Perencanaan Gording
Perencanaan Gording
Perencanaan Gording
Beban Angin
Rangka Atap
DATA STRUKTUR
q : 11.0 kg/m
Ix : 489 cm4
Iy : 99.2 cm4
Zx = Wx : 65.2 cm3
Zy = Wy : 19.8 cm3
= 41 kg/m
Beban Angin
Beban tekan angin yang diperhitungkan = 40 kg/m2
Koefisien angin tekan = 0.02 (31) – 0.4 = 0.22
Koefisien angin isap = - 0.4
qy
qx
q
qDL = 41 kg/m
qx = qDL x (cos α)
= 41 kg/m x (cos 31)
= 34. 28 kg/m
qy = qDL x (sin α)
= 41 kg/m x (sin 31)
= 21.12 kg/m
𝟏
Mx = 𝟖 x 34.28 x 52 = 107.13 kg/m
𝟏
My = 𝟖 x 21.12 x 2.52 = 16.5 kg/m
qy
qx
q
qLL = 100 kg
qx = qLL x (cos α )
= 100 x (cos 31 )
= 85.71 kg/m
qy = qLL x (sin α )
= 100 x (sin 31 )
= 51.50 kg/m
𝟏
Mx = 𝟒 x 85.71 x 5 = 107.13 kg/m
𝟏
My = 𝟒 x 51.50 x 2.5 = 32.18 kg/m
𝟏
Mx = 𝟖 x qH x L2
𝟏
= 𝟖 x 15.2 x 52
= 47.5 kg/m
𝟏
Wx = 𝟖 x qW tekan x L2
𝟏
= 𝟖 x 8.8 x 52
= 27.5 kg/m
Mny = Zy . fy
= 19800 x 410
= 8118000 Nmm
= 0.74 > 1 OK
Beban ultimate
qDL = 41 kg/m
qDL = 41 kg/m
= 120 kg
𝑀𝑢𝑥 𝑀𝑢𝑦
+ ᴓ𝑀𝑢𝑦 ≤ 1;
ᴓ 𝑀𝑢𝑥
1 1
Mux = ( 8 x qU x L2 ) +( 4 x pU x L )
1 1
= ( 8 x 53.11 kg/m x 52 m ) +( 4 x 72.1 kg x 5 m )
= 256.09 kg/m
1 1
Muy = ( 8 x qU x 1/2 L2 ) +( 4 x pU x ½ L )
1 1
= ( 8 x 55.71 kg/m x 2.52 m) +( 4 x 120 kg x 2.5 m )
= 118.52 kg/m
ØMnx = Ø Zx fy
ØMny = Ø Zy fy
= 730.62 kg/m
𝑀𝑢𝑥 𝑀𝑢𝑦
+ ≤ 1;
ᴓ 𝑀𝑛𝑥 ᴓ𝑀𝑛𝑦
256.09 118.52
+ 0.9 𝑥 730.62 ≤ 1;
0.9 𝑥 2405.88
0.29 ≤ 1 OK
Perencanaan Trakstang
Pembebanan Trakstang
Wu = 1,4 D
= 1,4 ( 300 ) = 420 N/m2
Wu = 1,2 D + 0,5 H
Wu = 1,2 D + 1,6 H
= 1,2 ( 300 ) + 1,6 ( 78.28 ) = 485.25 N/m2 Menentukan
Beban yang bekerja sejajar beban atap (α) = 485.25 x Sin 31 = 249.92
N/m2
12
Beban pada trakstang teratas = 14 x 2.5 m x 7 𝑚 x 249.92 N/m2 = 3748. 8 N
Nu 3748.8 𝑁
AD = 0,75 𝑥 0,75 𝑥 550 𝑥 106 𝑁/𝑚2 = 1.211 x 10-5 m2 = 12.11 mm2
.0,75.Fu
1
𝜋 𝐷2 12,11 mm2
4
D 3.9266 ≈ 4 mm
1
Nu1 = Jarak trakstang x r x beban sejajar beban atap x cos α
1
= 2.5 m x 7 m x 249.92 N/m2 x cos 31 = 5102.387 N
Nu 5102.387 𝑁
AD = 0,75 𝑥 0,75 𝑥 550𝑥 106 𝑁/𝑚2 = 1,65 x 10-5 m2 = 16.5 mm2
.0,75.Fu
AD 16.5 mm2
D 4.6 ≈ 5 mm
= 40 – 0.8 31⁰
= 15.2 kg/m2
Analis gaya dalam untuk perancangan atau perancangan kuda-kuda dilakukan dengan
bentuk program struktur SAP2000. Analis dilakukan dengan memasukan beban-beban yang
telah ditentukan, dengan mengacu pada buku peraturan baja ( SNI BAJA ) sebagai input
data dengan berbagai kombinasi pembebanan yang diantaranya adalah :