Anda di halaman 1dari 11

RINGKASAN TARGET PANJANG DAN TOTAL HARGA

Pekerjaan : Preservasi Rekonstruksi Jalan Tapan - Bts. Bengkulu (SBSN)/PN


No. Paket : -
Ruas Jalan : Tapan - Batas Bengkulu
Provinsi : Sumatera Barat
Panjang Jalan : 39,275

PANJANG TOTAL HARGA (RP) BOBOT (%)


NO LINGKUP PEKERJAAN
(KM/M) (RPB) (RPB)

1 Pelebaran Jalan 10,000


2 Rekonstruksi Jalan
3 Rehabilitasi Jalan 25,907
4 Pemeliharaan Preventif Jalan
5 Pemeliharaan Berkala Jembatan
6 Rehabilitasi Jembatan
7 Pemeliharaan Rutin Jalan 39,275
8 Pemeliharaan Rutin Jembatan 330,20

(A) Jumlah Harga Pekerjaan

Terbilang : ..............................................................................................................................................................

............, ...................................
Dibuat Oleh :
PT. ......................................................................

(Nama Pimpinan)
(Jabatan)
DAFTAR 2 : REKAPITULASI LINGKUP KEGIATAN

Pekerjaan : Preservasi Rekonstruksi Jalan Tapan - Bts. Bengkulu (SBSN)/PN


No. Paket : -
Ruas Jalan : Tapan - Batas Bengkulu
Propinsi : Sumatera Barat
Panjang Jalan : 39,740

Pemeliharaan Berkala
Pelebaran Jalan Rekonstruksi Jalan Rehabilitasi Jalan Pemeliharaan Rutin Jalan Pemeliharaan Rutin Jembatan Total
No. Mata Jembatan
Uraian
Pembayaran Bobot (%) Harga Per-Divisi Bobot (%) Harga Per-Divisi Bobot (%) Harga Per- Bobot (%) Harga Per-Divisi Bobot (%) Harga Per-Divisi Bobot (%) Bobot (%)
Harga Per-Divisi (RPB) Total Pr-Divisi (RPB)
(RPB) (RPB) (RPB) (RPB) (RPB) Divisi (RPB) (RPB) (RPB) (RPB) (RPB) (RPB) (RPB)
a b e f g h i j k l m n o p q

1 UMUM

2 DRAINASE

3 PEKERJAAN TANAH

4 PELEBARAN PERKERASAN DAN BAHU JALAN

5 PERKERASAN BERBUTIR

6 PERKERASAN ASPAL

7 STRUKTUR

8 PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

9 PEKERJAAN HARIAN

10 PEKERJAAN PEMELIHARAAN RUTIN

10.a SKh-2.10.a PEMELIHARAAN KINERJA JALAN

10.b SKh-2.10.b PEMELIHARAAN KINERJA JEMBATAN

A Harga Konstruksi

B Total Harga Kosntruski (T = A+B+C+D+E+F)

C Bobot Tertimbang (a/b)x100%

D Pajak Pertambahan Nilai (PPN) = 10% x T

E Total Harga + PPN = b + d


DAFTAR KUANTITAS DAN HARGA
SPESIFIKASI 2010 Revisi 3
PPK : 2.4 Kambang - Bts. Bengkulu, Tapan - Bts. Jambi
No. Paket Kontrak :
Nama Paket : Preservasi Rekonstruksi Jalan Tapan - Bts. Bengkulu (SBSN)/PN
Lokasi : Kab. Pesisir Selatan
Prop / Kab / Kodya : SUMATERA BARAT / KAB. PESISIR SELATAN

PELEBARAN JALAN REKONSTRUKSI JALAN REHABILITASI JALAN PEMELIHARAAN RUTIN JALAN PEMELIHARAAN RUTIN JEMBATAN
Harga Satuan TOTAL HARGA
No. Mata Uraian Satuan Perkiraan
(Rupiah) RPB Perkiraan Kuantitas Jumlah Harga Satuan Perkiraan Perkiraan Jumlah Harga Satuan Jumlah Harga Satuan Perkiraan Jumlah Harga Satuan (Rupiah) (RPB)
Pembayaran Jumlah Harga Satuan (Rupiah) Kuantitas
(RPB) (Rupiah) (RPB) Kuantitas Kuantitas (RPB) (Rupiah) (RPB) (Rupiah) (RPB) Kuantitas (RPB) (Rupiah) (RPB)
(RPB)

