REKAPITULASI TOTAL

KEGIATAN : REHABILITASI BANGUNAN RUMAH SAKIT


PEKERJAAN : REHABILITASI BANGSAL ANAK DAN GUDANG FARMASI
LOKASI : RSUD SOLOK SELATAN
TAHUN : 2016

JUMLAH
No URAIAN PEKLERJAAN
Rp.
1 2 3

A PEKERJAAN REHAB GEDUNG BANSAL ANAK 919,067,691.05


B PEKERJAAN RUANG TUNGGU POLY ANAK 61,967,582.92
C PEKERJAAN REHAB GUDANG FARMASI 318,967,063.11

JUMLAH 1,300,002,337.09
PPN 10 % 130,000,233.71
JUMLAH 1,430,002,570.79
DIBULATKAN 1,430,000,000.00
Terbilang :
Satu Milyar Empat Ratus Tiga Puluh Juta Rupiah,-

Padang, Maret 2016


Dibuat Oleh,
Diperiksa Oleh :
Konsultan Perencana
PENGELOLA TEKNIS CV. TOTAL CITRA CONSULTANT

DEPRIYANTO. P, S.IKom FRENGKY, ST


Nip. 19701228 200902 1 001 Direktur

Diketahui Oleh : Disetujui Oleh :


PENGGUNA ANGGARAN PEJABAT PEMBUAT KOMITMEN
RSUD SOLOK SELATAN

dr. MEDRI IDAMAN GUSTI ELITA, SE


Nip. 19810509 201001 1 022 Nip. 19690810 199202 2 001
REKAPITULASI

KEGIATAN : REHABILITASI BANGUNAN RUMAH SAKIT


PEKERJAAN : REHABILITASI BANGSAL ANAK DAN GUDANG FARMASI
LOKASI : RSUD SOLOK SELATAN
TAHUN : 2016

JUMLAH
No URAIAN PEKLERJAAN
Rp.
1 2 3
A PEKERJAAN REHAB GEDUNG BANSAL ANAK
I. PEKERJAAN PONDASI 43,040,232.18
II. PEKERJAAN BETON/DINDING 158,859,592.66
III. PEKERJAAN KAP/ATAP 142,919,429.33
IV. PEKERJAAN PLAFOND 73,579,661.43
V. PEKERJAAN PLESTERAN 65,890,348.16
VI. PEKERJAAN LANTAI 34,230,625.27
VII. PEKERJAAN PINTU/JENDELA 299,654,343.49
VIII. PEKERJAAN PENGECATAN 21,376,438.33
IX PEKERJAAN PERLENGKAPAN DALAM 73,017,020.20
X PEKERJAAN PERLENGKAPAN LUAR 6,500,000.00

JUMLAH 919,067,691.05

Padang, Maret 2016


Dibuat Oleh,
KONSULTAN PERENCANA
CV. TOTAL CITRA CONSULTANT

FRENGKY, ST
Direktur
RENCANA ANGGRAN BIAYA

KEGIATAN : REHABILITASI BANGUNAN RUMAH SAKIT


PEKERJAAN : REHABILITASI BANGSAL ANAK DAN GUDANG FARMASI
LOKASI : RSUD SOLOK SELATAN
TAHUN : 2016

HARGA JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6
A PEKERJAAN REHAB GEDUNG BANSAL ANAK
I PEKERJAAN PONDASI
1. Pekerjaan Permulaan
a Pek. Bongkaran Kap Atap Ls 1.00 3,000,000.00 3,000,000.00
b Pek. Bongkaran Dinding Ls 1.00 2,210,000.00 2,210,000.00
c Pek. Bongkaran Kozen Pintu Ls 1.00 1,500,000.00 1,500,000.00
d Pek. Bongkaran Plafond Ls 1.00 2,000,000.00 2,000,000.00
e Pek. Bongkaran Lantai Lama Ls 1.00 3,000,000.00 3,000,000.00
f Pek. Pembuangan Sisa Bongkaran Ls 1.00 1,500,000.00 1,500,000.00
g Pembersihan Lapangan M2 45.00 13,860.00 623,700.00
h Pasangan Bouplank M' 48.00 67,331.00 3,231,888.00

2. Pekerjaan Galian Tanah


a Galian Tanah Pondasi M3 29.02 61,600.00 1,787,632.00
b Timbunan 1/4 Galian M3 7.26 20,533.33 149,072.00
b Pek. Urugan Pasir Bawah pondasi M3 2.42 170,104.00 411,651.68

3. Pekerjaan Pondasi
a Pas. Aanstampang Batu Kali M3 9.68 324,122.04 3,137,501.35
b Pas. Pondasi Batu Kali 1:4 M3 27.21 752,987.40 20,488,787.15
43,040,232.18
II PEKERJAAN BETON/DINDING
1. Pekerjaan Beton/Dinding
a Pas. Sloof Beton Bertulang 15/20 M3 1.82 7,176,856.70 13,061,879.20
b Pas. Kolom Beton Bertulang 13/13 M3 1.98 8,347,927.69 16,528,896.83
c Pas. Balok Latei Beton Bertulang 13/13 M3 0.47 7,414,002.03 3,484,580.95
d Pas. Balok Beton Bertulang 13/25 M3 1.97 6,903,860.40 13,597,153.05
e Pek. Plat Beton M3 2.70 5,778,298.62 15,601,406.26
f Pas. Ring Balok Beton Bertulang 13/20 M3 4.59 7,711,101.80 35,393,957.26

2. Pekerjaan Dinding
a Pas. Dinding Bata 1:2 M2 32.23 144,406.46 4,654,220.21
b Pas. Dinding Bata 1:4 M2 ### 134,557.61 28,460,280.09
c Pek. Rangka Dinding Partisi M2 97.50 121,990.00 11,894,025.00
d Pek. Dinding Kalsiboard T=9mm M2 97.50 165,981.48 16,183,193.81
f Pas. Wallpaper Dinding M2 ### 96,244.50
158,859,592.66
HARGA JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6
III PEKERJAAN KAP/ATAP
1. Pekerjaan Kap/Atap
a Pas. Kuda-kuda Bajaringan C.75.75 M2 ### 144,392.60 80,591,285.76
b Pas. Atap BJLS Warna M2 ### 84,815.50 47,338,923.17
c Pas. Perabung Bjls Warna M' 58.90 66,396.00 3,910,724.40
e Pas. Lisplank 2/25 M' ### 68,640.00 11,078,496.00
142,919,429.33
IV PEKERJAAN PLAFOND
1. Pekerjaan Plafond
a Pas. Rangka Plafond Hollow M2 ### 103,015.00 40,924,769.05
b Pas. Plafond Kalsiboard T=4mm M2 ### 50,864.00 20,206,741.28
c Pas. List Profil M' ### 29,491.00 12,448,151.10
73,579,661.43
V PEKERJAAN PLESTERAN
1. Pekerjaan Plesteran
a Plesteran dinding bata 1:2 M2 64.45 63,215.50 4,074,239.23
b Plesteran dinding bata 1:4 M2 ### 58,292.52 24,658,901.81
c Acian Bidang Dinding M2 ### 33,352.00 16,258,099.44
d Afwerking Bidang Beton M2 27.00 70,077.30 1,892,087.21
e Pas. Dinding Keramik KM/WC M2 99.75 190,546.57 19,007,020.47
65,890,348.16
VI PEKERJAAN LANTAI
1. Pekerjaan Lantai
c Pas. Beton Tumbuk 1:3:5 Tbl. 7 cm M3 22.05 897,594.89 19,791,967.39
d Pas. Lantai Keramik 40x40 M2 42.38 214,988.95 9,111,231.70
e Pas. Lantai Keramik Uk. 40 x 40 cm Berpori M2 24.78 214,988.95 5,327,426.18
34,230,625.27
VII PEKERJAAN PINTU/JENDELA
1. Pekerjaan Pintu dan Jendela
a Pas. Kusen Alluminium Hitam 4" M1 ### 145,752.20 95,416,677.73
b Pas. Pintu Rangka Allumunium + Kaca Polos 5 Mm M2 37.80 1,295,147.70 48,956,583.06
c Pas. Pintu Allumunium Unit 16.00 1,150,000.00 18,400,000.00
d Pas. Jendela Alluminium + Kaca 5mm M2 57.46 1,295,147.70 74,419,186.84
e Pas. Kaca Mati M2 13.26 153,838.30 2,039,895.86
f Pas. Ventilasi Alluminium + Kaca 5mm Unit 37.26 750,000.00 27,945,000.00

2. Pekerjaan Perlengkapan
a Pas. Engsel Pintu Alluminium Bh ### 18,000.00 2,484,000.00
b Pas. Engsel Jendela & Ventilasi Alluminium Bh ### 23,500.00 8,366,000.00
c Pas. Grendel Jendela Alluminium Bh ### 19,500.00 6,942,000.00
d Pas. Handle Jendela Jendela Alluminium Bh ### 22,500.00 4,005,000.00
e Pas. Kait Angin Jendela Alluminium Bh ### 30,000.00 10,680,000.00
299,654,343.49
HARGA JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6
VIII PEKERJAAN PENGECATAN
1. Pekerjaan Cat Minyak
a Cat Kayu Lisplank Dan Pintu M2 40.35 49,547.30 1,999,233.56

2. Pekerjaan Cat Air


a Mencat dinding dengan cat air (Catylac) M2 ### 20,312.60 10,450,223.32
b Mencat plafond dengan cat air (Catylac) M2 ### 20,312.60 8,926,981.45
21,376,438.33
IX PEKERJAAN PERLENGKAPAN DALAM
1. Pekerjaan Instalasi Listrik
a Pas. Instalasi titik Lampu Ttk 56.00 200,000.00 11,200,000.00
b Pas. Instalasi Stop Kontak Ttk 27.00 200,000.00 5,400,000.00
c Pas. DOWN LIGHT, PL-2x11 W Bh 40.00 145,000.00 5,800,000.00
c Pas. Lampu Energi Saver 18 Watt Bh 16.00 70,000.00 1,120,000.00
d Pas. MCB/Zakering Unit 1.00 750,000.00 750,000.00

2. Pekerjaan Instalasi Air Bersih dan Air Kotor


a Pas. Instalasi air Bersih Ø1/2" M' 69.00 17,705.60 1,221,686.40
b Pas. Saluran air Kotor Ø4" M' 69.00 115,985.10 8,002,971.90
c Pas. Kran Air Ø3/4" Bh 1.00 35,046.00 35,046.00
d Pas. Floor Drain Bh 14.00 70,466.00 986,524.00
e Pas. Wastavel Unit 13.00 1,727,007.70 22,451,100.10

3. Pekerjaan Sanitasi
a Pas. Kloset Jongkok Bh 11.00 586,428.70 6,450,715.70
b Pas. Kloset Duduk Bh 3.00 2,499,658.70 7,498,976.10
c Ember Besar Bh 14.00 150,000.00 2,100,000.00
73,017,020.20
X PEKERJAAN PERLENGKAPAN LUAR
1. Pekerjaan Septictank dan Resapan
a Pas. Septictank + Resapan Unt 1.00 6,500,000.00 6,500,000.00

6,500,000.00

Padang, Maret 2016


Dibuat Oleh,
KONSULTAN PERENCANA
CV. TOTAL CITRA CONSULTANT

FRENGKY, ST
Direktur
PERHITUNGAN VOLUME

KEGIATAN : REHABILITASI BANGUNAN RUMAH SAKIT


PEKERJAAN : REHABILITASI BANGSAL ANAK DAN GUDANG FARMASI
LOKASI : RSUD SOLOK SELATAN
TAHUN : 2016

A PEKERJAAN REHAB GEDUNG BANSAL ANAK

No. Uraian Pekerjaan Perhitungan Volume

I PEKERJAAN PONDASI
1. Pekerjaan Permulaan
a Pembersihan Lapangan 5.00 x 1.50 x 6.00 = 45.00 45.00 45.00 M2
45.00

b Pasangan Bouplank 5.00 + 1.50 + 1.50 )x 6.00 = 48.00 48.00 48.00 M'

2. Pekerjaan Galian Tanah


a Galian Tanah Pondasi 29.02 29.02 M3
wc 1 Ruang 3.96 x 4.00 = 15.84
wc 2 Ruang 6.69 x 4.00 = 26.76
wc 2 Ruang 3.50 x 1.00 = 3.50
Koridor 2.00 x 2.00 = 4.00
WC Poly Anak 10.35 x 1.00 = 10.35
60.45 = 60.45

60.45 x 0.60 x 0.80 = 29.02


29.02

b Timbunan 1/4 Galian 29.02 x 0.25 = 7.25 7.25 7.26 M3

b Pek. Urugan Pasir Bawah pondasi 60.45 x 0.05 x 0.80 = 2.42 2.42 2.42 M3

3. Pekerjaan Pondasi
a Pas. Aanstampang Batu Kali 9.67 9.68 M3
60.45 x 0.20 x 0.80 = 9.67
9.67

b Pas. Pondasi Batu Kali 1:4 27.20 27.21 M3


60.45 x 0.45 x 1.00 = 27.20
27.20

II PEKERJAAN BETON/DINDING
1. Pekerjaan Beton/Dinding
a Pas. Sloof Beton Bertulang 15/20 1.81 1.82 M3
60.45 x 0.15 x 0.20 = 1.81
1.81

b Pas. Kolom Beton Bertulang 13/13 1.97 1.98 M3


32.00 x 0.13 x 0.13 x 2.90 = 1.57
6.00 x 0.13 x 0.13 x 4.00 = 0.41
1.97

c Pas. Balok Latei Beton Bertulang 13/13 0.46 0.47 M3


17.85 x 0.13 x 0.20 = 0.46
0.46

VOLUME A. PEKERJAAN REHAB GEDUNG POLY ANAK


No. Uraian Pekerjaan Perhitungan Volume

d Pas. Balok Beton Bertulang 13/25 1.97 1.97 M3


60.60 x 0.13 x 0.25 = 1.97
1.97

e Pek. Plat Beton 2.70 2.70 M3


1.50 x 3.00 x 0.10 x 4.00 = 1.80
1.50 x 1.50 x 0.10 x 4.00 = 0.90
2.70

f Pas. Ring Balok Beton Bertulang 13/20 4.59 4.59 M3


WC Dalam 17.85 x 0.13 x 0.20 = 0.46
61.00 x 0.13 x 0.20 = 1.59
97.60 x 0.13 x 0.20 = 2.54
4.59

2. Pekerjaan Dinding
a Pas. Dinding Bata 1:2 32.23 32.23 M2
60.60 x 0.50 x 1.00 = 30.30
17.85 x 0.50 x 1.00 = 8.93
Pengurangan Kozen P3 (0.75) x 0.50 x 14.00 = (5.25)
Pengurangan Kozen P2 (0.90) x 0.50 x 1.00 = (0.45)
Pengurangan Kozen P1 (1.30) x 0.50 x 2.00 = (1.30)
32.23

b Pas. Dinding Bata 1:4 211.51 211.51 M2


WC 60.60 x 2.40 x 1.00 = 145.44
WC 17.85 x 3.50 x 1.00 = 62.48
Atas Plat Dag WC 18.00 x 1.10 x 1.00 = 19.80
Pengurangan Kozen P3 (0.75) x 1.50 x 1.00 = (1.13)
Pengurangan Kozen P2 (0.90) x 2.20 x 1.00 = (1.98)
Pengurangan Kozen P1 (1.30) x 2.20 x 2.00 = (5.72)
Pengurangan Kozen v1 (0.70) x 0.50 x 12.00 = (4.20)
Pengurangan Kozen v2 (0.70) x 0.70 x 2.00 = (0.98)
Pengurangan Kozen V1 (2.00) x 0.55 x 2.00 = (2.20)
211.51

c Pek. Rangka Dinding Partisi 97.50 97.50 M2


WC 5.00 x 3.90 x 5.00 = 97.50
97.50

d Pas. Wallpaper Dinding 22.45 x 3.60 x = 80.82 442.88 442.89 M2


19.45 x 3.60 x = 70.02
15.90 x 3.60 x = 57.24
14.20 x 3.60 x = 51.12
15.20 x 3.60 x = 54.72
19.20 x 3.60 x = 69.12
15.40 x 3.60 x = 55.44
19.20 x 3.60 x = 69.12
Pengurangan Kozen P1 -1.28 x 2.78 x 12.00 = -42.70
Pengurangan Kozen P2 -0.88 x 2.78 x 9.00 = -22.02
442.88

III PEKERJAAN KAP/ATAP


1. Pekerjaan Kap/Atap
a Pas. Kuda-kuda Bajaringan C.75.75 558.14 558.14 M2
21.80 x 7.60 x 2.00 = 331.36
0.50 x 13.30 x 7.60 x 2.00 = 101.08
83.80 x 1.50 x 1.00 x 1.00 = 125.70
558.14

VOLUME A. PEKERJAAN REHAB GEDUNG POLY ANAK


No. Uraian Pekerjaan Perhitungan Volume

b Pas. Atap BJLS Warna 558.14 558.14 M2

c Pas. Perabung Bjls Warna 18.10 + 10.20 x 4.00 = 58.90 58.90 58.90 M'

e Pas. Lisplank 2/25 52.50 x 2.00 = 105.00 161.40 161.40 M'


28.20 x 2.00 = 56.40
161.40

IV PEKERJAAN PLAFOND
1. Pekerjaan Plafond
a Pas. Rangka Plafond Hollow 397.27 397.27 M2
26.40 x 14.20 x 1.00 = 374.88
1.23 x 1.50 x 4.00 = 7.38
1.23 x 3.05 x 4.00 = 15.01
397.27

c Pas. Plafond Kalsiboard T=4mm 397.27 x 1.00 = 397.27 397.27 397.27 M2

d Pas. List Profil 422.10 422.10 M'


3.55 x 12.00 x 1.00 = 42.60
24.00 x 8.00 x 1.00 = 192.00
9.50 x 1.00 x 1.00 = 9.50
12.00 x 4.00 x 1.00 = 48.00
10.00 x 13.00 x 1.00 = 130.00
422.10

