Gambar Embung
Gambar Embung
U P.16
P.15 Sawah
Sawah 1.00 1.00
P.14
P.13
Sawah 0.40
P.11 1.10
P.12 0.40
P.7 P.10
P.8 P.9 0.60
SITUASI
24.00
14.00
17.50
0.40
3100
+1.90
2.90
0.50 Sloof beton bertulang K. 175 (0,50 x 0,40 ) +1.30
+1.00
+ - 0.00
- 0.11
- 0.60
1.50
0.40 3.30 0.40
- 1.00
DETAIL - 1.30
1.00
2.90
+1.30
+1.00
+0.40
+ - 0.00
- 0.11
- 0.60
1.50
Lanning saluran distribusi - 1.00
- 1.30
0.40
1.00
4.00 3.00 7.00 7.00 7.00 6.00 3.00 3.00 0.50 1.00
Ø 10 - 20 8 Ø 12
8 Ø 12
Ø 8 - 25 4 Ø 12
Ø 8 - 25
100
Ø 8 - 25 Besi Drat Ulir Ø 1,5"
10
50 35 10
15
35
50
DETAIL BALOK
120 DETAIL KOLOM
DETAIL SLOOF
Besi siku 50.50.5
130
50 Besi Plat T.
DETAIL DINDING BETON Ø 10 - 20
2 mm
10
80 50
10 DETAIL PONDASI
20
480
DETAIL BANGUNAN PEMISAH
5 100 5 40
DETAIL PINTU SKAT ULIR
30 15 80 15 30
15
15
90 15 50 15 90
P.7
PENAMPANG LANNING SALURAN DISTRIBUSI
P.2' P.1'
P.0' P.6
P.4'
P.3' NO PATOK JARAK
P.3 P.4 P.5
30 15 50 15 30
U Tanggul timbunan tanah setempat
Sawit
Di Plester
P.6
Sawit
Sawah 50
Beton Cor K. 175
Sawah 15
P.3 Sawah
P.4 30
P.1
P.8
Sawah
40
A B + 2.00
+ 1.30
+ 1.00
+ - 0.00
- 0.12
A B
- 1.50
3920 3740
7840
TAMPAK DEPAN
+ 2.00 + 2.00
+ 1.30 + 1.30
+ 1.00
+ - 0.00 + - 0.00
- 0.60 - 0.60
- 1.50 - 1.50
- 2.10 - 2.10
- 2.80 - 2.80
1.50 3.00 1.00 1.50 7.00 1.50 1.50 3.00 1.00 1.50 7.00 3.00
1.50
POTONGAN BB POTONGAN A A
UNP 100.50.5
Ø 10 - 20 8 Ø 12
8 Ø 12
Ø 8 - 25 6 Ø 12
Ø 8 - 25
100
Ø 8 - 25 Besi Drat Ulir Ø 1,5"
10
50 30 10
15
30
30
DETAIL RING BALK
70 DETAIL KOLOM
DETAIL SLOOF
Ø 10 - 20
Besi siku 50.50.5
70
50
DETAIL DINDING BETON 60 2 mm
10
400
50
DETAIL BANGUNAN PEMISAH
DETAIL PONDASI
20
5 100 5 40
DETAIL PINTU SKAT ULIR
P. 174 M
150
U P.6
100
GALIAN PARIT P.6'
P.5
JALAN BETON
P.3
Akhir Proyek Laning
4000
40 P.2 P.4
1800
- 1.50
Galian parit 1340 2 P.1 - P.2 20 M'
200 3 P.2 - P.3 44 M'
40
4 P.3 - P.4 29 M'
rawa Bangunan Pelimpah Pas. Batu kali 1 : 2 5 P.4 - P.5 57 M'
200 200 100
6 P.5 - P.7 M'
400 3200 300 200
7 P.5 - P.6'
POTONGAN A - A
DETAIL
4000
100 Tanggul untuk meninggikan permukaan air + 1.70
+ 1.00
+ 0.70
+ 0.50
50
+ - 0.00
- 0.11
- 0.50
- 1.50
- 2.00
- 2.70
50 40 1600 80 100 40 50
Balok beton bertulang K. 175 (0,40 x 0,10 )
UNP 100.50.5
70
1.2
0.2
60
0.24
0.12
15
15 1.2
0.2
Besi siku 50.50.5
20
0.24
20 60
0.12
Besi Plat T. RENCANA
70
2 mm 0.028
0.014
0.15
0.15
0.022
20
2
0.04
5 100 5 40
0.19
DETAIL PINTU SKAT ULIR
DETAIL PINTU SKAT ULIR
2.4
KEGIATAN PEKERJAAN NAMA GAMBAR LOKASI PERENCANA DISETUJUI MENGETAHUI 0.15
Pejabat Pembuat Komitmen ( PPK ) Plt. Kepala Dinas Pertanian 0.36
PENGEMBANGAN SUMBER - SUMBER PEMBUATAN DETAIL PINTU DESA SIDOREJO Kabupaten Langkat 1
AIR UNTUK IRIGASI EMBUNG PENAMPANG LENING SAL. KEC. SIRAPIT DIGAMBAR DIRENCANA 0.36
( DAK - APBN.P ) TAHUN 2015 DISTRIBUSI ( BESAR )
SKALA : NIP. 19600927 198003 1 001 NIP. 19600927 198003 1 001 1.3
1
1.3
2.4
0.65
1.56
0.78
194
151.3
EXISTING
20 60 20 90 20 30 20 90
216
7.5
208.5
4
1
1
0.5
1
1.5
217.5
COR BETON K. 175 2.1 X 0.15 x 379 = 119.39 m3
PLESTERAN 1.3 X x 379 = 492.70 m2
TIMBUNAN TANGGUL 2.4 X 0.65 = 1.56 2 0.78 x 379 = 295.62 M3
ACIAN 1.3 X 1.00 = 1.30 x 379 = 492.70 m2
PEMADATAN TANGGUL 2.4 X 1.00 = 2.40 x 379 = 295.62 m2
81
9
1.3
0.35
0.35
9.923
32.8
32.8
Plat beton 1.3 x 0.8 x 0.15 = 0.16 m3
Penimbunan tanah kembali 968.8 : 3 = 322.93 M3
