03 OH 0.026
4 Mandor L.04 OH 0.026
Jumlah Harga Tenaga Ke
B BAHAN
1 Kayu kelas III m³ 0.040
2 Paku 5 - 10 cm Kg 0.300
3 Minyak bekisting Ltr 0.100
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A.4.1.1.20.a Pemasangan 1m² bekisting untuk tapak pondasi
A TENAGA
1 Pekerja L.01 OH 0.520
2 Tukang Kayu L.02 OH 0.260
3 Kepala Tukang L.03 OH 0.026
4 Mandor L.04 OH 0.026
Jumlah Harga Tenaga Ke
B BAHAN
1 Papan Mal Kelas III m³ 0.031
2 Paku 5 - 10 cm Kg 0.300
3 Minyak bekisting Ltr 0.100
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
Acuan : SNI DT 91-0008-2007
A.4.1.1.21 Pemasangan 1 m² bekisting untuk sloof
A TENAGA
1 Pekerja L.01 OH 0.520
2 Tukang Kayu L.02 OH 0.260
3 Kepala Tukang L.03 OH 0.026
4 Mandor L.04 OH 0.026
Jumlah Harga Tenaga Ke
B BAHAN
1 Kayu kelas III m³ 0.045
2 Paku 5 - 10 cm Kg 0.300
3 Minyak bekisting Ltr 0.100
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.520
2 Tukang Kayu L.02 OH 0.260
3 Kepala Tukang L.03 OH 0.026
4 Mandor L.04 OH 0.026
Jumlah Harga Tenaga Ke
B BAHAN
1 Kayu kelas III m³ 0.023
2 Paku 5 - 10 cm Kg 0.300
3 Minyak bekisting Ltr 0.100
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A.4.1.1.22 Pemasangan 1 m² bekisting untuk kolom
A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang Kayu L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
Jumlah Harga Tenaga Ke
B BAHAN
1 Kayu kelas III m³ 0.040
2 Paku 5 - 12 cm Kg 0.400
3 Minyak bekisting Ltr 0.200
4 Balok kayu kelas II m³ 0.015
5 Plywood tebal 9 mm Lbr 0.350
6 Dolken kayu Ø 8-10 / 400 cm Btg 2.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang Kayu L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
Jumlah Harga Tenaga Ke
B BAHAN
1 Kayu kelas III m³ 0.055
2 Paku 5 - 12 cm Kg 0.400
3 Minyak bekisting Ltr 0.200
5 Papan mal Lbr 0.017
6 Dolken kayu Ø 8-10 / 400 cm Btg 2.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang Kayu L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
Jumlah Harga Tenaga Ke
B BAHAN
1 Kayu kelas III m³ 0.028
2 Paku 5 - 12 cm Kg 0.400
3 Minyak bekisting Ltr 0.200
5 Papan mal Lbr 0.009
6 Dolken kayu Ø 8-10 / 400 cm Btg 1.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang Kayu L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
Jumlah Harga Tenaga Ke
B BAHAN
1 Kayu kelas III m³ 0.040
2 Paku 5 - 12 cm Kg 0.400
3 Minyak bekisting Ltr 0.200
4 Balok kayu kelas II m³ 0.018
5 Plywood tebal 9 mm Lbr 0.350
6 Dolken kayu Ø 8-10 / 400 cm Btg 2.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang Kayu L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
Jumlah Harga Tenaga Ke
B BAHAN
1 Kayu kelas III m³ 0.058
2 Paku 5 - 12 cm Kg 0.400
3 Minyak bekisting Ltr 0.200
4. Papan mal m³ 0.017
5. Dolken kayu Ø 8-10 / 400 cm Btg 2.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang Kayu L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
Jumlah Harga Tenaga Ke
B BAHAN
1 Kayu kelas III m³ 0.029
2 Paku 5 - 12 cm Kg 0.400
3 Minyak bekisting Ltr 0.200
4. Papan mal m³ 0.009
5. Dolken kayu Ø 8-10 / 400 cm Btg 1.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang Kayu L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
Jumlah Harga Tenaga Ke
B BAHAN
1 Kayu kelas III m³ 0.040
2 Paku 5 - 12 cm Kg 0.400
3 Minyak bekisting Ltr 0.200
4 Balok kayu kelas II m³ 0.015
5 Plywood tebal 9 mm Lbr 0.350
6 Dolken kayu Ø 8-10 / 400 cm Btg 6.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang Kayu L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
Jumlah Harga Tenaga Ke
B BAHAN
1 Kayu kelas III m³ 0.055
2 Paku 5 - 12 cm Kg 0.400
3 Minyak bekisting Ltr 0.200
4. Papan mal m³ 0.018
5. Dolken kayu Ø 8-10 / 400 cm Btg 6.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang Kayu L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
Jumlah Harga Tenaga Ke
B BAHAN
1 Kayu kelas III m³ 0.030
2 Paku 5 - 12 cm Kg 0.400
3 Minyak bekisting Ltr 0.200
4. Papan mal m³ 0.009
5. Dolken kayu Ø 8-10 / 400 cm Btg 2.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang Kayu L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
Jumlah Harga Tenaga Ke
B BAHAN
1 Kayu kelas III m³ 0.030
2 Paku 5 - 12 cm Kg 0.400
3 Minyak bekisting Ltr 0.200
4 Balok kayu kelas II m³ 0.020
5 Plywood tebal 9 mm Lbr 0.350
6 Dolken kayu Ø 8-10 / 400 cm Btg 3.000
7 Penjaga jarak bekisting/spacer Bh 4.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang Kayu L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
Jumlah Harga Tenaga Ke
B BAHAN
1 Kayu kelas III m³ 0.030
2 Paku 5 - 12 cm Kg 0.400
3 Minyak bekisting Ltr 0.200
4 Balok kayu kelas III m³ 0.020
5 Papan Mal m³ 0.018
6 Dolken kayu Ø 8-10 / 400 cm Btg 3.000
7 Penjaga jarak bekisting/spacer Bh 4.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.660
2 Tukang Kayu L.02 OH 0.330
3 Kepala Tukang L.03 OH 0.033
4 Mandor L.04 OH 0.033
Jumlah Harga Tenaga Ke
B BAHAN
1 Kayu kelas III m³ 0.030
2 Paku 5 - 12 cm Kg 0.400
3 Minyak bekisting Ltr 0.150
4 Balok kayu kelas II m³ 0.015
5 Plywood tebal 9 mm Lbr 0.350
6 Dolken kayu Ø 8-10 / 400 cm Btg 2.000
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
Pemasangan 1 m² bekisting untuk lantai dengan papan mal (tanpa p
B.22.a
pemakaian
A TENAGA
1 Pekerja L.01 OH 0.600
2 Tukang Kayu L.02 OH 0.300
3 Kepala Tukang L.03 OH 0.030
4 Mandor L.04 OH 0.060
Jumlah Harga Tenaga Ke
B BAHAN
1 Papan mal kayu kelas III m³ 0.018
2 Kayu kelas III m³ 0.020
3 Paku campuran Kg 0.040
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.600
2 Tukang Kayu L.02 OH 0.300
3 Kepala Tukang L.03 OH 0.030
4 Mandor L.04 OH 0.060
Jumlah Harga Tenaga Ke
B BAHAN
1 Papan mal kayu kelas III m³ 0.010
2 Kayu kelas III m³ 0.011
3 Paku campuran Kg 0.040
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
Pemasangan 1 m² bekisting untuk beton dengan papan mal (tanpa p
B.22.c
yang ada
A TENAGA
1 Pekerja L.01 OH 0.600
2 Tukang Kayu L.02 OH 0.300
3 Kepala Tukang L.03 OH 0.030
4 Mandor L.04 OH 0.060
Jumlah Harga Tenaga Ke
B BAHAN
1 Papan mal kayu kelas III m³ 0.018
2 Kayu kelas III m³ 0.020
3 Paku campuran Kg 0.040
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A.4.1.1.35 Pembuatan 1 m' kolom praktis beton bertulang (11 x 11) cm
A TENAGA
1 Pekerja L.01 OH 0.180
2 Tukang Batu L.02 OH 0.020
3 Tukang Kayu L.02 OH 0.020
4 Tukang Besi L.02 OH 0.020
5 Kepala Tukang L.03 OH 0.006
6 Mandor L.04 OH 0.009
Jumlah Harga Tenaga Ke
B BAHAN
1 Kayu kelas III m³ 0.002
2 Paku 5 - 12 cm Kg 0.010
3 Minyak bekisting Ltr 0.150
4 Besi beton polos Kg 3.000
5 Kawat beton Kg 0.450
6 Semen portland Kg 4.000
7 Pasir beton m³ 0.006
8 Kerikil m³ 0.009
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.297
2 Tukang Batu L.02 OH 0.033
3 Tukang Kayu L.02 OH 0.033
4 Tukang Besi L.02 OH 0.033
5 Kepala Tukang L.03 OH 0.010
6 Mandor L.04 OH 0.015
Jumlah Harga Tenaga Ke
B BAHAN
1 Kayu kelas III m³ 0.003
2 Paku 5 - 12 cm Kg 0.020
3 Minyak bekisting Ltr -
4 Besi beton polos Kg 3.600
5 Kawat beton Kg 0.050
6 Semen portland Kg 5.500
7 Pasir beton m³ 0.009
8 Kerikil m³ 0.015
Jumlah Harga Bah
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
Harga Satuan Jumlah Harga
(Rp) (Rp)
105,000.00 173,250.00
125,000.00 34,375.00
145,000.00 4,060.00
155,000.00 12,865.00
Jumlah Harga Tenaga Kerja 224,550.00
1,500.00 370,500.00
85.71 74,485.71
370.37 370,000.00
-
Jumlah Harga Bahan 814,985.71
-
Jumlah Harga Alat -
1,039,535.71
xD 103,953.57
1,143,489.29
105,000.00 173,250.00
125,000.00 34,375.00
145,000.00 4,060.00
155,000.00 12,865.00
Jumlah Harga Tenaga Kerja 224,550.00
1,500.00 414,000.00
85.71 70,971.43
370.37 374,814.81
-
Jumlah Harga Bahan 859,786.24
-
Jumlah Harga Alat -
1,084,336.24
xD 108,433.62
1,192,769.87
105,000.00 173,250.00
125,000.00 34,375.00
145,000.00 4,060.00
155,000.00 12,865.00
Jumlah Harga Tenaga Kerja 224,550.00
1,500.00 448,500.00
85.71 68,485.71
370.37 376,666.67
-
Jumlah Harga Bahan 893,652.38
-
Jumlah Harga Alat -
1,118,202.38
xD 111,820.24
1,230,022.62
kerja beton mutu fc 7,4 Mpa (K100)
Harga Satuan Jumlah Harga
(Rp) (Rp)
105,000.00 126,000.00
125,000.00 25,000.00
145,000.00 2,900.00
155,000.00 9,300.00
Jumlah Harga Tenaga Kerja 163,200.00
1,500.00 345,000.00
85.71 76,542.86
370.37 380,370.37
-
Jumlah Harga Bahan 801,913.23
-
Jumlah Harga Alat -
965,113.23
xD 96,511.32
1,061,624.55
105,000.00 173,250.00
125,000.00 34,375.00
145,000.00 4,060.00
155,000.00 12,865.00
Jumlah Harga Tenaga Kerja 224,550.00
1,500.00 489,000.00
85.71 65,142.86
370.37 381,111.11
-
Jumlah Harga Bahan 935,253.97
-
Jumlah Harga Alat -
1,159,803.97
xD 115,980.40
1,275,784.37
105,000.00 173,250.00
125,000.00 34,375.00
145,000.00 4,060.00
155,000.00 12,865.00
Jumlah Harga Tenaga Kerja 224,550.00
1,500.00 528,000.00
85.71 62,657.14
370.37 381,851.85
-
Jumlah Harga Bahan 972,508.99
-
Jumlah Harga Alat -
1,197,058.99
xD 119,705.90
1,316,764.89
105,000.00 173,250.00
125,000.00 34,375.00
145,000.00 4,060.00
155,000.00 12,865.00
Jumlah Harga Tenaga Kerja 224,550.00
1,500.00 556,500.00
85.71 59,828.57
370.37 387,777.78
-
Jumlah Harga Bahan 1,004,106.35
-
Jumlah Harga Alat -
1,228,656.35
xD 122,865.63
1,351,521.98
105,000.00 173,250.00
125,000.00 34,375.00
145,000.00 4,060.00
155,000.00 12,865.00
Jumlah Harga Tenaga Kerja 224,550.00
1,500.00 576,000.00
85.71 59,314.29
370.37 384,814.81
-
Jumlah Harga Bahan 1,020,129.10
-
Jumlah Harga Alat -
1,244,679.10
xD 124,467.91
1,369,147.01
105,000.00 173,250.00
125,000.00 34,375.00
145,000.00 4,060.00
155,000.00 12,865.00
Jumlah Harga Tenaga Kerja 224,550.00
1,500.00 609,000.00
85.71 58,628.57
370.37 380,000.00
-
Jumlah Harga Bahan 1,047,628.57
-
Jumlah Harga Alat -
1,272,178.57
xD 127,217.86
1,399,396.43
105,000.00 173,250.00
125,000.00 34,375.00
145,000.00 4,060.00
155,000.00 12,865.00
Jumlah Harga Tenaga Kerja 224,550.00
1,500.00 619,500.00
85.71 58,371.43
370.37 378,148.15
-
