Anda di halaman 1dari 220

TIME SCHEDULLE

PROYEK PERUMAHAN BUKIT PURI ASRI


CISARUA, SUMEDANG

BOBOT
NO URAIAN PEKERJAAN
(%)
1 PASANG BOUWPLANK 0.54
2 PEK. GALIAN PONDASI 0.51
3 PEK. URUGAN PASIR 0.20
4 URUGAN TANAH KEMBALI 0.10
5 PONDASI BATU KALI 3.35
6 PASANG DINDING BATAKO 14.35
7 PEK. PLESTERAN + ACI 8.64
8 PEK. BETON SLOOF 15/20 4.32
9 BETON KOLOM PRAKTIS 15/15 6.74
10 BETON KOLOM TERAS 15/20 0.30
11 BETON RING BALOK 15/20 DAN SOPI 4.29
12 BETON CANTILEVER T = 10 CM 1.76
13 RABAT BETON + CARPORT 1.11
14 PEK. BETON DUICKER 3 m' 0.85
15 PEK. ROLLAG BATA 0.37
16 PEK. LUBANG UDARA 0.30
17 PEK. BAN-BANAN 0.63
18 PEK. LOCIS PINTU 0.14
19 PEKERJAAN KUSEN 1.47
20 PASANG PINTU UTAMA 0.75
21 PINTU DOUBLE TRIPLEX 1.45
22 PASANG PINTU KM/WC 0.35
23 PASANG JENDELA 1.79
24 PEK. RANGKA ATAP 11.68
25 ATAP GENTENG 5.74
26 NOK GENTENG 0.99
27 PASANG LISTPLANK 3/20 0.89
28 PASANG TALANG 0.09
29 KUNCI PINTU UTAMA 0.18
30 KUNCI PINTU LAIN 0.30
31 PASANG ENGSEL PINTU 0.63
32 RANGKA PLAFOND 1/2x1 m 1.65
33 PENUTUP PLAFOND 2.61
34 PEK. LIST PLAFOND 1.15
35 KERAMIK LANTAI 30/30 4.37
36 KERAMIK LANTAI KM/WC 0.25
37 KERAMIK DINDING KM/WC 1.36
38 PEK. KERAMIK TERAS 0.41
39 PEK. PENGECATAN 6.28
40 PEK. INSTALASI LISTRIK 1.24
41 PEK. INSTALASI AIR 1.15
42 BAK MANDI FIBREGLASS 0.67
43 CLOSET JONGKOK 0.36
44 PASANG FLOOR DRAIN 0.05
45 PASANG KRAN TEMBOK 0.15
46 PEK. SEPTICTANK 1.01
47 PEK. BAK KONTROL 0.13
48 KISI - KISI / JALUSI KAYU 2.40

PROGRESS PER MINGGU


PROGRESS KOMULATIF 100.00
PROGRESS REALISASI

DIKETAHUI OLEH,

( SUYANTO )
15000
3000

#REF!

#REF!
BULAN JANUARI BULAN FEBRUARI
MINGGU 3 MINGGU 4 MINGGU 1 MINGGU 2
0.54
0.51
0.20
0.05
1.67 1.67
0.54 0.51 1.87 1.72
0.54 1.05 2.93 4.65

OLEH,

O)
JADWAL DAN WAKTU
ULAN FEBRUARI BULAN MARET
MINGGU 3 MINGGU 4 MINGGU 1 MINGGU 2

0.05

3.59 3.59 3.59 3.59


2.88 2.88
1.44 1.44 1.44
1.68 1.68 1.68

2.15 2.15
0.59

0.08 0.08

0.73 0.73

3.89
0.50
0.62 0.62
0.38 0.38

0.34 0.34

0.80

5.41 7.14 13.50 17.84


10.06 17.20 30.70 48.54
JADWAL DAN WAKTU PELAKSANAAN TAHUN 2019
BULAN MARET BULAN APRIL
MINGGU 3 MINGGU 4 MINGGU 1 MINGGU 2

2.88

1.68
0.15 0.15

0.59 0.59

0.18 0.18
0.08 0.08
0.32 0.32
0.07 0.07

3.89 3.89
5.24
0.99
0.45 0.45
0.09
0.83 0.83
1.31 1.31
0.50 0.65
1.46

0.38

0.34

0.80 0.80

16.17 8.01 3.58 3.72


64.71 72.73 76.31 80.03

DISETUJUI OLEH,

( PASA CAHYANTO )
BULAN APRIL BULAN MEI
MINGGU 3 MINGGU 4 MINGGU 1 MINGGU 2

0.37

0.25 0.25
0.73

0.89

0.09
1.46 1.46
0.25
1.36
0.20 0.20
2.09 2.09

0.34 0.34
0.18 0.18
0.02 0.02
0.15

1.46 3.33 3.33 4.80


81.49 84.82 88.16 92.96
BULAN MEI BULAN JUNI KET
MINGGU 3 MINGGU 4 MINGGU 1

0.37 0.37
0.42 0.42

0.25
0.73
0.35
0.89

0.09
0.30
0.63
2.09

0.06 0.06

6.19 0.86 -
99.14 100.00 100.00

SUMEDANG, 15 - FEBRUARI - 2019


DIBUAT OLEH,
PT. SUMBER KARYA MAKMUR ABADI

( GALIH )
0.54
0.51
0.20
0.10
3.35
14.35
8.64
4.32
6.74
0.30
4.29
1.76
1.11
0.85
0.37
0.30
0.63
0.14
1.47
0.75
1.45
0.35
1.79
11.68
5.74
0.99
0.89
0.09
0.18
0.30
0.63
1.65
2.61
1.15
4.37
0.25
1.36
0.41
6.28
1.24
1.15
0.67
0.36
0.05
0.15
1.01
0.13
2.40

100.00
PT. SUMBER KARYA MAKMUR ABADI
RENCANA ANGGARAN BIAYA
PROYEK: PERUMAHAN BUKIT PURI ASRI
T Y P E : 36/70

BOBOT

NO URAIAN PEKERJAAN MGG LALU

(%)

1 KAVLING A2
No. 13 -
No. 14 -
No. 15 -
No. 16 -
No. 17 -
No. 18 -
No. 19 -
No. 20 -
No. 21 -
No. 22 -
No. 23 -
No. 24 -

2 KAVLING A3
No. 1 -
No. 2 -
No. 3 -
No. 4 -
No. 5 -
No. 6 -
No. 7 -
No. 8 -
No. 9 -
No. 10 -
No. 11 -
No. 12 -

No. 13 -
No. 14 -
No. 15 -
No. 16 -
No. 17 -
No. 18 -
No. 19 -
No. 20 -
No. 21 -
No. 22 -
No. 23 -
No. 24 -

3 KAVLING B2
No. 1 -
No. 2 -
No. 3 -
No. 4 -
No. 5 -
No. 6 -
No. 7 -
No. 8 -
No. 9 -
No. 10 -
No. 11 -
No. 12 -

No. 13 -
No. 14 -
No. 15 -
No. 16 -
No. 17 -
No. 18 -
No. 19 -
No. 20 -
No. 21 -
No. 22 -
No. 23 -
No. 24 -
PERIODE
4 S/D 24 - FEB - 2019

BOBOT BOBOT

MGG INI S/D MGG INI

(%) (%)

5.35 5.35
5.35 5.35
5.35 5.35
5.35 5.35
5.35 5.35
5.35 5.35
5.35 5.35
5.35 5.35
5.35 5.35
5.35 5.35
5.35 5.35
5.35 5.35

5.61 5.61
5.61 5.61
5.61 5.61
5.61 5.61
5.61 5.61
5.61 5.61
5.61 5.61
5.61 5.61
5.61 5.61
5.61 5.61
5.61 5.61
5.61 5.61

5.35 5.35
5.35 5.35
5.35 5.35
5.35 5.35
5.35 5.35
5.35 5.35
5.35 5.35
5.35 5.35
5.35 5.35
5.35 5.35
5.35 5.35
5.35 5.35

5.51 5.51
5.51 5.51
5.51 5.51
5.51 5.51
5.51 5.51
5.51 5.51
5.51 5.51
5.51 5.51
5.51 5.51
5.51 5.51
5.51 5.51
5.51 5.51

5.17 5.17
5.17 5.17
5.17 5.17
5.17 5.17
5.17 5.17
5.17 5.17
5.17 5.17
5.17 5.17
5.17 5.17
5.17 5.17
5.17 5.17
5.17 5.17
PT. SUMBER KARYA MAKMUR ABADI
RENCANA ANGGARAN BIAYA
PROYEK: PERUMAHAN BUKIT PURI ASRI
T Y P E : 36/70

NO URAIAN PEKERJAAN SUB JUMLAH

1 PASANG BOUWPLANK 305,900.00

2 PEK. GALIAN PONDASI 291,465.00

3 PEK. URUGAN PASIR 113,317.20

4 URUGAN TANAH KEMBALI 55,767.09

5 PONDASI BATU KALI 1,903,189.54

6 PASANG DINDING BATAKO 8,152,907.03

7 PEK. PLESTERAN + ACI 4,906,413.75

8 PEK. BETON SLOOF 15/20 2,455,656.19

9 BETON KOLOM PRAKTIS 15/15 3,827,306.76

10 BETON KOLOM TERAS 15/20 168,803.50

11 BETON RING BALOK 15/20 DAN SOPI 2,437,394.59

12 BETON CANTILEVER T = 10 CM 997,356.85

13 RABAT BETON + CARPORT 631,235.00

14 PEK. BETON DUICKER 3 m' 480,744.00

15 PEK. ROLLAG BATA 208,462.33

16 PEK. LUBANG UDARA 170,850.00

17 PEK. BAN-BANAN 359,720.00

18 PEK. LOCIS PINTU 78,833.33

19 PEKERJAAN KUSEN 832,680.00

20 PASANG PINTU UTAMA 425,000.00

21 PINTU DOUBLE TRIPLEX 825,000.00

22 PASANG PINTU KM/WC 200,000.00

23 PASANG JENDELA 1,016,000.00

24 PEK. RANGKA ATAP 6,636,250.00

25 ATAP GENTENG 3,259,726.00


26 NOK GENTENG 559,660.50

27 PASANG LISTPLANK 3/20 508,018.00

28 PASANG TALANG 48,500.00

29 KUNCI PINTU UTAMA 102,500.00

30 KUNCI PINTU LAIN 170,000.00

31 PASANG ENGSEL PINTU 356,000.00

32 RANGKA PLAFOND 1/2x1 m 940,073.31

33 PENUTUP PLAFOND 1,483,198.20

34 PEK. LIST PLAFOND 651,337.60

35 KERAMIK LANTAI 30/30 2,480,450.00

36 KERAMIK LANTAI KM/WC 141,008.40

37 KERAMIK DINDING KM/WC 774,472.20

38 PEK. KERAMIK TERAS 231,357.50

39 PEK. PENGECATAN 3,570,025.25

40 PEK. INSTALASI LISTRIK 705,000.00

41 PEK. INSTALASI AIR 650,800.00

42 BAK MANDI FIBREGLASS 381,085.73

43 CLOSET JONGKOK 204,702.40

44 PASANG FLOOR DRAIN 27,000.00

45 PASANG KRAN TEMBOK 84,500.00

46 PEK. SEPTICTANK 573,433.33

47 PEK. BAK KONTROL 71,075.00

48 KISI - KISI / JALUSI KAYU 1,360,900.00

56,815,203.64
1,578,200.10
PT. SUMBER KARYA MAKMUR ABADI
RENCANA ANGGARAN BIAYA
PROYEK: PERUMAHAN BUKIT PURI ASRI
T Y P E : 36/70

BOBOT

NO URAIAN PEKERJAAN MGG LALU

(%)

1 KAVLING A2
No. 13 5.35
No. 14 5.35
No. 15 5.35
No. 16 5.35
No. 17 5.35
No. 18 5.35
No. 19 5.35
No. 20 5.35
No. 21 5.35
No. 22 5.35
No. 23 5.35
No. 24 5.35

2 KAVLING A3
No. 1 5.61
No. 2 5.61
No. 3 5.61
No. 4 5.61
No. 5 5.61
No. 6 5.61
No. 7 5.61
No. 8 5.61
No. 9 5.61
No. 10 5.61
No. 11 5.61
No. 12 5.61

No. 13 5.35
No. 14 5.35
No. 15 5.35
No. 16 5.35
No. 17 5.35
No. 18 5.35
No. 19 5.35
No. 20 5.35
No. 21 5.35
No. 22 5.35
No. 23 5.35
No. 24 5.35

3 KAVLING B2
No. 1 5.51
No. 2 5.51
No. 3 5.51
No. 4 5.51
No. 5 5.51
No. 6 5.51
No. 7 5.51
No. 8 5.51
No. 9 5.51
No. 10 5.51
No. 11 5.51
No. 12 5.51

No. 13 5.17
No. 14 5.17
No. 15 5.17
No. 16 5.17
No. 17 5.17
No. 18 5.17
No. 19 5.17
No. 20 5.17
No. 21 5.17
No. 22 5.17
No. 23 5.17
No. 24 5.17
PERIODE
25 S/D 10 - MART - 2019

BOBOT BOBOT

MGG INI S/D MGG INI

(%) (%)

4.37 9.72
4.37 9.72
4.37 9.72
4.37 9.72
4.37 9.72
4.37 9.72
4.37 9.72
4.37 9.72
4.37 9.72
4.37 9.72
4.37 9.72
4.37 9.72

4.81 10.41
4.81 10.41
4.81 10.41
4.81 10.41
4.81 10.41
4.81 10.41
4.81 10.41
4.81 10.41
4.81 10.41
4.81 10.41
4.81 10.41
4.81 10.41

4.37 9.72
4.37 9.72
4.37 9.72
4.37 9.72
4.37 9.72
4.37 9.72
4.37 9.72
4.37 9.72
4.37 9.72
4.37 9.72
4.37 9.72
4.37 9.72

4.88 10.39
4.88 10.39
4.88 10.39
4.88 10.39
4.88 10.39
4.88 10.39
4.88 10.39
4.88 10.39
4.88 10.39
4.88 10.39
4.88 10.39
4.88 10.39