Galian tanah 8 x 78 x 1.5 = 936 m3 34,859.26 32,628,265.22
Galian tanah Pondasi dan Sloof 131.2 x 0.5 x 0.5 = 32.8 m3 34,859.26 1,143,383.65
Pas. Pondasi batu belah 131 x 0.5 x 0.5 = 32.8 m3 131,962.50 4,328,370.00
Cor Sloof 50.1 x 0.5 x 0.5 = 12.521125 m3
Cor Kolom Praktis 1.3 18 23.4 0.3 0.3 = 2.11 m'
Cor Dinding Beton 24.6 x 1 x 0.1 = 2.46 m3
Cor Ring Balok 18 = 18.00 m'
Pas. Dinding Batu belah 106 x 1.3 x 0.4 = 55.22 m3 131,962.50 7,287,497.10
Pas. Dinding Batu belah (BP) 15 x 1 4.33 19.33 m3 131,962.50 2,550,835.13
Cor Lantai beton dan dinding 54.2 x 9.4 x 0.12 61.14 m3 80.14 1,029,339.70 62,931,358.84 61.1376
Plesteran 459.15 m2 59,880.96 27,494,342.78
Acian 459.15 m2 36,145.94 16,596,407.20
Pasang Pintu besi 2 Set 1,500,000.00 3,000,000.00
Pasang Cerucuk kayu bulat panjang 0,90 m 70 Batang 12,000.00 840,000.00
Pasang Cerucuk kayu bulat panjang 0,70 m 44 Batang 10,000.00 440,000.00
Foto Dokumentasi 7 Album 150,000.00 1,050,000.00
Plang Kegiatan 1 Bh 350,000.00 350,000.00
Pembersihan Lapangan Ls 2,000,000.00 2,000,000.00
Pengukuran Ls 1,000,000.00 1,000,000.00
310
19 206 23.4 163,640,459.93
-104
1.10 23.40 15.00
0.20 0.60
0.22 x 0.1 = 0.022 3.80
2.00 2.28
103 0.11 x 10.3 = 16.00 m3 1.33 1.90
32 0.36 = 1.30 m' 25 4.33
103 1.45 x 0.3 = 20.80 m3 33.25 1,000,000.00
0.65
0.9425
2
0.47
98.00 124 21
24 0.4 x 1 0.4 0.16 0.25
122.00 310 x 2 0.4 186 0.25
0.1 186.16 1.31
31.0 1.7
98 1.5 1
15.8 0.4 0.85
113.8 18.6 96
176207.92 310 81.6
328.6 140.60
15.4
88 0.7
1.5 0.1
132 1.1
98 0
230 1.1
+ - 0.00
1.7
2
0.85
98
83.3
9.24 batang
462 M'
target 676,640,000.00
486,000,000.00
190,640,000.00
realisasi 350,000,000.000
326,640,000.000
0.7 GALIAN TANAH 2.2 X 0.75 = 1.65 2 0.83 x 130 = 107.25 m3 0.15 0.3 130 5.85 = 113.10
0.5 COR BETON K. 175 1.8 X 0.20 = 0.36 x 130 = 46.80 m3 0.15 0.6 130 11.7 = 58.50
1.2 PLESTERAN 2 X 64,416.72 = 128,833.44 x 130 = 260 m2 260
0.2 1.6 X 0.60 = 0.66 x 130 = M3
0.24 ACIAN 2 X 35,553.54 = 71,107.08 x 130 = 260 m2
0.12 1.6 X - = - x 130 = - m2
x
1.2 1.6 462
0.2 2.4 0.6 -
0.24 0.6 0.96 350,000,000.00
0.12 1.44 0.48 350,000,000.00
0.0288 0.72 0.96 35,000,000.00
0.0144 163 0.48 385,000,000.00
117.36
0.15 0.15
0.15 17.604
0.0225 18.324
2 18.204
0.045
0.195
2.4
0.15
0.36
1
0.36
1.3
1
1.3
2.4
0.65
1.56
0.78
194
151.32
I PEK. PERSIAPAN
Pek. Pembersihan lokasi Pekerjaan Ls Ls 2,000,000.00 2,000,000.00
Pek. Pengukuran ( Uitzet ) Ls Ls 1,180,000.00 1,180,000.00
Pasang Plank kegiatan Ls 1.00 Bh 350,000.00 350,000.00
3,530,000.00
II PEK. TANAH
Galian Tanah EI-21 (Excavator) 651.00 M3 34,859.26 22,693,378.26
Galian Tanah Pondasi dan sloof EI-21 (Excavator) 32.88 M3 34,859.26 1,146,172.47
Timbunan tanah kembali PT.6.9 309.00 M3 21,528.00 6,652,152.00
30,491,702.73
III PEK. PASANGAN
Pasangan Pondasi batu belah 0,50 X 0,50 PP.6.1 28.60 M3 899,906.63 25,737,329.62
Pasangan Dinding batu belah PP.6.2 79.34 M3 840,746.03 66,708,153.00
Pas. Batu belah bangunan Pelimpah PP.6.2 38.68 M3 840,746.03 32,515,852.71
124,961,335.33
IV PEK. BETON
Cor sloof 0,50 X 0,50 PB.6.29 9.50 M3 6,878,371.95 65,344,533.53
Cor kolom / Tiang 0,35 X 0,35 PB.6.30 1.95 M3 10,630,869.10 20,707,435.61
Cor Dinding Beton PB.6.33 3.49 M3 6,099,915.68 21,300,905.55
Cor Ring Balok PB.6.36 17.50 M' 129,155.75 2,260,225.63