Jumlah Harga Bahan 1,056,019.58
-
Jumlah Harga Alat -
1,280,569.58
xD 128,056.96
1,408,626.53
105,000.00 220,500.00
125,000.00 43,750.00
145,000.00 5,075.00
155,000.00 16,275.00
Jumlah Harga Tenaga Kerja 285,600.00
1,500.00 658,500.00
85.71 57,428.57
370.37 372,592.59
-
Jumlah Harga Bahan 1,088,521.16
-
Jumlah Harga Alat -
1,374,121.16
xD 137,412.12
1,511,533.28
105,000.00 220,500.00
125,000.00 43,750.00
145,000.00 5,075.00
155,000.00 16,275.00
Jumlah Harga Tenaga Kerja 285,600.00
1,500.00 672,000.00
85.71 57,171.43
370.37 370,370.37
-
Jumlah Harga Bahan 1,099,541.80
-
Jumlah Harga Alat -
1,385,141.80
xD 138,514.18
1,523,655.98
105,000.00 220,500.00
125,000.00 43,750.00
145,000.00 5,075.00
155,000.00 16,275.00
Jumlah Harga Tenaga Kerja 285,600.00
1,500.00 600,000.00
120,000.00 57,600.00
500,000.00 400,000.00
-
Jumlah Harga Bahan 1,057,600.00
-
Jumlah Harga Alat -
1,343,200.00
xD 134,320.00
1,477,520.00
105,000.00 7,350.00
125,000.00 8,750.00
145,000.00 1,015.00
155,000.00 620.00
Jumlah Harga Tenaga Kerja 17,735.00
13,500.00 141,750.00
23,000.00 3,450.00
Jumlah Harga Bahan 145,200.00
-
Jumlah Harga Alat -
162,935.00
xD 16,293.50
179,228.50
17,922.85
105,000.00 5,250.00
125,000.00 6,250.00
145,000.00 725.00
155,000.00 465.00
Jumlah Harga Tenaga Kerja 12,690.00
12,000.00 126,000.00
23,000.00 2,300.00
Jumlah Harga Bahan 128,300.00
-
Jumlah Harga Alat -
140,990.00
xD 14,099.00
155,089.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
105,000.00 2,625.00
125,000.00 3,125.00
145,000.00 3,625.00
155,000.00 155.00
Jumlah Harga Tenaga Kerja 9,530.00
13,000.00 132,600.00
23,000.00 1,150.00
Jumlah Harga Bahan 133,750.00
-
Jumlah Harga Alat -
143,280.00
xD 14,328.00
157,608.00
15,760.80
105,000.00 54,600.00
125,000.00 32,500.00
145,000.00 3,770.00
155,000.00 4,030.00
Jumlah Harga Tenaga Kerja 94,900.00
2,083,000.00 83,320.00
20,500.00 6,150.00
-
Jumlah Harga Bahan 89,470.00
-
Jumlah Harga Alat -
184,370.00
xD 18,437.00
202,807.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
105,000.00 54,600.00
125,000.00 32,500.00
145,000.00 3,770.00
155,000.00 4,030.00
Jumlah Harga Tenaga Kerja 94,900.00
2,558,000.00 79,298.00
20,500.00 6,150.00
-
Jumlah Harga Bahan 85,448.00
-
Jumlah Harga Alat -
180,348.00
xD 18,034.80
198,382.80
Harga Satuan Jumlah Harga
(Rp) (Rp)
105,000.00 54,600.00
125,000.00 32,500.00
145,000.00 3,770.00
155,000.00 4,030.00
Jumlah Harga Tenaga Kerja 94,900.00
2,083,000.00 93,735.00
20,500.00 6,150.00
-
Jumlah Harga Bahan 99,885.00
-
Jumlah Harga Alat -
194,785.00
xD 19,478.50
214,263.50
105,000.00 54,600.00
125,000.00 32,500.00
145,000.00 3,770.00
155,000.00 4,030.00
Jumlah Harga Tenaga Kerja 94,900.00
2,083,000.00 46,867.50
20,500.00 6,150.00
-
Jumlah Harga Bahan 53,017.50
-
Jumlah Harga Alat -
147,917.50
xD 14,791.75
162,709.25
Harga Satuan Jumlah Harga
(Rp) (Rp)
105,000.00 69,300.00
125,000.00 41,250.00
145,000.00 4,785.00
155,000.00 5,115.00
Jumlah Harga Tenaga Kerja 120,450.00
2,500,000.00 100,000.00
20,500.00 8,200.00
10,320.00 2,064.00
5,070,000.00 76,050.00
220,000.00 77,000.00
12,000.00 24,000.00
Jumlah Harga Bahan 287,314.00
-
Jumlah Harga Alat -
407,764.00
xD 40,776.40
448,540.40
105,000.00 69,300.00
125,000.00 41,250.00
145,000.00 4,785.00
155,000.00 5,115.00
Jumlah Harga Tenaga Kerja 120,450.00
2,083,000.00 114,565.00
20,500.00 8,200.00
-
2,558,000.00 43,486.00
12,000.00 24,000.00
Jumlah Harga Bahan 190,251.00
-
Jumlah Harga Alat -
310,701.00
xD 31,070.10
341,771.10
105,000.00 69,300.00
125,000.00 41,250.00
145,000.00 4,785.00
155,000.00 5,115.00
Jumlah Harga Tenaga Kerja 120,450.00
2,083,000.00 57,282.50
20,500.00 8,200.00
-
2,558,000.00 21,743.00
12,000.00 12,000.00
Jumlah Harga Bahan 99,225.50
-
Jumlah Harga Alat -
219,675.50
xD 21,967.55
241,643.05
105,000.00 69,300.00
125,000.00 41,250.00
145,000.00 4,785.00
155,000.00 5,115.00
Jumlah Harga Tenaga Kerja 120,450.00
2,083,000.00 83,320.00
20,500.00 8,200.00
10,320.00 2,064.00
5,070,000.00 91,260.00
220,000.00 77,000.00
12,000.00 24,000.00
Jumlah Harga Bahan 285,844.00
-
Jumlah Harga Alat -
406,294.00
xD 40,629.40
446,923.40
105,000.00 69,300.00
125,000.00 41,250.00
145,000.00 4,785.00
155,000.00 5,115.00
Jumlah Harga Tenaga Kerja 120,450.00
2,083,000.00 120,814.00
20,500.00 8,200.00
-
2,558,000.00 43,486.00
12,000.00 24,000.00
Jumlah Harga Bahan 196,500.00
-
Jumlah Harga Alat -
316,950.00
xD 31,695.00
348,645.00
105,000.00 69,300.00
125,000.00 41,250.00
145,000.00 4,785.00
155,000.00 5,115.00
Jumlah Harga Tenaga Kerja 120,450.00
2,083,000.00 60,407.00
20,500.00 8,200.00
-
2,558,000.00 21,743.00
12,000.00 12,000.00
Jumlah Harga Bahan 102,350.00
-
Jumlah Harga Alat -
222,800.00
xD 22,280.00
245,080.00
105,000.00 69,300.00
125,000.00 41,250.00
145,000.00 4,785.00
155,000.00 5,115.00
Jumlah Harga Tenaga Kerja 120,450.00
2,083,000.00 83,320.00
20,500.00 8,200.00
10,320.00 2,064.00
5,070,000.00 76,050.00
220,000.00 77,000.00
12,000.00 72,000.00
Jumlah Harga Bahan 318,634.00
-
Jumlah Harga Alat -
439,084.00
xD 43,908.40
482,992.40
105,000.00 69,300.00
125,000.00 41,250.00
145,000.00 4,785.00
155,000.00 5,115.00
Jumlah Harga Tenaga Kerja 120,450.00
2,083,000.00 114,565.00
20,500.00 8,200.00
-
2,558,000.00 46,044.00
12,000.00 72,000.00
Jumlah Harga Bahan 240,809.00
-
Jumlah Harga Alat -
361,259.00
xD 36,125.90
397,384.90
105,000.00 69,300.00
125,000.00 41,250.00
145,000.00 4,785.00
155,000.00 5,115.00
Jumlah Harga Tenaga Kerja 120,450.00
2,083,000.00 63,010.75
20,500.00 8,200.00
-
2,558,000.00 23,022.00
12,000.00 23,997.60
Jumlah Harga Bahan 118,230.35
-
Jumlah Harga Alat -
238,680.35
xD 23,868.04
262,548.39
105,000.00 69,300.00
125,000.00 41,250.00
145,000.00 4,785.00
155,000.00 5,115.00
Jumlah Harga Tenaga Kerja 120,450.00
2,083,000.00 62,490.00
20,500.00 8,200.00
-
5,070,000.00 101,400.00
220,000.00 77,000.00
12,000.00 36,000.00
-
Jumlah Harga Bahan 285,090.00
-
Jumlah Harga Alat -
405,540.00
xD 40,554.00
446,094.00
105,000.00 69,300.00
125,000.00 41,250.00
145,000.00 4,785.00
155,000.00 5,115.00
Jumlah Harga Tenaga Kerja 120,450.00
2,083,000.00 62,490.00
20,500.00 8,200.00
-
2,083,000.00 41,660.00
2,558,000.00 46,044.00
12,000.00 36,000.00
-
Jumlah Harga Bahan 194,394.00
-
Jumlah Harga Alat -
314,844.00
xD 31,484.40
346,328.40
105,000.00 69,300.00
125,000.00 41,250.00
145,000.00 4,785.00
155,000.00 5,115.00
Jumlah Harga Tenaga Kerja 120,450.00
2,083,000.00 62,490.00
20,500.00 8,200.00
-
4,755,000.00 71,325.00
220,000.00 77,000.00
12,000.00 24,000.00
Jumlah Harga Bahan 243,015.00
-
Jumlah Harga Alat -
363,465.00
xD 36,346.50
399,811.50
sting untuk lantai dengan papan mal (tanpa perancah) untuk 1 kali
105,000.00 63,000.00
125,000.00 37,500.00
145,000.00 4,350.00
155,000.00 9,300.00
Jumlah Harga Tenaga Kerja 114,150.00
2,558,000.00 46,044.00
2,083,000.00 41,660.00
20,500.00 820.00
Jumlah Harga Bahan 88,524.00
-
Jumlah Harga Alat -
202,674.00
xD 20,267.40
222,941.40
105,000.00 63,000.00
125,000.00 37,500.00
145,000.00 4,350.00
155,000.00 9,300.00
Jumlah Harga Tenaga Kerja 114,150.00
2,558,000.00 25,324.20
2,083,000.00 22,913.00
20,500.00 820.00
Jumlah Harga Bahan 49,057.20
-
Jumlah Harga Alat -
163,207.20
xD 16,320.72
179,527.92
sting untuk beton dengan papan mal (tanpa perancah) pakai papan
105,000.00 63,000.00
125,000.00 37,500.00
145,000.00 4,350.00
155,000.00 9,300.00
Jumlah Harga Tenaga Kerja 114,150.00
- -
2,083,000.00 41,660.00
20,500.00 820.00
Jumlah Harga Bahan 42,480.00
-
Jumlah Harga Alat -
156,630.00
xD 15,663.00
172,293.00
praktis beton bertulang (11 x 11) cm
Harga Satuan Jumlah Harga
(Rp) (Rp)
105,000.00 18,900.00
125,000.00 2,500.00
125,000.00 2,500.00
125,000.00 2,500.00
145,000.00 870.00
155,000.00 1,395.00
Jumlah Harga Tenaga Kerja 28,665.00
2,558,000.00 5,116.00
20,500.00 205.00
-
12,000.00 36,000.00
23,000.00 10,350.00
1,500.00 6,000.00
120,000.00 720.00
500,000.00 4,500.00
Jumlah Harga Bahan 62,891.00
-
Jumlah Harga Alat -
91,556.00
xD 9,155.60
100,711.60
105,000.00 31,185.00
125,000.00 4,125.00
125,000.00 4,125.00
125,000.00 4,125.00
145,000.00 1,450.00
155,000.00 2,325.00
Jumlah Harga Tenaga Kerja 47,335.00
2,558,000.00 7,674.00
20,500.00 410.00
10,320.00 -
12,000.00 43,200.00
23,000.00 1,150.00
1,500.00 8,250.00
120,000.00 1,080.00
500,000.00 7,500.00
Jumlah Harga Bahan 69,264.00
-
Jumlah Harga Alat -
116,599.00
xD 11,659.90
128,258.90
A.3.2.1 Pek. Pondasi
D Jumlah ( A + B + C ) 982,650.00
E Overhead & Profit 10% x D 98,265.00
F Harga Satuan Pekerjaan ( D + E ) 1,080,915.00
A.4.2.1 Pek. Besi & Aluminium
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.2.1.4 Pembuatan 1 m² pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.050 105,000.00
2 Tukang Las Biasa L.02 OH 1.050 125,000.00
3 Kepala Tukang L.03 OH 0.105 145,000.00
4 Mandor L.04 OH 0.052 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Besi siku L 30.30.3 Kg 15.000 Err:509
2 Besi plat baja Kg 32.800 Err:509
3 Kawat las Kg 0.050 5,300.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.2.1.18 Pemasangan 1 m' talang datar/jurai seng BJLS 28 lebar 90 cm
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00
2 Tukang L.02 OH 0.200 125,000.00
3 Kepala Tukang L.03 OH 0.020 145,000.00
4 Mandor L.04 OH 0.001 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Seng plat m 1.050 68,000.00
2 Paku 1 - 2,5 cm Kg 0.015 20,900.00
3 Papan kayu kelas II atau III m³ 0.019 7,060,000.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.2.1.19 Pemasangan 1 m' talang ½ lingkaran Ø 15 cm, seng plat BJLS 30 lebar 45 cm
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.150 105,000.00
2 Tukang L.02 OH 0.300 125,000.00
3 Kepala Tukang L.03 OH 0.030 145,000.00
4 Mandor L.04 OH 0.008 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Seng plat m 1.050 68,000.00
2 Paku 1 - 2,5 cm Kg 0.010 20,900.00
