REKAPITULASI BIAYA TOTAL KONSTRUKSI

Proyek : SNOW WHITE


Pekerjaan : STRUKTUR PERBAIKAN
Lokasi : SURABAYA

HARGA REVISI HARGA REVISI


NO. JENIS PEKERJAAN
MATERIAL UPAH TOTAL
Rp. Rp. Rp.

A PEKERJAAN PERSIAPAN 3,177,527,999.49 3,177,527,999.49

B #REF!
B.1 PEKERJAAN STRUKTUR SNOW WHITE (1&2) 4,245,429,817.27 2,202,811,238.51 6,448,241,055.78
B.2 PEKERJAAN STRUKTUR COMPRESSOR & SNOW WHITE ( #REF! #REF! #REF!

C PEKERJAAN ARSITEKTUR
C.1 PEKERJAAN ARSITEKTUR SNOW WHITE (1&2) 667,585,909.38 227,693,418.75 895,279,328.13
C.2 PEKERJAAN ARSITEKTUR SNOW WHITE (3&4) 771,215,141.89 254,630,964.27 1,025,846,106.16
C.3 PEKERJAAN ARSITEKTUR COMPRESSOR (3&4) 78,099,606.45 36,216,393.95 114,316,000.40

D PEKERJAAN MEKANIKAL DAN ELETRIKAL


D.1 OIL WASHING SYSTEM 1&2 118,070,000.00 118,070,000.00
D.2 OIL WASHING SYSTEM 3&4 78,455,000.00 78,455,000.00
D.3 ICE CONDENSING SYSTEM 1&2 393,380,000.00 393,380,000.00
D.4 ICE CONDENSING SYSTEM 3&4 454,415,000.00 454,415,000.00

J U M L A H (A+B+C+D) #REF! #REF! #REF!


BOBOT 34 12

#REF!

#REF! #REF!
#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

#REF! #REF! #REF!


Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : C.2. ARSITEKTUR SNOW WHITE SURABAYA (3&4)
Lokasi : SURABAYA

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Satuan Volume
Bahan Upah Bahan

EL. ±11.00 dan ±11.60


I Pekerjaan Dinding dan Finishing
1 Dinding

Zincalume Clean Colorbond, AZ150, G550


m2 40.00 225,000.00 75,000.00 9,000,000.00
tbl 0.4 BMT termasuk rangka support

2 Railing ( R ) termasuk tangga m' 48.03 1,350,000.00 300,000.00 64,833,750.00

EL. ±15.00 dan ±15.20


I Pekerjaan Dinding dan Finishing
1 Pas. Bata Ringan + kolom dan balok praktis m2 38.40 85,000.00 45,000.00 3,264,000.00
2 Plesteran + Acian m2 76.80 40,000.00 50,000.00 3,072,000.00
3 Cat Exterior Wheathershield m2 38.40 55,000.00 35,000.00 2,112,000.00
4 Cat Interior Enamel m2 38.40 55,000.00 35,000.00 2,112,000.00
5 Dinding

Zincalume Clean Colorbond, AZ150, G550


m2 72.00 225,000.00 75,000.00 16,200,000.00
tbl 0.4 BMT termasuk rangka support

II Pek. Pintu dan Jendela


1 SD1 unit 1.00 12,500,000.00 5,500,000.00 12,500,000.00

III Pekerjaan Lantai


1 Homogenous Tile unpolish 600x600mm m2 6.27 350,000.00 100,000.00 2,194,500.00
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : C.2. ARSITEKTUR SNOW WHITE SURABAYA (3&4)
Lokasi : SURABAYA

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Satuan Volume
Bahan Upah Bahan

IV Pekerjaan Atap
1 Atap

Zincalume Clean Colorbond, AZ150, G550


m2 17.64 225,000.00 75,000.00 3,969,000.00
tbl 0.4 BMT termasuk rangka support

EL. ±18.90
I Pekerjaan Dinding dan Finishing
1 Railing ( R ) m' 18.00 185,000.00 100,000.00 3,330,000.00

II Pekerjaan Lantai
1 Homogenous Tile unpolish 600x600mm m2 36.00 350,000.00 100,000.00 12,600,000.00

EL. ±42.00
I Pekerjaan Dinding dan Finishing
1 Railing ( R ) termasuk tangga m' 18.90 1,350,000.00 300,000.00 25,515,000.00

EL. ±45.00
I Pekerjaan Dinding dan Finishing
1 Railing ( R ) m' 22.00 185,000.00 100,000.00 4,070,000.00

EL. ±46.00
I Pekerjaan Dinding dan Finishing
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : C.2. ARSITEKTUR SNOW WHITE SURABAYA (3&4)
Lokasi : SURABAYA