Cor Lantai beton ( K.175 ) PB.6.5 98.75 M3 1,043,172.82 103,010,186.46
Plat beton PB.6.32 0.16 M3 6,643,088.28 1,036,321.77
213,659,608.54
V PEK.. PLESTERAN
Pek. Plesteran PL.6.2 330.00 M2 64,858.32 21,403,245.60
Pek. Acian PA.6.27 330.00 M2 35,553.54 11,732,668.20
33,135,913.80
VI PEK. MEMASANG CERUCUK
Pasangan pintu besi Ls 1.00 Set 2,000,000.00 2,000,000.00
Pasang kayu cerucuk 0,90 M Ls 66.00 btg 15,000.00 990,000.00
Pasang kayu cerucuk 0,70 M Ls 40.00 btg 12,000.00 480,000.00
3,470,000.00
VII PEK. LAIN - LAIN
1. Foto Dokumentasi Ls 7.00 142,000.00 994,000.00
J U M LAH 410,242,560.40
-
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN PENGEMBANGAN SUMBER - SUMBER AIR UNTUK IRIGASI
PEKERJAAN PEMBUATAN EMBUNG
LOKASI DUSUN I SUKA TANI DESA SUKA JAYA KEC. BESITANG
Jumlah 410,242,560.40
PPN 10 % 41,024,256.04
Nilai 451,266,816.44
Pembulatan 451,266,000.00
Terbilang : EMPAT RATUS LIMA PULUH SATU JUTA DUA RATUS ENAM PULUH ENAM RIBU RUPIAH,-
I PEK. PERSIAPAN
Pek. Pembersihan lokasi Pekerjaan Ls Ls 2,000,000.00 2,000,000.00
Pek. Pengukuran ( Uitzet ) Ls Ls 1,200,000.00 1,200,000.00
Pasang Plank kegiatan Ls 1.00 Bh 350,000.00 350,000.00
3,550,000.00
II PEK. TANAH
Galian Tanah EI-21 (Excavator) 936.00 M3 34,859.26 32,628,267.36
Galian Tanah Pondasi dan sloof EI-21 (Excavator) 32.80 M3 34,859.26 1,143,383.73
Timbunan tanah kembali PT.6.9 322.93 M3 21,528.00 6,952,108.80
40,723,759.89
III PEK. PASANGAN
Pasangan Pondasi batu belah 0,50 X 0,50 PP.6.1 32.80 M3 942,526.20 30,914,859.36
Pasangan Dinding batu belah PP.6.2 55.22 M3 884,947.43 48,870,336.87
Pasangan batu belah bangunan pelimpah PP.6.2 19.33 M3 884,947.43 17,106,033.82
96,891,230.06
IV PEK. BETON
Cor sloof 0,50 X 0,50 PB.6.29 12.52 M3 6,916,749.75 86,605,488.21
Cor Kolom / Tiang 0,30 X 0,30 PB.6.30 2.11 M3 11,751,680.95 24,796,046.80
Cor Dinding Beton PB.6.33 2.46 M3 6,138,293.48 15,100,201.96
Cor Ring Balok PB.6.36 18.00 M' 129,821.26 2,336,782.68
Cor Lantai beton dan dinding ( K.175 ) PB.6.5 80.14 M3 1,077,069.07 86,313,730.30
Plat beton PB.6.32 0.16 M3 6,681,466.08 1,042,308.71
216,194,558.67
V PEK.. PLESTERAN
Pek. Plesteran PL.6.2 459.15 M2 65,762.22 30,194,723.31
Pek. Acian PA.6.27 459.15 M2 35,553.54 16,324,407.89
46,519,131.20
VI PEK. LAIN - LAIN
1. Foto Dokumentasi Ls 7.00 142,000.00 994,000.00
2. Pasangan pintu besi Ls 2.00 Set 2,000,000.00 4,000,000.00
3. Pas. Cerucuk Kayu bulat Ø 3" P. 90 Cm Ls 70.00 Btg 12,000.00 840,000.00
4. Pas. Cerucuk Kayu bulat Ø 3" P. 70 Cm Ls 44.00 Btg 10,000.00 440,000.00
6,274,000.00
J U M LAH 410,152,679.82
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN PENGEMBANGAN SUMBER - SUMBER AIR UNTUK IRIGASI
PEKERJAAN PEMBUATAN EMBUNG
LOKASI DUSUN XIV PALUH SEBATANG DESA HALABAN KEC. BESITANG
Jumlah 410,152,679.82
PPN 10 % 41,015,267.98
Nilai 451,167,947.80
Pembulatan 451,167,000.00
Terbilang : EMPAT RATUS LIMA PULUH SATU JUTA SERATUS ENAM PULUH TUJUH RIBU RUPIAH,-
I PEK. PERSIAPAN
Pek. Pembersihan lokasi Pekerjaan Ls Ls 2,000,000.00 2,000,000.00
Pek. Pembentukan Alur Air diatas Embung Ls 326.25 M3 33,347.00 10,879,458.75
Pek. Pengukuran ( Uitzet ) Ls Ls 1,200,000.00 1,200,000.00
Pasang Plank kegiatan Ls 1.00 Bh 350,000.00 350,000.00
14,429,458.75
II PEK. TANAH
Galian Tanah EI-21 (Excavator) 672.00 M3 34,859.26 23,425,422.72
