Anda di halaman 1dari 127

XI PEKERJAAN INSTALASI AIR BERSIH/KOTOR

1 Pekerjaan Pemipaan Pipa PVC Type AW Ø.4" m1 25.00 29,438.59 735,964.69


2 Pekerjaan Pipa PVC Type AW Ø.3/4" m1 25.00 21,702.15 542,553.75
3 Pekerjaan Pipa PVC Type AW Ø.2½" m1 25.00 23,108.78 577,719.38
4 Pas. Kran Air bh 4.00 35,307.02 141,228.07
5 Pek. Pas. Klosed Duduk bh 2.00 1,211,712.00 2,423,424.00
6 Pek. Pas. Klosed Jongkok bh 0.00 218,043.00 0.00
7 Pek. Pas. Urinoir bh 0.00 629,150.10 0.00
8 Pek. Pas. Wastafel bh 0.00 606,800.10 0.00
9 Pas. Floor Drain bh 4.00 40,380.00 161,520.00
10 Pek. Septicktank ls 1.00 2,500,000.00 2,500,000.00
11 Pek. Pas. Reservoir Kapasitas 1 m3 bh 0.00 1,165,800.00 0.00
JUMLAH 7,082,409.88
XII PEKERJAAN FINISHING , LANDSCAPING & LAIN-LAIN
1 Pek. Pintu Besi Jalan Samping m1 0.00 270,000.00 0.00
2 Pek. Pagar Depan ls 0.00 8,000,000.00 0.00
2 Pek. Landscape + Relief ls 0.00 7,700,000.00 0.00
3 Pembersihan Lapangan ls 1.00 600,000.00 600,000.00
4 Pek. Carport m3 0.00 56,525.33 0.00
5 Pasir Urug Alas Carport m3 0.00 51,120.00 0.00
JUMLAH 600,000.00
ANALISA HARGA SATUAN PEKERJAAN 2

1. ANALISA UNTUK PEKERJAAN PERSIAPAN

6,2 1 M' PAGAR SENG, T = 2 M


1.250 btg Dolken kayu a Rp. Rp.
2.500 kg Semen PC " 621.00 "
1.200 lbr Seng gelombang " 30,000.00 "
0.005 m3 Pasir beton " 60,750.00 "
0.009 m3 Koral beton " 120,000.00 "
0.072 m3 Kayu balok 5/7 " #REF! "
0.060 kg Paku biasa 2" - 5" " 7,762.50 "
0.450 kg Meni besi " 12,937.50 "
0.400 Pekerja " 65,000.00 "
0.020 Mandor " 90,000.00 "
0.200 Tukang " 110,000.00 "
0.020 Kepala Tukang " 120,000.00 "
Rp.
6,4 1 M' PENGUKURAN & PAS. BOUWPLANK
0.012 m3 Kayu balok 5/7 a Rp. #REF! Rp.
0.020 kg Paku biasa 2" - 5" " 7,762.50 "
0.007 m3 Kayu papan 3/20 " #REF! "
0.100 Pekerja " 65,000.00 "
0.005 Mandor " 90,000.00 "
0.100 Tukang " 110,000.00 "
0.010 Kepala Tukang " 120,000.00 "
Rp.

2. ANALISA UNTUK PEKERJAAN TANAH

PEKERJAAN PERSIAPAN
1.00 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN
0.100 Oh Pekerja @ Rp 65,000.00 Rp
0.050 Oh Mandor @ Rp 90,000.00 Rp
Rp

1.00 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK


0.012 M3 Kayu 5/7 @ Rp 1,281,720.00 Rp
0.02 Kg Paku Biasa 2'-5" @ Rp 8,470.00 Rp
0.007 M3 Kayu Papan 3/20 @ Rp 1,155,000.00 Rp
0.100 Oh Tukang Kayu @ Rp 110,000.00 Rp
0.100 Oh Pekerja @ Rp 65,000.00 Rp
0.010 Oh Kepala Tukang @ Rp 120,000.00 Rp
0.005 Oh Mandor @ Rp 90,000.00 Rp
Rp

6,1 1 M3 GALIAN TANAH


0.400 Pekerja a Rp. 65,000.00 Rp.
0.040 Mandor " 90,000.00 "
Rp.
6,9 1 M3 URUGAN KEMBALI
0.192 Pekerja a Rp. 65,000.00 Rp.
0.019 Mandor " 120,000.00 "
Rp.
6,10 1 M3 PEMADATAN
0.500 Pekerja a Rp. 65,000.00 Rp.
0.050 Mandor " 120,000.00 "
Rp.
6,11 1 M3 URUGAN
1.200 m3 Pasir urug a Rp. 54,000.00 Rp.
1.200 m3 Sirtu alam " 76,500.00 "
1.200 m3 Tanah urug " 45,000.00 "
0.300 Pekerja " 65,000.00 "
0.010 Mandor " 90,000.00 "
ANALISA HARGA SATUAN PEKERJAAN 3
Pasir Timbunan Rp.
Sirtu Rp.
Tanah urug Rp.

3. ANALISA UNTUK PEKERJAAN PONDASI

6,14 1 M3 PASANG BATU KOSONG


1.200 m3 Batu Gunung a Rp. 67,500.00 Rp.
0.300 m3 Pasir urug " 54,000.00 "
0.780 Pekerja " 65,000.00 "
0.039 Mandor " 90,000.00 "
0.390 Tukang " 110,000.00 "
0.039 Kepala Tukang " 120,000.00 "
Rp.
6,5 1 M3 PASANG PONDASI 1PC : 4PSR
1.100 m3 Batu Gunung a Rp. 67,500.00 Rp.
163.000 kg Semen PC " 621.00 "
0.522 m3 Pasir Pasangan " 60,750.00 "
1.500 Pekerja " 65,000.00 "
0.075 Mandor " 90,000.00 "
0.600 Tukang " 110,000.00 "
0.060 Kepala Tukang " 120,000.00 "
Rp.

4. ANALISA UNTUK PEKERJAAN DINDING

6,4 1 M2 PASANGAN TEMBOK 1 BATA; 1PC : 4PSR


140.000 bh Batu Bata a Rp. 225.00 Rp.
26.550 kg Semen PC " 621.00 "
0.093 m3 Pasir Pasangan " 60,750.00 "
0.650 Pekerja " 65,000.00 "
0.030 Mandor " 90,000.00 "
0.200 Tukang " 110,000.00 "
0.020 Kepala Tukang " 120,000.00 "
1.000 LS Alat Bantu " 2,000.00 "
1.000 m2 Langsir Material " 4,000.00 "
Rp.

6,9 1 M2 PASANGAN TEMBOK 1/2 BATA; 1PC : 2PSR


70.000 bh Batu Bata a Rp. 225.00 Rp.
18.950 kg Semen PC " 621.00 "
0.038 m3 Pasir Pasangan " 60,750.00 "
0.320 Pekerja " 65,000.00 "
0.015 Mandor " 90,000.00 "
0.100 Tukang " 110,000.00 "
0.010 Kepala Tukang " 120,000.00 "
1.000 LS Alat Bantu " 1,000.00 "
1.000 m2 Langsir Material " 2,000.00 "
Rp.

6,10 1 M2 PASANGAN TEMBOK 1/2 BATA; 1PC : 3PSR


70.000 bh Batu Bata a Rp. 225.00 Rp.
14.370 kg Semen PC " 621.00 "
0.040 m3 Pasir Pasangan " 60,750.00 "
0.320 Pekerja " 65,000.00 "
0.015 Mandor " 90,000.00 "
0.100 Tukang " 110,000.00 "
0.010 Kepala Tukang " 120,000.00 "
Rp.

6,11 1 M2 PASANGAN TEMBOK 1/2 BATA; 1PC : 4PSR


70.000 bh Batu Bata a Rp. 225.00 Rp.
11.500 kg Semen PC " 621.00 "
ANALISA HARGA SATUAN PEKERJAAN 4
0.043 m3 Pasir Pasangan " 60,750.00 "
0.320 Pekerja " 65,000.00 "
0.015 Mandor " 90,000.00 "
0.100 Tukang " 110,000.00 "
0.010 Kepala Tukang " 120,000.00 "
Rp.

6,12 1 M2 PASANGAN TEMBOK 1/2 BATA; 1PC : 5PSR


70.000 bh Batu Bata a Rp. 225.00 Rp.
9.680 kg Semen PC " 621.00 "
0.045 m3 Pasir Pasangan " 60,750.00 "
0.320 Pekerja " 65,000.00 "
0.015 Mandor " 90,000.00 "
0.100 Tukang " 110,000.00 "
0.010 Kepala Tukang " 120,000.00 "
Rp.

6.13 1 M3 PASANGAN TEMBOK 1/2 BATA; 1PC : 3PSR


500.000 bh Batu Bata a Rp. 225.00 Rp.
3.150 zak Semen PC " 621.00 "
0.378 m3 Pasir Pasangan " 60,750.00 "
7.000 Pekerja " 65,000.00 "
0.375 Mandor " 90,000.00 "
2.500 Tukang " 110,000.00 "
0.250 Kepala Tukang " 120,000.00 "
Rp.

1 M2 LANTAI BATA
35.000 bh Batu Bata a Rp. 225.00 Rp.
0.163 zak Semen PC " 31,050.00 "
0.035 m3 Pasir Pasangan " 60,750.00 "
0.200 Pekerja " 65,000.00 "
0.030 Mandor " 90,000.00 "
0.060 Tukang " 110,000.00 "
0.020 Kepala Tukang " 120,000.00 "
Rp.
5. ANALISA UNTUK PEKERJAAN PLESTERAN

6,2 1 M2 PLESTERAN 1 PC : 2 PSR (t=15 mm)


8.520 kg Semen PC a Rp. 621.00 Rp.
0.017 m3 Pasir Pasangan " 60,750.00 "
0.200 Pekerja " 65,000.00 "
0.010 Mandor " 90,000.00 "
0.150 Tukang " 110,000.00 "
0.015 Kepala Tukang " 120,000.00 "
Rp.
6,3 1 M2 PLESTERAN 1 PC : 3 PSR (t=15 mm)
6.480 kg Semen PC a Rp. 621.00 Rp.
0.019 m3 Pasir Pasangan " 60,750.00 "
0.200 Pekerja " 65,000.00 "
0.010 Mandor " 90,000.00 "
0.150 Tukang " 110,000.00 "
0.015 Kepala Tukang " 120,000.00 "
Rp.
ANALISA HARGA SATUAN PEKERJAAN 5
6,4 1 M2 PLESTERAN DINDING BATA 1 PC : 5 PSR (t= 15 mm)
4.320 kg Semen PC a Rp. 621.00 Rp.
0.022 m3 Pasir Pasangan " 60,750.00 "
0.200 Pekerja " 65,000.00 "
0.010 Mandor " 90,000.00 "
0.150 Tukang " 110,000.00 "
0.015 Kepala Tukang " 120,000.00 "
Rp.

1 M2 PLESTERAN BETON 1 PC : 5 PSR (t=15 mm)


4.320 kg Semen PC a Rp. 621.00 Rp.
0.022 m3 Pasir Pasangan " 60,750.00 "
0.200 Pekerja " 65,000.00 "
0.010 Mandor " 90,000.00 "
0.150 Tukang " 110,000.00 "
0.015 Kepala Tukang " 120,000.00 "
0.200 lt Lem beton " 40,500.00 "
1.000 ls Alat bantu " 4,000.00 "
1.000 ls Langsir Material " 4,000.00 "
Rp.
1 M2 ACIAN TEMBOK / BETON
3.146 kg Semen PC " 621.00 "
0.085 Pekerja " 65,000.00 "
0.0043 Mandor " 90,000.00 "
0.050 Tukang " 110,000.00 "
0.0050 Kepala Tukang " 120,000.00 "
1.0000 ls Alat Bantu " 1,500.00 "
1.0000 ls langsir Material " 1,000.00 "
1 M2 Acian Rp.

Plester Beton + Aci


Plester beton 1m2 52,319.22
Aci 1m2 16,461.17

6,30 1 M2 PLESTERAN BETON 1 PC : 3 PSR


7.070 kg Semen PC a Rp. 621.00 Rp.
0.021 m3 Pasir Pasangan " 60,750.00 "
0.260 Pekerja " 65,000.00 "
0.013 Mandor " 90,000.00 "
0.200 Tukang " 110,000.00 "
0.020 Kepala Tukang " 120,000.00 "
Rp.

6. ANALISA UNTUK PEKERJAAN KAYU

6.2 1 M3 KUSEN PINTU DAN JENDELA


1.100 m3 Kayu Kls I (Bayam) a Rp. 4,050,000.00 Rp.
6.000 Pekerja " 65,000.00 "
0.300 Mandor " 90,000.00 "
20.000 Tukang " 110,000.00 "
2.000 Kepala Tukang " 120,000.00 "
Rp.

6.17 1 M2 JALUSI KAYU


0.022 m3 Kayu kelas I a Rp. 4,500,000.00 Rp.
0.150 kg Paku biasa 1/2 " - 1" " 7,762.50 "
0.500 Pekerja " 65,000.00 "
0.025 Mandor " 90,000.00 "
2.000 Tukang Kayu " 110,000.00 "
0.200 Kepala Tukang " 120,000.00 "
Rp.

6.7 1 M2 PINTU PANIL


0.040 m3 Panil Kayu klas I a Rp. 4,500,000.00 Rp.
1.000 Pekerja " 65,000.00 "
ANALISA HARGA SATUAN PEKERJAAN 6
0.050 Mandor " 90,000.00 "
2.500 Tukang " 110,000.00 "
0.250 Kepala Tukang " 120,000.00 "
Rp.

6.17 1 M2 PINTU NYATOH


1.000 m2 Panil Kayu Nyatoh a Rp. Rp.
0.500 Pekerja " 65,000.00 "
0.025 Mandor " 90,000.00 "
1.000 Tukang " 110,000.00 "
0.100 Kepala Tukang " 120,000.00 "
Rp.

6.9 1 M2 PINTU / JENDELA KACA


0.035 m3 Kayu kelas I " 4,500,000.00 "
0.800 Pekerja " 65,000.00 "
0.040 Mandor " 90,000.00 "
2.000 Tukang Kayu " 110,000.00 "
0.200 Kepala Tukang " 120,000.00 "
Rp.

6.23 1 M2 PINTU RANGKA


0.500 lbr Teakwood 4' x 8' a Rp. 31,500.00 Rp.
0.500 lbr Formika 4" x 8" " 31,500.00 "
0.300 kg Paku biasa 1/2 " - 1" " "
0.800 lt Lem kayu " "
0.0196 m3 Kayu kelas I " 4,500,000.00 "
0.800 Pekerja " 65,000.00 "
0.040 Mandor " 90,000.00 "
2.500 Tukang Kayu " 110,000.00 "
0.250 Kepala Tukang " 120,000.00 "
Rp.
6.28 1 M3 MENGERJAKAN KUDA-2 & GORDING KAYU
1.100 m3 Kayu kelas I a Rp. 3,105,000.00 Rp.
1.100 m3 Kayu kelas II " 1,800,000.00 "
15.000 kg Besi streep " "
0.800 kg Paku biasa 2 " - 5" " 7,762.50 "
4.000 Pekerja " 65,000.00 "
0.200 Mandor " 90,000.00 "
12.000 Tukang Kayu " 110,000.00 "
1.200 Kepala Tukang " 120,000.00 "
Kayu kls.I Rp.
Kayu kls.II Rp.

6,50 1 M' PASANG LISTPLANK (3/30),


0.0072 m3 Kayu Kls I (Bayam) a Rp. 4,500,000.00 Rp.
0.0500 kg Paku Biasa 2"-5" " 7,762.50 Rp.
0.100 Pekerja " 65,000.00 "
0.005 Mandor " 90,000.00 "
0.200 Tukang " 110,000.00 "
0.025 Kepala Tukang " 120,000.00 "
Rp.
6.51 1 M' LISPLANK KAYU (2X3/20)
0.0145 m3 Kayu kelas I a Rp. 4,500,000.00 Rp.
0.060 kg Paku biasa 2 " - 5" " 7,762.50 "
0.150 Pekerja " 65,000.00 "
0.075 Mandor " 90,000.00 "
0.250 Tukang Kayu " 110,000.00 "
0.025 Kepala Tukang " 120,000.00 "
Rp.
6.35 1 M2 RANGKA ATAP (reng+kasau)
0.014 m3 Kayu kelas I a Rp. 3,105,000.00 Rp.
0.150 kg Paku biasa 2 " - 5" " 7,762.50 "
0.100 Pekerja " 65,000.00 "
ANALISA HARGA SATUAN PEKERJAAN 7
0.005 Mandor " 90,000.00 "
0.100 Tukang Kayu " 110,000.00 "
0.010 Kepala Tukang " 120,000.00 "
Kayu kls. I Rp.

6.43 1 M2 RANGKA PLAPON


0.023 m3 Kayu kelas I a Rp. 3,105,000.00 Rp.
0.023 m3 Kayu kelas II " 1,800,000.00 "
0.150 kg Paku biasa 2 " - 5" " 7,762.50 "
0.200 Pekerja " 65,000.00 "
0.010 Mandor " 90,000.00 "
0.300 Tukang Kayu " 110,000.00 "
0.030 Kepala Tukang " 120,000.00 "
Kayu kls.I Rp.
Kayu kls.II Rp.

6,60 1 M' LIST PLAPON


1.050 m' List kayu propil a Rp. 3,000.00 Rp.
1.050 m' Profil Gypsum a Rp. 4,500.00 "
0.100 kg Paku biasa 2 " - 5" " 7,762.50 "
0.021 Pekerja " 65,000.00 "
0.001 Mandor " 90,000.00 "
0.021 Tukang Kayu " 110,000.00 "
0.002 Kepala Tukang " 120,000.00 "
Kayu kls.I Rp.
Gypsum Rp.
6,54 1 M2 RANGKA KAYU PARTISI
0.0195 m3 Kayu Kls I (balok) a Rp. 4,500,000.00 Rp.
0.0070 m3 Kayu Kls I (papan) " 4,500,000.00 "
0.1000 kg Paku Biasa 2"-5" " 7,762.50 "
0.150 Pekerja " 65,000.00 "
0.075 Mandor " 90,000.00 "
0.450 Tukang " 110,000.00 "
0.045 Kepala Tukang " 120,000.00 "
Rp.

7. ANALISA UNTUK PEKERJAAN BETON

6,4 1 M2 LANTAI BETON 1 PC : 3 PSR : 5 KRL (T = 5 cm)


0.044 m3 Koral Beton a Rp. 108,000.00 Rp.
10.000 kg Semen PC " 621.00 "
0.026 m3 Pasir Beton " 60,750.00 "
1.150 Pekerja " 65,000.00 "
0.006 Mandor " 90,000.00 "
0.020 Tukang " 110,000.00 "
0.002 Kepala Tukang " 120,000.00 "
Rp.

6,1 1 M3 BETON 1PC : 3PSR : 5KRL


0.870 m3 Koral beton a Rp. 108,000.00 Rp.
218.000 kg Semen PC " 621.00 "
0.520 m3 Pasir Beton " 60,750.00 "
1.650 Pekerja " 65,000.00 "
0.080 Mandor " 90,000.00 "
0.250 Tukang " 110,000.00 "
0.025 Kepala Tukang " 120,000.00 "
Rp.