DIVISI 1. UMUM
1.2 Mobilisasi LS 1,00
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1,00
1,17 Pengamanan Lingkungan Hidup LS 1,00
1,21 Manajemen Mutu LS 1,00

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 3.840,00 14.270,00
2.2.(1) Pasangan Batu dengan Mortar M3 1.760,00 7.040,00
2.3.(11) Saluran berbentuk U Tipe DS 3 M1 8.240,00 15.200,00
2.3.(12) Beton K250 (fc’ 20) untuk struktur drainase beton minor M3 856,80 747,74
2.3.(13) Baja Tulangan untuk struktur drainase beton minor Kg 83.966,40 73.279,50
2.4.(1) Bahan Porous untuk Bahan Penyaring (Filter) M3 230,40 824,80
2
2.4.(2) Anyaman Filter Plastik M 144,00 515,50
Skh-1.7.26.(1).a Pengadaan Struktur Box Beton Pracetak (1.5 x 1.5 x 1.0 m) Bh 1,00 4,00
Skh-1.7.26.(3).a Pemasangan Struktur Box Beton Pracetak (1.5 x 1.5 x 1.0 m) Bh 1,00 4,00

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 3. PEKERJAAN TANAH


3.1.(1a) Galian Biasa M3 24.040,00
3.1.(6) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 72,00 339,57
3.1.(7) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 72,00 339,57
3
3.2.(2a) Timbunan Pilihan dari sumber galian M 9.616,00

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN


4.2.(1) Lapis Pondasi Agregat Kelas A M3 9.616,00
4.2.(2b) Lapis Pondasi Agregat Kelas S M3 - -
4.2.(7) Lapis Resap Pengikat Liter 18.336,00
4.2.(12) Laston Lapis Pondasi Modifikasi (AC-Base Mod) Ton 3.514,40
4.2.(13) Bahan anti pengelupasan Kg 421,73
4.2.(14) Perkerasan Beton Semen M3 6.560,00 16.045,05

Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 5. PERKERASAN BERBUTIR

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 6. PERKERASAN ASPAL


6.1 (2)(a) Lapis Perekat - Aspal Cair Liter 21.980,00 57.253,90
6.3(5b) Laston Lapis Aus Modifikasi (AC-WC Mod) Ton 7.109,30 16.490,76
6.3(6b) Laston Lapis Antara Modifikasi (AC-BC Mod) Ton 8.666,40 22.589,21
6.3(6d) Laston Lapis Antara Modifikasi Perata (AC-BC(L)Mod) Leveling Ton 6.079,81 15.082,09
6.3.(8) Bahan anti pengelupasan Kg 2.586,40 6.613,33

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 7. STRUKTUR
7.1 (7) a Beton mutu sedang fc’20 MPa M3 25,20 -
7.1 (10) Beton mutu rendah fc’10 Mpa M3 374,10 -
7.3 (1) Baja Tulangan U 24 Polos Kg 4.813,74 -
7.9.(1) Pasangan Batu M3 500,00 950,00 100,00
7.10.(3) a. Bronjong dengan kawat yang dilapisi galvanis M3 100,00

Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
PELEBARAN JALAN REKONSTRUKSI JALAN REHABILITASI JALAN PEMELIHARAAN RUTIN JALAN PEMELIHARAAN RUTIN JEMBATAN
Harga Satuan TOTAL HARGA
No. Mata Uraian Satuan Perkiraan
(Rupiah) RPB Perkiraan Kuantitas Jumlah Harga Satuan Perkiraan Perkiraan Jumlah Harga Satuan Jumlah Harga Satuan Perkiraan Jumlah Harga Satuan (Rupiah) (RPB)
Pembayaran Jumlah Harga Satuan (Rupiah) Kuantitas
(RPB) (Rupiah) (RPB) Kuantitas Kuantitas (RPB) (Rupiah) (RPB) (Rupiah) (RPB) Kuantitas (RPB) (Rupiah) (RPB)
(RPB)

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR


8.1 (1) Lapis Pondasi Agregat Kelas A utk Pekerjaan Minor M3 312,02 331,57
8.1 (5) Campuran Aspal Panas untuk Pekerjaan Minor M3 311,75 331,57
8.3.(3) Pohon Jenis Mahoni Buah 30,00 130,00
8.4.(1) Marka Jalan Termoplastik M2 3.300,00 8.654,00
8.4.(5) Patok Pengarah Buah 150,00 220,00
8.4.(6a) Patok Kilometer Buah 3,00 14,00
8.4.(7) Rel Pengaman Buah 526,00 1.500,00

Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 9. PEKERJAAN HARIAN


9.1.(1) Mandor Jam 200,00 400,00
9.1.(2) Pekerja Biasa Jam 200,00 800,00
9.1.(3) Tukang Kayu, Tukang Batu, dsb Jam 200,00 400,00
9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 100,00 400,00
9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 150,00 240,00
9.1.(11) Alat Penggali (Excavator) 80 - 140 PK Jam 150,00 240,00

Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN


10.1 (3) Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan LS
10.1 (3) Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan (Pelebaran) LS
10.1 (3) Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan (Rehabilitasi) LS
10.1 (4) Pemeliharaan Rutin Perlengkapan Jalan LS

Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 10.a Pemeliharaan Kinerja Jalan


Skh.2.10.a.(4) Lapis pondasi agregat Kelas A M3 - 400,00
Skh.2.10.a.(10) Campuran aspal panas M3 - 300,00
Skh.2.10.a.(18) Pengendalian tanaman M2 120.000,00 310.884,00 50.000,00
Skh.2.10.a.(19) Pembersihan Drainase M2 15.000,00 21.600,00 19.800,00
SKh.2.10.a.(20a) Pembersihan dan Perbaikan Rel Pengaman M1 2.000,00 2.100,00 1.000,00
SKh.2.10.a.(20b) Pembersihan dan Perbaikan Patok/Rambu Bh 250,00 300,00 200,00

Jumlah Harga Pekerjaan DIVISI 10.a (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 10.b Pemeliharaan Kinerja Jembatan


SKh.2.10.b (1) Pembersihan Jembatan M2 345,88
SKh.2.10.b (2) Perbaikan retak / kerusakan beton Non Struktural M2 230,00
SKh.2.10.b (7) Pengantian Baut Buah 742,00
SKh.2.10.b (8) Perbaikan Pasangan Batu M3 183,90
SKh.2.10.b (9.a) Perbaikan Pipa Cucuran dan drainase Buah 120,00
SKh.2.10.b (10) Perbaikan Sambung Siar Suar M 100,00
SKh.2.10.b (11) Perbaikan Sandaran M 300,00
SKh.2.10.b (5) Pengecatan Sederhana/Elemen Beton M2 1.200,00

Jumlah Harga Pekerjaan DIVISI 10.b (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK = %


Lembar 1.2-1
HARGA JUMLAH
No. U R AIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

A. Sewa Tanah M2

B. PERALATAN
Periksa lembar 1.2-2 Ls 1,00

C. MOBILISASI FASILITAS KONTRAKTOR


1 Base Camp M2 120,00
2 Kantor 100,00
3 Barak
4 Bengkel
5 Gudang, dan lain-lain M2
6 ...................... ....

D. MOBILISASI FASILITAS LABORATORIUM set


1 Ruang Laboratorium (sesuai Gambar)

2 Soil & Aggregate Testing


Compaction Test
CBR Test
Specific Gravity
Atterberg Limits
Grain Size Analysis
Field Density Test by Sand Cone Methode
Moisture Content
Abrasion of Aggregate by Los Angeles Machine

3 Bituminous Testing
Marshall Asphalt Test
Extraction Test, Centrifuge/Refflux Method
Specific Gravity for Coarse Aggregate
Specific Gravity for Fine Aggregate
Mix Air Viod Content (Accurate Method)
Core Drill
Metal Thermometer
Accessories and Tolls
Penetration Test
Softening Point
Refusal Density Compactor

4 Concrete Testing
Slump Cone
Cylinder/Cube Mould for Compressive Strength
Beam Mould for Flexural Strength (RIGID)
Crushing Machine

5 Pendukung (Periksa Fasilitas Laboratorium)

6 Operasional (Periksa Fasilitas Laboratorium) Set

E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT LS
1 Perkuatan Jembatan Lama
2 Pemeliharaan Jalan Kerja / Samping
3 Papan Nama Proyek Bh 2,00
4 Mobilisasi Staff dan lain-lain Ls 1,00
5 ...................... ....
6 ...................... ....
E.II. LAIN-LAIN
1 Komunikasi Lapangan Lengkap Set
2 As Buil Drawing Set
3 Pengukuran Lapangan Ls
4 Papan Informasi Proyek Ls
5 Sewa Mobil Operasional ....
Bulan 11,00

