JUMLAH
No URAIAN PEKLERJAAN
Rp.
1 2 3
JUMLAH 1,300,002,337.09
PPN 10 % 130,000,233.71
JUMLAH 1,430,002,570.79
DIBULATKAN 1,430,000,000.00
Terbilang :
Satu Milyar Empat Ratus Tiga Puluh Juta Rupiah,-
JUMLAH
No URAIAN PEKLERJAAN
Rp.
1 2 3
A PEKERJAAN REHAB GEDUNG BANSAL ANAK
I. PEKERJAAN PONDASI 43,040,232.18
II. PEKERJAAN BETON/DINDING 158,859,592.66
III. PEKERJAAN KAP/ATAP 142,919,429.33
IV. PEKERJAAN PLAFOND 73,579,661.43
V. PEKERJAAN PLESTERAN 65,890,348.16
VI. PEKERJAAN LANTAI 34,230,625.27
VII. PEKERJAAN PINTU/JENDELA 299,654,343.49
VIII. PEKERJAAN PENGECATAN 21,376,438.33
IX PEKERJAAN PERLENGKAPAN DALAM 73,017,020.20
X PEKERJAAN PERLENGKAPAN LUAR 6,500,000.00
JUMLAH 919,067,691.05
FRENGKY, ST
Direktur
RENCANA ANGGRAN BIAYA
HARGA JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6
A PEKERJAAN REHAB GEDUNG BANSAL ANAK
I PEKERJAAN PONDASI
1. Pekerjaan Permulaan
a Pek. Bongkaran Kap Atap Ls 1.00 3,000,000.00 3,000,000.00
b Pek. Bongkaran Dinding Ls 1.00 2,210,000.00 2,210,000.00
c Pek. Bongkaran Kozen Pintu Ls 1.00 1,500,000.00 1,500,000.00
d Pek. Bongkaran Plafond Ls 1.00 2,000,000.00 2,000,000.00
e Pek. Bongkaran Lantai Lama Ls 1.00 3,000,000.00 3,000,000.00
f Pek. Pembuangan Sisa Bongkaran Ls 1.00 1,500,000.00 1,500,000.00
g Pembersihan Lapangan M2 45.00 13,860.00 623,700.00
h Pasangan Bouplank M' 48.00 67,331.00 3,231,888.00
3. Pekerjaan Pondasi
a Pas. Aanstampang Batu Kali M3 9.68 324,122.04 3,137,501.35
b Pas. Pondasi Batu Kali 1:4 M3 27.21 752,987.40 20,488,787.15
43,040,232.18
II PEKERJAAN BETON/DINDING
1. Pekerjaan Beton/Dinding
a Pas. Sloof Beton Bertulang 15/20 M3 1.82 7,176,856.70 13,061,879.20
b Pas. Kolom Beton Bertulang 13/13 M3 1.98 8,347,927.69 16,528,896.83
c Pas. Balok Latei Beton Bertulang 13/13 M3 0.47 7,414,002.03 3,484,580.95
d Pas. Balok Beton Bertulang 13/25 M3 1.97 6,903,860.40 13,597,153.05
e Pek. Plat Beton M3 2.70 5,778,298.62 15,601,406.26
f Pas. Ring Balok Beton Bertulang 13/20 M3 4.59 7,711,101.80 35,393,957.26
2. Pekerjaan Dinding
a Pas. Dinding Bata 1:2 M2 32.23 144,406.46 4,654,220.21
b Pas. Dinding Bata 1:4 M2 ### 134,557.61 28,460,280.09
c Pek. Rangka Dinding Partisi M2 97.50 121,990.00 11,894,025.00
d Pek. Dinding Kalsiboard T=9mm M2 97.50 165,981.48 16,183,193.81
f Pas. Wallpaper Dinding M2 ### 96,244.50
158,859,592.66
HARGA JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6
III PEKERJAAN KAP/ATAP
1. Pekerjaan Kap/Atap
a Pas. Kuda-kuda Bajaringan C.75.75 M2 ### 144,392.60 80,591,285.76
b Pas. Atap BJLS Warna M2 ### 84,815.50 47,338,923.17
c Pas. Perabung Bjls Warna M' 58.90 66,396.00 3,910,724.40
e Pas. Lisplank 2/25 M' ### 68,640.00 11,078,496.00
142,919,429.33
IV PEKERJAAN PLAFOND
1. Pekerjaan Plafond
a Pas. Rangka Plafond Hollow M2 ### 103,015.00 40,924,769.05
b Pas. Plafond Kalsiboard T=4mm M2 ### 50,864.00 20,206,741.28
c Pas. List Profil M' ### 29,491.00 12,448,151.10
73,579,661.43
V PEKERJAAN PLESTERAN
1. Pekerjaan Plesteran
a Plesteran dinding bata 1:2 M2 64.45 63,215.50 4,074,239.23
b Plesteran dinding bata 1:4 M2 ### 58,292.52 24,658,901.81
c Acian Bidang Dinding M2 ### 33,352.00 16,258,099.44
d Afwerking Bidang Beton M2 27.00 70,077.30 1,892,087.21
e Pas. Dinding Keramik KM/WC M2 99.75 190,546.57 19,007,020.47
65,890,348.16
VI PEKERJAAN LANTAI
1. Pekerjaan Lantai
c Pas. Beton Tumbuk 1:3:5 Tbl. 7 cm M3 22.05 897,594.89 19,791,967.39
d Pas. Lantai Keramik 40x40 M2 42.38 214,988.95 9,111,231.70
e Pas. Lantai Keramik Uk. 40 x 40 cm Berpori M2 24.78 214,988.95 5,327,426.18
34,230,625.27
VII PEKERJAAN PINTU/JENDELA
1. Pekerjaan Pintu dan Jendela
a Pas. Kusen Alluminium Hitam 4" M1 ### 145,752.20 95,416,677.73
b Pas. Pintu Rangka Allumunium + Kaca Polos 5 Mm M2 37.80 1,295,147.70 48,956,583.06
c Pas. Pintu Allumunium Unit 16.00 1,150,000.00 18,400,000.00
d Pas. Jendela Alluminium + Kaca 5mm M2 57.46 1,295,147.70 74,419,186.84
e Pas. Kaca Mati M2 13.26 153,838.30 2,039,895.86
f Pas. Ventilasi Alluminium + Kaca 5mm Unit 37.26 750,000.00 27,945,000.00
2. Pekerjaan Perlengkapan
a Pas. Engsel Pintu Alluminium Bh ### 18,000.00 2,484,000.00
b Pas. Engsel Jendela & Ventilasi Alluminium Bh ### 23,500.00 8,366,000.00
c Pas. Grendel Jendela Alluminium Bh ### 19,500.00 6,942,000.00
d Pas. Handle Jendela Jendela Alluminium Bh ### 22,500.00 4,005,000.00
e Pas. Kait Angin Jendela Alluminium Bh ### 30,000.00 10,680,000.00
299,654,343.49
HARGA JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6
VIII PEKERJAAN PENGECATAN
1. Pekerjaan Cat Minyak
a Cat Kayu Lisplank Dan Pintu M2 40.35 49,547.30 1,999,233.56
3. Pekerjaan Sanitasi
a Pas. Kloset Jongkok Bh 11.00 586,428.70 6,450,715.70
b Pas. Kloset Duduk Bh 3.00 2,499,658.70 7,498,976.10
c Ember Besar Bh 14.00 150,000.00 2,100,000.00
73,017,020.20
X PEKERJAAN PERLENGKAPAN LUAR
1. Pekerjaan Septictank dan Resapan
a Pas. Septictank + Resapan Unt 1.00 6,500,000.00 6,500,000.00
6,500,000.00
FRENGKY, ST
Direktur
PERHITUNGAN VOLUME
I PEKERJAAN PONDASI
1. Pekerjaan Permulaan
a Pembersihan Lapangan 5.00 x 1.50 x 6.00 = 45.00 45.00 45.00 M2
45.00
b Pasangan Bouplank 5.00 + 1.50 + 1.50 )x 6.00 = 48.00 48.00 48.00 M'
b Pek. Urugan Pasir Bawah pondasi 60.45 x 0.05 x 0.80 = 2.42 2.42 2.42 M3
3. Pekerjaan Pondasi
a Pas. Aanstampang Batu Kali 9.67 9.68 M3
60.45 x 0.20 x 0.80 = 9.67
9.67
II PEKERJAAN BETON/DINDING
1. Pekerjaan Beton/Dinding
a Pas. Sloof Beton Bertulang 15/20 1.81 1.82 M3
60.45 x 0.15 x 0.20 = 1.81
1.81
2. Pekerjaan Dinding
a Pas. Dinding Bata 1:2 32.23 32.23 M2
60.60 x 0.50 x 1.00 = 30.30
17.85 x 0.50 x 1.00 = 8.93
Pengurangan Kozen P3 (0.75) x 0.50 x 14.00 = (5.25)