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Satuan Volume
Bahan Upah Bahan
1 Railing ( R ) m' 45.50 185,000.00 100,000.00 8,417,500.00

II Pekerjaan Atap
1 Canopy

Zincalume Clean Colorbond, AZ150, G550


m2 132.00 225,000.00 75,000.00 29,700,000.00
tbl 0.4 BMT termasuk rangka support

EL. ±47.00
I Pekerjaan Dinding dan Finishing
1 Railing ( R ) m' 24.00 185,000.00 100,000.00 4,440,000.00

Total Pekerjaan Arsitektur 207,329,750.00


Jumlah Harga
Upah

3,000,000.00

14,407,500.00

1,728,000.00
3,840,000.00
1,344,000.00
1,344,000.00

5,400,000.00

5,500,000.00

627,000.00
Jumlah Harga
Upah

1,323,000.00

1,800,000.00

3,600,000.00

5,670,000.00

2,200,000.00
Jumlah Harga
Upah
4,550,000.00

9,900,000.00

2,400,000.00

68,633,500.00
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : C.2. ARSITEKTUR SNOW WHITE SURABAYA (3&4)
Lokasi : SURABAYA

Harga Satuan
No Uraian Pekerjaan Satuan Volume
MATERIAL UPAH

EL. ±0.00
I Pekerjaan Lantai
EL. ±6.00
I Pekerjaan Plafond
EL. ±9.60
I Pekerjaan Bongkar
II Pekerjaan Pintu dan Jendela
EL. ±11.00 dan ±11.60
I Pekerjaan Dinding dan Finishing
II Pekerjaan Pintu dan Jendela
III Pekerjaan Lantai
IV Pekerjaan Plafond
EL. ±15.00 dan ±15.20
I Pekerjaan Dinding dan Finishing
II Pek. Pintu dan Jendela
III Pekerjaan Lantai
IV Pekerjaan Atap
1 Atap

Zincalume Clean Colorbond, AZ150, G550


m2 17.64 225,000.00 75,000.00
tbl 0.4 BMT termasuk rangka support

2 Talang datar fiber 300x400 mm (include rangka support) m' 6.00 200,000.00 50,000.00
3 Pipa talang PVC AW 4" (include aksesoris: knee, T, Clamp dl m' 13.00 80,000.00 20,000.00

EL. ±18.90
I Pekerjaan Dinding dan Finishing
1 Railing ( R ) m' 28.00 1,250,000.00 375,000.00

II Pekerjaan Lantai
1 Homogenous Tile unpolish 600x600mm m2 89.80 350,000.00 100,000.00

EL. ±42.00
I Pekerjaan Dinding dan Finishing
1 Railing ( R ) termasuk tangga m' 18.90 1,350,000.00 300,000.00
2 Dinding bata m2 84.00 75,000.00
3 Pintu unit 1.00 500,000.00

EL. ±45.00
I Pekerjaan Dinding dan Finishing
1 Railing ( R ) m' 22.00 185,000.00 100,000.00
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : C.2. ARSITEKTUR SNOW WHITE SURABAYA (3&4)
Lokasi : SURABAYA

Harga Satuan
No Uraian Pekerjaan Satuan Volume
MATERIAL UPAH

EL. ±46.00
I Pekerjaan Dinding dan Finishing
1 Railing ( R ) m' 72.00 1,250,000.00 375,000.00

II Pekerjaan Atap
1 Canopy

Zincalume Clean Colorbond, AZ150, G550


m2 176.00 225,000.00 75,000.00
tbl 0.4 BMT termasuk rangka support

ATAP

Zincalume Clean Colorbond, AZ150, G550


1 m2 490.46 225,000.00 75,000.00
tbl 0.4 BMT termasuk rangka support

2 Fascia m2 180.00 305,000.00 45,000.00


3 Pipa PVC AW 6" (include aksesoris: knee, T, Clamp dll) m' 200.00 175,000.00 45,000.00

EL. ±47.00
I Pekerjaan Dinding dan Finishing
1 Railing ( R ) m' 24.00 185,000.00 100,000.00

Total Pekerjaan Arsitektur


Jumlah Harga
MATERIAL UPAH

1,200,000.00 300,000.00
1,040,000.00 260,000.00

35,000,000.00 10,500,000.00

31,430,000.00 8,980,000.00

25,515,000.00 5,670,000.00
- 6,300,000.00
- 500,000.00

4,070,000.00 2,200,000.00
Jumlah Harga
MATERIAL UPAH

90,000,000.00 27,000,000.00

39,600,000.00 13,200,000.00

110,353,500.00 36,784,500.00

54,900,000.00 8,100,000.00
35,000,000.00 9,000,000.00

4,440,000.00 2,400,000.00

771,215,141.89 254,630,964.27
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : C.2. ARSITEKTUR SNOW WHITE SURABAYA (3&4)
Lokasi : SURABAYA