3 Besi strip Kg 0.500 13,500.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.2.1.20 Pemasangan 1 m² rangka besi hollow 1 x 40.40.2 mm, modul 60 x 120 cm din
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.250 105,000.00
2 Tukang Besi L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
4 Mandor L.04 OH 0.013 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Rangka metal hollow 40.40.2 mm m' 3.500 Err:509
2 Aksesoris (perkuatan, las, dll) Ls 100% x ran Err:509
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.2.1.22 (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.734 105,000.00
2 Tukang Besi L.02 OH 0.734 125,000.00
3 Kepala Tukang L.03 OH 0.073 145,000.00
4 Mandor L.04 OH 0.037 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Baja ringan canai dingin C75 Kg 3.065 x
Jumlah Harga Bahan
C PERALATAN
Peralatan % 10.000
Jumlah Harga Alat
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.2.1.23 (K3) Pemasangan 1 m2 atap jurai rangka atap baja canaL dingin profil C75
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.7604 105,000.00
2 Tukang Besi L.02 OH 0.7604 125,000.00
3 Kepala Tukang L.03 OH 0.076 145,000.00
4 Mandor L.04 OH 0.038 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Baja ringan canai dingin C75 Kg 4.050 zzzz
Jumlah Harga Bahan
C PERALATAN
Peralatan % 10.000 #VALUE!
Jumlah Harga Alat
Jumlah Harga
(Rp)
6,300.00
7,500.00
870.00
465.00
15,135.00
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
6,300.00
7,500.00
870.00
465.00
15,135.00
15,525.00
15,525.00
-
-
30,660.00
3,066.00
33,726.00
Jumlah Harga
(Rp)
10,500.00
12,500.00
145.00
775.00
23,920.00
10,320.00
2,880.00
13,200.00
56,000.00
56,000.00
93,120.00
9,312.00
102,432.00
110,250.00
131,250.00
15,225.00
8,060.00
264,785.00
Err:509
Err:509
265.00
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
4,200.00
2,500.00
290.00
310.00
7,300.00
11,400.00
2,430.00
1,152.00
14,982.00
11,900.00
11,900.00
34,182.00
3,418.20
37,600.20
3,760.02
Jumlah Harga
(Rp)
68,250.00
81,250.00
9,425.00
4,960.00
163,885.00
Err:509
Err:509
-
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
126,000.00
150,000.00
17,400.00
930.00
294,330.00
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
46,200.00
55,000.00
6,380.00
3,410.00
110,990.00
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
8,400.00
100,000.00
11,600.00
620.00
120,620.00
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
105,000.00
125,000.00
14,500.00
7,750.00
252,250.00
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
4,515.00
5,375.00
623.50
325.50
10,839.00
132,000.00
5,000.00
2,154.00
139,154.00
-
-
149,993.00
14,999.30
164,992.30
Jumlah Harga
(Rp)
8,925.00
10,625.00
1,232.50
651.00
21,433.50
418,000.00
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
8,925.00
10,625.00
1,305.00
775.00
21,630.00
374,000.00
1,791,000.00
9,693.00
2,174,693.00
-
-
2,196,323.00
219,632.30
2,415,955.30
Jumlah Harga
(Rp)
36,750.00
43,750.00
5,075.00
2,790.00
88,365.00
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
175,350.00
208,750.00
24,215.00
12,865.00
421,180.00
895,665.00
-
895,665.00
-
-
1,316,845.00
131,684.50
1,448,529.50
Jumlah Harga
(Rp)
10,500.00
12,500.00
1,450.00
775.00
25,225.00
17,600.00
-
119,433.60
137,033.60
-
-
162,258.60
16,225.86
178,484.46
Jumlah Harga
(Rp)
21,000.00
25,000.00
2,900.00
155.00
49,055.00
Err:509
Err:509
1,015,000.00
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
21,000.00
25,000.00
2,900.00
155.00
49,055.00
71,400.00
313.50
134,140.00
205,853.50
-
-
254,908.50
25,490.85
280,399.35
15,750.00
37,500.00
4,350.00
1,240.00
58,840.00
71,400.00
209.00
6,750.00
78,359.00
-
-
137,199.00
13,719.90
150,918.90
si hollow 1 x 40.40.2 mm, modul 60 x 120 cm dinding partisi
Jumlah Harga
(Rp)
26,250.00
31,250.00
3,625.00
2,015.00
63,140.00
Err:509
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
36,750.00
43,750.00
5,075.00
2,790.00
88,365.00
35,000.00
8,750.00
43,750.00
-
-
132,115.00
13,211.50
145,326.50
#VALUE!
#VALUE!
-
-
#VALUE!
#VALUE!
#VALUE!
79,842.00
95,050.00
11,020.00
5,890.00
191,802.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
A.4.4.1 Pek. Dinding Pasangan
D Jumlah ( A + B + C ) 103,965.00
E Overhead & Profit 10% x D 10,396.50
F Harga Satuan Pekerjaan ( D + E ) 114,361.50
D Jumlah ( A + B + C ) 95,615.00
E Overhead & Profit 10% x D 9,561.50
F Harga Satuan Pekerjaan ( D + E ) 105,176.50
A.4.4.2 Pek. Plesteran
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.4.2.3 Pemasangan 1 m² plesteran 1SP : 3PP tebal 15 mm
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00
2 Tukang Batu L.02 OH 0.150 125,000.00
3 Kepala Tukang L.03 OH 0.015 145,000.00
4 Mandor L.04 OH 0.015 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Semen portland Kg 7.776 1,500.00
2 Pasir pasang m³ 0.023 120,000.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.4.2.4 Pemasangan 1 m² plesteran 1SP : 4PP tebal 15 mm
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00
2 Tukang Batu L.02 OH 0.150 125,000.00
3 Kepala Tukang L.03 OH 0.015 145,000.00
4 Mandor L.04 OH 0.015 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Semen portland Kg 6.240 1,500.00
2 Pasir pasang m³ 0.024 120,000.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.4.2.27 Pemasangan 1 m² acian
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00
2 Tukang Batu L.02 OH 0.100 125,000.00
3 Kepala Tukang L.03 OH 0.010 145,000.00
4 Mandor L.04 OH 0.010 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Semen portland Kg 3.250 1,500.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp)
31,500.00
18,750.00
2,175.00
2,325.00
54,750.00
23,256.00
1,920.00
25,176.00
-
-
79,926.00
7,992.60
87,918.60
Jumlah Harga
(Rp)
31,500.00
18,750.00
2,175.00
2,325.00
54,750.00
15,336.00
2,400.00
17,736.00
-
-
72,486.00
7,248.60
79,734.60
Jumlah Harga
(Rp)
31,500.00
18,750.00
2,175.00
2,325.00
54,750.00
11,664.00
2,760.00
14,424.00
-
-
69,174.00
6,917.40
76,091.40
Jumlah Harga
(Rp)
31,500.00
18,750.00
2,175.00
2,325.00
54,750.00
9,360.00
2,880.00
12,240.00
-
-
66,990.00
6,699.00
73,689.00
Jumlah Harga
(Rp)
42,000.00
25,000.00
2,900.00
3,410.00
73,310.00
20,448.00
3,240.00
23,688.00
-
-
96,998.00
9,699.80
106,697.80
Jumlah Harga
(Rp)
27,300.00
25,000.00
2,900.00
2,015.00
57,215.00
15,552.00
3,720.00
19,272.00
-
-
76,487.00
7,648.70
84,135.70
Jumlah Harga
(Rp)
42,000.00
25,000.00
2,900.00
3,410.00
73,310.00
12,480.00
3,840.00
16,320.00
-
-
89,630.00
8,963.00
98,593.00
Jumlah Harga
(Rp)
42,000.00
25,000.00
2,900.00
3,410.00
73,310.00
10,368.00
4,200.00
14,568.00
-
-
87,878.00
8,787.80
96,665.80
Jumlah Harga
(Rp)
42,000.00
25,000.00
2,900.00
3,410.00
73,310.00
8,832.00
4,320.00
13,152.00
-
-
86,462.00
8,646.20
95,108.20
Jumlah Harga
(Rp)
21,000.00
12,500.00
1,450.00
1,550.00
36,500.00
4,875.00
4,875.00
-
-
41,375.00
4,137.50
45,512.50
A.4.4.3 Pek. Penutup Lantai & Penutup Dinding
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
Acuan : ABK Bangunan Gedung dan Perumahan - 6.47
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.4.3.13.a Pemasangan 1 m² lantai keramik uk. 30 x 60 cm
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.240 105,000.00
2 Tukang Batu L.02 OH 0.120 125,000.00
3 Kepala Tukang L.03 OH 0.012 145,000.00
4 Mandor L.04 OH 0.012 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Keramik 30 x 60 cm Polished Bh 6.000 40,500.00
2 Semen portland Kg 9.600 1,500.00
3 Semen warna Kg 1.500 14,000.00
4 Pasir pasang m³ 0.045 120,000.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.4.3.35 Pemasangan 1 m² lantai keramik 30 x 30 cm
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.700 105,000.00
2 Tukang Batu L.02 OH 0.350 125,000.00
3 Kepala Tukang L.03 OH 0.035 145,000.00
4 Mandor L.04 OH 0.035 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Keramik 30 x 30 cm Polished Bh 11.870 8,636.36
2 Semen portland Kg 10.000 1,500.00
3 Pasir pasang m³ 0.045 120,000.00
4 Semen warna Kg 1.500 14,000.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.4.3.39 Pemasangan 1 m² plint keramik 10 x 20 cm
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.090 105,000.00
2 Tukang Batu L.02 OH 0.090 125,000.00
3 Kepala Tukang L.03 OH 0.035 145,000.00
4 Mandor L.04 OH 0.005 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Plint keramik Bh 5.300 11,600.00
2 Semen portland Kg 1.140 1,500.00
3 Pasir pasang m³ 0.003 120,000.00
4 Semen warna Kg 0.025 14,000.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.4.3.46 Pemasangan 1 m² lantai parquet kayu
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.700 105,000.00
2 Tukang Kayu L.02 OH 0.350 125,000.00
3 Kepala Tukang L.03 OH 0.035 145,000.00
4 Mandor L.04 OH 0.035 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Parquet m² 1.050 420,000.00
2 Lem Kg 0.600 18,500.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.4.3.54 Pemasangan 1 m² dinding keramik 20 x 20 cm
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.900 105,000.00
2 Tukang Batu L.02 OH 0.450 125,000.00
3 Kepala Tukang L.03 OH 0.045 145,000.00
4 Mandor L.04 OH 0.045 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Keramik artistik Bh 26.500 3,264.00
2 Semen portland Kg 9.300 1,500.00
3 Pasir pasang m³ 0.018 120,000.00
4 Semen warna Kg 1.940 14,000.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
Acuan : ABK Bangunan Gedung dan Perumahan - 6.63
A.4.4.3.54.b Pemasangan 1 m² dinding keramik uk. 20 cm x 60 cm
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.600 105,000.00
2 Tukang batu L.02 OH 0.450 125,000.00
3 Kepala Tukang L.03 OH 0.045 145,000.00
4 Mandor L.04 OH 0.030 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Keramik uk. 20 x 60 cm Bh 8.000 30,375.00
2 Semen portland Kg 9.300 1,500.00
3 Pasir pasng m³ 0.018 120,000.00