Pengurangan Kozen P2 (0.90) x 0.50 x 1.00 = (0.45)
Pengurangan Kozen P1 (1.30) x 0.50 x 2.00 = (1.30)
32.23
c Pas. Perabung Bjls Warna 18.10 + 10.20 x 4.00 = 58.90 58.90 58.90 M'
IV PEKERJAAN PLAFOND
1. Pekerjaan Plafond
a Pas. Rangka Plafond Hollow 397.27 397.27 M2
26.40 x 14.20 x 1.00 = 374.88
1.23 x 1.50 x 4.00 = 7.38
1.23 x 3.05 x 4.00 = 15.01
397.27
IV PEKERJAAN PLESTERAN
1. Pekerjaan Plesteran
a Plesteran dinding bata 1:2 32.23 x 2.00 = 64.45 64.45 64.45 M2
V PEKERJAAN LANTAI
1. Pekerjaan Lantai
a Urugan Tanah dipadatkan 45.50 a M3
6.50 x 9.00 x 0.50 x 1.00 = 29.25
9.00 x 2.50 x 0.50 x 1.00 = 11.25
2.50 x 4.00 x 0.50 x 1.00 = 5.00
45.50
VI PEKERJAAN PINTU/JENDELA
1. Pekerjaan Pintu dan Jendela
a Pas. Kusen Alluminium Hitam 4" 654.65 654.65 M1
P1 8.20 x 2.00 x 1.00 = 16.40
P2 7.40 x 2.00 x 1.00 = 14.80
P3 4.85 x 14.00 x 1.00 = 67.90
J1 10.05 x 8.00 x 1.00 = 80.40
J2 12.05 x 7.00 x 1.00 = 84.35
J3 14.05 x 4.00 x 1.00 = 56.20
V5 14.40 x 5.00 x 1.00 = 72.00
PJ1 8.90 x 3.00 x 1.00 = 26.70
7.30 x 3.00 x 1.00 = 21.90
PJ2 8.90 x 10.00 x 1.00 = 89.00
7.90 x 10.00 x 1.00 = 79.00
V1 2.40 x 12.00 x 1.00 = 28.80
V2 2.80 x 2.00 x 1.00 = 5.60
V3 4.80 x 1.00 x 1.00 = 4.80
V4 6.80 x 1.00 x 1.00 = 6.80
654.65
2. Pekerjaan Perlengkapan
a Pas. Engsel Pintu Alluminium 46.00 x 3.00 = 138.00 138.00 138.00 Bh
b Pas. Engsel Jendela & Ventilasi Alluminium 178.00 x 2.00 = 356.00 356.00 356.00 Bh
c Pas. Grendel Jendela Alluminium 178.00 x 2.00 = 356.00 356.00 356.00 Bh
d Pas. Handle Jendela Jendela Alluminium 178.00 x 1.00 = 178.00 178.00 178.00 Bh
e Pas. Kait Angin Jendela Alluminium 178.00 x 2.00 = 356.00 356.00 356.00 Bh
b Mencat plafond dengan cat air (Catylac) 397.27 x 1.00 + 422.10 x 0.10 = 439.48 439.48 439.48 M2
3. Pekerjaan Sanitasi
a Pas. Kloset Jongkok 11.00 11.00 Bh
b Pas. Kloset Duduk 3.00 3.00 Bh
c Ember Besar 14.00 14.00 Bh
g Pas. Beton Tumbuk 1:3:5 Tbl. 7 cm 52.00 x 1.00 x 0.07 x 1.00 = 3.64 5.76 5.76 M3
3.50 x 1.50 x 0.15 x 2.00 = 1.58
4.00 x 0.90 x 0.15 x 1.00 = 0.54
5.76
JUMLAH
No URAIAN PEKLERJAAN
Rp.
1 2 3
B PEKERJAAN RUANG TUNGGU POLY ANAK
I. PEKERJAAN PONDASI 12,865,334.50
II. PEKERJAAN BETON/DINDING 15,129,392.07
III. PEKERJAAN KAP/ATAP 16,047,309.90
IV. PEKERJAAN PLAFOND 5,551,255.49
V. PEKERJAAN PLESTERAN 3,962,229.90
VI. PEKERJAAN LANTAI 5,934,538.67
VII. PEKERJAAN PENGECATAN 1,937,522.39
VIII. PEKERJAAN PERLENGKAPAN DALAM 540,000.00
JUMLAH 61,967,582.92
FRENGKY, ST
Direktur
RENCANA ANGGRAN BIAYA
HARGA JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6
B PEKERJAAN RUANG TUNGGU POLY ANAK
I PEKERJAAN PONDASI
1. Pekerjaan Permulaan
a Pembersihan Lapangan M2 41.75 13,860.00 578,655.00
b Pasangan Bouplank M' 26.70 67,331.00 1,797,737.70
3. Pekerjaan Pondasi
a Pas. Aanstampang Batu Kali M3 3.48 324,122.04 1,127,944.70
b Pas. Pondasi Batu Kali 1:4 M3 10.85 752,987.40 8,169,913.29
12,865,334.50
II PEKERJAAN BETON/DINDING
1. Pekerjaan Beton/Dinding
a Pas. Sloof Beton Bertulang 15/20 M3 0.66 7,176,856.70 4,736,725.42
b Pas. Kolom Beton Bertulang 13/13 M3 0.54 8,347,927.69 4,507,880.95
c Pas. Ring Balok Beton Bertulang 13/20 M3 0.47 7,711,101.80 3,624,217.85
2. Pekerjaan Dinding
a Pas. Dinding Bata 1:4 M2 16.80 134,557.61 2,260,567.85
15,129,392.07
III PEKERJAAN KAP/ATAP
1. Pekerjaan Kap/Atap
a Pas. Kuda-kuda Bajaringan C.75.75 M2 42.63 144,392.60 6,155,456.54
b Pas. Atap BJLS Warna M2 42.63 84,815.50 3,615,684.77
c Pas. Perabung Bjls Warna M' 17.85 66,396.00 1,185,168.60
d Pas. Lisplank 2/25 M' 25.00 68,640.00 1,716,000.00
e Pas. Talang Air + ACC M' 25.00 135,000.00 3,375,000.00
16,047,309.90
HARGA JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6
IV PEKERJAAN PLAFOND
1. Pekerjaan Plafond
a Pas. Rangka Plafond Hollow M2 31.61 103,015.00 3,256,304.15
b Pas. Plafond Kalsiboard T=4mm M2 31.61 50,864.00 1,607,811.04
c Pas. List Profil M' 23.30 29,491.00 687,140.30
5,551,255.49
V PEKERJAAN PLESTERAN
1. Pekerjaan Plesteran
a Plesteran dinding bata 1:4 M2 33.60 58,292.52 1,958,628.67
b Acian Bidang Dinding M2 33.60 33,352.00 1,120,627.20
c Afwerking Bidang Beton M2 12.60 70,077.30 882,974.03
3,962,229.90
VI PEKERJAAN LANTAI
1. Pekerjaan Lantai
a Urugan Tanah dipadatkan M3 3.60 174,328.00 627,580.80
b Urugan Pasir dipadatkan tbl. 10 cm M3 1.80 170,104.00 306,187.20
c Pas. Beton Tumbuk 1:3:5 Tbl. 7 cm M3 1.26 897,594.89 1,130,969.57
d Pas. Lantai Keramik 40x40 M2 18.00 214,988.95 3,869,801.10
5,934,538.67
VII PEKERJAAN PENGECATAN
1. Pekerjaan Cat Minyak
a Cat Kayu Lisplank Dan Pintu M2 6.25 49,547.30 309,670.63
540,000.00
FRENGKY, ST
Direktur
PERHITUNGAN VOLUME
I PEKERJAAN PONDASI
1. Pekerjaan Permulaan
a Pembersihan Lapangan 8.35 x 5.00 x 1.00 = 41.75 41.75 41.75 M2
41.75
b Pasangan Bouplank 8.35 + 8.35 + 5.00 + 5.00 = 26.70 26.70 26.70 M'
b Pek. Urugan Pasir Bawah pondasi 21.70 x 0.05 x 0.80 = 0.87 0.87 0.87 M3
3. Pekerjaan Pondasi
a Pas. Aanstampang Batu Kali 3.47 3.48 M3
21.70 x 0.20 x 0.80 = 3.47
3.47
II PEKERJAAN BETON/DINDING
1. Pekerjaan Beton/Dinding
a Pas. Sloof Beton Bertulang 15/20 0.65 0.66 M3
21.70 x 0.15 x 0.20 = 0.65
0.65
c Pas. Perabung Bjls Warna 3.00 + 3.71 x 4.00 = 17.85 17.85 17.85 M'
e Pas. Talang Air + ACC 7.75 x 2.00 = 15.50 25.00 25.00 M'
4.75 x 2.00 = 9.50
25.00
IV PEKERJAAN PLAFOND
1. Pekerjaan Plafond
a Pas. Rangka Plafond Hollow 31.61 31.61 M2
4.30 x 7.35 x 1.00 = 31.61
31.61
V PEKERJAAN LANTAI
1. Pekerjaan Lantai
a Urugan Tanah dipadatkan 3.60 3.60 M3
3.00 x 6.00 x 0.20 x 1.00 = 3.60
3.60
b Mencat plafond dengan cat air (Catylac) 31.61 x 1.00 + 23.30 x 0.10 = 33.94 33.94 33.94 M2
JUMLAH
No URAIAN PEKLERJAAN
Rp.