5.04 10.21
5.04 10.21
5.04 10.21
5.04 10.21
5.04 10.21
5.04 10.21
5.04 10.21
5.04 10.21
5.04 10.21
5.04 10.21
5.04 10.21
5.04 10.21

10.09
PT. SUMBER KARYA MAKMUR ABADI
RENCANA ANGGARAN BIAYA PERIODE : 25 S/D 10/MART/201
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : B2- 1 S/D 12
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN

(%) Prog (%)

B2-1 s/d 12

1 PASANG BOUWPLANK 0.54 90

2 PEK. GALIAN PONDASI 0.51 90

3 PEK. URUGAN PASIR 0.20 80

4 URUGAN TANAH KEMBALI 0.10

5 PONDASI BATU KALI 3.35 80

6 PASANG DINDING BATAKO 14.35

7 PEK. PLESTERAN + ACI 8.64

8 PEK. BETON SLOOF 15/20 4.32

9 BETON KOLOM PRAKTIS 15/15 6.74

10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29

12 BETON CANTILEVER T = 10 CM 1.76

13 RABAT BETON + CARPORT 1.11

14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37

16 PEK. LUBANG UDARA 0.30

17 PEK. BAN-BANAN 0.63


18 PEK. LOCIS PINTU 0.14

19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75

21 PINTU DOUBLE TRIPLEX 1.45

22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68

25 ATAP GENTENG 5.74

26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89

28 PASANG TALANG 0.09

29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63

32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61

34 PEK. LIST PLAFOND 1.15

35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25

37 KERAMIK DINDING KM/WC 1.36

38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24 0


41 PEK. INSTALASI AIR 1.15 80

42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36

44 PASANG FLOOR DRAIN 0.05

45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01 80

47 PEK. BAK KONTROL 0.13

48 KISI - KISI / JALUSI KAYU 2.40

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 25 S/D 10/MART/201
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : B2- 13 S/D 24
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
B2-13 s/d 24

1 PASANG BOUWPLANK 0.54 80

2 PEK. GALIAN PONDASI 0.51 80

3 PEK. URUGAN PASIR 0.20 75

4 URUGAN TANAH KEMBALI 0.10

5 PONDASI BATU KALI 3.35 75

6 PASANG DINDING BATAKO 14.35

7 PEK. PLESTERAN + ACI 8.64

8 PEK. BETON SLOOF 15/20 4.32


9 BETON KOLOM PRAKTIS 15/15 6.74

10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29

12 BETON CANTILEVER T = 10 CM 1.76

13 RABAT BETON + CARPORT 1.11

14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37

16 PEK. LUBANG UDARA 0.30

17 PEK. BAN-BANAN 0.63

18 PEK. LOCIS PINTU 0.14

19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75

21 PINTU DOUBLE TRIPLEX 1.45

22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68

25 ATAP GENTENG 5.74

26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89

28 PASANG TALANG 0.09

29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63


32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61

34 PEK. LIST PLAFOND 1.15

35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25

37 KERAMIK DINDING KM/WC 1.36

38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 75

42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36

44 PASANG FLOOR DRAIN 0.05

45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01 80

47 PEK. BAK KONTROL 0.13

48 KISI - KISI / JALUSI KAYU 2.40

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 25 S/D 10/MART/201
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : A2- 13 S/D 24
T Y P E : 36/70
BOBOT Opn Minggu Lalu
NO URAIAN PEKERJAAN
(%) Prog (%)
A2-13 s/d 24

1 PASANG BOUWPLANK 0.54 80

2 PEK. GALIAN PONDASI 0.51 80

3 PEK. URUGAN PASIR 0.20 80

4 URUGAN TANAH KEMBALI 0.10

5 PONDASI BATU KALI 3.35 80

6 PASANG DINDING BATAKO 14.35

7 PEK. PLESTERAN + ACI 8.64

8 PEK. BETON SLOOF 15/20 4.32

9 BETON KOLOM PRAKTIS 15/15 6.74

10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29

12 BETON CANTILEVER T = 10 CM 1.76

13 RABAT BETON + CARPORT 1.11

14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37

16 PEK. LUBANG UDARA 0.30

17 PEK. BAN-BANAN 0.63

18 PEK. LOCIS PINTU 0.14

19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75

21 PINTU DOUBLE TRIPLEX 1.45


22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68

25 ATAP GENTENG 5.74

26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89

28 PASANG TALANG 0.09

29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63

32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61

34 PEK. LIST PLAFOND 1.15

35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25

37 KERAMIK DINDING KM/WC 1.36

38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 75

42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36

44 PASANG FLOOR DRAIN 0.05


45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01 80

47 PEK. BAK KONTROL 0.13

48 KISI - KISI / JALUSI KAYU 2.40

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 25 S/D 10/MART/201
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : A3- 1 S/D 12
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-1 s/d 12

1 PASANG BOUWPLANK 0.54 80

2 PEK. GALIAN PONDASI 0.51 85

3 PEK. URUGAN PASIR 0.20 85

4 URUGAN TANAH KEMBALI 0.10

5 PONDASI BATU KALI 3.35 85

6 PASANG DINDING BATAKO 14.35

7 PEK. PLESTERAN + ACI 8.64

8 PEK. BETON SLOOF 15/20 4.32

9 BETON KOLOM PRAKTIS 15/15 6.74

10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29


12 BETON CANTILEVER T = 10 CM 1.76

13 RABAT BETON + CARPORT 1.11

14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37

16 PEK. LUBANG UDARA 0.30

17 PEK. BAN-BANAN 0.63

18 PEK. LOCIS PINTU 0.14

19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75

21 PINTU DOUBLE TRIPLEX 1.45

22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68

25 ATAP GENTENG 5.74

26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89

28 PASANG TALANG 0.09

29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63

32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61

34 PEK. LIST PLAFOND 1.15


35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25

37 KERAMIK DINDING KM/WC 1.36

38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 80

42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36

44 PASANG FLOOR DRAIN 0.05

45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01 80

47 PEK. BAK KONTROL 0.13

48 KISI - KISI / JALUSI KAYU 2.40

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 25 S/D 10/MART/201
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : A3- 13 S/D 24
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-13 s/d 24

1 PASANG BOUWPLANK 0.54 80


2 PEK. GALIAN PONDASI 0.51 80

3 PEK. URUGAN PASIR 0.20 80

4 URUGAN TANAH KEMBALI 0.10

5 PONDASI BATU KALI 3.35 80

6 PASANG DINDING BATAKO 14.35

7 PEK. PLESTERAN + ACI 8.64

8 PEK. BETON SLOOF 15/20 4.32

9 BETON KOLOM PRAKTIS 15/15 6.74

10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29

12 BETON CANTILEVER T = 10 CM 1.76

13 RABAT BETON + CARPORT 1.11

14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37

16 PEK. LUBANG UDARA 0.30

17 PEK. BAN-BANAN 0.63

18 PEK. LOCIS PINTU 0.14

19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75

21 PINTU DOUBLE TRIPLEX 1.45

22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68


25 ATAP GENTENG 5.74

26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89

28 PASANG TALANG 0.09

29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63

32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61

34 PEK. LIST PLAFOND 1.15

35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25

37 KERAMIK DINDING KM/WC 1.36

38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 75

42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36

44 PASANG FLOOR DRAIN 0.05

45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01 80

47 PEK. BAK KONTROL 0.13


48 KISI - KISI / JALUSI KAYU 2.40

100.00
25 S/D 10/MART/2019
B2- 1 S/D 12

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini

Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)

B2-1 s/d 12 B2-1 s/d 12 B2-1 s/d 12

0.48 0 - 90 0.48

0.46 0 - 90 0.46

0.16 0 - 80 0.16

- 75 0.07 75 0.07

2.68 0 - 80 2.68

- - 0 -

- - 0 -

- 80 3.46 80 3.46

- 20 1.35 20 1.35

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -
0.92 0 - 80 0.92

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.81 0 - 80 0.81

- - 0 -

- - 0 -

5.51 4.88 0 10.39

25 S/D 10/MART/2019
B2- 13 S/D 24

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
B2-13 s/d 24 B2-13 s/d 24 B2-13 s/d 24

0.43 0 - 80 0.43

0.41 0 - 80 0.41

0.15 5 0.01 80 0.16

- - 0 -

2.51 5 0.17 80 2.68

- - 0 -

- - 0 -

- 80 3.46 80 3.46
- 20 1.35 20 1.35

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -

0.86 5 0.06 80 0.92

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.81 0 - 80 0.81

- - 0 -

- - 0 -

5.17 5.04 0 10.21

25 S/D 10/MART/2019
A2- 13 S/D 24
Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A2-13 s/d 24 A2-13 s/d 24 A2-13 s/d 24

0.43 0 - 80 0.43

0.41 0 - 80 0.41

0.16 0 - 80 0.16

- - 0 -

2.68 0 - 80 2.68

- - 0 -

- - 0 -

- 70 3.03 70 3.03

- 20 1.35 20 1.35

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -

0.86 0 - 75 0.86

- - 0 -

- - 0 -

- - 0 -
- - 0 -

0.81 0 - 80 0.81

- - 0 -

- - 0 -

5.35 4.37 9.72

25 S/D 10/MART/2019
A3- 1 S/D 12

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-1 s/d 12 A3-1 s/d 12 A3-1 s/d 12

0.43 0 - 80 0.43

0.44 0 - 85 0.44

0.17 0 - 85 0.17

- - 0 -

2.85 0 - 85 2.85

- - 0 -

- - 0 -

- 80 3.46 80 3.46

- 20 1.35 20 1.35

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -

0.92 0 - 80 0.92

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.81 0 - 80 0.81

- - 0 -

- - 0 -

5.61 4.81 10.41

25 S/D 10/MART/2019
A3- 13 S/D 24

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-13 s/d 24 A3-13 s/d 24 A3-13 s/d 24

0.43 0 - 80 0.43
0.41 0 - 80 0.41

0.16 0 - 80 0.16

- - 0 -

2.68 0 - 80 2.68

- - 0 -

- - 0 -

- 70 3.03 70 3.03

- 20 1.35 20 1.35

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -

0.86 0 - 75 0.86

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.81 0 - 80 0.81

- - 0 -
- - 0 -

5.35 4.37 9.72


PT. SUMBER KARYA MAKMUR ABADI
RENCANA ANGGARAN BIAYA
PROYEK: PERUMAHAN BUKIT PURI ASRI
T Y P E : 36/70

BOBOT

NO URAIAN PEKERJAAN MGG LALU

(%)

1 KAVLING A2
No. 13 9.72
No. 14 9.72
No. 15 9.72
No. 16 9.72
No. 17 9.72
No. 18 9.72
No. 19 9.72
No. 20 9.72
No. 21 9.72
No. 22 9.72
No. 23 9.72
No. 24 9.72

2 KAVLING A3
No. 1 10.41
No. 2 10.41
No. 3 10.41
No. 4 10.41
No. 5 10.41
No. 6 10.41
No. 7 10.41
No. 8 10.41
No. 9 10.41
No. 10 10.41
No. 11 10.41
No. 12 10.41

No. 13 9.72
No. 14 9.72
No. 15 9.72
No. 16 9.72
No. 17 9.72
No. 18 9.72
No. 19 9.72
No. 20 9.72
No. 21 9.72
No. 22 9.72
No. 23 9.72
No. 24 9.72

3 KAVLING B2
No. 1 10.39
No. 2 10.39
No. 3 10.39
No. 4 10.39
No. 5 10.39
No. 6 10.39
No. 7 10.39
No. 8 10.39
No. 9 10.39
No. 10 10.39
No. 11 10.39
No. 12 10.39

No. 13 10.21
No. 14 10.21
No. 15 10.21
No. 16 10.21
No. 17 10.21
No. 18 10.21
No. 19 10.21
No. 20 10.21
No. 21 10.21
No. 22 10.21
No. 23 10.21
No. 24 10.21

4 KAVLING A4
No. 1 -
No. 2 -
No. 3 -
No. 4 -
No. 5 -
No. 6 -
No. 7 -

5 KAVLING A5
No. 1 -
No. 2 -
No. 3 -
No. 4 -
No. 5 -
No. 6 -
No. 7 -
No. 8 -
No. 9 -
No. 10 -
No. 11 -
No. 12 -

No. 13 -
No. 14 -
No. 15 -
No. 16 -
No. 17 -
No. 18 -
No. 19 -
No. 20 -
No. 21 -
No. 22 -
No. 23 -
No. 24 -

6 KAVLING A6
No. 1 -
No. 2 -
No. 3 -
No. 4 -
No. 5 -
No. 6 -
No. 7 -
No. 8 -
No. 9 -
No. 10 -
No. 11 -
No. 12 -
No. 13 -

7 KAVLING B3
No. 1 -
No. 2 -
No. 3 -
No. 4 -
No. 5 -
No. 6 -
No. 7 -
No. 8 -
No. 9 -
No. 10 -
No. 11 -
No. 12 -

No. 13 -
No. 14 -
No. 15 -
No. 16 -
No. 17 -
No. 18 -
No. 19 -
No. 20 -
No. 21 -
No. 22 -
No. 23 -
No. 24 -

8 KAVLING B4
No. 1 -
No. 2 -
No. 3 -
No. 4 -
No. 5 -
No. 6 -
No. 7 -
No. 8 -

9 KAVLING B5
No. 1 -
No. 2 -
No. 3 -
No. 4 -
No. 5 -
No. 6 -
No. 7 -
No. 8 -
No. 9 -
No. 10 -
No. 11 -
No. 12 -
PERIODE
25 S/D 10 - MART - 2019

BOBOT BOBOT

MGG INI S/D MGG INI

(%) (%)

13.22 22.94
13.22 22.94
13.22 22.94
13.22 22.94
13.22 22.94
13.22 22.94
13.22 22.94
13.22 22.94
13.22 22.94
13.22 22.94
13.22 22.94
13.22 22.94