IV PEKERJAAN PLESTERAN
1. Pekerjaan Plesteran
a Plesteran dinding bata 1:2 32.23 x 2.00 = 64.45 64.45 64.45 M2

b Plesteran dinding bata 1:4 211.51 x 2.00 = 423.02 423.02 423.02 M2


423.02

c Acian Bidang Dinding 64.45 + 423.02 = 487.47 487.47 487.47 M2


487.47 - 0.00 = 487.47

VOLUME A. PEKERJAAN REHAB GEDUNG POLY ANAK


No. Uraian Pekerjaan Perhitungan Volume

d Afwerking Bidang Beton 27.00 27.00 M2


Dag 1.50 x 3.00 x 4.00 = 18.00
Kolom 25/50 1.50 x 1.50 x 4.00 = 9.00
27.00

e Pas. Dinding Keramik KM/WC 99.75 99.75 M2


4.90 x 1.50 x 12.00 = 88.20
19.60 x 1.50 x 1.00 = 29.40
Pintu (0.70) x 1.50 x 17.00 = (17.85)
99.75

V PEKERJAAN LANTAI
1. Pekerjaan Lantai
a Urugan Tanah dipadatkan 45.50 a M3
6.50 x 9.00 x 0.50 x 1.00 = 29.25
9.00 x 2.50 x 0.50 x 1.00 = 11.25
2.50 x 4.00 x 0.50 x 1.00 = 5.00
45.50

b Urugan Pasir dipadatkan tbl. 10 cm 9.10 a M3


6.50 x 9.00 x 0.10 x 1.00 = 5.85
9.00 x 2.50 x 0.10 x 1.00 = 2.25
2.50 x 4.00 x 0.10 x 1.00 = 1.00
9.10

c Pas. Beton Tumbuk 1:3:5 Tbl. 7 cm 22.05 22.05 M3


24.40 x 12.00 x 0.07 x 1.00 = 20.50
1.50 x 1.23 x 0.07 x 12.00 = 1.55
22.05

d Pas. Lantai Keramik 40x40 42.38 42.38 M2


5.00 x 1.00 x 10.00 = 50.00
(2.50) x 3.05 x 1.00 = (7.63)
42.38

e Pas. Lantai Keramik Uk. 40 x 40 cm Berpori 24.78 24.78 M2


KM/WC 1.35 x 1.10 x 12.00 = 17.82
2.40 x 2.90 x 1.00 = 6.96
24.78

VI PEKERJAAN PINTU/JENDELA
1. Pekerjaan Pintu dan Jendela
a Pas. Kusen Alluminium Hitam 4" 654.65 654.65 M1
P1 8.20 x 2.00 x 1.00 = 16.40
P2 7.40 x 2.00 x 1.00 = 14.80
P3 4.85 x 14.00 x 1.00 = 67.90
J1 10.05 x 8.00 x 1.00 = 80.40
J2 12.05 x 7.00 x 1.00 = 84.35
J3 14.05 x 4.00 x 1.00 = 56.20
V5 14.40 x 5.00 x 1.00 = 72.00
PJ1 8.90 x 3.00 x 1.00 = 26.70
7.30 x 3.00 x 1.00 = 21.90
PJ2 8.90 x 10.00 x 1.00 = 89.00
7.90 x 10.00 x 1.00 = 79.00
V1 2.40 x 12.00 x 1.00 = 28.80
V2 2.80 x 2.00 x 1.00 = 5.60
V3 4.80 x 1.00 x 1.00 = 4.80
V4 6.80 x 1.00 x 1.00 = 6.80
654.65

VOLUME A. PEKERJAAN REHAB GEDUNG POLY ANAK


No. Uraian Pekerjaan Perhitungan Volume

b Pas. Pintu Rangka Allumunium + Kaca Polos 5 Mm 37.80 37.80 Bh


P1 1.20 x 2.10 x 2.00 = 5.04
Pj1 1.20 x 2.10 x 3.00 = 7.56
Pj2 1.20 x 2.10 x 10.00 = 25.20
37.80

b Pas. Pintu Allumunium 16.00 16.00 Bg


P2 1.00 x 1.00 x 2.00 = 2.00
P3 1.00 x 1.00 x 14.00 = 14.00
16.00

d Pas. Jendela Alluminium + Kaca 5mm 57.46 57.46 Bh


J1 1.20 x 1.26 x 8.00 12.10
J2 1.80 x 1.26 x 7.00 15.88
J3 2.40 x 1.26 x 4.00 12.10
Pj1 0.60 x 1.26 x 3.00 2.27
PJ2 1.20 x 1.26 x 10.00 15.12
57.46

d Pas. Kaca Mati 13.26 13.26 M2


V5 0.55 x 4.20 x 5.00 11.55
PJ1 0.30 x 1.90 x 3.00 1.71
13.26

e Pas. Ventilasi Alluminium + Kaca 5mm 37.26 37.26 M2


P1 1.20 x 0.60 x 2.00 = 1.44
P2 0.80 x 0.60 x 2.00 = 0.96
J1 1.20 x 0.60 x 8.00 = 5.76
J2 1.80 x 0.60 x 7.00 = 7.56
J3 2.40 x 0.60 x 4.00 = 5.76
Pj1 2.10 x 0.60 x 3.00 = 3.78
PJ2 2.40 x 0.60 x 10.00 = 14.40 +
37.26

2. Pekerjaan Perlengkapan
a Pas. Engsel Pintu Alluminium 46.00 x 3.00 = 138.00 138.00 138.00 Bh
b Pas. Engsel Jendela & Ventilasi Alluminium 178.00 x 2.00 = 356.00 356.00 356.00 Bh
c Pas. Grendel Jendela Alluminium 178.00 x 2.00 = 356.00 356.00 356.00 Bh
d Pas. Handle Jendela Jendela Alluminium 178.00 x 1.00 = 178.00 178.00 178.00 Bh
e Pas. Kait Angin Jendela Alluminium 178.00 x 2.00 = 356.00 356.00 356.00 Bh

VII PEKERJAAN PENGECATAN


1. Pekerjaan Cat Minyak
d Cat Kayu Lisplank Dan Pintu 40.35 40.35 M2
Lisplank 161.40 x 0.25 x 1.00 x 1.00 = 40.35
40.35
2. Pekerjaan Cat Air
a Mencat dinding dengan cat air (Catylac) 487.47 + 27.00 = 514.47 514.47 514.47 M2

b Mencat plafond dengan cat air (Catylac) 397.27 x 1.00 + 422.10 x 0.10 = 439.48 439.48 439.48 M2

VII PEKERJAAN PERLENGKAPAN DALAM


1. Pekerjaan Instalasi Listrik
a Pas. Instalasi titik Lampu 56.00 = 56.00 56.00 56.00 Ttk
b Pas. Instalasi Stop Kontak 27.00 = 27.00 27.00 27.00 Ttk
c Pas. DOWN LIGHT, PL-2x11 W 40.00 = 40.00 40.00 40.00 Bh
c Pas. Lampu Energi Saver 18 Watt 16.00 = 16.00 16.00 16.00 Bh
d Pas. MCB/Zakering 1.00 1.00 Unit

VOLUME A. PEKERJAAN REHAB GEDUNG POLY ANAK


No. Uraian Pekerjaan Perhitungan Volume

2. Pekerjaan Instalasi Air Bersih dan Air Kotor


a Pas. Instalasi air Bersih Ø1/2" 21.00 + 48.00 69.00 69.00 M'
b Pas. Saluran air Kotor Ø4" 21.00 + 48.00 = 69.00 69.00 69.00 M'
c Pas. Kran Air Ø3/4" 1.00 1.00 Bh
d Pas. Floor Drain 14.00 14.00 Bh
e Pas. Wastavel 13.00 13.00 Unit

3. Pekerjaan Sanitasi
a Pas. Kloset Jongkok 11.00 11.00 Bh
b Pas. Kloset Duduk 3.00 3.00 Bh
c Ember Besar 14.00 14.00 Bh

VII PEKERJAAN PERLENGKAPAN LUAR


1. Pekerjaan Septictank dan Resapan
a Pas. Septictank + Resapan 1.00 1.00 Unt

2. Pekerjaan Rabat Keliling + Tangga


a Pek. Galian Pondasi 13.88 13.88 M3
45.00 x 0.25 x 1.00 = 11.25
7.00 x 0.38 x 1.00 = 2.63
13.88

b Urugan Pasir tbl. 5 cm 0.65 0.65 M3


52.00 x 0.25 x 0.05 = 0.65

c Pas. Lantai Kerja Beton 1:3:5 0.65 0.65 M3


52.00 x 0.25 x 0.05 = 0.65
0.65

d Pas. Pondasi Bata 1:2 42.52 42.52 M2


45.00 x 0.77 = 34.65
7.00 x 0.38 = 2.63
4.00 x 1.31 = 5.24 +
42.52

e Plesteran Pondasi Bata 1:2 42.52 x 2.00 = 85.03 85.03 85.03 M2

f Acian Pondasi bata 85.03 x 1.00 = 85.03 85.03 85.03 M2

g Pas. Beton Tumbuk 1:3:5 Tbl. 7 cm 52.00 x 1.00 x 0.07 x 1.00 = 3.64 5.76 5.76 M3
3.50 x 1.50 x 0.15 x 2.00 = 1.58
4.00 x 0.90 x 0.15 x 1.00 = 0.54
5.76

h Pas. Keramik 40x40 52.00 x 1.00 = 52.00 52.00 52.00 M2

VOLUME A. PEKERJAAN REHAB GEDUNG POLY ANAK


REKAPITULASI

KEGIATAN : REHABILITASI BANGUNAN RUMAH SAKIT


PEKERJAAN : REHABILITASI BANGSAL ANAK DAN GUDANG FARMASI
LOKASI : RSUD SOLOK SELATAN
TAHUN : 2016

JUMLAH
No URAIAN PEKLERJAAN
Rp.
1 2 3
B PEKERJAAN RUANG TUNGGU POLY ANAK
I. PEKERJAAN PONDASI 12,865,334.50
II. PEKERJAAN BETON/DINDING 15,129,392.07
III. PEKERJAAN KAP/ATAP 16,047,309.90
IV. PEKERJAAN PLAFOND 5,551,255.49
V. PEKERJAAN PLESTERAN 3,962,229.90
VI. PEKERJAAN LANTAI 5,934,538.67
VII. PEKERJAAN PENGECATAN 1,937,522.39
VIII. PEKERJAAN PERLENGKAPAN DALAM 540,000.00

JUMLAH 61,967,582.92

Padang, Maret 2016


Dibuat Oleh,
KONSULTAN PERENCANA
CV. TOTAL CITRA CONSULTANT

FRENGKY, ST
Direktur
RENCANA ANGGRAN BIAYA

KEGIATAN : REHABILITASI BANGUNAN RUMAH SAKIT


PEKERJAAN : REHABILITASI BANGSAL ANAK DAN GUDANG FARMASI
LOKASI : RSUD SOLOK SELATAN
TAHUN : 2016

HARGA JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6
B PEKERJAAN RUANG TUNGGU POLY ANAK
I PEKERJAAN PONDASI
1. Pekerjaan Permulaan
a Pembersihan Lapangan M2 41.75 13,860.00 578,655.00
b Pasangan Bouplank M' 26.70 67,331.00 1,797,737.70

2. Pekerjaan Galian Tanah


a Galian Tanah Pondasi M3 15.63 61,600.00 962,808.00
b Timbunan 1/4 Galian M3 3.91 20,533.33 80,285.33
c Pek. Urugan Pasir Bawah pondasi M3 0.87 170,104.00 147,990.48

3. Pekerjaan Pondasi
a Pas. Aanstampang Batu Kali M3 3.48 324,122.04 1,127,944.70
b Pas. Pondasi Batu Kali 1:4 M3 10.85 752,987.40 8,169,913.29
12,865,334.50
II PEKERJAAN BETON/DINDING
1. Pekerjaan Beton/Dinding
a Pas. Sloof Beton Bertulang 15/20 M3 0.66 7,176,856.70 4,736,725.42
b Pas. Kolom Beton Bertulang 13/13 M3 0.54 8,347,927.69 4,507,880.95
c Pas. Ring Balok Beton Bertulang 13/20 M3 0.47 7,711,101.80 3,624,217.85

2. Pekerjaan Dinding
a Pas. Dinding Bata 1:4 M2 16.80 134,557.61 2,260,567.85
15,129,392.07
III PEKERJAAN KAP/ATAP
1. Pekerjaan Kap/Atap
a Pas. Kuda-kuda Bajaringan C.75.75 M2 42.63 144,392.60 6,155,456.54
b Pas. Atap BJLS Warna M2 42.63 84,815.50 3,615,684.77
c Pas. Perabung Bjls Warna M' 17.85 66,396.00 1,185,168.60
d Pas. Lisplank 2/25 M' 25.00 68,640.00 1,716,000.00
e Pas. Talang Air + ACC M' 25.00 135,000.00 3,375,000.00
16,047,309.90
HARGA JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6
IV PEKERJAAN PLAFOND
1. Pekerjaan Plafond
a Pas. Rangka Plafond Hollow M2 31.61 103,015.00 3,256,304.15
b Pas. Plafond Kalsiboard T=4mm M2 31.61 50,864.00 1,607,811.04
c Pas. List Profil M' 23.30 29,491.00 687,140.30
5,551,255.49
V PEKERJAAN PLESTERAN
1. Pekerjaan Plesteran
a Plesteran dinding bata 1:4 M2 33.60 58,292.52 1,958,628.67
b Acian Bidang Dinding M2 33.60 33,352.00 1,120,627.20
c Afwerking Bidang Beton M2 12.60 70,077.30 882,974.03
3,962,229.90
VI PEKERJAAN LANTAI
1. Pekerjaan Lantai
a Urugan Tanah dipadatkan M3 3.60 174,328.00 627,580.80
b Urugan Pasir dipadatkan tbl. 10 cm M3 1.80 170,104.00 306,187.20
c Pas. Beton Tumbuk 1:3:5 Tbl. 7 cm M3 1.26 897,594.89 1,130,969.57
d Pas. Lantai Keramik 40x40 M2 18.00 214,988.95 3,869,801.10
5,934,538.67
VII PEKERJAAN PENGECATAN
1. Pekerjaan Cat Minyak
a Cat Kayu Lisplank Dan Pintu M2 6.25 49,547.30 309,670.63

2. Pekerjaan Cat Air


a Mencat dinding dengan cat air (Catylac) M2 46.20 20,312.60 938,442.12
b Mencat plafond dengan cat air (Catylac) M2 33.94 20,312.60 689,409.64
1,937,522.39
VIII PEKERJAAN PERLENGKAPAN DALAM
1. Pekerjaan Instalasi Listrik
a Pas. Instalasi titik Lampu Ttk 2.00 200,000.00 400,000.00
b Pas. Lampu Energi Saver 18 Watt Bh 2.00 70,000.00 140,000.00

540,000.00

Padang, Maret 2016


Dibuat Oleh,
KONSULTAN PERENCANA
CV. TOTAL CITRA CONSULTANT

FRENGKY, ST
Direktur
PERHITUNGAN VOLUME

KEGIATAN : REHABILITASI BANGUNAN RUMAH SAKIT


PEKERJAAN : REHABILITASI BANGSAL ANAK DAN GUDANG FARMASI
LOKASI : RSUD SOLOK SELATAN
TAHUN : 2016

B PEKERJAAN RUANG TUNGGU POLY ANAK

No. Uraian Pekerjaan Perhitungan Volume

I PEKERJAAN PONDASI
1. Pekerjaan Permulaan
a Pembersihan Lapangan 8.35 x 5.00 x 1.00 = 41.75 41.75 41.75 M2
41.75

b Pasangan Bouplank 8.35 + 8.35 + 5.00 + 5.00 = 26.70 26.70 26.70 M'

2. Pekerjaan Galian Tanah


a Galian Tanah Pondasi 15.62 15.63 M3
6.35 x 2.00 = 12.70
3.00 x 3.00 = 9.00
21.70 = 21.70

21.70 x 0.90 x 0.80 = 15.62


15.62

b Timbunan 1/4 Galian 15.62 x 0.25 = 3.91 3.91 3.91 M3

b Pek. Urugan Pasir Bawah pondasi 21.70 x 0.05 x 0.80 = 0.87 0.87 0.87 M3

3. Pekerjaan Pondasi
a Pas. Aanstampang Batu Kali 3.47 3.48 M3
21.70 x 0.20 x 0.80 = 3.47
3.47

b Pas. Pondasi Batu Kali 1:4 10.85 10.85 M3


21.70 x 0.50 x 1.00 = 10.85
10.85

II PEKERJAAN BETON/DINDING
1. Pekerjaan Beton/Dinding
a Pas. Sloof Beton Bertulang 15/20 0.65 0.66 M3
21.70 x 0.15 x 0.20 = 0.65
0.65

b Pas. Kolom Beton Bertulang 15/20 0.54 0.54 M3


6.00 x 0.15 x 0.20 x 3.00 = 0.54
0.54

f Pas. Ring Balok Beton Bertulang 13/20 0.46 0.47 M3


17.85 x 0.13 x 0.20 = 0.46
0.46

b Pas. Dinding Bata 1:4 16.80 16.80 M2


6.00 x 2.80 x 1.00 = 16.80
16.80

III PEKERJAAN KAP/ATAP


1. Pekerjaan Kap/Atap
a Pas. Kuda-kuda Bajaringan C.75.75 42.63 42.63 M2
5.38 x 2.75 x 2.00 = 29.56
0.50 x 4.75 x 2.75 x 2.00 = 13.06
42.63

VOLUME B. RUANG TUNGGU POLY ANAK


No. Uraian Pekerjaan Perhitungan Volume

b Pas. Atap BJLS Warna 42.63 42.63 M2

c Pas. Perabung Bjls Warna 3.00 + 3.71 x 4.00 = 17.85 17.85 17.85 M'

e Pas. Lisplank 2/25 7.75 x 2.00 = 15.50 25.00 25.00 M'