1 2 3
C PEKERJAAN REHAB GUDANG FARMASI
I. PEKERJAAN PONDASI 28,331,716.31
II. PEKERJAAN BETON/DINDING 74,897,272.58
III. PEKERJAAN KAP/ATAP 52,062,673.21
IV. PEKERJAAN PLAFOND 24,307,099.74
V. PEKERJAAN PLESTERAN 25,883,912.84
VI. PEKERJAAN LANTAI 27,962,815.01
VII. PEKERJAAN PINTU/JENDELA 57,429,032.05
VIII. PEKERJAAN PENGECATAN 9,087,216.99
IX PEKERJAAN PERLENGKAPAN DALAM 12,505,324.40
X PEKERJAAN PERLENGKAPAN LUAR 6,500,000.00
JUMLAH 318,967,063.11
FRENGKY, ST
Direktur
RENCANA ANGGRAN BIAYA
KEGIATAN : REHABILITASI BANGUNAN RUMAH SAKIT
PEKERJAAN : REHABILITASI BANGSAL ANAK DAN GUDANG FARMASI
LOKASI : RSUD SOLOK SELATAN
TAHUN : 2016
HARGA JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6
C PEKERJAAN REHAB GUDANG FARMASI
I PEKERJAAN PONDASI
1. Pekerjaan Permulaan
a Pek. Pembongkaran Kuda-kuda Lama+Atap Ls 1.00 1,250,000.00 1,250,000.00
b Pek. Pembongkaran Dinding Lama Ls 1.00 1,000,000.00 1,000,000.00
c Pek. Pembongkaran Foldingate Lama Ls 1.00 250,000.00 250,000.00
d Pek. Pembuangan Sisa Bongkaram Ls 1.00 1,000,000.00 1,000,000.00
e Pembersihan Lapangan M2 ### 13,860.00 1,940,400.00
f Pasangan Bouplank M' 38.00 67,331.00 2,558,578.00
3. Pekerjaan Pondasi
a Pas. Aanstampang Batu Kali M3 9.49 324,122.04 3,075,918.16
b Pas. Pondasi Batu Kali 1:4 M3 18.68 752,987.40 14,065,804.63
28,331,716.31
II PEKERJAAN BETON/DINDING
1. Pekerjaan Beton/Dinding
a Pas. Sloof Beton Bertulang 15/20 M3 1.78 7,176,856.70 12,774,804.93
b Pas. Kolom Beton Bertulang 20/20 M3 2.24 8,347,927.69 18,699,358.03
c Pas. Kolom Beton Bertulang 13/13 M3 0.16 8,347,927.69 1,335,668.43
d Pas. Balok Latei Beton Bertulang 13/20 M3 1.38 7,414,002.03 10,231,322.80
e Pas. Balok Beton Bertulang 13/25 M3 0.20 6,903,860.40 1,413,565.42
f Pek. Plat Beton M3 0.44 5,778,298.62 2,542,451.39
g Pas. Ring Balok Beton Bertulang 13/20 M3 1.43 7,711,101.80 11,026,875.57
2. Pekerjaan Dinding
a Pas. Dinding Bata 1:2 M2 19.78 144,406.46 2,856,359.78
b Pas. Dinding Bata 1:4 M2 ### 134,557.61 14,016,866.23
74,897,272.58
III PEKERJAAN KAP/ATAP
1. Pekerjaan Kap/Atap
a Pek. Konstruksi Kuda-Kuda Kayu M2 3.64 5,417,830.00 19,720,901.20
b Pas. Atap Bjls Warna M2 ### 84,815.50 23,150,390.73
c Pas. Perabung BJLS M' 46.68 66,396.00 3,099,365.28
e Pas. Lisplank 2/25 M' 66.90 68,640.00 4,592,016.00
f Pek. Singok Unit 2.00 750,000.00 1,500,000.00
52,062,673.21
HARGA JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA
( Rp ) ( Rp )
1 2 3 4 5 6
IV PEKERJAAN PLAFOND
1. Pekerjaan Plafond
a Pas. Rangka Plafond Hollow M2 ### 103,015.00 13,109,688.90
Pas. Plafond Kalsiboard T=4mm
b M2 ### 50,864.00 6,472,952.64
c Pas. List Profil Gypsum M' ### 29,491.00 4,724,458.20
24,307,099.74
V PEKERJAAN PLESTERAN
1. Pekerjaan Plesteran
a Plesteran dinding bata 1:2 M2 39.55 63,215.50 2,500,173.18
b Plesteran dinding bata 1:4 M2 ### 58,292.52 12,144,080.69
c Acian Bidang Dinding M2 ### 33,352.00 7,989,471.60
d Afwerking Bidang Beton M2 23.73 70,077.30 1,662,934.42
e Pas. Dinding Keramik uk. 20x25 cm M2 8.33 190,546.57 1,587,252.94
25,883,912.84
VI PEKERJAAN LANTAI
1. Pekerjaan Lantai
a Urugan Tanah dipadatkan M3 12.60 174,328.00 2,196,532.80
b Urugan Pasir dipadatkan tbl. 10 cm M3 9.05 170,104.00 1,539,441.20
c Pas. Beton Tumbuk 1:3:5 Tbl. 7 cm M3 6.34 897,594.89 5,690,751.62
d Pas. Lantai Keramik Uk. 40 x 40 cm M2 84.00 214,988.95 18,059,071.80
e Pas. Lantai keramik Uk. 20 x 20 cm M2 2.30 207,398.95 477,017.59
27,962,815.01
VII PEKERJAAN PINTU/JENDELA
1. Pekerjaan Pintu dan Jendela
a Pas. Kusen Alluminium Hitam 4" M1 90.20 145,752.20 13,146,848.44
b Pas. Pintu Rangka Allumunium + Kaca Polos M2 7.56 1,295,147.70 9,791,316.61
c Pas. Pintu Allumunium Unit 1.00 1,150,000.00 1,150,000.00
d Pas. Jendela Alluminium + Kaca 5mm M2 9.08 1,295,147.70 11,759,941.12
e Pas. Kaca Mati 5mm M2 4.54 153,838.30 698,425.88
f Pas. Ventilasi Alluminium + Kaca 3mm M2 10.20 750,000.00 7,650,000.00
g Pas. Pintu Folding gate M2 10.00 875,000.00 8,750,000.00
2. Pekerjaan Perlengkapan
a Pas. Engsel Pintu Alluminium Bh 15.00 18,000.00 270,000.00
b Pas. Engsel Jendela & Ventilasi Alluminium Bh 50.00 23,500.00 1,175,000.00
c Pas. Grendel Jendela Alluminium Bh 50.00 19,500.00 975,000.00
d Pas. Handle Jendela Jendela Alluminium Bh 25.00 22,500.00 562,500.00
e Pas. Kait Angin Jendela Alluminium Bh 50.00 30,000.00 1,500,000.00
57,429,032.05
VIII PEKERJAAN PENGECATAN
1. Pekerjaan Cat Minyak
d Cat Kayu Lisplank Dan Pintu M2 16.73 49,547.30 828,926.33
3. Pekerjaan Sanitasi
a Pas. Kloset Duduk Bh 1.00 2,098,928.70 2,098,928.70
b Pas. Ember Air Bh 1.00 150,000.00 150,000.00
12,505,324.40
X PEKERJAAN PERLENGKAPAN LUAR
1. Pekerjaan Septictank dan Resapan
a Pas. Septictank + Resapan Unt 1.00 6,500,000.00 6,500,000.00
6,500,000.00
FRENGKY, ST
Direktur
PERHITUNGAN VOLUME
I PEKERJAAN PONDASI
1. Pekerjaan Permulaan
a Pembersihan Lapangan 14.00 x 10.00 = 140.00 140.00 140.00 M2
140.00
b Pasangan Bouplank 14.00 + 14.00 + 10.00 + 0.00 = 38.00 38.00 38.00 M'
b Pek. Urugan Pasir Bawah pondasi 59.30 x 0.05 x 0.80 = 2.37 2.37 2.38 M3
3. Pekerjaan Pondasi
a Pas. Aanstampang Batu Kali 9.49 9.49 M3
59.30 x 0.20 x 0.80 = 9.49
9.49
II PEKERJAAN BETON/DINDING
1. Pekerjaan Beton/Dinding
a Pas. Sloof Beton Bertulang 15/20 1.78 1.78 M3
59.30 x 0.15 x 0.20 = 1.78
1.78
c Pas. Kolom Beton Bertulang 13/13 3.00 x 0.13 x 0.13 x 3.00 = 0.15 0.15 0.16 M3
2. Pekerjaan Dinding
a Pas. Dinding Bata 1:2 19.78 19.78 M2
48.30 x 0.50 x 1.00 = 24.15
(1.30) x 0.50 x 1.00 = (0.65)
(0.90) x 0.50 x 3.00 = (1.35)
(4.00) x 0.50 x 1.00 = (2.00)
(0.75) x 0.50 x 1.00 = (0.38)
19.78
b Pas. Atap Bjls Warna 21.15 x 5.30 x 2.00 x 1.00 = 224.19 272.95 272.95 M2
0.50 x 5.30 x 9.20 x 2.00 = 48.76
272.95
c Pas. Perabung BJLS 18.06 + 7.16 x 4.00 = 46.68 46.68 46.68 M'
IV PEKERJAAN PLAFOND