Harga Satuan
Volume Volume volume
No Uraian Pekerjaan Satuan
Lama Baru selisih
Bahan Upah

EL. ±0.00
I Pekerjaan Lantai
1 Homogenous Tile unpolish 600x600mm m2 12.175 347,790.00 115,937.50

EL. ±9.60
I Pekerjaan Bongkar
1 Dinding Panel m2 4.55 100,000.00
2 Atap Lisplank m2 4.29 100,000.00

II Pekerjaan Pintu dan Jendela


1 SD1 unit 1.00 10,398,000.00 3,119,400.00
2 Railing ( R ) m' 5.45 1,250,000.00 375,000.00

EL. ±6.00
I Pekerjaan Plafond
1 Bongkar m2 16.50 500,000.00
2 Gypsumboard 9mm termasuk rangka metal furring m2 16.50 125,000.00 31,250.00
3 Cat Plafond m2 16.50 36,534.17 10,313.25

EL. ±11.00 dan ±11.60


I Pekerjaan Dinding dan Finishing
2 Railing ( R ) termasuk tangga m' 48.03 58.03 10.00 1,250,000.00 375,000.00
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : C.2. ARSITEKTUR SNOW WHITE SURABAYA (3&4)
Lokasi : SURABAYA

Harga Satuan
Volume Volume volume
No Uraian Pekerjaan Satuan
Lama Baru selisih
Bahan Upah

tambahan baru
1 Pas. Bata Ringan + kolom dan balok praktis m2 108.22 153,750.00 43,300.00
2 Plesteran + Acian m2 216.44 17,700.00 49,687.50
3 Cat Exterior Wheathershield m2 44.00 50,534.17 10,313.25
4 Cat Interior Enamel m2 172.44 36,534.17 10,313.25

II Pekerjaan Pintu dan Jendela


1 D1 unit 2.00 6,075,000.00 1,822,500.00
2 WD1 unit 8.00 12,000,000.00 3,600,000.00
3 Door Closer unit 2.00 400,000.00 100,000.00

III Pekerjaan Lantai


1 Homogenous Tile unpolish 800x800mm m2 13.20 347,790.00 115,937.50
2 Skirting lantai Homogenous Tile unpolish 100x80mm m2 3.22 347,790.00 115,937.50

IV Pekerjaan Plafond
1 Gypsumboard 9mm termasuk rangka metal furring m2 66.00 125,000.00 31,250.00
2 Cat Plafond m2 66.00 36,534.17 10,313.25

EL. ±15.00 dan ±15.20


5 Dinding
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : C.2. ARSITEKTUR SNOW WHITE SURABAYA (3&4)
Lokasi : SURABAYA

Harga Satuan
Volume Volume volume
No Uraian Pekerjaan Satuan
Lama Baru selisih
Bahan Upah

Zincalume Clean Colorbond, AZ150, G550 tbl 0.4


m2 72.00 - 250,000.00 100,000.00
BMT termasuk rangka support
Railing ( R ) m' 17.00 1,250,000.00 375,000.00

II Pek. Pintu dan Jendela


1 SD1 unit 1.00 - 15,000,000.00 4,500,000.00

III Pekerjaan Lantai


1 Homogenous Tile unpolish 600x600mm m2 6.27 77.00 70.73 347,790.00 115,937.50
2 Roof Drain (Dia 4") unit 2.00 350,000.00 87,500.00
3 Waterproofing coating m2 77.00 250,000.00 62,500.00

IV Pekerjaan Atap
1 Atap
Zincalume Clean Colorbond, AZ150, G550 tbl 0.4
m2 17.64 - 250,000.00 175,000.00
BMT termasuk rangka support
2 Talang datar fiber 300x400 mm (include rangka support) m' 6.00 200,000.00 50,000.00
3 Pipa talang PVC AW 4" (include aksesoris: knee, T, Clamp dll) m' 13.00 80,000.00 20,000.00

EL. ±18.90
I Pekerjaan Dinding dan Finishing
1 Railing ( R ) m' 18.00 28.00 10.00 1,250,000.00 375,000.00

II Pekerjaan Lantai
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : C.2. ARSITEKTUR SNOW WHITE SURABAYA (3&4)
Lokasi : SURABAYA

Harga Satuan
Volume Volume volume
No Uraian Pekerjaan Satuan
Lama Baru selisih
Bahan Upah

1 Homogenous Tile unpolish 600x600mm m2 36.00 89.80 53.80 347,790.00 115,937.50

EL. ±42.00
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : C.2. ARSITEKTUR SNOW WHITE SURABAYA (3&4)
Lokasi : SURABAYA

