No Gambar No. Gambar
R0/TGL R1 R2 R3

1 DENAH
1.1 Denah lt. G-02 (el. -12.200) A-01-01
- GWT didalam bangunan 16-Aug-18
- GWT dipindahkan keluar bangunan (sisi RKA)
- Lay Out BOH (From Tauzia) & Musholla 11-Oct-18 1-Nov-18
- Perubahan jumlah lantai 15-Feb-18 16-Aug-18
- perubahan lay out tiap lantai 15-Feb-18 16-Aug-18
Setting Out kolom 16-Aug-18 1-Nov-18
- Penambahan luas Ruang STP (penggabungan fungsi 18-Feb-19 17-May-19
STP PACH-02 & PACH RKA)

1.2 Denah lt. G-01 (el.-9.000) A-01-02


- Pond di area resto (ADD) menjadi Paddy field/taman 16-Aug-18 17-May-19
- Lay out kitchen equipment 20-Aug-18 21-May-19

- Pond area ADD zone 4 16-Aug-18


- Detail Sunken A-12-03

1.3 Denah lt. Lobby (el. -4.800)


- Perubahan desain bentuk void 16-Jul-18 20-Aug-18 4-Oct-18
- Perubahan desain akses ramp ke RKA 20-Aug-18

1.4 Denah lt. 01 (el. +0.200)


- Perubahan desain bentuk void 16-Jul-18 20-Aug-18 4-Oct-18

1.5 Denah lt. 02 (el. +3.400)


- Perubahan desain bentuk void 16-Jul-18 20-Aug-18 4-Oct-18

1.6 Denah lt. 03 (el. +6.600)


- Perubahan desain bentuk void 16-Jul-18 20-Aug-18 4-Oct-18

1.7 Denah lt. Poolside (el. +9.800) A-01-07


- perubahan desain planter box & roof skylight 4-Oct-18
- Denah lt. Poolside (Blok B) A-04-07B
- Denah lt. Poolside (Blok C) A-04-07C

1.8 Denah lt. Atap (el. +14.300)

2 Gambar Full package Arsitektur


> Denah 4-Oct-18 17-May-19
- Denah lt. G-02 (el. -12.200) A-01-01 4-Oct-18 17-May-19
- Denah lt. G-01 (el.-9.000) A-01-02 4-Oct-18 17-May-19
- Denah lt. Lobby (el. -4.800) A-01-03 4-Oct-18 17-May-19
For Info
No Gambar No. Gambar
R0/TGL R1 R2 R3
- Denah lt. 01 (el. +0.200) A-01-04 4-Oct-18 17-May-19
- Denah lt. 02 (el. +3.400) A-01-05 4-Oct-18 17-May-19
- Denah lt. 03 (el. +6.600) A-01-06 17-May-19
4-Oct-18
- Denah lt. Poolside (el. +9.800) A-01-07 17-May-19

4-Oct-18

- Denah lt. Atap (el. +14.300) A-01-08 4-Oct-18 17-May-19

> Tampak 4-Oct-18 17-May-19


- Tampak 1 & 2 A-02-01 4-Oct-18 17-May-19
- Tampak 3 & 4 A-02-02 4-Oct-18 17-May-19
- Tampak 5 & 6 A-02-03 4-Oct-18 17-May-19

> Potongan 4-Oct-18 17-May-19


- Potongan A & B A-03-01 4-Oct-18 17-May-19
- Potongan C & D A-03-02 4-Oct-18 17-May-19
- Potongan E & F A-03-03 4-Oct-18 17-May-19
- Potongan G, H & I A-03-04 4-Oct-18 17-May-19