4.75 x 2.00 = 9.50
25.00

e Pas. Talang Air + ACC 7.75 x 2.00 = 15.50 25.00 25.00 M'
4.75 x 2.00 = 9.50
25.00

IV PEKERJAAN PLAFOND
1. Pekerjaan Plafond
a Pas. Rangka Plafond Hollow 31.61 31.61 M2
4.30 x 7.35 x 1.00 = 31.61
31.61

c Pas. Plafond Kalsiboard T=4mm 31.61 x 1.00 = 31.61 31.61 31.61 M2

d Pas. List Profil 23.30 23.30 M'


4.30 x 2.00 x 1.00 = 8.60
7.35 x 2.00 x 1.00 = 14.70
23.30

b Plesteran dinding bata 1:4 16.80 x 2.00 = 33.60 33.60 33.60 M2


33.60

c Acian Bidang Dinding 0.00 + 33.60 = 33.60 33.60 33.60 M2


33.60 - 0.00 = 33.60

VOLUME B. RUANG TUNGGU POLY ANAK


No. Uraian Pekerjaan Perhitungan Volume

d Afwerking Bidang Beton 12.60 12.60 M2


0.70 x 3.00 x 6.00 = 12.60
12.60

V PEKERJAAN LANTAI
1. Pekerjaan Lantai
a Urugan Tanah dipadatkan 3.60 3.60 M3
3.00 x 6.00 x 0.20 x 1.00 = 3.60
3.60

b Urugan Pasir dipadatkan tbl. 10 cm 1.80 1.80 M3


3.00 x 6.00 x 0.10 x 1.00 = 1.80
1.80

c Pas. Beton Tumbuk 1:3:5 Tbl. 7 cm 1.26 1.26 M3


3.00 x 6.00 x 0.07 x 1.00 = 1.26
1.26

d Pas. Lantai Keramik 40x40 18.00 18.00 M2


3.00 x 6.00 x 1.00 = 18.00
18.00

VII PEKERJAAN PENGECATAN


1. Pekerjaan Cat Minyak
d Cat Kayu Lisplank Dan Pintu 6.25 6.25 M2
Lisplank 25.00 x 0.25 x 1.00 x 1.00 = 6.25
6.25
2. Pekerjaan Cat Air
a Mencat dinding dengan cat air (Catylac) 33.60 + 12.60 = 46.20 46.20 46.20 M2

b Mencat plafond dengan cat air (Catylac) 31.61 x 1.00 + 23.30 x 0.10 = 33.94 33.94 33.94 M2

VII PEKERJAAN PERLENGKAPAN DALAM


1. Pekerjaan Instalasi Listrik
a Pas. Instalasi titik Lampu 2.00 = 2.00 2.00 2.00 Ttk
c Pas. Lampu Energi Saver 18 Watt 2.00 = 2.00 2.00 2.00 Bh

VOLUME B. RUANG TUNGGU POLY ANAK


REKAPITULASI
KEGIATAN : REHABILITASI BANGUNAN RUMAH SAKIT
PEKERJAAN : REHABILITASI BANGSAL ANAK DAN GUDANG FARMASI
LOKASI : RSUD SOLOK SELATAN
TAHUN : 2016

JUMLAH
No URAIAN PEKLERJAAN
Rp.
1 2 3
C PEKERJAAN REHAB GUDANG FARMASI
I. PEKERJAAN PONDASI 28,331,716.31
II. PEKERJAAN BETON/DINDING 74,897,272.58
III. PEKERJAAN KAP/ATAP 52,062,673.21
IV. PEKERJAAN PLAFOND 24,307,099.74
V. PEKERJAAN PLESTERAN 25,883,912.84
VI. PEKERJAAN LANTAI 27,962,815.01
VII. PEKERJAAN PINTU/JENDELA 57,429,032.05
VIII. PEKERJAAN PENGECATAN 9,087,216.99
IX PEKERJAAN PERLENGKAPAN DALAM 12,505,324.40
X PEKERJAAN PERLENGKAPAN LUAR 6,500,000.00

JUMLAH 318,967,063.11

Padang, Maret 2016


Dibuat Oleh,
KONSULTAN PERENCANA
CV. TOTAL CITRA CONSULTANT

FRENGKY, ST
Direktur
RENCANA ANGGRAN BIAYA
KEGIATAN : REHABILITASI BANGUNAN RUMAH SAKIT
PEKERJAAN : REHABILITASI BANGSAL ANAK DAN GUDANG FARMASI
LOKASI : RSUD SOLOK SELATAN
TAHUN : 2016

HARGA JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6
C PEKERJAAN REHAB GUDANG FARMASI
I PEKERJAAN PONDASI
1. Pekerjaan Permulaan
a Pek. Pembongkaran Kuda-kuda Lama+Atap Ls 1.00 1,250,000.00 1,250,000.00
b Pek. Pembongkaran Dinding Lama Ls 1.00 1,000,000.00 1,000,000.00
c Pek. Pembongkaran Foldingate Lama Ls 1.00 250,000.00 250,000.00
d Pek. Pembuangan Sisa Bongkaram Ls 1.00 1,000,000.00 1,000,000.00
e Pembersihan Lapangan M2 ### 13,860.00 1,940,400.00
f Pasangan Bouplank M' 38.00 67,331.00 2,558,578.00

2. Pekerjaan Galian Tanah


a Galian Tanah Pondasi M3 41.75 61,600.00 2,571,800.00
b Timbunan 1/4 Galian M3 10.44 20,533.33 214,368.00
b Pek. Urugan Pasir Bawah pondasi M3 2.38 170,104.00 404,847.52

3. Pekerjaan Pondasi
a Pas. Aanstampang Batu Kali M3 9.49 324,122.04 3,075,918.16
b Pas. Pondasi Batu Kali 1:4 M3 18.68 752,987.40 14,065,804.63
28,331,716.31
II PEKERJAAN BETON/DINDING
1. Pekerjaan Beton/Dinding
a Pas. Sloof Beton Bertulang 15/20 M3 1.78 7,176,856.70 12,774,804.93
b Pas. Kolom Beton Bertulang 20/20 M3 2.24 8,347,927.69 18,699,358.03
c Pas. Kolom Beton Bertulang 13/13 M3 0.16 8,347,927.69 1,335,668.43
d Pas. Balok Latei Beton Bertulang 13/20 M3 1.38 7,414,002.03 10,231,322.80
e Pas. Balok Beton Bertulang 13/25 M3 0.20 6,903,860.40 1,413,565.42
f Pek. Plat Beton M3 0.44 5,778,298.62 2,542,451.39
g Pas. Ring Balok Beton Bertulang 13/20 M3 1.43 7,711,101.80 11,026,875.57

2. Pekerjaan Dinding
a Pas. Dinding Bata 1:2 M2 19.78 144,406.46 2,856,359.78
b Pas. Dinding Bata 1:4 M2 ### 134,557.61 14,016,866.23
74,897,272.58
III PEKERJAAN KAP/ATAP
1. Pekerjaan Kap/Atap
a Pek. Konstruksi Kuda-Kuda Kayu M2 3.64 5,417,830.00 19,720,901.20
b Pas. Atap Bjls Warna M2 ### 84,815.50 23,150,390.73
c Pas. Perabung BJLS M' 46.68 66,396.00 3,099,365.28
e Pas. Lisplank 2/25 M' 66.90 68,640.00 4,592,016.00
f Pek. Singok Unit 2.00 750,000.00 1,500,000.00
52,062,673.21
HARGA JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6
IV PEKERJAAN PLAFOND
1. Pekerjaan Plafond
a Pas. Rangka Plafond Hollow M2 ### 103,015.00 13,109,688.90
Pas. Plafond Kalsiboard T=4mm
b M2 ### 50,864.00 6,472,952.64
c Pas. List Profil Gypsum M' ### 29,491.00 4,724,458.20
24,307,099.74
V PEKERJAAN PLESTERAN
1. Pekerjaan Plesteran
a Plesteran dinding bata 1:2 M2 39.55 63,215.50 2,500,173.18
b Plesteran dinding bata 1:4 M2 ### 58,292.52 12,144,080.69
c Acian Bidang Dinding M2 ### 33,352.00 7,989,471.60
d Afwerking Bidang Beton M2 23.73 70,077.30 1,662,934.42
e Pas. Dinding Keramik uk. 20x25 cm M2 8.33 190,546.57 1,587,252.94
25,883,912.84
VI PEKERJAAN LANTAI
1. Pekerjaan Lantai
a Urugan Tanah dipadatkan M3 12.60 174,328.00 2,196,532.80
b Urugan Pasir dipadatkan tbl. 10 cm M3 9.05 170,104.00 1,539,441.20
c Pas. Beton Tumbuk 1:3:5 Tbl. 7 cm M3 6.34 897,594.89 5,690,751.62
d Pas. Lantai Keramik Uk. 40 x 40 cm M2 84.00 214,988.95 18,059,071.80
e Pas. Lantai keramik Uk. 20 x 20 cm M2 2.30 207,398.95 477,017.59
27,962,815.01
VII PEKERJAAN PINTU/JENDELA
1. Pekerjaan Pintu dan Jendela
a Pas. Kusen Alluminium Hitam 4" M1 90.20 145,752.20 13,146,848.44
b Pas. Pintu Rangka Allumunium + Kaca Polos M2 7.56 1,295,147.70 9,791,316.61
c Pas. Pintu Allumunium Unit 1.00 1,150,000.00 1,150,000.00
d Pas. Jendela Alluminium + Kaca 5mm M2 9.08 1,295,147.70 11,759,941.12
e Pas. Kaca Mati 5mm M2 4.54 153,838.30 698,425.88
f Pas. Ventilasi Alluminium + Kaca 3mm M2 10.20 750,000.00 7,650,000.00
g Pas. Pintu Folding gate M2 10.00 875,000.00 8,750,000.00

2. Pekerjaan Perlengkapan
a Pas. Engsel Pintu Alluminium Bh 15.00 18,000.00 270,000.00
b Pas. Engsel Jendela & Ventilasi Alluminium Bh 50.00 23,500.00 1,175,000.00
c Pas. Grendel Jendela Alluminium Bh 50.00 19,500.00 975,000.00
d Pas. Handle Jendela Jendela Alluminium Bh 25.00 22,500.00 562,500.00
e Pas. Kait Angin Jendela Alluminium Bh 50.00 30,000.00 1,500,000.00
57,429,032.05
VIII PEKERJAAN PENGECATAN
1. Pekerjaan Cat Minyak
d Cat Kayu Lisplank Dan Pintu M2 16.73 49,547.30 828,926.33

2. Pekerjaan Cat Air


a Mencat dinding dengan cat air (Catylac) M2 ### 20,312.60 5,347,901.33
b Mencat plafond dengan cat air (Catylac) M2 ### 20,312.60 2,910,389.33
9,087,216.99
HARGA JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6
IX PEKERJAAN PERLENGKAPAN DALAM
1. Pekerjaan Instalasi Listrik
a Pas. Instalasi titik Lampu Ttk 16.00 200,000.00 3,200,000.00
b Pas. Instalasi Stop Kontak Ttk 5.00 200,000.00 1,000,000.00
c Pas. DOWN LIGHT, PL-2x11 W Bh 15.00 145,000.00 2,175,000.00
c Pas. Lampu Energi Saver 18 Watt Bh 1.00 70,000.00 70,000.00
d Pas. MCB/Zakering Unit 1.00 750,000.00 750,000.00

2. Pekerjaan Instalasi Air Bersih dan Air Kotor


a Pas. Instalasi air Bersih Ø1/2" M' 17.00 17,705.60 300,995.20
b Pas. Saluran air Kotor Ø4" M' 8.00 115,985.10 927,880.80
c Pas. Kran Air Ø3/4" Bh 1.00 35,046.00 35,046.00
d Pas. Floor Drain Bh 1.00 70,466.00 70,466.00
e Pas. Wastavel Unit 1.00 1,727,007.70 1,727,007.70

3. Pekerjaan Sanitasi
a Pas. Kloset Duduk Bh 1.00 2,098,928.70 2,098,928.70
b Pas. Ember Air Bh 1.00 150,000.00 150,000.00
12,505,324.40
X PEKERJAAN PERLENGKAPAN LUAR
1. Pekerjaan Septictank dan Resapan
a Pas. Septictank + Resapan Unt 1.00 6,500,000.00 6,500,000.00

6,500,000.00

Padang, Maret 2016


Dibuat Oleh,
KONSULTAN PERENCANA
CV. TOTAL CITRA CONSULTANT

FRENGKY, ST
Direktur
PERHITUNGAN VOLUME

KEGIATAN : REHABILITASI BANGUNAN RUMAH SAKIT


PEKERJAAN : REHABILITASI BANGSAL ANAK DAN GUDANG FARMASI
LOKASI : RSUD SOLOK SELATAN
TAHUN : 2016

C PEKERJAAN REHAB GUDANG FARMASI

No. Uraian Pekerjaan Perhitungan Volume

I PEKERJAAN PONDASI
1. Pekerjaan Permulaan
a Pembersihan Lapangan 14.00 x 10.00 = 140.00 140.00 140.00 M2
140.00

b Pasangan Bouplank 14.00 + 14.00 + 10.00 + 0.00 = 38.00 38.00 38.00 M'

2. Pekerjaan Galian Tanah


a Galian Tanah Pondasi As As 41.75 41.75 M3
2.00 7.00
12.00 7.00
10.00 3.00
12.00 1.15
5.15
36.00 + 23.30 = 59.30

59.30 x 0.88 x 0.80 = 41.75


41.75

b Timbunan 1/4 Galian 41.75 x 0.25 = 10.44 10.44 10.44 M3

b Pek. Urugan Pasir Bawah pondasi 59.30 x 0.05 x 0.80 = 2.37 2.37 2.38 M3

3. Pekerjaan Pondasi
a Pas. Aanstampang Batu Kali 9.49 9.49 M3
59.30 x 0.20 x 0.80 = 9.49
9.49

b Pas. Pondasi Batu Kali 1:4 18.68 18.68 M3


59.30 x 0.45 x 0.70 = 18.68
18.68

II PEKERJAAN BETON/DINDING
1. Pekerjaan Beton/Dinding
a Pas. Sloof Beton Bertulang 15/20 1.78 1.78 M3
59.30 x 0.15 x 0.20 = 1.78
1.78

b Pas. Kolom Beton Bertulang 20/20 2.24 2.24 M3


16.00 x 0.20 x 0.20 x 3.50 = 2.24
2.24

c Pas. Kolom Beton Bertulang 13/13 3.00 x 0.13 x 0.13 x 3.00 = 0.15 0.15 0.16 M3

e Pas. Balok Latei Beton Bertulang 13/20 1.38 1.38 M3


53.00 x 0.13 x 0.20 = 1.38
1.38

VOLUME C. REHAB GUDANG FARMASI


No. Uraian Pekerjaan Perhitungan Volume

e Pas. Balok Beton Bertulang 13/25 0.20 0.21 M3


6.30 x 0.13 x 0.25 = 0.20
0.20

e Pek. Plat Beton 0.44 0.44 M3


1.60 x 2.75 x 0.10 x 1.00 = 0.44
0.44

f Pas. Ring Balok Beton Bertulang 13/20 1.43 1.43 M3


55.00 x 0.13 x 0.20 = 1.43
1.43

2. Pekerjaan Dinding
a Pas. Dinding Bata 1:2 19.78 19.78 M2
48.30 x 0.50 x 1.00 = 24.15
(1.30) x 0.50 x 1.00 = (0.65)
(0.90) x 0.50 x 3.00 = (1.35)
(4.00) x 0.50 x 1.00 = (2.00)
(0.75) x 0.50 x 1.00 = (0.38)
19.78

b Pas. Dinding Bata 1:4 104.16 104.17 M2


48.30 x 3.00 x 1.00 = 144.90
(1.30) x 2.30 x 1.00 = (2.99)
(0.90) x 2.30 x 3.00 = (6.21)
(4.00) x 2.00 x 1.00 = (8.00)
(0.75) x 1.55 x 1.00 = (1.16)
(0.70) x 2.00 x 2.00 = (2.80)
(1.35) x 2.00 x 2.00 = (5.40)
(1.35) x 2.00 x 3.00 = (8.10)
(2.00) x 2.00 x 1.00 = (4.00)
(1.35) x 0.50 x 1.00 = (0.68)
(2.00) x 0.70 x 1.00 = (1.40)
104.16

III PEKERJAAN KAP/ATAP


1. Pekerjaan Kap/Atap
a Pek. Konstruksi Kuda-Kuda Kayu 3.63 3.64 M2
Kuda-kuda K1 33.18 x 0.06 x 0.12 x 6.00 = 1.43
7.40 x 0.05 x 0.10 x 6.00 = 0.22
Kuda-kuda K2 19.22 x 0.06 x 0.12 x 2.00 = 0.28
Bubungan 12.14 x 0.06 x 0.12 x 2.00 = 0.17
Skor Angin 6.60 x 0.05 x 0.10 x 5.00 = 0.17
Gording 12.50 x 0.05 x 0.10 x 16.00 = 1.00
Gording 4.50 x 0.05 x 0.10 x 16.00 = 0.36
3.63

VOLUME C. REHAB GUDANG FARMASI


No. Uraian Pekerjaan Perhitungan Volume

b Pas. Atap Bjls Warna 21.15 x 5.30 x 2.00 x 1.00 = 224.19 272.95 272.95 M2
0.50 x 5.30 x 9.20 x 2.00 = 48.76
272.95

c Pas. Perabung BJLS 18.06 + 7.16 x 4.00 = 46.68 46.68 46.68 M'

e Pas. Lisplank 2/25 9.20 x 2.00 = 18.40 66.90 66.90 M'