13.56 23.97
13.56 23.97
13.56 23.97
13.56 23.97
13.56 23.97
13.56 23.97
13.56 23.97
13.56 23.97
13.56 23.97
13.56 23.97
13.56 23.97
13.56 23.97

6.78 16.50
6.78 16.50
6.78 16.50
6.78 16.50
6.78 16.50
6.78 16.50
6.78 16.50
6.78 16.50
6.78 16.50
6.78 16.50
6.78 16.50
6.78 16.50

1.43 11.82
1.43 11.82
1.43 11.82
1.43 11.82
1.43 11.82
1.43 11.82
1.43 11.82
1.43 11.82
1.43 11.82
1.43 11.82
1.43 11.82
1.43 11.82

2.12 12.33
2.12 12.33
2.12 12.33
2.12 12.33
2.12 12.33
2.12 12.33
2.12 12.33
2.12 12.33
2.12 12.33
2.12 12.33
2.12 12.33
2.12 12.33
17.51

3.76 3.76
3.76 3.76
3.76 3.76
3.76 3.76
3.76 3.76
3.76 3.76
3.76 3.76

5.28 5.28
5.28 5.28
5.28 5.28
5.28 5.28
5.28 5.28
5.28 5.28
5.28 5.28
5.28 5.28
5.28 5.28
5.28 5.28
5.28 5.28
5.28 5.28

5.08 5.08
5.08 5.08
5.08 5.08
5.08 5.08
5.08 5.08
5.08 5.08
5.08 5.08
5.08 5.08
5.08 5.08
5.08 5.08
5.08 5.08
5.08 5.08

5.08 5.08
5.08 5.08
5.08 5.08
5.08 5.08
5.08 5.08
5.08 5.08
5.08 5.08
5.08 5.08
5.08 5.08
5.08 5.08
5.08 5.08
5.08 5.08
5.08 5.08

3.78 3.78
3.78 3.78
3.78 3.78
3.78 3.78
3.78 3.78
3.78 3.78
3.78 3.78
3.78 3.78
3.78 3.78
3.78 3.78
3.78 3.78
3.78 3.78

3.78 3.78
3.78 3.78
3.78 3.78
3.78 3.78
3.78 3.78
3.78 3.78
3.78 3.78
3.78 3.78
3.78 3.78
3.78 3.78
3.78 3.78
3.78 3.78

2.52 2.52
2.52 2.52
2.52 2.52
2.52 2.52
2.52 2.52
2.52 2.52
2.52 2.52
2.52 2.52

1.81 1.81
1.81 1.81
1.81 1.81
1.81 1.81
1.81 1.81
1.81 1.81
1.81 1.81
1.81 1.81
1.81 1.81
1.81 1.81
1.81 1.81
1.81 1.81

9.13
PT. SUMBER KARYA MAKMUR ABADI
RENCANA ANGGARAN BIAYA PERIODE : 11 S/D 24/MART/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : B2- 1 S/D 12
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN

(%) Prog (%)

B2-1 s/d 12

1 PASANG BOUWPLANK 0.54 90

2 PEK. GALIAN PONDASI 0.51 90

3 PEK. URUGAN PASIR 0.20 80

4 URUGAN TANAH KEMBALI 0.10 75

5 PONDASI BATU KALI 3.35 80

6 PASANG DINDING BATAKO 14.35

7 PEK. PLESTERAN + ACI 8.64

8 PEK. BETON SLOOF 15/20 4.32 80

9 BETON KOLOM PRAKTIS 15/15 6.74 20

10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29

12 BETON CANTILEVER T = 10 CM 1.76

13 RABAT BETON + CARPORT 1.11

14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37


16 PEK. LUBANG UDARA 0.30

17 PEK. BAN-BANAN 0.63

18 PEK. LOCIS PINTU 0.14

19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75

21 PINTU DOUBLE TRIPLEX 1.45

22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68

25 ATAP GENTENG 5.74

26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89

28 PASANG TALANG 0.09

29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63

32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61

34 PEK. LIST PLAFOND 1.15

35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25

37 KERAMIK DINDING KM/WC 1.36


38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 80

42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36

44 PASANG FLOOR DRAIN 0.05

45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01 80

47 PEK. BAK KONTROL 0.13

48 KISI - KISI / JALUSI KAYU 2.40

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 11 S/D 24/MART/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : B2- 13 S/D 24
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
B2-13 s/d 24

1 PASANG BOUWPLANK 0.54 80

2 PEK. GALIAN PONDASI 0.51 80

3 PEK. URUGAN PASIR 0.20 80


4 URUGAN TANAH KEMBALI 0.10

5 PONDASI BATU KALI 3.35 80

6 PASANG DINDING BATAKO 14.35

7 PEK. PLESTERAN + ACI 8.64

8 PEK. BETON SLOOF 15/20 4.32 80

9 BETON KOLOM PRAKTIS 15/15 6.74 20

10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29

12 BETON CANTILEVER T = 10 CM 1.76

13 RABAT BETON + CARPORT 1.11

14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37

16 PEK. LUBANG UDARA 0.30

17 PEK. BAN-BANAN 0.63

18 PEK. LOCIS PINTU 0.14

19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75

21 PINTU DOUBLE TRIPLEX 1.45

22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68

25 ATAP GENTENG 5.74


26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89

28 PASANG TALANG 0.09

29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63

32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61

34 PEK. LIST PLAFOND 1.15

35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25

37 KERAMIK DINDING KM/WC 1.36

38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 80

42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36

44 PASANG FLOOR DRAIN 0.05

45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01 80


47 PEK. BAK KONTROL 0.13

48 KISI - KISI / JALUSI KAYU 2.40

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 11 S/D 24/MART/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : A2- 13 S/D 24
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A2-13 s/d 24

1 PASANG BOUWPLANK 0.54 80

2 PEK. GALIAN PONDASI 0.51 80

3 PEK. URUGAN PASIR 0.20 80

4 URUGAN TANAH KEMBALI 0.10

5 PONDASI BATU KALI 3.35 80

6 PASANG DINDING BATAKO 14.35

7 PEK. PLESTERAN + ACI 8.64

8 PEK. BETON SLOOF 15/20 4.32 70

9 BETON KOLOM PRAKTIS 15/15 6.74 20

10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29


12 BETON CANTILEVER T = 10 CM 1.76

13 RABAT BETON + CARPORT 1.11

14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37

16 PEK. LUBANG UDARA 0.30

17 PEK. BAN-BANAN 0.63

18 PEK. LOCIS PINTU 0.14

19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75

21 PINTU DOUBLE TRIPLEX 1.45

22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68

25 ATAP GENTENG 5.74

26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89

28 PASANG TALANG 0.09

29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63

32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61


34 PEK. LIST PLAFOND 1.15

35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25

37 KERAMIK DINDING KM/WC 1.36

38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 75

42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36

44 PASANG FLOOR DRAIN 0.05

45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01 80

47 PEK. BAK KONTROL 0.13

48 KISI - KISI / JALUSI KAYU 2.40

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 11 S/D 24/MART/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : A3- 1 S/D 12
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
BOBOT Opn Minggu Lalu
NO URAIAN PEKERJAAN
(%) Prog (%)
A3-1 s/d 12

1 PASANG BOUWPLANK 0.54 80

2 PEK. GALIAN PONDASI 0.51 85

3 PEK. URUGAN PASIR 0.20 85

4 URUGAN TANAH KEMBALI 0.10

5 PONDASI BATU KALI 3.35 85

6 PASANG DINDING BATAKO 14.35

7 PEK. PLESTERAN + ACI 8.64

8 PEK. BETON SLOOF 15/20 4.32 80

9 BETON KOLOM PRAKTIS 15/15 6.74 20

10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29

12 BETON CANTILEVER T = 10 CM 1.76

13 RABAT BETON + CARPORT 1.11

14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37

16 PEK. LUBANG UDARA 0.30

17 PEK. BAN-BANAN 0.63

18 PEK. LOCIS PINTU 0.14

19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75


21 PINTU DOUBLE TRIPLEX 1.45

22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68

25 ATAP GENTENG 5.74

26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89

28 PASANG TALANG 0.09

29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63

32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61

34 PEK. LIST PLAFOND 1.15

35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25

37 KERAMIK DINDING KM/WC 1.36

38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 80


42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36

44 PASANG FLOOR DRAIN 0.05

45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01 80

47 PEK. BAK KONTROL 0.13

48 KISI - KISI / JALUSI KAYU 2.40

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 11 S/D 24/MART/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : A3- 13 S/D 24
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-13 s/d 24

1 PASANG BOUWPLANK 0.54 80

2 PEK. GALIAN PONDASI 0.51 80

3 PEK. URUGAN PASIR 0.20 80

4 URUGAN TANAH KEMBALI 0.10

5 PONDASI BATU KALI 3.35 80

6 PASANG DINDING BATAKO 14.35

7 PEK. PLESTERAN + ACI 8.64


8 PEK. BETON SLOOF 15/20 4.32 70

9 BETON KOLOM PRAKTIS 15/15 6.74 20

10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29

12 BETON CANTILEVER T = 10 CM 1.76

13 RABAT BETON + CARPORT 1.11

14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37

16 PEK. LUBANG UDARA 0.30

17 PEK. BAN-BANAN 0.63

18 PEK. LOCIS PINTU 0.14

19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75

21 PINTU DOUBLE TRIPLEX 1.45

22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68

25 ATAP GENTENG 5.74

26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89

28 PASANG TALANG 0.09


29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63

32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61

34 PEK. LIST PLAFOND 1.15

35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25

37 KERAMIK DINDING KM/WC 1.36

38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 75

42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36

44 PASANG FLOOR DRAIN 0.05

45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01 80

47 PEK. BAK KONTROL 0.13

48 KISI - KISI / JALUSI KAYU 2.40

100.00
PT. SUMBER KARYA MAKMUR ABADI
RENCANA ANGGARAN BIAYA PERIODE : 11 S/D 24/MART/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : A4- 1 S/D 7
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-13 s/d 24

1 PASANG BOUWPLANK 0.54 0

2 PEK. GALIAN PONDASI 0.51 0

3 PEK. URUGAN PASIR 0.20 0

4 URUGAN TANAH KEMBALI 0.10

5 PONDASI BATU KALI 3.35 0

6 PASANG DINDING BATAKO 14.35

7 PEK. PLESTERAN + ACI 8.64

8 PEK. BETON SLOOF 15/20 4.32 0

9 BETON KOLOM PRAKTIS 15/15 6.74 0

10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29

12 BETON CANTILEVER T = 10 CM 1.76

13 RABAT BETON + CARPORT 1.11

14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37

16 PEK. LUBANG UDARA 0.30


17 PEK. BAN-BANAN 0.63

18 PEK. LOCIS PINTU 0.14

19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75

21 PINTU DOUBLE TRIPLEX 1.45

22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68

25 ATAP GENTENG 5.74

26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89

28 PASANG TALANG 0.09

29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63

32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61

34 PEK. LIST PLAFOND 1.15

35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25

37 KERAMIK DINDING KM/WC 1.36


38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 0

42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36

44 PASANG FLOOR DRAIN 0.05

45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01 0

47 PEK. BAK KONTROL 0.13

48 KISI - KISI / JALUSI KAYU 2.40

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 11 S/D 24/MART/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : A5- 1 S/D 12
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-13 s/d 24

1 PASANG BOUWPLANK 0.54 0

2 PEK. GALIAN PONDASI 0.51 0

3 PEK. URUGAN PASIR 0.20 0


4 URUGAN TANAH KEMBALI 0.10

5 PONDASI BATU KALI 3.35 0

6 PASANG DINDING BATAKO 14.35

7 PEK. PLESTERAN + ACI 8.64

8 PEK. BETON SLOOF 15/20 4.32 0

9 BETON KOLOM PRAKTIS 15/15 6.74 0

10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29

12 BETON CANTILEVER T = 10 CM 1.76

13 RABAT BETON + CARPORT 1.11

14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37

16 PEK. LUBANG UDARA 0.30

17 PEK. BAN-BANAN 0.63

18 PEK. LOCIS PINTU 0.14

19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75

21 PINTU DOUBLE TRIPLEX 1.45

22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68

25 ATAP GENTENG 5.74


26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89

28 PASANG TALANG 0.09

29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63

32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61

34 PEK. LIST PLAFOND 1.15

35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25

37 KERAMIK DINDING KM/WC 1.36

38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 0

42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36

44 PASANG FLOOR DRAIN 0.05

45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01 0


47 PEK. BAK KONTROL 0.13

48 KISI - KISI / JALUSI KAYU 2.40

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 11 S/D 24/MART/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : A5- 13 S/D 24
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-13 s/d 24

1 PASANG BOUWPLANK 0.54 0

2 PEK. GALIAN PONDASI 0.51 0

3 PEK. URUGAN PASIR 0.20 0

4 URUGAN TANAH KEMBALI 0.10

5 PONDASI BATU KALI 3.35 0

6 PASANG DINDING BATAKO 14.35

7 PEK. PLESTERAN + ACI 8.64

8 PEK. BETON SLOOF 15/20 4.32 0

9 BETON KOLOM PRAKTIS 15/15 6.74 0

10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29

12 BETON CANTILEVER T = 10 CM 1.76


13 RABAT BETON + CARPORT 1.11

14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37

16 PEK. LUBANG UDARA 0.30

17 PEK. BAN-BANAN 0.63

18 PEK. LOCIS PINTU 0.14

19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75

21 PINTU DOUBLE TRIPLEX 1.45

22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68

25 ATAP GENTENG 5.74

26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89

28 PASANG TALANG 0.09

29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63

32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61

34 PEK. LIST PLAFOND 1.15


35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25

37 KERAMIK DINDING KM/WC 1.36

38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 0

42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36

44 PASANG FLOOR DRAIN 0.05

45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01 0

47 PEK. BAK KONTROL 0.13

48 KISI - KISI / JALUSI KAYU 2.40

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 11 S/D 24/MART/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : A6- 1 S/D 13
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-13 s/d 24
1 PASANG BOUWPLANK 0.54 0