1. Pekerjaan Plafond
a Pas. Rangka Plafond Hollow 127.26 127.26 M2
8.80 x 14.20 x 1.00 = 124.96
1.15 x 2.00 x 1.00 = 2.30
127.26
IV PEKERJAAN PLESTERAN
1. Pekerjaan Plesteran
a Plesteran dinding bata 1:2 19.78 x 2.00 = 39.55 39.55 39.55 M2
V PEKERJAAN LANTAI
1. Pekerjaan Lantai
a Urugan Tanah dipadatkan 12.60 12.60 M3
12.00 x 7.00 x 0.15 x 1.00 = 12.60
12.60
VI PEKERJAAN PINTU/JENDELA
1. Pekerjaan Pintu dan Jendela
a Pas. Kusen Alluminium Hitam 4" 90.20 90.20 M1
P1 8.80 x 1.00 x 1.00 = 8.80
P2 7.40 x 3.00 x 1.00 = 22.20
P2 5.30 x 1.00 x 1.00 = 5.30
J1 6.10 x 2.00 x 1.00 = 12.20
J2 10.05 x 2.00 x 1.00 = 20.10
J4 14.00 x 1.00 x 1.00 = 14.00
V1 4.20 x 1.00 x 1.00 = 4.20
V2 3.40 x 1.00 x 1.00 = 3.40
90.20
2. Pekerjaan Perlengkapan
a Pas. Engsel Pintu Alluminium 5.00 x 3.00 = 15.00 15.00 15.00 Bh
b Pas. Engsel Jendela & Ventilasi Alluminium 25.00 x 2.00 = 50.00 50.00 50.00 Bh
c Pas. Grendel Jendela Alluminium 25.00 x 2.00 = 50.00 50.00 50.00 Bh
d Pas. Handle Jendela Jendela Alluminium 25.00 x 1.00 = 25.00 25.00 25.00 Bh
e Pas. Kait Angin Jendela Alluminium 25.00 x 2.00 = 50.00 50.00 50.00 Bh
b Mencat plafond dengan cat air (Catylac) 127.26 x 1.00 + 160.20 x 0.10 = 143.28 143.28 143.28 M2
3. Pekerjaan Sanitasi
a Pas. Kloset Duduk 1.00 1.00 Bh
b Pas. Ember Air 1.00 1.00 Bh
HARGA
NO U R A I A N SATUAN SATUAN KETERANGAN
( Rp. )
I. SATUAN UPAH
1 Mandor Hari Rp 110,000.00
2 Kepala Tukang Hari Rp 110,000.00
3 Tukang Kayu Hari Rp 95,000.00
4 Tukang Batu Hari Rp 95,000.00
5 Tukang Besi Hari Rp 95,000.00
6 Tukang Cat Hari Rp 95,000.00
7 Pekerja Hari Rp 71,000.00
FRENGKY, ST
Direktur
DAFTAR HARGA SATUAN PEKERJAAN
HARGA
NO URAIAN PEKERJAAN STN SATUAN
( Rp )
1 2 3 4
A HARGA SATUAN PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank/M1" M' Rp 67,331.00
2 Pembersihan Lapangan dan Perataan /M2 M2 Rp 13,860.00
FRENGKY, ST
Direktur
ANALISA HARGA SATUAN PEKERJAAN BIDANG CIPTA KARYA
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.100 71,000.00 7,100.00
Tukang Kayu L.02 OH 0.100 95,000.00 9,500.00
Kepala tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.005 110,000.00 550.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Kayu balok 5/7 m3 0.012 1,950,000.00 23,400.00
Paku biasa 2" - 5" Kg 0.020 33,000.00 660.00
Kayu papan 3/20 m3 0.007 2,700,000.00 18,900.00
JUMLAH HARGA BAHAN 42,960.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.100 71,000.00 7,100.00
Mandor L.04 OH 0.050 110,000.00 5,500.00
JUMLAH TENAGA KERJA 12,600.00
B JUMLAH (A) 12,600.00
C Overhead & profit 10% x Jumlah 1,260.00
D Harga Satuan Pekerjaan (B+C) 13,860.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.750 71,000.00 53,250.00
Mandor L.04 OH 0.025 110,000.00 2,750.00
JUMLAH TENAGA KERJA 56,000.00
B JUMLAH (A) 56,000.00
C Overhead & profit 10% x Jumlah 5,600.00
D Harga Satuan Pekerjaan (B+C) 61,600.00
JENIS PEKERJAAN : Pengurugan Kembali 1 M3 Galian Tanah
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 20,533.33
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.250 71,000.00 17,750.00
Mandor L.04 OH 0.008 110,000.00 916.67
JUMLAH TENAGA KERJA 18,666.67
B JUMLAH (A) 18,666.67
C Overhead & profit 10% x Jumlah 1,866.67
D Harga Satuan Pekerjaan (B+C) 20,533.33
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.300 71,000.00 21,300.00
Mandor L.04 OH 0.010 110,000.00 1,100.00
JUMLAH TENAGA KERJA 22,400.00
B BAHAN
Pasir urug m3 1.200 110,200.00 132,240.00
JUMLAH HARGA BAHAN 132,240.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.300 71,000.00 21,300.00
Mandor L.04 OH 0.010 110,000.00 1,100.00
JUMLAH TENAGA KERJA 22,400.00
B BAHAN
Pasir urug m3 1.200 113,400.00 136,080.00
JUMLAH HARGA BAHAN 136,080.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.250 71,000.00 17,750.00
Mandor L.04 OH 0.025 110,000.00 2,750.00
JUMLAH TENAGA KERJA 20,500.00
B BAHAN
Sirtu m3 1.200 156,521.00 187,825.20
JUMLAH HARGA BAHAN 187,825.20
C PERALATAN
JENIS PEKERJAAN : Pemasangan 1 M3 Pondasi Batu Kali Camp, 1PC : 4 Pasir Pasang
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 752,987.40
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.500 71,000.00 106,500.00
Tukang L.02 OH 0.750 95,000.00 71,250.00
Kepala tukang L.03 OH 0.075 110,000.00 8,250.00
Mandor L.04 OH 0.075 110,000.00 8,250.00
JUMLAH TENAGA KERJA 194,250.00
B BAHAN
Batu Kali m3 1.200 121,700.00 146,040.00
Semen Portland Kg 163.000 1,360.00 221,680.00
Pasir Pasang m3 0.520 235,700.00 122,564.00
JUMLAH HARGA BAHAN 490,284.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.780 71,000.00 55,380.00
Tukang Batu L.02 OH 0.390 95,000.00 37,050.00
Kepala tukang L.03 OH 0.039 110,000.00 4,290.00
Mandor L.04 OH 0.039 110,000.00 4,290.00
JUMLAH TENAGA KERJA 101,010.00
B BAHAN
Batu Kali m3 1.200 121,700.00 146,040.00
Pasir urug m3 0.432 110,200.00 47,606.40
JUMLAH HARGA BAHAN 193,646.40
C PERALATAN
JENIS PEKERJAAN : Membuat beton mutu f3c = 7,4 Mpa (K 100), slump (12 ± 2) Cm, w/c 0,87
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 897,594.89
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.650 71,000.00 117,150.00
Tukang Batu L.02 OH 0.275 95,000.00 26,125.00
Kepala tukang L.03 OH 0.028 110,000.00 3,080.00
Mandor L.04 OH 0.083 110,000.00 9,130.00
JUMLAH TENAGA KERJA 155,485.00
B BAHAN
Semen Portland Kg 247.000 1,360.00 335,920.00
Pasir beton Kg 869 168.36 146,302.36
Kerikil (Maks 30 mm) Kg 999 174.59 174,418.00
Air Liter 215 18.00 3,870.00
JUMLAH HARGA BAHAN 660,510.36
C PERALATAN
JENIS PEKERJAAN : Membuat Lantai kerja beton mutu f3c = 16,9 Mpa (K 175), slump (12 ± 2) Cm,
w/c 0,61
SATUAN : M3
HARGA SATUAN PEKERJAAN : Rp 1,008,678.87
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.650 71,000.00 117,150.00
Tukang Batu L.02 OH 0.275 95,000.00 26,125.00