24.25 x 2.00 = 48.50
66.90

IV PEKERJAAN PLAFOND
1. Pekerjaan Plafond
a Pas. Rangka Plafond Hollow 127.26 127.26 M2
8.80 x 14.20 x 1.00 = 124.96
1.15 x 2.00 x 1.00 = 2.30
127.26

Pas. Plafond Kalsiboard T=4mm


c 127.26 x 1.00 = 127.26 127.26 127.26 M2

d Pas. List Profil Gypsum 160.20 160.20 M'


7.00 x 7.00 x 1.00 = 49.00
14.20 x 6.00 x 1.00 = 85.20
13.00 x 2.00 x 1.00 = 26.00
160.20

IV PEKERJAAN PLESTERAN
1. Pekerjaan Plesteran
a Plesteran dinding bata 1:2 19.78 x 2.00 = 39.55 39.55 39.55 M2

b Plesteran dinding bata 1:4 104.16 x 2.00 = 208.33 208.33 208.33 M2


208.33

c Acian Bidang Dinding 39.55 + 208.33 = 247.88 239.55 239.55 M2


247.88 - 8.33 = 239.55

d Afwerking Bidang Beton 23.73 23.73 M2


Kolom 20/20 0.35 x 16.00 x 3.50 = 19.60
Plat 1.50 x 2.75 x 1.00 = 4.13
23.73

e Pas. Dinding Keramik uk. 20x25 cm 8.33 8.33 M2


6.30 x 1.50 x 1.00 = 9.45
Pintu (0.75) x 1.50 x 1.00 = (1.13)
8.33

VOLUME C. REHAB GUDANG FARMASI


No. Uraian Pekerjaan Perhitungan Volume

V PEKERJAAN LANTAI
1. Pekerjaan Lantai
a Urugan Tanah dipadatkan 12.60 12.60 M3
12.00 x 7.00 x 0.15 x 1.00 = 12.60
12.60

b Urugan Pasir dipadatkan tbl. 10 cm 9.05 9.05 M3


12.00 x 7.00 x 0.10 x 1.00 = 8.40
1.20 x 5.40 x 0.10 x 1.00 = 0.65
9.05

c Pas. Beton Tumbuk 1:3:5 Tbl. 7 cm 6.33 6.34 M3


12.00 x 7.00 x 0.07 x 1.00 = 5.88
1.20 x 5.40 x 0.07 x 1.00 = 0.45
6.33

d Pas. Lantai Keramik Uk. 40 x 40 cm 84.00 84.00 M2


12.00 x 7.00 x 1.00 = 84.00
84.00

e Pas. Lantai keramik Uk. 20 x 20 cm 2.30 2.30 M2


KM/WC 1.15 x 2.00 x 1.00 = 2.30
2.30

VI PEKERJAAN PINTU/JENDELA
1. Pekerjaan Pintu dan Jendela
a Pas. Kusen Alluminium Hitam 4" 90.20 90.20 M1
P1 8.80 x 1.00 x 1.00 = 8.80
P2 7.40 x 3.00 x 1.00 = 22.20
P2 5.30 x 1.00 x 1.00 = 5.30
J1 6.10 x 2.00 x 1.00 = 12.20
J2 10.05 x 2.00 x 1.00 = 20.10
J4 14.00 x 1.00 x 1.00 = 14.00
V1 4.20 x 1.00 x 1.00 = 4.20
V2 3.40 x 1.00 x 1.00 = 3.40
90.20

b Pas. Pintu Rangka Allumunium + Kaca Polos 5 Mm 7.56 7.56 Unit


P1 1.20 x 2.10 x 1.00 = 2.52
P2 0.80 x 2.10 x 3.00 = 5.04
7.56

c Pas. Pintu Allumunium P3 1.00 1.00 Unit

d Pas. Jendela Alluminium + Kaca 5mm 9.07 9.08 Bh


J1 0.60 x 1.26 x 2.00 1.51
J2 1.20 x 1.26 x 2.00 3.02
J3 0.00 x 0.00 x 0.00 0.00
J4 1.80 x 1.26 x 2.00 4.54
9.07

d Pas. Kaca Mati 5mm 4.54 4.54 Bh


J3 0.60 x 1.26 x 2.00 x 3.00 4.54
4.54

VOLUME C. REHAB GUDANG FARMASI


No. Uraian Pekerjaan Perhitungan Volume

e Pas. Ventilasi Alluminium + Kaca 3mm 10.20 10.20 Bh


P1 1.20 x 0.60 x 1.00 = 0.72
P2 0.80 x 0.60 x 3.00 = 1.44
J1 0.60 x 0.60 x 2.00 = 0.72
J2 1.20 x 0.60 x 2.00 = 1.44
J3 1.20 x 0.60 x 3.00 = 2.16
J4 1.80 x 0.60 x 2.00 = 2.16
V1 1.20 x 0.40 x 1.00 = 0.48
V2 1.80 x 0.60 x 1.00 = 1.08 +
10.20

2. Pekerjaan Perlengkapan
a Pas. Engsel Pintu Alluminium 5.00 x 3.00 = 15.00 15.00 15.00 Bh
b Pas. Engsel Jendela & Ventilasi Alluminium 25.00 x 2.00 = 50.00 50.00 50.00 Bh
c Pas. Grendel Jendela Alluminium 25.00 x 2.00 = 50.00 50.00 50.00 Bh
d Pas. Handle Jendela Jendela Alluminium 25.00 x 1.00 = 25.00 25.00 25.00 Bh
e Pas. Kait Angin Jendela Alluminium 25.00 x 2.00 = 50.00 50.00 50.00 Bh

VII PEKERJAAN PENGECATAN


1. Pekerjaan Cat Minyak
d Cat Kayu Lisplank Dan Pintu 16.73 16.73 M2
Lisplank 66.90 x 0.25 x 1.00 x 1.00 = 16.73
16.73
2. Pekerjaan Cat Air
a Mencat dinding dengan cat air (Catylac) 239.55 + 23.73 = 263.28 263.28 263.28 M2

b Mencat plafond dengan cat air (Catylac) 127.26 x 1.00 + 160.20 x 0.10 = 143.28 143.28 143.28 M2

VII PEKERJAAN PERLENGKAPAN DALAM


1. Pekerjaan Instalasi Listrik
a Pas. Instalasi titik Lampu 16.00 = 16.00 16.00 16.00 Ttk
b Pas. Instalasi Stop Kontak 5.00 = 5.00 5.00 5.00 Ttk
c Pas. DOWN LIGHT, PL-2x11 W 15.00 = 15.00 15.00 15.00 Bh
c Pas. Lampu Energi Saver 18 Watt 1.00 = 1.00 1.00 1.00 Bh
d Pas. MCB/Zakering 1.00 1.00 Unit

2. Pekerjaan Instalasi Air Bersih dan Air Kotor


a Pas. Instalasi air Bersih Ø1/2" 5.00 + 12.00 17.00 17.00 M'
b Pas. Saluran air Kotor Ø4" 7.00 + 1.00 = 8.00 8.00 8.00 M'
c Pas. Kran Air Ø3/4" 1.00 1.00 Bh
d Pas. Floor Drain 1.00 1.00 Bh
e Pas. Wastavel 1.00 1.00 Unit

3. Pekerjaan Sanitasi
a Pas. Kloset Duduk 1.00 1.00 Bh
b Pas. Ember Air 1.00 1.00 Bh

VII PEKERJAAN PERLENGKAPAN LUAR


1. Pekerjaan Septictank dan Resapan
a Pas. Septictank + Resapan 1.00 1.00 Unt

VOLUME C. REHAB GUDANG FARMASI


DAFTAR HARGA SATUAN UPAH, BAHAN & PEKERJAAN

KEGIATAN : REHABILITASI BANGUNAN RUMAH SAKIT


PEKERJAAN : REHABILITASI BANGSAL ANAK DAN GUDANG FARMASI
LOKASI : RSUD SOLOK SELATAN

HARGA
NO U R A I A N SATUAN SATUAN KETERANGAN
( Rp. )
I. SATUAN UPAH
1 Mandor Hari Rp 110,000.00
2 Kepala Tukang Hari Rp 110,000.00
3 Tukang Kayu Hari Rp 95,000.00
4 Tukang Batu Hari Rp 95,000.00
5 Tukang Besi Hari Rp 95,000.00
6 Tukang Cat Hari Rp 95,000.00
7 Pekerja Hari Rp 71,000.00

III. SATUAN BAHAN


1 Batu kali M3 Rp 121,700.00
2 Pasir Beton/Pasir Pasang M3 Rp 235,700.00
3 Kerikil Beton M3 Rp 235,700.00
4 Tanah Timbunan M3 Rp 113,400.00
5 Pasir Timbun/Urug M3 Rp 110,200.00
6 Kerikil Timbun/Sirtu M3 Rp 156,521.00
7 Semen Padang ( 50 Kg ) Kg Rp 1,360.00 Rp 68,000.00
8 Tepung Apha AA Kg Rp 11,200.00
9 Batu Bata (5 x 11 x 22) SNI Kelas I Bh Rp 900.00
10 Kayu banio (papan) Klas I M3 Rp 3,800,000.00
11 Kayu banio (balok) Klas I M3 Rp 3,550,000.00
12 Kayu Marsawa (Papan) Klas II M3 Rp 2,900,000.00
13 Kayu Marsawa (Balok) Klas II M3 Rp 2,710,000.00
14 Kayu Merantih (Papan) Klas III M3 Rp 2,700,000.00
15 Kayu Merantih (Balok) Klas III M3 Rp 3,100,000.00
16 Kayu untuk perancah kayu klas III M3 Rp 2,750,000.00
17 Kayu Bekesting (Papan) Klas IV M3 Rp 1,950,000.00
18 Kayu Bekesting (Balok) Klas IV M3 Rp 1,918,800.00
19 Dolken Ø-8 cm - 3 m Btg Rp 35,000.00
20 List Profil (3 x 3,5 x 400) M' Rp 4,250.00
21 Besi Beton /KS Kg Rp 10,800.00
22 Kawat Bindrad/Kawat Beton Kg Rp 20,000.00
23 Paku Kg Rp 33,000.00
24 Paku Seng Kg Rp 22,000.00
25 Besi Strip Kg Rp 12,100.00
26 Triplek uk. 120 x 240 Tebal 4 mm Lbr Rp 57,000.00
27 Plywood tebal 9 mm Lbr Rp 117,800.00
28 Lambersering M1 Rp 17,000.00
29 Gipsum Board tebal 9 mm Lbr Rp 72,000.00
30 Cat Tembok (Dulux Catylac) Kg Rp 23,800.00
31 Aqua Proof Kg Rp 54,000.00
32 Cat Minyak/Cat Warna (Platone) Kg Rp 45,000.00
33 Cat Dasar Kg Rp 23,000.00
34 Menie kayu Kg Rp 21,500.00
35 Menie Besi Kg Rp 32,700.00
36 Plamur tembok Kg Rp 18,000.00
37 Plamur kayu Kg Rp 27,600.00
37 Dompul Kg Rp 18,000.00
38 Residu kayu Ltr Rp 27,600.00
39 Sabun cuci Kg Rp 15,000.00
40 Kuas Bh Rp 14,800.00
41 Soda api Kg Rp 64,300.00
HARGA
NO U R A I A N SATUAN SATUAN KETERANGAN
( Rp. )
42 Amplas Lbr Rp 3,600.00
43 Minyak Cat Ltr Rp 11,000.00
44 Keramik Lantai 60 x 60 cm Bh Rp 29,600.00
45 Keramik Lantai 40 x 40 cm Bh Rp 10,000.00
46 Keramik Lantai 30 x 30 cm Bh Rp 7,150.00
47 Keramik Lantai uk. 20x20 cm Bh Rp 2,200.00
48 Keramik Dinding uk. 20x25 cm Bh Rp 3,250.00
49 Keramik Dinding uk. 20x40 cm Bh Rp 8,900.00
50 Genteng Metal (multi roof Lbr Rp 95,000.00
51 Seng Bjls 20 (Warna) Bandar 11 Lbr Rp 81,500.00
52 Seng Bjls 20 (Polos) Bandar 11 Lbr Rp 43,000.00
53 Seng Plat 020 Lbr Rp 43,000.00
54 Seng Plat 030 Lbr Rp 81,500.00
55 Profil Alluminium Hitam 4" M1 Rp 110,000.00
56 Karet Kaca M1 Rp 8,000.00
57 Engsel Jendela Alluminium Bh Rp 13,500.00
58 Tarikan Jendela Allluminium Bh Rp 12,500.00
59 Grendel Jendela Allluminium Bh Rp 9,500.00
60 Kait Angin Jendela Allluminium Bh Rp 20,000.00
61 Kaca polos tebal 5 mm M2 Rp 110,000.00
62 Kaca polos tebal 3 mm M2 Rp 100,000.00
63 Sealen (Lem Silicont) Tube Rp 36,000.00
64 Les kaca (1 x 3x400) M' Rp 2,125.00
65 Lem kayu Kg Rp 17,100.00
66 Engsel Pintu 4" Kuningan Bh Rp 11,000.00
67 Engsel Jendela 3" Kuningan Bh Rp 8,800.00
68 Kunci Tanam Antik SES Bh Rp 260,000.00
69 Hak Angin Kuningan (antik) 6" Bh Rp 4,400.00
70 Grendel Jendela 3" Bh Rp 9,500.00
71 Tarikan Jendela Bh Rp 4,100.00
72 Sekrup Kg Rp 24,000.00
73 Air Liter Rp 18.00
74 Minyak Bekisting Liter Rp 12,000.00
75 Closet Jongkok setara KIA Bh Rp 275,000.00
76 Closet duduk setara Toto Bh Rp 2,200,000.00
77 Wastavel Komplit setara KIA Bh Rp 1,250,000.00
78 Bak Fiber uk. 65x65 cm Bh Rp 270,000.00
79 Bak Cuci Piring Bh Rp 240,300.00
80 Floor Drain setara Toto Bh Rp 52,200.00
81 Pipa PVC Vinilon AW Ø1/2" M' Rp 5,800.00
82 Pipa PVC Vinilon AW Ø3/4" M' Rp 8,200.00
83 Pipa PVC Vinilon AW Ø1" M' Rp 9,900.00
84 Pipa PVC Vinilon AW Ø1.5" M' Rp 15,700.00
85 Pipa PVC Vinilon AW Ø2" M' Rp 19,800.00
86 Pipa PVC Vinilon AW Ø2.5" M' Rp 26,400.00
87 Pipa PVC Vinilon AW Ø3" M' Rp 35,200.00
88 Pipa PVC Vinilon AW Ø4" M' Rp 54,800.00
89 Kran air Ø3/4" Bh Rp 20,000.00
90 Seal Tape Bh Rp 3,500.00
91 Kawat Las Listrik Kg Rp 87,500.00
92 Solar Ltr Rp 8,450.00
93 Minyak pelumas/Oli Ltr Rp 37,440.00
94 Wallpaper M2 Rp 18,000.00

Padang, Maret 2016


Dibuat Oleh,
KONSULTAN PERENCANA
CV. TOTAL CITRA CONSULTANT

FRENGKY, ST
Direktur
DAFTAR HARGA SATUAN PEKERJAAN

KEGIATAN : REHABILITASI BANGUNAN RUMAH SAKIT

PEKERJAAN : REHABILITASI BANGSAL ANAK DAN GUDANG FARMASI


LOKASI : RSUD SOLOK SELATAN

HARGA
NO URAIAN PEKERJAAN STN SATUAN
( Rp )
1 2 3 4
A HARGA SATUAN PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank/M1" M' Rp 67,331.00
2 Pembersihan Lapangan dan Perataan /M2 M2 Rp 13,860.00

B HARGA SATUAN PEKERJAAN TANAH


1 Penggalian 1M3 Tanah Biasa Sedalam 1M M3 Rp 61,600.00
2 Pengurugan Kembali 1 M3 Galian Tanah M3 Rp 20,533.33
3 Pengurugan 1 M3 Dengan Pasir Urug M3 Rp 170,104.00
4 Pengurugan 1 M3 Dengan Tanah Urug M3 Rp 174,328.00
5 Pengurugan 1 M3 Dengan Sirtu Padat M3 Rp 229,157.72

C HARGA SATUAN PEKERJAAN PONDASI


1 Pemasangan 1 M3 Pondasi Batu Kali Camp, 1PC : 4 Pasir Pasang M3 Rp 752,987.40
2 Pemasangan 1 M3 Pondasi Batu Kosong (Aanstampang) M3 Rp 324,122.04

D HARGA SATUAN PEKERJAAN BETON


1 Membuat beton mutu f3c = 7,4 Mpa (K 100), slump (12 ± 2) Cm, w/c 0,87 M3 Rp 897,594.89
2 Membuat Lantai kerja beton mutu f3c = 16,9 Mpa (K 175), slump (12 ± 2) Cm, M3 Rp 1,008,678.87
3 Pembesian 1 Kg dengan Besi Polos atau Besi Ulir Kg Rp 14,215.30
4 Pemasangan 1 m2 bekisting untuk sloof M2 Rp 181,264.60
5 Pemasangan 1 m2 bekisting untuk kolom M2 Rp 349,617.40
6 Pemasangan 1 m2 bekisting untuk balok M2 Rp 355,949.44
7 Pemasangan Beton Sloof 15/20 M3 Rp 7,176,856.70
8 Pemasangan Beton Kolom 20 x 20 M3 Rp 8,347,927.69
9 Pemasangan Beton Kolom 25 x 50 M3 Rp 7,491,458.23
10 Pemasangan Beton Kolom 15 x 20 M3 Rp 9,395,780.09
11 Pemasangan Beton Balok Latei 13/20 M3 Rp 7,414,002.03
12 Pemasangan Beton Ring Balok 13 x 20 M3 Rp 7,711,101.80

E HARGA SATUAN PEKERJAAN DINDING


1 Pemasangan 1 M2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp 1PC : 2 Pasir Pasang M2 Rp 144,406.46
2 Pemasangan 1 M2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp 1PC : 4 Pasir Pasang M2 Rp 134,557.61