> Rencana pola lantai 4-Oct-18


> Rencana pola plafond 4-Oct-18
> Rencana Kusen 4-Oct-18
> Keyplan kusen KAYU lt. G-01 & G-02 A-07-01
> Keyplan kusen KAYU lt. Lobby & lt. 1 A-07-02
> Keyplan kusen KAYU lt. 02 & lt. 03 A-07-03
> Keyplan kusen KAYU lt. rekreasi (atap) A-07-04
> DETAIL KUSEN KAYU A-07-05
> Keyplan kusen aluminium lt. G-01 & G-02 A-07-06 21-Mar-19
> Keyplan kusen aluminium lt. Lobby & lt. 1 A-07-07 21-Mar-19
> Keyplan kusen aluminium lt. 02 & lt. 03 A-07-08 21-Mar-19
> Keyplan kusen aluminium lt. rekreasi (atap) A-07-09 21-Mar-19
> General kusen aluminium A-07-10A 21-Mar-19
> General kusen aluminium A-07-10B 21-Mar-19
> General kusen aluminium A-07-10C 21-Mar-19
> General kusen aluminium A-07-10D 21-Mar-19
> General kusen aluminium A-07-10E 21-Mar-19
> General kusen aluminium (tangga blok A,B,D) A-07-10F 21-Mar-19
> Keyplan kusen besi lt. G-01 & G-02 A-07-11
> Keyplan kusen besi lt. Lobby & lt. 1 A-07-12
> Keyplan kusen besi lt. 02 & lt. 03 A-07-13
> Keyplan kusen besi lt. rekreasi (atap) A-07-14
> DETAIL KUSEN BESI A-07-15

> Detail sirkulasi vertikal & horisontal A-08-04 4-Oct-18


- Service elevator A-08-04A
- Public Elevator A-08-04B
For Info
No Gambar No. Gambar
R0/TGL R1 R2 R3
- Public Elevator A-08-04C
- Public & Service Elevator (Section) A-08-04D
- DETAIL ESCALATOR A-08-05
- DETAIL ESCALATOR A-08-05A
- DETAIL ESCALATOR A-08-05B

> Detail toilet 4-Oct-18


- Toilet public lt. G-01 A-09-01
- Toilet public lt. LOBBY A-09-02
- Toilet public lt. POOLSIDE A-09-03

- TOILET R.LINEN TIPIKAL DAN G-02 R A-09-04


- TOILET KAMAR STANDAR R A-09-05
- TOILET KAMAR SUITE R A-09-06 & 07
> SUITE 1,5 RB A-09-06A & B

> SUITE 2 RB A-09-07A & B

> POTONGAN PARSIAL


- Potongan A-A A-10-01
- Potongan B-B A-10-02
- Potongan C-C A-10-03
- Potongan D-D A-10-04
- Potongan E-E A-10-05
- Potongan F-F A-10-06
- Potongan G-G A-10-07
- Potongan H-I A-10-08

> FAÇADE MATERIAL COLOUR SCHEME


- DETAIL TAMPAK 1 A-10-01 21-Mar-19
- DETAIL TAMPAK 01 POT A A-10-01B 21-Mar-19
- DETAIL TAMPAK 01 POT B A-10-01C 21-Mar-19
- DETAIL TAMPAK 02 A-10-02A 21-Mar-19
- DETAIL TAMPAK 02 POT A A-10-02B 21-Mar-19
- DETAIL TAMPAK 02 POT B-C A-10-02C 21-Mar-19
- DETAIL TAMPAK 03 A-10-03A 21-Mar-19
- DETAIL TAMPAK 03 POT A A-10-03B 21-Mar-19
- DETAIL TAMPAK 03 POT B A-10-03C 21-Mar-19
- DETAIL TAMPAK 04 A-10-04 21-Mar-19
- DETAIL TAMPAK 04 POT A A-10-04A 21-Mar-19
- DETAIL TAMPAK 04 POT B-C A-10-04B 21-Mar-19
- MATERIAL POOLSIDE A-10-04' 21-Mar-19
- MATERIAL POOLSIDE (SKYLIGHT, LOBBY LIFT) A-10-04' 21-Mar-19
- MATERIAL POOLSIDE (LOBBY LIFT SERVICE) A-10-04' 21-Mar-19
- SKEMA WARNA (COLOUR SCHEME) A-10-04 21-Mar-19

- Partial façade 4-Oct-18


- TAMPAK 1-2 A-11-01/02
- TAMPAK 3-4 A-11-03/04
- TAMPAK 5-6 A-11-05/06
For Info
No Gambar No. Gambar
R0/TGL R1 R2 R3