BETON BERTULANG

1 M3 Pekerjaan Beton
ANALISA HARGA SATUAN PEKERJAAN 8
6,36,1 1. Bahan beton K. 300
0.720 m3 Batu pecah a Rp. 108,000.00 Rp.
0.470 m3 Pasir beton " 60,750.00 "
400.000 kg Semen PC " 621.00 "
1.500 ltr Additive " "
Rp.
6,35,1 2. Bahan beton K. 225
0.650 m3 Batu pecah a Rp. 120,000.00 Rp.
0.650 m3 Pasir beton " 60,750.00 "
388.000 kg Semen PC " 621.00 "
Rp.
6,35,1 2. Bahan beton K. 175
0.540 m3 Batu pecah a Rp. 120,000.00 Rp.
0.540 m3 Pasir beton " 60,750.00 "
340.000 kg Semen PC " 690.00 "
Rp.

6,16,2 3. Upah Pengecoran


2.000 Pekerja a Rp. 65,000.00 Rp.
1.000 Mandor " 90,000.00 "
0.350 Tukang batu " 110,000.00 "
0.035 Kepala tukang " 120,000.00 "
Rp.
1 m3 Beton K300 Rp.
1 m3 Beton K225 Rp.
1 m3 Beton K175 Rp.
6,25 1 KG Pembesian Besi (polos / ulir)
1. Bahan
1.050 kg Besi beton (polos / ulir) a Rp. 13,464.00 Rp.
0.015 kg Kawat beton " 11,880.00 "
2. Tenaga
0.007 Pekerja a Rp. 65,000.00 Rp.
0.0003 Mandor " 90,000.00 "
0.007 Tukang besi " 110,000.00 "
0.0007 Kepala tukang " 120,000.00 "
1 Kg Pembesian Rp.

6,28 1 M2 Bekisting Pondasi


1. Bahan
0.040 m3 - Kayu Terentang a Rp. 1,800,000.00 Rp.
0.300 kg - Paku 2" - 5" " 7,762.50 "
0.100 Lt - Minyak bekisting " "
2. Tenaga
0.300 Pekerja " 65,000.00 "
0.005 Mandor " 90,000.00 "
0.260 Tukang kayu " 110,000.00 "
0.026 Kepala tukang " 120,000.00 "
Rp.
6,29 1 M2 Bekisting Sloof
1. Bahan
0.045 m3 - Kayu Terentang a Rp. 1,800,000.00 Rp.
0.300 kg - Paku 2" - 5" " 7,762.50 "
0.100 Lt - Minyak bekisting " "
2. Tenaga
0.300 Pekerja " 65,000.00 "
0.005 Mandor " 90,000.00 "
0.260 Tukang kayu " 110,000.00 "
0.026 Kepala tukang " 120,000.00 "
Rp.

6,30 1 M2 Bekisting Kolom


1. Bahan
0.040 m3 Kayu Terentang eff. 50 % a Rp. 1,800,000.00 Rp.
0.400 kg Paku 2" - 5" " 7,762.50 "
0.200 Lt Minyak bekisting " "
ANALISA HARGA SATUAN PEKERJAAN 9
0.015 m3 Balok kayu eff. 75% " 1,800,000.00 "
0.350 lbr Plywood 9 mm eff. 50% " 121,500.00 "
2.000 btg Dolken kayu 0 8 - 10 L= 4 m " "
2. Tenaga
0.300 Pekerja " 65,000.00 "
0.005 Mandor " 90,000.00 "
0.330 Tukang kayu " 110,000.00 "
0.033 Kepala tukang " 120,000.00 "
Rp.
ANALISA HARGA SATUAN PEKERJAAN 10
6,31 1 M2 Bekisting Balok
1. Bahan
0.040 m3 Kayu Terentang eff. 50 % a Rp. 1,800,000.00 Rp.
0.400 kg Paku 2" - 5" " 7,762.50 "
0.200 Lt Minyak bekisting " "
0.018 m3 Balok kayu eff. 75% " 1,800,000.00 "
0.350 lbr Plywood 9 mm eff. 50% " 121,500.00 "
2.000 btg Dolken kayu 0 8 - 10 L= 4 m " "

2. Tenaga
0.320 Pekerja " 65,000.00 "
0.006 Mandor " 90,000.00 "
0.330 Tukang kayu " 110,000.00 "
0.033 Kepala tukang " 120,000.00 "
Rp.

1 M2 Bekisting Balok Latei


1. Bahan
0.040 m3 Kayu Terentang eff. 40 % a Rp. 1,800,000.00 Rp.
0.400 kg Paku 2" - 5" " 7,762.50 "
0.200 Lt Minyak bekisting " "
0.018 m3 Balok kayu eff. 40 % " 1,800,000.00 "
0.350 lbr Plywood 9 mm eff. 40 % " 121,500.00 "
2.000 btg Dolken kayu 0 8 - 10 L= 4 m 40 % " "
2. Tenaga
0.320 Pekerja " 65,000.00 "
0.006 Mandor " 90,000.00 "
0.330 Tukang kayu " 110,000.00 "
0.033 Kepala tukang " 120,000.00 "
Rp.

6,32 1 M2 Bekisting Lantai


1. Bahan
0.040 m3 Kayu Terentang eff. 75 % a Rp. 1,800,000.00 Rp.
0.400 kg Paku 2" - 5" " 7,762.50 "
0.200 Lt Minyak bekisting " "
0.015 m3 Balok kayu eff. 75% " 1,800,000.00 "
0.350 lbr Plywood 9 mm eff. 50% " 121,500.00 "
4.000 btg Dolken kayu 0 8 - 10 L= 4 m 50 % " "

2. Tenaga
0.320 Pekerja " 65,000.00 "
0.006 Mandor " 90,000.00 "
0.330 Tukang kayu " 110,000.00 "
0.033 Kepala tukang " 120,000.00 "
Rp.

6,33 1 M2 Bekisting Dinding


1. Bahan
0.030 m3 Kayu Terentang eff. 60 % a Rp. 1,800,000.00 Rp.
0.400 kg Paku 2" - 5" " 7,762.50 "
0.200 Lt Minyak bekisting " "
0.020 m3 Balok kayu eff. 60% " 1,800,000.00 "
0.350 lbr Plywood 9 mm eff. 50% " 121,500.00 "
4.000 btg Dolken kayu 0 8 - 10 L= 4 m 50% " "
4.000 bh Formtie / P. jarak bekist. / spacer " "
2. Tenaga
0.320 Pekerja " 65,000.00 "
0.006 Mandor " 90,000.00 "
0.330 Tukang kayu " 110,000.00 "
0.033 Kepala tukang " 120,000.00 "
Rp.
ANALISA HARGA SATUAN PEKERJAAN 11
1 M2 Pembungkus Kolom Sudut
1. Bahan
0.030 m3 Kayu Terentang eff. 60 % a Rp. 1,800,000.00 Rp.
0.400 kg Paku 2" - 5" " 7,762.50 "
0.200 Lt Minyak bekisting " "
0.020 m3 Balok kayu eff. 60 % " 1,800,000.00 "
0.350 lbr Plywood 9 mm eff. 40 % " 121,500.00 "
2.000 btg Dolken kayu 0 8 - 10 L= 4 m 40 % " "

2. Tenaga
0.320 Pekerja " 65,000.00 "
0.006 Mandor " 90,000.00 "
0.330 Tukang kayu " 110,000.00 "
0.033 Kepala tukang " 120,000.00 "
Rp.

6,34 1 M2 Bekisting Tangga


1. Bahan
0.030 m3 Kayu Terentang eff. 50 % a Rp. 1,800,000.00 Rp.
0.400 kg Paku 2" - 5" " 7,762.50 "
0.150 Lt Minyak bekisting " "
0.015 m3 Balok kayu eff. 75% " 1,800,000.00 "
0.350 lbr Plywood 9 mm eff. 50% " 121,500.00 "
2.000 btg Dolken kayu 0 8 - 10 L= 4 m " "
2. Tenaga
0.320 Pekerja " 65,000.00 "
0.006 Mandor " 90,000.00 "
0.330 Tukang kayu " 110,000.00 "
0.033 Kepala tukang " 120,000.00 "
Rp.

1 M2 Bekisting Lisplank
1. Bahan
0.023 m3 Kayu Terentang eff. 50 % a Rp. 1,800,000.00 Rp.
0.400 kg Paku 2" - 5" " 7,762.50 "
0.200 Lt Minyak bekisting " "
0.015 m3 Balok kayu eff. 75% " 1,800,000.00 "
0.350 lbr Plywood 9 mm eff. 50% " 121,500.00 "

2. Tenaga
0.320 Pekerja " 65,000.00 "
0.006 Mandor " 90,000.00 "
0.330 Tukang kayu " 110,000.00 "
0.033 Kepala tukang " 120,000.00 "
Rp.
1 M2 Bekisting Balok / Kolom Praktis
1. Bahan
0.040 m3 Kayu Terentang eff. 20 % a Rp. 1,800,000.00 Rp.
0.100 kg Paku 2" - 5" " 7,762.50 "
0.100 Lt Minyak bekisting " "
0.018 m3 Balok kayu eff. 20 % " 1,800,000.00 "
0.350 lbr Plywood 9 mm eff. 20 % " 121,500.00 "
2. Tenaga eff. 50 %
0.160 Pekerja " 65,000.00 "
0.003 Mandor " 90,000.00 "
0.165 Tukang kayu " 110,000.00 "
0.017 Kepala tukang " 120,000.00 "
Rp.

1 M3 BETON BERTULANG

A. Bahan Cor K225


0.6500 m3 Batu Chipping a Rp. 108,000.00 a Rp.
0.5400 m3 Pasir Pasangan " 60,750.00 "
ANALISA HARGA SATUAN PEKERJAAN 12
7.0000 zak Semen PC " 31,050.00 "
Rp.

B. Upah Kerja Cor


0.5000 hr Tukang Batu a Rp. 110,000.00 Rp.
6.0000 hr Pekerja " 65,000.00 "
0.3000 hr Mandor " 90,000.00 "
0.1000 hr Kepala Tukang " 120,000.00 "
Rp.

HARGA BETON COR K225 ( Bahan + upah )


ANALISA HARGA SATUAN PEKERJAAN 13
C. Pekerjaan Besi U-32/100 Kg
Bahan
110.000 kg Besi Beton a Rp. 13,464.00 Rp.
2.000 kg Kawat Beton " 11,880.00 "
Rp.
D. Upah Kerja
2.2500 hr Tukang Besi a Rp. 110,000.00 Rp.
3.0000 hr Pekerja " 65,000.00 "
0.2200 hr Mandor " 90,000.00 "
1.0000 hr Kepala Tukang " 120,000.00 "
Rp.

HARGA PEMBESIAN UNTUK MUTU BAJA U32 (C+D)


Untuk 1 Kg Besi Rp.

E. Alat Bantu / Mollen/Vibrator/Air Bersih a Rp. 10,000 Rp.

F. Cetakan Beton 10 m2 untuk 1 m3 beton


2.000 hr Tukang Kayu a Rp. 110,000.00 Rp.
4.000 hr Pekerja " 65,000.00 "
0.100 hr Mandor " 90,000.00 "
0.500 hr Kepala Tukang " 120,000.00 "
0.220 m3 Kayu Klas II " 1,800,000.00 "
2.000 lbr Multipleks 6 mm " 67,500.00 "
1.000 kg Paku " 7,762.50 "
0.750 org Tukang Bongkar / Siram " 65,000.00 "
Rp.
Untuk 1 m2 Bekisting
H. 1 m3 Pekerjaan Stut-werk 10 m2 untuk 1 m3 ( Plat/Kolom/Balok Lantai )
0.550 hr Tukang Kayu a Rp. 110,000.00 a Rp.
1.000 hr Pekerja " 65,000.00 "
0.100 hr Mandor " 90,000.00 "
0.500 hr Kepala Tukang " 120,000.00 "
0.200 m3 Kayu Klas II " 1,800,000.00 "
5.000 btng Kayu Dolken " 15,300.00 "
1.000 kg Paku " 7,762.50 "
Rp.

1 M3 SLOOF S2 15/20
1.000 m3 Beton K225 a Rp. 621,135.50 a Rp.
107.760 Pembesian " 20,871.00 "
1.000 Peralatan Bantu " 10,000 "
13.330 Cetakan/Mal " 113,651.25 "
Rp.
1 M3 KOLOM K1 20/30 -
1.000 m3 Beton K225 a Rp. 621,135.50 a Rp.
193.470 Pembesian " 20,871.00 "
1.000 Peralatan Bantu " 10,000 "
13.330 Cetakan/Mal " 113,651.25 "
0.050 Pekerjaan Stut-Verk " 638,762.50 "
Rp.

1 M3 KOLOM K2 15/15 -
1.000 m3 Beton K225 a Rp. 621,135.50 a Rp.
146.300 Pembesian " 20,871.00 "
1.000 Peralatan Bantu " 10,000 "
13.330 Cetakan/Mal " 113,651.25 "
0.050 Pekerjaan Stut-Verk " 638,762.50 "
Rp.
1 M3 RINGBALOK R 15/20
1.000 m3 Beton K175 a Rp. 594,905.00 a Rp.
107.760 Pembesian " 20,871.00 "
1.000 Peralatan Bantu " 10,000 "
13.330 Cetakan/Mal " 113,651.25 "
0.050 Pekerjaan Stut-Verk " 638,762.50 "
Rp.
ANALISA HARGA SATUAN PEKERJAAN 14
1 M3 MEJA BETON
1.000 m3 Beton K175 a Rp. 594,905.00 a Rp.
137.940 Pembesian " 20,871.00 "
1.000 Peralatan Bantu " 10,000 "
11.670 Cetakan/Mal " 113,651.25 "
0.050 Pekerjaan Stut-Verk " 638,762.50 "
Rp.
2 Stek Poer
Beton K. 225
Besi Be (1 Kg) ### Kg
Bekisti 11.42 ( x Analisa )----------(2 x Pakai) 50%

Pek. Tangga
Beton K. 175 Rp
Besi Beton (1 Kg) 155.24 Kg Rp
Bekisting( 7.32 ( x Analisa )----------(2 x Pakai) 50% Rp
Rp
Pek. Plat Lantai
Beton K. 175 Rp
Besi Beton (1 Kg) 100.00 Kg Rp
Bekisting( 8.33 ( x Analisa )----------(2 x Pakai) 50% Rp
Rp
Pek. Balok Lesplank (B4)
Beton K. 175 Rp
Besi Beton (1 Kg) 65.00 Kg Rp
Bekisting( 21.66 ( x Analisa )----------(2 x Pakai) 50% Rp
Rp

8. ANALISA UNTUK PEKERJAAN PENUTUP ATAP


6,40 1 M2 PASANG ATAP KERAMIK
16.000 m2 Genteng Keramik " 8,500.00 "
0.025 bh Paku biasa " 6,750.00 "
1.100 m2 Karet pelapis Genteng " 5,000.00
0.100 Pekerja " 65,000.00 "
0.008 Mandor " 90,000.00 "
0.010 Tukang kayu " 110,000.00 "
0.008 Kepala Tukang " 120,000.00 "
Rp.

6,41 1 M' PASANG NOK GENTENG KERAMIK


4.000 m' Bubungan Genteng Keramik " 17,500.00 "
0.040 bh Paku (warna) " 6,750.00 "
10.800 kg Semen 621.00
0.030 m3 Pasir 60,750.00
1.000 kg Semen Warna 770.00
0.150 Pekerja " 65,000.00 "
0.020 Mandor " 90,000.00 "
0.200 Tukang " 110,000.00 "
0.020 Kepala Tukang " 120,000.00 "
Rp.

6,40 1 M2 PASANG ATAP SPANDEK


1.050 m2 Atap Spandek " 112,500.00 "
0.020 bh Paku Spandek (warna) " 6,750.00 "
0.150 Pekerja " 65,000.00 "
0.006 Mandor " 90,000.00 "
0.075 Tukang " 110,000.00 "
0.008 Kepala Tukang " 120,000.00 "
Rp.

6,41 1 M' PASANG NOK ATAP SPANDEK


1.200 m' Nok Standar " 83,250.00 "
0.040 bh Paku Spandek (warna) " 6,750.00 "
0.100 Pekerja " 65,000.00 "
ANALISA HARGA SATUAN PEKERJAAN 15
0.010 Mandor " 90,000.00 "
0.075 Tukang " 110,000.00 "
0.010 Kepala Tukang " 120,000.00 "
Rp.

9. ANALISA UNTUK PEKERJAAN LANGIT-LANGIT


6.24 1 M2 PLAPON
1.100 m2 Asbes a Rp. 0.00 Rp.
0.110 kg Paku sekrup " "
0.100 Pekerja " 65,000.00 "
0.005 Mandor " 90,000.00 "
0.050 Tukang " 110,000.00 "
0.005 Kepala Tukang " 120,000.00 "
Rp.
1 M2 RANGKA PARTISI (METAL)
0.670 m' Wall Track PN 150 a Rp. 49,500.00 Rp.
1.710 m' Wall Studs PN 162 " 58,500.00 "
Waste 5 %
1.000 ls Upah kerja " 48,951.00 "
ANALISA HARGA SATUAN PEKERJAAN 16
1 M2 PARTISI GYPSUM BOARD
0.384 lbr Gypsum 9 mm a Rp. 54,000.00 Rp.
15.000 bh Screw gypsum " 2,250.00 "
0.200 roll Paper tape " 31,500.00 "
1.000 ls Upah kerja " 21,275.10 "
1.000 m2 Wall paper " 22,500.00 "
1 m2 Partisi Gypsum

1 M2 PARTISI MULTIPLEKS
4.060 m2 Multipleks 9 mm a Rp. 121,500.00 Rp.
14.800 m' List profil kayu 2 cm " 4,275.00 "
3.244 m2 Melamine " 100,000.00 "
1.000 ls Upah kerja " 308,336.00 "
1 m2 Partisi Multipleks
1 M2 PLAFOND GYPSUM (10 x 12,5 m)
Rangka Plapon
34.00 btg Top cross PN 201 a Rp. #REF! Rp.
49.00 btg Furring channel PN 204 " #REF! "
210.00 bh Conector PN 210 " #REF! "
111.00 bh Suspension clip PN 223 " 5,850.00 "
56.00 btg Suspension rod PN 225 " 11,250.00 "
111.00 bh Siku tembak / angle bracket " 2,700.00 "
18.00 btg Wall angle 49,500.00
ls Waste 8 %
125.00 m2 Upah kerja " "
Rp.
1 m2 Frame Gypsum Rp.
Papan Plapon
2.00 roll Paper tape 75 m " 31,500.00 "
2.00 zak UB 20 20 kg " #REF! "
48.00 lbr Gypsum board 9 mm " 54,000.00 "
Aksesoris
111.00 set Mesiu & paku tembak " 13,500.00 "
108.00 bh Paku beton 1,5 inci " 2,250.00 "
8.00 lbr Amplas " 1,800.00 "
1449.00 bh Screw gypsum 25 mm " 2,250.00 "
10.00 roll Tali / benang " #REF! "
ls Waste 8 %
125.00 m2 Upah kerja " "
Rp.
1 m2 Plafond Gypsum Rp.