4 Semen warna Kg 2.000 14,000.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.4.3.60 Pemasangan 1 m² wallparer lebar 50 cm
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.350 105,000.00
2 Tukang Batu L.02 OH 0.175 125,000.00
3 Kepala Tukang L.03 OH 0.017 145,000.00
4 Mandor L.04 OH 0.002 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Wallpaper m 2.200 65,000.00
2 Lem Kg 0.250 18,500.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp)
65,100.00
43,750.00
5,075.00
4,650.00
118,575.00
104,166.67
17,070.00
21,000.00
5,040.00
147,276.67
-
-
265,851.67
26,585.17
292,436.83
Jumlah Harga
(Rp)
28,350.00
16,875.00
2,030.00
2,170.00
49,425.00
103,880.00
15,600.00
22,680.00
5,400.00
147,560.00
-
-
196,985.00
19,698.50
216,683.50
Jumlah Harga
(Rp)
27,300.00
16,250.00
1,885.00
2,015.00
47,450.00
161,458.33
15,000.00
21,000.00
5,400.00
202,858.33
-
-
250,308.33
25,030.83
275,339.17
Jumlah Harga
(Rp)
25,200.00
15,000.00
1,740.00
1,860.00
43,800.00
240,000.00
14,400.00
21,000.00
5,400.00
280,800.00
-
-
324,600.00
32,460.00
357,060.00
Jumlah Harga
(Rp)
25,200.00
15,000.00
1,740.00
1,860.00
43,800.00
243,000.00
14,400.00
21,000.00
5,400.00
283,800.00
-
-
327,600.00
32,760.00
360,360.00
Jumlah Harga
(Rp)
73,500.00
43,750.00
5,075.00
5,425.00
127,750.00
102,513.64
15,000.00
5,400.00
21,000.00
143,913.64
-
-
271,663.64
27,166.36
298,830.00
Jumlah Harga
(Rp)
73,500.00
43,750.00
5,075.00
5,425.00
127,750.00
86,496.00
15,600.00
5,400.00
22,680.00
130,176.00
-
-
257,926.00
25,792.60
283,718.60
Jumlah Harga
(Rp)
9,450.00
11,250.00
5,075.00
775.00
26,550.00
61,480.00
1,710.00
360.00
350.00
63,900.00
-
-
90,450.00
9,045.00
99,495.00
Jumlah Harga
(Rp)
9,450.00
11,250.00
5,075.00
775.00
26,550.00
122,960.00
1,710.00
360.00
700.00
125,730.00
-
-
152,280.00
15,228.00
167,508.00
Jumlah Harga
(Rp)
73,500.00
43,750.00
5,075.00
5,425.00
127,750.00
441,000.00
11,100.00
452,100.00
-
-
579,850.00
57,985.00
637,835.00
Jumlah Harga
(Rp)
94,500.00
56,250.00
6,525.00
6,975.00
164,250.00
86,496.00
13,950.00
2,160.00
27,160.00
129,766.00
-
-
294,016.00
29,401.60
323,417.60
Jumlah Harga
(Rp)
63,000.00
56,250.00
6,525.00
4,650.00
130,425.00
100,000.00
13,950.00
2,160.00
28,000.00
144,110.00
274,535.00
27,453.50
301,988.50
Jumlah Harga
(Rp)
63,000.00
56,250.00
6,525.00
4,650.00
130,425.00
243,000.00
13,950.00
2,160.00
28,000.00
287,110.00
417,535.00
41,753.50
459,288.50
Jumlah Harga
(Rp)
63,000.00
56,250.00
6,525.00
4,650.00
130,425.00
100,000.00
13,950.00
2,160.00
28,000.00
144,110.00
274,535.00
27,453.50
301,988.50
Jumlah Harga
(Rp)
36,750.00
21,875.00
2,465.00
310.00
61,400.00
143,000.00
4,625.00
147,625.00
-
-
209,025.00
20,902.50
229,927.50
A.4.5.1 Pek. Plafond
D Jumlah ( A + B + C ) 13,740.00
E Overhead & Profit 10% x D 1,374.00
F Harga Satuan Pekerjaan ( D + E ) 15,114.00
D Jumlah ( A + B + C ) 31,295.00
E Overhead & Profit 10% x D 3,129.50
F Harga Satuan Pekerjaan ( D + E ) 34,424.50
D Jumlah ( A + B + C ) 31,295.00
E Overhead & Profit 10% x D 3,129.50
F Harga Satuan Pekerjaan ( D + E ) 34,424.50
D Jumlah ( A + B + C ) 26,250.00
E Overhead & Profit 10% x D 2,625.00
F Harga Satuan Pekerjaan ( D + E ) 28,875.00
A.4.5.1.5 Pemasangan 1 m² langit-langit tripleks 120 x 240 cm, tebal 3 mm, 4 mm dan 6 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 0.100 105,000.00 10,500.00
2 Tukang Kayu L.02 OH 0.100 125,000.00 12,500.00
3 Kepala Tukang L.03 OH 0.010 145,000.00 1,450.00
4 Mandor L.04 OH 0.005 155,000.00 775.00
Jumlah Harga Tenaga Kerja 25,225.00
B BAHAN
1 Tripleks Lbr 0.375 120,000.00 45,000.00
2 Paku tripleks Kg 0.030 20,500.00 615.00
Jumlah Harga Bahan 45,615.00
C PERALATAN
-
Jumlah Harga Alat -
D Jumlah ( A + B + C ) 70,840.00
E Overhead & Profit 10% x D 7,084.00
F Harga Satuan Pekerjaan ( D + E ) 77,924.00
D Jumlah ( A + B + C ) 202,005.00
E Overhead & Profit 10% x D 20,200.50
F Harga Satuan Pekerjaan ( D + E ) 222,205.50
D Jumlah ( A + B + C ) 51,234.40
E Overhead & Profit 10% x D 5,123.44
F Harga Satuan Pekerjaan ( D + E ) 56,357.84
D Jumlah ( A + B + C ) 49,603.80
E Overhead & Profit 10% x D 4,960.38
F Harga Satuan Pekerjaan ( D + E ) 54,564.18
D Jumlah ( A + B + C ) 126,125.00
E Overhead & Profit 10% x D 12,612.50
F Harga Satuan Pekerjaan ( D + E ) 138,737.50
D Jumlah ( A + B + C ) 22,082.50
E Overhead & Profit 10% x D 2,208.25
F Harga Satuan Pekerjaan ( D + E ) 24,290.75
D Jumlah ( A + B + C ) 31,735.00
E Overhead & Profit 10% x D 3,173.50
F Harga Satuan Pekerjaan ( D + E ) 34,908.50
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.5.2.10 Pemasangan 1 m² atap asbes gelombang 92 x 200 cm, tebal 5 mm
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.140 105,000.00
2 Tukang Kayu L.02 OH 0.070 125,000.00
3 Kepala Tukang L.03 OH 0.007 145,000.00
4 Mandor L.04 OH 0.007 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Asbes gelombang 92 x 200 Lbr 0.600
2 Paku pancing 6 x 23 Kg 0.120 Err:509
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.5.2.19 Pemasangan 1 m² atap asbes gelombang 108 x 240 cm, tebal 6 mm
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.140 105,000.00
2 Tukang Kayu L.02 OH 0.070 125,000.00
3 Kepala Tukang L.03 OH 0.007 145,000.00
4 Mandor L.04 OH 0.007 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Asbes gelombang 108 x 240 Lbr 0.460
2 Paku pancing 6 x 23 Kg 0.120 Err:509
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.5.2.28 Pemasangan 1 m' nok stel rata 92 cm
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.100 105,000.00
2 Tukang Kayu L.02 OH 0.150 125,000.00
3 Kepala Tukang L.03 OH 0.013 145,000.00
4 Mandor L.04 OH 0.004 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Nok stel rata 92 cm Lbr 1.100
2 Paku sekrup 3,5" Bh 6.000 Err:509
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.5.2.32.c Pemasangan 1 m² genteng metal type classic 0.35
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00
2 Tukang Kayu L.02 OH 0.100 125,000.00
3 Kepala Tukang L.03 OH 0.010 145,000.00
4 Mandor L.04 OH 0.001 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Genteng metal type classic bjls 0.35 Bh 1.620 66,600.00
2 Paku biasa ½" - 1" Kg 0.200 20,500.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.5.2.39.a Pemasangan 1 m' nok atap seng dengan papan
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.250 105,000.00
2 Tukang Kayu L.02 OH 0.250 125,000.00
3 Kepala Tukang L.03 OH 0.025 145,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Seng plat 3" x 6" bjls 30 Lbr 6.000 68,000.00
2 Paku camp. Kg 0.100 20,500.00
3 Papan Kayu Kelas II (Tidak Ketam) M3 0.072 7,060,000.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
Jadi 1 M'
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - H.10
Jumlah Harga
(Rp)
15,750.00
9,375.00
1,087.50
1,240.00
27,452.50
-
-
-
-
27,452.50
2,745.25
30,197.75
Jumlah Harga
(Rp)
15,750.00
9,375.00
1,160.00
1,240.00
27,525.00
-
-
-
-
27,525.00
2,752.50
30,277.50
Jumlah Harga
(Rp)
15,750.00
9,375.00
1,160.00
1,240.00
27,525.00
-
-
-
-
27,525.00
2,752.50
30,277.50
Jumlah Harga
(Rp)
42,000.00
25,000.00
2,900.00
310.00
70,210.00
-
12,000.00
3,840.00
15,840.00
-
-
86,050.00
8,605.00
94,655.00
Jumlah Harga
(Rp)
42,000.00
25,000.00
2,900.00
310.00
70,210.00
-
12,000.00
3,840.00
15,840.00
-
-
86,050.00
8,605.00
94,655.00
Jumlah Harga
(Rp)
42,000.00
25,000.00
2,900.00
310.00
70,210.00
-
12,000.00
3,840.00
15,840.00
-
-
86,050.00
8,605.00
94,655.00
Jumlah Harga
(Rp)
14,700.00
8,375.00
1,015.00
1,085.00
25,175.00
-
1,025.00
1,025.00
-
-
26,200.00
2,620.00
28,820.00
Jumlah Harga
(Rp)
14,700.00
9,375.00
1,160.00
1,240.00
26,475.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
14,700.00
9,375.00
1,160.00
1,240.00
26,475.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
14,700.00
8,750.00
1,015.00
1,085.00
25,550.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
14,700.00
8,750.00
1,015.00
1,085.00
25,550.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
14,700.00
8,750.00
1,015.00
1,085.00
25,550.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
14,700.00
8,750.00
1,015.00
1,085.00
25,550.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
14,700.00
8,750.00
1,015.00
1,085.00
25,550.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
14,700.00
8,750.00
1,015.00
1,085.00
25,550.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
14,700.00
8,750.00
1,015.00
1,085.00
25,550.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
14,700.00
8,750.00
1,015.00
1,085.00
25,550.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
14,700.00
8,750.00
1,015.00
1,085.00
25,550.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
14,700.00
8,750.00
1,015.00
1,085.00
25,550.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
14,700.00
8,750.00
1,015.00
1,085.00
25,550.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
14,700.00
8,750.00
1,015.00
1,085.00
25,550.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
8,820.00
15,625.00
1,885.00
620.00
26,950.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
8,820.00
15,625.00
1,885.00
620.00
26,950.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
8,820.00
15,625.00
1,885.00
620.00
26,950.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
8,820.00
15,625.00
1,885.00
620.00
26,950.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
8,820.00
15,625.00
1,885.00
620.00
26,950.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
8,820.00
15,625.00
1,885.00
620.00
26,950.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
10,500.00
18,750.00
1,885.00
620.00
31,755.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
8,820.00
15,625.00
1,885.00
620.00
26,950.00
-
Err:509
Err:509
-
-
Err:509
Err:509
Err:509
Jumlah Harga
(Rp)
21,000.00
12,500.00
1,450.00
1,550.00
36,500.00
#VALUE!