- DETAIL ARSITEKTUR
>'DETAIL KOLAM RENANG A-12-01
>'DETAIL CANOPY ENTRANCE A-12-02
- Detail canopy entrance A-12-02A 21-Mar-19 2-Apr-19
- Detail canopy entrance A-12-02B 21-Mar-19 2-Apr-19
>'DETAIL SUNKEN LT. G-01 A-12-03 18-Oct-18
>'DETAIL PLAZA A-12-04 21-Mar-19
>DETAIL POTONGAN LANTAI & PLAFOND A-12-05 4-Oct-18
- Detail standard Dinding-Lantai A-12-05A
- Detail standard Dinding-Ceiling A-12-05B
- Detail Viewing Deck A-12-06A
- Detail Viewing Deck A-12-06B
- Detail Viewing Deck (section) A-12-06C
- Detail Plaza A-12-07
- Edge Slab 4-Oct-18

- DETAIL PERGOLA
- Detail Pergola 01 A-14-01 21-Mar-19
- Detail Pergola 01 A-14-01A 21-Mar-19
- Detail Pergola 01 A-14-01B 21-Mar-19
- Detail Pergola 01 A-14-01C 21-Mar-19
- Detail Pergola 01 A-14-01D 21-Mar-19
- Detail Pergola 02 A-14-02 21-Mar-19
- Detail Pergola Atap A-14-03A 28-Mar-19
- Detail Pergola Atap A-14-03B 28-Mar-19
- Detail Pergola Atap A-14-03C 28-Mar-19

3 Dokumen Tender Arsitektur


- Spesifikasi Teknis/T-spek

- BQ + Dokumen Kontrak
- For Tender Drawing Ars Hardcopy + Softcopy

- Color scheme arsitektur 15-Feb-18


- T-Spek Arsitektur Fasad, kaca & Aluminium

4 GENERAL LAY OUT LT. G-02 s/d atap


- parkir dihilangkan (pindah ke RKA), perubahan
- lay out BOH & musholla 11-Oct-18 1-Nov-18
- Perubahan jumlah lantai 15-Feb-18 16-Aug-18
- perubahan lay out tiap lantai 15-Feb-18 16-Aug-18
- Setting Out kolom 1-Nov-18
- Finishing Dinding & Plafond
For Info
No Gambar No. Gambar
R0/TGL R1 R2 R3
5 INTERIOR DRAWING
- Lay out restaurant lt. G-01 + Kitchen 18-Jan-19 18-Feb-19

* Public Toilet lt. G-01

- Lay out Lobby reception, Lobby Lounge, lobby lift 18-Jan-19 18-Feb-19

* Public Toilet lt. G-01


- guestroom standard for Mock up + toilet 18-Jan-19 18-Feb-19 5-Apr-19
- suite guestroom 1,5 bay typical 18-Feb-19
- suite guestroom 1,5 bay Hook + toilet (blok B) 18-Jan-19 18-Feb-19 5-Apr-19
- suite guestroom 2 bay Hook (blok B) 18-Jan-19 18-Feb-19
For tender forcon
R0 R1 R0 R1 R2 status

20-Sep-18 4-Oct-18 18-Oct-18 ok -


25-Oct-18 ok

ok -

20-Sep-18 4-Oct-18 18-Oct-18 ok -


21-Mar-19 outstanding -

ok
20-Sep-18 4-Oct-18 18-Oct-18 -
18-Oct-18 11-Apr-19 ok -

4-Oct-18 18-Oct-18
20-Sep-18 4-Oct-18 18-Oct-18

4-Oct-18 18-Oct-18

4-Oct-18 18-Oct-18

4-Oct-18 18-Oct-18

4-Oct-18 18-Oct-18
4-Oct-18 18-Oct-18 18-Apr-19 OUTSTANDING -
4-Oct-18 18-Oct-18 18-Apr-19 Forcon -

4-Oct-18

15-Jan-19 18-Oct-18 20-Dec-18


15-Jan-19 18-Oct-18 20-Dec-18 ok -
15-Jan-19 18-Oct-18 20-Dec-18 ok -
15-Jan-19 18-Oct-18 20-Dec-18
For tender forcon
R0 R1 R0 R1 R2 status
15-Jan-19 18-Oct-18 20-Dec-18
15-Jan-19 18-Oct-18 20-Dec-18
18-Oct-18 20-Dec-18 -
15-Jan-19 ok
18-Oct-18 20-Dec-18 -