Kepala tukang L.03 OH 0.028 110,000.00 3,080.00
Mandor L.04 OH 0.083 110,000.00 9,130.00
JUMLAH TENAGA KERJA 155,485.00
B BAHAN
Semen Portland Kg 326.000 1,360.00 443,360.00
Pasir beton Kg 760 168.36 127,961.53
Kerikil (Maks 30 mm) Kg 1067 174.59 186,304.26
Air Liter 215 18.00 3,870.00
JUMLAH HARGA BAHAN 761,495.79
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.007 71,000.00 497.00
Tukang L.02 OH 0.007 95,000.00 665.00
Kepala tukang L.03 OH 0.0007 110,000.00 77.00
Mandor L.04 OH 0.0004 110,000.00 44.00
JUMLAH TENAGA KERJA 1,283.00
B BAHAN
Besi beton (polos/ulir) Kg 1.050 10,800.00 11,340.00
Kawat beton Kg 0.015 20,000.00 300.00
JUMLAH HARGA BAHAN 11,640.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.520 71,000.00 36,920.00
Tukang L.02 OH 0.260 95,000.00 24,700.00
Kepala tukang L.03 OH 0.026 110,000.00 2,860.00
Mandor L.04 OH 0.026 110,000.00 2,860.00
JUMLAH TENAGA KERJA 67,340.00
B BAHAN
Kayu kelas III m3 0.045 1,918,800.00 86,346.00
Paku 5 - 10 Cm Kg 0.300 33,000.00 9,900.00
Minyak bekisting Liter 0.100 12,000.00 1,200.00
JUMLAH HARGA BAHAN 97,446.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.660 71,000.00 46,860.00
Tukang L.02 OH 0.330 95,000.00 31,350.00
Kepala tukang L.03 OH 0.033 110,000.00 3,630.00
Mandor L.04 OH 0.033 110,000.00 3,630.00
JUMLAH TENAGA KERJA 85,470.00
B BAHAN
Kayu kelas III m3 0.040 1,918,800.00 76,752.00
Paku 5 - 10 Cm Kg 0.400 33,000.00 13,200.00
Minyak bekisting Liter 0.200 12,000.00 2,400.00
Balok kayu kelas II m3 0.015 1,918,800.00 28,782.00
Plywod tebal 9 mm Lbr 0.350 117,800.00 41,230.00
Dolken kayu φ 8-10 Cm Batang 2.000 35,000.00 70,000.00
JUMLAH HARGA BAHAN 232,364.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.660 71,000.00 46,860.00
Tukang L.02 OH 0.330 95,000.00 31,350.00
Kepala tukang L.03 OH 0.033 110,000.00 3,630.00
Mandor L.04 OH 0.033 110,000.00 3,630.00
JUMLAH TENAGA KERJA 85,470.00
B BAHAN
Kayu kelas III m3 0.040 1,918,800.00 76,752.00
Paku 5 - 10 Cm Kg 0.400 33,000.00 13,200.00
Minyak bekisting Liter 0.200 12,000.00 2,400.00
Balok kayu kelas II m3 0.018 1,918,800.00 34,538.40
Plywod tebal 9 mm Lbr 0.350 117,800.00 41,230.00
Dolken kayu φ 8-10 Cm Batang 2.000 35,000.00 70,000.00
JUMLAH HARGA BAHAN 238,120.40
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
JENIS PEKERJAAN : Pemasangan 1 M2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp,
1PC : 2 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 144,406.46
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.300 71,000.00 21,300.00
Tukang L.02 OH 0.100 95,000.00 9,500.00
Kepala tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 33,550.00
B BAHAN
Bata Merah m3 70.000 900.00 63,000.00
Semen Portland Kg 18.950 1,360.00 25,772.00
Pasir Pasang m3 0.038 235,700.00 8,956.60
JUMLAH HARGA BAHAN 97,728.60
C PERALATAN
JENIS PEKERJAAN : Pemasangan 1 M2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp,
1PC : 4 Pasir Pasang
SATUAN : M2
HARGA SATUAN : Rp 134,557.61
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.300 71,000.00 21,300.00
Tukang L.02 OH 0.100 95,000.00 9,500.00
Kepala tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 33,550.00
B BAHAN
Bata Merah m3 70.000 900.00 63,000.00
Semen Portland Kg 11.500 1,360.00 15,640.00
Pasir Pasang m3 0.043 235,700.00 10,135.10
JUMLAH HARGA BAHAN 88,775.10
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.300 71,000.00 21,300.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 38,850.00
B BAHAN
Semen Portland Kg 10.224 1,360.00 13,904.64
Pasir Pasang m3 0.020 235,700.00 4,714.00
JUMLAH HARGA BAHAN 18,618.64
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.300 71,000.00 21,300.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 38,850.00
B BAHAN
Semen Portland Kg 6.240 1,360.00 8,486.40
Pasir Pasang m3 0.024 235,700.00 5,656.80
JUMLAH HARGA BAHAN 14,143.20
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.200 71,000.00 14,200.00
Tukang L.02 OH 0.100 95,000.00 9,500.00
Kepala tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.010 110,000.00 1,100.00
JUMLAH TENAGA KERJA 25,900.00
B BAHAN
Semen Portland Kg 3.250 1,360.00 4,420.00
JUMLAH HARGA BAHAN 4,420.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.300 71,000.00 21,300.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 38,850.00
B BAHAN
Semen Portland Kg 15.504 1,360.00 21,085.44
Pasir Pasangan M3 0.016 235,700.00 3,771.20
JUMLAH HARGA BAHAN 24,856.64
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.700 71,000.00 49,700.00
Tukang L.02 OH 0.350 95,000.00 33,250.00
Kepala tukang L.03 OH 0.035 110,000.00 3,850.00
Mandor L.04 OH 0.035 110,000.00 3,850.00
JUMLAH TENAGA KERJA 90,650.00
B BAHAN
keramik ukuran 60 Cm x 60 Cm Bh 3.10 29,600.00 91,760.00
Semen Portland Kg 9.80 1,360.00 13,328.00
Pasir Pasang m3 0.045 235,700.00 10,606.50
Semen warna Kg 1.300 11,200.00 14,560.00
JUMLAH HARGA BAHAN 130,254.50
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.700 71,000.00 49,700.00
Tukang L.02 OH 0.350 95,000.00 33,250.00
Kepala tukang L.03 OH 0.035 110,000.00 3,850.00
Mandor L.04 OH 0.035 110,000.00 3,850.00
JUMLAH TENAGA KERJA 90,650.00
B BAHAN
keramik ukuran 40 Cm x 40 Cm Bh 6.63 10,000.00 66,300.00
Semen Portland Kg 9.80 1,360.00 13,328.00
Pasir Pasang m3 0.045 235,700.00 10,606.50
Semen warna Kg 1.300 11,200.00 14,560.00
JUMLAH HARGA BAHAN 104,794.50
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.900 71,000.00 63,900.00
Tukang L.02 OH 0.450 95,000.00 42,750.00
Kepala tukang L.03 OH 0.045 110,000.00 4,950.00
Mandor L.04 OH 0.045 110,000.00 4,950.00
JUMLAH TENAGA KERJA 116,550.00
B BAHAN
Keramik Dinding Bh 5.56 3,250.00 18,055.56
Semen Portland Kg 9.30 1,360.00 12,648.00
Pasir Pasang m3 0.018 235,700.00 4,242.60
Semen warna Kg 1.940 11,200.00 21,728.00