Galian Tanah Pondasi dan sloof EI-21 (Excavator) 33.00 M3 34,859.26 1,150,355.58
Timbunan Tanggul Embung PT.6.9 83.30 M3 21,528.00 1,793,282.40
26,369,060.70
III PEK. PASANGAN
Pasangan Pondasi batu belah 0,50 x 0,50 PP.6.1 33.00 M3 889,197.83 29,343,528.39
Pasangan Dinding batu belah PP.6.2 122.00 M3 829,264.43 101,170,260.46
Pasangan batu belah bangunan pelimpah PP.6.2 20.22 M3 829,264.43 16,769,385.30
147,283,174.15
IV PEK. BETON
Cor sloof 0,50 X 0,50 PB.6.29 9.00 M3 6,866,448.75 61,798,038.75
Cor Kolom / Tiang 0,25 x 0,25 PB.6.30 1.31 M3 11,701,379.95 15,328,807.73
Cor Dinding Beton PB.6.33 1.08 M3 6,087,992.48 6,562,855.89
Cor Ring Balok PB.6.36 119.00 M' 128,957.03 15,345,886.57
Cor Lantai beton ( K.175 ) PB.6.5 68.11 M3 1,026,612.82 69,924,652.40
Plat beton PB.6.32 0.16 M3 6,631,165.08 1,034,461.75
169,994,703.10
V PEK.. PLESTERAN
Pek. Plesteran PL.6.2 461.00 M2 64,416.72 29,696,107.92
Pek. Acian PA.6.27 461.00 M2 35,553.54 16,390,181.94
46,086,289.86
J U M LAH 408,734,686.56
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN PENGEMBANGAN SUMBER - SUMBER AIR UNTUK IRIGASI
PEKERJAAN PEMBUATAN EMBUNG
LOKASI DESA SIDOREJO KEC. SIRAPIT
Jumlah 408,734,686.56
PPN 10 % 40,873,468.66
Nilai 449,608,155.22
Pembulatan 449,608,000.00
Terbilang : ENAM RATUS EMPAT PULUH SEMBILAN JUTA ENAM RATUS DELAPAN RIBU RUPIAH,-
I PEK. PENDAHULUAN
Pembersihan lokasi pekerjaan Ls Ls 2,000,000.00 2,000,000.00
Pengukuran ( Uitzet ) Ls Ls 1,180,000.00 1,180,000.00
Pasang Plank Kegiatan Ls 1.00 Bh 350,000.00 350,000.00
3,530,000.00
II PEK. LENING SALURAN DISTRIBUSI SEP. 379 m'
Cor beton K. 175 PB.6.5 119.39 M3 1,043,172.82 124,539,187.12
Timbunan Tanggul PT.6.1 295.62 M3 64,687.50 19,122,918.75
Pemadatan tanggul lening Taksir 295.62 M3 13,041.00 3,855,180.42
Plesteran PL.6.2 492.70 M2 64,858.32 31,955,694.26
Acian PA.6.27 492.70 M2 35,553.54 17,517,229.16
Pas. Pipa Paralon Ø 3" Sep. 1 M Ls 8.00 Btg 35,000.00 280,000.00
197,270,209.71
III PEK. LAIN - LAIN
Foto Dokumentasi Ls 7 Exp. 142,000.00 994,000.00
Pembersihan akhir Ls Ls 984,000.00 984,000.00
1,978,000.00
J U M LAH 202,778,209.71
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN PENGEMBANGAN SUMBER - SUMBER AIR UNTUK IRIGASI
PEKERJAAN PEMBUATAN LEANNING SALURAN DISTRIBUSI SEP. 379 M
LOKASI DUSUN I SUKA TANI DESA SUKA JAYA KEC. BESITANG
Jumlah 202,778,209.71
PPN 10 % 20,277,820.97
Nilai 223,056,030.68
Pembulatan 223,056,000.00
Terbilang : DUA RATUS DUA PULUH TIGA JUTA LIMA PULUH ENAM RIBU RUPIAH,-
I PEK. PERSIAPAN
Pek. Pembersihan lokasi Pekerjaan Ls Ls 2,000,000.00 2,000,000.00
Pek. Pengukuran ( Uitzet ) Ls Ls 1,166,000.00 1,166,000.00
Pasang Plank kegiatan Ls 1.00 Bh 350,000.00 350,000.00
3,516,000.00
II PEK. LENING SALURAN DISTRIBUSI SEP. 337 m'
Cor beton K. 175 PB.6.5 113.74 M3 1,077,069.07 122,503,143.35
Timbunan Tanggul PT.6.1 262.86 M3 64,687.50 17,003,756.25
Pemadatan tanggul lening Taksir 262.86 M3 13,041.00 3,427,957.26
Plesteran PL.6.2 539.20 M2 65,762.22 35,458,989.02
Acian PA.6.27 539.20 M2 35,553.54 19,170,468.77
Pas. Pipa Paralon Ø 3" Sep. 1 M Ls 8.00 Btg 35,000.00 280,000.00
197,844,314.65
III PEKERJAAN LAIN - LAIN
Foto Dokumentasi Ls 7.00 142,000.00 994,000.00
J U M LAH 202,354,314.65