15-Jan-19 ok
-
ok
15-Jan-19 18-Oct-18 20-Dec-18 -
ok

15-Jan-19 18-Oct-18 20-Dec-18


15-Jan-19 18-Oct-18 20-Dec-18 ok -
15-Jan-19 18-Oct-18 20-Dec-18 ok
15-Jan-19 18-Oct-18 20-Dec-18 ok

15-Jan-19 18-Oct-18 20-Dec-18


15-Jan-19 18-Oct-18 20-Dec-18
15-Jan-19 18-Oct-18 20-Dec-18 ok -
15-Jan-19 18-Oct-18 20-Dec-18 ok
15-Jan-19 18-Oct-18 20-Dec-18

15-Jan-19 18-Oct-18 20-Dec-18 ok


15-Jan-19 18-Oct-18 20-Dec-18 ok
15-Jan-19 18-Oct-18 20-Dec-18 ok
20-Dec-18 ok
20-Dec-18 ok
20-Dec-18 ok
20-Dec-18 ok
20-Dec-18 ok
14-May-19 20-Dec-18 ok
14-May-19 20-Dec-18 ok
14-May-19 20-Dec-18 ok
14-May-19 20-Dec-18 ok
14-May-19 20-Dec-18 ok
14-May-19 20-Dec-18 ok
14-May-19 20-Dec-18 ok
14-May-19 20-Dec-18 ok
14-May-19 20-Dec-18 ok
14-May-19 20-Dec-18 ok
20-Dec-18 ok
20-Dec-18 ok
20-Dec-18 ok
20-Dec-18 ok
20-Dec-18 ok

15-Jan-19 18-Oct-18 20-Dec-18 ok


15-Jan-19 25-Oct-18 20-Dec-18 ok
15-Jan-19 25-Oct-18 20-Dec-18 ok
For tender forcon
R0 R1 R0 R1 R2 status
15-Jan-19 25-Oct-18 20-Dec-18 ok
15-Jan-19 25-Oct-18 20-Dec-18 ok
15-Jan-19 25-Oct-18 20-Dec-18 8-Mar-19 ok
ok
ok

15-Jan-19 18-Oct-18 20-Dec-18


20-Dec-18 25-Mar-19 ok
20-Dec-18 25-Mar-19 ok
20-Dec-18 18-Apr-19 ok -

20-Dec-18 ok
20-Dec-18 ok
20-Dec-18
20-Dec-18 -

20-Dec-18 ok

20-Dec-18 ok
20-Dec-18 ok
20-Dec-18 ok
20-Dec-18 ok
20-Dec-18 ok
20-Dec-18 ok
20-Dec-18 ok
20-Dec-18 ok

14-May-19 ok
14-May-19 ok
14-May-19 ok
14-May-19 ok
14-May-19 ok
14-May-19 ok
14-May-19 ok
14-May-19 ok
14-May-19 ok
14-May-19 ok
14-May-19 ok
14-May-19 ok
14-May-19 ok
14-May-19 ok
14-May-19 ok
14-May-19 ok

15-Jan-19 18-Oct-18 20-Dec-18 ok


14-May-19 20-Dec-18 ok
14-May-19 20-Dec-18 ok
14-May-19 20-Dec-18 ok
For tender forcon
R0 R1 R0 R1 R2 status

20-Dec-18
20-Dec-18
20-Dec-18
20-Dec-18 11-Apr-19 -
20-Dec-18
15-Jan-19 18-Oct-18 20-Dec-18
15-Jan-19 25-Oct-18 20-Dec-18
15-Jan-19 25-Oct-18 20-Dec-18
15-Jan-19 25-Oct-18 20-Dec-18
15-Jan-19 25-Oct-18 20-Dec-18
15-Jan-19 25-Oct-18 20-Dec-18
15-Jan-19 25-Oct-18 20-Dec-18
15-Jan-19 18-Oct-18 20-Dec-18

14-May-19 ok
14-May-19 ok
14-May-19 ok
14-May-19 ok
14-May-19 ok
14-May-19 ok
14-May-19 ok
14-May-19 ok
14-May-19 ok

15-Jan-19 22-Jan-19 ok

15-Jan-19 ok
15-Jan-19 ok

outstanding
14-May-19 ok

15-Feb-18 16-Aug-18 15-Jan-19 20-Dec-18


15-Jan-19 20-Dec-18 ok
15-Jan-19 20-Dec-18 ok
ok
ok

15-Jan-19 20-Dec-18 Outstanding


For tender forcon
R0 R1 R0 R1 R2 status

-
Outstanding
14-Mar-19 forcon ok -

Outstanding -

-
7-May-19 18-Apr-19 ok -
7-May-19 ok -
7-May-19 18-Apr-19 ok -
7-May-19 ok -
Keterangan

Forcon R0 & R1 sudah tidak berubah


lay out mengikuti for info tgl 11/10/2018

Gambar perubahan dirilis oleh Konsultan MEP 08 april


2019, usulan extend luas STP awal (bertambah 120
m2 atau 150m3 )

Pond di zone 5 dihilangkan


Lay out Equipment kitchen ada perubahan karena
menyesuaikan Lay out restaurant (jenis makanan yang
disajikan)

reposisi gutter terkena balok


Pond dihilangkan, sunken bar tetap ada
Pond dihilangkan, sunken bar tetap ada

Lay out rencana Terascafe belum ditentukan


Perubahan lay out & posisi toilet, area MEP, &
perluasan area roof deck

Penyesuaian area STP (penambahan luas STP)


Pond blok B ditiadakan, Sunken Bar masih ada
Keterangan

Penambahan Guestroom di lt. 3 (14 roomkey)+ R.


Balancing Tank
Peninggian elevasi lt. poolside blok A menjadi ffl +
11.900, berikut penyesuaian lay out akibat
penambahan guestroom di lt. 3

Perubahan Lay out toilet Poolside blok C & Lay out


Roof & MEP
Teras café di roof blok B dihilangkan, outdoor AC
dipindah ke roof blok C

Penyesuaian fasad akibat peninggian lt. poolside blok


A karena penambahan kamar lt. 3 & perubahan posisi
R. Balancing Tank lt. 3

Penyesuaian ketinggian level lt. Poolside blok A akibat


penambahan kamar lt. 3 & Perubahan posisi R.
Balancing Tank

tidak ada perubahan


tidak ada perubahan
Keterangan

tidak ada perubahan


tidak ada perubahan
tidak ada perubahan

Ada Perubahan posisi & lay out toilet karena


kebutuhan R. MEP di roof blok C

suite 1,5 hoek ada perubahan lay out & posisi toilet,
refer to interior drawing (forcon)
Keterangan

Pond dihilangkan, hanya ada sunken


menjadi no. A-12-07, tidak ada perubahan

tidak ada perubahan


tidak ada perubahan
tidak ada perubahan
tidak ada perubahan
tidak ada perubahan
tidak ada perubahan

Revisi jenis material semua area


CT/HT/Marble/Granite/Andesit/ Mosaic

Type Cat belum ditentukan

dari lt. 1 s/d 8 menjadi lt. G-02, G-01, 1,2,3,


Poolside & lantai atap

Type cat dinding interior koridor, public area


wethershield emulsion paint, ex. Sigma, Jotun,
Propan, atau setara (berdasarkan T-Spek), type & kode
cat belum ditentukan (Color Scheme arsitektur dalam
bangunan)
Keterangan

Gambar baru sebatas konsep lay out, rencana


presentasi konsultan 23/05/2019
info perubahan posisi pintu toilet & perubahan posisi
urinoir male toilet, re-posisi disable toilet, gambar
revisi lay out dirilis 18 Feb 2019, perubahan type
sanitary

gambar baru sebatas konsep usulan 2 alternatif lay


out orientasi reception, belum diputuskan dipilih yang
mana

Public toilet refer to Architecture Drawing


Lay out sudah ok (mock up)
Lay out sudah ok (mock up)
Perubahan Lay out untuk Mock up,
Perubahan Lay out Living room, lay out untuk mock up