Sewa Sepeda Motor


- 100 CC S/D 150 CC Bulan 22,00

F. Manajemen dan Keselamatan lalu lintas LS

G. DEMOBILISASI LS 1,00

Total Biaya Mobilisasi

Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI (PEMELIHARAAN RUTIN JALAN)
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

B. PERALATAN

1 COMPRESSOR 4000-6500 L\M E05 Unit 1,00


2 DUMP TRUCK 3.5 TON E08 Unit 2,00
3 FLAT BED TRUCK 3-4 M3 E11 Unit 1,00
4 GENERATOR SET E12 Unit 1,00
5 PEDESTRIAN ROLLER E24 Unit 1,00
6 TAMPER E25 Unit 1,00
7 JACK HAMMER E26 Unit 1,00
8 PICK UP Unit 3,00
9 GRASS CUTTER Unit 5,00

Total untuk Item B pada Lembar 1


ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI (PERALATAN EFEKTIF)
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

B. PERALATAN

1 ASPHALT MIXING PLANT E01 Unit 2,00


2 ASPHALT FINISHER E02 Unit 2,00
3 ASPHALT SPRAYER E03 Unit 2,00
4 COMPRESSOR 4000-6500 L\M E05 Unit 3,00
5 CONCRETE MIXER 0.3-0.6 M3 E06 Unit 3,00
6 DUMP TRUCK 3.5 TON E08 Unit 5,00
7 DUMP TRUCK 10 TON E09 Unit 15,00
8 EXCAVATOR 80-140 HP E10 Unit 3,00
9 GENERATOR SET E12 Unit 3,00
10 MOTOR GRADER >100 HP E13 Unit 3,00
11 WHEEL LOADER 1.0-1.6 M3 E15 Unit 3,00
12 TANDEM ROLLER 6-8 T. E17 Unit 3,00
13 TIRE ROLLER 8-10 T. E18 Unit 5,00
14 VIBRATORY ROLLER 5-8 T. E19 Unit 3,00
15 CONCRETE VIBRATOR E20 Unit 3,00
16 STONE CRUSHER E21 Unit 2,00
17 WATER TANKER 3000-4500 L. E23 Unit 3,00
18 TAMPER E25 Unit 1,00
19 JACK HAMMER E26 Unit 3,00
20 COLD MILLING MACHINE E37 Unit 1,00
21 CONCRETE PAN MIXER E43 Unit 1,00
22 TRUK MIXER (AGITATOR) E49 Unit 1,00
23 PICK UP Unit 3,00
24 GRASS CUTTER Unit 10,00

Total untuk Item B pada Lembar 1


Analisa El - 18
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.8.


JENIS PEKERJAAN : Manajemen dan Keselamatan Lalu Lintas
SATUAN PEMBAYARAN : Lump Sum

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Panjang Lokasi Pekerjaan KM 39.275
2 Total Masa Pelaksanaan Kegiatan Bulan 11
3 Masa Mobilisasi Bulan 2
4 Periode Pekerjaan Perkerasan Jalan Bulan 1
5 Panjang zona kerja Perkerasan Jalan Km 39.275

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan keselamatan jalan selama
periode konstruksi sesuai ketentuan
2 Buat rencana kerja manajemen lalu-lintas sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Kelompok kerja pengatur lalu-lintas selama konstruksi
menggunakan tenaga pengatur dan flagman dengan 3 shift
4 Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait
5 Semua rambu harus jelas dan terbaca oleh Pengguna Jalan

C. PERALATAN KESELAMATAN LALU LINTAS


1 Rambu panah berkedip Buah
2 Rambu suar berkedip portabel M'
3 Rambu tetap informasi pengalihan/pengaturan lalu lintas Buah
4 Rambu portabel informasi pengalihan/pengaturan lalu lintas Buah
5 Rambu penghalang lalu-lintas jenis plastik Buah 20,00
6 Rambu penghalang lalu-lintas jenis beton Buah
7 Rambu Peringatan Buah 20,00
8 Rambu Petunjuk Buah 15,00
9 Barikade kayu 1/2 lebar jalan Buah 4,00
10 Police Line Roll 5,00
11 Peralatan komunikasi dan Lainnya Set 2,00
12 Perlengkapan pengatur lalu lintas (safety boots, helm, rompi dll) Set 4,00