Harga Satuan
Volume Volume volume
No Uraian Pekerjaan Satuan
Lama Baru selisih
Bahan Upah

II Pekerjaan Bongkar
1 Dinding bata m2 84.00 75,000.00
2 Pintu unit 1.00 500,000.00

EL. ±46.00
I Pekerjaan Dinding dan Finishing
1 Railing ( R ) m' 45.50 72.00 26.50 1,250,000.00 375,000.00

II Pekerjaan Atap
1 Canopy
Zincalume Clean Colorbond, AZ150, G550 tbl 0.4
m2 132.00 176.00 44.00 250,000.00 100,000.00
BMT termasuk rangka support

ATAP
Zincalume Clean Colorbond, AZ150, G550 tbl 0.4
m2 490.46 250,000.00 100,000.00
BMT termasuk rangka support

2 Fascia m2 180.00 305,000.00 45,000.00

3 Pipa PVC AW 6" (include aksesoris: knee, T, Clamp dll) m' 200.00 175,000.00 45,000.00

Total Pekerjaan Arsitektur


Jumlah Harga

Bahan Upah

4,234,343.25 1,411,539.06

- 455,000.00
- 428,750.00

10,398,000.00 3,119,400.00
6,812,500.00 2,043,750.00

- 8,250,000.00
2,062,500.00 515,625.00
602,813.75 170,168.63

12,500,000.00 3,750,000.00
Jumlah Harga

Bahan Upah

16,638,825.00 4,685,926.00
3,830,988.00 10,754,362.50
2,223,503.33 453,783.00
6,299,951.70 1,778,416.83

12,150,000.00 3,645,000.00
96,000,000.00 28,800,000.00
800,000.00 1,600,000.00

4,590,828.00 1,530,375.00
1,119,883.80 373,318.75

8,250,000.00 2,062,500.00
2,411,255.00 680,674.50
Jumlah Harga

Bahan Upah

DIHILANGKAN DIHILANGKAN

21,250,000.00 6,375,000.00

DIHILANGKAN DIHILANGKAN

24,599,186.70 8,200,259.38
700,000.00 175,000.00
19,250,000.00 4,812,500.00

DIHILANGKAN DIHILANGKAN

1,200,000.00 300,000.00
1,040,000.00 260,000.00

12,500,000.00 3,750,000.00
Jumlah Harga

Bahan Upah

18,711,102.00 6,237,437.50
Jumlah Harga

Bahan Upah

- 6,300,000.00
- 500,000.00

33,125,000.00 9,937,500.00

11,000,000.00 4,400,000.00

122,615,000.00 49,046,000.00

54,900,000.00 8,100,000.00

35,000,000.00 9,000,000.00

456,915,680.53 176,802,286.14
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : D.1 OIL WASHING SYSTEM 1&2
Lokasi : SURABAYA

NO. JENIS PEKERJAAN SATUAN Volume


( Berat Equipment
- ton )
A EQUIPMENT

1 19R05.1 RETENTION TANK WITH AGITATOR-COIL ton 1.59


Installation Tank (elev.7.400)
Dia.Tank 2.069 m; Height 3.650 m; Thickness as per
technical specification.

2 19R05.2 RETENTION TANK WITH AGITATOR-COIL ton 1.59


Installation Tank (elev.7.400)
Dia.Tank 2.069 m; Height 3.650 m; Thickness as per
technical specification.

3 19B32A.1 UNIT TANK ton


Intallation Tank (elev.0.050)
Length 3.150 m; Width 1.650 m; Thickness as per technical
specification.

4 19B32A.2 UNIT TANK ton


Intallation Tank (elev.0.050)
Length 3.150 m; Width 1.650 m; Thickness as per technical
specification.

5 19B41.1 SLUDGE COLLECTING TANK-COIL (IMPURITIES) ton 0.68

Intallation Tank (elev.0.050)


Dia.Tank 1.455 m; Height 1.885 m; Thickness as per
technical specification.

6 19B41.2 SLUDGE COLLECTING TANK-COIL (IMPURITIES) ton 0.68

Intallation Tank (elev.0.050)


Dia.Tank 1.455 m; Height 1.885 m; Thickness as per
technical specification.

7 19B21.1 COUSTIC DOSING TANK ton 0.11


Intallation Tank (elev.0.050)
Dia.Tank 0.600 m; Height 1.164 m; Thickness as per
technical specification.

8 19B21.2 COUSTIC DOSING TANK ton 0.11


Intallation Tank (elev.0.050)
Dia.Tank 0.600 m; Height 1.164 m; Thickness as per
technical specification.

9 19B31.1 HOT WATER TANK ton 0.36


Intallation Tank (elev.7.400)
Dia.Tank 0.970 m; Height 2.600 m; Thickness as per
technical specification.

