Rp 125,000,000 MINYAK PICK UP Rp 180,000 Rp 124,820,000 UANG SAMA KPA Rp 20,000,000 Rp 104,820,000 BATU Rp 40,200,000 Rp 64,620,000 PASIR Rp 8,800,000 Rp 55,820,000 SEMEN Rp 23,120,000 Rp 32,700,000 TANAH TIMBUNAN Rp 1,400,000 Rp 31,300,000 PEMASANGAN BRONJONG Rp 9,030,000 Rp 22,270,000 PEMASANGAN SALURAN Rp 9,900,000 Rp 12,370,000 SEWA EXCAVATOR MENIMBUN BRONJONG Rp 2,000,000 Rp 10,370,000 HARIAN KANTOR MENGANGKAT SEDIMEN DAN HASIL GALIAN Rp 1,470,000 Rp 8,900,000 JAGA MALAM BRONJONG TERAKHIR Rp 450,000 Rp 8,450,000 PELUNASAN PINTU Rp 4,850,000 Rp 3,600,000 MINGGUAN PENGAWAS Rp 1,500,000 Rp 2,100,000 MAKAN SAMA ORG DINAS DAN INSPETORAT Rp 400,000 Rp 1,700,000 UANG SAKU INSPEKTORAT 5 ORG Rp 1,500,000 Rp 200,000 MINYAK POMPA AIR Rp 200,000 Rp -
UANG MASUK TGL : 26 Okt 2017
URAIAN PENGELUARAN NILAI SALDO
Rp 3,440,000 MINYAK PICK UP Rp 180,000 Rp 3,260,000 OPERATOR Rp 200,000 Rp 3,060,000 PERBAIKI PICK UP Rp 340,000 Rp 2,720,000 HARIAN KANTOR FINISHING SHELTER Rp 450,000 Rp 2,270,000 BELI AQUA Rp 25,000 Rp 2,245,000 UANG PENGAMANAN LSM Rp 300,000 Rp 1,945,000 PROPOSAL DARI KEPALA DESA Rp 500,000 Rp 1,445,000 BON WARUNG 8-14 Rp 875,000 Rp 570,000 BON WARUNG 15-21 (KUNJUNGAN DINAS DAN TINGKAT I ) Rp 830,000 -Rp 260,000 UANG KAS MINUS -Rp 260,000 UANG MASUK TGL : 19 Okt 2017
URAIAN PENGELUARAN NILAI PENGELUARAN SALDO
Rp 70,000,000 BATU Rp 18,000,000 Rp 52,000,000 PASIR Rp 6,600,000 Rp 45,400,000 SEMEN Rp 21,080,000 Rp 24,320,000 TANAH TIMBUNAN Rp 1,000,000 Rp 23,320,000 PEMASANGAN SALURAN Rp 9,240,000 Rp 14,080,000 PELUNASAN UANG LAPORAN Rp 6,000,000 Rp 8,080,000 HARIAN KANTOR MENGANGKAT SEDIMEN DAN HASILRp GALIAN 1,470,000 Rp 6,610,000 BORONGAN PEMASANGAN BAYA-BAYA PLAT LAYAN DAN Rp PINTU 2,000,000 Rp 4,610,000 HARIAN MENARIK TANAH MENIMBUN SALURAN Rp 450,000 Rp 4,160,000 MINGGUAN PENGAWAS Rp 750,000 Rp 3,410,000 Minyak Pick Up Rp 200,000 Rp 3,210,000 Cat Minyak, Kuas dan Thiner Rp 150,000 Rp 3,060,000 Uang Pompa dan Minyak Pompa Rp 230,000 Rp 2,830,000 Bon Warung Rp 1,200,000 Rp 1,630,000 Berobat Junimars Rp 150,000 Rp 1,480,000 Mengirim Genset dan Breker Rp 200,000 Rp 1,280,000 Minyak Pick Up Rp 100,000 Rp 1,180,000 Hanafi Rp 500,000 Rp 680,000 Makan Sama org Dinas Rp 200,000 Rp 480,000 LSM Rp 100,000 Rp 380,000 SISA Rp 380,000 PENGURANGAN KURANG KAS MINGGU LALU Rp 260,000 