2 PEK. GALIAN PONDASI 0.51 0

3 PEK. URUGAN PASIR 0.20 0

4 URUGAN TANAH KEMBALI 0.10

5 PONDASI BATU KALI 3.35 0

6 PASANG DINDING BATAKO 14.35

7 PEK. PLESTERAN + ACI 8.64

8 PEK. BETON SLOOF 15/20 4.32 0

9 BETON KOLOM PRAKTIS 15/15 6.74 0

10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29

12 BETON CANTILEVER T = 10 CM 1.76

13 RABAT BETON + CARPORT 1.11

14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37

16 PEK. LUBANG UDARA 0.30

17 PEK. BAN-BANAN 0.63

18 PEK. LOCIS PINTU 0.14

19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75

21 PINTU DOUBLE TRIPLEX 1.45


22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68

25 ATAP GENTENG 5.74

26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89

28 PASANG TALANG 0.09

29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63

32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61

34 PEK. LIST PLAFOND 1.15

35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25

37 KERAMIK DINDING KM/WC 1.36

38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 0

42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36


44 PASANG FLOOR DRAIN 0.05

45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01 0

47 PEK. BAK KONTROL 0.13

48 KISI - KISI / JALUSI KAYU 2.40

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 11 S/D 24/MART/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : B3- 1 S/D 12
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-13 s/d 24

1 PASANG BOUWPLANK 0.54 0

2 PEK. GALIAN PONDASI 0.51 0

3 PEK. URUGAN PASIR 0.20 0

4 URUGAN TANAH KEMBALI 0.10

5 PONDASI BATU KALI 3.35 0

6 PASANG DINDING BATAKO 14.35

7 PEK. PLESTERAN + ACI 8.64

8 PEK. BETON SLOOF 15/20 4.32 0

9 BETON KOLOM PRAKTIS 15/15 6.74 0


10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29

12 BETON CANTILEVER T = 10 CM 1.76

13 RABAT BETON + CARPORT 1.11

14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37

16 PEK. LUBANG UDARA 0.30

17 PEK. BAN-BANAN 0.63

18 PEK. LOCIS PINTU 0.14

19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75

21 PINTU DOUBLE TRIPLEX 1.45

22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68

25 ATAP GENTENG 5.74

26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89

28 PASANG TALANG 0.09

29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63


32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61

34 PEK. LIST PLAFOND 1.15

35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25

37 KERAMIK DINDING KM/WC 1.36

38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 0

42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36

44 PASANG FLOOR DRAIN 0.05

45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01 0

47 PEK. BAK KONTROL 0.13

48 KISI - KISI / JALUSI KAYU 2.40

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 11 S/D 24/MART/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : B3- 13 S/D 24
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-13 s/d 24

1 PASANG BOUWPLANK 0.54 0

2 PEK. GALIAN PONDASI 0.51 0

3 PEK. URUGAN PASIR 0.20 0

4 URUGAN TANAH KEMBALI 0.10

5 PONDASI BATU KALI 3.35 0

6 PASANG DINDING BATAKO 14.35

7 PEK. PLESTERAN + ACI 8.64

8 PEK. BETON SLOOF 15/20 4.32 0

9 BETON KOLOM PRAKTIS 15/15 6.74 0

10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29

12 BETON CANTILEVER T = 10 CM 1.76

13 RABAT BETON + CARPORT 1.11

14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37

16 PEK. LUBANG UDARA 0.30

17 PEK. BAN-BANAN 0.63

18 PEK. LOCIS PINTU 0.14


19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75

21 PINTU DOUBLE TRIPLEX 1.45

22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68

25 ATAP GENTENG 5.74

26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89

28 PASANG TALANG 0.09

29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63

32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61

34 PEK. LIST PLAFOND 1.15

35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25

37 KERAMIK DINDING KM/WC 1.36

38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24 0


41 PEK. INSTALASI AIR 1.15 0

42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36

44 PASANG FLOOR DRAIN 0.05

45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01 0

47 PEK. BAK KONTROL 0.13

48 KISI - KISI / JALUSI KAYU 2.40

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 11 S/D 24/MART/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : B4- 1 S/D 8
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-13 s/d 24

1 PASANG BOUWPLANK 0.54 0

2 PEK. GALIAN PONDASI 0.51 0

3 PEK. URUGAN PASIR 0.20 0

4 URUGAN TANAH KEMBALI 0.10

5 PONDASI BATU KALI 3.35 0

6 PASANG DINDING BATAKO 14.35


7 PEK. PLESTERAN + ACI 8.64

8 PEK. BETON SLOOF 15/20 4.32 0

9 BETON KOLOM PRAKTIS 15/15 6.74 0

10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29

12 BETON CANTILEVER T = 10 CM 1.76

13 RABAT BETON + CARPORT 1.11

14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37

16 PEK. LUBANG UDARA 0.30

17 PEK. BAN-BANAN 0.63

18 PEK. LOCIS PINTU 0.14

19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75

21 PINTU DOUBLE TRIPLEX 1.45

22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68

25 ATAP GENTENG 5.74

26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89


28 PASANG TALANG 0.09

29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63

32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61

34 PEK. LIST PLAFOND 1.15

35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25

37 KERAMIK DINDING KM/WC 1.36

38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 0

42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36

44 PASANG FLOOR DRAIN 0.05

45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01 0

47 PEK. BAK KONTROL 0.13

48 KISI - KISI / JALUSI KAYU 2.40

100.00
PT. SUMBER KARYA MAKMUR ABADI
RENCANA ANGGARAN BIAYA PERIODE : 11 S/D 24/MART/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : B5- 1 S/D 12
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-13 s/d 24

1 PASANG BOUWPLANK 0.54 0

2 PEK. GALIAN PONDASI 0.51 0

3 PEK. URUGAN PASIR 0.20 0

4 URUGAN TANAH KEMBALI 0.10

5 PONDASI BATU KALI 3.35 0

6 PASANG DINDING BATAKO 14.35

7 PEK. PLESTERAN + ACI 8.64

8 PEK. BETON SLOOF 15/20 4.32 0

9 BETON KOLOM PRAKTIS 15/15 6.74 0

10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29

12 BETON CANTILEVER T = 10 CM 1.76

13 RABAT BETON + CARPORT 1.11

14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37


16 PEK. LUBANG UDARA 0.30

17 PEK. BAN-BANAN 0.63

18 PEK. LOCIS PINTU 0.14

19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75

21 PINTU DOUBLE TRIPLEX 1.45

22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68

25 ATAP GENTENG 5.74

26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89

28 PASANG TALANG 0.09

29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63

32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61

34 PEK. LIST PLAFOND 1.15

35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25


37 KERAMIK DINDING KM/WC 1.36

38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 0

42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36

44 PASANG FLOOR DRAIN 0.05

45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01 0

47 PEK. BAK KONTROL 0.13

48 KISI - KISI / JALUSI KAYU 2.40

100.00
11 S/D 24/MART/2019
B2- 1 S/D 12

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini

Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)

B2-1 s/d 12 B2-1 s/d 12 B2-1 s/d 12

0.48 0 - 90 0.48

0.46 0 - 90 0.46

0.16 0 - 80 0.16

0.07 - 75 0.07

2.68 0 - 80 2.68

- 10 1.43 10 1.43

- - 0 -

3.46 0 - 80 3.46

1.35 0 - 20 1.35

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- 0 - 0 -

0.92 0 - 80 0.92

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.81 0 - 80 0.81

- - 0 -

- - 0 -

10.39 1.43 0 11.82

11 S/D 24/MART/2019
B2- 13 S/D 24

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
B2-13 s/d 24 B2-13 s/d 24 B2-13 s/d 24

0.43 10 0.05 90 0.48

0.41 10 0.05 90 0.46

0.16 10 0.02 90 0.18


- 70 0.07 70 0.07

2.68 10 0.33 90 3.01

- 8 1.15 8 1.15

- - 0 -

3.46 0 - 80 3.46

1.35 5 0.34 25 1.68

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -

0.92 5 0.06 85 0.97

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.81 5 0.05 85 0.86


- - 0 -

- - 0 -

10.21 2.12 0 12.33

11 S/D 24/MART/2019
A2- 13 S/D 24

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A2-13 s/d 24 A2-13 s/d 24 A2-13 s/d 24

0.43 0 - 80 0.43

0.41 0 - 80 0.41

0.16 0 - 80 0.16

- 80 0.08 80 0.08

2.68 0 - 80 2.68

- 60 8.61 60 8.61

- - 0 -

3.03 10 0.43 80 3.46

1.35 60 4.04 80 5.39

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -

0.86 5 0.06 80 0.92

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.81 0 - 80 0.81

- - 0 -

- - 0 -

9.72 13.22 22.94

11 S/D 24/MART/2019
A3- 1 S/D 12

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-1 s/d 12 A3-1 s/d 12 A3-1 s/d 12

0.43 0 - 80 0.43

0.44 0 - 85 0.44

0.17 0 - 85 0.17

- 90 0.09 90 0.09

2.85 5 0.17 90 3.01

- 60 8.61 60 8.61

- - 0 -

3.46 10 0.43 90 3.89

1.35 60 4.04 80 5.39

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -

0.92 10 0.11 90 1.03


- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.81 10 0.10 90 0.91

- - 0 -

- - 0 -

10.41 13.56 23.97

11 S/D 24/MART/2019
A3- 13 S/D 24

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-13 s/d 24 A3-13 s/d 24 A3-13 s/d 24

0.43 0 - 80 0.43

0.41 0 - 80 0.41

0.16 0 - 80 0.16

- 50 0.05 50 0.05

2.68 0 - 80 2.68

- 20 2.87 20 2.87

- - 0 -
3.03 10 0.43 80 3.46

1.35 50 3.37 70 4.72

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -

0.86 5 0.06 80 0.92

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.81 0 - 80 0.81

- - 0 -

- - 0 -

9.72 6.78 16.50


11 S/D 24/MART/2019
A4- 1 S/D 7

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-13 s/d 24 A3-13 s/d 24 A3-13 s/d 24

- 80 0.43 80 0.43

- 80 0.41 80 0.41

- 80 0.16 80 0.16

- 80 0.08 80 0.08

- 80 2.68 80 2.68

- 0 - 0 -

- - 0 -

- 0 - 0 -

- 0 - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- 0 - 0 -

- 0 - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -

- - 0 -

- - 0 -

- 3.76 3.76

11 S/D 24/MART/2019
A5- 1 S/D 12

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-13 s/d 24 A3-13 s/d 24 A3-13 s/d 24

- 90 0.48 90 0.48

- 80 0.41 80 0.41

- 80 0.16 80 0.16
- 50 0.05 50 0.05

- 80 2.68 80 2.68

- 0 - 0 -

- - 0 -

- 0 - 0 -

- 0 - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -

- 60 0.69 60 0.69

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 80 0.81 80 0.81
- - 0 -

- - 0 -

- 5.28 5.28

11 S/D 24/MART/2019
A5- 13 S/D 24

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-13 s/d 24 A3-13 s/d 24 A3-13 s/d 24

- 90 0.48 90 0.48

- 80 0.41 80 0.41

- 80 0.16 80 0.16

- 50 0.05 50 0.05

- 80 2.68 80 2.68

- 0 - 0 -

- - 0 -

- 0 - 0 -

- 0 - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -

- 60 0.69 60 0.69

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 80 0.81 80 0.81

- - 0 -

- - 0 -

- 5.28 5.28

11 S/D 24/MART/2019
A6- 1 S/D 13

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-13 s/d 24 A3-13 s/d 24 A3-13 s/d 24
- 90 0.48 90 0.48

- 80 0.41 80 0.41

- 80 0.16 80 0.16

- 50 0.05 50 0.05

- 80 2.68 80 2.68

- 0 - 0 -

- - 0 -

- 0 - 0 -

- 0 - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -

- 60 0.69 60 0.69

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- 60 0.61 60 0.61

- - 0 -

- - 0 -

- 5.08 5.08

11 S/D 24/MART/2019
B3- 1 S/D 12

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-13 s/d 24 A3-13 s/d 24 A3-13 s/d 24

- 90 0.48 90 0.48

- 80 0.41 80 0.41

- 80 0.16 80 0.16

- 50 0.05 50 0.05

- 80 2.68 80 2.68

- 0 - 0 -

- - 0 -

- 0 - 0 -

- 0 - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -

- 0 - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -

- - 0 -

- - 0 -

- 3.78 3.78

11 S/D 24/MART/2019
B3- 13 S/D 24

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-13 s/d 24 A3-13 s/d 24 A3-13 s/d 24

- 90 0.48 90 0.48

- 80 0.41 80 0.41

- 80 0.16 80 0.16

- 50 0.05 50 0.05

- 80 2.68 80 2.68

- 0 - 0 -

- - 0 -

- 0 - 0 -

- 0 - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -
- 0 - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -

- - 0 -

- - 0 -

- 3.78 3.78

11 S/D 24/MART/2019
B4- 1 S/D 8

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-13 s/d 24 A3-13 s/d 24 A3-13 s/d 24

- 90 0.48 90 0.48

- 50 0.26 50 0.26

- 50 0.10 50 0.10

- 0 - 0 -

- 50 1.67 50 1.67

- 0 - 0 -
- - 0 -

- 0 - 0 -

- 0 - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -

- 0 - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -

- - 0 -

- - 0 -

- 2.52 2.52
11 S/D 24/MART/2019
B5- 1 S/D 12

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-13 s/d 24 A3-13 s/d 24 A3-13 s/d 24

- 90 0.48 90 0.48

- 50 0.26 50 0.26

- 30 0.06 30 0.06

- 0 - 0 -

- 30 1.00 30 1.00

- 0 - 0 -

- - 0 -

- 0 - 0 -

- 0 - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -

- 0 - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 0 - 0 -

- - 0 -

- - 0 -

- 1.81 1.81
PT. SUMBER KARYA MAKMUR ABADI
RENCANA ANGGARAN BIAYA PERIODE
PROYEK: PERUMAHAN BUKIT PURI ASRI 24 MART S/D 22 - APR - 2
T Y P E : 36/70