F HARGA SATUAN PEKERJAAN PLESTERAN


1 Pemasangan 1 M2 Plesteran 1PC : 2 Pasir Pasang tebal 15 mm M2 Rp 63,215.50
2 Pemasangan 1 M2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm M2 Rp 58,292.52
3 Pemasangan 1 M2 Acian M2 Rp 33,352.00
4 Pemasangan 1 M2 Afwerking Beton M2 Rp 70,077.30

G HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 Pemasangan 1 m2 Lantai Keramik 60x60 M2 Rp 242,994.95
2 Pemasangan 1 m2 Lantai keramik ukuran 40 Cm x 40 Cm M2 Rp 214,988.95
3 Pemasangan 1 m2 dinding keramik M2 Rp 190,546.57
4 Pas. Wallpaper M2 Rp 96,244.50

H HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


1 Pemasangan 1 m2 langit-langit Kalsiboard T=4mm M2 Rp 50,864.00
2 Pemasangan List Profil Gypsum 9 mm / M' M1 Rp 29,491.00

I HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 Analisa Memasang Kuda-kuda SMARTRUSS/M2 M2 Rp 144,392.60
2 Pemasangan 1 m2 atap BJLS Warna M2 Rp 84,815.50
3 Pemasangan 1 m' Nok Atap M1 Rp 66,396.00
4 Pemasangan 1 m' Talang Miring seng plat bjls 30 M1 Rp 173,461.75
HARGA
NO URAIAN PEKERJAAN STN SATUAN
( Rp )
1 2 3 4

K HARGA SATUAN PEKERJAAN KAYU


1 Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, Kayu Klas II M2 Rp 6,245,085.00
2 Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas II M2 Rp 683,490.50
3 Pemasangan 1 m2 jendela rangka kayu + Kaca 3 mm, kayu kelas II M2 Rp 492,954.00
4 Pemasangan 1 m2 jalusi kusen, kayu kelas II M2 Rp 520,283.50
5 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kls II M3 Rp 5,417,830.00
6 Pemasangan 1 m3 konstruksi gording, kayu kelas II M3 Rp 4,629,130.00
7 Pemasangan 1 m2 rangka langit-langit (60 x 60) Cm, kayu kelas II atau III M2 Rp 110,192.50
8 Pemasangan 1 m' lisplank ukuran (2 x 25) Cm, kayu kelas I atau kelas II M1 Rp 68,640.00

L HARGA SATUAN PEKERJAAN PENGGANTUNG, PENGUNCI DAN KACA


1 Pemasangan 1 buah kunci tanam Bh Rp 361,009.00
2 Pemasangan 1 buah engsel pintu 4" Bh Rp 30,858.30
3 Pemasangan 1 buah engsel jendela 3" Bh Rp 22,181.50
4 Pemasangan 1 buah grendel pintu Bh Rp 30,412.25
5 Pemasangan 1 buah Hak angin Bh Rp 24,469.50
6 Pemasangan 1 buah tarikan jendela Bh Rp 24,139.50
7 Pemasangan 1 buah grendel jendela Bh Rp 30,079.50
8 Pemasangan 1 m2 kaca tebal 3 mm M2 Rp 141,738.30
9 Pemasangan 1 m2 kaca tebal 5 mm M2 Rp 153,838.30

M HARGA SATUAN PEKERJAAN PENGECATAN


1 Pengecatan bidang kayu lama (1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) M2 Rp 35,302.30
2 Pengecatan bidang kayu baru (1lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) M2 Rp 49,547.30
3 Peleburan 1 m2 bidang kayu dengan cat residu dan ter M2 Rp 19,162.00
4 Menie kayu M2 Rp 16,813.50
5 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat penutup) M2 Rp 20,312.60
6 Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) M2 Rp 15,195.40

O HARGA SATUAN PEKERJAAN SANITASI


1 Pemasangan 1 buah Closet Jongkok Bh Rp 586,428.70
2 Pemasangan 1 buah Closet Duduk Bh Rp 2,499,658.70
3 Pemasangan 1 buah floor drain Bh Rp 70,466.00
4 Pemasangan 1 m' pipa PVC tipe AW diameter 1/2" M1 Rp 17,705.60
5 Pemasangan 1 m' pipa PVC tipe AW diameter 3/4" M1 Rp 20,873.60
6 Pemasangan 1 m' pipa PVC tipe AW diameter 2" M1 Rp 41,210.40
7 Pemasangan 1 m' pipa PVC tipe AW diameter 2½" M1 Rp 57,399.10
8 Pemasangan 1 m' pipa PVC tipe AW diameter 3" M1 Rp 82,567.10
9 Pemasangan 1 m' pipa PVC tipe AW diameter 4" M1 Rp 115,985.10
10 Pemasangan 1 Buah Kran Air Bh Rp 35,046.00

Padang, Maret 2016


Dibuat Oleh,
KONSULTAN PERENCANA
CV. TOTAL CITRA CONSULTANT

FRENGKY, ST
Direktur
ANALISA HARGA SATUAN PEKERJAAN BIDANG CIPTA KARYA

HARGA SATUAN PEKERJAAN PERSIAPAN

JENIS PEKERJAAN : Pengukuran dan Pemasangan Bouwplank/M1"


SATUAN : M'
HARGA SATUAN PEKERJAAN : Rp 67,331.00

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.100 71,000.00 7,100.00
Tukang Kayu L.02 OH 0.100 95,000.00 9,500.00
Kepala tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.005 110,000.00 550.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Kayu balok 5/7 m3 0.012 1,950,000.00 23,400.00
Paku biasa 2" - 5" Kg 0.020 33,000.00 660.00
Kayu papan 3/20 m3 0.007 2,700,000.00 18,900.00
JUMLAH HARGA BAHAN 42,960.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 61,210.00
E Overhead & profit 10% x Jumlah 6,121.00
F Harga Satuan Pekerjaan (D+E) 67,331.00

JENIS PEKERJAAN : Pembersihan Lapangan dan Perataan /M2


SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 13,860.00

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.100 71,000.00 7,100.00
Mandor L.04 OH 0.050 110,000.00 5,500.00
JUMLAH TENAGA KERJA 12,600.00
B JUMLAH (A) 12,600.00
C Overhead & profit 10% x Jumlah 1,260.00
D Harga Satuan Pekerjaan (B+C) 13,860.00

HARGA SATUAN PEKERJAAN TANAH

JENIS PEKERJAAN : Penggalian 1M3 Tanah Biasa Sedalam 1M


SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 61,600.00

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.750 71,000.00 53,250.00
Mandor L.04 OH 0.025 110,000.00 2,750.00
JUMLAH TENAGA KERJA 56,000.00
B JUMLAH (A) 56,000.00
C Overhead & profit 10% x Jumlah 5,600.00
D Harga Satuan Pekerjaan (B+C) 61,600.00
JENIS PEKERJAAN : Pengurugan Kembali 1 M3 Galian Tanah
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 20,533.33

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.250 71,000.00 17,750.00
Mandor L.04 OH 0.008 110,000.00 916.67
JUMLAH TENAGA KERJA 18,666.67
B JUMLAH (A) 18,666.67
C Overhead & profit 10% x Jumlah 1,866.67
D Harga Satuan Pekerjaan (B+C) 20,533.33

JENIS PEKERJAAN : Pengurugan 1 M3 Dengan Pasir Urug


SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 170,104.00

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.300 71,000.00 21,300.00
Mandor L.04 OH 0.010 110,000.00 1,100.00
JUMLAH TENAGA KERJA 22,400.00
B BAHAN
Pasir urug m3 1.200 110,200.00 132,240.00
JUMLAH HARGA BAHAN 132,240.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 154,640.00
E Overhead & profit 10% x Jumlah 15,464.00
F Harga Satuan Pekerjaan (D+E) 170,104.00

JENIS PEKERJAAN : Pengurugan 1 M3 Dengan Tanah Urug


SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 174,328.00

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.300 71,000.00 21,300.00
Mandor L.04 OH 0.010 110,000.00 1,100.00
JUMLAH TENAGA KERJA 22,400.00
B BAHAN
Pasir urug m3 1.200 113,400.00 136,080.00
JUMLAH HARGA BAHAN 136,080.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 158,480.00
E Overhead & profit 10% x Jumlah 15,848.00
F Harga Satuan Pekerjaan (D+E) 174,328.00
JENIS PEKERJAAN : Pengurugan 1 M3 Dengan Sirtu Padat
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 229,157.72

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.250 71,000.00 17,750.00
Mandor L.04 OH 0.025 110,000.00 2,750.00
JUMLAH TENAGA KERJA 20,500.00
B BAHAN
Sirtu m3 1.200 156,521.00 187,825.20
JUMLAH HARGA BAHAN 187,825.20
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 208,325.20
E Overhead & profit 10% x Jumlah 20,832.52
F Harga Satuan Pekerjaan (D+E) 229,157.72

JENIS PEKERJAAN : Pemasangan 1 M3 Pondasi Batu Kali Camp, 1PC : 4 Pasir Pasang
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 752,987.40

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 1.500 71,000.00 106,500.00
Tukang L.02 OH 0.750 95,000.00 71,250.00
Kepala tukang L.03 OH 0.075 110,000.00 8,250.00
Mandor L.04 OH 0.075 110,000.00 8,250.00
JUMLAH TENAGA KERJA 194,250.00
B BAHAN
Batu Kali m3 1.200 121,700.00 146,040.00
Semen Portland Kg 163.000 1,360.00 221,680.00
Pasir Pasang m3 0.520 235,700.00 122,564.00
JUMLAH HARGA BAHAN 490,284.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 684,534.00
E Overhead & profit 10% x Jumlah 68,453.40
F Harga Satuan Pekerjaan (D+E) 752,987.40

JENIS PEKERJAAN : Pemasangan 1 M3 Pondasi Batu Kosong (Aanstampang)


SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 324,122.04

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.780 71,000.00 55,380.00
Tukang Batu L.02 OH 0.390 95,000.00 37,050.00
Kepala tukang L.03 OH 0.039 110,000.00 4,290.00
Mandor L.04 OH 0.039 110,000.00 4,290.00
JUMLAH TENAGA KERJA 101,010.00
B BAHAN
Batu Kali m3 1.200 121,700.00 146,040.00
Pasir urug m3 0.432 110,200.00 47,606.40
JUMLAH HARGA BAHAN 193,646.40
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 294,656.40
E Overhead & profit 10% x Jumlah 29,465.64
F Harga Satuan Pekerjaan (D+E) 324,122.04
HARGA SATUAN PEKERJAAN BETON

JENIS PEKERJAAN : Membuat beton mutu f3c = 7,4 Mpa (K 100), slump (12 ± 2) Cm, w/c 0,87
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 897,594.89

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 1.650 71,000.00 117,150.00
Tukang Batu L.02 OH 0.275 95,000.00 26,125.00
Kepala tukang L.03 OH 0.028 110,000.00 3,080.00
Mandor L.04 OH 0.083 110,000.00 9,130.00
JUMLAH TENAGA KERJA 155,485.00
B BAHAN
Semen Portland Kg 247.000 1,360.00 335,920.00
Pasir beton Kg 869 168.36 146,302.36
Kerikil (Maks 30 mm) Kg 999 174.59 174,418.00
Air Liter 215 18.00 3,870.00
JUMLAH HARGA BAHAN 660,510.36
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 815,995.36
E Overhead & profit 10% x Jumlah 81,599.54
F Harga Satuan Pekerjaan (D+E) 897,594.89

JENIS PEKERJAAN : Membuat Lantai kerja beton mutu f3c = 16,9 Mpa (K 175), slump (12 ± 2) Cm,
w/c 0,61
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 1,008,678.87

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 1.650 71,000.00 117,150.00
Tukang Batu L.02 OH 0.275 95,000.00 26,125.00
Kepala tukang L.03 OH 0.028 110,000.00 3,080.00
Mandor L.04 OH 0.083 110,000.00 9,130.00
JUMLAH TENAGA KERJA 155,485.00
B BAHAN
Semen Portland Kg 326.000 1,360.00 443,360.00
Pasir beton Kg 760 168.36 127,961.53
Kerikil (Maks 30 mm) Kg 1067 174.59 186,304.26
Air Liter 215 18.00 3,870.00
JUMLAH HARGA BAHAN 761,495.79
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 916,980.79
E Overhead & profit 10% x Jumlah 91,698.08
F Harga Satuan Pekerjaan (D+E) 1,008,678.87
JENIS PEKERJAAN : Pembesian 1 Kg dengan Besi Polos atau Besi Ulir
SATUAN : Kg
HARGA SATUAN : Rp 14,215.30

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.007 71,000.00 497.00
Tukang L.02 OH 0.007 95,000.00 665.00
Kepala tukang L.03 OH 0.0007 110,000.00 77.00
Mandor L.04 OH 0.0004 110,000.00 44.00
JUMLAH TENAGA KERJA 1,283.00
B BAHAN
Besi beton (polos/ulir) Kg 1.050 10,800.00 11,340.00
Kawat beton Kg 0.015 20,000.00 300.00
JUMLAH HARGA BAHAN 11,640.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 12,923.00
E Overhead & profit 10% x Jumlah 1,292.30
F Harga Satuan Pekerjaan (D+E) 14,215.30

JENIS PEKERJAAN : Pemasangan 1 m2 bekisting untuk sloof


SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 181,264.60

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.520 71,000.00 36,920.00
Tukang L.02 OH 0.260 95,000.00 24,700.00
Kepala tukang L.03 OH 0.026 110,000.00 2,860.00
Mandor L.04 OH 0.026 110,000.00 2,860.00
JUMLAH TENAGA KERJA 67,340.00
B BAHAN
Kayu kelas III m3 0.045 1,918,800.00 86,346.00
Paku 5 - 10 Cm Kg 0.300 33,000.00 9,900.00
Minyak bekisting Liter 0.100 12,000.00 1,200.00
JUMLAH HARGA BAHAN 97,446.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 164,786.00
E Overhead & profit 10% x Jumlah 16,478.60
F Harga Satuan Pekerjaan (D+E) 181,264.60
JENIS PEKERJAAN : Pemasangan 1 m2 bekisting untuk kolom
SATUAN : M2
HARGA SATUAN PEKERJAAN : Rp 349,617.40

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.660 71,000.00 46,860.00
Tukang L.02 OH 0.330 95,000.00 31,350.00
Kepala tukang L.03 OH 0.033 110,000.00 3,630.00
Mandor L.04 OH 0.033 110,000.00 3,630.00
JUMLAH TENAGA KERJA 85,470.00
B BAHAN
Kayu kelas III m3 0.040 1,918,800.00 76,752.00
Paku 5 - 10 Cm Kg 0.400 33,000.00 13,200.00
Minyak bekisting Liter 0.200 12,000.00 2,400.00
Balok kayu kelas II m3 0.015 1,918,800.00 28,782.00
Plywod tebal 9 mm Lbr 0.350 117,800.00 41,230.00
Dolken kayu φ 8-10 Cm Batang 2.000 35,000.00 70,000.00
JUMLAH HARGA BAHAN 232,364.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 317,834.00
E Overhead & profit 10% x Jumlah 31,783.40
F Harga Satuan Pekerjaan (D+E) 349,617.40

JENIS PEKERJAAN : Pemasangan 1 m2 bekisting untuk balok


SATUAN : M2
HARGA SATUAN : Rp 355,949.44

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.660 71,000.00 46,860.00
Tukang L.02 OH 0.330 95,000.00 31,350.00
Kepala tukang L.03 OH 0.033 110,000.00 3,630.00
Mandor L.04 OH 0.033 110,000.00 3,630.00
JUMLAH TENAGA KERJA 85,470.00
B BAHAN
Kayu kelas III m3 0.040 1,918,800.00 76,752.00
Paku 5 - 10 Cm Kg 0.400 33,000.00 13,200.00
Minyak bekisting Liter 0.200 12,000.00 2,400.00
Balok kayu kelas II m3 0.018 1,918,800.00 34,538.40
Plywod tebal 9 mm Lbr 0.350 117,800.00 41,230.00
Dolken kayu φ 8-10 Cm Batang 2.000 35,000.00 70,000.00
JUMLAH HARGA BAHAN 238,120.40
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 323,590.40
E Overhead & profit 10% x Jumlah 32,359.04
F Harga Satuan Pekerjaan (D+E) 355,949.44

JENIS PEKERJAAN : Pemasangan Beton Sloof 15/20


SATUAN : M3
HARGA SATUAN : Rp 7,176,856.70

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A BAHAN DAN UPAH


Beton K175 M3 1.000 1,008,678.87 1,008,678.87
Cetak /Bekesting Sloof M2 13.333 181,264.60 2,416,800.91
Pembesian Kg 218.000 14,215.30 3,098,935.40
JUMLAH HARGA BAHAN + UPAH 6,524,415.18
B PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 6,524,415.18
E Overhead & profit 10% x Jumlah 652,441.52
F Harga Satuan Pekerjaan (D+E) 7,176,856.70
JENIS PEKERJAAN : Pemasangan Beton Kolom 20 x 20
SATUAN : M3
HARGA SATUAN : Rp 8,347,927.69

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A BAHAN DAN UPAH


Beton K175 M3 1.000 1,008,678.87 1,008,678.87
Cetak /Bekesting kolom M2 22.500 181,264.60 4,078,453.50
Pembesian Kg 176.000 14,215.30 2,501,892.80
JUMLAH HARGA BAHAN + UPAH 7,589,025.17
B PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 7,589,025.17
E Overhead & profit 10% x Jumlah 758,902.52
F Harga Satuan Pekerjaan (D+E) 8,347,927.69