###
###
###
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN PENGEMBANGAN SUMBER - SUMBER AIR UNTUK IRIGASI
PEKERJAAN PEMBUATAN LEANNING SALURAN DISTRIBUSI SEP. 337 M
LOKASI DUSUN XIV PALUH SEBATANG DESA HALABAN KEC. BESITANG
Jumlah 202,354,314.65
PPN 10 % 20,235,431.47
Nilai 222,589,746.12
Pembulatan 222,589,000.00
Terbilang : DUA RATUS DUA PULUH DUA JUTA LIMA RATUS DELAPAN PULUH SEMBILAN RIBU RUPIAH,-
I PEK. PERSIAPAN
Pek. Pembersihan lokasi Pekerjaan Ls Ls 2,000,000.00 2,000,000.00
Pek. Pengukuran ( Uitzet ) Ls Ls 1,062,000.00 1,062,000.00
Pasang Plank kegiatan Ls 1.00 Bh 350,000.00 350,000.00
3,412,000.00
II PEK. LENING SALURAN DISTRIBUSI BESAR SEP. 130 m'
Galian Tanah PT.6.1 113.10 M3 64,687.50 7,316,156.25
Cor beton K. 175 PB.6.5 58.50 M3 1,026,612.82 60,056,849.97
Plesteran PL.6.2 260.00 M2 64,416.72 16,748,347.20
Acian PA.6.27 260.00 M2 35,553.54 9,243,920.40
93,365,273.82
III PEK. LENING SALURAN DISTRIBUSI KECIL SEP. 210 m'
Cor beton K. 175 PB.6.5 67.20 M3 1,026,612.82 68,988,381.50
Timbunan Tanggul PT.6.1 126.00 M3 64,687.50 8,150,625.00
Pemadatan tanggul lening Taksir 126.00 M3 13,041.00 1,643,166.00
Plesteran PL.6.2 261.91 M2 64,416.72 16,871,383.14
Acian PA.6.27 261.91 M2 35,553.54 9,311,827.66
104,965,383.30
IV PEK. LAIN - LAIN
1. Foto Dokumentasi Ls 7.00 142,000.00 994,000.00
5. Pas. Pipa Paralon Ø 3 " P. 90 Cm Ls 4.00 Btg 35,000.00 140,000.00
1,134,000.00
202,876,657.12
-
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN PENGEMBANGAN SUMBER - SUMBER AIR UNTUK IRIGASI
PEKERJAAN PEMBUATAN LEANNING SALURAN DISTRIBUSI
LOKASI DESA SIDOREJO KEC. SIRAPIT
Jumlah 202,876,657.12
PPN 10 % 20,287,665.71
Nilai 223,164,322.83
Pembulatan 223,164,000.00
Terbilang : DUA RATUS DUA PULUH TIGA JUTA SERATUS ENAM PULUH EMPAT RIBU RUPIAH,-
#VALUE!
#VALUE!
#VALUE!
###
###
###
333
46
379 379
333
379
50
7.58
135.88 119.39
336.46 295.62
336.46 295.62
560.76 492.7
560.76 492.7
173,156,322.04
333
519,988.96
0
353
313
#VALUE! 31.77
337 128.27 119.14
50 296.45 275.34
6.74 296.45 275.34
608.11 458.9
608.11 458.9
175,175,579.18
313
559,666.39
313
40
353
194 #VALUE! 40.75
144.5 90.22 54.74
169.16 151.32
- 169.16 151.32
351.63 261.91
351.63 261.91
KEGIATAN
KEGIATAN PENGEMBANGAN SUMBER - SUMBER AIR UNTUK IRIGASI
PEKERJAAN PEMBUATAN EMBUNG / LEANNING SALURAN DISTRIBUSI
DUSUN I SUKA TANI DESA SUKA JAYA KEC. BESITANG
HARGA SATUAN UPAH KERJA
HARGA SAMPAI
NO BAHAN PERHITUNGAN JARAK ANGKUT DILOKASI
( Rp.)
1 Kerikil 30 X Rp. 1.500 = Rp. 139,154.00,- 142,200.00
2 Pasir pasang / Beton 54 X Rp. 1.500 = Rp. 33,940.00,- 119,700.00
3 Batu belah 30 X Rp. 1.500 = Rp. 33,940.00,- 199,350.00
KEGIATAN
KEGIATAN PENGEMBANGAN SUMBER - SUMBER AIR UNTUK IRIGASI
PEKERJAAN PEMBUATAN EMBUNG / LEANNING SALURAN DISTRIBUSI
LOKASI DUSUN XIV PALUH SEBATANG DESA HALABAN KEC. BESITANG
HARGA SATUAN UPAH KERJA
HARGA SAMPAI
NO BAHAN PERHITUNGAN JARAK ANGKUT DILOKASI
( Rp.)
1 Kerikil 40 X Rp. 1.500 = Rp. 60.000.00,- 157,200.00
2 Pasir pasang / Beton 64 X Rp. 1.500 = Rp. 96,000.00,- 159,000.00
3 Batu belah 40 X Rp. 1.500 = Rp. 60.000.00,- 214,350.00
KEGIATAN
KEGIATAN PENGEMBANGAN SUMBER - SUMBER AIR UNTUK IRIGASI
PEKERJAAN PEMBUATAN EMBUNG / LEANNING SALURAN DISTRIBUSI
LOKASI DESA SIDOREJO KECAMATAN SIRAPIT
HARGA SATUAN UPAH KERJA
HARGA SAMPAI
NO BAHAN PERHITUNGAN JARAK ANGKUT DILOKASI
( Rp.)