BOBOT BOBOT

NO URAIAN PEKERJAAN MGG LALU MGG INI

(%) (%)

1 KAVLING A1
No. 1 1.81 3.09
No. 2 1.81 3.09
No. 3 1.81 3.09
No. 4 1.81 3.09
No. 5 1.81 3.09
No. 6 1.81 3.09
No. 7 1.81 3.09
No. 8 1.81 3.09
No. 9 1.81 3.09
No. 10 1.81 3.09
No. 11 1.81 3.09
No. 12 1.81 3.09
No. 13 1.81 3.09
No. 14 1.81 3.09
No. 15 1.81 3.09
No. 16 1.81 3.09

2 KAVLING A2
No. 1 0.84 3.49
No. 2 0.84 3.49
No. 3 0.84 3.49
No. 4 0.84 3.49
No. 5 0.84 3.49
No. 6 0.84 3.49
No. 7 0.84 3.49
No. 8 0.84 3.49
No. 9 0.84 3.49
No. 10 0.84 3.49
No. 11 0.84 3.49
No. 12 0.84 3.49

No. 13 9.72 26.92


No. 14 9.72 26.92
No. 15 9.72 26.92
No. 16 9.72 26.92
No. 17 9.72 26.92
No. 18 9.72 26.92
No. 19 9.72 26.92
No. 20 9.72 26.92
No. 21 9.72 26.92
No. 22 9.72 26.92
No. 23 9.72 26.92
No. 24 9.72 26.92

3 KAVLING A3
No. 1 23.97 22.56
No. 2 23.97 22.56
No. 3 23.97 22.56
No. 4 23.97 22.56
No. 5 23.97 22.56
No. 6 23.97 22.56
No. 7 23.97 22.56
No. 8 23.97 22.56
No. 9 23.97 22.56
No. 10 23.97 22.56
No. 11 23.97 22.56
No. 12 23.97 22.56

No. 13 16.50 10.49


No. 14 16.50 10.49
No. 15 16.50 10.49
No. 16 16.50 10.49
No. 17 16.50 10.49
No. 18 16.50 10.49
No. 19 16.50 10.49
No. 20 16.50 10.49
No. 21 16.50 10.49
No. 22 16.50 10.49
No. 23 16.50 10.49
No. 24 16.50 10.49
4 KAVLING B2
No. 1 11.82 23.81
No. 2 11.82 23.81
No. 3 11.82 23.81
No. 4 11.82 23.81
No. 5 11.82 23.81
No. 6 11.82 23.81
No. 7 11.82 23.81
No. 8 11.82 23.81
No. 9 11.82 23.81
No. 10 11.82 23.81
No. 11 11.82 23.81
No. 12 11.82 23.81

No. 13 12.33 18.45


No. 14 12.33 18.45
No. 15 12.33 18.45
No. 16 12.33 18.45
No. 17 12.33 18.45
No. 18 12.33 18.45
No. 19 12.33 18.45
No. 20 12.33 18.45
No. 21 12.33 18.45
No. 22 12.33 18.45
No. 23 12.33 18.45
No. 24 12.33 18.45

5 KAVLING A4
No. 1 3.76 15.93
No. 2 3.76 15.93
No. 3 3.76 15.93
No. 4 3.76 15.93
No. 5 3.76 15.93
No. 6 3.76 15.93
No. 7 3.76 15.93

6 KAVLING A5
No. 1 5.28 22.01
No. 2 5.28 22.01
No. 3 5.28 22.01
No. 4 5.28 22.01
No. 5 5.28 22.01
No. 6 5.28 22.01
No. 7 5.28 22.01
No. 8 5.28 22.01
No. 9 5.28 22.01
No. 10 5.28 22.01
No. 11 5.28 22.01
No. 12 5.28 22.01

No. 13 5.28 21.27


No. 14 5.28 21.27
No. 15 5.28 21.27
No. 16 5.28 21.27
No. 17 5.28 21.27
No. 18 5.28 21.27
No. 19 5.28 21.27
No. 20 5.28 21.27
No. 21 5.28 21.27
No. 22 5.28 21.27
No. 23 5.28 21.27
No. 24 5.28 21.27

7 KAVLING A6
No. 1 5.08 8.88
No. 2 5.08 8.88
No. 3 5.08 8.88
No. 4 5.08 8.88
No. 5 5.08 8.88
No. 6 5.08 8.88
No. 7 5.08 8.88
No. 8 5.08 8.88
No. 9 5.08 8.88
No. 10 5.08 8.88
No. 11 5.08 8.88
No. 12 5.08 8.88
No. 13 5.08 8.88

8 KAVLING B3
No. 1 3.78 0.10
No. 2 3.78 0.10
No. 3 3.78 0.10
No. 4 3.78 0.10
No. 5 3.78 0.10
No. 6 3.78 0.10
No. 7 3.78 0.10
No. 8 3.78 0.10
No. 9 3.78 0.10
No. 10 3.78 0.10
No. 11 3.78 0.10
No. 12 3.78 0.10

No. 13 3.78 0.84


No. 14 3.78 0.84
No. 15 3.78 0.84
No. 16 3.78 0.84
No. 17 3.78 0.84
No. 18 3.78 0.84
No. 19 3.78 0.84
No. 20 3.78 0.84
No. 21 3.78 0.84
No. 22 3.78 0.84
No. 23 3.78 0.84
No. 24 3.78 0.84

9 KAVLING B4
No. 1 2.52 2.10
No. 2 2.52 2.10
No. 3 2.52 2.10
No. 4 2.52 2.10
No. 5 2.52 2.10
No. 6 2.52 2.10
No. 7 2.52 2.10
No. 8 2.52 2.10

10 KAVLING B5
No. 1 1.81 2.97
No. 2 1.81 2.97
No. 3 1.81 2.97
No. 4 1.81 2.97
No. 5 1.81 2.97
No. 6 1.81 2.97
No. 7 1.81 2.97
No. 8 1.81 2.97
No. 9 1.81 2.97
No. 10 1.81 2.97
No. 11 1.81 2.97
No. 12 1.81 2.97
PERIODE
ART S/D 22 - APR - 2019

BOBOT

S/D MGG INI

(%)

4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90
4.90

4.33
4.33
4.33
4.33
4.33
4.33
4.33
4.33
4.33
4.33
4.33
4.33

36.64
36.64
36.64
36.64
36.64
36.64
36.64
36.64
36.64
36.64
36.64
36.64

46.52
46.52
46.52
46.52
46.52
46.52
46.52
46.52
46.52
46.52
46.52
46.52

26.98
26.98
26.98
26.98
26.98
26.98
26.98
26.98
26.98
26.98
26.98
26.98
35.63
35.63
35.63
35.63
35.63
35.63
35.63
35.63
35.63
35.63
35.63
35.63

30.78
30.78
30.78
30.78
30.78
30.78
30.78
30.78
30.78
30.78
30.78
30.78
35.31

19.69
19.69
19.69
19.69
19.69
19.69
19.69

27.29
27.29
27.29
27.29
27.29
27.29
27.29
27.29
27.29
27.29
27.29
27.29

26.55
26.55
26.55
26.55
26.55
26.55
26.55
26.55
26.55
26.55
26.55
26.55

13.95
13.95
13.95
13.95
13.95
13.95
13.95
13.95
13.95
13.95
13.95
13.95
13.95

3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88
3.88

4.62
4.62
4.62
4.62
4.62
4.62
4.62
4.62
4.62
4.62
4.62
4.62

4.62
4.62
4.62
4.62
4.62
4.62
4.62
4.62

4.78
4.78
4.78
4.78
4.78
4.78
4.78
4.78
4.78
4.78
4.78
4.78
21.69
PT. SUMBER KARYA MAKMUR ABADI
RENCANA ANGGARAN BIAYA PERIODE : 10 MAR S/D 22/APR/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : B2- 1 S/D 12
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN

(%) Prog (%)

B2-1 s/d 12

1 PASANG BOUWPLANK 0.54 90

2 PEK. GALIAN PONDASI 0.51 90

3 PEK. URUGAN PASIR 0.20 80

4 URUGAN TANAH KEMBALI 0.10 75

5 PONDASI BATU KALI 3.35 80

6 PASANG DINDING BATAKO 14.35 10

7 PEK. PLESTERAN + ACI 8.64 0

8 PEK. BETON SLOOF 15/20 4.32 80

9 BETON KOLOM PRAKTIS 15/15 6.74 20

10 BETON KOLOM TERAS 15/20 0.30 0

11 BETON RING BALOK 15/20 DAN SOPI 4.29 0

12 BETON CANTILEVER T = 10 CM 1.76 0

13 RABAT BETON + CARPORT 1.11 0

14 PEK. BETON DUICKER 3 m' 0.85 0

15 PEK. ROLLAG BATA 0.37 0


16 PEK. LUBANG UDARA 0.30 0

17 PEK. BAN-BANAN 0.63 0

18 PEK. LOCIS PINTU 0.14 0

19 PEKERJAAN KUSEN 1.47 0

20 PASANG PINTU UTAMA 0.75 0

21 PINTU DOUBLE TRIPLEX 1.45 0

22 PASANG PINTU KM/WC 0.35 0

23 PASANG JENDELA 1.79 0

24 PEK. RANGKA ATAP 11.68 0

25 ATAP GENTENG 5.74 0

26 NOK GENTENG 0.99 0

27 PASANG LISTPLANK 3/20 0.89 0

28 PASANG TALANG 0.09 0

29 KUNCI PINTU UTAMA 0.18 0

30 KUNCI PINTU LAIN 0.30 0

31 PASANG ENGSEL PINTU 0.63 0

32 RANGKA PLAFOND 1/2x1 m 1.65 0

33 PENUTUP PLAFOND 2.61 0

34 PEK. LIST PLAFOND 1.15 0

35 KERAMIK LANTAI 30/30 4.37 0

36 KERAMIK LANTAI KM/WC 0.25 0

37 KERAMIK DINDING KM/WC 1.36 0


38 PEK. KERAMIK TERAS 0.41 0

39 PEK. PENGECATAN 6.28 0

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 80

42 BAK MANDI FIBREGLASS 0.67 0

43 CLOSET JONGKOK 0.36 0

44 PASANG FLOOR DRAIN 0.05 0

45 PASANG KRAN TEMBOK 0.15 0

46 PEK. SEPTICTANK 1.01 80

47 PEK. BAK KONTROL 0.13 0

48 KISI - KISI / JALUSI KAYU 2.40 0

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 10 MAR S/D 22/APR/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : B2- 13 S/D 24
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
B2-13 s/d 24

1 PASANG BOUWPLANK 0.54 90

2 PEK. GALIAN PONDASI 0.51 90

3 PEK. URUGAN PASIR 0.20 90


4 URUGAN TANAH KEMBALI 0.10 70

5 PONDASI BATU KALI 3.35 90

6 PASANG DINDING BATAKO 14.35 8

7 PEK. PLESTERAN + ACI 8.64 0

8 PEK. BETON SLOOF 15/20 4.32 80

9 BETON KOLOM PRAKTIS 15/15 6.74 25

10 BETON KOLOM TERAS 15/20 0.30 0

11 BETON RING BALOK 15/20 DAN SOPI 4.29 0

12 BETON CANTILEVER T = 10 CM 1.76 0

13 RABAT BETON + CARPORT 1.11 0

14 PEK. BETON DUICKER 3 m' 0.85 0

15 PEK. ROLLAG BATA 0.37 0

16 PEK. LUBANG UDARA 0.30 0

17 PEK. BAN-BANAN 0.63 0

18 PEK. LOCIS PINTU 0.14 0

19 PEKERJAAN KUSEN 1.47 0

20 PASANG PINTU UTAMA 0.75 0

21 PINTU DOUBLE TRIPLEX 1.45 0

22 PASANG PINTU KM/WC 0.35 0

23 PASANG JENDELA 1.79 0

24 PEK. RANGKA ATAP 11.68 0

25 ATAP GENTENG 5.74 0


26 NOK GENTENG 0.99 0

27 PASANG LISTPLANK 3/20 0.89 0

28 PASANG TALANG 0.09 0

29 KUNCI PINTU UTAMA 0.18 0

30 KUNCI PINTU LAIN 0.30 0

31 PASANG ENGSEL PINTU 0.63 0

32 RANGKA PLAFOND 1/2x1 m 1.65 0

33 PENUTUP PLAFOND 2.61 0

34 PEK. LIST PLAFOND 1.15 0

35 KERAMIK LANTAI 30/30 4.37 0

36 KERAMIK LANTAI KM/WC 0.25 0

37 KERAMIK DINDING KM/WC 1.36 0

38 PEK. KERAMIK TERAS 0.41 0

39 PEK. PENGECATAN 6.28 0

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 85

42 BAK MANDI FIBREGLASS 0.67 0

43 CLOSET JONGKOK 0.36 0

44 PASANG FLOOR DRAIN 0.05 0

45 PASANG KRAN TEMBOK 0.15 0

46 PEK. SEPTICTANK 1.01 85


47 PEK. BAK KONTROL 0.13 0

48 KISI - KISI / JALUSI KAYU 2.40 0

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 10 MAR S/D 22/APR/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : A2- 13 S/D 24
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A2-13 s/d 24

1 PASANG BOUWPLANK 0.54 80

2 PEK. GALIAN PONDASI 0.51 80

3 PEK. URUGAN PASIR 0.20 80

4 URUGAN TANAH KEMBALI 0.10

5 PONDASI BATU KALI 3.35 80

6 PASANG DINDING BATAKO 14.35

7 PEK. PLESTERAN + ACI 8.64

8 PEK. BETON SLOOF 15/20 4.32 70

9 BETON KOLOM PRAKTIS 15/15 6.74 20

10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29


12 BETON CANTILEVER T = 10 CM 1.76

13 RABAT BETON + CARPORT 1.11

14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37

16 PEK. LUBANG UDARA 0.30

17 PEK. BAN-BANAN 0.63

18 PEK. LOCIS PINTU 0.14

19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75

21 PINTU DOUBLE TRIPLEX 1.45

22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68

25 ATAP GENTENG 5.74

26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89

28 PASANG TALANG 0.09

29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63

32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61


34 PEK. LIST PLAFOND 1.15

35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25

37 KERAMIK DINDING KM/WC 1.36

38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 75

42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36

44 PASANG FLOOR DRAIN 0.05

45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01 80

47 PEK. BAK KONTROL 0.13

48 KISI - KISI / JALUSI KAYU 2.40

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 10 MAR S/D 22/APR/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : A3- 1 S/D 12
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
BOBOT Opn Minggu Lalu
NO URAIAN PEKERJAAN
(%) Prog (%)
A3-1 s/d 12