Page 23 of 48
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : D.1 OIL WASHING SYSTEM 1&2
Lokasi : SURABAYA

NO. JENIS PEKERJAAN SATUAN Volume


( Berat Equipment
- ton )

10 19B31.2 HOT WATER TANK ton 0.36


Intallation Tank (elev.7.400)
Dia.Tank 0.970 m; Height 2.600 m; Thickness as per
technical specification.

11 19M05B.1 WAXING MIXER ton


Intallation WAXING MIXER (elev.7.400)

12 19M05B.2 WAXING MIXER ton


Intallation WAXING MIXER (elev.7.400)

13 19S05.1 WASHING SEPARATOR ton 2.80


Intallation Washing Separator (elev.7.400)

14 19S05.2 WASHING SEPARATOR ton 2.80


Intallation Washing Separator (elev.7.400)

19M21 SCRUBBER ton


Intallation SCRUBBER Separator (elev.7.400)

ROOF WATER TANK WASHING SEPARATOR


Intallation Tank (elev.12.000)
Dia.Tank 0.400 m; Height 0.500 m; Thickness as per
technical specification.

Page 24 of 48
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : D.1 OIL WASHING SYSTEM 1&2
Lokasi : SURABAYA

NO. JENIS PEKERJAAN SATUAN Volume


( Berat Equipment
- ton )
15 19CT01 BOWL CLEANING TABLE ton 0.20
Intallation BOWL CLEANING TABLE (elev.7.400)
Length 2.100 m; Width 1.020 m; Thickness as per technical
specification.

B PUMP

1 19P32.1 PUMP unit 1.00


Installation Pump (elev.0.050)

2 19P32.2 PUMP unit 1.00


Installation Pump (elev.0.050)

3 19P12.1 PUMP unit 1.00


Installation Pump elev.0.050)

4 19P12.2 PUMP unit 1.00


Installation Pump (elev.0.050)

5 19P05.1 RETENTION PUMP unit 1.00


Installation Pump (elev.0.050)

6 19P05.2 RETENTION PUMP unit 1.00


Installation Pump (elev.0.050)

7 19P08.1 PUMP unit 1.00


Installation Pump (elev.0.050)

8 19P08.2 PUMP unit 1.00


Installation Pump (elev.0.050)

9 19P31.1 PUMP HOT WATER unit 1.00


Installation Pump (elev.0.050)

10 19P31.2 PUMP HOT WATER unit 1.00


Installation Pump (elev.0.050)

11 19P41.1 SLUDGE COLLECTING PUMP unit 1.00


Installation Pump (elev.0.050)

12 19P41.2 SLUDGE COLLECTING PUMP unit 1.00


Installation Pump (elev.0.050)

Page 25 of 48
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : D.1 OIL WASHING SYSTEM 1&2
Lokasi : SURABAYA

NO. JENIS PEKERJAAN SATUAN Volume


( Berat Equipment
- ton )

13 19P21.1 COUSTIC DOSING PUMP unit 1.00


Installation Pump (elev.0.050)

14 19P21.2 COUSTIC DOSING PUMP unit 1.00


Installation Pump (elev.0.050)

C HEAT EXCHANGER

1 19W08.1 OIL HEATER 1 ton 0.22


Installation Oil Heater(HE) (elev.0.050)

2 19W08.2 OIL HEATER 2 ton 0.22


Installation Oil Heater(HE) (elev.0.050)

3 19W09.1 OIL HEATER 1 ton 0.22


Installation Oil Heater(HE) (elev.0.050)

4 19W09.2 OIL HEATER 2 ton 0.22


Installation Oil Heater(HE) (elev.0.050)

5 19W31.1 HOT WATER HEATER ton 0.10


Installation Hot Water Heater (elev.0.050)

6 19W31.2 HOT WATER HEATER ton 0.10


Installation Hot Water Heater (elev.0.050)

7 19W32.1 HOT WATER ECONOMIZER ton 0.21


Installation Hot Water Heater (elev.0.050)

8 19W32.2 HOT WATER ECONOMIZER ton 0.21


Installation Hot Water Heater (elev.0.050)

Page 26 of 48
HARGA SATUAN JUMLAH HARGA

(RP) (RP)

Page 27 of 48
HARGA SATUAN JUMLAH HARGA

(RP) (RP)

Page 28 of 48
HARGA SATUAN JUMLAH HARGA

(RP) (RP)

Page 29 of 48
HARGA SATUAN JUMLAH HARGA

(RP) (RP)

Page 30 of 48
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : D.2 OIL WASHING SYSTEM 3&4
Lokasi : SURABAYA

NO. JENIS PEKERJAAN SATUAN Volume


( Berat Equipment -
ton )

A EQUIPMENT

1 19R05 RETENTION TANK WITH AGITATOR-COIL ton 2.27


Installation Tank (elev.23.000)
Dia.Tank 2.322 m; Height 3.900 m; Thickness as per
technical specification.