1 M2 PLAFOND AQUSTIK (10 x 12,5 m)


Framing :
17.50 length Wall Angle 3m x 19 mm x 19 mm PN 408 a Rp. #REF! Rp.
33.75 length Main Tee 3,6m x 33 mm x 24 mm PN 400 " #REF! "
160.00 length Cross Tee 600 mm x 26 mm x 24 mm PN 401 " #REF! "
170.00 length Cross Tee 1200 mm x 26 mm x 24 mm PN 402 #REF!
101.00 length Suspension Rod per PN 4 " #REF! "
101.25 pcs Suspension Clip PN " #REF! "
Waste 5 %
125.00 m2 Upah kerja " 20,000.00 "
Rp.
1 m2 Frame Aqustik Rp.

Panels :
361.25 pcs Star Angle Edge " #REF! "
Accessories :
101.25 set Fasteners and concreate nails " #REF! "
101.25 bh Angle bracket " #REF! "
83.75 lbr Conreate nail " #REF! "
Waste 5 %
125.00 m2 Upah kerja " "
Rp.
1 m2 P. Aqustiq Rp.
ANALISA HARGA SATUAN PEKERJAAN 17

1 M2 PLAFOND CALSIBOARD (10 x 12,5 m)


Framing :
34.000 btg Hollow steel 40 x 40 mm a Rp. 99,000.00 Rp.
49.000 btg Hollow steel 20 x 40 mm " 85,500.00 "
Rp.
1 m2 F. Calsiboard Rp.

111.00 bh Suspension Rod " 11,250.00 "


56.00 btg Suspension Clip " 5,850.00 "
111.00 bh Siku tembak / angle bracket " 2,700.00 "
Waste 5 % " "
125.00 m2 Upah kerja " 20,000.00 "
Rp.
1 m2 PG Calsiboard Rp.
Panels :
208.750 m2 Calsiboard " 26,250.00 "
65.000 btg Wall angle Alluminium " 22,500.00 "
Accessories :
111.00 set Mesiu & paku tembak " 7,500.00 "
1449.00 bh Paku rivet " 500.00 "
10.00 roll Tali benang " 2,500.00 "
Waste 5 % " "
125.00 m2 Upah kerja " 20,000.00 "
Rp.
1 m2 P. Calsiboard Rp.

10. ANALISA UNTUK PEKERJAAN SANITASI


6,1 MEMASANG 1 BUAH KLOSET DUDUK
1.000 bh Kloset Duduk a Rp. 1,575,000.00 Rp.
0.060 Perlengkapan (6% Harga Kloset) "
3.300 Pekerja " 65,000.00 "
0.160 Mandor " 90,000.00 "
1.100 Tukang " 110,000.00 "
0.001 Kepala Tukang " 120,000.00 "
Rp.

6,4 MEMASANG 1 BUAH URINOIR


1.000 bh Urinoir a Rp. 652,500.00 Rp.
0.300 Perlengkapan (30% Harga Urinoir) " "
6.000 kg Semen Portland " 621.00 Rp.
0.010 m3 Pasir Pasang " 60,750.00 Rp.
1.000 Pekerja " 65,000.00 "
0.100 Mandor " 90,000.00 "
1.000 Tukang " 110,000.00 "
0.100 Kepala Tukang " 120,000.00 "
Rp.
ANALISA HARGA SATUAN PEKERJAAN 18
6,5 MEMASANG 1 BUAH WASTAFEL
1.000 bh Wastafel a Rp. 742,500.00 Rp.
0.120 Perlengkapan (12% Harga Wastafel) " "
6.000 kg Semen Warna " 621.00 "
0.010 m3 Pasir Pasang " 60,750.00 "
1.200 Pekerja " 65,000.00 "
0.100 Mandor " 90,000.00 "
1.450 Tukang " 110,000.00 "
0.150 Kepala Tukang " 120,000.00 "
Rp.
Rp.
6,5 MEMASANG 2 BUAH WASTAFEL
2.000 bh Wastafel a Rp. 742,500.00 Rp.
0.120 Perlengkapan (12% Harga Wastafel) " "
6.000 kg Semen Warna " 621.00 "
0.020 m3 Pasir Pasang " 60,750.00 "
1.500 Pekerja " 65,000.00 "
0.200 Mandor " 90,000.00 "
1.750 Tukang " 110,000.00 "
0.200 Kepala Tukang " 120,000.00 "
Rp.

6,5 MEMASANG 3 BUAH WASTAFEL


3.000 bh Wastafel a Rp. 742,500.00 Rp.
0.120 Perlengkapan (12% Harga Wastafel) " "
6.000 kg Semen Warna " 621.00 "
0.030 m3 Pasir Pasang " 31,500.00 "
1.750 Pekerja " 65,000.00 "
0.250 Mandor " 90,000.00 "
2.000 Tukang " 110,000.00 "
0.250 Kepala Tukang " 120,000.00 "
Rp.

6,36 MEMASANG 1 BUAH FLOOR DRAIN


1.000 bh Floor Drain a Rp. 54,000.00 Rp.
0.010 Pekerja " 65,000.00 "
0.005 Mandor " 90,000.00 "
0.100 Tukang " 110,000.00 "
0.010 Kepala Tukang " 120,000.00 "
Rp.

6,21 1 M' MEMASANG PIPA GIP. INS. AIR BERSIH


1. Bahan
1.200 m' Pipa GIP dia. 1 " a Rp. 227,700.00 Rp.
0.350 Perlengkapan (35 % Harga Pipa) "
1.200 m' Pipa GIP dia. 3/4 " " 117,645.00 "
0.350 Perlengkapan (35 % Harga Pipa) "
1.200 m' Pipa GIP dia. 1/2 " " 117,645.00 "
0.350 Perlengkapan (35 % Harga Pipa) "
2. Tenaga
0.054 Pekerja " 65,000.00 "
0.027 Mandor " 90,000.00 "
0.090 Tukang " 110,000.00 "
0.009 Kepala tukang " 120,000.00 "
1 M' Pipa GIP 1 " Rp.
1 M' Pipa GIP 3/4 " Rp.
1 M' Pipa GIP 1/2 " Rp.

6,24 1 M' TALANG TEGAK


1. Bahan
1.200 m' Pipa GIP dia. 6 " a Rp. 227,700.00 Rp.
1.200 m' Pipa GIP dia. 4 " " 117,645.00 "
3.000 bh Klem besi " "
0.250 ls Bahan las & alat bantu " "

2. Tenaga
0.135 Pekerja " 65,000.00 "
ANALISA HARGA SATUAN PEKERJAAN 19
0.0068 Mandor " 90,000.00 "
0.225 Tukang " 110,000.00 "
0.0225 Kepala tukang " 120,000.00 "
1 M' Pipa GIP 6 " Rp.
1 M' Pipa GIP 4 " Rp.

11. ANALISA UNTUK PEKERJAAN BESI DAN ALUMINIUM

6.1 1 m' PEKERJAAN BAJA


1. Bahan
1.100 kg Besi propil SIKU a Rp. 12,870.00 Rp.
1.100 kg Besi Plat " 18,810.00 "
1.100 kg Besi propil IWF " 20,790.00 "
1.100 kg Besi Hollow " 15,840.00 "
0.080 kg Meni besi " 12,937.50 "
0.300 Bahan las & alat bantu " 18,785.25 "
2. Tenaga
0.006 Pekerja " 65,000.00 "
0.0003 Mandor " 90,000.00 "
0.060 Tukang " 110,000.00 "
0.006 Kepala tukang " 120,000.00 "

1 kg Besi propil SIKU Rp.


1 kg Besi Plat Rp.
1 kg Besi propil IWF Rp.
1 kg Besi Hollow Rp.

1 M' KUZEN PINTU / JENDELA ALLUMINIUM


1.000 m' Kuzen Alluminium Warna a Rp. 38,250.00 Rp.
1.000 m' Upah kerja & alat bantu " 35,000.00 "
Rp.
1 UNIT DAUN PINTU P1
11.400 m' Bingkai pintu all. Warna a Rp. 324,000.00 Rp.
5.700 m2 Kaca 62,100.00
4.200 m' karet moher " 6,500.00 "
5.700 m' karet/Sealant " 5,000.00 "
1.000 bh Upah kerja & alat bantu " 50,000.00 "
Rp.

1 UNIT DAUN PINTU P2


11.080 m' Bingkai pintu all. Warna a Rp. 324,000.00 Rp.
3.360 m2 Kaca 62,100.00
4.200 m' karet moher " 6,500.00 "
15.480 m' karet/Sealant " 5,000.00 "
1.000 bh Upah kerja & alat bantu " 50,000.00 "
Rp.

1 UNIT DAUN PINTU P3


5.800 m' Bingkai pintu all. Warna a Rp. 324,000.00 Rp.
2.000 m2 Kaca 62,100.00
2.100 m' karet moher " 6,500.00 "
5.800 m' karet/Sealant " 5,000.00 "
1.000 bh Upah kerja & alat bantu " 50,000.00 "
Rp.

1 UNIT DAUN PINTU PJ1


18.680 m' Bingkai pintu all. Warna a Rp. 324,000.00 Rp.
3.980 m2 Kaca 62,100.00
2.100 m' karet moher " 6,500.00 "
18.680 m' karet/Sealant " 5,000.00 "
1.000 bh Upah kerja & alat bantu " 50,000.00 "
Rp.

1 UNIT VENTILASI 1
2.200 m' Bingkai pintu all. Warna a Rp. 324,000.00 Rp.
0.280 m2 Kaca 62,100.00
ANALISA HARGA SATUAN PEKERJAAN 20
2.200 m' karet/Sealant " 5,000.00 "
1.000 bh Upah kerja & alat bantu " 25,000.00 "
Rp.

1 UNIT VENTILASI 2
6.600 m' Bingkai pintu all. Warna a Rp. 324,000.00 Rp.
0.840 m2 Kaca 62,100.00
6.600 m' karet/Sealant " 5,000.00 "
1.000 bh Upah kerja & alat bantu " 25,000.00 "
Rp.

1 UNIT VENTILASI 3
4.400 m' Bingkai pintu all. Warna a Rp. 324,000.00 Rp.
0.560 m2 Kaca 62,100.00
4.400 m' karet/Sealant " 5,000.00 "
1.000 bh Upah kerja & alat bantu " 25,000.00 "
Rp.

1 UNIT JENDELA VENTILASI 1


5.600 m' Bingkai pintu all. Warna a Rp. 324,000.00 Rp.
1.030 m2 Kaca 62,100.00
Rp.
1 UNIT DAUN JENDELA J4 ALL.
3.750 m' Bingkai jendela all. Warna a Rp. 324,000.00 Rp.
1.000 bh Grendel All " 15,000.00 "
3.300 m' karet " 5,000.00 "
1.000 bh Upah kerja & alat bantu " 25,000.00 "
Rp.
1 UNIT DAUN JENDELA J9 ALL.
3.830 m' Bingkai jendela all. Warna a Rp. 324,000.00 Rp.
1.000 bh Grendel All " 15,000.00 "
3.500 m' karet " 5,000.00 "
1.000 bh Upah kerja & alat bantu " 25,000.00 "
Rp.
ANALISA HARGA SATUAN PEKERJAAN 21
1 UNIT DAUN PINTU KM ALL.
5.600 m' Bingkai pintu all. Warna a Rp. 324,000.00 Rp.
9.100 Alluminium Holow/rangka 38,250.00
1.470 btg Aluminium Plat " 26,250.00 "
2.100 m' karet moher " 6,000.00 "
1.000 bh Upah kerja & alat bantu " 25,000.00 "
Rp.

1 UNIT DAUN PINTU P8 ALL.


5.320 m' Bingkai pintu all. Warna a Rp. 324,000.00 Rp.
5.600 m' karet moher " 6,500.00 "
5.000 m' karet " 5,000.00 "
1.000 bh Upah kerja & alat bantu " 6,000.00 "
Rp.

12. ANALISA UNTUK PEKERJAAN KUNCI DAN KACA

6.19 1 M2 PAS. KACA


1.100 m2 Kaca 12 mm a Rp. 465,750.00 Rp.
1.100 m2 Kaca 10 mm " 414,000.00 "
0.250 tube Sealent " "
0.025 Pekerja " 65,000.00 "
0.00125 Mandor " 90,000.00 "
0.250 Tukang " 110,000.00 "
0.025 Kepala Tukang " 120,000.00 "
1 m2 Kaca 12 mm Rp.
1 m2 Kaca 10 mm Rp.

6.18 1 M2 PAS. KACA POLOS


1.100 m2 Kaca 8 mm a Rp. Rp.
1.100 m2 Kaca 5 mm " 62,100.00 "
0.0165 Pekerja " 65,000.00 "
0.0008 Mandor " 90,000.00 "
0.165 Tukang " 110,000.00 "
0.0165 Kepala Tukang " 120,000.00 "
1 m2 Kaca 8 mm Rp.
1 m2 Kaca 5 mm Rp.

6.2 1 BUAH MEMASANG KUNCI TANAM


1.000 Bh Cisa Master key a Rp. 315,000.00 Rp.
1.000 Bh Kunci tanam 2 x putar " 202,500.00 "
1.000 Bh Kunci tanam " 112,500.00 "
1.000 Bh Handle Pintu Kaca " 22,500.00 "
0.010 Pekerja " 65,000.00 "
0.005 Mandor " 90,000.00 "
0.500 Tukang " 110,000.00 "
0.010 Kepala Tukang " 120,000.00 "
Cisa Master key Rp.
Alluminium key Rp.
Kunci tanam Rp.
Handle Pintu Kaca Rp.

6.5 1 BUAH MEMASANG ENGSEL, GRENDEL PINTU / JENDELA


1.000 Bh Engsel Pintu a Rp. 20,250.00 Rp.
1.000 Bh Engsel Jendela Besar " 11,250.00 "
1.000 Bh Engsel Jendela Kecil " 8,550.00 "
1.000 Bh Expanoglet " 247,500.00 "
1.000 Bh Grendel Jendela " 4,725.00 "
1.000 Bh Grendel Ventilasi " 4,725.00 "
1.000 Bh Hak Angin (kuningan) " 4,050.00 "
0.015 Pekerja " 65,000.00 "
0.00075 Mandor " 90,000.00 "
0.150 Tukang " 110,000.00 "
0.015 Kepala Tukang " 120,000.00 "
E. Pintu Rp.
E. Jendela besar Rp.
E. Jendela kecil Rp.
ANALISA HARGA SATUAN PEKERJAAN 22
Expanoglet Rp.
G. Jendela Rp.
G. Ventilasi Rp.

6.1 1 BUAH MEMASANG DOOR CLOSER & FLOOR HINGES


1.000 Bh Door closer a Rp. 0.00 Rp.
1.000 Bh Floor Hinges " 0.00 "
0.050 Pekerja " 65,000.00 "
0.0025 Mandor " 90,000.00 "
0.500 Tukang " 110,000.00 "
0.050 Kepala Tukang " 120,000.00 "
Door closer Rp.
Floor hinge Rp.
ANALISA HARGA SATUAN PEKERJAAN 23

13. ANALISA UNTUK PEKERJAAN PENUTUP LANTAI

6.44 1 M2 LANTAI KERAMIK


1.050 m2 Keramik 40/40 Granito a Rp. 184,500.00 Rp.
1.050 m2 Keramik 30/30 " 29,250.00 "
1.050 m2 Keramik 20/20 " 36,000.00 "
1.050 m2 Keramik 40/40 biasa " 36,000.00 "
1.050 m2 Keramik kasar 30/30 Asia tile " 36,000.00 "
11.380 kg Semen PC " 621.00 "
0.042 m3 Pasir pasang " 60,750.00 "
1.500 kg Semen warna " 1,080.00 "

0.620 Pekerja " 65,000.00 "


0.030 Mandor " 90,000.00 "
0.350 Tukang " 110,000.00 "
0.035 Kepala Tukang " 120,000.00 "
0.100 zak AM Grout " 43,200.00 "
1.000 ls Alat Bantu " 1,000.00 "
1.000 ls Langsir Material " 2,000.00 "
Keramik 40/40 Granito Rp.
Keramik 30/30 Rp.
Keramik 20/20 Rp.
Keramik kasar 30/30 Asia t Rp.

6.68 1 M2 DINDING KERAMIK


1.050 m2 Keramik 20/25 " 45,000.00 "
1.050 m2 Keramik 20/20 " 36,000.00 "
9.300 kg Semen PC " 621.00 "
0.018 m3 Pasir pasang " 60,750.00 "
1.500 kg Semen warna " "
0.600 Pekerja " 65,000.00 "
0.030 Mandor " 90,000.00 "
0.100 Tukang " 110,000.00 "
0.045 Kepala Tukang " 120,000.00 "
0.100 zak AM Grout " 43,200.00 "
1.000 ls Alat Bantu " 1,000.00 "
1.000 ls Langsir Material " 2,000.00 "
Keramik 20/25 Rp.
Keramik 20/20 Rp.

6.51 1 M2 LANTAI GRANITE


1.050 m2 Granite Type Egypt Red a Rp. 191,544.73 Rp.
1.050 m2 Granite Type Porino CN " 147,729.73 "
1.050 m2 Granite Type Crystal White " 416,829.73 "
1.050 m2 Granite Type Pure black 0.00
14.150 kg Semen PC " 621.00 "
0.039 m3 Pasir pasang " 60,750.00 "
2.000 kg Semen warna " 1,080.00 "
0.620 Pekerja a Rp. 65,000.00 Rp.
0.030 Mandor " 90,000.00 "
0.350 Tukang " 110,000.00 "
0.035 Kepala Tukang " 120,000.00 "
0.150 lt Coating " 0.00 "
1.000 ls Alat bantu " 75,000.00 "
1.000 m2 langsir material " 20,000.00 "
Egypt Red Rp.
Porino CN Rp.
Crystal White Rp.
Pure black Rp.

6.70 1 M2 DINDING GRANITE


1.050 m2 Granite Type Egypt Red a Rp. 191,544.73 Rp.
1.050 m2 Granite Type Porino CN " 147,729.73 "
1.050 m2 Granite Type Crystal White " 416,829.73 "
12.440 kg Semen PC " 621.00 "
ANALISA HARGA SATUAN PEKERJAAN 24
0.025 m3 Pasir pasang " 60,750.00 "
1.500 kg Semen warna " 1,080.00 "
2.000 bh Paku pancing " 10,000.00 "
0.720 Pekerja " 65,000.00 "
0.035 Mandor " 90,000.00 "
0.650 Tukang " 110,000.00 "
0.065 Kepala Tukang " 120,000.00 "
0.150 lt Coating " 0.00 "
1.000 ls Alat bantu " 75,000.00 "
1.000 m2 langsir material " 20,000.00 "
4.000 ls Braket + pin Baut " 10,000.00 "
0.500 ls Silikont " 80,000.00 "

Egypt Red Rp.


Porino CN Rp.
Crystal White Rp.