615.00
#VALUE!
-
-
#VALUE!
#VALUE!
#VALUE!
Jumlah Harga
(Rp)
21,000.00
37,500.00
435.00
1,550.00
60,485.00
#VALUE!
-
615.00
-
#VALUE!
-
-
#VALUE!
#VALUE!
#VALUE!
Jumlah Harga
(Rp)
21,000.00
12,500.00
1,450.00
155.00
35,105.00
67,932.00
4,100.00
72,032.00
-
-
107,137.00
10,713.70
117,850.70
Jumlah Harga
(Rp)
21,000.00
12,500.00
1,450.00
155.00
35,105.00
122,544.00
4,100.00
126,644.00
-
-
161,749.00
16,174.90
177,923.90
Jumlah Harga
(Rp)
21,000.00
12,500.00
1,450.00
155.00
35,105.00
95,312.00
4,100.00
99,412.00
-
-
134,517.00
13,451.70
147,968.70
Jumlah Harga
(Rp)
21,000.00
12,500.00
1,450.00
155.00
35,105.00
113,886.00
4,100.00
117,986.00
-
-
153,091.00
15,309.10
168,400.10
Jumlah Harga
(Rp)
21,000.00
12,500.00
1,450.00
155.00
35,105.00
88,578.00
4,100.00
92,678.00
-
-
127,783.00
12,778.30
140,561.30
Jumlah Harga
(Rp)
21,000.00
12,500.00
1,450.00
155.00
35,105.00
107,892.00
4,100.00
111,992.00
-
-
147,097.00
14,709.70
161,806.70
Jumlah Harga
(Rp)
21,000.00
12,500.00
1,450.00
155.00
35,105.00
83,916.00
4,100.00
88,016.00
-
-
123,121.00
12,312.10
135,433.10
Jumlah Harga
(Rp)
21,000.00
12,500.00
1,450.00
155.00
35,105.00
102,060.00
4,100.00
106,160.00
-
-
141,265.00
14,126.50
155,391.50
Jumlah Harga
(Rp)
17,430.00
31,250.00
3,625.00
1,240.00
53,545.00
-
4,100.00
4,100.00
-
-
57,645.00
5,764.50
63,409.50
Jumlah Harga
(Rp)
42,000.00
25,000.00
2,900.00
3,100.00
73,000.00
#VALUE!
1,025.00
16,200.00
3,840.00
60,000.00
#VALUE!
-
-
#VALUE!
#VALUE!
#VALUE!
Jumlah Harga
(Rp)
13,125.00
31,250.00
3,625.00
930.00
48,930.00
#VALUE!
1,025.00
-
#VALUE!
-
-
#VALUE!
#VALUE!
#VALUE!
Jumlah Harga
(Rp)
26,250.00
18,750.00
2,175.00
2,015.00
49,190.00
50,600.00
1,025.00
51,625.00
-
-
100,815.00
10,081.50
110,896.50
Jumlah Harga
(Rp)
13,125.00
31,250.00
3,625.00
930.00
48,930.00
27,200.00
1,025.00
1,025.00
29,250.00
-
-
78,180.00
7,818.00
85,998.00
Jumlah Harga
(Rp)
12,600.00
7,500.00
870.00
930.00
21,900.00
50,400.00
410.00
50,810.00
-
-
72,710.00
7,271.00
79,981.00
Jumlah Harga
(Rp)
15,750.00
8,750.00
1,015.00
930.00
26,445.00
20,400.00
820.00
21,220.00
-
-
47,665.00
4,766.50
52,431.50
Jumlah Harga
(Rp)
26,250.00
31,250.00
3,625.00
61,125.00
408,000.00
2,050.00
508,320.00
918,370.00
979,495.00
97,949.50
1,077,444.50
107,744.45
A.4.6.1 Pekerjaan Kayu
A.4.6.1.1 Pembuatan & pemasangan 1 m³ kusen pintu dan jendela, kayu kelas
A TENAGA
1 Pekerja L.01 OH 7.000
2 Tukang Kayu L.02 OH 21.000
3 Kepala Tukang L.03 OH 2.100
4 Mandor L.04 OH 0.350
Jumlah Harga Tenaga Ke
B BAHAN
1 Balok kayu m³ 1.100
2 Paku 10 cm Kg 1.250
3 Lem kayu Kg 1.000
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.2 Pembuatan & pemasangan 1 m³ kusen pintu dan jendela, kayu kelas
A TENAGA
1 Pekerja L.01 OH 6.000
2 Tukang Kayu L.02 OH 18.000
3 Kepala Tukang L.03 OH 1.800
4 Mandor L.04 OH 0.300
Jumlah Harga Tenaga Ke
B BAHAN
1 Balok kayu m³ 1.200
2 Paku 10 cm Kg 1.250
3 Lem kayu Kg 1.000
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.5 Pembuatan & pemasangan 1 m² daun pintu panel, kayu kelas I
A TENAGA
1 Pekerja L.01 OH 1.000
2 Tukang Kayu L.02 OH 3.000
3 Kepala Tukang L.03 OH 0.300
4 Mandor L.04 OH 0.050
Jumlah Harga Tenaga Ke
B BAHAN
1 Papan kayu m³ 0.040
2 Lem kayu Kg 0.500
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.5.a Pembuatan & pemasangan 1 m² daun pintu panel kayu belian
A TENAGA
1 Pekerja L.01 OH 1.000
2 Tukang Kayu L.02 OH 3.000
3 Kepala Tukang L.03 OH 0.300
4 Mandor L.04 OH 0.050
Jumlah Harga Tenaga Ke
B BAHAN
1 Papan belian (ketam) m³ 0.040
2 Lem kayu Kg 0.500
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 1.000
2 Tukang Kayu L.02 OH 3.000
3 Kepala Tukang L.03 OH 0.300
4 Mandor L.04 OH 0.050
Jumlah Harga Tenaga Ke
B BAHAN
1 Papan kayu kls. II (ketam) m³ 0.040
2 Lem kayu Kg 0.500
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.6 Pembuatan & pemasangan 1 m² pintu dan jendela kaca, kayu kelas
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.6.a Pembuatan & pemasangan 1 m² pintu dan jendela kaca, kayu kelas
A TENAGA
1 Pekerja L.01 OH 0.800
2 Tukang Kayu L.02 OH 2.400
3 Kepala Tukang L.03 OH 0.240
4 Mandor L.04 OH 0.040
Jumlah Harga Tenaga Ke
B BAHAN
1 Papan kayu kls. II (ketam) m³ 0.024
2 Lem kayu Kg 0.300
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.7 Pembuatan & pemasangan 1 m² pintu dan jendela jalusi, kayu kelas
A TENAGA
1 Pekerja L.01 OH 1.000
2 Tukang Kayu L.02 OH 3.000
3 Kepala Tukang L.03 OH 0.300
4 Mandor L.04 OH 0.050
Jumlah Harga Tenaga Ke
B BAHAN
1 Papan kayu m³ 0.064
2 Lem kayu Kg 0.500
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.700
2 Tukang Kayu L.02 OH 2.100
3 Kepala Tukang L.03 OH 0.210
4 Mandor L.04 OH 0.035
Jumlah Harga Tenaga Ke
B BAHAN
1 Papan kayu m³ 0.025
2 Paku 1 - 2,5 cm Kg 0.030
3 Lem kayu Kg 0.500
4 Plywood tebal 4 mm uk. (90 x 220) cm Lbr 1.000
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.9 Pembuatan 1 m² pintu plywood rangkap, rangka ekspose kayu kelas
A TENAGA
1 Pekerja L.01 OH 0.800
2 Tukang Kayu L.02 OH 2.400
3 Kepala Tukang L.03 OH 0.240
4 Mandor L.04 OH 0.040
Jumlah Harga Tenaga Ke
B BAHAN
1 Papan kayu m³ 0.0256
2 Paku 1 - 2,5 cm Kg 0.030
3 Lem kayu Kg 0.500
4 Plywood tebal 4 mm uk. (90 x 220) cm Lbr 1.000
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.670
2 Tukang Kayu L.02 OH 2.000
3 Kepala Tukang L.03 OH 0.200
4 Mandor L.04 OH 0.335
Jumlah Harga Tenaga Ke
B BAHAN
1 Papan kayu m³ 0.0600
2 Paku 1 - 2,5 cm Kg 0.150
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.14 Pemasangan 1 m³ kuda-kuda ekspose, kayu kelas I
A TENAGA
1 Pekerja L.01 OH 6.700
2 Tukang Kayu L.02 OH 20.100
3 Kepala Tukang L.03 OH 2.010
4 Mandor L.04 OH 0.335
Jumlah Harga Tenaga Ke
B BAHAN
1 Balok kayu m³ 1.200
2 Besi strip tebal 5 mm Kg 15.000
3 Paku 12 cm Kg 5.600
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 6.700
2 Tukang Kayu L.02 OH 20.100
3 Kepala Tukang L.03 OH 2.010
4 Mandor L.04 OH 0.335
Jumlah Harga Tenaga Ke
B BAHAN
1 Balok kayu kelas II (tidak ketam) m³ 1.100
2 Besi strip tebal 5 mm Kg 15.000
3 Paku 12 cm Kg 3.000
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.15.b Pemasangan 1 m³ konstruksi gordeng, kayu kelas II uk. 5/10
A TENAGA
1 Pekerja L.01 OH 6.700
2 Tukang Kayu L.02 OH 20.100
3 Kepala Tukang L.03 OH 2.010
4 Mandor L.04 OH 0.335
Jumlah Harga Tenaga Ke
B BAHAN
1 Balok kayu kelas II (tidak ketam) m³ 1.100
2 Besi strip tebal 5 mm Kg 15.000
3 Paku 12 cm Kg 3.000
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.100
2 Tukang Kayu L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.005
Jumlah Harga Tenaga Ke
B BAHAN
1 Kayu Kelas II (Tidak Ketam) m³ 0.014
2 Paku Kg 0.150
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
Acuan : ABK Bangunan Gedung dan Perumahan - 6.35
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.20 Pemasangan 1 m² rangka langit-langit 60 x 60 cm, kayu kelas II
A TENAGA
1 Pekerja L.01 OH 0.200
2 Tukang Kayu L.02 OH 0.300
3 Kepala Tukang L.03 OH 0.030
4 Mandor L.04 OH 0.010
Jumlah Harga Tenaga Ke
B BAHAN
1 Kasau 5 x 7 cm m³ 0.0163
2 Paku 7 - 10 cm Kg 0.250
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.200
2 Tukang Kayu L.02 OH 0.300
3 Kepala Tukang L.03 OH 0.030
4 Mandor L.04 OH 0.010
Jumlah Harga Tenaga Ke
B BAHAN
1 Kasau 5 x 7 cm m³ 0.0163
2 Paku 7 - 10 cm Kg 0.250
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.100
2 Tukang Kayu L.02 OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.005
Jumlah Harga Tenaga Ke
B BAHAN
1 Papan kayu m³ 0.0108
2 Paku 5 dan 7 cm Kg 0.100
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.22 Pemasangan 1 m' lisplank 3 x 30 cm, kayu kelas I atau II
A TENAGA
1 Pekerja L.01 OH 0.100
2 Tukang Kayu L.02 OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.005
Jumlah Harga Tenaga Ke
B BAHAN
1 Papan kayu m³ 0.011
2 Paku 5 dan 7 cm Kg 0.050
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.100
2 Tukang Kayu L.02 OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.005
Jumlah Harga Tenaga Ke
B BAHAN
1 Papan kayu kelas II m³ 0.004
2 Paku 5 dan 7 cm Kg 0.050
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.100
2 Tukang Kayu L.02 OH 0.200
3 Kepala Tukang L.03 OH 0.020
4 Mandor L.04 OH 0.005
Jumlah Harga Tenaga Ke
B BAHAN
1 Papan kayu kelas II m³ 0.008
2 Paku 5 dan 7 cm Kg 0.100
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A.4.6.1.23 Pemasangan 1 m² rangka dinding pemisah (60 x 120) cm, kayu kela
A TENAGA
1 Pekerja L.01 OH 0.150
2 Tukang Kayu L.02 OH 0.450
3 Kepala Tukang L.03 OH 0.045
4 Mandor L.04 OH 0.008
Jumlah Harga Tenaga Ke