1 Kerikil 30 X Rp. 1.500 = Rp. 45.000.00,- 142,200.00
2 Pasir pasang / Beton 25 X Rp. 1.500 = Rp. 37,500.00,- 100,500.00
3 Batu belah 30 X Rp. 1.500 = Rp. 45.000.00,- 199,350.00
10% 142.65 1,283.85
10% 6,300.00 56,700.00
10% 6,300.00 56,700.00 81000 119,700.00
10% 9,720.00 87,480.00 45,000 142,200.00
10% 15,435.00 138,915.00 45000 199,350.00
10% 1,404.00 12,636.00
10% 590,000.00 5,310,000.00
10% 2,520.00 22,680.00
10% 23.00 207.00
10% 1,350.00 12,150.00
10% 2,115.00 19,035.00
10% 2,250.00 20,250.00
10% 1,295.48 11,659.28
10% 1,784.59 16,061.33
10% 1,368.64 12,317.79
10% 1,935.00 17,415.00
10% 2,547.00 22,923.00
10% 4,140.00 37,260.00
10% 4,140.00 37,260.00
10% 4,950.00 44,550.00
10% 109,700.00 10,970.00 98,730.00
10% 900.00 8,100.00
30 1,500 45,000
54 1,500 81,000
30 1,500 45,000
40 1,500 60,000 157,200.00
64 1,500 96,000 159,000.00
40 1,500 60,000 214,350.00
30 1,500 45,000 142,200.00
25 1,500 37,500 100,500.00
30 1,500 45,000 199,350.00
37500
25
1500
37500
TABEL REKAPITULASI
KEGIATAN PENGEMBANGAN SUMBER - SUMBER AIR UNTUK IRIGASI
PEKERJAAN PEMBUATAN EMBUNG DAN PEMBUATAN LANING SALURAN DISTRIBUSI
( DAK ) APBN - P . TAHUN ANGGARAN 2015
1 Pembuatan Embung Desa Halaban Kecamatan Besitang 1 Unit 451,167,000.00 453,000,000.00 Tender
Pembuatan Laning Saluran Distribusi Desa Halaban Kecamatan Besitang 337 M 222,589,000.00 223,640,000.00 Tender
2 Pembuatan Embung Dusun I Suka Tani Desa Suka Jaya Kec. Besitang 1 Unit 451,266,000.00 453,000,000.00 Tender
Pembuatan Laning Saluran Distribusi Dusun I Suka Tani Desa Suka Jaya Kec. Besitang 379 M 223,056,000.00 223,640,000.00 Tender
3 Pembuatan Embung Desa Sidorejo Kecamatan Sirapit 1 Unit 449,608,000.00 453,000,000.00 Tender
Pembuatan Laning Saluran Distribusi Desa Sidorejo Kecamatan Sirapit 340 M 223,164,000.00 223,640,000.00 Tender
B Bahan
1 Batu belah M3 1.200 199,350.00 239,220.00
Semen portland Kg 163.000 1,426.50 232,519.50
Pasir pasang M3 0.520 119,700.00 62,244.00
Jumlah harga bahan 533,983.50
C Peralatan - - - - -
Jumlah harga Peralatan -
B Bahan
Kayu sembarang keras M3 0.240 5,900,000.00 1,416,000.00
Paku biasa Kg 3.200 14,040.00 44,928.00
Minyak bekisting Kg 1.600 25,200.00 40,320.00
Besi beton polos Kg 157.500 13,500.00 2,126,250.00
Kawat beton Kg 2.250 21,150.00 47,587.50
Semen portland Kg 336.000 1,426.50 479,304.00
Pasir pasang M3 0.540 119,700.00 64,638.00
Kerikil M3 0.810 142,200.00 115,182.00
Tripleks 9" Lbr 2.800 98,730.00 276,444.00
Jumlah harga bahan 4,610,653.50
C Peralatan - - - - -
PL.6.2 1 m2 Plesteran tebal 1.5 Cm dengan perbandingan 1.PC dan 2.Pasir pasang
A Tenaga Kerja
1 Pekerja L.01 OH 0.300 72,000.00 21,600.00
2 Tukang batu L.02 OH 0.150 99,000.00 14,850.00
3 Kep. Tukang L.02 OH 0.015 108,000.00 1,620.00
4 Mandor L.04 OH 0.015 90,000.00 1,350.00
Jumlah Harga tenaga 39,420.00
B Bahan
1 Pasir Pasang M.14b M3 0.02 119,700.00 2,394.00
2 Portland Cement M.15 Kg 10.224 1,426.50 14,584.54
Jumlah harga bahan 16,978.54
C Peralatan - - - - -
Jumlah harga Peralatan -
D Jumlah harga Tenaga, Bahan dan Peralatan ( A + B + C ) 56,398.54
E Over head + Profit ( 15% ) 8,459.78
F Harga satuan per M' ( D + E ) 64,858.32
PA.6.27 1 M2 Acian
A Tenaga Kerja
1 Pekerja L.01 OH 0.200 72,000.00 14,400.00
2 Tukang batu L.02 OH 0.100 99,000.00 9,900.00
3 Kep. Tukang L.02 OH 0.010 108,000.00 1,080.00
4 Mandor L.04 OH 0.010 90,000.00 900.00
Jumlah Harga tenaga 26,280.00
B Bahan
2 Portland Cement Kg 3.250 1,426.50 4,636.13
Jumlah harga bahan 4,636.13
C Peralatan - - - - -
Jumlah harga Peralatan -
B Bahan
Kayu sembarang keras M3 0.003 5,900,000.00 17,700.00
Paku biasa Kg 0.020 14,040.00 280.80
Besi beton polos Kg 3.600 13,500.00 48,600.00
Kawat beton Kg 0.050 21,150.00 1,057.50
Semen portland Kg 5.500 1,426.50 7,845.75
Pasir pasang M3 0.009 119,700.00 1,077.30
Kerikil M3 0.015 142,200.00 2,133.00
Jumlah harga bahan 78,694.35
C Peralatan - - - - -
Jumlah harga Peralatan -
B Bahan
Kayu sembarang keras M3 0.400 5,900,000.00 2,360,000.00
Paku biasa Kg 4.000 14,040.00 56,160.00
Minyak bekisting Kg 2.000 25,200.00 50,400.00