6,38 1 M' PLINT DINDING


3.500 bh Keramik 10/30 a Rp. 1,815.00 Rp.
1.650 kg Semen PC " 621.00 "
0.0032 m3 Pasir pasang " 60,750.00 "
0.120 kg Semen warna " 43,200.00 "
0.090 Pekerja " 65,000.00 "
0.0045 Mandor " 90,000.00 "
0.090 Tukang " 110,000.00 "
0.009 Kepala Tukang " 120,000.00 "
0.015 lt Coating Anti gores " 0.00 "
1.000 ls Alat Bantu " 20,000.00 "

1 M' Plint Kuku Rp.


1 M' Plint Granite Rp.
14. ANALISA UNTUK PEKERJAAN PENGECETAN

6.14 1 M2 MENGECAT TEMBOK


0.260 kg Cat tembok ICI Pentalite Dulux a Rp. 31,050.00 Rp.
0.260 kg Cat tembok ICI Weathershield Dulux " 46,575.00 "
0.100 kg Plamur " 12,937.50 "
0.100 kg Cat dasar " 12,937.50 "
1.000 lbr Kertas Gosok " 1,552.50 "
0.020 Pekerja " 65,000.00 "
0.0025 Mandor " 90,000.00 "
0.063 Tukang " 110,000.00 "
0.0063 Kepala Tukang " 120,000.00 "
Pentalite Dulux Rp.
Weathershield Dulux Rp.

6.8 1 M2 MENGECAT KAYU


0.260 kg Cat Pasific Paint a Rp. 23,287.50 Rp.
0.260 kg Cat kayu ICI Dulux " 62,100.00 "
0.150 kg Plamur " 12,937.50 "
0.170 kg Cat dasar " 12,937.50 "
0.200 kg Cat meni " 12,937.50 "
0.025 ltr Minyak Cat " 5,175.00 "
0.070 Pekerja " 65,000.00 "
0.0025 Mandor " 90,000.00 "
0.090 Tukang " 110,000.00 "
0.0090 Kepala Tukang " 120,000.00 "
1 M2 Cat Pasific Rp.
1 M2 Cat ICI Rp.

6.6 1 M2 MENDEMPUL & MENGGOSOK KAYU


0.080 kg Dempul " 12,937.50 "
1.000 lbr Kertas Gosok " 1,552.50 "
0.020 ltr Minyak Cat " 5,175.00 "
0.040 Pekerja " 65,000.00 "
ANALISA HARGA SATUAN PEKERJAAN 25
0.0025 Mandor " 90,000.00 "
0.040 Tukang " 110,000.00 "
0.0040 Kepala Tukang " 120,000.00 "
1 M2 Mendempul Rp.

6.19 1 M2 WALL PAPER


1.200 m2 Wall paper Bravo a Rp. 2,250.00 Rp.
0.200 kg Perekat " "
0.020 Pekerja " 65,000.00 "
0.0025 Mandor " 90,000.00 "
0.200 Tukang " 110,000.00 "
0.0200 Kepala Tukang " 120,000.00 "
1 M2 Wall paper Rp.
ANALISA HARGA SATUAN PEKERJAAN 26
20 M2 CAT MELAMINE
1.000 ltr Wood filler a Rp. Rp.
6.660 ltr Wood stain " "
6.600 ltr Sending sealer " "
1 M2 ACIAN TEMBOK / BETON
3.146 kg Semen PC " 621.00 "
0.085 Pekerja " 65,000.00 "
0.0043 Mandor " 90,000.00 "
0.050 Tukang " 110,000.00 "
0.0050 Kepala Tukang " 120,000.00 "
1.0000 ls Alat Bantu " 1,500.00 "
1.0000 ls langsir Material " 750.00 "
1 M2 Acian Rp.

1 M2 PAVING BLOK t= 8 cm
48.000 m2 Paving Blok t.8 cm a Rp. 1,125.00 Rp.
0.150 m3 Pasir urug " 85,200.00 "
0.021 Mandor " 90,000.00 "
0.010 Kepala Tukang Batu " 120,000.00 "
0.100 Tukang Batu " 110,000.00 "
0.420 Pekerja " 65,000.00 "
Rp.

1 Ttk Instalasi Cahaya / Stop kontak per-titik


20 m Kabel NYA 2,5 mm2 m' 2350.00 Rp.
20 m Kabel NYM 3 x 2,5 mm2 m' 7050.00 "
1 btg Pipa PVC D. 5/8" m' 1400.00 "
40 bh Klem kabel bh 75.00 "
1 bh T - dos 5/8 bh 125.00 "
4 roll Isolasi roll 600.00 "
1.000 bh Inbow dos bh 3000.00 "
1.000 org Upah kerja ls 50000.00
Kabel NYA 2,5 mm2
Kabel NYM 3 x 2,5 mm2

1 M' SALURAN KELL. BANG.


0.600 m3 Galian tanah a Rp. 29,600.00 Rp.
0.209 m3 Pas. Bata 1 : 3 " 931,169.65 "
1.100 m2 Plesteran 1 : 3 " 48,136.22 "
0.100 m3 Urugan pasir " 85,200.00 "
1.000 m' Buis beton 1/2 dia. 25 " 31,500.00 "
Rp.

10 M2 ACIAN TEMBOK
0.025 zak Semen PC a Rp. 31,050.00 Rp.
0.003 m3 Kapur Ayak " 135,000.00 "
0.900 Upah kerja cat " 110,000.00 "
1 M2 Acian Rp.

1 M2 lantai bata
36.000 bh batu merah a Rp. 300.00 Rp.
0.163 zak Semen PC " 31,050.00 "
0.035 m3 Pasir Pasangan " 60,750.00 "
0.200 Pekerja " 65,000.00 "
0.030 Mandor " 90,000.00 "
0.060 Tukang " 110,000.00 "
0.020 Kepala Tukang " 120,000.00 "
Rp.
1 M' PROFIL JENDELA / DINDING
0.350 zak Semen PC a Rp. 31,050.00 Rp.
0.003 m3 Kapur Ayak " 31,500.00 "
0.750 Upah kerja cat " 110,000.00 "
Rp.

1 M' PROFIL LISPLANK BETON


0.250 zak Semen PC a Rp. 31,050.00 Rp.
ANALISA HARGA SATUAN PEKERJAAN 27
0.003 m3 Kapur Ayak " 31,500.00 "
0.650 Upah kerja cat " 110,000.00 "
Rp.
ANALISA HARGA SATUAN PEKERJAAN 28

0.00
1,552.50
36,000.00
303.75
1,080.00
#REF!
465.75
5,821.88
26,000.00
1,800.00
22,000.00
2,400.00
#REF!

#REF!
155.25
#REF!
6,500.00
450.00
11,000.00
1,200.00
#REF!

6,500.00
4,500.00
11,000.00

15,380.64
169.40
8,085.00
11,000.00
6,500.00
1,200.00
450.00
8,150.00

26,000.00
3,600.00
29,600.00

12,480.00
2,280.00
14,760.00

32,500.00
6,000.00
38,500.00

64,800.00
91,800.00
54,000.00
19,500.00
900.00
ANALISA HARGA SATUAN PEKERJAAN 29
85,200.00
112,200.00
74,400.00

81,000.00
16,200.00
50,700.00
3,510.00
42,900.00
4,680.00
198,990.00

74,250.00
101,223.00
31,711.50
97,500.00
6,750.00
66,000.00
7,200.00
384,634.50

31,500.00
16,487.55
5,649.75
42,250.00
2,700.00
22,000.00
2,400.00
2,000.00
4,000.00
128,987.30

15,750.00
11,767.95
2,308.50
20,800.00
1,350.00
11,000.00
1,200.00
1,000.00
2,000.00
67,176.45

15,750.00
8,923.77
2,430.00
20,800.00
1,350.00
11,000.00
1,200.00
61,453.77

15,750.00
7,141.50
ANALISA HARGA SATUAN PEKERJAAN 30
2,612.25
20,800.00
1,350.00
11,000.00
1,200.00
59,853.75

15,750.00
6,011.28
2,733.75
20,800.00
1,350.00
11,000.00
1,200.00
58,845.03

112,500.00
1,956.15
22,963.50
455,000.00
33,750.00
275,000.00
30,000.00
931,169.65

7,875.00
5,067.36
2,126.25
13,000.00
2,700.00
6,600.00
2,400.00
39,768.61

5,290.92
1,032.75
13,000.00
900.00
16,500.00
1,800.00
38,523.67

4,024.08
1,154.25
13,000.00
900.00
16,500.00
1,800.00
37,378.33
ANALISA HARGA SATUAN PEKERJAAN 31

2,682.72
1,336.50
13,000.00
900.00
16,500.00
1,800.00
36,219.22

2,682.72
1,336.50
13,000.00
900.00
16,500.00
1,800.00
8,100.00
4,000.00
4,000.00
52,319.22

1,953.67
5,525.00
382.50
5,500.00
600.00
1,500.00
1,000.00
16,461.17

68,780.39

4,390.47
1,275.75
16,900.00
1,170.00
22,000.00
2,400.00
48,136.22

4,455,000.00
390,000.00
27,000.00
2,200,000.00
240,000.00
7,312,000.00

99,000.00
1,164.38
32,500.00
2,250.00
220,000.00
24,000.00
378,914.38

180,000.00
65,000.00
ANALISA HARGA SATUAN PEKERJAAN 32
4,500.00
275,000.00
30,000.00
554,500.00

0.00
32,500.00
2,250.00
110,000.00
12,000.00
156,750.00

157,500.00
52,000.00
3,600.00
220,000.00
24,000.00
457,100.00

15,750.00
15,750.00

88,200.00
52,000.00
3,600.00
275,000.00
30,000.00
480,300.00

3,415,500.00
1,980,000.00

6,210.00
260,000.00
18,000.00
1,320,000.00
144,000.00
5,163,710.00
3,728,210.00

32,400.00
388.13
6,500.00
450.00
22,000.00
3,000.00
64,738.13

65,250.00
465.75
9,750.00
6,750.00
27,500.00
3,000.00
112,715.75

43,470.00
1,164.38
6,500.00
ANALISA HARGA SATUAN PEKERJAAN 33
450.00
11,000.00
1,200.00
63,784.38

71,415.00
41,400.00
1,164.38
13,000.00
900.00
33,000.00
3,600.00
123,079.38
93,064.38

3,150.00
4,725.00
776.25
1,365.00
90.00
2,310.00
240.00
7,931.25
9,506.25

87,750.00
31,500.00
776.25
9,750.00
6,750.00
49,500.00
5,400.00
191,426.25

4,752.00
6,210.00
1,579.50
74,750.00
540.00
2,200.00
240.00
90,271.50

93,960.00
135,378.00
31,590.00
107,250.00
7,200.00
27,500.00
3,000.00
405,878.00
ANALISA HARGA SATUAN PEKERJAAN 34

77,760.00
28,552.50
248,400.00
0.00
354,712.50

78,000.00
39,487.50
240,948.00
358,435.50

64,800.00
32,805.00
234,600.00
332,205.00

130,000.00
90,000.00
38,500.00
4,200.00
262,700.00
617,412.50
621,135.50
594,905.00

14,137.20
178.20

455.00
27.00
770.00
84.00
15,651.40

72,000.00
2,328.75
0.00

19,500.00
450.00
28,600.00
3,120.00
125,998.75

81,000.00
2,328.75
0.00

19,500.00
450.00
28,600.00
3,120.00
134,998.75

36,000.00
3,105.00
0.00
ANALISA HARGA SATUAN PEKERJAAN 35
20,250.00
21,262.50
0.00

19,500.00
450.00
36,300.00
3,960.00
140,827.50
ANALISA HARGA SATUAN PEKERJAAN 36

36,000.00
3,105.00
0.00
24,300.00
21,262.50
0.00

20,800.00
540.00
36,300.00
3,960.00
146,267.50

28,800.00
3,105.00
0.00
12,960.00
17,010.00
0.00

20,800.00
540.00
36,300.00
3,960.00
123,475.00

54,000.00
3,105.00
0.00
20,250.00
21,262.50
0.00

20,800.00
540.00
36,300.00
3,960.00
160,217.50

32,400.00
3,105.00
0.00
21,600.00
21,262.50
0.00
0.00

20,800.00
540.00
36,300.00
3,960.00
139,967.50
ANALISA HARGA SATUAN PEKERJAAN 37

32,400.00
3,105.00
0.00
21,600.00
17,010.00
0.00

20,800.00
540.00
36,300.00
3,960.00
135,715.00

27,000.00
3,105.00
0.00
20,250.00
21,262.50
0.00

20,800.00
540.00
36,300.00
3,960.00
133,217.50

20,250.00
3,105.00
0.00
20,250.00
21,262.50

20,800.00
540.00
36,300.00
3,960.00
126,467.50

14,400.00
776.25
0.00
6,480.00
8,505.00

10,400.00
270.00
18,150.00
1,980.00
60,961.25

70,200.00
32,805.00
ANALISA HARGA SATUAN PEKERJAAN 38
217,350.00
320,355.00

55,000.00
390,000.00
27,000.00
12,000.00
484,000.00

804,355.00
ANALISA HARGA SATUAN PEKERJAAN 39

1,481,040.00
23,760.00
1,504,800.00

247,500.00
195,000.00
19,800.00
120,000.00
582,300.00

2,087,100.00
20,871.00

10,000.00

220,000.00
260,000.00
9,000.00
60,000.00
396,000.00
135,000.00
7,762.50
48,750.00
1,136,512.50
113,651.25

60,500.00
65,000.00
9,000.00
60,000.00
360,000.00
76,500.00
7,762.50
638,762.50

621,135.50
2,249,058.96
10,000.00
757,485.58
3,637,680.04

621,135.50
4,037,912.37
10,000.00
757,485.58
31,938.13
5,458,471.58

621,135.50
3,053,427.30
10,000.00
757,485.58
31,938.13
4,473,986.51

594,905.00
2,249,058.96
10,000.00
757,485.58
31,938.13
3,643,387.67
ANALISA HARGA SATUAN PEKERJAAN 40

594,905.00
2,878,945.74
10,000.00
663,155.04
31,938.13
4,178,943.91

Rp
Rp
Rp
Rp

332,205.00
3,228,971.20
487,576.05
4,048,752.25

332,205.00
3,228,971.20
667,305.89
4,228,482.09

332,205.00
3,228,971.20
233,906.40
3,795,082.60

136,000.00
168.75
5,500.00
6,500.00
720.00
1,100.00
960.00
150,948.75

70,000.00
270.00
6,706.80
1,822.50
770.00
9,750.00
1,800.00
22,000.00
2,400.00
115,519.30

118,125.00
135.00
9,750.00
540.00
8,250.00
960.00
137,760.00

99,900.00
270.00
6,500.00
ANALISA HARGA SATUAN PEKERJAAN 41
900.00
8,250.00
1,200.00
117,020.00

0.00
0.00
6,500.00
450.00
5,500.00
600.00
0.00

33,165.00
100,035.00
6,660.00
48,951.00
188,811.00
ANALISA HARGA SATUAN PEKERJAAN 42

20,736.00
33,750.00
6,300.00
21,275.10
22,500.00
104,561.10

493,290.00
63,270.00
324,400.00
308,336.00
424,748.57

#REF!
#REF!
#REF!
649,350.00
630,000.00
299,700.00
891,000.00
#REF!
0.00
#REF!
#REF!

63,000.00
#REF!
2,592,000.00

1,498,500.00
243,000.00
14,400.00
3,260,250.00
#REF!
#REF!
0.00
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2,500,000.00
#REF!
#REF!

#REF!

#REF!
#REF!
#REF!
#REF!
0.00
#REF!
#REF!
ANALISA HARGA SATUAN PEKERJAAN 43

3,366,000.00
4,189,500.00
7,555,500.00
60,444.00

1,248,750.00
327,600.00
299,700.00
852,374.70
2,500,000.00
5,228,424.70
41,827.40

5,479,687.50
1,462,500.00

832,500.00
724,500.00
25,000.00
426,209.38
2,500,000.00
11,450,396.88
91,603.18

1,575,000.00
94,500.00
214,500.00
14,400.00
121,000.00
120.00
2,019,520.00

652,500.00
195,750.00
3,726.00
607.50
65,000.00
9,000.00
110,000.00
12,000.00
1,048,583.50
ANALISA HARGA SATUAN PEKERJAAN 44

742,500.00
89,100.00
3,726.00
607.50
78,000.00
9,000.00
159,500.00
18,000.00
1,100,433.50
1,011,333.50

1,485,000.00
89,100.00
3,726.00
1,215.00
97,500.00
18,000.00
192,500.00
24,000.00
1,911,041.00

2,227,500.00
89,100.00
3,726.00
945.00
113,750.00
22,500.00
220,000.00
30,000.00
2,707,521.00

54,000.00
650.00
450.00
11,000.00
1,200.00
67,300.00

273,240.00
79,695.00
141,174.00
41,175.75
141,174.00
41,175.75

3,510.00
2,430.00
9,900.00
1,080.00
369,855.00
199,269.75
199,269.75

273,240.00
141,174.00
0.00
0.00

8,775.00
ANALISA HARGA SATUAN PEKERJAAN 45
612.00
24,750.00
2,700.00
310,077.00
178,011.00

14,157.00
20,691.00
22,869.00
17,424.00
1,035.00
5,635.58

390.00
27.00
6,600.00
720.00

28,564.58
35,098.58
37,276.58
31,831.58

38,250.00
35,000.00
73,250.00

3,693,600.00
353,970.00
27,300.00
28,500.00
50,000.00
4,153,370.00

3,589,920.00
208,656.00
27,300.00
77,400.00
50,000.00
3,953,276.00

1,879,200.00
124,200.00
13,650.00
29,000.00
50,000.00
2,096,050.00

6,052,320.00
247,158.00
13,650.00
93,400.00
50,000.00
6,456,528.00

712,800.00
17,388.00
ANALISA HARGA SATUAN PEKERJAAN 46
11,000.00
25,000.00
766,188.00

2,138,400.00
52,164.00
33,000.00
25,000.00
2,248,564.00

1,425,600.00
34,776.00
22,000.00
25,000.00
1,507,376.00

1,814,400.00
63,963.00
5,794,089.00

1,215,000.00
15,000.00
16,500.00
25,000.00
1,271,500.00

1,240,920.00
15,000.00
17,500.00
25,000.00
1,298,420.00
ANALISA HARGA SATUAN PEKERJAAN 47

1,814,400.00
348,075.00
38,587.50
12,600.00
25,000.00
2,238,662.50

1,723,680.00
36,400.00
25,000.00
6,000.00
1,791,080.00

512,325.00
455,400.00
0.00
1,625.00
112.50
27,500.00
3,000.00
544,562.50
487,637.50

0.00
68,310.00
1,072.50
72.00
18,150.00
1,980.00
21,274.50
89,584.50

315,000.00
202,500.00
112,500.00
22,500.00
650.00
450.00
55,000.00
1,200.00
372,300.00
259,800.00
169,800.00
79,800.00

20,250.00
11,250.00
8,550.00
247,500.00
4,725.00
4,725.00
4,050.00
975.00
67.50
16,500.00
1,800.00
39,592.50
30,592.50
27,892.50
ANALISA HARGA SATUAN PEKERJAAN 48
266,842.50
24,067.50
24,067.50

0.00
0.00
3,250.00
225.00
55,000.00
6,000.00
64,475.00
64,475.00
ANALISA HARGA SATUAN PEKERJAAN 49

193,725.00
30,712.50
37,800.00
37,800.00
37,800.00
7,066.98
2,551.50
1,620.00

40,300.00
2,700.00
38,500.00
4,200.00
4,320.00
1,000.00
2,000.00
297,983.48
134,970.98
142,058.48
142,058.48

47,250.00
37,800.00
5,775.30
1,093.50
0.00
39,000.00
2,700.00
11,000.00
5,400.00
4,320.00
1,000.00
2,000.00
119,538.80
110,088.80

201,121.97
155,116.22
437,671.22
0.00
8,787.15
2,369.25
2,160.00
40,300.00
2,700.00
38,500.00
4,200.00
0.00
75,000.00
20,000.00
375,138.37
349,132.62
631,687.62
194,016.40

201,121.97
155,116.22
437,671.22
0.00
ANALISA HARGA SATUAN PEKERJAAN 50
1,518.75
1,620.00
20,000.00
46,800.00
3,150.00
71,500.00
7,800.00
0.00
75,000.00
20,000.00
40,000.00
40,000.00

528,510.72
482,504.97
765,059.97

6,352.50
1,024.65
194.40
5,184.00
5,850.00
405.00
9,900.00
1,080.00
0.00
20,000.00

29,990.55
#VALUE!
79,981.10

8,073.00
12,109.50
1,293.75
1,293.75
1,552.50
1,300.00
225.00
6,930.00
756.00
21,424.00
25,460.50

6,054.75
16,146.00
1,940.63
2,199.38
2,587.50
129.38
4,550.00
225.00
9,900.00
1,080.00
28,666.63
38,757.88

1,035.00
1,552.50
103.50
2,600.00
ANALISA HARGA SATUAN PEKERJAAN 51
225.00
4,400.00
480.00
10,396.00

2,700.00
0.00
1,300.00
225.00
22,000.00
2,400.00
28,625.00
ANALISA HARGA SATUAN PEKERJAAN 52

0.00
0.00
0.00

1,953.67
5,525.00
382.50
5,500.00
600.00
1,500.00
750.00
16,211.17

54,000.00
12,780.00
1,890.00
1,200.00
11,000.00
27,300.00
108,170.00

47,000.00
141,000.00
1,400.00
3,000.00
125.00
2,400.00
3,000.00
50,000.00
106,925.00
200,925.00

17,760.00
194,614.46
52,949.84
8,520.00
31,500.00
305,344.30

776.25
405.00
99,000.00
10,018.13

10,800.00
5,067.36
2,126.25
13,000.00
2,700.00
6,600.00
2,400.00
42,693.61

10,867.50
94.50
82,500.00
93,462.00

7,762.50
ANALISA HARGA SATUAN PEKERJAAN 53
94.50
71,500.00
79,357.00
54
DAFTAR HARGA BAHAN DAN
DAN UPAH KERJA '07
No. JENIS BAHAN SATUAN

1 Batu Gunung m3
2 Sirtu m3
3 Batu Kali m3
4 Batu pecah (splijt) m3
5 Pasir Timbunan m3
6 Pasir Pasangan m3
7 Pasir Beton m3
8 Tanah urug m3
9 Kerikil beton m3
10 Batu Bata bh
11 Paving Blok 8 mm bh
12 Semen Tonasa @ 50 kg zak
13 Kapur Ayak m3
14 Lem beton zak
15 Semen Putih zak
16 Buis Beton 1/2 m'
17 Spandek 0.4 mm Pal Merah m2
18 Nok Spandek 0.4 mm m1
19 Paku Spandek ( Warna ) bh
20 Paku Biasa kg
21 Karet pelapis l= 110 cm m'
22 Kayu Klas I (Balok) senso m3
23 Kayu Klas II (balok) ex Samarindah m3
24 Kayu Klas II (papan) ex Samarindah m3
25 Kayu Klas I (Balok) sawmill m3
26 Kayu Klas I (papan) sawmill m3
27 Kayu Dolken 4 mm btng
28 Kusen Ventilasi bh
29 Teakwood 4 mm lbr
30 Tripleks 3 mm lbr
31 Multiplex 6 mm lbr
32 Multiplex 9 mm Lbr
33 Multiplex 12 mm Lbr
34 Kawat beton kg
35 Besi Beton kg
36 Besi propil SIKU kg
37 Besi Plat kg
38 Besi propil IWF kg
39 Besi propil C kg
40 Pipa GIP - MED."A" dia. 4 " btg
41 Pipa GIP - MED."A" dia. 6 " btg
47 Keramik 20/25 m2
48 Keramik 10/20 m2
49 Keramik 20/20 m2
50 Keramik 30/30 m2
51 Keramik 30/30 kasar (Oskar Grey) m2
52 Keramik 40/40 Granito m2
53 Cat tembok ICI Pentalite Dulux ltr
54 Cat tembok ICI Weathershield Dulux ltr
55 Cat kayu ICI Dulux ltr
56 Cat Tembok Pasific paint kg
55
No. JENIS BAHAN SATUAN

57 Cat Kayu Pasific Paint kg


58 Politur/teal oil kg
59 Minyak cat kg
60 Dempul kg
61 Plamur kg
62 Kertas Gosok Lbr
63 Kaca bening 12 mm Tempered m2
64 Kaca bening 10 mm Tempered m2
65 Kaca rayband 5 mm m2
66 Kaca bening 5 mm m2
67 Kran wastafel set
68 Kran dinding bh
69 Kloset duduk Merk TOTO set
70 Kitchen Sinc + Kran Leher Angsa set
71 Wastafel LW 237 Toto + Kran putar lengkap set
72 Cermin + Rak handuk set
73 Urinoar Muslim + Kran tekan set
74 Floor Drain bh
75 Down Light SL 25 w Artolite A. 2021 RD 150 E27 R set
76 RM 2 X 18 w Artolite set
77 Down Light SL 14 w Artolite RD 150 set
78 Instalasi cahaya / Stop kontak ttk
79 Saklar triple set
80 Saklar ganda set
81 Saklar tunggal set
82 Kabel NYM 2 X 2,5 m'
83 Kabel NYM 3 X 2,5 m'
84 Kabel NYM 3 X 4 m'
85 Kabel NYA 2,5 mm m'
86 Splitzen Ø 1" lengkap dengan pipa GIP set
87 Pentanahan lbr
88 Kabel BC 50 mm2 m'
89 Kabel BC 25 mm2 m'
90 Stop kontak KKB set
91 Stop kontak KKK set
92 Sekring Box + Arde bh
93 Engsel pintu Milano bh
94 Engsel jendela Milano bh
95 Engsel jendela Milano kecil bh
96 Grendel Jendela bh
97 Pengait Jendela bh
98 Expanoglet bh
99 Kunci Tanam 2 slag SES / YALE bh
100 Kunci Tanam 2 slag bh
101 Cisa Master key bh
102 Alluminium holow 1" x 2" warna m'
103 Kosen All. m'
104 Bingkai pintu / jendela All. m'
105 Handle Pintu Kaca bh
106 List propil Gypsum btg /3 m
107 List propil kayu 5 cm m'
108 Wall paper ( merk Baravo ) Rol (100 x 0,50)
109 Suspension clip PN 223 bh
110 Suspension rod PN 225 btg
111 Siku tembak / angle bracket bh
112 Wall Studs PN 162 M'
56
No. JENIS BAHAN SATUAN

113 Wall Track PN 150 M'


114 Paper tape 75 m roll
115 Gypsum board 9 mm lbr
116 Mesiu & paku tembak set
57
No. JENIS BAHAN SATUAN

117 Paku beton 1,5 inci bh


118 Amplas lbr
119 Screw gypsum 25 mm bh
120 Hollow steel 30.30.3 mm btg
121 Hollow steel 20.40.3 mm btg
122 Spandrel Alluminium 10 cm merk Indal, Super x, alexindo m2
123 Wall angle Alluminium btg / 6 m

UPAH KERJA

NO. U R A I A N SATUAN

1 Pekerja Hari

2 Mandor Hari

3 Tukang Hari

4 Kepala Tukang Hari


58
FTAR HARGA BAHAN DAN
DAN UPAH KERJA '07
HARGA EE
( Rp. )

67,500.00
76,500.00
72,000.00
108,000.00
54,000.00
60,750.00
60,750.00
45,000.00
120,000.00
225.00
1,125.00
31,050.00
135,000.00
40,500.00
43,200.00
31,500.00
112,500.00
83,250.00
6,750.00
7,762.50
5,692.50
3,105,000.00
1,800,000.00
2,025,000.00
4,050,000.00
4,500,000.00
15,300.00
31,500.00
60,750.00
31,500.00
67,500.00
121,500.00
135,000.00
11,880.00
13,464.00
12,870.00
18,810.00
20,790.00
15,840.00
705,870.00
1,366,200.00
45,000.00
42,300.00
36,000.00
29,250.00
36,000.00
184,500.00
31,050.00
46,575.00
62,100.00
14,850.00
59
HARGA EE
( Rp. )
23,287.50
20,493.00
5,175.00
12,937.50
12,937.50
1,552.50
465,750.00
414,000.00
56,925.00
62,100.00
112,500.00
40,500.00
1,575,000.00
427,500.00
742,500.00
225,000.00
652,500.00
54,000.00
76,500.00
112,500.00
49,500.00
99,000.00
42,750.00
40,500.00
38,250.00
6,300.00
10,800.00
16,200.00
15,750.00
382,500.00
67,500.00
58,500.00
14,400.00
58,500.00
58,500.00
495,000.00
20,250.00
11,250.00
8,550.00
4,725.00
4,050.00
247,500.00
202,500.00
112,500.00
315,000.00
38,250.00
38,250.00
324,000.00
22,500.00
13,500.00
4,275.00
22,500.00
5,850.00
11,250.00
2,700.00
58,500.00
60
HARGA EE
( Rp. )
49,500.00
31,500.00
54,000.00
13,500.00
61
HARGA EE
( Rp. )
2,250.00
1,800.00
2,250.00
99,000.00
85,500.00
26,250.00
22,500.00

UPAH KERJA

JUMLAH

65,000.00

90,000.00

110,000.00

120,000.00
PEKERJAAN PERSIAPAN
1 1.00 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN
0.100 Oh Pekerja @ Rp
0.050 Oh Mandor @ Rp

2 1.00 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK


0.012 M3 Kayu 5/7 @ Rp
0.02 Kg Paku Biasa 2'-5" @ Rp
0.007 M3 Kayu Papan 3/20 @ Rp
0.100 Oh Tukang Kayu @ Rp
0.100 Oh Pekerja @ Rp
0.010 Oh Kepala Tukang @ Rp
0.005 Oh Mandor @ Rp

3 1.00 M2 PEKERJAAN KANTOR DIREKSI


0.100 M3 Kayu Kls II @ Rp
0.250 Kg Paku @ Rp
1.100 Lbr Seng Gelombang BJLS 28 (80x180 cm) @ Rp
1.440 Lbr Triplks 3 mm @ Rp
5.000 Kg PC @ Rp
0.250 M3 Pasir Pasang @ Rp
70.000 Bh Bata Merah @ Rp
0.020 Ls Peralatan @ Rp
0.150 Ls Ongkos Pasang @ Rp

4 1.00 M3 BONGKARAN DINDING TEMBOK


6.667 M3 Pekerja @ Rp
0.003 Kg Mandor @ Rp

PEKERJAAN TANAH
1 1.00 M3 GALIAN TANAH BIASA
0.400 Oh Pekerja @ Rp
0.040 Oh Mandor @ Rp

2 1.00 M3 GALIAN TANAH CADAS


1.250 Oh Pekerja @ Rp
0.125 Oh Mandor @ Rp

3 1.00 M3 GALIAN TANAH LUMPUR


0.823 Oh Pekerja @ Rp
0.083 Oh Mandor @ Rp
4 1.00 M3 URUGAN KEMBALI
0.192 Oh Pekerja @ Rp
0.019 Oh Mandor @ Rp

5 1.00 M3 PEMADATAN TANAH


0.500 Oh Pekerja @ Rp
0.050 Oh Mandor @ Rp

6 1.00 M3 URUGAN PASIR


1.200 M3 Pasir Urug @ Rp
0.300 Oh Pekerja @ Rp
0.010 Oh Mandor @ Rp

7 1.00 M3 URUGAN SIRTU


1.200 M3 Sirtu @ Rp
0.250 Oh Pekerja @ Rp
0.025 Oh Mandor @ Rp

8 1.00 M3 URUGAN TANAH


1.200 M3 Tanah Urug @ Rp
0.300 Oh Pekerja @ Rp
0.100 Oh Mandor @ Rp

9 1.00 M3 PEMASANGAN LAPISAN IJUK


1.200 M3 Ijuk @ Rp
0.150 Oh Pekerja @ Rp
0.015 Oh Mandor @ Rp

PEKERJAAN PONDASI
1 1.00 M3 PASANG PONDASI BATU KALI, 1 Pc : 3 Ps
1.100 M3 0 @ Rp
202.000 Kg Semen portland @ Rp
0.485 M3 Pasir pasangan @ Rp
1.500 Oh Pekerja @ Rp
0.600 Oh Tukang batu @ Rp
0.060 Oh Kepala tukang @ Rp
0.075 Oh Mandor @ Rp

2 1.00 M3 PASANG PONDASI BATU GUNUNG, 1 Pc : 5 Ps


1.100 M3 0 @ Rp
136.000 Kg Semen portland @ Rp
0.544 M3 Pasir pasangan @ Rp
1.500 Oh Pekerja @ Rp
0.600 Oh Tukang batu @ Rp
0.060 Oh Kepala tukang @ Rp
0.075 Oh Mandor @ Rp

3 1.00 M3 PASANG PONDASI BATU KOSONG


1.200 M3 0 @ Rp
0.300 M3 Pasir urug @ Rp
0.780 Oh Pekerja @ Rp
0.390 Oh Tukang batu @ Rp
0.039 Oh Kepala tukang @ Rp
0.039 Oh Mandor @ Rp

4 1.00 M3 PASANG PONDASI SIKLOP 40% BATU KALI


75.000 Kg Besi beton @ Rp
202.000 Kg Semen portland @ Rp
0.320 M3 Pasir beton @ Rp
0.490 M3 0 @ Rp
0.800 Kg Kawat beton @ Rp
3.000 Oh Pekerja @ Rp
0.850 Oh Tukang batu @ Rp
0.085 Oh Kepala tukang @ Rp
0.150 Oh Mandor @ Rp

5 1.00 M PEMBUATAN TIANG PANCANG (40 X 40)CM, BETON BERTULANG


0.019 M3 Pasir Urug @ Rp
0.094 M3 Pasir Beton @ Rp
0.150 M3 Batu Pecah 2 - 3 cm @ Rp
60.500 Kg Semen Portland @ Rp
45.000 Kg Besi Beton Polos @ Rp
0.900 Kg Kawat Beton @ Rp
0.032 M3 Kayu Kelas II (Balok) @ Rp
0.120 Kg Paku biasa 2" - 5" @ Rp
0.090 Lt Minyak bekisting @ Rp
0.240 Kg Plamur tembok @ Rp
1.000 Oh Pekerja @ Rp
0.670 Oh Tukang batu @ Rp
0.067 Oh Kepala tukang @ Rp
0.050 Oh Mandor @ Rp

PEKERJAAN DINDING
1 1.00 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc : 2 Ps
140.000 Bh Bata merah 5 x 11 x 22 cm @ Rp
43.500 Kg Semen portland @ Rp
0.080 M3 Pasir pasangan @ Rp
0.650 Oh Pekerja @ Rp
0.200 Oh Tukang batu @ Rp
0.020 Oh Kepala tukang @ Rp
0.030 Oh Mandor @ Rp

2 1.00 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc : 3 Ps


140.000 Bh Bata merah 5 x 11 x 22 cm @ Rp
32.950 Kg Semen portland @ Rp
0.091 M3 Pasir pasangan @ Rp
0.650 Oh Pekerja @ Rp
0.200 Oh Tukang batu @ Rp
0.020 Oh Kepala tukang @ Rp
0.030 Oh Mandor @ Rp

3 1.00 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc : 5 Ps


140.000 Bh Bata merah 5 x 11 x 22 cm @ Rp
22.200 Kg Semen portland @ Rp
0.102 M3 Pasir pasangan @ Rp
0.650 Oh Pekerja @ Rp
0.200 Oh Tukang batu @ Rp
0.020 Oh Kepala tukang @ Rp
0.030 Oh Mandor @ Rp

4 1.00 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 3 Ps


70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp
14.370 Kg Semen portland @ Rp
0.040 M3 Pasir pasangan @ Rp
0.320 Oh Pekerja @ Rp
0.100 Oh Tukang batu @ Rp
0.010 Oh Kepala tukang @ Rp
0.015 Oh Mandor @ Rp
5 1.00 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps
70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp
11.500 Kg Semen portland @ Rp
0.043 M3 Pasir pasangan @ Rp
0.320 Oh Pekerja @ Rp
0.100 Oh Tukang batu @ Rp
0.010 Oh Kepala tukang @ Rp
0.015 Oh Mandor @ Rp

6 1.00 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps


70.000 Bh Bata merah 5 x 11 x 22 cm @ Rp
9.680 Kg Semen portland @ Rp
0.045 M3 Pasir pasangan @ Rp
0.320 Oh Pekerja @ Rp
0.100 Oh Tukang batu @ Rp
0.010 Oh Kepala tukang @ Rp
0.015 Oh Mandor @ Rp

7 1.00 Bh PEKERJAAN LUBANG VENTILASI


0.320 Oh Pekerja @ Rp
0.100 Oh Tukang batu @ Rp
0.010 Oh Kepala tukang @ Rp
0.015 Oh Mandor @ Rp

PEKERJAAN PLESTERAN
1 1.00 M3 PLESTERAN 1 Pc : 2 Ps, Tebal 15 mm.
8.520 Kg Semen portland @ Rp
0.017 M3 Pasir pasangan @ Rp
0.200 Oh Pekerja @ Rp
0.150 Oh Tukang batu @ Rp
0.015 Oh Kepala tukang @ Rp
0.010 Oh Mandor @ Rp

2 1.00 M2 PLESTERAN 1 Pc : 4 Ps, Tebal 15 mm.


5.200 Kg Semen portland @ Rp
0.020 M3 Pasir pasangan @ Rp
0.200 Oh Pekerja @ Rp
0.150 Oh Tukang batu @ Rp
0.015 Oh Kepala tukang @ Rp
0.010 Oh Mandor @ Rp

3 1.00 M2 PLESTERAN 1 Pc : 5 Ps, Tebal 15 mm.


4.320 Kg Semen portland @ Rp
0.022 M3 Pasir pasangan @ Rp
0.200 Oh Pekerja @ Rp
0.150 Oh Tukang batu @ Rp
0.015 Oh Kepala tukang @ Rp
0.010 Oh Mandor @ Rp

4 1.00 M2 PLESTERAN 1 Pc : 3 Ps, Tebal 15 mm.


6.480 Kg Semen Portland @ Rp
0.019 M3 Pasir Pasangan @ Rp
0.200 Oh Pekerja @ Rp
0.150 Oh Tukang batu @ Rp
0.015 Oh Kepala tukang @ Rp
0.010 Oh Mandor @ Rp

5 1.00 M2 PLESTERAN BETON 1 Pc : 2 Ps, Tebal 15 mm.


9.300 Kg Semen Portland @ Rp
0.018 M3 Pasir Pasangan @ Rp
0.260 Oh Pekerja @ Rp
0.200 Oh Tukang batu @ Rp
0.020 Oh Kepala tukang @ Rp
0.013 Oh Mandor @ Rp

6 1.00 M2 PLESTERAN BETON 1 Pc : 3 Ps, Tebal 15 mm.


7.070 Kg Semen Portland @ Rp
0.021 M3 Pasir Pasangan @ Rp
0.260 Oh Pekerja @ Rp
0.200 Oh Tukang batu @ Rp
0.020 Oh Kepala tukang @ Rp
0.013 Oh Mandor @ Rp
7 1.00 M2 PLESTERAN SIAR ADUKAN 1 PC : 2 PS
4.320 Kg Semen portland @ Rp
0.016 M3 Pasir pasangan @ Rp
0.150 Oh Pekerja @ Rp
0.070 Oh Tukang batu @ Rp
0.007 Oh Kepala tukang @ Rp
0.008 Oh Mandor @ Rp

8 10.00 M2 ACIAN SEMEN (SAUS SEMEN)


59.270 Kg Semen @ Rp
0.850 Oh Pekerja @ Rp
0.500 Oh Tukang batu @ Rp
0.050 Oh Kepala tukang @ Rp
0.043 Oh Mandor @ Rp

Maka 1 M2 Mengaci = 1/10

PEKERJAAN KAYU
1 1.00 M3 PASANG KUSEN PINTU DAN JENDELA KAYU KELAS - I
1.100 M3 Kayu Kls I (Balok Somil) @ Rp
6.000 Oh Pekerja @ Rp
20.000 Oh Tukang kayu @ Rp
2.000 Oh Kepala tukang @ Rp
0.300 Oh Mandor @ Rp

2 1.00 M3 PASANG KUSEN PINTU DAN JENDELA KAYU KELAS - I


1.200 M3 Kayu Kls I (Balok Somil) @ Rp
6.000 Oh Pekerja @ Rp
18.000 Oh Tukang kayu @ Rp
2.000 Oh Kepala tukang @ Rp
0.300 Oh Mandor @ Rp

3 1.00 M3 PASANG PINTU PANEL KAYU KELAS I


0.040 M3 Kayu Kelas I (Papan) @ Rp
1.000 Oh Pekerja @ Rp
2.500 Oh Tukang kayu @ Rp
0.250 Oh Kepala tukang @ Rp
0.050 Oh Mandor @ Rp
4 1.00 Bh MENGERJAKAN DAUN PINTU PANIL PVC
1.000 Lbr Pintu Panil PVC @ Rp
0.450 M2 Kaca Buram 5mm @ Rp
0.360 Oh Pekerja @ Rp
1.100 Oh Tukang kayu @ Rp
0.110 Oh Kepala tukang @ Rp
0.036 Oh Mandor @ Rp

5 1.00 M2 PASANG PINTU DAN JENDELA KACA KAYU KELAS - I


0.035 M3 Kayu Papan Klas I @ Rp
0.800 Oh Pekerja @ Rp
2.000 Oh Tukang kayu @ Rp
0.200 Oh Kepala tukang @ Rp
0.040 Oh Mandor @ Rp

6 1.00 M2 PASANG PINTU PLYWOOD RANGKAP, RANGKA KAYU KELAS - II


0.0196 M3 Kayu Kelas II (Papan) @ Rp
0.030 Kg Paku biasa 1/2" - 1" @ Rp
0.300 Lt Lem kayu @ Rp
1.000 Lbr Tripleks Pintu 4 mm @ Rp
0.600 Oh Pekerja @ Rp
2.000 Oh Tukang kayu @ Rp
0.200 Oh Kepala tukang @ Rp
0.030 Oh Mandor @ Rp

7 1.00 M2 PASANG JALUSI MATI KUSEN KAYU KELAS - I


0.0600 M3 Kayu Kls I (Papan Somil) @ Rp
0.150 Kg Paku biasa 1/2" - 1" @ Rp
0.500 Oh Pekerja @ Rp
2.000 Oh Tukang kayu @ Rp
0.200 Oh Kepala tukang @ Rp
0.025 Oh Mandor @ Rp

8 1.00 M3 PASANG KONSTRUKSI KUDA-KUDA KAYU KELAS - I


1.1000 M3 Kayu Kls I (Balok Somil) @ Rp
15.000 Kg Besi strip @ Rp
0.800 Kg Paku biasa 2" - 5" @ Rp
4.000 Oh Pekerja @ Rp
12.000 Oh Tukang kayu @ Rp
1.200 Oh Kepala tukang @ Rp
0.200 Oh Mandor @ Rp

9 1.00 M3 PASANG GORDING KAYU KELAS - I


1.1000 M3 Kayu Kls I (Balok Somil) @ Rp
0.800 Kg Paku biasa 2" - 5" @ Rp
4.000 Oh Pekerja @ Rp
12.000 Oh Tukang kayu @ Rp
1.200 Oh Kepala tukang @ Rp
0.200 Oh Mandor @ Rp

10 1.00 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU KELAS II


1.100 M3 Kayu Kelas II (Balok) @ Rp
15.000 Kg Besi Strip @ Rp
0.800 Kg Paku biasa 2" - 5" @ Rp
4.000 Oh Pekerja @ Rp
12.000 Oh Tukang kayu @ Rp
1.200 Oh Kepala tukang @ Rp
0.200 Oh Mandor @ Rp

11 1.00 M3 PASANG GORDING ATAP KAYU KELAS II


1.100 M3 Kayu Kelas II (Balok) @ Rp
0.800 Kg Paku biasa 2" - 5" @ Rp
4.000 Oh Pekerja @ Rp
12.000 Oh Tukang kayu @ Rp
1.200 Oh Kepala tukang @ Rp
0.200 Oh Mandor @ Rp

12 1.00 M2 PASANG KASO + RENG GENTENG KERAMIK KAYU KELAS - I


0.012 M3 Kayu Kls I (Balok Somil) @ Rp
0.150 Kg Paku biasa 2" - 5" @ Rp
0.100 Oh Pekerja @ Rp
0.100 Oh Tukang kayu @ Rp
0.010 Oh Kepala tukang @ Rp
0.005 Oh Mandor @ Rp
13 1.00 M2 PASANG KASO + RENG GENTENG BETON KAYU KELAS - I
0.014 M3 Kayu Kls I (Balok Somil) @ Rp
0.150 Kg Paku biasa 2" - 5" @ Rp
0.100 Oh Pekerja @ Rp
0.100 Oh Tukang kayu @ Rp
0.010 Oh Kepala tukang @ Rp
0.005 Oh Mandor @ Rp

14 1.00 M2 PASANG KASO + RENG ATAP SIRAP KAYU KELAS - I


0.165 M3 Kayu Kls I (Balok Somil) @ Rp
0.200 Kg Paku biasa 2" - 5" @ Rp
0.120 Oh Pekerja @ Rp
0.120 Oh Tukang kayu @ Rp
0.012 Oh Kepala tukang @ Rp
0.006 Oh Mandor @ Rp

15 1.00 M2 PASANG RANGKA PLAFOND (1.00 X 1.00) M, KAYU KELAS - II


0.012 M3 Kayu Kelas II (Balok) @ Rp
0.100 Kg Paku biasa 2" - 5" @ Rp
0.150 Oh Pekerja @ Rp
0.250 Oh Tukang kayu @ Rp
0.025 Oh Kepala tukang @ Rp
0.075 Oh Mandor @ Rp

16 1.00 M2 PASANG RANGKA PLAFOND (0.60 X 0.80) M, KAYU KELAS - II


0.014 M3 Kayu Kelas II (Balok) @ Rp
0.120 Kg Paku biasa 2" - 5" @ Rp
0.175 Oh Pekerja @ Rp
0.290 Oh Tukang kayu @ Rp
0.029 Oh Kepala tukang @ Rp
0.088 Oh Mandor @ Rp

17 1.00 M' PASANG LISPLANK UKURAN (3 x 30) CM, KAYU KELAS - II


0.0110 M3 Kayu Kelas II (Papan) @ Rp
0.050 Kg Paku biasa 2" - 5" @ Rp
0.110 Oh Pekerja @ Rp
0.220 Oh Tukang kayu @ Rp
0.022 Oh Kepala tukang @ Rp
0.005 Oh Mandor @ Rp

18 1.00 M' PASANG LISPLANK UKURAN (3 x 30) CM, KAYU KELAS I


0.0110 M3 Kayu Kls I (Papan Somil) @ Rp
0.050 Kg Paku biasa 2" - 5" @ Rp
0.110 Oh Pekerja @ Rp
0.220 Oh Tukang kayu @ Rp
0.022 Oh Kepala tukang @ Rp
0.005 Oh Mandor @ Rp

19 1.00 M' PASANG LISPLANK UKURAN 2 x(3 x 20) CM, KAYU KELAS - II
0.0145 M3 Kayu Kelas II (Papan) @ Rp
0.060 Kg Paku biasa 2" - 5" @ Rp
0.150 Oh Pekerja @ Rp
0.250 Oh Tukang kayu @ Rp
0.025 Oh Kepala tukang @ Rp
0.075 Oh Mandor @ Rp

20 1.00 M' PASANG LISPLANK UKURAN 2x (2 x 20) CM, KAYU KELAS I


0.0088 M3 Kayu Kls I (Papan Somil) @ Rp
0.060 Kg Paku biasa 2" - 5" @ Rp
0.100 Oh Pekerja @ Rp
0.100 Oh Tukang kayu @ Rp
0.010 Oh Kepala tukang @ Rp
0.050 Oh Mandor @ Rp

21 1.00 M2 PASANG RANGKA DINDING PEMISAH KAYU KLS II


0.0195 M3 Kayu Kelas II (Balok) @ Rp
0.0070 M3 Kayu Kelas II (Papan) @ Rp
0.100 Kg Paku biasa 2" - 5" @ Rp
0.150 Oh Pekerja @ Rp
0.450 Oh Tukang kayu @ Rp
0.045 Oh Kepala tukang @ Rp
0.075 Oh Mandor @ Rp

22 1.00 M2 PASANG DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KELA


0.0195 M3 Kayu Kelas II (Balok) @ Rp
0.0070 M3 Kayu Kelas II (Papan) @ Rp
0.8121 Lbr Teakwood (Multipleks 6mm) @ Rp
0.100 Kg Paku biasa 2" - 5" @ Rp
0.150 Oh Pekerja @ Rp
0.450 Oh Tukang kayu @ Rp
0.045 Oh Kepala tukang @ Rp
0.075 Oh Mandor @ Rp

23 1.00 M' PASANG PLAFOND LAMBRIZING DARI PAPAN KLS I


0.0195 M3 Kayu Kls I (Balok Somil) @ Rp
0.100 Kg Paku biasa 2" - 5" @ Rp
0.150 Kg Paku skrup 3,5" @ Rp
0.600 Oh Pekerja @ Rp
1.800 Oh Tukang kayu @ Rp
0.180 Oh Kepala tukang @ Rp
0.030 Oh Mandor @ Rp

PEKERJAAN BETON
1 1.00 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr
218.000 Kg Semen portland @ Rp
0.520 M3 Pasir beton @ Rp
0.870 M3 Batu Pecah 2 - 3 cm @ Rp
1.650 Oh Pekerja @ Rp
0.250 Oh Tukang batu @ Rp
0.025 Oh Kepala tukang @ Rp
0.080 Oh Mandor @ Rp

2 1.00 M2 MEMBUAT LANTAI KERJA BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr TEBAL 5 Cm


10.000 Kg Semen portland @ Rp
0.026 M3 Pasir beton @ Rp
0.044 M3 Batu Pecah 2 - 3 cm @ Rp
1.150 Oh Pekerja @ Rp
0.020 Oh Tukang batu @ Rp
0.002 Oh Kepala tukang @ Rp
0.006 Oh Mandor @ Rp

3 1.00 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr


232.000 Kg Semen portland @ Rp
0.520 M3 Pasir beton @ Rp
0.780 M3 Batu Pecah 2 - 3 cm @ Rp
1.650 Oh Pekerja @ Rp
0.250 Oh Tukang batu @ Rp
0.025 Oh Kepala tukang @ Rp
0.080 Oh Mandor @ Rp

4 1.00 M2 PASANG BEKISTING UNTUK PONDASI


0.040 M3 Kayu Papan Kelas III @ Rp
0.300 Kg Paku biasa 2" - 5" @ Rp
0.100 Lt Minyak bekisting @ Rp
0.300 Oh Pekerja @ Rp
0.260 Oh Tukang batu @ Rp
0.026 Oh Kepala tukang @ Rp
0.005 Oh Mandor @ Rp

5 1.00 M2 PASANG BEKISTING UNTUK SLOOF


0.045 M3 Kayu Papan Kelas III @ Rp
0.300 Kg Paku biasa 2" - 5" @ Rp
0.100 Lt Minyak bekisting @ Rp
0.300 Oh Pekerja @ Rp
0.260 Oh Tukang batu @ Rp
0.026 Oh Kepala tukang @ Rp
0.005 Oh Mandor @ Rp

6 1.00 M2 PASANG BEKISTING UNTUK KOLOM


0.040 M3 Kayu Balok Kelas II @ Rp
0.400 Kg Paku biasa 2" - 5" @ Rp
0.200 Lt Minyak bekisting @ Rp
0.015 M3 Kayu Balok Kelas III @ Rp
0.350 Lbr Multipleks 9 mm @ Rp
2.000 Btg Kayu Dolken @ Rp
0.300 Oh Pekerja @ Rp
0.330 Oh Tukang batu @ Rp
0.033 Oh Kepala tukang @ Rp
0.006 Oh Mandor @ Rp

7 1.00 M2 PASANG BEKISTING UNTUK BALOK


0.040 M3 Kayu Balok Kelas II @ Rp
0.400 Kg Paku biasa 2" - 5" @ Rp
0.200 Lt Minyak bekisting @ Rp
0.015 M3 Kayu Balok Kelas III @ Rp
0.350 Lbr Multipleks 9 mm @ Rp
2.000 Btg Kayu Dolken @ Rp
0.320 Oh Pekerja @ Rp
0.330 Oh Tukang batu @ Rp
0.033 Oh Kepala tukang @ Rp
0.006 Oh Mandor @ Rp

8 1.00 M' PASANG BEKISTING UNTUK RING BALOK


0.003 M3 Kayu Papan Kelas III @ Rp
0.020 Kg Paku biasa 2" - 5" @ Rp
0.050 Lt Minyak bekisting @ Rp
0.100 Oh Pekerja @ Rp
0.033 Oh Tukang kayu @ Rp
0.010 Oh Kepala tukang @ Rp
0.005 Oh Mandor @ Rp

9 1.00 M2 PASANG BEKISTING UNTUK DINDING


0.030 M3 Kayu Kelas II (Balok) @ Rp
0.400 Kg Paku biasa 2" - 5" @ Rp
0.200 Lt Minyak bekisting @ Rp
0.020 M3 Kayu Kelas III (Balok) @ Rp
0.350 Lbr Multipleks 9 mm @ Rp
3.000 Btg Kayu Dolken @ Rp
4.000 Bh Formtie/penjaga jarak bekisting/spacer @ Rp
0.320 Oh Pekerja @ Rp
0.330 Oh Tukang batu @ Rp
0.033 Oh Kepala tukang @ Rp
0.006 Oh Mandor @ Rp

10 1.00 M2 PASANG BEKISTING UNTUK LANTAI


0.040 M3 Kayu Kelas II (Balok) @ Rp
0.400 Kg Paku biasa 2" - 5" @ Rp
0.200 Lt Minyak bekisting @ Rp
0.015 M3 Kayu Kelas III (Balok) @ Rp
0.350 Lbr Multipleks 9 mm @ Rp
6.000 Btg Kayu Dolken @ Rp
0.320 Oh Pekerja @ Rp
0.330 Oh Tukang batu @ Rp
0.033 Oh Kepala tukang @ Rp
0.006 Oh Mandor @ Rp

11 1.00 M2 PASANG BEKISTING UNTUK TANGGA


0.030 M3 Kayu Kelas II (Balok) @ Rp
0.400 Kg Paku biasa 2" - 5" @ Rp
0.150 Lt Minyak bekisting @ Rp
0.015 M3 Kayu Kelas III (Balok) @ Rp
0.350 Lbr Multipleks 9 mm @ Rp
2.000 Btg Kayu Dolken @ Rp
0.320 Oh Pekerja @ Rp
0.330 Oh Tukang batu @ Rp
0.033 Oh Kepala tukang @ Rp
0.006 Oh Mandor @ Rp

12 1.00 M3 MEMBUAT BETON DENGAN MUTU K 275


400.000 Kg Semen Portland @ Rp
0.400 M3 Pasir Beton @ Rp
0.820 M3 Batu Pecah 2 - 3 cm @ Rp
6.000 Oh Pekerja @ Rp
1.000 Oh Tukang batu @ Rp
0.100 Oh Kepala tukang @ Rp
0.300 Oh Mandor @ Rp

13 1.00 M3 MEMBUAT BETON DENGAN MUTU K 225


388.000 Kg Semen Portland @ Rp
0.650 M3 Pasir Beton @ Rp
0.650 M3 Batu Pecah 2 - 3 cm @ Rp
6.000 Oh Pekerja @ Rp
1.000 Oh Tukang batu @ Rp
0.100 Oh Kepala tukang @ Rp
0.300 Oh Mandor @ Rp

14 1.00 M3 MEMBUAT BETON DENGAN MUTU K 175


340.000 Kg Semen Portland @ Rp
0.540 M3 Pasir Beton @ Rp
0.830 M3 Batu Pecah 2 - 3 cm @ Rp
6.000 Oh Pekerja @ Rp
1.000 Oh Tukang batu @ Rp
0.100 Oh Kepala tukang @ Rp
0.300 Oh Mandor @ Rp

15 1.00 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR


1.050 Kg Besi Beton ( Polos / Ulir ) @ Rp
0.015 Kg Kawat Beton @ Rp
0.007 Oh Pekerja @ Rp
0.0070 Oh Tukang Besi @ Rp
0.00007 Oh Kepala tukang @ Rp
0.00030 Oh Mandor @ Rp

HARGA SATUAN BETON


1 Pek. Pondasi
Beton K. 225
Besi Beton (1 Kg) 112.92 Kg
Bekisting(M2 4.00 ( x Analisa )----------(2 x Pakai) 50%

2 Stek Poer
Beton K. 225
Besi Beton (1 Kg) 138.75 Kg
Bekisting(M2 11.42 ( x Analisa )----------(2 x Pakai) 50%

3 Pek. Meja Beton


Beton K. 175
Besi Beton (1 Kg) 137.94 Kg
Bekisting(M2 11.67 ( x Analisa )----------(2 x Pakai) 50%

5 Pek. Sloef Praktis 15 x 20


Beton K. 175
Besi Beton (1 Kg) 107.76 Kg
Bekisting(M2 13.33 ( x Analisa )----------(2 x Pakai) 50%

6 Pek. Sloef Utama 20 x 30


Beton K. 225
Besi Beton (1 Kg) 99.66 Kg
Bekisting(M2 10.00 ( x Analisa )----------(2 x Pakai) 50%

7 Pek. Kolom 15 x 30
Beton K. 175
Besi Beton (1 Kg) 136.91 Kg
Bekisting(M2 13.33 ( x Analisa )----------(2 x Pakai) 50%

8 Pek. Kolom 30 x 30 (Type A)


Beton K. 225
Besi Beton (1 Kg) 87.69 Kg
Bekisting(M2 13.33 ( x Analisa )----------(2 x Pakai) 50%
9 Pek. Kolom 30 x 30 (Type B)
Beton K. 225
Besi Beton (1 Kg) 146.30 Kg
Bekisting(M2 13.33 ( x Analisa )----------(2 x Pakai) 50%

10 Pek. Kolom 35 x 35
Beton K. 225
Besi Beton (1 Kg) 135.50 Kg
Bekisting(M2 11.42 ( x Analisa )----------(2 x Pakai) 50%

11 Pek. Kolom Praktis 15 x 15


Beton K. 175
Besi Beton (1 Kg) 193.47 Kg
Bekisting(M2 13.33 ( x Analisa )----------(2 x Pakai) 50%

12 Pek. Ring Balok Praktis 15 x 20 (Type A)


Beton K. 175
Besi Beton (1 Kg) 107.76 Kg
Bekisting(M1 33.33 ( x Analisa )----------(2 x Pakai) 50%

13 Pek. Ring Balok Praktis 15 x 20 (Type B)


Beton K. 175
Besi Beton (1 Kg) 220.58 Kg
Bekisting(M1 33.33 ( x Analisa )----------(2 x Pakai) 50%

14 Pek. Ring Balok Utama 20 x 30


Beton K. 175
Besi Beton (1 Kg) 166.90 Kg
Bekisting(M1 16.67 ( x Analisa )----------(2 x Pakai) 50%

15 Pek. Balok Kuda - Kuda Beton


Beton K. 175
Besi Beton (1 Kg) 166.90 Kg
Bekisting(M1 16.67 ( x Analisa )----------(2 x Pakai) 50%
16 Pek. Balok Utama (B1) 25 x 50
Beton K. 225
Besi Beton (1 Kg) 204.93 Kg
Bekisting(M2 8.08 ( x Analisa )----------(2 x Pakai) 50%

17 Pek. Balok Utama (B2) 20 x 40


Beton K. 225
Besi Beton (1 Kg) 231.93 Kg
Bekisting(M2 9.50 ( x Analisa )----------(2 x Pakai) 50%

18 Pek. Balok Anak (B3) 15 x 25


Beton K. 225
Besi Beton (1 Kg) 233.85 Kg
Bekisting(M2 10.93 ( x Analisa )----------(2 x Pakai) 50%

19 Pek. Balok Utama (B1")


Beton K. 225
Besi Beton (1 Kg) 132.30 Kg
Bekisting(M2 11.04 ( x Analisa )----------(2 x Pakai) 50%

20 Pek. Balok Lesplank (B4)


Beton K. 175
Besi Beton (1 Kg) 65.00 Kg
Bekisting(M2 21.66 ( x Analisa )----------(2 x Pakai) 50%

21 Pek. Beton Sirip + Level


Beton K. 175
Besi Beton (1 Kg) 80.00 Kg
Bekisting(M2 14.20 ( x Analisa )----------(2 x Pakai) 50%

22 Pek. Plat Lantai


Beton K. 175
Besi Beton (1 Kg) 100.00 Kg
Bekisting(M2 8.33 ( x Analisa )----------(2 x Pakai) 50%

23 Pek. Tangga
Beton K. 175
Besi Beton (1 Kg) 155.24 Kg
Bekisting(M2 7.32 ( x Analisa )----------(2 x Pakai) 50%

PEKERJAAN PENUTUP ATAP


1 1.00 M2 PASANG GENTENG BETON
11.000 Bh Genteng Beton @ Rp
1.100 M2 Karet Pelapis Genteng @ Rp
0.030 Kg Paku biasa 2" - 5" @ Rp
0.200 Oh Pekerja @ Rp
0.100 Oh Tukang kayu @ Rp
0.010 Oh Kepala tukang @ Rp
0.010 Oh Mandor @ Rp

2 1.00 M' PASANG NOK ATAP GENTENG BETON


3.500 Bh Bubungan Genteng Beton @ Rp
0.050 Kg Paku biasa 2" - 5" @ Rp
10.800 Kg Semen Portland @ Rp
0.032 M3 Pasir Pasangan @ Rp
1.000 Kg Semen Warna @ Rp
0.400 Oh Pekerja @ Rp
0.200 Oh Tukang kayu @ Rp
0.020 Oh Kepala tukang @ Rp
0.020 Oh Mandor @ Rp

3 1.00 M' PASANG NOK GENTENG KERAMIK


4.000 bh Bubungan Genteng Keramik @ Rp
0.050 Kg Paku biasa 2" - 5" @ Rp
10.800 Kg Semen Portland @ Rp
0.032 M3 Pasir Pasangan @ Rp
1.000 Kg Semen Warna @ Rp
0.400 Oh Pekerja @ Rp
0.200 Oh Tukang kayu @ Rp
0.020 Oh Kepala tukang @ Rp
0.020 Oh Mandor @ Rp

4 1.00 M2 PASANG ATAP GENTENG KERAMIK


16.000 Bh Genteng Keramik @ Rp
1.100 M2 Karet Pelapis Genteng @ Rp
0.030 Kg Paku biasa 2" - 5" @ Rp
0.200 Oh Pekerja @ Rp
0.100 Oh Tukang kayu @ Rp
0.010 Oh Kepala tukang @ Rp
0.010 Oh Mandor @ Rp

5 1.00 M' PASANG Bubungan Metal


4.000 Lbr Metal Roof @ Rp
0.040 Kg Paku @ Rp
0.150 Oh Pekerja @ Rp
0.070 Oh Tukang kayu @ Rp
0.008 Oh Kepala tukang @ Rp
0.006 Oh Mandor @ Rp

6 1.00 M2 PASANG ATAP Metal


1.250 bh Metal Roof @ Rp
0.020 Kg Paku @ Rp
0.120 Oh Pekerja @ Rp
0.060 Oh Tukang kayu @ Rp
0.006 Oh Kepala tukang @ Rp
0.006 Oh Mandor @ Rp

PEKERJAAN BESI DAN ALUMINIUM


1 1.00 M' PASANG TALANG 1/2 LINGKARAN D-10 CM, SENG BJLS 28
0.300 Lbr Seng Plat 3' x 6' bjls 28 @ Rp
0.100 Kg Paku biasa 1/2" - 1" @ Rp
0.019 M3 Kayu Kls II Papan @ Rp
0.500 Kg Besi Strip @ Rp
0.150 Oh Pekerja @ Rp
0.250 Oh Tukang kayu @ Rp
0.025 Oh Kepala tukang @ Rp
0.00125 Oh Mandor @ Rp

2 1.00 M' PASANG TALANG JURAI SENG PLAT


0.500 Lbr Seng Plat BJLS 0,30 (BWG 28) 6 kk @ Rp
0.015 Kg Paku biasa 1/2" - 1" @ Rp
0.019 M3 Kayu Kelas II (Papan) @ Rp
0.300 Kg Cat Meni Kayu/Besi Merek Gloteks @ Rp
0.040 Oh Pekerja @ Rp
0.400 Oh Tukang kayu @ Rp
0.025 Oh Kepala tukang @ Rp
0.00125 Oh Mandor @ Rp

3 1.00 M2 PASANG PINTU ALUMINIUM


1.000 M2 Pintu Aluminium @ Rp
1.050 Oh Pekerja @ Rp
1.050 Oh Tukang besi @ Rp
0.105 Oh Kepala tukang @ Rp
0.00520 Oh Mandor @ Rp

PEKERJAAN PENGECATAN
1 1.00 M2 PENGECATAN TEMBOK BARU ( 1x Plamir, 1 x Cat Dasar, 2 x Cat Penutu
0.100 Kg Plamir @ Rp
0.100 Kg Cat Dasar @ Rp
0.260 Kg Cat Penutup 2 x ( Metrolite ) @ Rp
0.020 Oh Pekerja @ Rp
0.063 Oh Tukang Cat @ Rp
0.006 Oh Kepala tukang @ Rp
0.003 Oh Mandor @ Rp

2 1.00 M2 PENGECATAN TEMBOK LAMA ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
0.120 Kg Cat Dasar @ Rp
0.180 Kg Cat Penutup 2 x ( Metrolite ) @ Rp
0.028 Oh Pekerja @ Rp
0.042 Oh Tukang cat @ Rp
0.004 Oh Kepala tukang @ Rp
0.003 Oh Mandor @ Rp

3 1.00 M2 MENGIKIS / MENGEROK PERMUKAAN CAT TEMBOK LAMA


0.050 Kg Soda Api @ Rp
0.150 Oh Pekerja @ Rp
0.000 Oh Tukang cat @ Rp
0.000 Oh Kepala tukang @ Rp
0.003 Oh Mandor @ Rp

4 1.00 M2 MENGECAT ANTI BOCOR LANTAI 3 X


0.500 Ltr Cat Lapisan Anti Bocor @ Rp
0.200 Ltr Cat Arcilic Anti Lumut @ Rp
Upah mengacat
Untuk 1 M2 Mengecat Anti Bocor 3 Kali 3x
Untuk 1 M2 Mengecat Arcilic 2 Kali 3x

5 1.00 M2 PELABURAN BIDANG KAYU DGN CAT RESIDU DAN TER


0.350 Ltr Residu atau Ter @ Rp
0.100 Oh Pekerja @ Rp
0.006 Oh Mandor @ Rp

6 1.00 M2 PENGECATAN BIDANG KAYU BARU (1 x Plamir, 1 x Cat Dasar, 2 x Cat Penutup
0.200 Kg Cat Meni @ Rp
0.150 Kg Plamir @ Rp
0.170 Kg Cat Dasar @ Rp
0.260 Kg Cat Penutup 2 x ( Glotex ) @ Rp
0.070 Oh Pekerja @ Rp
0.009 Oh Tukang Cat @ Rp
0.006 Oh Kepala tukang @ Rp
0.0025 Oh Mandor @ Rp

7 1.00 M2 PENGECATAN BIDANG ATAP SENG SECARA MANUAL


0.300 Kg Cat Seng @ Rp
0.010 Bh Kuas @ Rp
0.006 Oh Pekerja @ Rp
0.060 Oh Tukang cat @ Rp
0.012 Oh Kepala tukang @ Rp
0.0060 Oh Mandor @ Rp

PEKERJAAN PENUTUP LANTAI DAN DINDING


1 1.00 M2 PASANG LANTAI KERAMIK 30X30 CM
12.000 Bh Ubin Keramik 30x30 @ Rp
11.300 Kg Semen Portland @ Rp
0.042 M3 Pasir Pasang @ Rp
1.500 Kg Semen Warna @ Rp
0.062 Oh Pekerja @ Rp
0.350 Oh Tukang Batu @ Rp
0.035 Oh Kepala tukang @ Rp
0.030 Oh Mandor @ Rp

2 1.00 M2 PASANG LANTAI KERAMIK 20X20 CM


25.000 Bh Ubin Keramik 20 X 20 cm ( Kasar ) @ Rp
11.380 Kg Semen Portland @ Rp
0.042 M3 Pasir Pasang @ Rp
1.500 Kg Semen Warna @ Rp
0.620 Oh Pekerja @ Rp
0.350 Oh Tukang Batu @ Rp
0.035 Oh Kepala tukang @ Rp
0.030 Oh Mandor @ Rp

3 1.00 M2 PASANG LANTAI KERAMIK 20X25 CM


20.000 Bh Tegel Keramik 20x25 Untuk Lantai @ Rp
11.380 Kg Semen Portland @ Rp
0.042 M3 Pasir Pasang @ Rp
1.500 Kg Semen Warna @ Rp
0.620 Oh Pekerja @ Rp
0.350 Oh Tukang Batu @ Rp
0.035 Oh Kepala tukang @ Rp
0.030 Oh Mandor @ Rp

4 1.00 M2 PASANG DINDING KERAMIK 20 X 25


20.000 Bh Keramik 20 X 25 cm @ Rp
9.300 Kg Semen Porland @ Rp
0.018 M3 Pasir Pasang @ Rp
1.500 Kg Semen Warna @ Rp
0.600 Oh Pekerja @ Rp
0.450 Oh Tukang Batu @ Rp
0.045 Oh Kepala tukang @ Rp
0.030 Oh Mandor @ Rp

5 1.00 M' PASANG PLINT KERAIMIK 10 X 30


4.000 Bh Plint Keramik 10 x 30 Cm @ Rp
1.650 Kg Semen Portland @ Rp
0.0032 M3 Pasir Pasang @ Rp
0.100 Kg Semen Warna @ Rp
0.090 Oh Pekerja @ Rp
0.090 Oh Tukang Batu @ Rp
0.009 Oh Kepala tukang @ Rp
0.0045 Oh Mandor @ Rp

PEKERJAAN KUNCI DAN KACA


1 1.00 M2 PASANG KACA TEBAL, 5 MM
A 1.1000 M2 Kaca Buram 5mm @ Rp
B 1.1000 M2 Kaca Rayband 5mm @ Rp
C 1.1000 M3 Kaca Bening 5mm @ Rp
0.0150 Oh Pekerja @ Rp
0.1500 Oh Tukang kayu @ Rp
0.0150 Oh Kepala tukang @ Rp
0.00075 Oh Mandor @ Rp

2 1.00 BH PASANG REL PINTU DORONG


1.0000 Bh Rel Pintu Dorong @ Rp
0.0600 Oh Pekerja @ Rp
0.6000 Oh Tukang Kayu @ Rp
0.0600 Oh Kepala tukang @ Rp
0.00300 Oh Mandor @ Rp

3 1.00 BH PASANG KUNCI PINTU DORONG


1.0000 Bh Kunci Pintu Dorong @ Rp
0.0250 Oh Pekerja @ Rp
0.2500 Oh Tukang Kayu @ Rp
0.0250 Oh Kepala tukang @ Rp
0.00125 Oh Mandor @ Rp

4 1.00 BH PASANG KUNCI PINTU


A 1.000 Bh Kunci Pintu 2x Putar (Ex Yale) @ Rp
B 1.000 Bh Kunci Bundar Kamar Mandi @ Rp
0.0050 Oh Pekerja @ Rp
0.5000 Oh Tukang Kayu @ Rp
0.0050 Oh Kepala tukang @ Rp
0.00250 Oh Mandor @ Rp

5 1.00 BH PASANG KAIT ANGIN


1.000 Bh Kait Angin @ Rp
0.0150 Oh Pekerja @ Rp
0.1500 Oh Tukang Kayu @ Rp
0.0150 Oh Kepala tukang @ Rp
0.00075 Oh Mandor @ Rp
6 1.00 BH PASANG ENGSEL JENDELA
1.000 Bh Engsel Jendela @ Rp
0.0100 Oh Pekerja @ Rp
0.1000 Oh Tukang Kayu @ Rp
0.0100 Oh Kepala tukang @ Rp
0.00050 Oh Mandor @ Rp

7 1.00 BH PASANG ENGSEL PINTU


1.000 Bh Engsel Pintu @ Rp
0.0150 Oh Pekerja @ Rp
0.1500 Oh Tukang Kayu @ Rp
0.0150 Oh Kepala tukang @ Rp
0.00075 Oh Mandor @ Rp

8 1.00 BH PASANG EXPANYOLET TEMPEL/DOOR CLOSER


1.000 Bh Expanyolet Tempel/Door Closer @ Rp
0.0500 Oh Pekerja @ Rp
0.5000 Oh Tukang Kayu @ Rp
0.0500 Oh Kepala tukang @ Rp
0.00250 Oh Mandor @ Rp

9 1.00 BH PASANG GRENDEL


A 1.000 Bh Gerendel Jendela @ Rp
B 1.000 Psg Gerendel Tanam @ Rp
0.0100 Oh Pekerja @ Rp
0.1000 Oh Tukang Kayu @ Rp
0.0100 Oh Kepala tukang @ Rp
0.00050 Oh Mandor @ Rp

PEKERJAAN PELAFOND
1 1.00 M2 PEKERJAAN PLAFOND Calsiboard
1.000 M2 Calsiboard @ Rp
0.0100 Kg Paku biasa 2" - 5" @ Rp
0.0300 Oh Pekerja @ Rp
0.0700 Oh Tukang kayu @ Rp
0.0070 Oh Kepala tukang @ Rp
0.00150 Oh Mandor @ Rp

2 1.00 M2 PEKERJAAN TRIPLEKS


1.0000 Lbr Tripleks t = 3 cm @ Rp
0.0100 Kg Paku biasa 2" - 5" @ Rp
0.0300 Oh Pekerja @ Rp
0.0700 Oh Tukang kayu @ Rp
0.0070 Oh Kepala tukang @ Rp
0.00150 Oh Mandor @ Rp

3 1.00 M' PEKERJAAN LIST PLAFOND KAYU PROFIL


1.100 M' List Plafond (kayu profil 3x4) @ Rp
0.0100 Kg Paku @ Rp
0.0500 Oh Pekerja @ Rp
0.0500 Oh Tukang Kayu @ Rp
0.0050 Oh Kepala tukang @ Rp
0.00300 Oh Mandor @ Rp

PEKERJAAN SANITASI
1 1.00 BH MEMASANG KLOSET DUDUK
1.000 Bh Kloset Duduk Ex. TOTO/KIA (dud Blok) @ Rp
0.0600 Perlengkapan @ Rp
3.3000 Oh Pekerja @ Rp
1.1000 Oh Tukang batu @ Rp
0.0010 Oh Kepala tukang @ Rp
0.16000 Oh Mandor @ Rp

2 1.00 BH MEMASANG KLOSET JONGKOK


1.000 Bh Kloset Jongkok @ Rp
7.0000 Bh Bata merah @ Rp
6.0000 Kg Semen Portland @ Rp
0.0100 M3 Pasir Pasangan @ Rp
1.0000 Oh Pekerja @ Rp
1.5000 Oh Tukang batu @ Rp
0.3000 Oh Kepala tukang @ Rp
0.11000 Oh Mandor @ Rp

3 1.00 BH MEMASANG URINOIR


1.000 Bh Urinoir @ Rp
0.3000 Perlengkapan @ Rp
6.0000 Kg Semen Portland @ Rp
0.0100 M3 Pasir Pasang @ Rp
1.0000 Oh Pekerja @ Rp
1.0000 Oh Tukang Batu @ Rp
0.1000 Oh Kepala tukang @ Rp
0.10000 Oh Mandor @ Rp
4 1.00 BH MEMASANG WASTAFEL
1.000 Bh Wastafel @ Rp
0.1200 Perlengkapan @ Rp
6.0000 Kg Semen Porland @ Rp
0.0100 M3 Pasir Pasang @ Rp
1.2000 Oh Pekerja @ Rp
1.4500 Oh Tukang Batu @ Rp
0.1500 Oh Kepala tukang @ Rp
0.10000 Oh Mandor @ Rp

5 1.00 BH MEMASANG BAK KONTROL PAS. BATU ( 45X45 ) T = 50 cm


0.250 M3 Batu Bata @ Rp
77.0000 Kg Semen Portland @ Rp
0.1300 M3 Pasir Pasang @ Rp
0.0200 M3 Batu Krikil @ Rp
2.6000 Kg Besi Beton @ Rp
0.0900 M3 Pasir Beton @ Rp
1.4200 Oh Pekerja @ Rp
0.4730 Oh Tukang Batu @ Rp
0.4700 Oh Kepala tukang @ Rp
0.07100 Oh Mandor @ Rp

6 1.00 BH MEMASANG PIPA GALVANIS


A 1.200 M' Pipa Galvanis Dia 1/2" @ Rp
0.3500 Perlengkapan @ Rp
B 1.200 M' Pipa Galvanis Dia 3/4" @ Rp
0.3500 Perlengkapan @ Rp
C 1.200 M' Pipa Galvanis Dia 1" @ Rp
0.3500 Perlengkapan @ Rp
0.0540 Oh Pekerja @ Rp
0.0900 Oh Tukang batu @ Rp
0.0090 Oh Kepala tukang @ Rp
0.02700 Oh Mandor @ Rp

7 1.00 BH MEMASANG PIPA PVC


A 1.200 M' PVC Dia 3" (D) @ Rp
0.3500 Perlengkapan @ Rp
B 1.200 M' PVC Dia 4" (D) @ Rp
0.3500 Perlengkapan @ Rp
C 1.200 M' PVC Dia 3/4" @ Rp
0.3500 Perlengkapan @ Rp
D 1.200 M' PVC Dia 2" @ Rp
0.3500 Perlengkapan @ Rp
0.0810 Oh Pekerja @ Rp
0.1350 Oh Tukang batu @ Rp
0.0135 Oh Kepala tukang @ Rp
0.00410 Oh Mandor @ Rp

8 1.00 BH MEMASANG WASHBASIN


1.000 Bh Washbasin @ Rp
1.0000 Set Water Drain + Asesories @ Rp
0.0360 Oh Pekerja @ Rp
0.0600 Oh Tukang batu @ Rp
0.0060 Oh Kepala tukang @ Rp
0.00180 Oh Mandor @ Rp

9 1.00 BH MEMASANG KRAN AIR


A 1.000 Bh Kran Air @ Rp
0.0250 Set Seal Tape @ Rp
B 1.0000 Bh Stop Kran @ Rp
0.0250 Set Seal Tape @ Rp
0.0100 Oh Pekerja @ Rp
0.1000 Oh Tukang batu @ Rp
0.0100 Oh Kepala tukang @ Rp
0.00500 Oh Mandor @ Rp

10 1.00 BH MEMASANG FLOOR DRAIN


1.000 Bh Floor Drain @ Rp
0.0100 Oh Pekerja @ Rp
0.1000 Oh Tukang batu @ Rp
0.0100 Oh Kepala tukang @ Rp
0.00500 Oh Mandor @ Rp
11 1.00 BH MEMASANG TEMPAT SABUN
1.000 Bh Tempat Sabun @ Rp
0.0100 Oh Pekerja @ Rp
0.1000 Oh Tukang batu @ Rp
0.0100 Oh Kepala tukang @ Rp
0.00500 Oh Mandor @ Rp

12 1.00 BH MEMASANG BAK FIBREGLASS (RESERVOIR) VOLUME 1 M3


1.000 Bh Bak Air Fiberglass (Tangki) 1 M3 @ Rp
0.120 Perlengkapan @ Rp
3.0000 Oh Pekerja @ Rp
4.5000 Oh Tukang batu @ Rp
0.9000 Oh Kepala tukang @ Rp
0.90000 Oh Mandor @ Rp

13 1.00 M' MENGERJAKAN SALURAN AIR HUJAN


0.070 M3 Beton Penutup Saluran @ Rp
0.263 M3 Galian Tanah @ Rp
0.090 M3 Pas. Trasram @ Rp
0.065 M3 Pasir Urug @ Rp
0.050 M3 Urugan Kembali @ Rp
0.520 M2 Plester Trasram @ Rp
1 M1 Mengerjakan saluran Air Hujan (Terbuka)
1 M1 Mengerjakan saluran Air Hujan (Tertutup)

14 1.00 UNIT SEPTICKTANK DAN PERESAPAN


- M3 Galian Tanah @ Rp
- M3 Pas. Trasram @ Rp
- M3 Pasir Urug @ Rp
- M3 Urugan Kembali @ Rp
- M2 Plester Trasram @ Rp
- M2 Ijuk @ Rp
- M3 Plat Beton @ Rp
- M2 Acian Semen Licin @ Rp
- M1 Pipa Penghawaan @ Rp
- M3 Krikil @ Rp
- M' PVC Dia 4" (D) + By Pasang + Sambungan @ Rp

1 TITIK MENGERJAKAN INSTALASI PENERANGAN


I Pemasangan Titik Lampu
20.000 Meter Kabel NYM (2x2,5) mm @ Rp
40.000 Bh Klem Kabel No. 10 @ Rp
1.000 Btg Pipa Pvc 5/8" @ Rp
1.000 Bh Inbow Dos @ Rp
4.000 Bh Las Dop @ Rp
4.000 Roll Isolasi @ Rp
1.000 Bh T - Dos 5/8" @ Rp
1.000 Ls Alat Bantu @ Rp
0.500 Tukang Instalatur @ Rp
0.500 Pembantu Tukang @ Rp

II Pemasangan Stop Kontak


12.000 Meter Kabel NYM (3x2,5) mm @ Rp
20.000 Bh Klem Kabel No. 12 @ Rp
2.000 Btg Pipa Pvc 5/8" @ Rp
1.000 Bh Inbow Dos @ Rp
6.000 Bh Las Dop @ Rp
1.000 Roll Isolasi @ Rp
1.000 Bh T - Dos 5/8" @ Rp
1.000 Ls Alat Bantu @ Rp
0.500 Tukang Instalatur @ Rp
0.500 Pembantu Tukang @ Rp
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

OUWPLANK
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

1,815,000.00 Rp 181,500.00
8,470.00 Rp 2,117.50
36,300.00 Rp 39,930.00
40,232.50 Rp 57,934.80
858.00 Rp 4,290.00
93,500.00 Rp 23,375.00
396.00 Rp 27,720.00
97000 Rp 1,940.00
105000 Rp 15,750.00
Rp 354,557.30

#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!
untuk 1M' Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

40)CM, BETON BERTULANG


#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

ATA, 1 Pc : 2 Ps
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

ATA, 1 Pc : 3 Ps
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

ATA, 1 Pc : 5 Ps
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

BATA, 1 Pc : 3 Ps
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!
BATA, 1 Pc : 4 Ps
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

BATA, 1 Pc : 5 Ps
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

858.00 Rp 50,853.66
65,000.00 Rp 55,250.00
110,000.00 Rp 55,000.00
120,000.00 Rp 6,000.00
90,000.00 Rp 3,870.00
Rp 170,973.66
Rp 17,097.37

A KAYU KELAS - I
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

A KAYU KELAS - I
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF!

KAYU KELAS - I
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

, RANGKA KAYU KELAS - II


#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

KAYU KELAS - I
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

KAYU KELAS II
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

RAMIK KAYU KELAS - I


#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!
TON KAYU KELAS - I
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

KAYU KELAS - I
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

1.00) M, KAYU KELAS - II


#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

0.80) M, KAYU KELAS - II


#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

CM, KAYU KELAS - II


#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

CM, KAYU KELAS I


#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

20) CM, KAYU KELAS - II


1,677,060.00 Rp 24,317.37
8,470.00 Rp 508.20
65,000.00 Rp 9,750.00
110,000.00 Rp 27,500.00
120,000.00 Rp 3,000.00
90,000.00 Rp 6,750.00
Rp 71,825.57

20) CM, KAYU KELAS I


#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

H KAYU KLS II
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

OOD RANGKAP, RANGKA KAYU KELAS II


#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!
RI PAPAN KLS I
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

MBUK, 1 Pc : 3 Ps : 5 Kr TEBAL 5 Cm
858.00 Rp 8,580.00
84,700.00 Rp 2,202.20
129,470.00 Rp 5,696.68
65,000.00 Rp 74,750.00
110,000.00 Rp 2,200.00
120,000.00 Rp 240.00
90,000.00 Rp 540.00
Rp 94,208.88
: 2 Ps : 3 Kr
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

1,155,000.00 Rp 46,200.00
8,470.00 Rp 2,541.00
12,650.00 Rp 1,265.00
65,000.00 Rp 19,500.00
110,000.00 Rp 28,600.00
120,000.00 Rp 3,120.00
90,000.00 Rp 450.00
Rp 101,676.00

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

858.00 Rp 291,720.00
84,700.00 Rp 45,738.00
129,470.00 Rp 107,460.10
65,000.00 Rp 390,000.00
110,000.00 Rp 110,000.00
120,000.00 Rp 12,000.00
90,000.00 Rp 27,000.00
Rp 983,918.10

TAU BESI ULIR


11,400.00 Rp 11,970.00
12,540.00 Rp 188.10
65,000.00 Rp 455.00
110,000.00 Rp 770.00
120,000.00 Rp 8.40
90,000.00 Rp 27.00
Rp 13,418.50

Rp 983,918.10
Rp 1,515,217.02
Rp 203,352.00
Rp 2,702,487.12

Rp #REF!
Rp 1,861,883.47
Rp #REF!
Rp #REF!

Rp 983,918.10
Rp 1,850,892.87
Rp #REF!
Rp #REF!

Rp 983,918.10
Rp 1,445,977.56
Rp #REF!
Rp #REF!

Rp #REF!
Rp 1,337,289.25
Rp #REF!
Rp #REF!

Rp 983,918.10
Rp 1,837,163.06
Rp #REF!
Rp #REF!

Rp #REF!
Rp 1,176,623.98
Rp #REF!
Rp #REF!
Rp #REF!
Rp 1,963,171.42
Rp #REF!
Rp #REF!

Rp #REF!
Rp 1,818,154.19
Rp #REF!
Rp #REF!

Rp 983,918.10
Rp 2,596,042.95
Rp #REF!
Rp #REF!

Rp 983,918.10
Rp 1,445,977.56
Rp #REF!
Rp #REF!

Rp 983,918.10
Rp 2,959,884.73
Rp #REF!
Rp #REF!

Rp 983,918.10
Rp 2,239,502.89
Rp #REF!
Rp #REF!

Rp 983,918.10
Rp 2,239,547.65
Rp #REF!
Rp #REF!
Rp #REF!
Rp 2,749,888.52
Rp #REF!
Rp #REF!

Rp #REF!
Rp 3,112,158.21
Rp #REF!
Rp #REF!

Rp #REF!
Rp 3,137,886.82
Rp #REF!
Rp #REF!

Rp #REF!
Rp 1,775,220.92
Rp #REF!
Rp #REF!

Rp 983,918.10
Rp 872,202.50
Rp #REF!
Rp #REF!

Rp 983,918.10
Rp 1,073,480.00
Rp #REF!
Rp #REF!

Rp 983,918.10
Rp 1,341,850.00
Rp #REF!
Rp #REF!

Rp 983,918.10
Rp 2,083,074.52
Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

-10 CM, SENG BJLS 28


#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

750,000.00 Rp 750,000.00
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

lamir, 1 x Cat Dasar, 2 x Cat Penutup )


#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

pis Cat Dasar, 2 Lapis Cat Penutup )


#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

N CAT TEMBOK LAMA


#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!
Anti Bocor Rp #REF!
Arcilic Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!

RESIDU DAN TER


#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

lamir, 1 x Cat Dasar, 2 x Cat Penutup


#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
1 Lapis Cat Rp #REF!
2 Lapis Cat Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Jum : A Rp #REF!
Jum : B Rp #REF!
Jum : C Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

87,120.00 Rp 87,120.00
165,000.00 Rp 165,000.00
65,000.00 Rp 325.00
110,000.00 Rp 55,000.00
120,000.00 Rp 600.00
90,000.00 Rp 225.00
Jum : A Rp 143,270.00
Jum : B Rp 221,150.00

7,260.00 Rp 7,260.00
65,000.00 Rp 975.00
110,000.00 Rp 16,500.00
120,000.00 Rp 1,800.00
90,000.00 Rp 67.50
Rp 26,602.50
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Jum : A Rp #REF!
Jum : B Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

78,650.00 Rp 78,650.00
396.00 Rp 2,772.00
858.00 Rp 5,148.00
93,500.00 Rp 935.00
65,000.00 Rp 65,000.00
110,000.00 Rp 165,000.00
120,000.00 Rp 36,000.00
90,000.00 Rp 9,900.00
Rp 363,405.00

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

TU ( 45X45 ) T = 50 cm
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Jum : A Rp #REF!
Jum : B Rp #REF!
Jum : C Rp #REF!

10,587.50 Rp 12,705.00
10,587.50 Rp 3,705.63
17,393.75 Rp 20,872.50
17,393.75 Rp 6,087.81
9,075.00 Rp 10,890.00
9,075.00 Rp 3,176.25
10,587.50 Rp 12,705.00
10,587.50 Rp 3,705.63
65,000.00 Rp 5,265.00
110,000.00 Rp 14,850.00
120,000.00 Rp 1,620.00
90,000.00 Rp 369.00
Jum : A Rp 38,514.63
Jum : B Rp 49,064.31
Jum : C Rp 36,170.25
Jum : D Rp 38,514.63

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Jum : A Rp #REF!
Jum : B Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!
RVOIR) VOLUME 1 M3
950,000.00 Rp 950,000.00
950,000.00 Rp 114,000.00
65,000.00 Rp 195,000.00
110,000.00 Rp 495,000.00
120,000.00 Rp 108,000.00
90,000.00 Rp 81,000.00
Rp 1,943,000.00

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
Rp #REF!
Rp #REF!

#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
#REF! Rp #REF!
17,097.37 Rp 0.00
Ls Rp 50,000.00
#REF! Rp #REF!
49,064.31 Rp 0.00
Rp #REF!

6,300.00 Rp 126,000.00
75.00 Rp 3,000.00
1,400.00 Rp 1,400.00
3,000.00 Rp 3,000.00
50.00 Rp 200.00
600.00 Rp 2,400.00
125.00 Rp 125.00
500.00 Rp 500.00
110,000.00 Rp 55,000.00
65,000.00 Rp 32,500.00
Rp 224,125.00

10,800.00 Rp 129,600.00
75.00 Rp 1,500.00
1,400.00 Rp 2,800.00
3,000.00 Rp 3,000.00
50.00 Rp 300.00
600.00 Rp 600.00
125.00 Rp 125.00
500.00 Rp 500.00
110,000.00 Rp 55,000.00
65,000.00 Rp 32,500.00
Rp 225,925.00
RINGKASAN SPESIFIKASI MATERIAL
BANGUNAN TOWER & BANG. PENGHUBUNG / PERPUSTAKAAN
GEDUNG DPRD PROPINSI SUL SEL

A PEKERJAAN SIPIL / ARSITEKTUR

NO U R A I A N SPESIFIKASI

1 Keramik Lantai K I A , ASIA TILE, IKAD


2 Keramik Dinding K I A , ASIA TILE, IKAD
3 Granit Lantai PERMATA GRAHA PRIMA GEMILANG
4 Granit Dinding PERMATA GRAHA PRIMA GEMILANG
5 Cat Tembok Luar I C I WEATHERSHIELD
6 Cat Tembok Dalam I C I PENTALITE
7 Cat Kayu I C I DULUX
8 Cat Melamine I M PRA
9 Master key eks. KENARI JAYA
10 Kunci tanam 2 slag SES / YALE
11 Expanoglet MILANO
12 Engsel pintu / Jendela MILANO
13 Daun Pintu NYATOH TULUS DOOR
14 Kuzen Pintu / Jendela INDAL ALL.
15 Bingkai Pintu / Jendela INDAL ALL.
16 Floor hinges DORMA
17 Door closer DORMA
18 Kaca Polos 12 mm & 10 mm TEMPERED (khusus pintu)
19 Kaca Polos 5 mm KACA BIASA
20 Plapon Gypsum + rangka JAYA BOARD
21 Plapon Aqustik + rangka JAYA BOARD
22 Plapon spandril INDAL ALL.
23 Rangka spandril BESI HOLOW
24 Dinding Partisi GYPSUM + WALL PAPER ( BRAVO)
25 Dinding Partisi MULTIPLEKS 9 mm + MELAMINE
26 Railing tangga STAINLESS STELL
27 Railing Outdoor AC STAINLESS STELL
28 Pipa talang GIP MED. A
29 Kuda - kuda, Gording dll BESI PROPIL
30 Rangka atap KAYU KLAS I BAYAM
31 Atap & Bubungan GENTENG KERAMIK KIA
32 Anjong FIBER + RANGKA BESI
33 Sanitair K I A / TOTO
34 Armatur Lamp ARTOLITE + PHILIPS
35 Water proofing Eks. S I K A

B PEKERJAAN MECANICAL ELECTRICAL

NO U R A I A N SPESIFIKASI

1 LVMDP MERLIN GERIN


2 Kabel - kabel Instalasi TRANGKA , SUPPREME DLL (4 BESAR)
3 Kompenen - komponen Panel MERLIN GERIN
4 Panel Panel SUILITE 1,5 mm
5 Genset 300 KVA MAN
6 TRAFO 400 KVA UNINDO, TRAFINDO
7 Telephone PANOSONIC
8 Fire Alarm NITTAN
9 Sound Sistem T OA
10 Conference Sistem T OA
11 MATV / CATV IKUSI
12 Air Condition DAIKIN
13 Plambing
- Pompa KSB - TORISIMA, GAE
- Valve & Fitting KITAZAWA, TOYO, NBC
- Pipa GIP MEDIUM A
- Pipa MASPION, PVC AW
14 Hydrant
- Pompa KSB - TORISIMA, GAE
- Valve & Fitting KITAZAWA, TOYO, NBC
- Pipa SCHEDULE 40
- Hydran Pilar, Siemese Con. APRON
15 Sprinkler
- Head sprinkler VIKING
- Retarding chamber, Water motor alarm VIKING
- Valve & Fitting KITAZAWA, TOYO, NBC
- Pipa SCHEDULE 40
- Pipa GIP MEDIUM A
16 Passenger Elevator O T I S GEN 2 (P8) = 630 kg
PERPUSTAKAAN
SEL

SPESIFIKASI ALTER.

SES, Tanpa MK

KACA BIASA

BSP + DUCO
ALLUMINIUM HOLOW
TOTO

KETERANGAN

( 4 BESAR )

Anda mungkin juga menyukai