JENIS PEKERJAAN : Pemasangan Beton Kolom 25 x 50


SATUAN : M3
HARGA SATUAN : Rp 7,491,458.23

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A BAHAN DAN UPAH


Beton K175 M3 1.000 1,008,678.87 1,008,678.87
Cetak /Bekesting kolom M2 12.000 349,617.40 4,195,408.80
Pembesian Kg 113.000 14,215.30 1,606,328.90
JUMLAH HARGA BAHAN + UPAH 6,810,416.57
B PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 6,810,416.57
E Overhead & profit 10% x Jumlah 681,041.66
F Harga Satuan Pekerjaan (D+E) 7,491,458.23

JENIS PEKERJAAN : Pemasangan Beton Kolom 15 x 20


SATUAN : M3
HARGA SATUAN : Rp 9,395,780.09

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A BAHAN DAN UPAH


Beton K175 M3 1.000 1,008,678.87 1,008,678.87
Cetak /Bekesting kolom M2 13.333 349,617.40 4,661,448.79
Pembesian Kg 202.000 14,215.30 2,871,490.60
JUMLAH HARGA BAHAN + UPAH 8,541,618.27
B PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 8,541,618.27
E Overhead & profit 10% x Jumlah 854,161.83
F Harga Satuan Pekerjaan (D+E) 9,395,780.09
JENIS PEKERJAAN : Pemasangan Beton Balok Latei 13/20
SATUAN : M3
HARGA SATUAN : Rp 7,414,002.03

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A BAHAN DAN UPAH


Beton K175 M3 1.000 1,008,678.87 1,008,678.87
Cetak /Bekesting kolom M2 15.385 181,264.60 2,788,755.87
Pembesian Kg 207.000 14,215.30 2,942,567.10
JUMLAH HARGA BAHAN + UPAH 6,740,001.84
B PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 6,740,001.84
E Overhead & profit 10% x Jumlah 674,000.18
F Harga Satuan Pekerjaan (D+E) 7,414,002.03

JENIS PEKERJAAN : Pemasangan Beton Balok Latei 13/25


SATUAN : M3
HARGA SATUAN : Rp 6,903,860.40

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A BAHAN DAN UPAH


Beton K175 M3 1.000 1,008,678.87 1,008,678.87
Cetak /Bekesting kolom M2 13.846 181,264.60 2,509,789.65
Pembesian Kg 194.000 14,215.30 2,757,768.20
JUMLAH HARGA BAHAN + UPAH 6,276,236.72
B PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 6,276,236.72
E Overhead & profit 10% x Jumlah 627,623.67
F Harga Satuan Pekerjaan (D+E) 6,903,860.40

JENIS PEKERJAAN : Pemasangan Plat Beton


SATUAN : M3
HARGA SATUAN : Rp 5,778,298.62

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A BAHAN DAN UPAH


Beton K175 M3 1.000 1,008,678.87 1,008,678.87
Cetak /Bekesting kolom M2 10.000 349,617.40 3,496,174.00
Pembesian Kg 52.630 14,215.30 748,145.87
JUMLAH HARGA BAHAN + UPAH 5,252,998.74
B PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 5,252,998.74
E Overhead & profit 10% x Jumlah 525,299.87
F Harga Satuan Pekerjaan (D+E) 5,778,298.62
JENIS PEKERJAAN : Pemasangan Beton Ring Balok 13 x 20
SATUAN : M3
HARGA SATUAN : Rp 7,711,101.80

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A BAHAN DAN UPAH


Beton K175 M3 1.000 1,008,678.87 1,008,678.87
Cetak /Bekesting kolom M2 15.385 181,264.60 2,788,755.87
Pembesian Kg 226.000 14,215.30 3,212,657.80
JUMLAH HARGA BAHAN + UPAH 7,010,092.54
B PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 7,010,092.54
E Overhead & profit 10% x Jumlah 701,009.25
F Harga Satuan Pekerjaan (D+E) 7,711,101.80

HARGA SATUAN PEKERJAAN DINDING

JENIS PEKERJAAN : Pemasangan 1 M2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp,
1PC : 2 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 144,406.46

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.300 71,000.00 21,300.00
Tukang L.02 OH 0.100 95,000.00 9,500.00
Kepala tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 33,550.00
B BAHAN
Bata Merah m3 70.000 900.00 63,000.00
Semen Portland Kg 18.950 1,360.00 25,772.00
Pasir Pasang m3 0.038 235,700.00 8,956.60
JUMLAH HARGA BAHAN 97,728.60
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 131,278.60
E Overhead & profit 10% x Jumlah 13,127.86
F Harga Satuan Pekerjaan (D+E) 144,406.46

JENIS PEKERJAAN : Pemasangan 1 M2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp,
1PC : 4 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 134,557.61

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.300 71,000.00 21,300.00
Tukang L.02 OH 0.100 95,000.00 9,500.00
Kepala tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 33,550.00
B BAHAN
Bata Merah m3 70.000 900.00 63,000.00
Semen Portland Kg 11.500 1,360.00 15,640.00
Pasir Pasang m3 0.043 235,700.00 10,135.10
JUMLAH HARGA BAHAN 88,775.10
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 122,325.10
E Overhead & profit 10% x Jumlah 12,232.51
F Harga Satuan Pekerjaan (D+E) 134,557.61
HARGA SATUAN PEKERJAAN PLESTERAN

JENIS PEKERJAAN : Pemasangan 1 M2 Plesteran 1PC : 2 Pasir Pasang tebal 15 mm


SATUAN : M2
HARGA SATUAN : Rp 63,215.50

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.300 71,000.00 21,300.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 38,850.00
B BAHAN
Semen Portland Kg 10.224 1,360.00 13,904.64
Pasir Pasang m3 0.020 235,700.00 4,714.00
JUMLAH HARGA BAHAN 18,618.64
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 57,468.64
E Overhead & profit 10% x Jumlah 5,746.86
F Harga Satuan Pekerjaan (D+E) 63,215.50

JENIS PEKERJAAN : Pemasangan 1 M2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm


SATUAN : M2
HARGA SATUAN : Rp 58,292.52

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.300 71,000.00 21,300.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 38,850.00
B BAHAN
Semen Portland Kg 6.240 1,360.00 8,486.40
Pasir Pasang m3 0.024 235,700.00 5,656.80
JUMLAH HARGA BAHAN 14,143.20
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 52,993.20
E Overhead & profit 10% x Jumlah 5,299.32
F Harga Satuan Pekerjaan (D+E) 58,292.52

JENIS PEKERJAAN : Pemasangan 1 M2 Acian


SATUAN : M2
HARGA SATUAN : Rp 33,352.00

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.200 71,000.00 14,200.00
Tukang L.02 OH 0.100 95,000.00 9,500.00
Kepala tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.010 110,000.00 1,100.00
JUMLAH TENAGA KERJA 25,900.00
B BAHAN
Semen Portland Kg 3.250 1,360.00 4,420.00
JUMLAH HARGA BAHAN 4,420.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 30,320.00
E Overhead & profit 10% x Jumlah 3,032.00
F Harga Satuan Pekerjaan (D+E) 33,352.00
JENIS PEKERJAAN : Pemasangan 1 M2 Afwerking Beton
SATUAN : M2
HARGA SATUAN : Rp 70,077.30

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.300 71,000.00 21,300.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 38,850.00
B BAHAN
Semen Portland Kg 15.504 1,360.00 21,085.44
Pasir Pasangan M3 0.016 235,700.00 3,771.20
JUMLAH HARGA BAHAN 24,856.64
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 63,706.64
E Overhead & profit 10% x Jumlah 6,370.66
F Harga Satuan Pekerjaan (D+E) 70,077.30

HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

JENIS PEKERJAAN : Pemasangan 1 m2 Lantai Keramik 60x60


SATUAN : M2
HARGA SATUAN : Rp 242,994.95

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.700 71,000.00 49,700.00
Tukang L.02 OH 0.350 95,000.00 33,250.00
Kepala tukang L.03 OH 0.035 110,000.00 3,850.00
Mandor L.04 OH 0.035 110,000.00 3,850.00
JUMLAH TENAGA KERJA 90,650.00
B BAHAN
keramik ukuran 60 Cm x 60 Cm Bh 3.10 29,600.00 91,760.00
Semen Portland Kg 9.80 1,360.00 13,328.00
Pasir Pasang m3 0.045 235,700.00 10,606.50
Semen warna Kg 1.300 11,200.00 14,560.00
JUMLAH HARGA BAHAN 130,254.50
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 220,904.50
E Overhead & profit 10% x Jumlah 22,090.45
F Harga Satuan Pekerjaan (D+E) 242,994.95
JENIS PEKERJAAN : Pemasangan 1 m2 Lantai keramik ukuran 40 Cm x 40 Cm
SATUAN : M2
HARGA SATUAN : Rp 214,988.95

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.700 71,000.00 49,700.00
Tukang L.02 OH 0.350 95,000.00 33,250.00
Kepala tukang L.03 OH 0.035 110,000.00 3,850.00
Mandor L.04 OH 0.035 110,000.00 3,850.00
JUMLAH TENAGA KERJA 90,650.00
B BAHAN
keramik ukuran 40 Cm x 40 Cm Bh 6.63 10,000.00 66,300.00
Semen Portland Kg 9.80 1,360.00 13,328.00
Pasir Pasang m3 0.045 235,700.00 10,606.50
Semen warna Kg 1.300 11,200.00 14,560.00
JUMLAH HARGA BAHAN 104,794.50
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 195,444.50
E Overhead & profit 10% x Jumlah 19,544.45
F Harga Satuan Pekerjaan (D+E) 214,988.95

JENIS PEKERJAAN : Pemasangan 1 m2 dinding keramik


SATUAN : M2
HARGA SATUAN : Rp 190,546.57

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.900 71,000.00 63,900.00
Tukang L.02 OH 0.450 95,000.00 42,750.00
Kepala tukang L.03 OH 0.045 110,000.00 4,950.00
Mandor L.04 OH 0.045 110,000.00 4,950.00
JUMLAH TENAGA KERJA 116,550.00
B BAHAN
Keramik Dinding Bh 5.56 3,250.00 18,055.56
Semen Portland Kg 9.30 1,360.00 12,648.00
Pasir Pasang m3 0.018 235,700.00 4,242.60
Semen warna Kg 1.940 11,200.00 21,728.00
JUMLAH HARGA BAHAN 56,674.16
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 173,224.16
E Overhead & profit 10% x Jumlah 17,322.42
F Harga Satuan Pekerjaan (D+E) 190,546.57
HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

JENIS PEKERJAAN : Pemasangan 1 m2 langit-langit Kalsiboard T=4mm


SATUAN : M2
HARGA SATUAN : Rp 50,864

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.100 71,000.00 7,100.00
Tukang L.02 OH 0.100 95,000.00 9,500.00
Kepala tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.005 110,000.00 550.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Kalsiboard T=4mm Lembar 0.375 72,000.00 27,000.00
Paku triplek Kg 0.030 33,000.00 990.00
JUMLAH HARGA BAHAN 27,990.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 46,240.00
E Overhead & profit 10% x Jumlah 4,624.00
F Harga Satuan Pekerjaan (D+E) 50,864.00

JENIS PEKERJAAN : Pemasangan 1 m2 Penutup Dinding Kalsiboard T=9mm


SATUAN : M2
HARGA SATUAN : Rp 165,981

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.200 71,000.00 14,200.00
Tukang L.02 OH 0.200 95,000.00 19,000.00
Kepala tukang L.03 OH 0.020 110,000.00 2,200.00
Mandor L.04 OH 0.010 110,000.00 1,100.00
JUMLAH TENAGA KERJA 36,500.00
B BAHAN
Kalsiboard T=4mm Lembar 0.788 145,000.00 114,187.50
Paku triplek Kg 0.063 3,250.00 204.75
JUMLAH HARGA BAHAN 114,392.25
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 150,892.25
E Overhead & profit 10% x Jumlah 15,089.23
F Harga Satuan Pekerjaan (D+E) 165,981.48
JENIS PEKERJAAN : Pemasangan List Profil Gypsum 9 mm / M'
SATUAN : M1
HARGA SATUAN : Rp 29,491

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.050 71,000.00 3,550.00
Tukang L.02 OH 0.050 95,000.00 4,750.00
Kepala tukang L.03 OH 0.005 110,000.00 550.00
Mandor L.04 OH 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 9,180.00
B BAHAN
List Profil M' 1.000 14,000.00 14,000.00
Paku Sekrup Kg 0.110 33,000.00 3,630.00
JUMLAH HARGA BAHAN 17,630.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 26,810.00
E Overhead & profit 10% x Jumlah 2,681.00
F Harga Satuan Pekerjaan (D+E) 29,491.00

JENIS PEKERJAAN : Pas. Wallpaper


SATUAN : M2
HARGA SATUAN : Rp 96,245

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.350 71,000.00 24,850.00
Tukang L.02 OH 0.175 95,000.00 16,625.00
Kepala tukang L.03 OH 0.018 110,000.00 1,925.00
Mandor L.04 OH 0.002 110,000.00 220.00
JUMLAH TENAGA KERJA 43,620.00
B BAHAN
Wallpaper M2 2.200 18,000.00 39,600.00
Lem Kg 0.250 17,100.00 4,275.00
JUMLAH HARGA BAHAN 43,875.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 87,495.00
E Overhead & profit 10% x Jumlah 8,749.50
F Harga Satuan Pekerjaan (D+E) 96,244.50

HARGA SATUAN PEKERJAAN PENUTUP ATAP

JENIS PEKERJAAN : Pemasangan 1 m2 atap BJLS Warna


SATUAN : M2
HARGA SATUAN : Rp 84,816

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.120 71,000.00 8,520.00
Tukang L.02 OH 0.060 95,000.00 5,700.00
Kepala tukang L.03 OH 0.006 110,000.00 660.00
Mandor L.04 OH 0.006 110,000.00 660.00
JUMLAH TENAGA KERJA 15,540.00
B BAHAN
Atap BJLS WARNA Lbr 0.75 81,500.00 61,125.00
Paku Atap Kg 0.02 22,000.00 440.00
JUMLAH HARGA BAHAN 61,565.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 77,105.00
E Overhead & profit 10% x Jumlah 7,710.50
F Harga Satuan Pekerjaan (D+E) 84,815.50
JENIS PEKERJAAN : Pemasangan 1 m' Nok Atap
SATUAN : M'
HARGA SATUAN : Rp 66,396

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.150 71,000.00 10,650.00
Tukang L.02 OH 0.070 95,000.00 6,650.00
Kepala tukang L.03 OH 0.007 110,000.00 770.00
Mandor L.04 OH 0.006 110,000.00 660.00
JUMLAH TENAGA KERJA 18,730.00
B BAHAN
Seng Plat 030 Lbr 0.50 81,500.00 40,750.00
Paku biasa 1/2" - 1" Kg 0.04 22,000.00 880.00
JUMLAH HARGA BAHAN 41,630.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 60,360.00
E Overhead & profit 10% x Jumlah 6,036.00
F Harga Satuan Pekerjaan (D+E) 66,396.00

JENIS PEKERJAAN : Pemasangan 1 m' Talang Miring seng plat bjls 30


SATUAN : M'
HARGA SATUAN : Rp 173,462

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.150 71,000.00 10,650.00
Tukang L.02 OH 0.400 95,000.00 38,000.00
Kepala tukang L.03 OH 0.025 110,000.00 2,750.00
Mandor L.04 OH 0.001 110,000.00 137.50
JUMLAH TENAGA KERJA 51,537.50
B BAHAN
Seng Plat BJLS 30 Lbr 0.50 81,500.00 40,750.00
Paku biasa Kg 0.02 33,000.00 495.00
Kayu papan klas II M3 0.02 2,900,000.00 55,100.00
Meni besi Kg 0.30 32,700.00 9,810.00
JUMLAH HARGA BAHAN 106,155.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 157,692.50
E Overhead & profit 10% x Jumlah 15,769.25
F Harga Satuan Pekerjaan (D+E) 173,461.75
HARGA SATUAN PEKERJAAN KAYU

JENIS PEKERJAAN : Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela,
kayu kelas II
SATUAN : M3
HARGA SATUAN : Rp 6,245,085

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 6.000 71,000.00 426,000.00
Tukang L.02 OH 18.000 95,000.00 1,710,000.00
Kepala tukang L.03 OH 1.800 110,000.00 198,000.00
Mandor L.04 OH 0.300 110,000.00 33,000.00
JUMLAH TENAGA KERJA 2,367,000.00
B BAHAN
Balok kayu m3 1.200 2,710,000.00 3,252,000.00
Paku 10 Cm Kg 1.250 33,000.00 41,250.00
Lem kayu Kg 1.000 17,100.00 17,100.00
JUMLAH HARGA BAHAN 3,310,350.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 5,677,350.00
E Overhead & profit 10% x Jumlah 567,735.00
F Harga Satuan Pekerjaan (D+E) 6,245,085.00

JENIS PEKERJAAN : Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas II
SATUAN : M2
HARGA SATUAN : Rp 683,491

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 1.000 71,000.00 71,000.00
Tukang L.02 OH 3.000 95,000.00 285,000.00
Kepala tukang L.03 OH 0.300 110,000.00 33,000.00
Mandor L.04 OH 0.050 110,000.00 5,500.00
JUMLAH TENAGA KERJA 394,500.00
B BAHAN
Papan kayu m3 0.040 2,900,000.00 116,000.00
Kaca 5mm M2 1.000 110,000.00 110,000.00
Lem kayu Kg 0.050 17,100.00 855.00
JUMLAH HARGA BAHAN 226,855.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 621,355.00
E Overhead & profit 10% x Jumlah 62,135.50
F Harga Satuan Pekerjaan (D+E) 683,490.50

JENIS PEKERJAAN : Pemasangan 1 m2 jendela rangka kayu + Kaca 3 mm, kayu kelas II
SATUAN : M2
HARGA SATUAN : Rp 492,954