Besi beton polos Kg 315.000 13,500.00 4,252,500.00
Kawat beton Kg 4.500 21,150.00 95,175.00
Semen portland Kg 336.000 1,426.50 479,304.00
Pasir beton M3 0.540 119,700.00 64,638.00
Kerikil beton 2 3 Cm M3 0.810 142,200.00 115,182.00
Kayu Sembarang keras ( balok ) M3 0.150 5,900,000.00 885,000.00
Triplek 9 MM Lembar 3.500 98,730.00 345,555.00
Kayu Dolken / Kayu bulat Ø 3" - 4 " Btg 20.000 25,000.00 500,000.00
B Bahan
1 Batu belah M3 1.200 214,350.00 257,220.00
Semen portland Kg 163.000 1,426.50 232,519.50
Pasir pasang M3 0.520 159,000.00 82,680.00
Jumlah harga bahan 572,419.50
C Peralatan - - - - -
Jumlah harga Peralatan -
B Bahan
Semen portland Kg 326.000 1,426.50 465,039.00
Pasir pasang Kg 750.000 159.00 119,250.00
Kerikil Kg 1029.000 142.20 146,323.80
Air Liter 215.000 230.00 49,450.00
Jumlah harga bahan 780,062.80
C Peralatan - - - - -
Jumlah harga Peralatan -
B Bahan
Kayu sembarang keras M3 0.400 5,900,000.00 2,360,000.00
Paku biasa Kg 4.000 14,040.00 56,160.00
Minyak bekisting Kg 2.000 25,299.00 50,598.00
Besi beton polos Kg 315.000 13,500.00 4,252,500.00
Kawat beton Kg 4.500 21,150.00 95,175.00
Semen portland Kg 336.000 1,426.50 479,304.00
Pasir beton M3 0.540 159,000.00 85,860.00
Kerikil beton 2 3 Cm M3 0.810 157,200.00 127,332.00
Kayu Sembarang keras ( balok ) M3 0.150 5,900,000.00 885,000.00
Triplek 9 MM Lembar 3.500 98,730.00 345,555.00
Kayu Dolken / Kayu bulat Ø 3" - 4 " Btg 20.000 25,000.00 500,000.00
PL.6.2 1 m2 Plesteran tebal 1.5 Cm dengan perbandingan 1.PC dan 2.Pasir pasang
A Tenaga Kerja
1 Pekerja L.01 OH 0.300 72,000.00 21,600.00
2 Tukang batu L.02 OH 0.150 99,000.00 14,850.00
3 Kep. Tukang L.02 OH 0.015 108,000.00 1,620.00
4 Mandor L.04 OH 0.015 90,000.00 1,350.00
Jumlah Harga tenaga 39,420.00
Harga Jumlah
No Analisa Uraian Kode Satuan Koefisien Satuan Harga
( Rp.) ( Rp.)
B Bahan
1 Pasir Pasang M.14b M3 0.02 159,000.00 3,180.00
2 Portland Cement M.15 Kg 10.224 1,426.50 14,584.54
Jumlah harga bahan 17,764.54
C Peralatan - - - - -
Jumlah harga Peralatan -
D Jumlah harga Tenaga, Bahan dan Peralatan ( A + B + C ) 57,184.54
E Over head + Profit ( 15% ) 8,577.68
F Harga satuan per M' ( D + E ) 65,762.22
PA.6.27 1 M2 Acian
A Tenaga Kerja
1 Pekerja L.01 OH 0.200 72,000.00 14,400.00
2 Tukang batu L.02 OH 0.100 99,000.00 9,900.00
3 Kep. Tukang L.02 OH 0.010 108,000.00 1,080.00
4 Mandor L.04 OH 0.010 90,000.00 900.00
Jumlah Harga tenaga 26,280.00
B Bahan
2 Portland Cement Kg 3.250 1,426.50 4,636.13
Jumlah harga bahan 4,636.13
C Peralatan - - - - -
Jumlah harga Peralatan -
Harga Jumlah
No Analisa Uraian Kode Satuan Koefisien Satuan Harga
( Rp.) ( Rp.)
B Bahan
1 Batu belah M3 1.200 199,350.00 239,220.00
Semen portland Kg 163.000 1,426.50 232,519.50
Pasir pasang M3 0.520 100,500.00 52,260.00
Jumlah harga bahan 523,999.50
C Peralatan - - - - -
Jumlah harga Peralatan -
Harga Jumlah
No Analisa Uraian Kode Satuan Koefisien Satuan Harga
( Rp.) ( Rp.)
Harga Jumlah
No Analisa Uraian Kode Satuan Koefisien Satuan Harga
( Rp.) ( Rp.)
PL.6.2 1 m2 Plesteran tebal 1.5 Cm dengan perbandingan 1.PC dan 2.Pasir pasang
A Tenaga Kerja
1 Pekerja L.01 OH 0.300 72,000.00 21,600.00
2 Tukang batu L.02 OH 0.150 99,000.00 14,850.00
3 Kep. Tukang L.02 OH 0.015 108,000.00 1,620.00
4 Mandor L.04 OH 0.015 90,000.00 1,350.00
Jumlah Harga tenaga 39,420.00
B Bahan
1 Pasir Pasang M.14b M3 0.02 100,500.00 2,010.00
2 Portland Cement M.15 Kg 10.224 1,426.50 14,584.54
Jumlah harga bahan 16,594.54
C Peralatan - - - - -
Jumlah harga Peralatan -
D Jumlah harga Tenaga, Bahan dan Peralatan ( A + B + C ) 56,014.54
E Over head + Profit ( 15% ) 8,402.18
F Harga satuan per M' ( D + E ) 64,416.72
PA.6.27 1 M2 Acian
A Tenaga Kerja
1 Pekerja L.01 OH 0.200 72,000.00 14,400.00
2 Tukang batu L.02 OH 0.100 99,000.00 9,900.00
3 Kep. Tukang L.02 OH 0.010 108,000.00 1,080.00
4 Mandor L.04 OH 0.010 90,000.00 900.00
Jumlah Harga tenaga 26,280.00
B Bahan
2 Portland Cement Kg 3.250 1,426.50 4,636.13
Jumlah harga bahan 4,636.13
C Peralatan - - - - -
Jumlah harga Peralatan -
Harga Jumlah
No Analisa Uraian Kode Satuan Koefisien Satuan Harga
( Rp.) ( Rp.)