JUMLAH HARGA BAHAN 56,674.16
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.100 71,000.00 7,100.00
Tukang L.02 OH 0.100 95,000.00 9,500.00
Kepala tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.005 110,000.00 550.00
JUMLAH TENAGA KERJA 18,250.00
B BAHAN
Kalsiboard T=4mm Lembar 0.375 72,000.00 27,000.00
Paku triplek Kg 0.030 33,000.00 990.00
JUMLAH HARGA BAHAN 27,990.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.200 71,000.00 14,200.00
Tukang L.02 OH 0.200 95,000.00 19,000.00
Kepala tukang L.03 OH 0.020 110,000.00 2,200.00
Mandor L.04 OH 0.010 110,000.00 1,100.00
JUMLAH TENAGA KERJA 36,500.00
B BAHAN
Kalsiboard T=4mm Lembar 0.788 145,000.00 114,187.50
Paku triplek Kg 0.063 3,250.00 204.75
JUMLAH HARGA BAHAN 114,392.25
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.050 71,000.00 3,550.00
Tukang L.02 OH 0.050 95,000.00 4,750.00
Kepala tukang L.03 OH 0.005 110,000.00 550.00
Mandor L.04 OH 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 9,180.00
B BAHAN
List Profil M' 1.000 14,000.00 14,000.00
Paku Sekrup Kg 0.110 33,000.00 3,630.00
JUMLAH HARGA BAHAN 17,630.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.350 71,000.00 24,850.00
Tukang L.02 OH 0.175 95,000.00 16,625.00
Kepala tukang L.03 OH 0.018 110,000.00 1,925.00
Mandor L.04 OH 0.002 110,000.00 220.00
JUMLAH TENAGA KERJA 43,620.00
B BAHAN
Wallpaper M2 2.200 18,000.00 39,600.00
Lem Kg 0.250 17,100.00 4,275.00
JUMLAH HARGA BAHAN 43,875.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.120 71,000.00 8,520.00
Tukang L.02 OH 0.060 95,000.00 5,700.00
Kepala tukang L.03 OH 0.006 110,000.00 660.00
Mandor L.04 OH 0.006 110,000.00 660.00
JUMLAH TENAGA KERJA 15,540.00
B BAHAN
Atap BJLS WARNA Lbr 0.75 81,500.00 61,125.00
Paku Atap Kg 0.02 22,000.00 440.00
JUMLAH HARGA BAHAN 61,565.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.150 71,000.00 10,650.00
Tukang L.02 OH 0.070 95,000.00 6,650.00
Kepala tukang L.03 OH 0.007 110,000.00 770.00
Mandor L.04 OH 0.006 110,000.00 660.00
JUMLAH TENAGA KERJA 18,730.00
B BAHAN
Seng Plat 030 Lbr 0.50 81,500.00 40,750.00
Paku biasa 1/2" - 1" Kg 0.04 22,000.00 880.00
JUMLAH HARGA BAHAN 41,630.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.150 71,000.00 10,650.00
Tukang L.02 OH 0.400 95,000.00 38,000.00
Kepala tukang L.03 OH 0.025 110,000.00 2,750.00
Mandor L.04 OH 0.001 110,000.00 137.50
JUMLAH TENAGA KERJA 51,537.50
B BAHAN
Seng Plat BJLS 30 Lbr 0.50 81,500.00 40,750.00
Paku biasa Kg 0.02 33,000.00 495.00
Kayu papan klas II M3 0.02 2,900,000.00 55,100.00
Meni besi Kg 0.30 32,700.00 9,810.00
JUMLAH HARGA BAHAN 106,155.00
C PERALATAN
JENIS PEKERJAAN : Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela,
kayu kelas II
SATUAN : M3
HARGA SATUAN : Rp 6,245,085
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 6.000 71,000.00 426,000.00
Tukang L.02 OH 18.000 95,000.00 1,710,000.00
Kepala tukang L.03 OH 1.800 110,000.00 198,000.00
Mandor L.04 OH 0.300 110,000.00 33,000.00
JUMLAH TENAGA KERJA 2,367,000.00
B BAHAN
Balok kayu m3 1.200 2,710,000.00 3,252,000.00
Paku 10 Cm Kg 1.250 33,000.00 41,250.00
Lem kayu Kg 1.000 17,100.00 17,100.00
JUMLAH HARGA BAHAN 3,310,350.00
C PERALATAN
JENIS PEKERJAAN : Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas II
SATUAN : M2
HARGA SATUAN : Rp 683,491
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.000 71,000.00 71,000.00
Tukang L.02 OH 3.000 95,000.00 285,000.00
Kepala tukang L.03 OH 0.300 110,000.00 33,000.00
Mandor L.04 OH 0.050 110,000.00 5,500.00
JUMLAH TENAGA KERJA 394,500.00
B BAHAN
Papan kayu m3 0.040 2,900,000.00 116,000.00
Kaca 5mm M2 1.000 110,000.00 110,000.00
Lem kayu Kg 0.050 17,100.00 855.00
JUMLAH HARGA BAHAN 226,855.00
C PERALATAN
JENIS PEKERJAAN : Pemasangan 1 m2 jendela rangka kayu + Kaca 3 mm, kayu kelas II
SATUAN : M2
HARGA SATUAN : Rp 492,954
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.800 71,000.00 56,800.00
Tukang L.02 OH 2.000 95,000.00 190,000.00
Kepala tukang L.03 OH 0.200 110,000.00 22,000.00
Mandor L.04 OH 0.040 110,000.00 4,400.00
JUMLAH TENAGA KERJA 273,200.00
B BAHAN
Papan kayu m3 0.024 2,710,000.00 65,040.00
Paku 1 Cm - 2,5 Cm Kg 0.300 33,000.00 9,900.00
Kaca tebal 3 mm M2 1.000 100,000.00 100,000.00
JUMLAH HARGA BAHAN 174,940.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.670 71,000.00 47,570.00
Tukang L.02 OH 2.000 95,000.00 190,000.00
Kepala tukang L.03 OH 0.200 110,000.00 22,000.00
Mandor L.04 OH 0.335 110,000.00 36,850.00
JUMLAH TENAGA KERJA 296,420.00
B BAHAN
Papan kayu m3 0.060 2,900,000.00 174,000.00
Paku 1 Cm - 2,5 Cm Kg 0.150 17,100.00 2,565.00
JUMLAH HARGA BAHAN 176,565.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 4.000 71,000.00 284,000.00
Tukang L.02 OH 12.000 95,000.00 1,140,000.00
Kepala tukang L.03 OH 1.200 110,000.00 132,000.00
Mandor L.04 OH 0.200 110,000.00 22,000.00
JUMLAH TENAGA KERJA 1,578,000.00
B BAHAN
Balok kayu m3 1.100 2,710,000.00 2,981,000.00
Besi strip tebal 5 mm Kg 15.000 12,100.00 181,500.00
Paku 12 Cm Kg 5.600 33,000.00 184,800.00
JUMLAH HARGA BAHAN 3,347,300.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 2.400 71,000.00 170,400.00
Tukang L.02 OH 7.200 95,000.00 684,000.00
Kepala tukang L.03 OH 0.720 110,000.00 79,200.00
Mandor L.04 OH 0.120 110,000.00 13,200.00
JUMLAH TENAGA KERJA 946,800.00
B BAHAN
Balok kayu m3 1.100 2,710,000.00 2,981,000.00
Besi strip tebal 5 mm Kg 15.000 12,100.00 181,500.00
Paku 12 Cm Kg 3.000 33,000.00 99,000.00
JUMLAH HARGA BAHAN 3,261,500.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.200 71,000.00 14,200.00
Tukang L.02 OH 0.300 95,000.00 28,500.00
Kepala tukang L.03 OH 0.030 110,000.00 3,300.00
Mandor L.04 OH 0.010 110,000.00 1,100.00
JUMLAH TENAGA KERJA 47,100.00
B BAHAN
Kaso-kaso 5 x 7 Cm m3 0.0163 2,750,000.00 44,825.00
Paku 7 dan 10 Cm Kg 0.2500 33,000.00 8,250.00
JUMLAH HARGA BAHAN 53,075.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.150 71,000.00 10,650.00
Tukang L.02 OH 0.250 95,000.00 23,750.00
Kepala tukang L.03 OH 0.025 110,000.00 2,750.00
Mandor L.04 OH 0.075 110,000.00 8,250.00
JUMLAH TENAGA KERJA 45,400.00
B BAHAN
Hollow M1 5.000 8,500.00 42,500.00
Pengantung M1 0.500 8,500.00 4,250.00
Alat Bantu Ls 1.000 1,500.00 1,500.00
JUMLAH HARGA BAHAN 48,250.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.150 71,000.00 10,650.00
Tukang L.02 OH 0.250 95,000.00 23,750.00
Kepala tukang L.03 OH 0.025 110,000.00 2,750.00
Mandor L.04 OH 0.075 110,000.00 8,250.00
JUMLAH TENAGA KERJA 45,400.00
B BAHAN
Kanal M1 4.000 16,000.00 64,000.00
Alat Bantu Ls 1.000 1,500.00 1,500.00
JUMLAH HARGA BAHAN 65,500.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.100 71,000.00 7,100.00
Tukang L.02 OH 0.200 95,000.00 19,000.00
Kepala tukang L.03 OH 0.020 110,000.00 2,200.00
Mandor L.04 OH 0.005 110,000.00 550.00
JUMLAH TENAGA KERJA 28,850.00
B BAHAN
Papan kayu m3 0.0110 2,900,000.00 31,900.00
Paku 5 dan 10 Cm Kg 0.050 33,000.00 1,650.00
JUMLAH HARGA BAHAN 33,550.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0430 71,000.00 3,053.00
Tukang L.02 OH 0.0430 95,000.00 4,085.00
Kepala tukang L.03 OH 0.0043 110,000.00 473.00
Mandor L.04 OH 0.0021 110,000.00 231.00
JUMLAH TENAGA KERJA 7,842.00
B BAHAN
Profil alluminium M' 1.1000 110,000.00 121,000.00
Skrup fixer Bh 2.0000 750.00 1,500.00
Lem Silikon Tube 0.0600 36,000.00 2,160.00
JUMLAH HARGA BAHAN 124,660.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.0850 71,000.00 6,035.00
Tukang L.02 OH 0.0850 95,000.00 8,075.00
Kepala tukang L.03 OH 0.0085 110,000.00 935.00
Mandor L.04 OH 0.0042 110,000.00 462.00
JUMLAH TENAGA KERJA 15,507.00
B BAHAN
Profil aluminium 4" M' 4.4000 110,000.00 484,000.00
Profil kaca M' 4.5000 125,000.00 562,500.00
Kaca 5mm M2 1.0000 110,000.00 110,000.00
Sealant Tube 0.2700 20,000.00 5,400.00
JUMLAH HARGA BAHAN 1,161,900.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.06 71,000.00 4,260.00
Tukang L.02 OH 0.60 95,000.00 57,000.00
Kepala tukang L.03 OH 0.06 110,000.00 6,600.00
Mandor L.04 OH 0.00 110,000.00 330.00
JUMLAH TENAGA KERJA 68,190.00
B BAHAN
Kunci Tanam SES set 1.000 260,000.00 260,000.00
JUMLAH HARGA BAHAN 260,000.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.015 71,000.00 1,065.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.0008 110,000.00 88.00
JUMLAH TENAGA KERJA 17,053.00
B BAHAN
Engsel pintu Bh 1.000 11,000.00 11,000.00
JUMLAH HARGA BAHAN 11,000.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.01 71,000.00 710.00
Tukang L.02 OH 0.10 95,000.00 9,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.00 110,000.00 55.00
JUMLAH TENAGA KERJA 11,365.00
B BAHAN
Engsel Bh 1.000 8,800.00 8,800.00
JUMLAH HARGA BAHAN 8,800.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.015 71,000.00 1,065.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.001 110,000.00 82.50
JUMLAH TENAGA KERJA 17,047.50
B BAHAN
Grendel Bh 1.000 10,600.00 10,600.00
JUMLAH HARGA BAHAN 10,600.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.015 71,000.00 1,065.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.008 110,000.00 880.00
JUMLAH TENAGA KERJA 17,845.00
B BAHAN
Kait angin Bh 1.000 4,400.00 4,400.00
JUMLAH HARGA BAHAN 4,400.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.015 71,000.00 1,065.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.008 110,000.00 880.00
JUMLAH TENAGA KERJA 17,845.00
B BAHAN
Tarikan jendela Bh 1.000 4,100.00 4,100.00
JUMLAH HARGA BAHAN 4,100.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.015 71,000.00 1,065.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.008 110,000.00 880.00
JUMLAH TENAGA KERJA 17,845.00
B BAHAN
Grendel Jendela Bh 1.000 9,500.00 9,500.00
JUMLAH HARGA BAHAN 9,500.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.015 71,000.00 1,065.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.0008 110,000.00 88.00
JUMLAH TENAGA KERJA 17,053.00
B BAHAN
Kaca tebal 3 mm m2 1.100 100,000.00 110,000.00
Sealant Kg 0.050 36,000.00 1,800.00
JUMLAH HARGA BAHAN 111,800.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.015 71,000.00 1,065.00
Tukang L.02 OH 0.150 95,000.00 14,250.00
Kepala tukang L.03 OH 0.015 110,000.00 1,650.00
Mandor L.04 OH 0.0008 110,000.00 88.00
JUMLAH TENAGA KERJA 17,053.00
B BAHAN
Kaca tebal 5 mm m2 1.100 110,000.00 121,000.00
Sealant Kg 0.050 36,000.00 1,800.00
JUMLAH HARGA BAHAN 122,800.00
C PERALATAN
JENIS PEKERJAAN : Pengecatan bidang kayu lama (1lapis plamuur, 1 lapis cat dasar,
2 lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp 35,302
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.070 71,000.00 4,970.00
Tukang L.02 OH 0.009 95,000.00 855.00
Kepala tukang L.03 OH 0.006 110,000.00 660.00
Mandor L.04 OH 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 6,815.00
B BAHAN
Cat menie Kg 0.200 21,500.00 4,300.00
Plamuur Kg 0.150 27,600.00 4,140.00
Cat dasar Kg 0.170 23,000.00 3,910.00
Cat penutup Kg 0.260 45,000.00 11,700.00
Kuas Bh 0.010 14,800.00 148.00
Pengencer ltr 0.030 12,000.00 360.00
Ampelas Lbr 0.200 3,600.00 720.00
JUMLAH HARGA BAHAN 25,278.00
C PERALATAN
JENIS PEKERJAAN : Pengecatan bidang kayu baru (1lapis plamuur, 1 lapis cat dasar,
3 lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp 49,547
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.070 71,000.00 4,970.00
Tukang L.02 OH 0.105 95,000.00 9,975.00
Kepala tukang L.03 OH 0.004 110,000.00 440.00
Mandor L.04 OH 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 15,715.00
B BAHAN
Cat menie Kg 0.200 21,500.00 4,300.00
Plamuur Kg 0.150 27,600.00 4,140.00
Cat dasar Kg 0.170 23,000.00 3,910.00
Cat penutup Kg 0.350 45,000.00 15,750.00
Kuas Bh 0.010 14,800.00 148.00
Pengencer Kg 0.030 12,000.00 360.00
Ampelas Lbr 0.200 3,600.00 720.00
JUMLAH HARGA BAHAN 29,328.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.100 71,000.00 7,100.00
Mandor L.04 OH 0.006 110,000.00 660.00
JUMLAH TENAGA KERJA 7,760.00
B BAHAN
Residu atau ter L 0.350 27,600.00 9,660.00
JUMLAH HARGA BAHAN 9,660.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.100 71,000.00 7,100.00
Mandor L.04 OH 0.006 110,000.00 660.00
JUMLAH TENAGA KERJA 7,760.00
B BAHAN
Residu atau ter L 0.350 21,500.00 7,525.00
JUMLAH HARGA BAHAN 7,525.00
C PERALATAN
JENIS PEKERJAAN : Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat penutup)
SATUAN : M2
HARGA SATUAN : Rp 20,313
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.020 71,000.00 1,420.00
Tukang L.02 OH 0.063 95,000.00 5,985.00
Kepala tukang L.03 OH 0.006 110,000.00 693.00
Mandor L.04 OH 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 8,428.00
B BAHAN
Plamuur Kg 0.150 18,000.00 2,700.00
Cat dasar Kg 0.050 23,000.00 1,150.00
Cat penutup Kg 0.260 23,800.00 6,188.00
JUMLAH HARGA BAHAN 10,038.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.028 71,000.00 1,988.00
Tukang L.02 OH 0.042 95,000.00 3,990.00
Kepala tukang L.03 OH 0.004 110,000.00 462.00
Mandor L.04 OH 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 6,770.00
B BAHAN
Cat dasar Kg 0.120 23,000.00 2,760.00
Cat penutup Kg 0.180 23,800.00 4,284.00
JUMLAH HARGA BAHAN 7,044.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.000 71,000.00 71,000.00
Tukang L.02 OH 1.500 95,000.00 142,500.00
Kepala tukang L.03 OH 0.150 110,000.00 16,500.00
Mandor L.04 OH 0.160 110,000.00 17,600.00
JUMLAH TENAGA KERJA 247,600.00
B BAHAN
Closet Jongkok Unit 1.000 275,000.00 275,000.00
Semen Portland Kg 6.000 1,360.00 8,160.00
Pasir Pasang m3 0.010 235,700.00 2,357.00
JUMLAH HARGA BAHAN 285,517.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.250 71,000.00 17,750.00
Tukang L.02 OH 0.375 95,000.00 35,625.00
Kepala tukang L.03 OH 0.038 110,000.00 4,125.00
Mandor L.04 OH 0.040 110,000.00 4,400.00
JUMLAH TENAGA KERJA 61,900.00
B BAHAN
Closet Duduk Unit 1.000 2,200,000.00 2,200,000.00
Semen Portland Kg 6.000 1,360.00 8,160.00
Pasir Pasang m3 0.010 235,700.00 2,357.00
JUMLAH HARGA BAHAN 2,210,517.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.010 71,000.00 710.00
Tukang L.02 OH 0.100 95,000.00 9,500.00
Kepala tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.005 110,000.00 550.00
JUMLAH TENAGA KERJA 11,860.00
B BAHAN
Floor Drain Lokal Unit 1.00 52,200.00 52,200.00
JUMLAH HARGA BAHAN 52,200.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 1.200 71,000.00 85,200.00
Tukang L.02 OH 1.450 95,000.00 137,750.00
Kepala tukang L.03 OH 0.150 110,000.00 16,500.00
Mandor L.04 OH 0.100 110,000.00 11,000.00
JUMLAH TENAGA KERJA 250,450.00
B BAHAN
Wastafel + Kaca Bh 1.00 1,250,000.00 1,250,000.00
Semen Abu Abu Kg 6.00 11,200.00 67,200.00
Pasir Pasang M3 0.01 235,700.00 2,357.00
JENIS PEKERJAAN : A.5.1.1.25 Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"
SATUAN : M'
HARGA SATUAN : Rp 17,705.60
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.036 71,000.00 2,556.00
Tukang L.02 OH 0.060 95,000.00 5,700.00
Kepala tukang L.03 OH 0.006 110,000.00 660.00
Mandor L.04 OH 0.002 110,000.00 220.00
JUMLAH TENAGA KERJA 9,136.00
B BAHAN
Pipa PVC 1/2" btg 1.20 5,800.00 6,960.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.036 71,000.00 2,556.00
Tukang L.02 OH 0.060 95,000.00 5,700.00
Kepala tukang L.03 OH 0.006 110,000.00 660.00
Mandor L.04 OH 0.002 110,000.00 220.00
JUMLAH TENAGA KERJA 9,136.00
B BAHAN
Pipa PVC 3/4" m 1.20 8,200.00 9,840.00
JENIS PEKERJAAN : A.5.1.1.29 Pemasangan 1 m' pipa PVC tipe AW diameter 2"
SATUAN : M'
HARGA SATUAN : Rp 41,210.40
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.054 71,000.00 3,834.00
Tukang L.02 OH 0.090 95,000.00 8,550.00
Kepala tukang L.03 OH 0.009 110,000.00 990.00
Mandor L.04 OH 0.003 110,000.00 330.00
JUMLAH TENAGA KERJA 13,704.00
B BAHAN
Pipa PVC 2" m 1.20 19,800.00 23,760.00
JENIS PEKERJAAN : A.5.1.1.30 Pemasangan 1 m' pipa PVC tipe AW diameter 2½"
SATUAN : M'
HARGA SATUAN : Rp 57,399.10
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.081 71,000.00 5,751.00
Tukang L.02 OH 0.135 95,000.00 12,825.00
Kepala tukang L.03 OH 0.0135 110,000.00 1,485.00
Mandor L.04 OH 0.004 110,000.00 440.00
JUMLAH TENAGA KERJA 20,501.00
B BAHAN
Pipa PVC 2½" m 1.20 26,400.00 31,680.00
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.081 71,000.00 5,751.00
Tukang L.02 OH 0.135 95,000.00 12,825.00
Kepala tukang L.03 OH 0.0135 110,000.00 1,485.00
Mandor L.04 OH 0.004 110,000.00 440.00
JUMLAH TENAGA KERJA 20,501.00
B BAHAN
Pipa PVC 3" m 1.20 35,200.00 42,240.00
Perlengkapan Ls 0.35 35,200.00 12,320.00
JUMLAH HARGA BAHAN 54,560.00
C PERALATAN
JENIS PEKERJAAN : A.5.1.1.32 Pemasangan 1 m' pipa PVC tipe AW diameter 4"
SATUAN : M'
HARGA SATUAN : Rp 115,985.10
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.081 71,000.00 5,751.00
Tukang L.02 OH 0.135 95,000.00 12,825.00
Kepala tukang L.03 OH 0.0135 110,000.00 1,485.00
Mandor L.04 OH 0.004 110,000.00 440.00
JUMLAH TENAGA KERJA 20,501.00
B BAHAN
Pipa PVC 4" m 1.20 54,800.00 65,760.00
Perlengkapan Ls 0.35 54,800.00 19,180.00
JUMLAH HARGA BAHAN 84,940.00
C PERALATAN
NO URAIAN KODE SATUAN KOEFISIEN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
A TENAGA
Pekerja L.01 OH 0.010 71,000.00 710.00
Tukang L.02 OH 0.100 95,000.00 9,500.00
Kepala tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.005 110,000.00 550.00
JUMLAH TENAGA KERJA 11,860.00
B BAHAN
Kran Air Bh 1.00 20,000.00 20,000.00
NO SKETSA HITUNGAN
1 Pas. