Anda di halaman 1dari 108

PEKERJAAN : PEMBANGUNAN PAGAR KANTOR BPN KOTA TERNATE

LOKASI : KOTA TERNATE


TAHUN ANGG : 2019

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT.

1 2 3 4 5
I PEMBANGUNAN PAGAR
A PEKERJAAN TANAH
1 Pekerjaan Pembongkaran Pagar Lama 1.00 Ls 3,000,000.00

2 Pembersihan Lapangan dan Perataan 1.00 Ls 1,000,000.00

3 Pembuatan Gudang Bahan 1.00 Ls 2,537,000.00

4 Pemasangan Bowplank 47.15 M' 101,818.75

5 Papan Nama Proyek 1.00 Ls 200,000.00

6 Dokumentasi dan Pelaporan 1.00 Ls 2,400,000.00

7 Pembersihan Akhir 1.00 Ls 500,000.00

B PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 18.39 M3 85,800.00

2 Urugan Kembali 4.60 M3 61,600.00


3 Urugan Pasir di Bawah Pondasi 1.53 M3 385,110.00

JUMLAH
C PEKERJAAN PONDASI DAN PASANGAN
1 Pasangan Pondasi Batu Kali 1 PC : 4 Ps 14.56 M3 1,272,594.40
2 Pek. Pasangan Batu Kosong 5.66 M3 699,989.40
3 Pasangan Dinding Bata Cetak 1 Pc : 5 Pc 53.93 M² 187,732.20
4 Plesteran Dinding, Beton & Pondasi 1 Pc : 4 Pc tbl 1.5 cm 45.71 M² 78,295.27
5 Plesteran Kolom Beton 1 Pc : 3 Pc 1.5 cm 14.40 M² 81,269.60
6 Plesteran Balok dan Ring Balok Beton 1 Pc : 3 Pc 1.5 cm 12.35 M² 81,269.60
7 Plesteran Pondasi 1 Pc : 3 Pc 1.5 cm 39.90 M² 81,269.60
8 Plesteran ciprat/kamprotan, 1 Pc : 2 Pp 62.15 M² 60,193.50
10 Acian Kolom, Dinding & Kepala Kolom 166.29 M² 43,772.85
11 Pelesteran Motif (Penebalan 10 cm) Kepala Kolom 25.60 M² 81,269.60
JUMLAH
D PEKERJAAN BETON
1 Pekerjaan Kolom Beton Pagar Samping Uk 20 x 20 cm, K-200 1.28 M3 8219806.58
2 Pekerjaan Sloof Beton Uk. 15 x 20 cm, K-200 1.41 M3 7153462.7
3 Pekerjaan Rink Balok Uk. 10 x 15 cm 47.15 M1 137115.62
4 Pekerjaan Balok Uk. 10 x 15 cm 47.15 M1 137,115.62
JUMLAH
E PEKERJAAN PENGECETAN
1 Pengecatan Dinding Pagar Ex. Dulux Watersild 174.51 M² 70,269.98
JUMLAH
F PEKERJAAN RELING PAGAR
1 Pekerjaan Reling Pagar dan Asesoies (Finisng Dico) 1.00 M2 8,100,000.00
JUMLAH
TOTAL I + II + III
PPN ( 10% x i )
TOTAL a + b
DIBULATKAN
Bobot Minggu ini 5.37

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
KANTOR PERTANAHAN KOTA TERNATE

(…………………………………………)
NIP/.
LAPORAN KEMAJUAN PEKERJAAN (MINGGUN)
KONTRAKTOR : CV KARINDA
NO. KONTRAK : 03/SPK/BPN.TERNATE/V/2019
TGL. KONTRAK : 06 MEI 2019
BERAKHIR : 04 JULI 2019 Monday, May 06, 201
MINGGU KE : I (KE SATU)
BOBOT MINGGU LALU
PEK.
JUMLAH HARGA TK.Kemajuan Pek.
(%) VOLUME JML. HARGA BOBOT VOLUME
Per Item kegiatan
( Rp ) (%)
6 7 8 9 10 11 12

3,000,000.00 2.39 0.00 - - 1.00


1,000,000.00 0.80 0.00 - - 1.00
2,537,000.00 2.02 0.00 - - 1.00
4,800,754.06 3.83 0.00 - - -
200,000.00 0.16 0.00 - - 1.00
2,400,000.00 1.91 0.00 - - -
500,000.00 0.40 0.00 - - -
14,437,754.06 11.50 - -

1,577,862.00 1.26 0.00 - - -


283,360.00 0.23 0.00 - - -
589,218.30 0.47 0.00 - - -
2,450,440.30 1.95 - -

18,528,974.46 14.76 0.00 - - -


3,961,940.00 3.16 0.00 - - -
10,124,397.55 8.07 0.00 - - -
3,578,876.79 2.85 0.00 - - -
1,170,282.24 0.93 0.00 - - -
1,003,679.56 0.80 0.00 - - -
3,242,657.04 2.58 0.00 - - -
3,741,026.03 2.98 0.00 - - -
7,278,987.23 5.80 0.00 - - -
2,080,501.76 1.66 0.00 - - -
54,711,322.66 43.59 0.00 0.00

10,521,352.42 8.38 0.00 - - -


10,086,382.41 8.04 0.00 - - -
6,465,001.48 5.15 0.00 - - -
6,465,001.48 5.15 0.00 - - -
33,537,737.80 26.72 0.00 0.00

12,262,814.21 9.77 0.00 - - -


12,262,814.21 9.77 - -

8,100,000.00 6.45 0.00 - - -


8,100,000.00 6.45 0.00 0.00
125,500,069.02 100.00 0.00 0.00
Rp 12,550,006.90 Rp - Rp.

Rp 138,050,075.93 Rp - Rp.

Rp 138,050,000.00 Rp - Rp.

KONSULTANT PENGAWAS
CV. MEGA BINTANG

(MUNAWAR M.NUR)
Direktur
Monday, May 06, 2019 S/D Sunday, May 12, 2019

MINGGU INI SAMPAI MINGGU INI

TK.Kemajuan Pek. TK.Kemajuan Pek.


JML. HARGA BOBOT VOLUME JML. HARGA
Per Item kegiatan Per Item kegiatan
( Rp ) (%) ( Rp )
13 14 15 16 17 18

3,000,000.00 100.00 2.39 1.00 3,000,000.00 100.00


1,000,000.00 100.00 0.80 1.00 1,000,000.00 100.00
2,537,000.00 100.00 2.02 1.00 2,537,000.00 100.00
- - - - -
200,000.00 100.00 0.16 1.00 200,000.00 100.00
- - - - -
- - - - -
6,737,000.00 5.37 6,737,000.00

- - - - -
- - - - -
- - - - -
- - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.00 0.00 0.00

- - - - -
- - - - -
- - - - -
- - - - -
0.00 0.00 0.00

- - - - -
- - -

- - - - -
0.00 0.00 0.00
6,737,000.00 5.37 6,737,000.00
Rp 673,700.00 Rp. Rp 673,700.00
Rp 7,410,700.00 Rp. Rp 7,410,700.00
Rp 7,411,000.00 Rp. Rp 7,411,000.00

DI BUAT
KONTRAKTOR
CV. KARINDA

(AGNES THERESIA)
Direktris
SAMPAI MINGGU INI
KET.
BOBOT
(%)
19 20

2.39
0.80
2.02
-
0.16
-
-
5.37

-
-
-
-

-
-
-
-
-
-
-
-
-
-
0.00

-
-
-
-
0.00

-
-

-
0.00
5.37

DI BUAT
KONTRAKTOR
CV. KARINDA

(AGNES THERESIA)
Direktris
PEKERJAAN : PEMBANGUNAN PAGAR KANTOR BPN KOTA TERNATE
LOKASI : KOTA TERNATE
TAHUN ANGG : 2019

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT.

1 2 3 4 5
I PEMBANGUNAN PAGAR
A PEKERJAAN TANAH
1 Pekerjaan Pembongkaran Pagar Lama 1.00 Ls 3,000,000.00

2 Pembersihan Lapangan dan Perataan 1.00 Ls 1,000,000.00

3 Pembuatan Gudang Bahan 1.00 Ls 2,537,000.00

4 Pemasangan Bowplank 47.15 M' 101,818.75

5 Papan Nama Proyek 1.00 Ls 200,000.00

6 Dokumentasi dan Pelaporan 1.00 Ls 2,400,000.00

7 Pembersihan Akhir 1.00 Ls 500,000.00

B PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 18.39 M3 85,800.00

2 Urugan Kembali 4.60 M3 61,600.00


3 Urugan Pasir di Bawah Pondasi 1.53 M3 385,110.00

JUMLAH
C PEKERJAAN PONDASI DAN PASANGAN
1 Pasangan Pondasi Batu Kali 1 PC : 4 Ps 14.56 M3 1,272,594.40
2 Pek. Pasangan Batu Kosong 5.66 M3 699,989.40
3 Pasangan Dinding Bata Cetak 1 Pc : 5 Pc 53.93 M² 187,732.20
4 Plesteran Dinding, Beton & Pondasi 1 Pc : 4 Pc tbl 1.5 cm 45.71 M² 78,295.27
5 Plesteran Kolom Beton 1 Pc : 3 Pc 1.5 cm 14.40 M² 81,269.60
6 Plesteran Balok dan Ring Balok Beton 1 Pc : 3 Pc 1.5 cm 12.35 M² 81,269.60
7 Plesteran Pondasi 1 Pc : 3 Pc 1.5 cm 39.90 M² 81,269.60
8 Plesteran ciprat/kamprotan, 1 Pc : 2 Pp 62.15 M² 60,193.50
10 Acian Kolom, Dinding & Kepala Kolom 166.29 M² 43,772.85
11 Pelesteran Motif (Penebalan 10 cm) Kepala Kolom 25.60 M² 81,269.60
JUMLAH
D PEKERJAAN BETON
1 Pekerjaan Kolom Beton Pagar Samping Uk 20 x 20 cm, K-200 1.28 M3 8219806.58
2 Pekerjaan Sloof Beton Uk. 15 x 20 cm, K-200 1.41 M3 7153462.7
3 Pekerjaan Rink Balok Uk. 10 x 15 cm 47.15 M1 137115.62
4 Pekerjaan Balok Uk. 10 x 15 cm 47.15 M1 137,115.62
JUMLAH
E PEKERJAAN PENGECETAN
1 Pengecatan Dinding Pagar Ex. Dulux Watersild 174.51 M² 70,269.98
JUMLAH
F PEKERJAAN RELING PAGAR
1 Pekerjaan Reling Pagar dan Asesoies (Finisng Dico) 1.00 M2 8,100,000.00
JUMLAH
TOTAL I + II + III
PPN ( 10% x i )
TOTAL a + b
DIBULATKAN
Bobot Minggu ini 11.15

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
KANTOR PERTANAHAN KOTA TERNATE

(…………………………………………)
NIP/.
LAPORAN KEMAJUAN PEKERJAAN (MINGGUN)
KONTRAKTOR : CV KARINDA
NO. KONTRAK : 03/SPK/BPN.TERNATE/V/2019
TGL. KONTRAK : 06 MEI 2019
BERAKHIR : 04 JULI 2019 Monday, May 13, 201
MINGGU KE : II (KE DUA)
BOBOT MINGGU LALU
PEK.
JUMLAH HARGA TK.Kemajuan Pek.
(%) VOLUME JML. HARGA BOBOT VOLUME
Per Item kegiatan
( Rp ) (%)
6 7 8 9 10 11 12

3,000,000.00 2.39 1.00 3,000,000.00 100.00 2.39 -


1,000,000.00 0.80 1.00 1,000,000.00 100.00 0.80 -
2,537,000.00 2.02 1.00 2,537,000.00 100.00 2.02 -
4,800,754.06 3.83 0.00 - - 47.15
200,000.00 0.16 1.00 200,000.00 100.00 0.16 -
2,400,000.00 1.91 0.00 - - -
500,000.00 0.40 0.00 - - -
14,437,754.06 11.50 6,737,000.00 5.37

1,577,862.00 1.26 0.00 - - 18.39


283,360.00 0.23 0.00 - - 4.60
589,218.30 0.47 0.00 - - 1.53
2,450,440.30 1.95 - -

18,528,974.46 14.76 0.00 - - -


3,961,940.00 3.16 0.00 - - -
10,124,397.55 8.07 0.00 - - -
3,578,876.79 2.85 0.00 - - -
1,170,282.24 0.93 0.00 - - -
1,003,679.56 0.80 0.00 - - -
3,242,657.04 2.58 0.00 - - -
3,741,026.03 2.98 0.00 - - -
7,278,987.23 5.80 0.00 - - -
2,080,501.76 1.66 0.00 - - -
54,711,322.66 43.59 0.00 0.00

10,521,352.42 8.38 0.00 - - -


10,086,382.41 8.04 0.00 - - -
6,465,001.48 5.15 0.00 - - -
6,465,001.48 5.15 0.00 - - -
33,537,737.80 26.72 0.00 0.00

12,262,814.21 9.77 0.00 - - -


12,262,814.21 9.77 - -

8,100,000.00 6.45 0.00 - - -


8,100,000.00 6.45 0.00 0.00
125,500,069.02 100.00 6,737,000.00 5.37
Rp 12,550,006.90 Rp 673,700.00 Rp.

Rp 138,050,075.93 Rp 7,410,700.00 Rp.

Rp 138,050,000.00 Rp 7,410,700.00 Rp.

KONSULTANT PENGAWAS
CV. MEGA BINTANG

(MUNAWAR M.NUR)
Direktur
Monday, May 13, 2019 S/D Sunday, May 19, 2019

MINGGU INI SAMPAI MINGGU INI

TK.Kemajuan Pek. TK.Kemajuan Pek.


JML. HARGA BOBOT VOLUME JML. HARGA
Per Item kegiatan Per Item kegiatan
( Rp ) (%) ( Rp )
13 14 15 16 17 18

- - 1.00 3,000,000.00 100.00


- - 1.00 1,000,000.00 100.00
- - 1.00 2,537,000.00 100.00
4,800,754.06 100.00 3.83 47.15 4,800,754.06 100.00
- - 1.00 200,000.00 100.00
- - - - -
- - - - -
4,800,754.06 3.83 11,537,754.06

1,577,862.00 100.00 1.26 18.39 1,577,862.00 100.00


283,360.00 100.00 0.23 4.60 283,360.00 100.00
589,218.30 100.00 0.47 1.53 589,218.30 100.00
2,450,440.30 1.95 2,450,440.30

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
0.00 0.00 0.00

- - - - -
- - - - -
- - - - -
- - - - -
0.00 0.00 0.00

- - - - -
- - -

- - - - -
0.00 0.00 0.00
7,251,194.36 5.78 13,988,194.36
Rp 725,119.44 Rp. Rp 1,398,819.44
Rp 7,976,313.80 Rp. Rp 15,387,013.80
Rp 7,976,000.00 Rp. Rp 15,387,000.00

DI BUAT
KONTRAKTOR
CV. KARINDA

(AGNES THERESIA)
Direktris
SAMPAI MINGGU INI
KET.
BOBOT
(%)
19 20

2.39
0.80
2.02
3.83
0.16
-
-
9.19

1.26
0.23
0.47
1.95

-
-
-
-
-
-
-
-
-
-
0.00

-
-
-
-
0.00

-
-

-
0.00
11.15

DI BUAT
KONTRAKTOR
CV. KARINDA

(AGNES THERESIA)
Direktris
PEKERJAAN : PEMBANGUNAN PAGAR KANTOR BPN KOTA TERNATE
LOKASI : KOTA TERNATE
TAHUN ANGG : 2019

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT.

1 2 3 4 5
I PEMBANGUNAN PAGAR
A PEKERJAAN TANAH
1 Pekerjaan Pembongkaran Pagar Lama 1.00 Ls 3,000,000.00

2 Pembersihan Lapangan dan Perataan 1.00 Ls 1,000,000.00

3 Pembuatan Gudang Bahan 1.00 Ls 2,537,000.00

4 Pemasangan Bowplank 47.15 M' 101,818.75

5 Papan Nama Proyek 1.00 Ls 200,000.00

6 Dokumentasi dan Pelaporan 1.00 Ls 2,400,000.00

7 Pembersihan Akhir 1.00 Ls 500,000.00

B PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 18.39 M3 85,800.00

2 Urugan Kembali 4.60 M3 61,600.00


3 Urugan Pasir di Bawah Pondasi 1.53 M3 385,110.00

JUMLAH
C PEKERJAAN PONDASI DAN PASANGAN
1 Pasangan Pondasi Batu Kali 1 PC : 4 Ps 14.56 M3 1,272,594.40
2 Pek. Pasangan Batu Kosong 5.66 M3 699,989.40
3 Pasangan Dinding Bata Cetak 1 Pc : 5 Pc 53.93 M² 187,732.20
4 Plesteran Dinding, Beton & Pondasi 1 Pc : 4 Pc tbl 1.5 cm 45.71 M² 78,295.27
5 Plesteran Kolom Beton 1 Pc : 3 Pc 1.5 cm 14.40 M² 81,269.60
6 Plesteran Balok dan Ring Balok Beton 1 Pc : 3 Pc 1.5 cm 12.35 M² 81,269.60
7 Plesteran Pondasi 1 Pc : 3 Pc 1.5 cm 39.90 M² 81,269.60
8 Plesteran ciprat/kamprotan, 1 Pc : 2 Pp 62.15 M² 60,193.50
10 Acian Kolom, Dinding & Kepala Kolom 166.29 M² 43,772.85
11 Pelesteran Motif (Penebalan 10 cm) Kepala Kolom 25.60 M² 81,269.60
JUMLAH
D PEKERJAAN BETON
1 Pekerjaan Kolom Beton Pagar Samping Uk 20 x 20 cm, K-200 1.28 M3 8219806.58
2 Pekerjaan Sloof Beton Uk. 15 x 20 cm, K-200 1.41 M3 7153462.7
3 Pekerjaan Rink Balok Uk. 10 x 15 cm 47.15 M1 137115.62
4 Pekerjaan Balok Uk. 10 x 15 cm 47.15 M1 137,115.62
JUMLAH
E PEKERJAAN PENGECETAN
1 Pengecatan Dinding Pagar Ex. Dulux Watersild 174.51 M² 70,269.98
JUMLAH
F PEKERJAAN RELING PAGAR
1 Pekerjaan Reling Pagar dan Asesoies (Finisng Dico) 1.00 M2 8,100,000.00
JUMLAH
TOTAL I + II + III
PPN ( 10% x i )
TOTAL a + b
DIBULATKAN
Bobot Minggu ini 24.21

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
KANTOR PERTANAHAN KOTA TERNATE

(…………………………………………)
NIP/.
LAPORAN KEMAJUAN PEKERJAAN (MINGGUN)
KONTRAKTOR : CV KARINDA
NO. KONTRAK : 03/SPK/BPN.TERNATE/V/2019
TGL. KONTRAK : 06 MEI 2019
BERAKHIR : 04 JULI 2019 Monday, May 20, 201
MINGGU KE : III (KE TIGA)
BOBOT MINGGU LALU
PEK.
JUMLAH HARGA TK.Kemajuan Pek.
(%) VOLUME JML. HARGA BOBOT VOLUME
Per Item kegiatan
( Rp ) (%)
6 7 8 9 10 11 12

3,000,000.00 2.39 1.00 3,000,000.00 100.00 2.39 -


1,000,000.00 0.80 1.00 1,000,000.00 100.00 0.80 -
2,537,000.00 2.02 1.00 2,537,000.00 100.00 2.02 -
4,800,754.06 3.83 47.15 4,800,754.06 100.00 3.83 -
200,000.00 0.16 1.00 200,000.00 100.00 0.16 -
2,400,000.00 1.91 0.00 - - - -
500,000.00 0.40 0.00 - - - -
14,437,754.06 11.50 11,537,754.06 9.19

1,577,862.00 1.26 18.39 1,577,862.00 100.00 1.26 -


283,360.00 0.23 4.60 283,360.00 100.00 0.23 -
589,218.30 0.47 1.53 589,218.30 100.00 0.47 -
2,450,440.30 1.95 2,450,440.30 1.95

18,528,974.46 14.76 0.00 - - 7.28


3,961,940.00 3.16 0.00 - - 2.83
10,124,397.55 8.07 0.00 - - -
3,578,876.79 2.85 0.00 - - -
1,170,282.24 0.93 0.00 - - -
1,003,679.56 0.80 0.00 - - -
3,242,657.04 2.58 0.00 - - -
3,741,026.03 2.98 0.00 - - -
7,278,987.23 5.80 0.00 - - -
2,080,501.76 1.66 0.00 - - -
54,711,322.66 43.59 0.00 0.00

10,521,352.42 8.38 0.00 - - 0.32


10,086,382.41 8.04 0.00 - - 0.35
6,465,001.48 5.15 0.00 - - -
6,465,001.48 5.15 0.00 - - -
33,537,737.80 26.72 0.00 0.00

12,262,814.21 9.77 0.00 - - -


12,262,814.21 9.77 - -

8,100,000.00 6.45 0.00 - - -


8,100,000.00 6.45 0.00 0.00
125,500,069.02 100.00 13,988,194.36 11.15
Rp 12,550,006.90 Rp 1,398,819.44 Rp.

Rp 138,050,075.93 Rp 15,387,013.80 Rp.

Rp 138,050,000.00 Rp 15,387,000.00 Rp.

KONSULTANT PENGAWAS
CV. MEGA BINTANG

(MUNAWAR M.NUR)
Direktur
Monday, May 20, 2019 S/D Sunday, May 26, 2019

MINGGU INI SAMPAI MINGGU INI

TK.Kemajuan Pek. TK.Kemajuan Pek.


JML. HARGA BOBOT VOLUME JML. HARGA
Per Item kegiatan Per Item kegiatan
( Rp ) (%) ( Rp )
13 14 15 16 17 18

- - 1.00 3,000,000.00 100.00


- - 1.00 1,000,000.00 100.00
- - 1.00 2,537,000.00 100.00
- - 47.15 4,800,754.06 100.00
- - 1.00 200,000.00 100.00
- - - - -
- - - - -
- - 11,537,754.06

- - 18.39 1,577,862.00 100.00


- - 4.60 283,360.00 100.00
- - 1.53 589,218.30 100.00
- - 2,450,440.30

9,264,487.23 50.00 7.38 7.28 9,264,487.23 50.00


1,980,970.00 50.00 1.58 2.83 1,980,970.00 50.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
11,245,457.23 8.96 11,245,457.23

2,630,338.11 25.00 2.10 0.32 2,630,338.11 25.00


2,521,595.60 25.00 2.01 0.35 2,521,595.60 25.00
- - - - -
- - - - -
5,151,933.71 4.11 5,151,933.71

- - - - -
- - -

- - - - -
0.00 0.00 0.00
16,397,390.94 13.07 30,385,585.30
Rp 1,639,739.09 Rp. Rp 3,038,558.53
Rp 18,037,130.04 Rp. Rp 33,424,143.83
Rp 18,037,000.00 Rp. Rp 33,424,000.00

DI BUAT
KONTRAKTOR
CV. KARINDA

(AGNES THERESIA)
Direktris
SAMPAI MINGGU INI
KET.
BOBOT
(%)
19 20

2.39
0.80
2.02
3.83
0.16
-
-
9.19

1.26
0.23
0.47
1.95

7.38
1.58
-
-
-
-
-
-
-
-
8.96

2.10
2.01
-
-
4.11

-
-

-
0.00
24.21

DI BUAT
KONTRAKTOR
CV. KARINDA

(AGNES THERESIA)
Direktris
PEKERJAAN : PEMBANGUNAN PAGAR KANTOR BPN KOTA TERNATE
LOKASI : KOTA TERNATE
TAHUN ANGG : 2019

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT.

1 2 3 4 5
I PEMBANGUNAN PAGAR
A PEKERJAAN TANAH
1 Pekerjaan Pembongkaran Pagar Lama 1.00 Ls 3,000,000.00

2 Pembersihan Lapangan dan Perataan 1.00 Ls 1,000,000.00

3 Pembuatan Gudang Bahan 1.00 Ls 2,537,000.00

4 Pemasangan Bowplank 47.15 M' 101,818.75

5 Papan Nama Proyek 1.00 Ls 200,000.00

6 Dokumentasi dan Pelaporan 1.00 Ls 2,400,000.00

7 Pembersihan Akhir 1.00 Ls 500,000.00

B PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 18.39 M3 85,800.00

2 Urugan Kembali 4.60 M3 61,600.00


3 Urugan Pasir di Bawah Pondasi 1.53 M3 385,110.00

JUMLAH
C PEKERJAAN PONDASI DAN PASANGAN
1 Pasangan Pondasi Batu Kali 1 PC : 4 Ps 14.56 M3 1,272,594.40
2 Pek. Pasangan Batu Kosong 5.66 M3 699,989.40
3 Pasangan Dinding Bata Cetak 1 Pc : 5 Pc 53.93 M² 187,732.20
4 Plesteran Dinding, Beton & Pondasi 1 Pc : 4 Pc tbl 1.5 cm 45.71 M² 78,295.27
5 Plesteran Kolom Beton 1 Pc : 3 Pc 1.5 cm 14.40 M² 81,269.60
6 Plesteran Balok dan Ring Balok Beton 1 Pc : 3 Pc 1.5 cm 12.35 M² 81,269.60
7 Plesteran Pondasi 1 Pc : 3 Pc 1.5 cm 39.90 M² 81,269.60
8 Plesteran ciprat/kamprotan, 1 Pc : 2 Pp 62.15 M² 60,193.50
10 Acian Kolom, Dinding & Kepala Kolom 166.29 M² 43,772.85
11 Pelesteran Motif (Penebalan 10 cm) Kepala Kolom 25.60 M² 81,269.60
JUMLAH
D PEKERJAAN BETON
1 Pekerjaan Kolom Beton Pagar Samping Uk 20 x 20 cm, K-200 1.28 M3 8219806.58
2 Pekerjaan Sloof Beton Uk. 15 x 20 cm, K-200 1.41 M3 7153462.7
3 Pekerjaan Rink Balok Uk. 10 x 15 cm 47.15 M1 137115.62
4 Pekerjaan Balok Uk. 10 x 15 cm 47.15 M1 137,115.62
JUMLAH
E PEKERJAAN PENGECETAN
1 Pengecatan Dinding Pagar Ex. Dulux Watersild 174.51 M² 70,269.98
JUMLAH
F PEKERJAAN RELING PAGAR
1 Pekerjaan Reling Pagar dan Asesoies (Finisng Dico) 1.00 M2 8,100,000.00
JUMLAH
TOTAL I + II + III
PPN ( 10% x i )
TOTAL a + b
DIBULATKAN
Bobot Minggu ini 40.47

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
KANTOR PERTANAHAN KOTA TERNATE

(…………………………………………)
NIP/.
LAPORAN KEMAJUAN PEKERJAAN (MINGGUN)
KONTRAKTOR : CV KARINDA
NO. KONTRAK : 03/SPK/BPN.TERNATE/V/2019
TGL. KONTRAK : 06 MEI 2019
BERAKHIR : 04 JULI 2019 Friday, May 27, 2016
MINGGU KE : IV (KE EMPAT)
BOBOT MINGGU LALU
PEK.
JUMLAH HARGA TK.Kemajuan Pek.
(%) VOLUME JML. HARGA BOBOT VOLUME
Per Item kegiatan
( Rp ) (%)
6 7 8 9 10 11 12

3,000,000.00 2.39 1.00 3,000,000.00 100.00 2.39 -


1,000,000.00 0.80 1.00 1,000,000.00 100.00 0.80 -
2,537,000.00 2.02 1.00 2,537,000.00 100.00 2.02 -
4,800,754.06 3.83 47.15 4,800,754.06 100.00 3.83 -
200,000.00 0.16 1.00 200,000.00 100.00 0.16 -
2,400,000.00 1.91 0.00 - - - -
500,000.00 0.40 0.00 - - - -
14,437,754.06 11.50 11,537,754.06 9.19

1,577,862.00 1.26 18.39 1,577,862.00 100.00 1.26 -


283,360.00 0.23 4.60 283,360.00 100.00 0.23 -
589,218.30 0.47 1.53 589,218.30 100.00 0.47 -
2,450,440.30 1.95 2,450,440.30 1.95

18,528,974.46 14.76 7.28 9,264,487.23 50.00 7.38 7.28


3,961,940.00 3.16 2.83 1,980,970.00 50.00 1.58 2.83
10,124,397.55 8.07 0.00 - - - 13.48
3,578,876.79 2.85 0.00 - - - 11.43
1,170,282.24 0.93 0.00 - - - 7.20
1,003,679.56 0.80 0.00 - - - -
3,242,657.04 2.58 0.00 - - - -
3,741,026.03 2.98 0.00 - - - -
7,278,987.23 5.80 0.00 - - - -
2,080,501.76 1.66 0.00 - - - -
54,711,322.66 43.59 11,245,457.23 8.96

10,521,352.42 8.38 0.32 2,630,338.11 25.00 2.10 0.32


10,086,382.41 8.04 0.35 2,521,595.60 25.00 2.01 0.35
6,465,001.48 5.15 0.00 - - -
6,465,001.48 5.15 0.00 - - -
33,537,737.80 26.72 5,151,933.71 4.11

12,262,814.21 9.77 0.00 - - -


12,262,814.21 9.77 - -

8,100,000.00 6.45 0.00 - - -


8,100,000.00 6.45 0.00 0.00
125,500,069.02 100.00 30,385,585.30 24.21
Rp 12,550,006.90 Rp 3,038,558.53 Rp.

Rp 138,050,075.93 Rp 33,424,143.83 Rp.

Rp 138,050,000.00 Rp 33,424,100.00 Rp.

KONSULTANT PENGAWAS
CV. MEGA BINTANG

(MUNAWAR M.NUR)
Direktur
Friday, May 27, 2016 S/D Thursday, June 02, 2016

MINGGU INI SAMPAI MINGGU INI

TK.Kemajuan Pek. TK.Kemajuan Pek.


JML. HARGA BOBOT VOLUME JML. HARGA
Per Item kegiatan Per Item kegiatan
( Rp ) (%) ( Rp )
13 14 15 16 17 18

- - 1.00 3,000,000.00 100.00


- - 1.00 1,000,000.00 100.00
- - 1.00 2,537,000.00 100.00
- - 47.15 4,800,754.06 100.00
- - 1.00 200,000.00 100.00
- - - - -
- - - - -
- - 11,537,754.06

- - 18.39 1,577,862.00 100.00


- - 4.60 283,360.00 100.00
- - 1.53 589,218.30 100.00
- - 2,450,440.30

9,264,487.23 50.00 7.38 14.56 18,528,974.46 100.00


1,980,970.00 50.00 1.58 5.66 3,961,940.00 100.00
2,531,099.39 25.00 2.02 13.48 2,531,099.39 25.00
894,719.20 25.00 0.71 11.43 894,719.20 25.00
585,141.12 50.00 0.47 7.20 585,141.12 50.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
15,256,416.94 12.16 26,501,874.17

2,630,338.11 25.00 2.10 0.64 5,260,676.21 50.00


2,521,595.60 25.00 2.01 0.71 5,043,191.20 50.00
- - - - -
- - - - -
5,151,933.71 4.11 10,303,867.41

- - - - -
- - -

- - - - -
0.00 0.00 0.00
20,408,350.65 16.26 50,793,935.95
Rp 2,040,835.06 Rp. Rp 5,079,393.59
Rp 22,449,185.71 Rp. Rp 55,873,329.54
Rp 22,449,000.00 Rp. Rp 55,873,000.00

DI BUAT
KONTRAKTOR
CV. KARINDA

(AGNES THERESIA)
Direktris
SAMPAI MINGGU INI
KET.
BOBOT
(%)
19 20

2.39
0.80
2.02
3.83
0.16
-
-
9.19

1.26
0.23
0.47
1.95

14.76
3.16
2.02
0.71
0.47
-
-
-
-
-
21.12

4.19
4.02
-
-
8.21

-
-

-
0.00
40.47

DI BUAT
KONTRAKTOR
CV. KARINDA

(AGNES THERESIA)
Direktris
PEKERJAAN : PEMBANGUNAN PAGAR KANTOR BPN KOTA TERNATE
LOKASI : KOTA TERNATE
TAHUN ANGG : 2019

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT.

1 2 3 4 5
I PEMBANGUNAN PAGAR
A PEKERJAAN TANAH
1 Pekerjaan Pembongkaran Pagar Lama 1.00 Ls 3,000,000.00

2 Pembersihan Lapangan dan Perataan 1.00 Ls 1,000,000.00

3 Pembuatan Gudang Bahan 1.00 Ls 2,537,000.00

4 Pemasangan Bowplank 47.15 M' 101,818.75

5 Papan Nama Proyek 1.00 Ls 200,000.00

6 Dokumentasi dan Pelaporan 1.00 Ls 2,400,000.00

7 Pembersihan Akhir 1.00 Ls 500,000.00

B PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 18.39 M3 85,800.00

2 Urugan Kembali 4.60 M3 61,600.00


3 Urugan Pasir di Bawah Pondasi 1.53 M3 385,110.00

JUMLAH
C PEKERJAAN PONDASI DAN PASANGAN
1 Pasangan Pondasi Batu Kali 1 PC : 4 Ps 14.56 M3 1,272,594.40
2 Pek. Pasangan Batu Kosong 5.66 M3 699,989.40
3 Pasangan Dinding Bata Cetak 1 Pc : 5 Pc 53.93 M² 187,732.20
4 Plesteran Dinding, Beton & Pondasi 1 Pc : 4 Pc tbl 1.5 cm 45.71 M² 78,295.27
5 Plesteran Kolom Beton 1 Pc : 3 Pc 1.5 cm 14.40 M² 81,269.60
6 Plesteran Balok dan Ring Balok Beton 1 Pc : 3 Pc 1.5 cm 12.35 M² 81,269.60
7 Plesteran Pondasi 1 Pc : 3 Pc 1.5 cm 39.90 M² 81,269.60
8 Plesteran ciprat/kamprotan, 1 Pc : 2 Pp 62.15 M² 60,193.50
10 Acian Kolom, Dinding & Kepala Kolom 166.29 M² 43,772.85
11 Pelesteran Motif (Penebalan 10 cm) Kepala Kolom 25.60 M² 81,269.60
JUMLAH
D PEKERJAAN BETON
1 Pekerjaan Kolom Beton Pagar Samping Uk 20 x 20 cm, K-200 1.28 M3 8219806.58
2 Pekerjaan Sloof Beton Uk. 15 x 20 cm, K-200 1.41 M3 7153462.7
3 Pekerjaan Rink Balok Uk. 10 x 15 cm 47.15 M1 137115.62
4 Pekerjaan Balok Uk. 10 x 15 cm 47.15 M1 137,115.62
JUMLAH
E PEKERJAAN PENGECETAN
1 Pengecatan Dinding Pagar Ex. Dulux Watersild 174.51 M² 70,269.98
JUMLAH
F PEKERJAAN RELING PAGAR
1 Pekerjaan Reling Pagar dan Asesoies (Finisng Dico) 1.00 M2 8,100,000.00
JUMLAH
TOTAL I + II + III
PPN ( 10% x i )
TOTAL a + b
DIBULATKAN
Bobot Minggu ini 64.36

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
KANTOR PERTANAHAN KOTA TERNATE

(…………………………………………)
NIP/.
LAPORAN KEMAJUAN PEKERJAAN (MINGGUN)
KONTRAKTOR : CV KARINDA
NO. KONTRAK : 03/SPK/BPN.TERNATE/V/2019
TGL. KONTRAK : 06 MEI 2019
BERAKHIR : 04 JULI 2019 Sunday, June 02, 201
MINGGU KE : V (KE LIMA)
BOBOT MINGGU LALU
PEK.
JUMLAH HARGA TK.Kemajuan Pek.
(%) VOLUME JML. HARGA BOBOT VOLUME
Per Item kegiatan
( Rp ) (%)
6 7 8 9 10 11 12

3,000,000.00 2.39 1.00 3,000,000.00 100.00 2.39 -


1,000,000.00 0.80 1.00 1,000,000.00 100.00 0.80 -
2,537,000.00 2.02 1.00 2,537,000.00 100.00 2.02 -
4,800,754.06 3.83 47.15 4,800,754.06 100.00 3.83 -
200,000.00 0.16 1.00 200,000.00 100.00 0.16 -
2,400,000.00 1.91 0.00 - - - -
500,000.00 0.40 0.00 - - - -
14,437,754.06 11.50 11,537,754.06 9.19

1,577,862.00 1.26 18.39 1,577,862.00 100.00 1.26 -


283,360.00 0.23 4.60 283,360.00 100.00 0.23 -
589,218.30 0.47 1.53 589,218.30 100.00 0.47 -
2,450,440.30 1.95 2,450,440.30 1.95

18,528,974.46 14.76 14.56 18,528,974.46 100.00 14.76 -


3,961,940.00 3.16 5.66 3,961,940.00 100.00 3.16 -
10,124,397.55 8.07 13.48 2,531,099.39 25.00 2.02 21.57
3,578,876.79 2.85 11.43 894,719.20 25.00 0.71 18.28
1,170,282.24 0.93 7.20 585,141.12 50.00 0.47 7.20
1,003,679.56 0.80 0.00 - - - -
3,242,657.04 2.58 0.00 - - - 39.90
3,741,026.03 2.98 0.00 - - - 31.08
7,278,987.23 5.80 0.00 - - - -
2,080,501.76 1.66 0.00 - - - -
54,711,322.66 43.59 26,501,874.17 21.12

10,521,352.42 8.38 1.28 10,521,352.42 100.00 8.38 -


10,086,382.41 8.04 1.41 10,086,382.41 100.00 8.04 -
6,465,001.48 5.15 0.00 - - - 23.58
6,465,001.48 5.15 0.00 - - - 23.58
33,537,737.80 26.72 20,607,734.83 16.42

12,262,814.21 9.77 0.00 - - -


12,262,814.21 9.77 - -

8,100,000.00 6.45 0.00 - - 0.25


8,100,000.00 6.45 0.00 0.00
125,500,069.02 100.00 61,097,803.36 48.68
Rp 12,550,006.90 Rp 6,109,780.34 Rp.

Rp 138,050,075.93 Rp 67,207,583.70 Rp.

Rp 138,050,000.00 Rp 67,207,600.00 Rp.

KONSULTANT PENGAWAS
CV. MEGA BINTANG

(MUNAWAR M.NUR)
Direktur
unday, June 02, 2019 S/D Saturday, June 08, 2019

MINGGU INI SAMPAI MINGGU INI

TK.Kemajuan Pek. TK.Kemajuan Pek.


JML. HARGA BOBOT VOLUME JML. HARGA
Per Item kegiatan Per Item kegiatan
( Rp ) (%) ( Rp )
13 14 15 16 17 18

- - 1.00 3,000,000.00 100.00


- - 1.00 1,000,000.00 100.00
- - 1.00 2,537,000.00 100.00
- - 47.15 4,800,754.06 100.00
- - 1.00 200,000.00 100.00
- - - - -
- - - - -
- - 11,537,754.06

- - 18.39 1,577,862.00 100.00


- - 4.60 283,360.00 100.00
- - 1.53 589,218.30 100.00
- - 2,450,440.30

- - 14.56 18,528,974.46 100.00


- - 5.66 3,961,940.00 100.00
4,049,759.02 40.00 3.23 35.05 6,580,858.40 65.00
1,431,550.72 40.00 1.14 29.71 2,326,269.91 65.00
585,141.12 50.00 0.47 14.40 1,170,282.24 100.00
- - - - -
3,242,657.04 100.00 2.58 39.90 3,242,657.04 100.00
1,870,513.01 50.00 1.49 31.08 1,870,513.01 50.00
- - - - -
- - - - -
11,179,620.91 8.91 37,681,495.08

- - 1.28 10,521,352.42 100.00


- - 1.41 10,086,382.41 100.00
3,232,500.74 50.00 2.58 23.58 3,232,500.74 50.00
3,232,500.74 50.00 2.58 23.58 3,232,500.74 50.00
6,465,001.48 5.15 27,072,736.31

- - - - -
- - -

2,025,000.00 25.00 1.61 0.25 2,025,000.00 25.00


2,025,000.00 1.61 2,025,000.00
19,669,622.39 15.67 80,767,425.75
Rp 1,966,962.24 Rp. Rp 8,076,742.58
Rp 21,636,584.63 Rp. Rp 88,844,168.33
Rp 21,637,000.00 Rp. Rp 88,844,000.00

DI BUAT
KONTRAKTOR
CV. KARINDA

(AGNES THERESIA)
Direktris
SAMPAI MINGGU INI
KET.
BOBOT
(%)
19 20

2.39
0.80
2.02
3.83
0.16
-
-
9.19

1.26
0.23
0.47
1.95

14.76
3.16
5.24
1.85
0.93
-
2.58
1.49
-
-
30.03

8.38
8.04
2.58
2.58
21.57

-
-

1.61
1.61
64.36

DI BUAT
KONTRAKTOR
CV. KARINDA

(AGNES THERESIA)
Direktris
PEKERJAAN : PEMBANGUNAN PAGAR KANTOR BPN KOTA TERNATE
LOKASI : KOTA TERNATE
TAHUN ANGG : 2019

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT.

1 2 3 4 5
I PEMBANGUNAN PAGAR
A PEKERJAAN TANAH
1 Pekerjaan Pembongkaran Pagar Lama 1.00 Ls 3,000,000.00

2 Pembersihan Lapangan dan Perataan 1.00 Ls 1,000,000.00

3 Pembuatan Gudang Bahan 1.00 Ls 2,537,000.00

4 Pemasangan Bowplank 47.15 M' 101,818.75

5 Papan Nama Proyek 1.00 Ls 200,000.00

6 Dokumentasi dan Pelaporan 1.00 Ls 2,400,000.00

7 Pembersihan Akhir 1.00 Ls 500,000.00

B PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 18.39 M3 85,800.00

2 Urugan Kembali 4.60 M3 61,600.00


3 Urugan Pasir di Bawah Pondasi 1.53 M3 385,110.00

JUMLAH
C PEKERJAAN PONDASI DAN PASANGAN
1 Pasangan Pondasi Batu Kali 1 PC : 4 Ps 14.56 M3 1,272,594.40
2 Pek. Pasangan Batu Kosong 5.66 M3 699,989.40
3 Pasangan Dinding Bata Cetak 1 Pc : 5 Pc 53.93 M² 187,732.20
4 Plesteran Dinding, Beton & Pondasi 1 Pc : 4 Pc tbl 1.5 cm 45.71 M² 78,295.27
5 Plesteran Kolom Beton 1 Pc : 3 Pc 1.5 cm 14.40 M² 81,269.60
6 Plesteran Balok dan Ring Balok Beton 1 Pc : 3 Pc 1.5 cm 12.35 M² 81,269.60
7 Plesteran Pondasi 1 Pc : 3 Pc 1.5 cm 39.90 M² 81,269.60
8 Plesteran ciprat/kamprotan, 1 Pc : 2 Pp 62.15 M² 60,193.50
10 Acian Kolom, Dinding & Kepala Kolom 166.29 M² 43,772.85
11 Pelesteran Motif (Penebalan 10 cm) Kepala Kolom 25.60 M² 81,269.60
JUMLAH
D PEKERJAAN BETON
1 Pekerjaan Kolom Beton Pagar Samping Uk 20 x 20 cm, K-200 1.28 M3 8219806.58
2 Pekerjaan Sloof Beton Uk. 15 x 20 cm, K-200 1.41 M3 7153462.7
3 Pekerjaan Rink Balok Uk. 10 x 15 cm 47.15 M1 137115.62
4 Pekerjaan Balok Uk. 10 x 15 cm 47.15 M1 137,115.62
JUMLAH
E PEKERJAAN PENGECETAN
1 Pengecatan Dinding Pagar Ex. Dulux Watersild 174.51 M² 70,269.98
JUMLAH
F PEKERJAAN RELING PAGAR
1 Pekerjaan Reling Pagar dan Asesoies (Finisng Dico) 1.00 M2 8,100,000.00
JUMLAH
TOTAL I + II + III
PPN ( 10% x i )
TOTAL a + b
DIBULATKAN
Bobot Minggu ini 81.12

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
KANTOR PERTANAHAN KOTA TERNATE

(…………………………………………)
NIP/.
LAPORAN KEMAJUAN PEKERJAAN (MINGGUN)
KONTRAKTOR : CV KARINDA
NO. KONTRAK : 03/SPK/BPN.TERNATE/V/2019
TGL. KONTRAK : 06 MEI 2019
BERAKHIR : 04 JULI 2019 Saturday, June 08, 20
MINGGU KE : VI (KE ENAM)
BOBOT MINGGU LALU
PEK.
JUMLAH HARGA TK.Kemajuan Pek.
(%) VOLUME JML. HARGA BOBOT VOLUME
Per Item kegiatan
( Rp ) (%)
6 7 8 9 10 11 12

3,000,000.00 2.39 1.00 3,000,000.00 100.00 2.39 -


1,000,000.00 0.80 1.00 1,000,000.00 100.00 0.80 -
2,537,000.00 2.02 1.00 2,537,000.00 100.00 2.02 -
4,800,754.06 3.83 47.15 4,800,754.06 100.00 3.83 -
200,000.00 0.16 1.00 200,000.00 100.00 0.16 -
2,400,000.00 1.91 0.00 - - - -
500,000.00 0.40 0.00 - - - -
14,437,754.06 11.50 11,537,754.06 9.19

1,577,862.00 1.26 18.39 1,577,862.00 100.00 1.26 -


283,360.00 0.23 4.60 283,360.00 100.00 0.23 -
589,218.30 0.47 1.53 589,218.30 100.00 0.47 -
2,450,440.30 1.95 2,450,440.30 1.95

18,528,974.46 14.76 14.56 18,528,974.46 100.00 14.76 -


3,961,940.00 3.16 5.66 3,961,940.00 100.00 3.16 -
10,124,397.55 8.07 35.05 6,580,858.40 65.00 5.24 18.88
3,578,876.79 2.85 29.71 2,326,269.91 65.00 1.85 16.00
1,170,282.24 0.93 14.40 1,170,282.24 100.00 0.93 -
1,003,679.56 0.80 0.00 - - - 12.35
3,242,657.04 2.58 39.90 3,242,657.04 100.00 2.58 -
3,741,026.03 2.98 31.08 1,870,513.01 50.00 1.49 15.54
7,278,987.23 5.80 0.00 - - - 83.15
2,080,501.76 1.66 0.00 - - - 12.80
54,711,322.66 43.59 37,681,495.08 30.03

10,521,352.42 8.38 1.28 10,521,352.42 100.00 8.38 -


10,086,382.41 8.04 1.41 10,086,382.41 100.00 8.04 -
6,465,001.48 5.15 23.58 3,232,500.74 50.00 2.58 16.50
6,465,001.48 5.15 23.58 3,232,500.74 50.00 2.58 16.50
33,537,737.80 26.72 27,072,736.31 21.57

12,262,814.21 9.77 0.00 - - - 61.08


12,262,814.21 9.77 - -

8,100,000.00 6.45 0.25 2,025,000.00 25.00 1.61 0.10


8,100,000.00 6.45 2,025,000.00 1.61
125,500,069.02 100.00 80,767,425.75 64.36
Rp 12,550,006.90 Rp 8,076,742.58 Rp.

Rp 138,050,075.93 Rp 88,844,168.33 Rp.

Rp 138,050,000.00 Rp 88,844,200.00 Rp.

KONSULTANT PENGAWAS
CV. MEGA BINTANG

(MUNAWAR M.NUR)
Direktur
aturday, June 08, 2019 S/D Friday, June 14, 2019

MINGGU INI SAMPAI MINGGU INI

TK.Kemajuan Pek. TK.Kemajuan Pek.


JML. HARGA BOBOT VOLUME JML. HARGA
Per Item kegiatan Per Item kegiatan
( Rp ) (%) ( Rp )
13 14 15 16 17 18

- - 1.00 3,000,000.00 100.00


- - 1.00 1,000,000.00 100.00
- - 1.00 2,537,000.00 100.00
- - 47.15 4,800,754.06 100.00
- - 1.00 200,000.00 100.00
- - - - -
- - - - -
- - 11,537,754.06

- - 18.39 1,577,862.00 100.00


- - 4.60 283,360.00 100.00
- - 1.53 589,218.30 100.00
- - 2,450,440.30

- - 14.56 18,528,974.46 100.00


- - 5.66 3,961,940.00 100.00
3,543,539.14 35.00 2.82 53.93 10,124,397.55 100.00
1,252,606.88 35.00 1.00 45.71 3,578,876.79 100.00
- - 14.40 1,170,282.24 100.00
1,003,679.56 100.00 0.80 12.35 1,003,679.56 100.00
- - 39.90 3,242,657.04 100.00
935,256.51 25.00 0.75 46.61 2,805,769.52 75.00
3,639,493.61 50.00 2.90 83.15 3,639,493.61 50.00
1,040,250.88 50.00 0.83 12.80 1,040,250.88 50.00
11,414,826.58 9.10 49,096,321.66

- - 1.28 10,521,352.42 100.00


- - 1.41 10,086,382.41 100.00
2,262,750.52 35.00 1.80 40.08 5,495,251.26 85.00
2,262,750.52 35.00 1.80 40.08 5,495,251.26 85.00
4,525,501.04 3.61 31,598,237.35

4,291,984.97 35.00 3.42 61.08 4,291,984.97 35.00


4,291,984.97 3.42 4,291,984.97

810,000.00 10.00 0.65 0.35 2,835,000.00 35.00


810,000.00 0.65 2,835,000.00
21,042,312.59 16.77 101,809,738.34
Rp 2,104,231.26 Rp. Rp 10,180,973.83
Rp 23,146,543.85 Rp. Rp 111,990,712.18
Rp 23,147,000.00 Rp. Rp 111,991,000.00

DI BUAT
KONTRAKTOR
CV. KARINDA

(AGNES THERESIA)
Direktris
SAMPAI MINGGU INI
KET.
BOBOT
(%)
19 20

2.39
0.80
2.02
3.83
0.16
-
-
9.19

1.26
0.23
0.47
1.95

14.76
3.16
8.07
2.85
0.93
0.80
2.58
2.24
2.90
0.83
39.12

8.38
8.04
4.38
4.38
25.18

3.42
3.42

2.26
2.26
81.12

DI BUAT
KONTRAKTOR
CV. KARINDA

(AGNES THERESIA)
Direktris
PEKERJAAN : PEMBANGUNAN PAGAR KANTOR BPN KOTA TERNATE
LOKASI : KOTA TERNATE
TAHUN ANGG : 2019

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT.

1 2 3 4 5
I PEMBANGUNAN PAGAR
A PEKERJAAN TANAH
1 Pekerjaan Pembongkaran Pagar Lama 1.00 Ls 3,000,000.00

2 Pembersihan Lapangan dan Perataan 1.00 Ls 1,000,000.00

3 Pembuatan Gudang Bahan 1.00 Ls 2,537,000.00

4 Pemasangan Bowplank 47.15 M' 101,818.75

5 Papan Nama Proyek 1.00 Ls 200,000.00

6 Dokumentasi dan Pelaporan 1.00 Ls 2,400,000.00

7 Pembersihan Akhir 1.00 Ls 500,000.00

B PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 18.39 M3 85,800.00

2 Urugan Kembali 4.60 M3 61,600.00


3 Urugan Pasir di Bawah Pondasi 1.53 M3 385,110.00

JUMLAH
C PEKERJAAN PONDASI DAN PASANGAN
1 Pasangan Pondasi Batu Kali 1 PC : 4 Ps 14.56 M3 1,272,594.40
2 Pek. Pasangan Batu Kosong 5.66 M3 699,989.40
3 Pasangan Dinding Bata Cetak 1 Pc : 5 Pc 53.93 M² 187,732.20
4 Plesteran Dinding, Beton & Pondasi 1 Pc : 4 Pc tbl 1.5 cm 45.71 M² 78,295.27
5 Plesteran Kolom Beton 1 Pc : 3 Pc 1.5 cm 14.40 M² 81,269.60
6 Plesteran Balok dan Ring Balok Beton 1 Pc : 3 Pc 1.5 cm 12.35 M² 81,269.60
7 Plesteran Pondasi 1 Pc : 3 Pc 1.5 cm 39.90 M² 81,269.60
8 Plesteran ciprat/kamprotan, 1 Pc : 2 Pp 62.15 M² 60,193.50
10 Acian Kolom, Dinding & Kepala Kolom 166.29 M² 43,772.85
11 Pelesteran Motif (Penebalan 10 cm) Kepala Kolom 25.60 M² 81,269.60
JUMLAH
D PEKERJAAN BETON
1 Pekerjaan Kolom Beton Pagar Samping Uk 20 x 20 cm, K-200 1.28 M3 8219806.58
2 Pekerjaan Sloof Beton Uk. 15 x 20 cm, K-200 1.41 M3 7153462.7
3 Pekerjaan Rink Balok Uk. 10 x 15 cm 47.15 M1 137115.62
4 Pekerjaan Balok Uk. 10 x 15 cm 47.15 M1 137,115.62
JUMLAH
E PEKERJAAN PENGECETAN
1 Pengecatan Dinding Pagar Ex. Dulux Watersild 174.51 M² 70,269.98
JUMLAH
F PEKERJAAN RELING PAGAR
1 Pekerjaan Reling Pagar dan Asesoies (Finisng Dico) 1.00 M2 8,100,000.00
JUMLAH
TOTAL I + II + III
PPN ( 10% x i )
TOTAL a + b
DIBULATKAN
Bobot Minggu ini 100.00

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
KANTOR PERTANAHAN KOTA TERNATE

(…………………………………………)
NIP/.
LAPORAN KEMAJUAN PEKERJAAN (MINGGUN)
KONTRAKTOR : CV KARINDA
NO. KONTRAK : 03/SPK/BPN.TERNATE/V/2019
TGL. KONTRAK : 06 MEI 2019
BERAKHIR : 04 JULI 2019 Saturday, June 15, 20
MINGGU KE : VII (KE TUJUH)
BOBOT MINGGU LALU
PEK.
JUMLAH HARGA TK.Kemajuan Pek.
(%) VOLUME JML. HARGA BOBOT VOLUME
Per Item kegiatan
( Rp ) (%)
6 7 8 9 10 11 12

3,000,000.00 2.39 1.00 3,000,000.00 100.00 2.39 -


1,000,000.00 0.80 1.00 1,000,000.00 100.00 0.80 -
2,537,000.00 2.02 1.00 2,537,000.00 100.00 2.02 -
4,800,754.06 3.83 47.15 4,800,754.06 100.00 3.83 -
200,000.00 0.16 1.00 200,000.00 100.00 0.16 -
2,400,000.00 1.91 0.00 - - - 1.00
500,000.00 0.40 0.00 - - - 1.00
14,437,754.06 11.50 11,537,754.06 9.19

1,577,862.00 1.26 18.39 1,577,862.00 100.00 1.26 -


283,360.00 0.23 4.60 283,360.00 100.00 0.23 -
589,218.30 0.47 1.53 589,218.30 100.00 0.47 -
2,450,440.30 1.95 2,450,440.30 1.95

18,528,974.46 14.76 14.56 18,528,974.46 100.00 14.76 -


3,961,940.00 3.16 5.66 3,961,940.00 100.00 3.16 -
10,124,397.55 8.07 53.93 10,124,397.55 100.00 8.07 -
3,578,876.79 2.85 45.71 3,578,876.79 100.00 2.85 -
1,170,282.24 0.93 14.40 1,170,282.24 100.00 0.93 -
1,003,679.56 0.80 12.35 1,003,679.56 100.00 0.80 -
3,242,657.04 2.58 39.90 3,242,657.04 100.00 2.58 -
3,741,026.03 2.98 46.61 2,805,769.52 75.00 2.24 15.54
7,278,987.23 5.80 83.15 3,639,493.61 50.00 2.90 83.15
2,080,501.76 1.66 12.80 1,040,250.88 50.00 0.83 12.80
54,711,322.66 43.59 49,096,321.66 39.12

10,521,352.42 8.38 1.28 10,521,352.42 100.00 8.38 -


10,086,382.41 8.04 1.41 10,086,382.41 100.00 8.04 -
6,465,001.48 5.15 40.08 5,495,251.26 85.00 4.38 7.07
6,465,001.48 5.15 40.08 5,495,251.26 85.00 4.38 7.07
33,537,737.80 26.72 31,598,237.35 25.18

12,262,814.21 9.77 61.08 4,291,984.97 35.00 3.42 113.43


12,262,814.21 9.77 4,291,984.97 3.42

8,100,000.00 6.45 0.35 2,835,000.00 35.00 2.26 0.65


8,100,000.00 6.45 2,835,000.00 2.26
125,500,069.02 100.00 101,809,738.34 81.12
Rp 12,550,006.90 Rp 10,180,973.83 Rp.

Rp 138,050,075.93 Rp 111,990,712.18 Rp.

Rp 138,050,000.00 Rp 111,990,700.00 Rp.

KONSULTANT PENGAWAS
CV. MEGA BINTANG

(MUNAWAR M.NUR)
Direktur
aturday, June 15, 2019 S/D Friday, June 21, 2019

MINGGU INI SAMPAI MINGGU INI

TK.Kemajuan Pek. TK.Kemajuan Pek.


JML. HARGA BOBOT VOLUME JML. HARGA
Per Item kegiatan Per Item kegiatan
( Rp ) (%) ( Rp )
13 14 15 16 17 18

- - 1.00 3,000,000.00 100.00


- - 1.00 1,000,000.00 100.00
- - 1.00 2,537,000.00 100.00
- - 47.15 4,800,754.06 100.00
- - 1.00 200,000.00 100.00
2,400,000.00 100.00 1.91 1.00 2,400,000.00 100.00
500,000.00 100.00 0.40 1.00 500,000.00 100.00
2,900,000.00 2.31 14,437,754.06

- - 18.39 1,577,862.00 100.00


- - 4.60 283,360.00 100.00
- - 1.53 589,218.30 100.00
- - 2,450,440.30

- - 14.56 18,528,974.46 100.00


- - 5.66 3,961,940.00 100.00
- - 53.93 10,124,397.55 100.00
- - 45.71 3,578,876.79 100.00
- - 14.40 1,170,282.24 100.00
- - 12.35 1,003,679.56 100.00
- - 39.90 3,242,657.04 100.00
935,256.51 25.00 0.75 62.15 3,741,026.03 100.00
3,639,493.61 50.00 2.90 166.29 7,278,987.23 100.00
1,040,250.88 50.00 0.83 25.60 2,080,501.76 100.00
5,615,001.00 4.47 54,711,322.66

- - 1.28 10,521,352.42 100.00


- - 1.41 10,086,382.41 100.00
969,750.22 15.00 0.77 47.15 6,465,001.48 100.00
969,750.22 15.00 0.77 47.15 6,465,001.48 100.00
1,939,500.44 1.55 33,537,737.80

7,970,829.24 65.00 6.35 174.51 12,262,814.21 100.00


7,970,829.24 6.35 12,262,814.21

5,265,000.00 65.00 4.20 1.00 8,100,000.00 100.00


5,265,000.00 4.20 8,100,000.00
23,690,330.68 18.88 125,500,069.02
Rp 2,369,033.07 Rp. Rp 12,550,006.90
Rp 26,059,363.75 Rp. Rp 138,050,075.93
Rp 26,059,000.00 Rp. Rp 138,050,000.00

DI BUAT
KONTRAKTOR
CV. KARINDA

(AGNES THERESIA)
Direktris
SAMPAI MINGGU INI
KET.
BOBOT
(%)
19 20

2.39
0.80
2.02
3.83
0.16
1.91
0.40
11.50

1.26
0.23
0.47
1.95

14.76
3.16
8.07
2.85
0.93
0.80
2.58
2.98
5.80
1.66
43.59

8.38
8.04
5.15
5.15
26.72

9.77
9.77

6.45
6.45
100.00

DI BUAT
KONTRAKTOR
CV. KARINDA

(AGNES THERESIA)
Direktris
PEKERJAAN : PEMBANGUNAN PAGAR KANTOR BPN KOTA TERNATE
LOKASI : KOTA TERNATE
TAHUN ANGG : 2019

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT.

1 2 3 4 5
I PEMBANGUNAN PAGAR
A PEKERJAAN TANAH
1 Pekerjaan Pembongkaran Pagar Lama 1.00 Ls 3,000,000.00

2 Pembersihan Lapangan dan Perataan 1.00 Ls 1,000,000.00

3 Pembuatan Gudang Bahan 1.00 Ls 2,537,000.00

4 Pemasangan Bowplank 47.15 M' 101,818.75

5 Papan Nama Proyek 1.00 Ls 200,000.00

6 Dokumentasi dan Pelaporan 1.00 Ls 2,400,000.00

7 Pembersihan Akhir 1.00 Ls 500,000.00

B PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 18.39 M3 85,800.00

2 Urugan Kembali 4.60 M3 61,600.00


3 Urugan Pasir di Bawah Pondasi 1.53 M3 385,110.00

JUMLAH
C PEKERJAAN PONDASI DAN PASANGAN
1 Pasangan Pondasi Batu Kali 1 PC : 4 Ps 14.56 M3 1,272,594.40
2 Pek. Pasangan Batu Kosong 5.66 M3 699,989.40
3 Pasangan Dinding Bata Cetak 1 Pc : 5 Pc 53.93 M² 187,732.20
4 Plesteran Dinding, Beton & Pondasi 1 Pc : 4 Pc tbl 1.5 cm 45.71 M² 78,295.27
5 Plesteran Kolom Beton 1 Pc : 3 Pc 1.5 cm 14.40 M² 81,269.60
6 Plesteran Balok dan Ring Balok Beton 1 Pc : 3 Pc 1.5 cm 12.35 M² 81,269.60
7 Plesteran Pondasi 1 Pc : 3 Pc 1.5 cm 39.90 M² 81,269.60
8 Plesteran ciprat/kamprotan, 1 Pc : 2 Pp 62.15 M² 60,193.50
10 Acian Kolom, Dinding & Kepala Kolom 166.29 M² 43,772.85
11 Pelesteran Motif (Penebalan 10 cm) Kepala Kolom 25.60 M² 81,269.60
JUMLAH
D PEKERJAAN BETON
1 Pekerjaan Kolom Beton Pagar Samping Uk 20 x 20 cm, K-200 1.28 M3 8219806.58
2 Pekerjaan Sloof Beton Uk. 15 x 20 cm, K-200 1.41 M3 7153462.7
3 Pekerjaan Rink Balok Uk. 10 x 15 cm 47.15 M1 137115.62
4 Pekerjaan Balok Uk. 10 x 15 cm 47.15 M1 137,115.62
JUMLAH
E PEKERJAAN PENGECETAN
1 Pengecatan Dinding Pagar Ex. Dulux Watersild 174.51 M² 70,269.98
JUMLAH
F PEKERJAAN RELING PAGAR
1 Pekerjaan Reling Pagar dan Asesoies (Finisng Dico) 1.00 M2 8,100,000.00
JUMLAH
TOTAL I + II + III
PPN ( 10% x i )
TOTAL a + b
DIBULATKAN
Bobot Bulan ini 40.47

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
KANTOR PERTANAHAN KOTA TERNATE

(…………………………………………)
NIP/.
LAPORAN KEMAJUAN PEKERJAAN (BULANAN)
KONTRAKTOR : CV KARINDA
NO. KONTRAK : 03/SPK/BPN.TERNATE/V/2019
TGL. KONTRAK : 06 MEI 2019
BERAKHIR : 04 JULI 2019 Monday, May 06, 201
BULAN : I (KE SATU)
BOBOT BULAN LALU
PEK.
JUMLAH HARGA TK.Kemajuan Pek.
(%) VOLUME JML. HARGA BOBOT VOLUME
Per Item kegiatan
( Rp ) (%)
6 7 8 9 10 11 12

3,000,000.00 2.39 1.00 3,000,000.00 100.00 2.39 -


1,000,000.00 0.80 1.00 1,000,000.00 100.00 0.80 -
2,537,000.00 2.02 1.00 2,537,000.00 100.00 2.02 -
4,800,754.06 3.83 47.15 4,800,754.06 100.00 3.83 -
200,000.00 0.16 1.00 200,000.00 100.00 0.16 -
2,400,000.00 1.91 0.00 - - - -
500,000.00 0.40 0.00 - - - -
14,437,754.06 11.50 11,537,754.06 9.19

1,577,862.00 1.26 18.39 1,577,862.00 100.00 1.26 -


283,360.00 0.23 4.60 283,360.00 100.00 0.23 -
589,218.30 0.47 1.53 589,218.30 100.00 0.47 -
2,450,440.30 1.95 2,450,440.30 1.95

18,528,974.46 14.76 7.28 9,264,487.23 50.00 7.38 7.28


3,961,940.00 3.16 2.83 1,980,970.00 50.00 1.58 2.83
10,124,397.55 8.07 0.00 - - - 13.48
3,578,876.79 2.85 0.00 - - - 11.43
1,170,282.24 0.93 0.00 - - - 7.20
1,003,679.56 0.80 0.00 - - - -
3,242,657.04 2.58 0.00 - - - -
3,741,026.03 2.98 0.00 - - - -
7,278,987.23 5.80 0.00 - - - -
2,080,501.76 1.66 0.00 - - - -
54,711,322.66 43.59 11,245,457.23 8.96

10,521,352.42 8.38 0.32 2,630,338.11 25.00 2.10 0.32


10,086,382.41 8.04 0.35 2,521,595.60 25.00 2.01 0.35
6,465,001.48 5.15 0.00 - - -
6,465,001.48 5.15 0.00 - - -
33,537,737.80 26.72 5,151,933.71 4.11

12,262,814.21 9.77 0.00 - - -


12,262,814.21 9.77 - -

8,100,000.00 6.45 0.00 - - -


8,100,000.00 6.45 0.00 0.00
125,500,069.02 100.00 30,385,585.30 24.21
Rp 12,550,006.90 Rp 3,038,558.53 Rp.

Rp 138,050,075.93 Rp 33,424,143.83 Rp.

Rp 138,050,000.00 Rp 33,424,100.00 Rp.

KONSULTANT PENGAWAS
CV. MEGA BINTANG

(MUNAWAR M.NUR)
Direktur
Monday, May 06, 2019 S/D Sunday, June 02, 2019

BULAN INI SAMPAI BULAN INI

TK.Kemajuan Pek. TK.Kemajuan Pek.


JML. HARGA BOBOT VOLUME JML. HARGA
Per Item kegiatan Per Item kegiatan
( Rp ) (%) ( Rp )
13 14 15 16 17 18

- - 1.00 3,000,000.00 100.00


- - 1.00 1,000,000.00 100.00
- - 1.00 2,537,000.00 100.00
- - 47.15 4,800,754.06 100.00
- - 1.00 200,000.00 100.00
- - - - -
- - - - -
- - 11,537,754.06

- - 18.39 1,577,862.00 100.00


- - 4.60 283,360.00 100.00
- - 1.53 589,218.30 100.00
- - 2,450,440.30

9,264,487.23 50.00 7.38 14.56 18,528,974.46 100.00


1,980,970.00 50.00 1.58 5.66 3,961,940.00 100.00
2,531,099.39 25.00 2.02 13.48 2,531,099.39 25.00
894,719.20 25.00 0.71 11.43 894,719.20 25.00
585,141.12 50.00 0.47 7.20 585,141.12 50.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
15,256,416.94 12.16 26,501,874.17

2,630,338.11 25.00 2.10 0.64 5,260,676.21 50.00


2,521,595.60 25.00 2.01 0.71 5,043,191.20 50.00
- - - - -
- - - - -
5,151,933.71 4.11 10,303,867.41

- - - - -
- - -

- - - - -
0.00 0.00 0.00
20,408,350.65 16.26 50,793,935.95
Rp 2,040,835.06 Rp. Rp 5,079,393.59
Rp 22,449,185.71 Rp. Rp 55,873,329.54
Rp 22,449,000.00 Rp. Rp 55,873,000.00

DI BUAT
KONTRAKTOR
CV. KARINDA

(AGNES THERESIA)
Direktris
SAMPAI BULAN INI
KET.
BOBOT
(%)
19 20

2.39
0.80
2.02
3.83
0.16
-
-
9.19

1.26
0.23
0.47
1.95

14.76
3.16
2.02
0.71
0.47
-
-
-
-
-
21.12

4.19
4.02
-
-
8.21

-
-

-
0.00
40.47

DI BUAT
KONTRAKTOR
CV. KARINDA

(AGNES THERESIA)
Direktris
PEKERJAAN : PEMBANGUNAN PAGAR KANTOR BPN KOTA TERNATE
LOKASI : KOTA TERNATE
TAHUN ANGG : 2019

NO URAIAN PEKERJAAN VOL. SAT. HARGA SAT.

1 2 3 4 5
I PEMBANGUNAN PAGAR
A PEKERJAAN TANAH
1 Pekerjaan Pembongkaran Pagar Lama 1.00 Ls 3,000,000.00

2 Pembersihan Lapangan dan Perataan 1.00 Ls 1,000,000.00

3 Pembuatan Gudang Bahan 1.00 Ls 2,537,000.00

4 Pemasangan Bowplank 47.15 M' 101,818.75

5 Papan Nama Proyek 1.00 Ls 200,000.00

6 Dokumentasi dan Pelaporan 1.00 Ls 2,400,000.00

7 Pembersihan Akhir 1.00 Ls 500,000.00

B PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus 18.39 M3 85,800.00

2 Urugan Kembali 4.60 M3 61,600.00


3 Urugan Pasir di Bawah Pondasi 1.53 M3 385,110.00

JUMLAH
C PEKERJAAN PONDASI DAN PASANGAN
1 Pasangan Pondasi Batu Kali 1 PC : 4 Ps 14.56 M3 1,272,594.40
2 Pek. Pasangan Batu Kosong 5.66 M3 699,989.40
3 Pasangan Dinding Bata Cetak 1 Pc : 5 Pc 53.93 M² 187,732.20
4 Plesteran Dinding, Beton & Pondasi 1 Pc : 4 Pc tbl 1.5 cm 45.71 M² 78,295.27
5 Plesteran Kolom Beton 1 Pc : 3 Pc 1.5 cm 14.40 M² 81,269.60
6 Plesteran Balok dan Ring Balok Beton 1 Pc : 3 Pc 1.5 cm 12.35 M² 81,269.60
7 Plesteran Pondasi 1 Pc : 3 Pc 1.5 cm 39.90 M² 81,269.60
8 Plesteran ciprat/kamprotan, 1 Pc : 2 Pp 62.15 M² 60,193.50
10 Acian Kolom, Dinding & Kepala Kolom 166.29 M² 43,772.85
11 Pelesteran Motif (Penebalan 10 cm) Kepala Kolom 25.60 M² 81,269.60
JUMLAH
D PEKERJAAN BETON
1 Pekerjaan Kolom Beton Pagar Samping Uk 20 x 20 cm, K-200 1.28 M3 8219806.58
2 Pekerjaan Sloof Beton Uk. 15 x 20 cm, K-200 1.41 M3 7153462.7
3 Pekerjaan Rink Balok Uk. 10 x 15 cm 47.15 M1 137115.62
4 Pekerjaan Balok Uk. 10 x 15 cm 47.15 M1 137,115.62
JUMLAH
E PEKERJAAN PENGECETAN
1 Pengecatan Dinding Pagar Ex. Dulux Watersild 174.51 M² 70,269.98
JUMLAH
F PEKERJAAN RELING PAGAR
1 Pekerjaan Reling Pagar dan Asesoies (Finisng Dico) 1.00 M2 8,100,000.00
JUMLAH
TOTAL I + II + III
PPN ( 10% x i )
TOTAL a + b
DIBULATKAN
Bobot Bulan ini 100.00

MENGETAHUI
PEJABAT PEMBUAT KOMITMEN
KANTOR PERTANAHAN KOTA TERNATE

(…………………………………………)
NIP/.
LAPORAN KEMAJUAN PEKERJAAN (BULANAN)
KONTRAKTOR : CV KARINDA
NO. KONTRAK : 03/SPK/BPN.TERNATE/V/2019
TGL. KONTRAK : 06 MEI 2019
BERAKHIR : 04 JULI 2019 Sunday, June 02, 201
MINGGU KE : II (KE DUA)
BOBOT BULAN LALU
PEK.
JUMLAH HARGA TK.Kemajuan Pek.
(%) VOLUME JML. HARGA BOBOT VOLUME
Per Item kegiatan
( Rp ) (%)
6 7 8 9 10 11 12

3,000,000.00 2.39 1.00 3,000,000.00 100.00 2.39 -


1,000,000.00 0.80 1.00 1,000,000.00 100.00 0.80 -
2,537,000.00 2.02 1.00 2,537,000.00 100.00 2.02 -
4,800,754.06 3.83 47.15 4,800,754.06 100.00 3.83 -
200,000.00 0.16 1.00 200,000.00 100.00 0.16 -
2,400,000.00 1.91 0.00 - - - 1.00
500,000.00 0.40 0.00 - - - 1.00
14,437,754.06 11.50 11,537,754.06 9.19

1,577,862.00 1.26 18.39 1,577,862.00 100.00 1.26 -


283,360.00 0.23 4.60 283,360.00 100.00 0.23 -
589,218.30 0.47 1.53 589,218.30 100.00 0.47 -
2,450,440.30 1.95 2,450,440.30 1.95

18,528,974.46 14.76 14.56 18,528,974.46 100.00 14.76 -


3,961,940.00 3.16 5.66 3,961,940.00 100.00 3.16 -
10,124,397.55 8.07 53.93 10,124,397.55 100.00 8.07 -
3,578,876.79 2.85 45.71 3,578,876.79 100.00 2.85 -
1,170,282.24 0.93 14.40 1,170,282.24 100.00 0.93 -
1,003,679.56 0.80 12.35 1,003,679.56 100.00 0.80 -
3,242,657.04 2.58 39.90 3,242,657.04 100.00 2.58 -
3,741,026.03 2.98 46.61 2,805,769.52 75.00 2.24 15.54
7,278,987.23 5.80 83.15 3,639,493.61 50.00 2.90 83.15
2,080,501.76 1.66 12.80 1,040,250.88 50.00 0.83 12.80
54,711,322.66 43.59 49,096,321.66 39.12

10,521,352.42 8.38 1.28 10,521,352.42 100.00 8.38 -


10,086,382.41 8.04 1.41 10,086,382.41 100.00 8.04 -
6,465,001.48 5.15 40.08 5,495,251.26 85.00 4.38 7.07
6,465,001.48 5.15 40.08 5,495,251.26 85.00 4.38 7.07
33,537,737.80 26.72 31,598,237.35 25.18

12,262,814.21 9.77 61.08 4,291,984.97 35.00 3.42 113.43


12,262,814.21 9.77 4,291,984.97 3.42

8,100,000.00 6.45 0.35 2,835,000.00 35.00 2.26 0.65


8,100,000.00 6.45 2,835,000.00 2.26
125,500,069.02 100.00 101,809,738.34 81.12
Rp 12,550,006.90 Rp 10,180,973.83 Rp.

Rp 138,050,075.93 Rp 111,990,712.18 Rp.

Rp 138,050,000.00 Rp 111,990,700.00 Rp.

KONSULTANT PENGAWAS
CV. MEGA BINTANG

(MUNAWAR M.NUR)
Direktur
unday, June 02, 2019 S/D Friday, June 21, 2019

BULAN INI SAMPAI BULAN INI

TK.Kemajuan Pek. TK.Kemajuan Pek.


JML. HARGA BOBOT VOLUME JML. HARGA
Per Item kegiatan Per Item kegiatan
( Rp ) (%) ( Rp )
13 14 15 16 17 18

- - 1.00 3,000,000.00 100.00


- - 1.00 1,000,000.00 100.00
- - 1.00 2,537,000.00 100.00
- - 47.15 4,800,754.06 100.00
- - 1.00 200,000.00 100.00
2,400,000.00 100.00 1.91 1.00 2,400,000.00 100.00
500,000.00 100.00 0.40 1.00 500,000.00 100.00
2,900,000.00 2.31 14,437,754.06

- - 18.39 1,577,862.00 100.00


- - 4.60 283,360.00 100.00
- - 1.53 589,218.30 100.00
- - 2,450,440.30

- - 14.56 18,528,974.46 100.00


- - 5.66 3,961,940.00 100.00
- - 53.93 10,124,397.55 100.00
- - 45.71 3,578,876.79 100.00
- - 14.40 1,170,282.24 100.00
- - 12.35 1,003,679.56 100.00
- - 39.90 3,242,657.04 100.00
935,256.51 25.00 0.75 62.15 3,741,026.03 100.00
3,639,493.61 50.00 2.90 166.29 7,278,987.23 100.00
1,040,250.88 50.00 0.83 25.60 2,080,501.76 100.00
5,615,001.00 4.47 54,711,322.66

- - 1.28 10,521,352.42 100.00


- - 1.41 10,086,382.41 100.00
969,750.22 15.00 0.77 47.15 6,465,001.48 100.00
969,750.22 15.00 0.77 47.15 6,465,001.48 100.00
1,939,500.44 1.55 33,537,737.80

7,970,829.24 65.00 6.35 174.51 12,262,814.21 100.00


7,970,829.24 6.35 12,262,814.21

5,265,000.00 65.00 4.20 1.00 8,100,000.00 100.00


5,265,000.00 4.20 8,100,000.00
23,690,330.68 18.88 125,500,069.02
Rp 2,369,033.07 Rp. Rp 12,550,006.90
Rp 26,059,363.75 Rp. Rp 138,050,075.93
Rp 26,059,000.00 Rp. Rp 138,050,000.00

DI BUAT
KONTRAKTOR
CV. KARINDA

(AGNES THERESIA)
Direktris
SAMPAI BULAN INI
KET.
BOBOT
(%)
19 20

2.39
0.80
2.02
3.83
0.16
1.91
0.40
11.50

1.26
0.23
0.47
1.95

14.76
3.16
8.07
2.85
0.93
0.80
2.58
2.98
5.80
1.66
43.59

8.38
8.04
5.15
5.15
26.72

9.77
9.77

6.45
6.45
100.00

DI BUAT
KONTRAKTOR
CV. KARINDA

(AGNES THERESIA)
Direktris

Anda mungkin juga menyukai