1 PASANG BOUWPLANK 0.54 80

2 PEK. GALIAN PONDASI 0.51 85

3 PEK. URUGAN PASIR 0.20 85

4 URUGAN TANAH KEMBALI 0.10 90

5 PONDASI BATU KALI 3.35 90

6 PASANG DINDING BATAKO 14.35 60

7 PEK. PLESTERAN + ACI 8.64 0

8 PEK. BETON SLOOF 15/20 4.32 90

9 BETON KOLOM PRAKTIS 15/15 6.74 80

10 BETON KOLOM TERAS 15/20 0.30 0

11 BETON RING BALOK 15/20 DAN SOPI 4.29 0

12 BETON CANTILEVER T = 10 CM 1.76 0

13 RABAT BETON + CARPORT 1.11 0

14 PEK. BETON DUICKER 3 m' 0.85 0

15 PEK. ROLLAG BATA 0.37 0

16 PEK. LUBANG UDARA 0.30 0

17 PEK. BAN-BANAN 0.63 0

18 PEK. LOCIS PINTU 0.14 0

19 PEKERJAAN KUSEN 1.47 0

20 PASANG PINTU UTAMA 0.75 0


21 PINTU DOUBLE TRIPLEX 1.45 0

22 PASANG PINTU KM/WC 0.35 0

23 PASANG JENDELA 1.79 0

24 PEK. RANGKA ATAP 11.68 0

25 ATAP GENTENG 5.74 0

26 NOK GENTENG 0.99 0

27 PASANG LISTPLANK 3/20 0.89 0

28 PASANG TALANG 0.09 0

29 KUNCI PINTU UTAMA 0.18 0

30 KUNCI PINTU LAIN 0.30 0

31 PASANG ENGSEL PINTU 0.63 0

32 RANGKA PLAFOND 1/2x1 m 1.65 0

33 PENUTUP PLAFOND 2.61 0

34 PEK. LIST PLAFOND 1.15 0

35 KERAMIK LANTAI 30/30 4.37 0

36 KERAMIK LANTAI KM/WC 0.25 0

37 KERAMIK DINDING KM/WC 1.36 0

38 PEK. KERAMIK TERAS 0.41 0

39 PEK. PENGECATAN 6.28 0

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 90


42 BAK MANDI FIBREGLASS 0.67 0

43 CLOSET JONGKOK 0.36 0

44 PASANG FLOOR DRAIN 0.05 0

45 PASANG KRAN TEMBOK 0.15 0

46 PEK. SEPTICTANK 1.01 90

47 PEK. BAK KONTROL 0.13 0

48 KISI - KISI / JALUSI KAYU 2.40 0

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 10 MAR S/D 22/APR/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : A3- 13 S/D 24
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-13 s/d 24

1 PASANG BOUWPLANK 0.54 80

2 PEK. GALIAN PONDASI 0.51 80

3 PEK. URUGAN PASIR 0.20 80

4 URUGAN TANAH KEMBALI 0.10 50

5 PONDASI BATU KALI 3.35 80

6 PASANG DINDING BATAKO 14.35 20

7 PEK. PLESTERAN + ACI 8.64 0


8 PEK. BETON SLOOF 15/20 4.32 80

9 BETON KOLOM PRAKTIS 15/15 6.74 70

10 BETON KOLOM TERAS 15/20 0.30 0

11 BETON RING BALOK 15/20 DAN SOPI 4.29 0

12 BETON CANTILEVER T = 10 CM 1.76 0

13 RABAT BETON + CARPORT 1.11 0

14 PEK. BETON DUICKER 3 m' 0.85 0

15 PEK. ROLLAG BATA 0.37 0

16 PEK. LUBANG UDARA 0.30 0

17 PEK. BAN-BANAN 0.63 0

18 PEK. LOCIS PINTU 0.14 0

19 PEKERJAAN KUSEN 1.47 0

20 PASANG PINTU UTAMA 0.75 0

21 PINTU DOUBLE TRIPLEX 1.45 0

22 PASANG PINTU KM/WC 0.35 0

23 PASANG JENDELA 1.79 0

24 PEK. RANGKA ATAP 11.68 0

25 ATAP GENTENG 5.74 0

26 NOK GENTENG 0.99 0

27 PASANG LISTPLANK 3/20 0.89 0

28 PASANG TALANG 0.09 0


29 KUNCI PINTU UTAMA 0.18 0

30 KUNCI PINTU LAIN 0.30 0

31 PASANG ENGSEL PINTU 0.63 0

32 RANGKA PLAFOND 1/2x1 m 1.65 0

33 PENUTUP PLAFOND 2.61 0

34 PEK. LIST PLAFOND 1.15 0

35 KERAMIK LANTAI 30/30 4.37 0

36 KERAMIK LANTAI KM/WC 0.25 0

37 KERAMIK DINDING KM/WC 1.36 0

38 PEK. KERAMIK TERAS 0.41 0

39 PEK. PENGECATAN 6.28 0

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 80

42 BAK MANDI FIBREGLASS 0.67 0

43 CLOSET JONGKOK 0.36 0

44 PASANG FLOOR DRAIN 0.05 0

45 PASANG KRAN TEMBOK 0.15 0

46 PEK. SEPTICTANK 1.01 80

47 PEK. BAK KONTROL 0.13 0

48 KISI - KISI / JALUSI KAYU 2.40 0

100.00
PT. SUMBER KARYA MAKMUR ABADI
RENCANA ANGGARAN BIAYA PERIODE : 10 MAR S/D 22/APR/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : A4- 1 S/D 7
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-13 s/d 24

1 PASANG BOUWPLANK 0.54 80

2 PEK. GALIAN PONDASI 0.51 80

3 PEK. URUGAN PASIR 0.20 80

4 URUGAN TANAH KEMBALI 0.10 80

5 PONDASI BATU KALI 3.35 80

6 PASANG DINDING BATAKO 14.35 0

7 PEK. PLESTERAN + ACI 8.64 0

8 PEK. BETON SLOOF 15/20 4.32 0

9 BETON KOLOM PRAKTIS 15/15 6.74 0

10 BETON KOLOM TERAS 15/20 0.30 0

11 BETON RING BALOK 15/20 DAN SOPI 4.29 0

12 BETON CANTILEVER T = 10 CM 1.76 0

13 RABAT BETON + CARPORT 1.11 0

14 PEK. BETON DUICKER 3 m' 0.85 0

15 PEK. ROLLAG BATA 0.37 0

16 PEK. LUBANG UDARA 0.30 0


17 PEK. BAN-BANAN 0.63 0

18 PEK. LOCIS PINTU 0.14 0

19 PEKERJAAN KUSEN 1.47 0

20 PASANG PINTU UTAMA 0.75 0

21 PINTU DOUBLE TRIPLEX 1.45 0

22 PASANG PINTU KM/WC 0.35 0

23 PASANG JENDELA 1.79 0

24 PEK. RANGKA ATAP 11.68 0

25 ATAP GENTENG 5.74 0

26 NOK GENTENG 0.99 0

27 PASANG LISTPLANK 3/20 0.89 0

28 PASANG TALANG 0.09 0

29 KUNCI PINTU UTAMA 0.18 0

30 KUNCI PINTU LAIN 0.30 0

31 PASANG ENGSEL PINTU 0.63 0

32 RANGKA PLAFOND 1/2x1 m 1.65 0

33 PENUTUP PLAFOND 2.61 0

34 PEK. LIST PLAFOND 1.15 0

35 KERAMIK LANTAI 30/30 4.37 0

36 KERAMIK LANTAI KM/WC 0.25 0

37 KERAMIK DINDING KM/WC 1.36 0


38 PEK. KERAMIK TERAS 0.41 0

39 PEK. PENGECATAN 6.28 0

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 0

42 BAK MANDI FIBREGLASS 0.67 0

43 CLOSET JONGKOK 0.36 0

44 PASANG FLOOR DRAIN 0.05 0

45 PASANG KRAN TEMBOK 0.15 0

46 PEK. SEPTICTANK 1.01 0

47 PEK. BAK KONTROL 0.13 0

48 KISI - KISI / JALUSI KAYU 2.40 0

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 10 MAR S/D 22/APR/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : A5- 1 S/D 12
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-13 s/d 24

1 PASANG BOUWPLANK 0.54 90

2 PEK. GALIAN PONDASI 0.51 80

3 PEK. URUGAN PASIR 0.20 80


4 URUGAN TANAH KEMBALI 0.10 50

5 PONDASI BATU KALI 3.35 80

6 PASANG DINDING BATAKO 14.35 0

7 PEK. PLESTERAN + ACI 8.64 0

8 PEK. BETON SLOOF 15/20 4.32 0

9 BETON KOLOM PRAKTIS 15/15 6.74 0

10 BETON KOLOM TERAS 15/20 0.30 0

11 BETON RING BALOK 15/20 DAN SOPI 4.29 0

12 BETON CANTILEVER T = 10 CM 1.76 0

13 RABAT BETON + CARPORT 1.11 0

14 PEK. BETON DUICKER 3 m' 0.85 0

15 PEK. ROLLAG BATA 0.37 0

16 PEK. LUBANG UDARA 0.30 0

17 PEK. BAN-BANAN 0.63 0

18 PEK. LOCIS PINTU 0.14 0

19 PEKERJAAN KUSEN 1.47 0

20 PASANG PINTU UTAMA 0.75 0

21 PINTU DOUBLE TRIPLEX 1.45 0

22 PASANG PINTU KM/WC 0.35 0

23 PASANG JENDELA 1.79 0

24 PEK. RANGKA ATAP 11.68 0

25 ATAP GENTENG 5.74 0


26 NOK GENTENG 0.99 0

27 PASANG LISTPLANK 3/20 0.89 0

28 PASANG TALANG 0.09 0

29 KUNCI PINTU UTAMA 0.18 0

30 KUNCI PINTU LAIN 0.30 0

31 PASANG ENGSEL PINTU 0.63 0

32 RANGKA PLAFOND 1/2x1 m 1.65 0

33 PENUTUP PLAFOND 2.61 0

34 PEK. LIST PLAFOND 1.15 0

35 KERAMIK LANTAI 30/30 4.37 0

36 KERAMIK LANTAI KM/WC 0.25 0

37 KERAMIK DINDING KM/WC 1.36 0

38 PEK. KERAMIK TERAS 0.41 0

39 PEK. PENGECATAN 6.28 0

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 60

42 BAK MANDI FIBREGLASS 0.67 0

43 CLOSET JONGKOK 0.36 0

44 PASANG FLOOR DRAIN 0.05 0

45 PASANG KRAN TEMBOK 0.15 0

46 PEK. SEPTICTANK 1.01 80


47 PEK. BAK KONTROL 0.13 0

48 KISI - KISI / JALUSI KAYU 2.40 0

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 10 MAR S/D 22/APR/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : A5- 13 S/D 24
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-13 s/d 24

1 PASANG BOUWPLANK 0.54 90

2 PEK. GALIAN PONDASI 0.51 80

3 PEK. URUGAN PASIR 0.20 80

4 URUGAN TANAH KEMBALI 0.10 50

5 PONDASI BATU KALI 3.35 80

6 PASANG DINDING BATAKO 14.35 0

7 PEK. PLESTERAN + ACI 8.64 0

8 PEK. BETON SLOOF 15/20 4.32 0

9 BETON KOLOM PRAKTIS 15/15 6.74 0

10 BETON KOLOM TERAS 15/20 0.30 0

11 BETON RING BALOK 15/20 DAN SOPI 4.29 0

12 BETON CANTILEVER T = 10 CM 1.76 0


13 RABAT BETON + CARPORT 1.11 0

14 PEK. BETON DUICKER 3 m' 0.85 0

15 PEK. ROLLAG BATA 0.37 0

16 PEK. LUBANG UDARA 0.30 0

17 PEK. BAN-BANAN 0.63 0

18 PEK. LOCIS PINTU 0.14 0

19 PEKERJAAN KUSEN 1.47 0

20 PASANG PINTU UTAMA 0.75 0

21 PINTU DOUBLE TRIPLEX 1.45 0

22 PASANG PINTU KM/WC 0.35 0

23 PASANG JENDELA 1.79 0

24 PEK. RANGKA ATAP 11.68 0

25 ATAP GENTENG 5.74 0

26 NOK GENTENG 0.99 0

27 PASANG LISTPLANK 3/20 0.89 0

28 PASANG TALANG 0.09 0

29 KUNCI PINTU UTAMA 0.18 0

30 KUNCI PINTU LAIN 0.30 0

31 PASANG ENGSEL PINTU 0.63 0

32 RANGKA PLAFOND 1/2x1 m 1.65 0

33 PENUTUP PLAFOND 2.61 0

34 PEK. LIST PLAFOND 1.15 0


35 KERAMIK LANTAI 30/30 4.37 0

36 KERAMIK LANTAI KM/WC 0.25 0

37 KERAMIK DINDING KM/WC 1.36 0

38 PEK. KERAMIK TERAS 0.41 0

39 PEK. PENGECATAN 6.28 0

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 60

42 BAK MANDI FIBREGLASS 0.67 0

43 CLOSET JONGKOK 0.36 0

44 PASANG FLOOR DRAIN 0.05 0

45 PASANG KRAN TEMBOK 0.15 0

46 PEK. SEPTICTANK 1.01 80

47 PEK. BAK KONTROL 0.13 0

48 KISI - KISI / JALUSI KAYU 2.40 0

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 10 MAR S/D 22/APR/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : A6- 1 S/D 13
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-13 s/d 24
1 PASANG BOUWPLANK 0.54 90