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.800 71,000.00 56,800.00
Tukang L.02 OH 2.000 95,000.00 190,000.00
Kepala tukang L.03 OH 0.200 110,000.00 22,000.00
Mandor L.04 OH 0.040 110,000.00 4,400.00
JUMLAH TENAGA KERJA 273,200.00
B BAHAN
Papan kayu m3 0.024 2,710,000.00 65,040.00
Paku 1 Cm - 2,5 Cm Kg 0.300 33,000.00 9,900.00
Kaca tebal 3 mm M2 1.000 100,000.00 100,000.00
JUMLAH HARGA BAHAN 174,940.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 448,140.00
E Overhead & profit 10% x Jumlah 44,814.00
F Harga Satuan Pekerjaan (D+E) 492,954.00
JENIS PEKERJAAN : Pemasangan 1 m2 jalusi kusen, kayu kelas II
SATUAN : M2
HARGA SATUAN : Rp 520,284

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.670 71,000.00 47,570.00
Tukang L.02 OH 2.000 95,000.00 190,000.00
Kepala tukang L.03 OH 0.200 110,000.00 22,000.00
Mandor L.04 OH 0.335 110,000.00 36,850.00
JUMLAH TENAGA KERJA 296,420.00
B BAHAN
Papan kayu m3 0.060 2,900,000.00 174,000.00
Paku 1 Cm - 2,5 Cm Kg 0.150 17,100.00 2,565.00
JUMLAH HARGA BAHAN 176,565.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 472,985.00
E Overhead & profit 10% x Jumlah 47,298.50
F Harga Satuan Pekerjaan (D+E) 520,283.50

JENIS PEKERJAAN : Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kls II


SATUAN : M3
HARGA SATUAN : Rp 5,417,830

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 4.000 71,000.00 284,000.00
Tukang L.02 OH 12.000 95,000.00 1,140,000.00
Kepala tukang L.03 OH 1.200 110,000.00 132,000.00
Mandor L.04 OH 0.200 110,000.00 22,000.00
JUMLAH TENAGA KERJA 1,578,000.00
B BAHAN
Balok kayu m3 1.100 2,710,000.00 2,981,000.00
Besi strip tebal 5 mm Kg 15.000 12,100.00 181,500.00
Paku 12 Cm Kg 5.600 33,000.00 184,800.00
JUMLAH HARGA BAHAN 3,347,300.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 4,925,300.00
E Overhead & profit 10% x Jumlah 492,530.00
F Harga Satuan Pekerjaan (D+E) 5,417,830.00

JENIS PEKERJAAN : Pemasangan 1 m3 konstruksi gording, kayu kelas II


SATUAN : M3
HARGA SATUAN : Rp 4,629,130

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 2.400 71,000.00 170,400.00
Tukang L.02 OH 7.200 95,000.00 684,000.00
Kepala tukang L.03 OH 0.720 110,000.00 79,200.00
Mandor L.04 OH 0.120 110,000.00 13,200.00
JUMLAH TENAGA KERJA 946,800.00
B BAHAN
Balok kayu m3 1.100 2,710,000.00 2,981,000.00
Besi strip tebal 5 mm Kg 15.000 12,100.00 181,500.00
Paku 12 Cm Kg 3.000 33,000.00 99,000.00
JUMLAH HARGA BAHAN 3,261,500.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 4,208,300.00
E Overhead & profit 10% x Jumlah 420,830.00
F Harga Satuan Pekerjaan (D+E) 4,629,130.00
JENIS PEKERJAAN : Pemasangan 1 m2 rangka langit-langit (60 x 60) Cm, kayu kelas II atau III
SATUAN : M2
HARGA SATUAN : Rp 110,193

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.200 71,000.00 14,200.00
Tukang L.02 OH 0.300 95,000.00 28,500.00
Kepala tukang L.03 OH 0.030 110,000.00 3,300.00
Mandor L.04 OH 0.010 110,000.00 1,100.00
JUMLAH TENAGA KERJA 47,100.00
B BAHAN
Kaso-kaso 5 x 7 Cm m3 0.0163 2,750,000.00 44,825.00
Paku 7 dan 10 Cm Kg 0.2500 33,000.00 8,250.00
JUMLAH HARGA BAHAN 53,075.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 100,175.00
E Overhead & profit 10% x Jumlah 10,017.50
F Harga Satuan Pekerjaan (D+E) 110,192.50

JENIS PEKERJAAN : Pemasangan 1 m2 rangka Plafond Hollow


SATUAN : M2
HARGA SATUAN : Rp 103,015

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.150 71,000.00 10,650.00
Tukang L.02 OH 0.250 95,000.00 23,750.00
Kepala tukang L.03 OH 0.025 110,000.00 2,750.00
Mandor L.04 OH 0.075 110,000.00 8,250.00
JUMLAH TENAGA KERJA 45,400.00
B BAHAN
Hollow M1 5.000 8,500.00 42,500.00
Pengantung M1 0.500 8,500.00 4,250.00
Alat Bantu Ls 1.000 1,500.00 1,500.00
JUMLAH HARGA BAHAN 48,250.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 93,650.00
E Overhead & profit 10% x Jumlah 9,365.00
F Harga Satuan Pekerjaan (D+E) 103,015.00

JENIS PEKERJAAN : Pemasangan 1 m2 rangka Dinding Kanal 75


SATUAN : M2
HARGA SATUAN : Rp 121,990

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.150 71,000.00 10,650.00
Tukang L.02 OH 0.250 95,000.00 23,750.00
Kepala tukang L.03 OH 0.025 110,000.00 2,750.00
Mandor L.04 OH 0.075 110,000.00 8,250.00
JUMLAH TENAGA KERJA 45,400.00
B BAHAN
Kanal M1 4.000 16,000.00 64,000.00
Alat Bantu Ls 1.000 1,500.00 1,500.00
JUMLAH HARGA BAHAN 65,500.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 110,900.00
E Overhead & profit 10% x Jumlah 11,090.00
F Harga Satuan Pekerjaan (D+E) 121,990.00
JENIS PEKERJAAN : Pemasangan 1 m' lisplank ukuran (2 x 25) Cm, kayu kelas I atau kelas II
SATUAN : M'
HARGA SATUAN : Rp 68,640

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.100 71,000.00 7,100.00
Tukang L.02 OH 0.200 95,000.00 19,000.00
Kepala tukang L.03 OH 0.020 110,000.00 2,200.00
Mandor L.04 OH 0.005 110,000.00 550.00
JUMLAH TENAGA KERJA 28,850.00
B BAHAN
Papan kayu m3 0.0110 2,900,000.00 31,900.00
Paku 5 dan 10 Cm Kg 0.050 33,000.00 1,650.00
JUMLAH HARGA BAHAN 33,550.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 62,400.00
E Overhead & profit 10% x Jumlah 6,240.00
F Harga Satuan Pekerjaan (D+E) 68,640.00

HARGA SATUAN PEKERJAAN PENGGANTUNG, PENGUNCI DAN KACA

JENIS PEKERJAAN : Pemasangan 1 M' Kusen Alluminium 4"


SATUAN : M'
HARGA SATUAN : Rp 145,752

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.0430 71,000.00 3,053.00
Tukang L.02 OH 0.0430 95,000.00 4,085.00
Kepala tukang L.03 OH 0.0043 110,000.00 473.00
Mandor L.04 OH 0.0021 110,000.00 231.00
JUMLAH TENAGA KERJA 7,842.00
B BAHAN
Profil alluminium M' 1.1000 110,000.00 121,000.00
Skrup fixer Bh 2.0000 750.00 1,500.00
Lem Silikon Tube 0.0600 36,000.00 2,160.00
JUMLAH HARGA BAHAN 124,660.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 132,502.00
E Overhead & profit 10% x Jumlah 13,250.20
F Harga Satuan Pekerjaan (D+E) 145,752.20
JENIS PEKERJAAN : Pemasangan 1 M' Kusen Alluminium 4"
SATUAN : M'
HARGA SATUAN : Rp 1,295,148

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.0850 71,000.00 6,035.00
Tukang L.02 OH 0.0850 95,000.00 8,075.00
Kepala tukang L.03 OH 0.0085 110,000.00 935.00
Mandor L.04 OH 0.0042 110,000.00 462.00
JUMLAH TENAGA KERJA 15,507.00
B BAHAN
Profil aluminium 4" M' 4.4000 110,000.00 484,000.00
Profil kaca M' 4.5000 125,000.00 562,500.00
Kaca 5mm M2 1.0000 110,000.00 110,000.00
Sealant Tube 0.2700 20,000.00 5,400.00
JUMLAH HARGA BAHAN 1,161,900.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 1,177,407.00
E Overhead & profit 10% x Jumlah 117,740.70
F Harga Satuan Pekerjaan (D+E) 1,295,147.70

JENIS PEKERJAAN : Pemasangan 1 buah kunci tanam


SATUAN : Bh
HARGA SATUAN : Rp 361,009

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.06 71,000.00 4,260.00
Tukang L.02 OH 0.60 95,000.00 57,000.00
Kepala tukang L.03 OH 0.06 110,000.00 6,600.00
Mandor L.04 OH 0.00 110,000.00 330.00
JUMLAH TENAGA KERJA 68,190.00
B BAHAN
Kunci Tanam SES set 1.000 260,000.00 260,000.00
JUMLAH HARGA BAHAN 260,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 328,190.00
E Overhead & profit 10% x Jumlah 32,819.00
F Harga Satuan Pekerjaan (D+E) 361,009.00

JENIS PEKERJAAN : Pemasangan 1 buah engsel pintu 4"


SATUAN : Bh
HARGA SATUAN : Rp 30,858

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.015 71,000.00 1,065.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.0008 110,000.00 88.00
JUMLAH TENAGA KERJA 17,053.00
B BAHAN
Engsel pintu Bh 1.000 11,000.00 11,000.00
JUMLAH HARGA BAHAN 11,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 28,053.00
E Overhead & profit 10% x Jumlah 2,805.30
F Harga Satuan Pekerjaan (D+E) 30,858.30
JENIS PEKERJAAN : Pemasangan 1 buah engsel jendela 3"
SATUAN : Bh
HARGA SATUAN : Rp 22,182

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.01 71,000.00 710.00
Tukang L.02 OH 0.10 95,000.00 9,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.00 110,000.00 55.00
JUMLAH TENAGA KERJA 11,365.00
B BAHAN
Engsel Bh 1.000 8,800.00 8,800.00
JUMLAH HARGA BAHAN 8,800.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 20,165.00
E Overhead & profit 10% x Jumlah 2,016.50
F Harga Satuan Pekerjaan (D+E) 22,181.50

JENIS PEKERJAAN : Pemasangan 1 buah grendel pintu


SATUAN : Bh
HARGA SATUAN : Rp 30,412

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.015 71,000.00 1,065.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.001 110,000.00 82.50
JUMLAH TENAGA KERJA 17,047.50
B BAHAN
Grendel Bh 1.000 10,600.00 10,600.00
JUMLAH HARGA BAHAN 10,600.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 27,647.50
E Overhead & profit 10% x Jumlah 2,764.75
F Harga Satuan Pekerjaan (D+E) 30,412.25

JENIS PEKERJAAN : Pemasangan 1 buah Hak angin


SATUAN : Bh
HARGA SATUAN : Rp 24,470

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.015 71,000.00 1,065.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.008 110,000.00 880.00
JUMLAH TENAGA KERJA 17,845.00
B BAHAN
Kait angin Bh 1.000 4,400.00 4,400.00
JUMLAH HARGA BAHAN 4,400.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 22,245.00
E Overhead & profit 10% x Jumlah 2,224.50
F Harga Satuan Pekerjaan (D+E) 24,469.50
JENIS PEKERJAAN : Pemasangan 1 buah tarikan jendela
SATUAN : Bh
HARGA SATUAN : Rp 24,140

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.015 71,000.00 1,065.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.008 110,000.00 880.00
JUMLAH TENAGA KERJA 17,845.00
B BAHAN
Tarikan jendela Bh 1.000 4,100.00 4,100.00
JUMLAH HARGA BAHAN 4,100.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 21,945.00
E Overhead & profit 10% x Jumlah 2,194.50
F Harga Satuan Pekerjaan (D+E) 24,139.50

JENIS PEKERJAAN : Pemasangan 1 buah grendel jendela


SATUAN : Bh
HARGA SATUAN : Rp 30,080

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.015 71,000.00 1,065.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.008 110,000.00 880.00
JUMLAH TENAGA KERJA 17,845.00
B BAHAN
Grendel Jendela Bh 1.000 9,500.00 9,500.00
JUMLAH HARGA BAHAN 9,500.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 27,345.00
E Overhead & profit 10% x Jumlah 2,734.50
F Harga Satuan Pekerjaan (D+E) 30,079.50
JENIS PEKERJAAN : Pemasangan 1 m2 kaca tebal 3 mm
SATUAN : M2
HARGA SATUAN : Rp 141,738

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.015 71,000.00 1,065.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.0008 110,000.00 88.00
JUMLAH TENAGA KERJA 17,053.00
B BAHAN
Kaca tebal 3 mm m2 1.100 100,000.00 110,000.00
Sealant Kg 0.050 36,000.00 1,800.00
JUMLAH HARGA BAHAN 111,800.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 128,853.00
E Overhead & profit 10% x Jumlah 12,885.30
F Harga Satuan Pekerjaan (D+E) 141,738.30

JENIS PEKERJAAN : Pemasangan 1 m2 kaca tebal 5 mm


SATUAN : M2
HARGA SATUAN : Rp 153,838

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.015 71,000.00 1,065.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.0008 110,000.00 88.00
JUMLAH TENAGA KERJA 17,053.00
B BAHAN
Kaca tebal 5 mm m2 1.100 110,000.00 121,000.00
Sealant Kg 0.050 36,000.00 1,800.00
JUMLAH HARGA BAHAN 122,800.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 139,853.00
E Overhead & profit 10% x Jumlah 13,985.30
F Harga Satuan Pekerjaan (D+E) 153,838.30
HARGA SATUAN PEKERJAAN PENGECATAN

JENIS PEKERJAAN : Pengecatan bidang kayu lama (1lapis plamuur, 1 lapis cat dasar,
2 lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp 35,302

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.070 71,000.00 4,970.00
Tukang L.02 OH 0.009 95,000.00 855.00
Kepala tukang L.03 OH 0.006 110,000.00 660.00
Mandor L.04 OH 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 6,815.00
B BAHAN
Cat menie Kg 0.200 21,500.00 4,300.00
Plamuur Kg 0.150 27,600.00 4,140.00
Cat dasar Kg 0.170 23,000.00 3,910.00
Cat penutup Kg 0.260 45,000.00 11,700.00
Kuas Bh 0.010 14,800.00 148.00
Pengencer ltr 0.030 12,000.00 360.00
Ampelas Lbr 0.200 3,600.00 720.00
JUMLAH HARGA BAHAN 25,278.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 32,093.00
E Overhead & profit 10% x Jumlah 3,209.30
F Harga Satuan Pekerjaan (D+E) 35,302.30

JENIS PEKERJAAN : Pengecatan bidang kayu baru (1lapis plamuur, 1 lapis cat dasar,
3 lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp 49,547

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.070 71,000.00 4,970.00
Tukang L.02 OH 0.105 95,000.00 9,975.00
Kepala tukang L.03 OH 0.004 110,000.00 440.00
Mandor L.04 OH 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 15,715.00
B BAHAN
Cat menie Kg 0.200 21,500.00 4,300.00
Plamuur Kg 0.150 27,600.00 4,140.00
Cat dasar Kg 0.170 23,000.00 3,910.00
Cat penutup Kg 0.350 45,000.00 15,750.00
Kuas Bh 0.010 14,800.00 148.00
Pengencer Kg 0.030 12,000.00 360.00
Ampelas Lbr 0.200 3,600.00 720.00
JUMLAH HARGA BAHAN 29,328.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 45,043.00
E Overhead & profit 10% x Jumlah 4,504.30
F Harga Satuan Pekerjaan (D+E) 49,547.30
JENIS PEKERJAAN : Peleburan 1 m2 bidang kayu dengan cat residu dan ter
SATUAN : M2
HARGA SATUAN : Rp 19,162

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.100 71,000.00 7,100.00
Mandor L.04 OH 0.006 110,000.00 660.00
JUMLAH TENAGA KERJA 7,760.00
B BAHAN
Residu atau ter L 0.350 27,600.00 9,660.00
JUMLAH HARGA BAHAN 9,660.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 17,420.00
E Overhead & profit 10% x Jumlah 1,742.00
F Harga Satuan Pekerjaan (D+E) 19,162.00

JENIS PEKERJAAN : Menie kayu


SATUAN : M2
HARGA SATUAN : Rp 16,814

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.100 71,000.00 7,100.00
Mandor L.04 OH 0.006 110,000.00 660.00
JUMLAH TENAGA KERJA 7,760.00
B BAHAN
Residu atau ter L 0.350 21,500.00 7,525.00
JUMLAH HARGA BAHAN 7,525.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 15,285.00
E Overhead & profit 10% x Jumlah 1,528.50
F Harga Satuan Pekerjaan (D+E) 16,813.50

JENIS PEKERJAAN : Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp 20,313

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.020 71,000.00 1,420.00
Tukang L.02 OH 0.063 95,000.00 5,985.00
Kepala tukang L.03 OH 0.006 110,000.00 693.00
Mandor L.04 OH 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 8,428.00
B BAHAN
Plamuur Kg 0.150 18,000.00 2,700.00
Cat dasar Kg 0.050 23,000.00 1,150.00
Cat penutup Kg 0.260 23,800.00 6,188.00
JUMLAH HARGA BAHAN 10,038.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 18,466.00
E Overhead & profit 10% x Jumlah 1,846.60
F Harga Satuan Pekerjaan (D+E) 20,312.60
JENIS PEKERJAAN : Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp 15,195

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.028 71,000.00 1,988.00
Tukang L.02 OH 0.042 95,000.00 3,990.00
Kepala tukang L.03 OH 0.004 110,000.00 462.00
Mandor L.04 OH 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 6,770.00
B BAHAN
Cat dasar Kg 0.120 23,000.00 2,760.00
Cat penutup Kg 0.180 23,800.00 4,284.00
JUMLAH HARGA BAHAN 7,044.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 13,814.00
E Overhead & profit 10% x Jumlah 1,381.40
F Harga Satuan Pekerjaan (D+E) 15,195.40