TOTAL SISA UANG Rp 120,000 UANG MASUK TGL : 2 Nov 2017 URAIAN PENGELUARAN NILAI PENGELUARAN SALDO Rp 28,000,000 BATU Rp 1,200,000 Rp 26,800,000 PASIR Rp 4,400,000 Rp 22,400,000 SEMEN Rp 9,520,000 Rp 12,880,000 TANAH TIMBUNAN Rp 800,000 Rp 12,080,000 HARIAN KANTOR MENGANGKAT SEDIMEN DAN HASIL GALIAN Rp 2,940,000 Rp 9,140,000 HARIAN MENARIK TANAH MENIMBUN SALURAN Rp 980,000 Rp 8,160,000 GAJI JUNIMARS Rp 1,700,000 Rp 6,460,000 OPERASIONAL JUNIMARS Rp 2,000,000 Rp 4,460,000 BON WARUNG Rp 500,000 Rp 3,960,000 SEWA RUMAH Rp 500,000 Rp 3,460,000 Tambahan Semen Rp 1,206,000 Rp 2,254,000 Beli Terpal Rp 360,000 Rp 1,894,000 PROPOSAL PEMUDA SETEMPAT Rp 300,000 Rp 1,594,000 POMPA Rp 120,000 Rp 1,474,000 EMBER Rp 30,000 Rp 1,444,000 PIPA Rp 40,000 Rp 1,404,000 Beli Kain Klos Pick Up Rp 450,000 Rp 954,000 Upah Pasang Rp 200,000 Rp 754,000 Minyak Pick Up Rp 100,000 Rp 654,000 Beli Kertas Foto dan Perlengakapan Print Rp 199,000 Rp 455,000 SISA Rp 455,000 SISA KAS MINGGU LALU Rp 120,000 TOTAL KAS SISA Rp 575,000 UANG MASUK TGL : 7 Nov 2017
URAIAN PENGELUARAN NILAI PENGELUARAN SALDO
Rp 40,000,000 SEMEN 15 ZAK Rp 1,020,000 Rp 38,980,000 HARIAN KANTOR MENGANGKAT SEDIMEN DAN HASIL GALIAN Rp 2,940,000 Rp 36,040,000 HARIAN PENAMBAHAN PEKERJAAN SETELAH PHO Rp 630,000 Rp 35,410,000 BIAYA PHO ( 1% DARI PAGU LEPAS PAJAK) Rp 15,000,000 Rp 20,410,000 JAMINAN PEMELIHARAAN GALIAN C (TERPOTONG DARI 17 JUTA) Rp 9,068,000 Rp 11,342,000 UPAH MENYETEL JAMINAN PEMELIHARAAN Rp 3,000,000 Rp 8,342,000 UANG PENGURUSAN BERKAS KE TU ADMINISTRASI DLL Rp 2,000,000 Rp 6,342,000 UANG TANDA TANGAN PENGAWAS 3 Org Rp 3,000,000 Rp 3,342,000 UANG TANDA TANGAN TEAM MC-0 DAN PENGURUSAN ADENDUM KONTRAK Rp 2,000,000 Rp 1,342,000 UANG TANDA TANGAN PPTK Rp 1,000,000 Rp 342,000 UANG FOTO COPY LAPORAN, DOKUMENTASI DLL Rp 700,000 -Rp 358,000 UANG MEMBELI MATERAI Rp 100,000 -Rp 458,000 UANG KAS MINUS -Rp 458,000 UANG KAS SISA MINGGU LALU Rp 575,000 TOTAL SISA UANG Rp 90,000 UANG MASUK TGL : 14 Nov 2017
URAIAN PENGELUARAN NILAI PENGELUARAN SALDO
Rp 60,000,000 PASIR HALUS Rp 3,250,000 Rp 56,750,000 PASIR COR Rp 5,364,000 Rp 51,386,000 SEMEN Rp 12,060,000 Rp 39,326,000 BATU PECAH Rp 4,480,000 Rp 34,846,000 TANAH TIMBUN Rp 2,640,000 Rp 32,206,000 BATU KALI Rp 1,875,000 Rp 30,331,000 Triplek Rp 3,750,000 Rp 26,581,000 Kayu Stud Rp 2,500,000 Rp 24,081,000 Pipa 4" Rp 468,000 Rp 23,613,000 Bambu Rp 680,000 Rp 22,933,000 Upah Borongan Meng-Asphalt Rp 3,500,000 Rp 19,433,000 Permintaan Borongan Jembatan Rp 8,000,000 Rp 11,433,000 Upah Pekerjaan PL 15 m Rp 2,025,000 Rp 9,408,000 Upah Melangsir Bahan Jarak 200 m Rp 600,000 Rp 8,808,000 Sewa Kost Rp 1,500,000 Rp 7,308,000 Harian Kantor Mulai Minggu Lalu + Minggu Ini Rp 2,100,000 Rp 5,208,000 Gaji Humas Rp 1,200,000 Rp 4,008,000 Sewa Pompa Rp 630,000 Rp 3,378,000 Kayu Bakar Rp 250,000 Rp 3,128,000 Upah Langsir Semen, Kayu, aspal Rp 250,000 Rp 2,878,000 Minyak Rp 50,000 Rp 2,828,000 Mata Gerinda Rp 70,000 Rp 2,758,000 Goni Rp 156,000 Rp 2,602,000 Upah Memasukkan Tanah Ke Goni Rp 200,000 Rp 2,402,000 Paku Rp 72,000 Rp 2,330,000 Minyak Rp 50,000 Rp 2,280,000 Kawat Rp 150,000 Rp 2,130,000 Upah Membendung Rp 100,000 Rp 2,030,000 Minyak Rp 30,000 Rp 2,000,000 Bongkar Muat SPSI untuk Besi Rp 1,500,000 Rp 500,000 Penambahan Pembelian Papan Untuk Kisdam Rp 350,000 Rp 150,000 Minyak Rp 80,000 Rp 70,000 Paku Rp 70,000 Rp - UANG MASUK TGL : 21 Des 2017
URAIAN PENGELUARAN NILAI PENGELUARAN SALDO
Rp 29,000,000 PASIR HALUS 14 m3 Rp 1,750,000 Rp 27,250,000 PASIR COR 25 m3 Rp 3,000,000 Rp 24,250,000 SEMEN 60 Zak Rp 4,020,000 Rp 20,230,000 BATU PECAH 5 m3 Rp 1,600,000 Rp 18,630,000 BATU KALI 15 m3 Rp 1,875,000 Rp 16,755,000 Pembayaran Sisa Upah Borongan Jembatan Rp 11,000,000 Rp 5,755,000 Pengecoran Rabat Beton (10 m) Rp 1,350,000 Rp 4,405,000 Harian Kantor Rp 1,300,000 Rp 3,105,000 Penambahan Pasir Halus (6 m3) Rp 750,000 Rp 2,355,000 Penambahan Semen (16 Zak) Rp 1,072,000 Rp 1,283,000 Penambahan pasir Cor (5 m3) Rp 600,000 Rp 683,000 Sewa Molen 2 Hari Rp 500,000 Rp 183,000 Minyak Solar Rp 100,000 Rp 83,000 Plastik 10 Kg Rp 300,000 -Rp 217,000 SISA KAS MINGGU INI -Rp 217,000
UANG MASUK TGL : 28 Des 2017
URAIAN PENGELUARAN NILAI PENGELUARAN SALDO
Rp 6,570,000 Ongkos Truck Bawa Molen Rp 3,500,000 Rp 3,070,000 Upah Harian Untuk Pembersihan Rp 320,000 Rp 2,750,000 Upah Dyk Yg belum Terbayar Husein Rp 1,750,000 Rp 1,000,000 Ongkos Pulang Bawa Pick dan Barang a. Minyak Rp 500,000 Rp 500,000 b. Makan Rp 100,000 Rp 400,000 c. Biaya Foto Copy Laporoan dan Dokumentasi Rp 115,000 Rp 285,000 Kurang Uang Kas Pada Minggu Terkahir Dari Lapangan Rp 217,000 Rp 68,000 TOTAL SISA KAS Rp 68,000