B BAHAN
1 Balok kayu m³ 0.028
2 Paku 5 dan 7 cm Kg 0.150
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.150
2 Tukang Kayu L.02 OH 0.450
3 Kepala Tukang L.03 OH 0.045
4 Mandor L.04 OH 0.008
Jumlah Harga Tenaga Ke
B BAHAN
1 Balok kayu 6 x 12 m³ 0.028
2 Paku 5 dan 10 cm Kg 0.150
3 Teakwood 4 mm uk. (120 x 240) cm Lbr 0.860
4 Lem kayu Kg 0.560
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.200
2 Tukang Kayu L.02 OH 0.600
3 Kepala Tukang L.03 OH 0.060
4 Mandor L.04 OH 0.010
Jumlah Harga Tenaga Ke
B BAHAN
1 Balok kayu 6 x 12 m³ 0.028
2 Paku 5 dan 10 cm Kg 0.150
3 Plywood 4 mm uk. (120 x 240) cm Lbr 0.860
4 Lem kayu Kg 0.560
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
A TENAGA
1 Pekerja L.01 OH 0.025
2 Tukang Kayu L.02 OH 0.075
3 Kepala Tukang L.03 OH 0.008
4 Mandor L.04 OH 0.001
Jumlah Harga Tenaga Ke
B BAHAN
1 GRC Board m³ 0.400
2 Pakeu GRC Kg 0.050
Jumlah Harga Ba
C PERALATAN
Jumlah Harga A
D Jumlah ( A + B + C )
E Overhead & Profit 10%
F Harga Satuan Pekerjaan ( D + E )
ngan 1 m³ kusen pintu dan jendela, kayu kelas I
Harga Satuan Jumlah Harga
(Rp) (Rp)
105,000.00 735,000.00
125,000.00 2,625,000.00
145,000.00 304,500.00
155,000.00 54,250.00
Jumlah Harga Tenaga Kerja 3,718,750.00
80,000.00 88,000.00
20,500.00 25,625.00
18,500.00 18,500.00
Jumlah Harga Bahan 132,125.00
-
Jumlah Harga Alat -
3,850,875.00
xD 385,087.50
4,235,962.50
105,000.00 630,000.00
125,000.00 2,250,000.00
145,000.00 261,000.00
155,000.00 46,500.00
Jumlah Harga Tenaga Kerja 3,187,500.00
3,355,000.00 4,026,000.00
20,500.00 25,625.00
18,500.00 18,500.00
Jumlah Harga Bahan 4,070,125.00
-
Jumlah Harga Alat -
7,257,625.00
xD 725,762.50
7,983,387.50
ngan 1 m² daun pintu panel, kayu kelas I
Harga Satuan Jumlah Harga
(Rp) (Rp)
105,000.00 105,000.00
125,000.00 375,000.00
145,000.00 43,500.00
155,000.00 7,750.00
Jumlah Harga Tenaga Kerja 531,250.00
11,188,300.00 447,532.00
18,500.00 9,250.00
Jumlah Harga Bahan 456,782.00
-
Jumlah Harga Alat -
988,032.00
xD 98,803.20
1,086,835.20
ngan 1 m² daun pintu panel kayu belian
Harga Satuan Jumlah Harga
(Rp) (Rp)
105,000.00 105,000.00
125,000.00 375,000.00
145,000.00 43,500.00
155,000.00 7,750.00
Jumlah Harga Tenaga Kerja 531,250.00
14,814,000.00 592,560.00
18,500.00 9,250.00
Jumlah Harga Bahan 601,810.00
-
Jumlah Harga Alat -
1,133,060.00
xD 113,306.00
1,246,366.00
105,000.00 105,000.00
125,000.00 375,000.00
145,000.00 43,500.00
155,000.00 7,750.00
Jumlah Harga Tenaga Kerja 531,250.00
8,300,000.00 332,000.00
18,500.00 9,250.00
Jumlah Harga Bahan 341,250.00
-
Jumlah Harga Alat -
872,500.00
xD 87,250.00
959,750.00
11,188,300.00 268,519.20
18,500.00 5,550.00
Jumlah Harga Bahan 274,069.20
-
Jumlah Harga Alat -
699,069.20
xD 69,906.92
768,976.12
ngan 1 m² pintu dan jendela kaca, kayu kelas II
Harga Satuan Jumlah Harga
(Rp) (Rp)
105,000.00 84,000.00
125,000.00 300,000.00
145,000.00 34,800.00
155,000.00 6,200.00
Jumlah Harga Tenaga Kerja 425,000.00
8,300,000.00 199,200.00
18,500.00 5,550.00
Jumlah Harga Bahan 204,750.00
-
Jumlah Harga Alat -
629,750.00
xD 62,975.00
692,725.00
105,000.00 105,000.00
125,000.00 375,000.00
145,000.00 43,500.00
155,000.00 7,750.00
Jumlah Harga Tenaga Kerja 531,250.00
11,188,300.00 716,051.20
18,500.00 9,250.00
Jumlah Harga Bahan 725,301.20
-
Jumlah Harga Alat -
1,256,551.20
xD 125,655.12
1,382,206.32
n pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)
Harga Satuan Jumlah Harga
(Rp) (Rp)
105,000.00 73,500.00
125,000.00 262,500.00
145,000.00 30,450.00
155,000.00 5,425.00
Jumlah Harga Tenaga Kerja 371,875.00
8,300,000.00 207,500.00
20,500.00 615.00
18,500.00 9,250.00
120,000.00 120,000.00
Jumlah Harga Bahan 337,365.00
-
Jumlah Harga Alat -
709,240.00
xD 70,924.00
780,164.00
u plywood rangkap, rangka ekspose kayu kelasi I atau II
Harga Satuan Jumlah Harga
(Rp) (Rp)
105,000.00 84,000.00
125,000.00 300,000.00
145,000.00 34,800.00
155,000.00 6,200.00
Jumlah Harga Tenaga Kerja 425,000.00
11,188,300.00 286,420.48
20,500.00 615.00
18,500.00 9,250.00
120,000.00 120,000.00
Jumlah Harga Bahan 416,285.48
-
Jumlah Harga Alat -
841,285.48
xD 84,128.55
925,414.03
105,000.00 70,350.00
125,000.00 250,000.00
145,000.00 29,000.00
155,000.00 51,925.00
Jumlah Harga Tenaga Kerja 401,275.00
11,188,300.00 671,298.00
20,500.00 3,075.00
Jumlah Harga Bahan 674,373.00
-
Jumlah Harga Alat -
1,075,648.00
xD 107,564.80
1,183,212.80
3,355,000.00 3,690,500.00
13,500.00 202,500.00
20,500.00 114,800.00
Jumlah Harga Bahan 4,007,800.00
-
Jumlah Harga Alat -
6,132,800.00
xD 613,280.00
6,746,080.00
Harga Satuan Jumlah Harga
(Rp) (Rp)
105,000.00 703,500.00
125,000.00 2,512,500.00
145,000.00 291,450.00
155,000.00 51,925.00
Jumlah Harga Tenaga Kerja 3,559,375.00
80,000.00 96,000.00
15,000.00 225,000.00
20,500.00 114,800.00
Jumlah Harga Bahan 435,800.00
-
Jumlah Harga Alat -
3,995,175.00
xD 399,517.50
4,394,692.50
105,000.00 703,500.00
125,000.00 2,512,500.00
145,000.00 291,450.00
155,000.00 51,925.00
Jumlah Harga Tenaga Kerja 3,559,375.00
3,576,000.00 3,933,600.00
15,000.00 225,000.00
20,500.00 61,500.00
Jumlah Harga Bahan 4,220,100.00
-
Jumlah Harga Alat -
7,779,475.00
xD 777,947.50
8,557,422.50
4,224,000.00 4,646,400.00
15,000.00 225,000.00
20,500.00 61,500.00
Jumlah Harga Bahan 4,932,900.00
-
Jumlah Harga Alat -
8,492,275.00
xD 849,227.50
9,341,502.50
nstruksi gordeng, kayu kelas II uk. 5/10
Harga Satuan Jumlah Harga
(Rp) (Rp)
105,000.00 703,500.00
125,000.00 2,512,500.00
145,000.00 291,450.00
155,000.00 51,925.00
Jumlah Harga Tenaga Kerja 3,559,375.00
3,355,000.00 3,690,500.00
15,000.00 225,000.00
20,500.00 61,500.00
Jumlah Harga Bahan 3,977,000.00
-
Jumlah Harga Alat -
7,536,375.00
xD 753,637.50
8,290,012.50
105,000.00 10,500.00
125,000.00 12,500.00
145,000.00 1,450.00
155,000.00 775.00
Jumlah Harga Tenaga Kerja 25,225.00
4,755,000.00 66,570.00
20,500.00 3,075.00
Jumlah Harga Bahan 69,645.00
-
Jumlah Harga Alat -
94,870.00
xD 9,487.00
104,357.00
4,755,000.00 73,227.00
20,500.00 4,100.00
Jumlah Harga Bahan 77,327.00
-
Jumlah Harga Alat -
146,552.00
xD 14,655.20
161,207.20
gka langit-langit 60 x 60 cm, kayu kelas II
Harga Satuan Jumlah Harga
(Rp) (Rp)
105,000.00 21,000.00
125,000.00 37,500.00
145,000.00 4,350.00
155,000.00 1,550.00
Jumlah Harga Tenaga Kerja 64,400.00
4,755,000.00 77,506.50
20,500.00 5,125.00
Jumlah Harga Bahan 82,631.50
-
Jumlah Harga Alat -
147,031.50
xD 14,703.15
161,734.65
105,000.00 21,000.00
125,000.00 37,500.00
145,000.00 4,350.00
155,000.00 1,550.00
Jumlah Harga Tenaga Kerja 64,400.00
2,083,000.00 33,952.90
20,500.00 5,125.00
Jumlah Harga Bahan 39,077.90
-
Jumlah Harga Alat -
103,477.90
xD 10,347.79
113,825.69
105,000.00 10,500.00
125,000.00 25,000.00
145,000.00 2,900.00
155,000.00 775.00
Jumlah Harga Tenaga Kerja 39,175.00
11,188,300.00 120,833.64
20,500.00 2,050.00
Jumlah Harga Bahan 122,883.64
-
Jumlah Harga Alat -
162,058.64
xD 16,205.86
178,264.50
lank 3 x 30 cm, kayu kelas I atau II
Harga Satuan Jumlah Harga
(Rp) (Rp)
105,000.00 10,500.00
125,000.00 25,000.00
145,000.00 2,900.00
155,000.00 775.00
Jumlah Harga Tenaga Kerja 39,175.00
11,188,300.00 123,071.30
20,500.00 1,025.00
Jumlah Harga Bahan 124,096.30
-
Jumlah Harga Alat -
163,271.30
xD 16,327.13
179,598.43
105,000.00 10,500.00
125,000.00 25,000.00
145,000.00 2,900.00
155,000.00 775.00
Jumlah Harga Tenaga Kerja 39,175.00
8,300,000.00 33,200.00
20,500.00 1,025.00
Jumlah Harga Bahan 34,225.00
-
Jumlah Harga Alat -
73,400.00
xD 7,340.00
80,740.00
105,000.00 10,500.00
125,000.00 25,000.00
145,000.00 2,900.00
155,000.00 775.00
Jumlah Harga Tenaga Kerja 39,175.00
8,300,000.00 66,400.00
20,500.00 2,050.00
Jumlah Harga Bahan 68,450.00
-
Jumlah Harga Alat -
107,625.00
xD 10,762.50
118,387.50
gka dinding pemisah (60 x 120) cm, kayu kelas II
Harga Satuan Jumlah Harga
(Rp) (Rp)
105,000.00 15,750.00
125,000.00 56,250.00
145,000.00 6,525.00
155,000.00 1,240.00
Jumlah Harga Tenaga Kerja 79,765.00
5,070,000.00 141,960.00
20,500.00 3,075.00
Jumlah Harga Bahan 145,035.00
-
Jumlah Harga Alat -
224,800.00
xD 22,480.00
247,280.00
105,000.00 15,750.00
125,000.00 56,250.00
145,000.00 6,525.00
155,000.00 1,240.00
Jumlah Harga Tenaga Kerja 79,765.00
3,576,000.00 100,128.00
20,500.00 3,075.00
-
18,500.00 10,360.00
Jumlah Harga Bahan 113,563.00
-
Jumlah Harga Alat -
193,328.00
xD 19,332.80
212,660.80
105,000.00 21,000.00
125,000.00 75,000.00
145,000.00 8,700.00
155,000.00 1,550.00
Jumlah Harga Tenaga Kerja 106,250.00
3,576,000.00 100,128.00
20,500.00 3,075.00
120,000.00 103,200.00
18,500.00 10,360.00