HARGA SATUAN PEKERJAAN SANITASI

JENIS PEKERJAAN : Pemasangan 1 buah Closet Jongkok


SATUAN : Bh
HARGA SATUAN : Rp 586,428.70

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 1.000 71,000.00 71,000.00
Tukang L.02 OH 1.500 95,000.00 142,500.00
Kepala tukang L.03 OH 0.150 110,000.00 16,500.00
Mandor L.04 OH 0.160 110,000.00 17,600.00
JUMLAH TENAGA KERJA 247,600.00
B BAHAN
Closet Jongkok Unit 1.000 275,000.00 275,000.00
Semen Portland Kg 6.000 1,360.00 8,160.00
Pasir Pasang m3 0.010 235,700.00 2,357.00
JUMLAH HARGA BAHAN 285,517.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 533,117.00
E Overhead & profit 10% x Jumlah 53,311.70
F Harga Satuan Pekerjaan (D+E) 586,428.70

JENIS PEKERJAAN : Pemasangan 1 buah Closet Duduk


SATUAN : Bh
HARGA SATUAN : Rp 2,499,658.70

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.250 71,000.00 17,750.00
Tukang L.02 OH 0.375 95,000.00 35,625.00
Kepala tukang L.03 OH 0.038 110,000.00 4,125.00
Mandor L.04 OH 0.040 110,000.00 4,400.00
JUMLAH TENAGA KERJA 61,900.00
B BAHAN
Closet Duduk Unit 1.000 2,200,000.00 2,200,000.00
Semen Portland Kg 6.000 1,360.00 8,160.00
Pasir Pasang m3 0.010 235,700.00 2,357.00
JUMLAH HARGA BAHAN 2,210,517.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 2,272,417.00
E Overhead & profit 10% x Jumlah 227,241.70
F Harga Satuan Pekerjaan (D+E) 2,499,658.70
JENIS PEKERJAAN : Pemasangan 1 buah floor drain
SATUAN : Bh
HARGA SATUAN : Rp 70,466.00

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.010 71,000.00 710.00
Tukang L.02 OH 0.100 95,000.00 9,500.00
Kepala tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.005 110,000.00 550.00
JUMLAH TENAGA KERJA 11,860.00
B BAHAN
Floor Drain Lokal Unit 1.00 52,200.00 52,200.00
JUMLAH HARGA BAHAN 52,200.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 64,060.00
E Overhead & profit 10% x Jumlah 6,406.00
F Harga Satuan Pekerjaan (D+E) 70,466.00

JENIS PEKERJAAN : Pemasangan 1 buah Wastafel Komplit


SATUAN : Bh
HARGA SATUAN : Rp 1,727,007.70

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 1.200 71,000.00 85,200.00
Tukang L.02 OH 1.450 95,000.00 137,750.00
Kepala tukang L.03 OH 0.150 110,000.00 16,500.00
Mandor L.04 OH 0.100 110,000.00 11,000.00
JUMLAH TENAGA KERJA 250,450.00
B BAHAN
Wastafel + Kaca Bh 1.00 1,250,000.00 1,250,000.00
Semen Abu Abu Kg 6.00 11,200.00 67,200.00
Pasir Pasang M3 0.01 235,700.00 2,357.00

JUMLAH HARGA BAHAN 1,319,557.00


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 1,570,007.00
E Overhead & profit 10% x Jumlah 157,000.70
F Harga Satuan Pekerjaan (D+E) 1,727,007.70

JENIS PEKERJAAN : A.5.1.1.25 Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"
SATUAN : M'
HARGA SATUAN : Rp 17,705.60

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.036 71,000.00 2,556.00
Tukang L.02 OH 0.060 95,000.00 5,700.00
Kepala tukang L.03 OH 0.006 110,000.00 660.00
Mandor L.04 OH 0.002 110,000.00 220.00
JUMLAH TENAGA KERJA 9,136.00
B BAHAN
Pipa PVC 1/2" btg 1.20 5,800.00 6,960.00

JUMLAH HARGA BAHAN 6,960.00


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 16,096.00
E Overhead & profit 10% x Jumlah 1,609.60
F Harga Satuan Pekerjaan (D+E) 17,705.60
JENIS PEKERJAAN : A.5.1.1.26 Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"
SATUAN : M'
HARGA SATUAN : Rp 20,873.60

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.036 71,000.00 2,556.00
Tukang L.02 OH 0.060 95,000.00 5,700.00
Kepala tukang L.03 OH 0.006 110,000.00 660.00
Mandor L.04 OH 0.002 110,000.00 220.00
JUMLAH TENAGA KERJA 9,136.00
B BAHAN
Pipa PVC 3/4" m 1.20 8,200.00 9,840.00

JUMLAH HARGA BAHAN 9,840.00


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 18,976.00
E Overhead & profit 10% x Jumlah 1,897.60
F Harga Satuan Pekerjaan (D+E) 20,873.60

JENIS PEKERJAAN : A.5.1.1.29 Pemasangan 1 m' pipa PVC tipe AW diameter 2"
SATUAN : M'
HARGA SATUAN : Rp 41,210.40

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.054 71,000.00 3,834.00
Tukang L.02 OH 0.090 95,000.00 8,550.00
Kepala tukang L.03 OH 0.009 110,000.00 990.00
Mandor L.04 OH 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 13,704.00
B BAHAN
Pipa PVC 2" m 1.20 19,800.00 23,760.00

JUMLAH HARGA BAHAN 23,760.00


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 37,464.00
E Overhead & profit 10% x Jumlah 3,746.40
F Harga Satuan Pekerjaan (D+E) 41,210.40

JENIS PEKERJAAN : A.5.1.1.30 Pemasangan 1 m' pipa PVC tipe AW diameter 2½"
SATUAN : M'
HARGA SATUAN : Rp 57,399.10

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.081 71,000.00 5,751.00
Tukang L.02 OH 0.135 95,000.00 12,825.00
Kepala tukang L.03 OH 0.0135 110,000.00 1,485.00
Mandor L.04 OH 0.004 110,000.00 440.00
JUMLAH TENAGA KERJA 20,501.00
B BAHAN
Pipa PVC 2½" m 1.20 26,400.00 31,680.00

JUMLAH HARGA BAHAN 31,680.00


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 52,181.00
E Overhead & profit 10% x Jumlah 5,218.10
F Harga Satuan Pekerjaan (D+E) 57,399.10
JENIS PEKERJAAN : A.5.1.1.31 Pemasangan 1 m' pipa PVC tipe AW diameter 3"
SATUAN : M'
HARGA SATUAN : Rp 82,567.10

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.081 71,000.00 5,751.00
Tukang L.02 OH 0.135 95,000.00 12,825.00
Kepala tukang L.03 OH 0.0135 110,000.00 1,485.00
Mandor L.04 OH 0.004 110,000.00 440.00
JUMLAH TENAGA KERJA 20,501.00
B BAHAN
Pipa PVC 3" m 1.20 35,200.00 42,240.00
Perlengkapan Ls 0.35 35,200.00 12,320.00
JUMLAH HARGA BAHAN 54,560.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 75,061.00
E Overhead & profit 10% x Jumlah 7,506.10
F Harga Satuan Pekerjaan (D+E) 82,567.10

JENIS PEKERJAAN : A.5.1.1.32 Pemasangan 1 m' pipa PVC tipe AW diameter 4"
SATUAN : M'
HARGA SATUAN : Rp 115,985.10

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.081 71,000.00 5,751.00
Tukang L.02 OH 0.135 95,000.00 12,825.00
Kepala tukang L.03 OH 0.0135 110,000.00 1,485.00
Mandor L.04 OH 0.004 110,000.00 440.00
JUMLAH TENAGA KERJA 20,501.00
B BAHAN
Pipa PVC 4" m 1.20 54,800.00 65,760.00
Perlengkapan Ls 0.35 54,800.00 19,180.00
JUMLAH HARGA BAHAN 84,940.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 105,441.00
E Overhead & profit 10% x Jumlah 10,544.10
F Harga Satuan Pekerjaan (D+E) 115,985.10

JENIS PEKERJAAN : Pemasangan 1 Buah Kran Air


SATUAN : Bh
HARGA SATUAN : Rp 35,046.00

NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)

A TENAGA
Pekerja L.01 OH 0.010 71,000.00 710.00
Tukang L.02 OH 0.100 95,000.00 9,500.00
Kepala tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.005 110,000.00 550.00
JUMLAH TENAGA KERJA 11,860.00
B BAHAN
Kran Air Bh 1.00 20,000.00 20,000.00

JUMLAH HARGA BAHAN 20,000.00


C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 31,860.00
E Overhead & profit 10% x Jumlah 3,186.00
F Harga Satuan Pekerjaan (D+E) 35,046.00
Analisa Memasang Kuda-kuda SMARTRUSS/M2
- Analisa Pemotongan Bahan Kuda-kuda
Pekerja OH 1.000 71,000.00 71,000.00
Mandor OH 1.000 110,000.00 110,000.00
Tukang OH 0.500 95,000.00 47,500.00
Kepala Tukang OH 0.500 110,000.00 55,000.00
283,500.00
Untuk 7 Hari Kerja Biaya Permeter Persegi 1,984,500.00

- Analisa Pemas. Wallplate/Metal Beam


Pekerja OH 1.000 71,000.00 71,000.00
Mandor OH 0.500 110,000.00 55,000.00
Tukang OH 1.000 95,000.00 95,000.00
Kepala Tukang OH 0.500 110,000.00 55,000.00
276,000.00
Untuk 4 Hari Kerja Biaya Permeter Persegi 1,104,000.00

- Analisa Fabrikasi Kuda-Kuda


Pekerja OH 2.000 71,000.00 142,000.00
Mandor OH 0.500 110,000.00 55,000.00
Tukang OH 2.000 95,000.00 190,000.00
Kepala Tukang OH 0.500 110,000.00 55,000.00
442,000.00
Untuk 10 Hari Kerja Biaya Permeter Persegi 4,420,000.00

- Analisa Instalasi Kuda-Kuda Diatas Ring Balok


Pekerja OH 2.000 71,000.00 142,000.00
Mandor OH 1.000 110,000.00 110,000.00
Tukang OH 2.000 95,000.00 190,000.00
Kepala Tukang OH 1.000 110,000.00 110,000.00
552,000.00
Untuk 10 Hari Kerja Biaya Permeter Persegi 5,520,000.00

- Analisa Pemasangan Reng


Pekerja OH 2.000 71,000.00 142,000.00
Mandor OH 0.500 110,000.00 55,000.00
Tukang OH 2.000 95,000.00 190,000.00
Kepala Tukang OH 0.500 110,000.00 55,000.00
442,000.00
Untuk 10 Hari Kerja Biaya Permeter Persegi 4,420,000.00
- Analisa Pemakaian Material
Smartruss C.75.075 M' 1,250 22,500.00 28,125,000
Reng / Topspan M' 1,500 18,000.00 27,000,000
Baut/Srew 14/20 Pcs 4,110 600.00 2,466,000
Baut/Srew 16/16 Pcs 4,900 600.00 2,940,000
Dynabolt Pcs 65 2,000.00 130,000
Talang M' 9 8,000.00 72,000
Plat Strip 1,5 x 3 Tb. 0,5 M' 280 5,000.00 1,400,000
Cat Metalic Kg 5 45,000.00 225,000
Kayu Btg 65 35,000.00 2,275,000
Jumlah 64,633,000
Alat Bantu Peralatan 500,000.00
Material Bantu Kerja 500,000.00
Jumlah 65,633,000.00
Untuk 1 M2 = 1/500x 131,266.00
E Overhead & profit 10% x Jumlah 13,126.60
Jumlah 144,392.60
HITUNGAN BETON

KEGIATAN : REHABILITASI BANGUNAN RUMAH SAKIT

PEKERJAAN : REHABILITASI BANGSAL ANAK DAN GUDANG FARMASI


LOKASI : RSUD SOLOK SELATAN

NO SKETSA HITUNGAN
1 Pas. Sloof 15/20
1 m3 = 33.33 m'
Beugel = 33.33 : 0.125 = 266.6667 ¥ 267.00 Bh
Besi Polos
Ø 12 = 33.33 x 4.00 x 0.888 = 118.368
Ø 10 = 267.00 x 0.61 x 0.617 = 100.409
218.777 ¥ 218.00 Kg

Pemakaian Bekisting :
33.33 x 0.40 = 13.3333 ¥ 13.333 m2
Pemakaian Stoot Werk :
NO SKETSA HITUNGAN
4 Pas. Kolom 20/20
1 m3 = 25.00 m'
Beugel = 25.00 : 0.125 = 200 ¥ 201.00 Bh
Besi Polos
Ø 12 = 25.00 x 4.00 x 0.888 = 88.776
Ø 10 = 201.00 x 0.71 x 0.617 = 87.981
176.757 ¥ 176.00 Kg

Pemakaian Bekisting :
25.00 x 0.90 = 22.5000 ¥ 22.500 m2
Pemakaian Stoot Werk :

5 Pas. Ring Balok 13/20


1 m3 = 38.46 m'
Beugel = 38.46 : 0.15 = 256.4103 ¥ 257.00 Bh
Besi Polos
Ø 12= 38.46 x 4.00 x 0.888 = 136.578
Ø 10 = 257.00 x 0.57 x 0.617 = 90.311
226.890 ¥ 226.00 Kg
Pemakaian Bekisting :
38.46 x 0.40 = 15.3846 ¥ 15.385 m2
Pemakaian Stoot Werk :

5 Pas. Ring Balok 13/25


1 m3 = 30.77 m'
Beugel = 30.77 : 0.15 = 205.1282 ¥ 206.00 Bh
Besi Polos
Ø 12= 30.77 x 4.00 x 0.888 = 109.263
Ø 10 = 206.00 x 0.67 x 0.617 = 85.089
194.352 ¥ 194.00 Kg
Pemakaian Bekisting :
30.77 x 0.45 = 13.8462 ¥ 13.846 m2
Pemakaian Stoot Werk :

6 Pas. Balok Latei 13/20


1 m3 = 38.46 m'
Beugel = 38.46 : 0.15 = 256.4103 ¥ 257.00 Bh

Besi Polos
Ø12 = 38.46 x 4.00 x 0.888 = 136.578
Ø 12 = 257.00 x 0.45 x 0.617 = 71.298
207.877 ¥ 207.00 Kg
Pemakaian Bekisting :
38.46 x 0.40 = 15.3846 ¥ 15.385 m2
Pemakaian Stoot Werk :
TIME - SCHEDULLE

KEGIATAN : REHABILITASI BANGUNAN RUMAH SAKIT


PEKERJAAN : REHABILITASI BANGSAL ANAK DAN GUDANG FARMASI
LOKASI : RSUD SOLOK SELATAN

BULAN KE . I BULAN KE . II BULAN KE . III BULAN KE . IV BULAN KE . V


BOBOT
No. URAIAN PEKERJAAN JANGKA WAKTU PELAKSANAAN PER MINGGU ( MINGGU KE ) KET
(%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

A PEKERJAAN REHAB GEDUNG BANSAL ANAK 70.70 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93
B PEKERJAAN RUANG TUNGGU POLY ANAK 4.77 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
C PEKERJAAN REHAB GUDANG FARMASI 24.54 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36

JUMLAH 100.00
PERMINGGU 5.29 5.29 5.29 5.29 5.29 5.29 5.69 5.69 5.69 5.69 5.69 5.69 5.69 5.69 5.69 5.69 5.69 5.69
AKUMULASI 5.29 10.58 15.87 21.16 26.45 31.74 37.43 43.12 48.81 54.50 60.18 65.87 71.56 77.25 82.94 88.62 94.31 ###
RENCANA KEMAJUANPERMINGGU
PEKERJAAN AKUMULASI
CEPAT PERMINGGU
LAMBAT AKUMULASI
Rencana Waktu Pelaksanaan : 120 (Seratus Dua Puluh) Hari Kalender
Padang, Maret 2016
Dibuat Oleh,
KONSULTAN PERENCANA
CV. TOTAL CITRA CONSULTANT

FRENGKY, ST
Direktur
TABEL KOZEN
### ###
###
KEGIATAN : REHABILITASI BANGUNAN RUMAH SAKIT
PEKERJAAN : REHABILITASI BANGSAL ANAK DAN GUDANG FARMASI
LOKASI : RSUD SOLOK SELATAN

No TYPE Jml Luas Panjang Pintu Jendela Ventilasi Perlengkapan


K Keliling Dalam Fiber Panil R Kaca Rangka Kc Mati Jalusi Ppn Hias Angker Kunci
U J.1 8 22.88 56.00 20.80 16.00 8.00
S
E
N J.2 8 20.8 52.80 20.80 16.00 8.00

A PJ.1/2 2 7.25 15.80 5.20 2.00 2.00 2.00


L
U
M P.1 8 15.48 41.60 8.00
I
N P.2 2 7.74 12.20 4.00
I
U
M JUMLAH 74.15 178.40 46.80 14.00 34.00 18.00

No TYPE Jml Luas Panjang Pintu Jendela Ventilasi Perlengkapan


Keliling Dalam Fiber Panil R kaca Rangka Kc Mati Jalusi Ppn Hias Angker Kunci
VJ.1 8 3.6 43.20 24.00 48.00

VJ.2 8 3.6 43.20 24.00 48.00

K
U VPJ.1/2 2 0.9 10.80 6.00 12.00
S
E VP.1 8 1.2 14.40 8.00 16.00
N

K VP.2 2 0.6 7.20 4.00 8.00


A
Y P.3 7 9.065 31.50 7.00 42.00
U
VP.3 7 1.05 12.60 7.00 14.00

V.1 3 0.9 25.20 6.00 12.00

JUMLAH 20.92 188.10 7.00 79.00 200.00