D. TENAGA / PERSONIL

1 Pekerja (Flagman) OB 22,00

2 Koordinator / Pengatur OB 11,00

E TOTAL BIAYA MANAJEMEN DAN KESELAMATAN LALU LINTAS


Analisa El - 117
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.17


JENIS PEKERJAAN : Pengamanan Lingkungan
SATUAN PEMBAYARAN : Lump Sum

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Kegiatan yang dilakukan, pengukuran baku mutu air tanah dan air permukaan,
baku mutu udara dan kebisingan
2 Pengambilan sampel Titik 3,00
3 Lokasi pengambilan sampel : Basecamp, daerah pemukiman dan daerah Quarry

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengujian lingkungan
(air, udara dan kebisingan)
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian

C. PENGUJIAN PARAMETER KUALITAS LINGKUNGAN


1 Uji Udara Emisi dan Ambien, parameter yang diambil meliputi
- NOX Metode Phenol Disulonic Acid (PDS) sampel 6,00
- Sulfurdioksida (SOX) Metode Turbidimetrik sampel 6,00
- Karbondioksida (CO2) Metode Infra Merah sampel 6,00
- Hidro Carbon (HC)-CH4 Metode Gas Chromatography-Flame Ionized Detector sampel 6,00
- Particulate Matter10 (PM10) sampel 6,00
- Timah Hitam (Pb) Metode SSA sampel 6,00

2 Pengukuran Kebisingan , parameter yang diambil meliputi :


- Vibrasi lingkungan untuk kenyamanan dan kesehatan sampel 6,00
- Emisi bising kendaraan bermotor secara statis sampel 6,00

3 Pengukuran Kualitas Air, parameter yang diambil meliputi :


- pH Metode Elektrometik sampel 6,00
- Oksigen Terlarut (DO) Metode Winkler sampel 6,00
- Zat Padat Terlarut (TDS) Metode Gravimetrik sampel 6,00
- Zat Padat Tersuspensi (TSS) Metode Gravimetrik sampel 6,00
- Biological Oxygen Demand (BOD) Metode Inkubasi-Winkler sampel 6,00
- Chemical Oxygen Demand (COD) Metode Spektrofotometrik sampel 6,00
- Coliform Metode Petrifilm sampel 6,00
- E. Coli Metode Most Probably Number sampel 6,00
- Destruksi Pb, Cu, Cd, Zn, Mn, Ag, Co, Cr tot, Fe, Ni sampel 6,00
- Temperatur (Suhu) Metode Termometrik sampel 6,00

D Biaya Operasional
Biaya peralatan Ls
Personil Ls
Transportasi Ls

D TOTAL BIAYA PENGAMANAN LINGKUNGAN


Analisa El - 121
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

ITEM PEMBAYARAN NO. : 1.21.


JENIS PEKERJAAN : Manajemen Mutu
SATUAN PEMBAYARAN : Lump Sum

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Tidak ada pengadaan peralatan pengujian mutu dan
perlengkapan perangkat alat tulis dan kantor
2 Hanya Jasa Pengendalian Mutu Pekerjaan dilapangan
selama masa pelaksanaan pekerjaan
3 Personil melakukan pengendalian mutu berdasarkan spesifikasi
pekerjaan dan membuat laporan mutu pekerjaan
4 Manajemen Mutu sesuai ketentuan Ditjen Bina Marga

B. URUTAN KERJA
1 Penyedia setelah menerima SPMK mengusulkan personil
Tenaga Ahli Mutu Pekerjaan sbg Manajer Kendali Mutu
2 Tenaga Ahli dibantu oleh Asisten Kendali Mutu yang
berpengalaman dibidangnya dan tenaga pendukung
3 Membuat RMK dan laporan mutu yg disetujui PPK
4 Melakukan pengendalian mutu semua pekerjaan dan
membuat laporan secara berkala

C. TENAGA / PERSONIL

Masa Pelaksanaan Pekerjaan Bulan 11,00


1 Ahli Kendali Mutu OB 11,00

2 Petugas Pengendali Mutu OB 11,00

3 Staff Pendukung (supporting Staff) OB -

4 Laporan Kendali Mutu Bulan 11,00

D TOTAL BIAYA PENGENDALIAN MUTU