2 19B32A UNIT TANK ton


Intallation Tank (elev.15.000)
Length 3.500 m; Width 1.695 m; Thickness as per technical
specification.

3 19B41 SLUDGE COLLECTING TANK-COIL (IMPURITIES) ton 0.99

Intallation Tank (elev.15.000)


Dia.Tank 1.455 m; Height 1.900 m; Thickness as per
technical specification.

4 19B21 COUSTIC DOSING TANK ton 0.11


Intallation Tank (elev.0.000)
Dia.Tank 0.600 m; Height 2.000 m; Thickness as per
technical specification.

5 19B31 HOT WATER TANK ton 0.44


Intallation Tank (elev.18.900)
Dia.Tank 1.164 m; Height 2.700 m; Thickness as per
technical specification.

6 19M05B WAXING MIXER 2 ton 0.64


Intallation WAXING MIXER (elev.18.900)

7 19S05 WASHING SEPARATOR ton 2.80


Intallation Washing Separator (elev.18.900)

19M21 SCRUBBER ton


Intallation SCRUBBER Separator (elev.18.900)

ROOF WATER TANK WASHING SEPARATOR A ton


Intallation Tank c/w ISBL (elev.24.000)
Dia.Tank 0.400 m; Height 0.500 m; Thickness as per
technical specification.

Page 31 of 48
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : D.2 OIL WASHING SYSTEM 3&4
Lokasi : SURABAYA

NO. JENIS PEKERJAAN SATUAN Volume


( Berat Equipment -
ton )

8 19CT01 BOWL CLEANING TABLE ton 0.20


Intallation BOWL CLEANING TABLE (elev.18.900)
Length 2.100 m; Width 1.200 m; Thickness as per technical
specification.

B PUMP

1 19P32 PUMP unit 1.00


Installation Pump (elev.15.000)

2 19P12 PUMP unit 1.00


Installation Pump (elev.15.000)

3 19P05 RETENTION PUMP unit 1.00


Installation Pump (elev.15.000)

4 19P08 PUMP unit 1.00


Installation Pump (elev.15.000)

5 19P31 PUMP HOT WATER unit 1.00


Installation Pump (elev.15.000)

6 19P41 SLUDGE COLLECTING PUMP unit 1.00


Installation Pump (elev.15.000)

7 19P21A COUSTIC DOSING PUMP A unit 1.00


Installation Pump (elev.0.000)

8 19P21B COUSTIC DOSING PUMP B unit 1.00


Installation Pump (elev.0.000)

C HEAT EXCHANGER

1 19W08 OIL HEATER A ton 0.31


Installation Oil Heater(HE) (elev.0.000)

2 19W09 OIL HEATER B ton


Installation Oil Heater(HE) (elev.0.000)

Page 32 of 48
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : D.2 OIL WASHING SYSTEM 3&4
Lokasi : SURABAYA

NO. JENIS PEKERJAAN SATUAN Volume


( Berat Equipment -
ton )

3 19W31 HOT WATER HEATER ton 0.10


Installation Hot Water Heater (elev.15.000)

4 19W32 HOT WATER ECONOMIZER ton 0.21


Installation Hot Water Heater (elev.15.000)

Page 33 of 48
HARGA SATUAN JUMLAH HARGA

(RP) (RP)

Page 34 of 48
HARGA SATUAN JUMLAH HARGA

(RP) (RP)

Page 35 of 48
HARGA SATUAN JUMLAH HARGA

(RP) (RP)

Page 36 of 48
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : D.3 ICE CONDENSING SYSTEM 1&2
Lokasi : SURABAYA

NO. JENIS PEKERJAAN SATUAN

A EQUIPMENT

1 CU738A AMMONIA COMPRESSOR A ton


Installation Tank (elev.0.750)
Length 3.400 m; Width 1.800 m; Thickness as per technical
specification

2 CU738B AMMONIA COMPRESSOR B ton


Installation Tank (elev.0.750)
Length 3.400 m; Width 1.800 m; Thickness as per technical
specification

3 VE739 AMMONIA ECONOMIZER ton


Installation AMMONIA ECONOMIZER (elev.0.750)
Dia.Tank 0.6 m; Thickness as per technical specification.