2 PEK. GALIAN PONDASI 0.51 80

3 PEK. URUGAN PASIR 0.20 80

4 URUGAN TANAH KEMBALI 0.10 50

5 PONDASI BATU KALI 3.35 80

6 PASANG DINDING BATAKO 14.35 0

7 PEK. PLESTERAN + ACI 8.64 0

8 PEK. BETON SLOOF 15/20 4.32 0

9 BETON KOLOM PRAKTIS 15/15 6.74 0

10 BETON KOLOM TERAS 15/20 0.30 0

11 BETON RING BALOK 15/20 DAN SOPI 4.29 0

12 BETON CANTILEVER T = 10 CM 1.76 0

13 RABAT BETON + CARPORT 1.11 0

14 PEK. BETON DUICKER 3 m' 0.85 0

15 PEK. ROLLAG BATA 0.37 0

16 PEK. LUBANG UDARA 0.30 0

17 PEK. BAN-BANAN 0.63 0

18 PEK. LOCIS PINTU 0.14 0

19 PEKERJAAN KUSEN 1.47 0

20 PASANG PINTU UTAMA 0.75 0

21 PINTU DOUBLE TRIPLEX 1.45 0


22 PASANG PINTU KM/WC 0.35 0

23 PASANG JENDELA 1.79 0

24 PEK. RANGKA ATAP 11.68 0

25 ATAP GENTENG 5.74 0

26 NOK GENTENG 0.99 0

27 PASANG LISTPLANK 3/20 0.89 0

28 PASANG TALANG 0.09 0

29 KUNCI PINTU UTAMA 0.18 0

30 KUNCI PINTU LAIN 0.30 0

31 PASANG ENGSEL PINTU 0.63 0

32 RANGKA PLAFOND 1/2x1 m 1.65 0

33 PENUTUP PLAFOND 2.61 0

34 PEK. LIST PLAFOND 1.15 0

35 KERAMIK LANTAI 30/30 4.37 0

36 KERAMIK LANTAI KM/WC 0.25 0

37 KERAMIK DINDING KM/WC 1.36 0

38 PEK. KERAMIK TERAS 0.41 0

39 PEK. PENGECATAN 6.28 0

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 60

42 BAK MANDI FIBREGLASS 0.67 0

43 CLOSET JONGKOK 0.36 0


44 PASANG FLOOR DRAIN 0.05 0

45 PASANG KRAN TEMBOK 0.15 0

46 PEK. SEPTICTANK 1.01 60

47 PEK. BAK KONTROL 0.13 0

48 KISI - KISI / JALUSI KAYU 2.40 0

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 10 MAR S/D 22/APR/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : B3- 1 S/D 12
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-13 s/d 24

1 PASANG BOUWPLANK 0.54 90

2 PEK. GALIAN PONDASI 0.51 80

3 PEK. URUGAN PASIR 0.20 80

4 URUGAN TANAH KEMBALI 0.10 50

5 PONDASI BATU KALI 3.35 80

6 PASANG DINDING BATAKO 14.35 0

7 PEK. PLESTERAN + ACI 8.64 0

8 PEK. BETON SLOOF 15/20 4.32 0

9 BETON KOLOM PRAKTIS 15/15 6.74 0


10 BETON KOLOM TERAS 15/20 0.30 0

11 BETON RING BALOK 15/20 DAN SOPI 4.29 0

12 BETON CANTILEVER T = 10 CM 1.76 0

13 RABAT BETON + CARPORT 1.11 0

14 PEK. BETON DUICKER 3 m' 0.85 0

15 PEK. ROLLAG BATA 0.37 0

16 PEK. LUBANG UDARA 0.30 0

17 PEK. BAN-BANAN 0.63 0

18 PEK. LOCIS PINTU 0.14 0

19 PEKERJAAN KUSEN 1.47 0

20 PASANG PINTU UTAMA 0.75 0

21 PINTU DOUBLE TRIPLEX 1.45 0

22 PASANG PINTU KM/WC 0.35 0

23 PASANG JENDELA 1.79 0

24 PEK. RANGKA ATAP 11.68 0

25 ATAP GENTENG 5.74 0

26 NOK GENTENG 0.99 0

27 PASANG LISTPLANK 3/20 0.89 0

28 PASANG TALANG 0.09 0

29 KUNCI PINTU UTAMA 0.18 0

30 KUNCI PINTU LAIN 0.30 0

31 PASANG ENGSEL PINTU 0.63 0


32 RANGKA PLAFOND 1/2x1 m 1.65 0

33 PENUTUP PLAFOND 2.61 0

34 PEK. LIST PLAFOND 1.15 0

35 KERAMIK LANTAI 30/30 4.37 0

36 KERAMIK LANTAI KM/WC 0.25 0

37 KERAMIK DINDING KM/WC 1.36 0

38 PEK. KERAMIK TERAS 0.41 0

39 PEK. PENGECATAN 6.28 0

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 0

42 BAK MANDI FIBREGLASS 0.67 0

43 CLOSET JONGKOK 0.36 0

44 PASANG FLOOR DRAIN 0.05 0

45 PASANG KRAN TEMBOK 0.15 0

46 PEK. SEPTICTANK 1.01 0

47 PEK. BAK KONTROL 0.13 0

48 KISI - KISI / JALUSI KAYU 2.40 0

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 10 MAR S/D 22/APR/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : B3- 13 S/D 24
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-13 s/d 24

1 PASANG BOUWPLANK 0.54 90

2 PEK. GALIAN PONDASI 0.51 80

3 PEK. URUGAN PASIR 0.20 80

4 URUGAN TANAH KEMBALI 0.10 50

5 PONDASI BATU KALI 3.35 80

6 PASANG DINDING BATAKO 14.35 0

7 PEK. PLESTERAN + ACI 8.64 0

8 PEK. BETON SLOOF 15/20 4.32 0

9 BETON KOLOM PRAKTIS 15/15 6.74 0

10 BETON KOLOM TERAS 15/20 0.30 0

11 BETON RING BALOK 15/20 DAN SOPI 4.29 0

12 BETON CANTILEVER T = 10 CM 1.76 0

13 RABAT BETON + CARPORT 1.11 0

14 PEK. BETON DUICKER 3 m' 0.85 0

15 PEK. ROLLAG BATA 0.37 0

16 PEK. LUBANG UDARA 0.30 0

17 PEK. BAN-BANAN 0.63 0

18 PEK. LOCIS PINTU 0.14 0


19 PEKERJAAN KUSEN 1.47 0

20 PASANG PINTU UTAMA 0.75 0

21 PINTU DOUBLE TRIPLEX 1.45 0

22 PASANG PINTU KM/WC 0.35 0

23 PASANG JENDELA 1.79 0

24 PEK. RANGKA ATAP 11.68 0

25 ATAP GENTENG 5.74 0

26 NOK GENTENG 0.99 0

27 PASANG LISTPLANK 3/20 0.89 0

28 PASANG TALANG 0.09 0

29 KUNCI PINTU UTAMA 0.18 0

30 KUNCI PINTU LAIN 0.30 0

31 PASANG ENGSEL PINTU 0.63 0

32 RANGKA PLAFOND 1/2x1 m 1.65 0

33 PENUTUP PLAFOND 2.61 0

34 PEK. LIST PLAFOND 1.15 0

35 KERAMIK LANTAI 30/30 4.37 0

36 KERAMIK LANTAI KM/WC 0.25 0

37 KERAMIK DINDING KM/WC 1.36 0

38 PEK. KERAMIK TERAS 0.41 0

39 PEK. PENGECATAN 6.28 0

40 PEK. INSTALASI LISTRIK 1.24 0


41 PEK. INSTALASI AIR 1.15 0

42 BAK MANDI FIBREGLASS 0.67 0

43 CLOSET JONGKOK 0.36 0

44 PASANG FLOOR DRAIN 0.05 0

45 PASANG KRAN TEMBOK 0.15 0

46 PEK. SEPTICTANK 1.01 0

47 PEK. BAK KONTROL 0.13 0

48 KISI - KISI / JALUSI KAYU 2.40 0

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 10 MAR S/D 22/APR/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : B4- 1 S/D 8
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-13 s/d 24

1 PASANG BOUWPLANK 0.54 90

2 PEK. GALIAN PONDASI 0.51 50

3 PEK. URUGAN PASIR 0.20 50

4 URUGAN TANAH KEMBALI 0.10 0

5 PONDASI BATU KALI 3.35 50

6 PASANG DINDING BATAKO 14.35 0


7 PEK. PLESTERAN + ACI 8.64 0

8 PEK. BETON SLOOF 15/20 4.32 0

9 BETON KOLOM PRAKTIS 15/15 6.74 0

10 BETON KOLOM TERAS 15/20 0.30 0

11 BETON RING BALOK 15/20 DAN SOPI 4.29 0

12 BETON CANTILEVER T = 10 CM 1.76 0

13 RABAT BETON + CARPORT 1.11 0

14 PEK. BETON DUICKER 3 m' 0.85 0

15 PEK. ROLLAG BATA 0.37 0

16 PEK. LUBANG UDARA 0.30 0

17 PEK. BAN-BANAN 0.63 0

18 PEK. LOCIS PINTU 0.14 0

19 PEKERJAAN KUSEN 1.47 0

20 PASANG PINTU UTAMA 0.75 0

21 PINTU DOUBLE TRIPLEX 1.45 0

22 PASANG PINTU KM/WC 0.35 0

23 PASANG JENDELA 1.79 0

24 PEK. RANGKA ATAP 11.68 0

25 ATAP GENTENG 5.74 0

26 NOK GENTENG 0.99 0

27 PASANG LISTPLANK 3/20 0.89 0


28 PASANG TALANG 0.09 0

29 KUNCI PINTU UTAMA 0.18 0

30 KUNCI PINTU LAIN 0.30 0

31 PASANG ENGSEL PINTU 0.63 0

32 RANGKA PLAFOND 1/2x1 m 1.65 0

33 PENUTUP PLAFOND 2.61 0

34 PEK. LIST PLAFOND 1.15 0

35 KERAMIK LANTAI 30/30 4.37 0

36 KERAMIK LANTAI KM/WC 0.25 0

37 KERAMIK DINDING KM/WC 1.36 0

38 PEK. KERAMIK TERAS 0.41 0

39 PEK. PENGECATAN 6.28 0

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 0

42 BAK MANDI FIBREGLASS 0.67 0

43 CLOSET JONGKOK 0.36 0

44 PASANG FLOOR DRAIN 0.05 0

45 PASANG KRAN TEMBOK 0.15 0

46 PEK. SEPTICTANK 1.01 0

47 PEK. BAK KONTROL 0.13 0

48 KISI - KISI / JALUSI KAYU 2.40 0

100.00
PT. SUMBER KARYA MAKMUR ABADI
RENCANA ANGGARAN BIAYA PERIODE : 10 MAR S/D 22/APR/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : B5- 1 S/D 12
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A3-13 s/d 24

1 PASANG BOUWPLANK 0.54 90

2 PEK. GALIAN PONDASI 0.51 50

3 PEK. URUGAN PASIR 0.20 30

4 URUGAN TANAH KEMBALI 0.10 0

5 PONDASI BATU KALI 3.35 30

6 PASANG DINDING BATAKO 14.35 0

7 PEK. PLESTERAN + ACI 8.64 0

8 PEK. BETON SLOOF 15/20 4.32 0

9 BETON KOLOM PRAKTIS 15/15 6.74 0

10 BETON KOLOM TERAS 15/20 0.30 0

11 BETON RING BALOK 15/20 DAN SOPI 4.29 0

12 BETON CANTILEVER T = 10 CM 1.76 0

13 RABAT BETON + CARPORT 1.11 0

14 PEK. BETON DUICKER 3 m' 0.85 0

15 PEK. ROLLAG BATA 0.37 0


16 PEK. LUBANG UDARA 0.30 0

17 PEK. BAN-BANAN 0.63 0

18 PEK. LOCIS PINTU 0.14 0

19 PEKERJAAN KUSEN 1.47 0

20 PASANG PINTU UTAMA 0.75 0

21 PINTU DOUBLE TRIPLEX 1.45 0

22 PASANG PINTU KM/WC 0.35 0

23 PASANG JENDELA 1.79 0

24 PEK. RANGKA ATAP 11.68 0

25 ATAP GENTENG 5.74 0

26 NOK GENTENG 0.99 0

27 PASANG LISTPLANK 3/20 0.89 0

28 PASANG TALANG 0.09 0

29 KUNCI PINTU UTAMA 0.18 0

30 KUNCI PINTU LAIN 0.30 0

31 PASANG ENGSEL PINTU 0.63 0

32 RANGKA PLAFOND 1/2x1 m 1.65 0

33 PENUTUP PLAFOND 2.61 0

34 PEK. LIST PLAFOND 1.15 0

35 KERAMIK LANTAI 30/30 4.37 0

36 KERAMIK LANTAI KM/WC 0.25 0


37 KERAMIK DINDING KM/WC 1.36 0

38 PEK. KERAMIK TERAS 0.41 0

39 PEK. PENGECATAN 6.28 0

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 0

42 BAK MANDI FIBREGLASS 0.67 0

43 CLOSET JONGKOK 0.36 0

44 PASANG FLOOR DRAIN 0.05 0

45 PASANG KRAN TEMBOK 0.15 0

46 PEK. SEPTICTANK 1.01 0

47 PEK. BAK KONTROL 0.13 0

48 KISI - KISI / JALUSI KAYU 2.40 0

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 10 MAR S/D 22/APR/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : A1 1 S/D 16
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A1-1 s/d 16