Jumlah Harga Bahan 216,763.00
-
Jumlah Harga Alat -
323,013.00
xD 32,301.30
355,314.30
105,000.00 2,625.00
125,000.00 9,375.00
145,000.00 1,160.00
155,000.00 155.00
Jumlah Harga Tenaga Kerja 13,315.00
79,700.00 31,880.00
21,300.00 1,065.00
Jumlah Harga Bahan 32,945.00
-
Jumlah Harga Alat -
46,260.00
xD 4,626.00
50,886.00
A.4.6.2 Pek. Kunci & Kaca
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.6.2.5 Pemasangan 1 buah engsel pintu
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.015 105,000.00
2 Tukang Kayu L.02 OH 0.150 125,000.00
3 Kepala Tukang L.03 OH 0.015 145,000.00
4 Mandor L.04 OH 0.0008 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Engsel pintu Bh 1.000 29,000.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.6.2.13 Pemasangan 1 buah door stop
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.010 105,000.00
2 Tukang Kayu L.02 OH 0.100 125,000.00
3 Kepala Tukang L.03 OH 0.010 145,000.00
4 Mandor L.04 OH 0.005 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Door stop Bh 1.000 88,750.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp)
6,300.00
75,000.00
8,700.00
465.00
90,465.00
47,500.00
47,500.00
-
-
137,965.00
13,796.50
151,761.50
Jumlah Harga
(Rp)
6,300.00
75,000.00
8,700.00
465.00
90,465.00
179,100.00
179,100.00
-
-
269,565.00
26,956.50
296,521.50
Jumlah Harga
(Rp)
1,050.00
62,500.00
7,250.00
775.00
71,575.00
57,500.00
57,500.00
-
-
129,075.00
12,907.50
141,982.50
Jumlah Harga
(Rp)
1,575.00
18,750.00
2,175.00
124.00
22,624.00
29,000.00
29,000.00
-
-
51,624.00
5,162.40
56,786.40
Jumlah Harga
(Rp)
1,050.00
12,500.00
1,450.00
77.50
15,077.50
18,800.00
18,800.00
-
-
33,877.50
3,387.75
37,265.25
Jumlah Harga
(Rp)
1,575.00
18,750.00
2,175.00
1,240.00
23,740.00
14,400.00
14,400.00
-
-
38,140.00
3,814.00
41,954.00
Jumlah Harga
(Rp)
5,250.00
62,500.00
7,250.00
465.00
75,465.00
190,000.00
190,000.00
-
-
265,465.00
26,546.50
292,011.50
Jumlah Harga
(Rp)
2,100.00
25,000.00
2,900.00
155.00
30,155.00
18,900.00
18,900.00
-
-
49,055.00
4,905.50
53,960.50
Jumlah Harga
(Rp)
2,100.00
25,000.00
2,900.00
155.00
30,155.00
8,800.00
8,800.00
-
-
38,955.00
3,895.50
42,850.50
Jumlah Harga
(Rp)
1,050.00
12,500.00
1,450.00
775.00
15,775.00
88,750.00
88,750.00
-
-
104,525.00
10,452.50
114,977.50
Jumlah Harga
(Rp)
1,575.00
18,750.00
2,175.00
124.00
22,624.00
165,000.00
1,750.00
166,750.00
-
-
189,374.00
18,937.40
208,311.40
Jumlah Harga
(Rp)
1,575.00
18,750.00
2,175.00
124.00
22,624.00
220,000.00
1,750.00
221,750.00
-
-
244,374.00
24,437.40
268,811.40
Jumlah Harga
(Rp)
1,785.00
21,250.00
2,465.00
139.50
25,639.50
437,800.00
2,450.00
440,250.00
-
-
465,889.50
46,588.95
512,478.45
Jumlah Harga
(Rp)
2,625.00
31,250.00
3,625.00
201.50
37,701.50
704,000.00
2,450.00
706,450.00
-
-
744,151.50
74,415.15
818,566.65
Jumlah Harga
(Rp)
1,575.00
18,750.00
2,175.00
1,240.00
23,740.00
459,800.00
459,800.00
-
-
483,540.00
48,354.00
531,894.00
A.4.7.1 Pek. Pengecatan
D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.4 Pengecatan 1 m² bidang kayu baru (1 lapis plamur, 1 lapis cat dasar 2 lapis c
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.070 105,000.00
2 Tukang Cat L.02 OH 0.009 125,000.00
3 Kepala Tukang L.03 OH 0.006 145,000.00
4 Mandor L.04 OH 0.003 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Cat menie Kg 0.200 52,000.00
2 Plamur Kg 0.150 31,500.00
3 Cat dasar Kg 0.170 140,000.00
4 Cat penutup Kg 0.260 70,000.00
5 Kuas Bh 0.010 24,000.00
6 Pengencer Kg 0.030 22,100.00
7 Ampelas Lbr 0.200 3,500.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.5 Pengecatan 1 m² bidang kayu baru (1 lapis plamur,1 lapis cat dasar, 3 lapis c
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.070 105,000.00
2 Tukang Cat L.02 OH 0.105 125,000.00
3 Kepala Tukang L.03 OH 0.004 145,000.00
4 Mandor L.04 OH 0.003 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Cat menie Kg 0.200 52,000.00
2 Plamur Kg 0.150 31,500.00
3 Cat dasar Kg 0.170 140,000.00
4 Cat penutup Kg 0.350 70,000.00
5 Kuas Bh 0.010 24,000.00
6 Pengencer Kg 0.030 22,100.00
7 Ampelas Lbr 0.200 3,500.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.10 Pengecatan 1 m² tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat p
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.020 105,000.00
2 Tukang Cat L.02 OH 0.063 125,000.00
3 Kepala Tukang L.03 OH 0.0063 145,000.00
4 Mandor L.04 OH 0.003 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Plamur Kg 0.100 31,500.00
2 Cat dasar Kg 0.100 140,000.00
3 Cat penutup Kg 0.260 84,000.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.10.a Pengecatan 1 m² tembok baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat p
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.020 105,000.00
2 Tukang Cat L.02 OH 0.063 125,000.00
3 Kepala Tukang L.03 OH 0.0063 145,000.00
4 Mandor L.04 OH 0.003 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Plamur Kg 0.100 31,500.00
2 Cat dasar Kg 0.100 140,000.00
3 Cat penutup Kg 0.260 27,000.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.11 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.028 105,000.00
2 Tukang Cat L.02 OH 0.042 125,000.00
3 Kepala Tukang L.03 OH 0.0042 145,000.00
4 Mandor L.04 OH 0.003 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Cat dasar Kg 0.120 140,000.00
2 Cat penutup Kg 0.180 84,000.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.11.a Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.028 105,000.00
2 Tukang Cat L.02 OH 0.042 125,000.00
3 Kepala Tukang L.03 OH 0.0042 145,000.00
4 Mandor L.04 OH 0.003 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Cat dasar Kg 0.120 140,000.00
2 Cat penutup Kg 0.180 27,000.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.17 Pengecatan 1 m² permukaan baja dengan menie besi dengan perancah
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.250 105,000.00
2 Tukang Cat L.02 OH 0.225 125,000.00
3 Kepala Tukang L.03 OH 0.0225 145,000.00
4 Mandor L.04 OH 0.0075 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Menie besi Kg 0.100 52,000.00
2 Pengencer Ltr 0.010 22,100.00
3 Kuas Bh 0.010 24,000.00
4 Perancah kayu m³ 0.002
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.19 Pengecatan 1 m² permukaan baja galvanis secara manual 1 lapis cat mutakh
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.060 105,000.00
2 Tukang Cat L.02 OH 0.060 125,000.00
3 Kepala Tukang L.03 OH 0.012 145,000.00
4 Mandor L.04 OH 0.003 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Cat Kg 0.300 70,000.00
2 Kuas Bh 0.010 24,000.00
3 Pengencer Ltr 0.010 22,100.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.7.1.21 Pengecatan 1 m² permukaan baja galvanis secara semprot 3 lapis cat mutakh
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.400 105,000.00
2 Tukang Cat L.02 OH 0.700 125,000.00
3 Kepala Tukang L.03 OH 0.070 145,000.00
4 Mandor L.04 OH 0.020 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Cat dasar Kg 0.300 140,000.00
2 Pengencer Ltr 0.010 22,100.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 0% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp)
15,750.00
465.00
16,215.00
1,225.00
1,225.00
-
-
17,440.00
-
17,440.00
Jumlah Harga
(Rp)
15,750.00
465.00
16,215.00
-
-
-
-
16,215.00
-
16,215.00
Jumlah Harga
(Rp)
15,750.00
1,240.00
16,990.00
-
-
-
-
16,990.00
-
16,990.00
7,350.00
1,125.00
870.00
465.00
9,810.00
10,400.00
4,725.00
23,800.00
18,200.00
240.00
663.00
700.00
58,728.00
-
-
68,538.00
6,853.80
75,391.80
Jumlah Harga
(Rp)
7,350.00
9,375.00
1,087.50
387.50
18,200.00
4,725.00
23,800.00
11,900.00
40,425.00
-
-
58,625.00
-
58,625.00
7,350.00
13,125.00
580.00
465.00
21,520.00
10,400.00
4,725.00
23,800.00
24,500.00
240.00
663.00
700.00
65,028.00
-
-
86,548.00
8,654.80
95,202.80
Jumlah Harga
(Rp)
4,200.00
7,875.00
9,135.00
465.00
21,675.00
-
-
-
-
21,675.00
-
21,675.00
Jumlah Harga
(Rp)
4,200.00
7,500.00
2,320.00
465.00
14,485.00
9,600.00
23,808.00
7,000.00
40,408.00
-
-
54,893.00
-
54,893.00
Jumlah Harga
(Rp)
10,500.00
930.00
11,430.00
20,440.00
20,440.00
-
-
31,870.00
-
31,870.00
Jumlah Harga
(Rp)
16,800.00
20,000.00
2,320.00
465.00
39,585.00
6,750.00
Err:509
350.00
Err:509
-
-
Err:509
Err:509
Err:509
2,100.00
7,875.00
913.50
465.00
11,353.50
3,150.00
14,000.00
21,840.00
38,990.00
-
-
50,343.50
5,034.35
55,377.85
2,100.00
7,875.00
913.50
465.00
11,353.50
3,150.00
14,000.00
7,020.00
24,170.00
-
-
35,523.50
-
35,523.50
Jumlah Harga
(Rp)
2,940.00
5,250.00
609.00
465.00
9,264.00
16,800.00
15,120.00
31,920.00
-
-
41,184.00
-
41,184.00
Jumlah Harga
(Rp)
2,940.00
5,250.00
609.00
465.00
9,264.00
16,800.00
4,860.00
21,660.00
-
-
30,924.00
-
30,924.00
Jumlah Harga
(Rp)
2,940.00
5,250.00
609.00
465.00
9,264.00
-
-
-
-
9,264.00
-
9,264.00
Jumlah Harga
(Rp)
15,750.00
125.00
14.50
387.50
16,277.00
-
350.00
-
350.00
-
-
16,627.00
-
16,627.00
Jumlah Harga
(Rp)
4,200.00
625.00
72.50
387.50
5,285.00
-
700.00
-
700.00
-
-
5,985.00
-
5,985.00
Jumlah Harga
(Rp)
2,100.00
25,000.00
2,900.00
387.50
30,387.50
-
-
-
-
-
30,387.50
-
30,387.50
Jumlah Harga
(Rp)
2,100.00
25,000.00
2,900.00
387.50
30,387.50
5,200.00
240.00
5,440.00
-
-
35,827.50
3,582.75
39,410.25
Jumlah Harga
(Rp)
26,250.00
28,125.00
3,262.50
1,162.50
58,800.00
5,200.00
221.00
240.00
-
5,661.00
-
-
64,461.00
-
64,461.00
Jumlah Harga
(Rp)
26,250.00
31,250.00
3,625.00
201.50
61,326.50
5,200.00
5,200.00
5,600.00
240.00
221.00
16,461.00
-
-
77,787.50
-
77,787.50
6,300.00
7,500.00
1,740.00
465.00
16,005.00
21,000.00
240.00
221.00
21,461.00
-
-
37,466.00
-
37,466.00
Jumlah Harga
(Rp)
42,000.00
100,000.00
11,600.00
3,100.00
156,700.00
15,400.00
-
5,600.00
240.00
221.00
21,461.00
-
-
178,161.00
-
178,161.00
42,000.00
87,500.00
10,150.00
3,100.00
142,750.00
42,000.00
221.00
42,221.00
-
-
184,971.00
-
184,971.00
A.5.1.1 Pek. Sanitasi Gedung
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.5.1.1.5 Pemasangan 1 buah wastafel
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 1.200 105,000.00
2 Tukang Batu L.02 OH 1.450 125,000.00
3 Kepala Tukang L.03 OH 0.150 145,000.00
4 Mandor L.04 OH 0.060 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Wastafel unit 1.000 1,000,000.00
2 Semen portland Kg 6.000 1,500.00
3 Pasir pasang m³ 0.010 120,000.00
4 Perlengkapan 12% 1.000 120,000.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.5.1.1.14 Pemasangan 1 buah floor drain
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.010 105,000.00
2 Tukang Batu L.02 OH 0.100 125,000.00
3 Kepala Tukang L.03 OH 0.010 145,000.00
4 Mandor L.04 OH 0.005 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Floor drain unit 1.000 18,500.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.5.1.1.15 Pemasangan 1 buah bak kontrol pasangan bata 30 x 30 cm tinggi 35 cm
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 2.160 105,000.00
2 Tukang Batu L.02 OH 0.720 125,000.00
3 Kepala Tukang L.03 OH 0.072 145,000.00
4 Mandor L.04 OH 0.011 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Bak cuci piring Bh 40.000 650,000.00
2 Semen portland Kg 44.000 1,500.00
3 Pasir pasang m³ 0.070 120,000.00
4 Pasir beton m³ 0.060 120,000.00
5 Kerikil m³ 0.070 467,500.00
6 Baja tulangan Kg 1.600 12,000.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.5.1.1.19 Pemasangan 1 buah kran Ø ½" atau ¾"
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.010 105,000.00
2 Tukang Batu L.02 OH 0.400 125,000.00
3 Kepala Tukang L.03 OH 0.040 145,000.00
4 Mandor L.04 OH 0.005 155,000.00
Jumlah Harga Tenaga Kerja x 1/4
B BAHAN
1 Kran air m' 1.000 32,500.00
2 Sealtape Bh 0.025 5,000.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.5.1.1.20 Pemasangan 1 m' pipa galvanis Ø ¾"
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.054 105,000.00
2 Tukang Batu L.02 OH 0.090 125,000.00
3 Kepala Tukang L.03 OH 0.009 145,000.00
4 Mandor L.04 OH 0.027 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Pipa galvanis ¾" m' 1.200 23,333.33
2 Perlengkapan % 35.000 233.33
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.5.1.1.23 Pemasangan 1 m' pipa galvanis Ø 3"
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.135 105,000.00
2 Tukang Batu L.02 OH 0.225 125,000.00
3 Kepala Tukang L.03 OH 0.023 145,000.00
4 Mandor L.04 OH 0.007 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Pipa galvanis 3" m' 1.200 97,083.33
2 Perlengkapan % 35.000 970.83
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.5.1.1.26 Pemasangan 1 m' pipa PVC tipe AW Ø ¾"
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.036 105,000.00
2 Tukang Batu L.02 OH 0.060 125,000.00
3 Kepala Tukang L.03 OH 0.006 145,000.00
4 Mandor L.04 OH 0.002 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Pipa PVC ¾" m' 1.200 5,500.00
2 Perlengkapan % 35.000 55.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
A.5.1.1.31 Pemasangan 1 m' pipa PVC tipe AW Ø 3"
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.081 105,000.00
2 Tukang Batu L.02 OH 0.135 125,000.00
3 Kepala Tukang L.03 OH 0.0135 145,000.00
4 Mandor L.04 OH 0.004 155,000.00
Jumlah Harga Tenaga Kerja
B BAHAN
1 Pipa PVC 3" m' 1.200 20,500.00
2 Perlengkapan % 35.000 205.00
Jumlah Harga Bahan
C PERALATAN
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
D Jumlah ( A + B + C )
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan ( D + E )
Jumlah Harga
(Rp)
346,500.00
137,500.00
1,450.00
24,800.00
510,250.00
2,962,700.00
10,665.72
2,973,365.72
-
-
3,483,615.72
348,361.57
3,831,977.29
Jumlah Harga
(Rp)
105,000.00
187,500.00
21,750.00
24,800.00
84,762.50
330,000.00
9,000.00
1,200.00
340,200.00
-
-
424,962.50
42,496.25
467,458.75
Jumlah Harga
(Rp)
105,000.00
125,000.00
14,500.00
7,750.00
252,250.00
2,000,000.00
9,000.00
1,200.00
600,000.00
2,610,200.00
-
-
2,862,450.00
286,245.00
3,148,695.00
Jumlah Harga
(Rp)
126,000.00
181,250.00
21,750.00
9,300.00
338,300.00
1,000,000.00
9,000.00
1,200.00
120,000.00
1,130,200.00
-
-
1,468,500.00
146,850.00
1,615,350.00
Jumlah Harga
(Rp)
31,500.00
56,250.00
6,525.00
2,325.00
96,600.00
280,000.00
33,600.00
313,600.00
-
-
410,200.00
41,020.00
451,220.00
Jumlah Harga
(Rp)
1,050.00
12,500.00
1,450.00
775.00
15,775.00
18,500.00
18,500.00
-
-
34,275.00
3,427.50
37,702.50
rol pasangan bata 30 x 30 cm tinggi 35 cm
Jumlah Harga
(Rp)
226,800.00
90,000.00
10,440.00
1,705.00
328,945.00
26,000,000.00
66,000.00
8,400.00
7,200.00
32,725.00
19,200.00
26,133,525.00
-
-
26,462,470.00
2,646,247.00
29,108,717.00
336,000.00
143,750.00
1,595.00
2,480.00
483,825.00
140,000.00
115,500.00
15,600.00
10,800.00
9,350.00
31,200.00
322,450.00
-
-
806,275.00
80,627.50
886,902.50
rol pasangan bata 60 x 60 cm tinggi 65 cm
Jumlah Harga
(Rp)
336,000.00
143,750.00
1,595.00
2,480.00
483,825.00
246,000.00
171,000.00
22,080.00
14,400.00
15,427.50
58,200.00
527,107.50
-
-
1,010,932.50
101,093.25
1,112,025.75
Jumlah Harga
(Rp)
5,670.00
11,250.00
1,305.00
4,185.00
22,410.00
22,000.00
6,416.67
28,416.67
-
-
50,826.67
5,082.67
55,909.33
Jumlah Harga
(Rp)
1,050.00
50,000.00
5,800.00
775.00
14,406.25
32,500.00
125.00
32,625.00
-
-
47,031.25
4,703.13
51,734.38
Jumlah Harga
(Rp)
5,670.00
11,250.00
1,305.00
4,185.00
22,410.00
28,000.00
8,166.67
36,166.67
-
-
58,576.67
5,857.67
64,434.33
Jumlah Harga
(Rp)
5,670.00
11,250.00
1,305.00
4,185.00
22,410.00
33,800.00
9,858.33
43,658.33
-
-
66,068.33
6,606.83
72,675.17
Jumlah Harga
(Rp)
11,340.00
22,500.00
2,610.00
775.00
37,225.00
57,400.00
16,741.67
74,141.67
-
-
111,366.67
11,136.67
122,503.33
Jumlah Harga
(Rp)
14,175.00
28,125.00
3,335.00
1,085.00
46,720.00
116,500.00
33,979.17
150,479.17
-
-
197,199.17
19,719.92
216,919.08
Jumlah Harga
(Rp)
14,175.00
28,125.00
3,335.00
1,085.00
46,720.00
185,000.00
53,958.33
238,958.33
-
-
285,678.33
28,567.83
314,246.17
Jumlah Harga
(Rp)
3,780.00
7,500.00
870.00
310.00
12,460.00
3,450.00
1,006.25
4,456.25
-
-
16,916.25
1,691.63
18,607.88
Jumlah Harga
(Rp)
3,780.00
7,500.00
870.00
310.00
12,460.00
6,600.00
1,925.00
8,525.00
-
-
20,985.00
2,098.50
23,083.50
Jumlah Harga
(Rp)
3,780.00
7,500.00
870.00
310.00
12,460.00
9,000.00
2,625.00
11,625.00
-
-
24,085.00
2,408.50
26,493.50
Jumlah Harga
(Rp)
5,670.00
11,250.00
1,305.00
465.00
18,690.00
13,500.00
3,937.50
17,437.50
-
-
36,127.50
3,612.75
39,740.25
Jumlah Harga
(Rp)
8,505.00
16,875.00
1,957.50
620.00
27,957.50
24,600.00
7,175.00
31,775.00
-
-
59,732.50
5,973.25
65,705.75
Jumlah Harga
(Rp)
8,505.00
16,875.00
1,957.50
620.00
27,957.50
49,200.00
14,350.00
63,550.00
-
-
91,507.50
9,150.75
100,658.25
PEMBONGKARAN
A.2.2.1.14b 1 m2 Membongkar Genteng/Sirap (SNI. Edisi Rev. 2005) Jika bongkaran tidak dipakai
A TENAGA
Pekerja L.01.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJ
B BAHAN
A.2.2.1.14c 1 m2 Membongkar Plafond (SNI. Edisi Rev. 2005) Jika bongkaran tidak dipakai lagi
A TENAGA
Pekerja L.01.01 OH
Mandor L.04.01 OH
JUMLAH TENAGA KERJ
B BAHAN
-
-
JUMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 3,650.00
10% 365.00
- 4,015.00
-
-
JUMLAH HARGA BAHAN -
- -
JUMLAH HARGA ALAT -
- 11,275.00
10% 1,127.50
- 12,402.00