4 HE736 EVAPORATIVE CONDENSER


Installation Evaporator Condenser (elev.22.000)
Length 4.000 m; Width 2.600 m; Thickness as per technical
specification

5 VE736 AMMONIA RECEIVER ton


Installation Ammonia Receiver (elev.18.755)
Dia.Tank 0.910 m; Length 4.216 m; Thickness as per technical
specification

6 TK735 SEAL POT /WASTE WATER TANK ton


Installation Waste Water Tank (elev.7400)
Length 2.510 m; Width 0.820 m; Thickness as per technical
specification

7 PU735 FAT STRAP /WASTE WATER PUMP ton


Installation Waste Water Pump (elev.0.050)
Length 1.150 m; Width 0.450 m; Thickness as per technical
specification

8 1VP611 BLEACHING VACUUM PUMP ton


Installation Bleaching Vacuum Pump (elev.18.755)

9 2VP611 BLEACHING VACUUM PUMP ton


Installation Bleaching Vacuum Pump (elev.18.755)

10 1SE611 BLEACHING SURFACE CONDENSER ton

Page 37 of 48
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : D.3 ICE CONDENSING SYSTEM 1&2
Lokasi : SURABAYA

NO. JENIS PEKERJAAN SATUAN

Installation Bleaching Surface Condenser (elev.24.755)


Dia.Tank 0.450 m; Thickness as per technical specification.

11 2SE611 BLEACHING SURFACE CONDENSER ton


Installation Bleaching Surface Condenser (elev.24.755)
Dia.Tank 0.450 m; Thickness as per technical specification.

12 VE733 MELTING VESSEL ton


Installation MELTING VESSEL (elev.22.000)
Dia.Tank 0.812m; Length 4.887 m; Thickness as per technical
specification.

13 1SE734a EJECTOR STAGE 1 AND STAGE 2 ton


Installation EJECTOR STAGE 1 & 2 (elev.27.755 & 24.755)
Dia.Tank 0.450 m; Length 2.600 m; Thickness as per technical
specification.

14 2SE734a EJECTOR STAGE 1 AND STAGE 2 ton


Installation EJECTOR STAGE 1 & 2 (elev.27.755 & 24.755)
Dia.Tank 0.450 m; Length 2.600 m; Thickness as per technical
specification.

15 1SE734b DEODORIZATION SURFACE CONDENSER ton


Installation Deodorization Surface Condenser (elev.24.755)
Dia.Tank 0.450 m; Length 4.500 m; Thickness as per technical
specification.

16 1SE734b DEODORIZATION SURFACE CONDENSER ton


Installation Deodorization Surface Condenser (elev.24.755)
Dia.Tank 0.450 m; Length 4.500 m; Thickness as per technical
specification.

17 SE32A/B ICE CONDENSER SKID INCLUDING TEE PIECE AND VALVES ton
Installation Ice Condenser Skid (elev.24.755)
Dia.Tank 1.120 m; Length 5.800 m;Width 6.078 m; Height 2.500 m;
Thickness as per technical specification.

18 VE737 AMMONIA SEPARATOR ton


Installation Ammonia Separator (elev.27.755)
Dia.Tank 1.070 m; Length 4.496 m; Height 1.827 m; Thickness as per
technical specification.

19 1VP734 DEODORIZATION VACUUM PUMP ton

Page 38 of 48
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : D.3 ICE CONDENSING SYSTEM 1&2
Lokasi : SURABAYA

NO. JENIS PEKERJAAN SATUAN

Installation Deodorization Vacuum Pump (elev.18.755)

20 2VP734 DEODORIZATION VACUUM PUMP ton


Installation Deodorization Vacuum Pump (elev.18.755)

Page 39 of 48
Volume HARGA SATUAN JUMLAH HARGA
( Berat Equipment - ton
(RP) (RP)
)

4.50

4.50

0.90

1.70

1.00

0.22

0.80

0.80

2.20

Page 40 of 48
Volume HARGA SATUAN JUMLAH HARGA
( Berat Equipment - ton
(RP) (RP)
)

2.20

1.90

1.50

1.50

2.20

2.20

29.00

2.00

0.70

Page 41 of 48
Volume HARGA SATUAN JUMLAH HARGA
( Berat Equipment - ton
(RP) (RP)
)

0.70

Page 42 of 48
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : D.4 ICE CONDENSING SYSTEM 3&4
Lokasi : SURABAYA

NO. JENIS PEKERJAAN SATUAN Volume


( Berat Equipment -
ton )

A EQUIPMENT

1 CU738A AMMONIA COMPRESSOR A ton 4.00


Installation Tank (elev.-0.500)

Length 3.400 m; Width 1.800 m; Thickness as per technical specification

2 CU738B AMMONIA COMPRESSOR B ton 4.00


Installation Tank (elev.-0.500)

Length 3.400 m; Width 1.800 m; Thickness as per technical specification

3 CU738C AMMONIA COMPRESSOR C ton 4.00


Installation Tank (elev.-0.500)

Length 3.400 m; Width 1.800 m; Thickness as per technical specification

4 VE739 AMMONIA ECONOMIZER ton 0.14


Installation AMMONIA ECONOMIZER (elev.-0.500)
Dia.Tank 0.600 m; Thickness as per technical specification.

5 HE736 EVAPORATIVE CONDENSER ton 6.00


Installation Evaporator Condenser (elev.15.200)
Length 5.448 m; Width 2.600 m; Thickness as per technical specification

6 VE736 AMMONIA RECEIVER ton 2.00


Installation Ammonia Receiver (elev.11.600)
Dia.Tank 1.220 m; Length 4.978 m; Thickness as per technical
specification

7 TK735 SEAL POT /WASTE WATER TANK ton 1.00


Installation Waste Water Tank (elev.11.000)

Length 2.510 m; Width 0.820 m; Thickness as per technical specification

8 PU735 FAT STRAP /WASTE WATER PUMP ton 0.22


Installation Waste Water Pump (elev.0.000)
Length 0.895 m; Width 0.415 m; Thickness as per technical specification

9 1VP611 BLEACHING VACUUM PUMP ton 0.95


Installation Bleaching Vacuum Pump (elev.26.000)

Page 43 of 48
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : D.4 ICE CONDENSING SYSTEM 3&4
Lokasi : SURABAYA

NO. JENIS PEKERJAAN SATUAN Volume


( Berat Equipment -
ton )

10 2VP611 BLEACHING VACUUM PUMP ton 0.70


Installation Bleaching Vacuum Pump (elev.26.000)

11 1SE611 BLEACHING SURFACE CONDENSER (FOR 1000 MTD) ton 3.00


Installation Bleaching Surface Condenser (elev.34.00)
Dia.Tank 0.600 m; Thickness as per technical specification.

12 2SE611 BLEACHING SURFACE CONDENSER (FOR 300 MTD) ton 1.60


Installation Bleaching Surface Condenser (elev.34.00)
Dia.Tank 0.350 m; Thickness as per technical specification.

13 VE733 MELTING VESSEL ton 2.00


Installation MELTING VESSEL (elev.34.600)
Dia.Tank 1.200 m; Length 3.550 m; Heigth 1.500 m; Thickness as per
technical specification.

14 1SE734a EJECTOR STAGE 1 AND STAGE 2 ton 1.50


Installation EJECTOR STAGE 1 & 2 (elev.46.000 & 42.000)
Dia.Tank 0.450 m; Length 3.550 m; Thickness as per technical
specification.

15 1SE734b DEODORIZATION SURFACE CONDENSER ton 2.50


Installation Deodorization Surface Condenser (elev.42.000)
Dia.Tank 0.500 m; Length 4.692 m; Thickness as per technical
specification.

16 2SE734a EJECTOR STAGE 1 AND STAGE 2 ton 1.50


Installation EJECTOR STAGE 1 & 2 (elev.46.000 & 42.000)
Dia.Tank 0.450 m; Length 3.550 m; Thickness as per technical
specification.

17 2SE734b DEODORIZATION SURFACE CONDENSER ton 2.20


Installation Deodorization Surface Condenser (elev.42.000)
Dia.Tank 0.450 m; Length 4.272 m; Thickness as per technical
specification.

18 SE732A/B ICE CONDENSER SKID INCLUDING TEE PIECE AND VALVES ton 29.00
Installation Ice Condenser Skid (elev.38.500)
Dia.Tank 1.120 m; Length 5.800 m;Width 6.078 m; Height 2.500 m;
Thickness as per technical specification.
Installation Pump c/w ISBL (elev.42.000)

Page 44 of 48
Rencana Anggaran Biaya
Proyek : SNOW WHITE
Pekerjaan : D.4 ICE CONDENSING SYSTEM 3&4
Lokasi : SURABAYA

NO. JENIS PEKERJAAN SATUAN Volume


( Berat Equipment -
ton )

19 VE737 AMMONIA SEPARATOR ton 2.20


Installation Ammonia Separator (elev.42.400)
Dia.Tank 1.370 m; Length 4.500 m; Height 2.345 m; Thickness as per
technical specification.

20 1VP734 DEODORIZATION VACUUM PUMP ton 0.80


Installation Deodorization Vacuum Pump (elev.26.000)

21 2VP734 DEODORIZATION VACUUM PUMP ton 0.60


Installation Deodorization Vacuum Pump (elev.26.000)

Page 45 of 48
HARGA SATUAN JUMLAH HARGA

(RP) (RP)

Page 46 of 48
HARGA SATUAN JUMLAH HARGA

(RP) (RP)

Page 47 of 48
HARGA SATUAN JUMLAH HARGA

(RP) (RP)

Page 48 of 48

Anda mungkin juga menyukai