1 PASANG BOUWPLANK 0.54 90

2 PEK. GALIAN PONDASI 0.51 50

3 PEK. URUGAN PASIR 0.20 30


4 URUGAN TANAH KEMBALI 0.10 0

5 PONDASI BATU KALI 3.35 30

6 PASANG DINDING BATAKO 14.35 0

7 PEK. PLESTERAN + ACI 8.64 0

8 PEK. BETON SLOOF 15/20 4.32 0

9 BETON KOLOM PRAKTIS 15/15 6.74 0

10 BETON KOLOM TERAS 15/20 0.30 0

11 BETON RING BALOK 15/20 DAN SOPI 4.29 0

12 BETON CANTILEVER T = 10 CM 1.76 0

13 RABAT BETON + CARPORT 1.11 0

14 PEK. BETON DUICKER 3 m' 0.85 0

15 PEK. ROLLAG BATA 0.37 0

16 PEK. LUBANG UDARA 0.30 0

17 PEK. BAN-BANAN 0.63 0

18 PEK. LOCIS PINTU 0.14 0

19 PEKERJAAN KUSEN 1.47 0

20 PASANG PINTU UTAMA 0.75 0

21 PINTU DOUBLE TRIPLEX 1.45 0

22 PASANG PINTU KM/WC 0.35 0

23 PASANG JENDELA 1.79 0

24 PEK. RANGKA ATAP 11.68 0

25 ATAP GENTENG 5.74 0


26 NOK GENTENG 0.99 0

27 PASANG LISTPLANK 3/20 0.89 0

28 PASANG TALANG 0.09 0

29 KUNCI PINTU UTAMA 0.18 0

30 KUNCI PINTU LAIN 0.30 0

31 PASANG ENGSEL PINTU 0.63 0

32 RANGKA PLAFOND 1/2x1 m 1.65 0

33 PENUTUP PLAFOND 2.61 0

34 PEK. LIST PLAFOND 1.15 0

35 KERAMIK LANTAI 30/30 4.37 0

36 KERAMIK LANTAI KM/WC 0.25 0

37 KERAMIK DINDING KM/WC 1.36 0

38 PEK. KERAMIK TERAS 0.41 0

39 PEK. PENGECATAN 6.28 0

40 PEK. INSTALASI LISTRIK 1.24 0

41 PEK. INSTALASI AIR 1.15 0

42 BAK MANDI FIBREGLASS 0.67 0

43 CLOSET JONGKOK 0.36 0

44 PASANG FLOOR DRAIN 0.05 0

45 PASANG KRAN TEMBOK 0.15 0

46 PEK. SEPTICTANK 1.01 0


47 PEK. BAK KONTROL 0.13 0

48 KISI - KISI / JALUSI KAYU 2.40 0

100.00

PT. SUMBER KARYA MAKMUR ABADI


RENCANA ANGGARAN BIAYA PERIODE : 10 MAR S/D 22/APR/2019
PROYEK: PERUMAHAN BUKIT PURI ASRI KAVLING : A2- 1 S/D 12
T Y P E : 36/70

BOBOT Opn Minggu Lalu


NO URAIAN PEKERJAAN
(%) Prog (%)
A2-13 s/d 24

1 PASANG BOUWPLANK 0.54 80

2 PEK. GALIAN PONDASI 0.51 80

3 PEK. URUGAN PASIR 0.20

4 URUGAN TANAH KEMBALI 0.10

5 PONDASI BATU KALI 3.35

6 PASANG DINDING BATAKO 14.35

7 PEK. PLESTERAN + ACI 8.64

8 PEK. BETON SLOOF 15/20 4.32

9 BETON KOLOM PRAKTIS 15/15 6.74

10 BETON KOLOM TERAS 15/20 0.30

11 BETON RING BALOK 15/20 DAN SOPI 4.29

12 BETON CANTILEVER T = 10 CM 1.76

13 RABAT BETON + CARPORT 1.11


14 PEK. BETON DUICKER 3 m' 0.85

15 PEK. ROLLAG BATA 0.37

16 PEK. LUBANG UDARA 0.30

17 PEK. BAN-BANAN 0.63

18 PEK. LOCIS PINTU 0.14

19 PEKERJAAN KUSEN 1.47

20 PASANG PINTU UTAMA 0.75

21 PINTU DOUBLE TRIPLEX 1.45

22 PASANG PINTU KM/WC 0.35

23 PASANG JENDELA 1.79

24 PEK. RANGKA ATAP 11.68

25 ATAP GENTENG 5.74

26 NOK GENTENG 0.99

27 PASANG LISTPLANK 3/20 0.89

28 PASANG TALANG 0.09

29 KUNCI PINTU UTAMA 0.18

30 KUNCI PINTU LAIN 0.30

31 PASANG ENGSEL PINTU 0.63

32 RANGKA PLAFOND 1/2x1 m 1.65

33 PENUTUP PLAFOND 2.61

34 PEK. LIST PLAFOND 1.15


35 KERAMIK LANTAI 30/30 4.37

36 KERAMIK LANTAI KM/WC 0.25

37 KERAMIK DINDING KM/WC 1.36

38 PEK. KERAMIK TERAS 0.41

39 PEK. PENGECATAN 6.28

40 PEK. INSTALASI LISTRIK 1.24

41 PEK. INSTALASI AIR 1.15

42 BAK MANDI FIBREGLASS 0.67

43 CLOSET JONGKOK 0.36

44 PASANG FLOOR DRAIN 0.05

45 PASANG KRAN TEMBOK 0.15

46 PEK. SEPTICTANK 1.01

47 PEK. BAK KONTROL 0.13

48 KISI - KISI / JALUSI KAYU 2.40

100.00
10 MAR S/D 22/APR/2019
B2- 1 S/D 12

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini

Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)

B2-1 s/d 12 B2-1 s/d 12 B2-1 s/d 12

0.48 - 90 0.48

0.46 - 90 0.46

0.16 - 80 0.16

0.07 - 75 0.07

2.68 - 80 2.68

1.43 70 10.04 80 11.48

- 55 4.75 55 4.75

3.46 10 0.43 90 3.89

1.35 70 4.72 90 6.06

- - 0 -

- 55 2.36 55 2.36

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- 90 0.27 90 0.27
-
- - 0 -

- - 0 -

- 80 1.17 80 1.17

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- 5 0.06 5 0.06

0.92 0 - 80 0.92

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.81 0 - 80 0.81

- - 0 -

- - 0 -

11.82 23.81 0 35.63

10 MAR S/D 22/APR/2019


B2- 13 S/D 24

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
B2-13 s/d 24 B2-13 s/d 24 B2-13 s/d 24

0.48 - 90 0.48

0.46 - 90 0.46

0.18 - 90 0.18
0.07 - 70 0.07

3.01 - 90 3.01

1.15 72 10.33 80 11.48

- 0 - 0 -

3.46 - 80 3.46

1.68 55 3.71 80 5.39

- - 0 -

- 70 3.00 70 3.00

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 80 0.24 80 0.24
-
- - 0 -

- - 0 -

- 80 1.17 80 1.17

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.97 - 85 0.97

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.86 - 85 0.86
- - 0 -

- - 0 -

12.33 18.45 0 30.78

10 MAR S/D 22/APR/2019


A2- 13 S/D 24

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A2-13 s/d 24 A2-13 s/d 24 A2-13 s/d 24

0.43 - 80 0.43

0.41 - 80 0.41

0.16 - 80 0.16

- 80 0.08 80 0.08

2.68 - 80 2.68

- 80 11.48 80 11.48

- 80 6.91 80 6.91

3.03 - 70 3.03

1.35 60 4.04 80 5.39

- - 0 -

- 70 3.00 70 3.00
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 80 0.24 80 0.24
-
- - 0 -

- - 0 -

- 80 1.17 80 1.17

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.86 - 75 0.86

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.81 - 80 0.81

- - 0 -

- - 0 -

9.72 26.92 36.64

10 MAR S/D 22/APR/2019


A3- 1 S/D 12

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-1 s/d 12 A3-1 s/d 12 A3-1 s/d 12

0.43 - 80 0.43

0.44 - 85 0.44

0.17 - 85 0.17

0.09 - 90 0.09

3.01 - 90 3.01

8.61 30 4.30 90 12.91

- 90 7.77 90 7.77

3.89 - 90 3.89

5.39 10 0.67 90 6.06

- - 0 -

- 85 3.65 85 3.65

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 80 0.24 80 0.24
-
- - 0 -

- - 0 -

- 85 1.25 85 1.25

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- 40 4.67 40 4.67

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

1.03 - 90 1.03
- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.91 - 90 0.91

- - 0 -

- - 0 -

23.97 22.56 46.52

10 MAR S/D 22/APR/2019


A3- 13 S/D 24

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-13 s/d 24 A3-13 s/d 24 A3-13 s/d 24

0.43 - 80 0.43

0.41 - 80 0.41

0.16 - 80 0.16

0.05 30 0.03 80 0.08

2.68 - 80 2.68

2.87 60 8.61 80 11.48

- - 0 -
3.46 - 80 3.46

4.72 10 0.67 80 5.39

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- 80 1.17 80 1.17

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.92 - 80 0.92

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.81 - 80 0.81

- - 0 -

- - 0 -

16.50 10.49 26.98


10 MAR S/D 22/APR/2019
A4- 1 S/D 7

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-13 s/d 24 A3-13 s/d 24 A3-13 s/d 24

0.43 - 80 0.43

0.41 - 80 0.41

0.16 - 80 0.16

0.08 - 80 0.08

2.68 - 80 2.68

- 30 4.30 30 4.30

- - 0 -

- 90 3.89 90 3.89

- 90 6.06 90 6.06

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 20 0.06 20 0.06
-
- - 0 -

- - 0 -

- 20 0.29 20 0.29

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- 45 0.52 45 0.52

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 80 0.81 80 0.81

- - 0 -

- - 0 -

3.76 15.93 19.69

10 MAR S/D 22/APR/2019


A5- 1 S/D 12

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-13 s/d 24 A3-13 s/d 24 A3-13 s/d 24

0.48 - 90 0.48

0.41 - 80 0.41

0.16 - 80 0.16
0.05 40 0.04 90 0.09

2.68 - 80 2.68

- 80 11.48 80 11.48

- - 0 -

- 80 3.46 80 3.46

- 80 5.39 80 5.39

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 80 0.24 80 0.24
-
- - 0 -

- - 0 -

- 80 1.17 80 1.17

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.69 20 0.23 80 0.92

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.81 - 80 0.81
- - 0 -

- - 0 -

5.28 22.01 27.29

10 MAR S/D 22/APR/2019


A5- 13 S/D 24

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-13 s/d 24 A3-13 s/d 24 A3-13 s/d 24

0.48 - 90 0.48

0.41 - 80 0.41

0.16 - 80 0.16

0.05 40 0.04 90 0.09

2.68 - 80 2.68

- 70 10.04 70 10.04

- - 0 -

- 90 3.89 90 3.89

- 90 6.06 90 6.06

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- 70 0.21 70 0.21
-
- - 0 -

- - 0 -

- 70 1.03 70 1.03

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.69 - 60 0.69

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.81 - 80 0.81

- - 0 -

- - 0 -

5.28 21.27 26.55

10 MAR S/D 22/APR/2019


A6- 1 S/D 13

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-13 s/d 24 A3-13 s/d 24 A3-13 s/d 24
0.48 - 90 0.48

0.41 - 80 0.41

0.16 - 80 0.16

0.05 30 0.03 80 0.08

2.68 - 80 2.68

- - 0 -

- - 0 -

- 80 3.46 80 3.46

- 80 5.39 80 5.39

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

0.69 - 60 0.69

- - 0 -

- - 0 -
- - 0 -

- - 0 -

0.61 - 60 0.61

- - 0 -

- - 0 -

5.08 8.88 13.95

10 MAR S/D 22/APR/2019


B3- 1 S/D 12

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-13 s/d 24 A3-13 s/d 24 A3-13 s/d 24

0.48 - 90 0.48

0.41 - 80 0.41

0.16 - 80 0.16

0.05 30 0.03 80 0.08

2.68 - 80 2.68

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 6 0.07 6 0.07

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

3.78 0.10 3.88

10 MAR S/D 22/APR/2019


B3- 13 S/D 24

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-13 s/d 24 A3-13 s/d 24 A3-13 s/d 24

0.48 - 90 0.48

0.41 - 80 0.41

0.16 - 80 0.16

0.05 30 0.03 80 0.08

2.68 - 80 2.68

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 80 0.81 80 0.81

- - 0 -

- - 0 -

3.78 0.84 4.62

10 MAR S/D 22/APR/2019


B4- 1 S/D 8

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-13 s/d 24 A3-13 s/d 24 A3-13 s/d 24

0.48 - 90 0.48

0.26 30 0.15 80 0.41

0.10 30 0.06 80 0.16

- 80 0.08 80 0.08

1.67 30 1.00 80 2.68

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 80 0.81 80 0.81

- - 0 -

- - 0 -

2.52 2.10 4.62


10 MAR S/D 22/APR/2019
B5- 1 S/D 12

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A3-13 s/d 24 A3-13 s/d 24 A3-13 s/d 24

0.48 - 90 0.48

0.26 30 0.15 80 0.41

0.06 - 30 0.06

- - 0 -

1.00 60 2.01 90 3.01

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 80 0.81 80 0.81

- - 0 -

- - 0 -

1.81 2.97 4.78

10 MAR S/D 22/APR/2019


A1 1 S/D 16

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A1-1 s/d 16 A1-1 s/d 16 A1-1 s/d 16

0.48 - 90 0.48

0.26 30 0.15 80 0.41

0.06 60 0.12 90 0.18


- - 0 -

1.00 60 2.01 90 3.01

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 80 0.81 80 0.81
- - 0 -

- - 0 -

1.81 3.09 4.90

10 MAR S/D 22/APR/2019


A2- 1 S/D 12

Opn Minggu Lalu Opn s/d Minggu ini Opn Minggu ini
Bobot (%) Prog (%) Bobot (%) Prog (%) Bobot (%)
A2-13 s/d 24 A2-13 s/d 24 A2-13 s/d 24

0.43 - 80 0.43

0.41 - 80 0.41

- - 0 -

- - 0 -

- 80 2.68 80 2.68

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -
-
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -
- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- - 0 -

- 80 0.81 80 0.81

- - 0 -

- - 0 -

0.84 3.49 4.33