Harga Jumlah
No Analisa Uraian Kode Satuan Koefisien Satuan Harga
( Rp.) ( Rp.)
PL.6.2 1 m2 Plesteran tebal 1.5 Cm dengan perbandingan 1.PC dan 2.Pasir pasang
A Tenaga Kerja
1 Pekerja L.01 OH 0.300 72,000.00 21,600.00
2 Tukang batu L.02 OH 0.150 99,000.00 14,850.00
3 Kep. Tukang L.02 OH 0.015 108,000.00 1,620.00
4 Mandor L.04 OH 0.015 90,000.00 1,350.00
Jumlah Harga tenaga 39,420.00
B Bahan
1 Pasir Pasang M.14b M3 0.02 119,700.00 2,394.00
2 Portland Cement M.15 Kg 10.224 1,426.50 14,584.54
Jumlah harga bahan 16,978.54
C Peralatan - - - - -
Jumlah harga Peralatan -
D Jumlah harga Tenaga, Bahan dan Peralatan ( A + B + C ) 56,398.54
E Over head + Profit ( 15% ) 8,459.78
F Harga satuan per M' ( D + E ) 64,858.32
Harga Jumlah
No Analisa Uraian Kode Satuan Koefisien Satuan Harga
( Rp.) ( Rp.)
PA.6.27 1 M2 Acian
A Tenaga Kerja
1 Pekerja L.01 OH 0.200 72,000.00 14,400.00
2 Tukang batu L.02 OH 0.100 99,000.00 9,900.00
3 Kep. Tukang L.02 OH 0.010 108,000.00 1,080.00
4 Mandor L.04 OH 0.010 90,000.00 900.00
Jumlah Harga tenaga 26,280.00
B Bahan
2 Portland Cement Kg 3.250 1,426.50 4,636.13
Jumlah harga bahan 4,636.13
C Peralatan - - - - -
Jumlah harga Peralatan -
39,420.00
ANALISA BIAYA
KEGIATAN PENGEMBANGAN SUMBER - SUMBER AIR UNTUK IRIGASI
PEKERJAAN PEMBUATAN LEANNING SALURAN DISTRIBUSI
LOKASI DUSUN XIV PALUH SEBATANG DESA HALABAN KEC. BESITANG
Harga Jumlah
No Analisa Uraian Kode Satuan Koefisien Satuan Harga
( Rp.) ( Rp.)
PL.6.2 1 m2 Plesteran tebal 1.5 Cm dengan perbandingan 1.PC dan 2.Pasir pasang
A Tenaga Kerja
1 Pekerja L.01 OH 0.300 72,000.00 21,600.00
2 Tukang batu L.02 OH 0.150 99,000.00 14,850.00
3 Kep. Tukang L.02 OH 0.015 108,000.00 1,620.00
4 Mandor L.04 OH 0.015 90,000.00 1,350.00
Jumlah Harga tenaga 39,420.00
B Bahan
1 Pasir Pasang M.14b M3 0.02 159,000.00 3,180.00
2 Portland Cement M.15 Kg 10.224 1,426.50 14,584.54
Jumlah harga bahan 17,764.54
C Peralatan - - - - -
Jumlah harga Peralatan -
D Jumlah harga Tenaga, Bahan dan Peralatan ( A + B + C ) 57,184.54
E Over head + Profit ( 15% ) 8,577.68
F Harga satuan per M' ( D + E ) 65,762.22
Harga Jumlah
No Analisa Uraian Kode Satuan Koefisien Satuan Harga
( Rp.) ( Rp.)
PA.6.27 1 M2 Acian
A Tenaga Kerja
1 Pekerja L.01 OH 0.200 72,000.00 14,400.00
2 Tukang batu L.02 OH 0.100 99,000.00 9,900.00
3 Kep. Tukang L.02 OH 0.010 108,000.00 1,080.00
4 Mandor L.04 OH 0.010 90,000.00 900.00
Jumlah Harga tenaga 26,280.00
B Bahan
2 Portland Cement Kg 3.250 1,426.50 4,636.13
Jumlah harga bahan 4,636.13
C Peralatan - - - - -
Jumlah harga Peralatan -
Harga Jumlah
No Analisa Uraian Kode Satuan Koefisien Satuan Harga
( Rp.) ( Rp.)
PA.6.27 1 M2 Acian
A Tenaga Kerja
1 Pekerja L.01 OH 0.200 72,000.00 14,400.00
2 Tukang batu L.02 OH 0.100 99,000.00 9,900.00
3 Kep. Tukang L.02 OH 0.010 108,000.00 1,080.00
4 Mandor L.04 OH 0.010 90,000.00 900.00
Jumlah Harga tenaga 26,280.00
B Bahan
2 Portland Cement Kg 3.250 1,426.50 4,636.13
Jumlah harga bahan 4,636.13
C Peralatan - - - - -
Jumlah harga Peralatan -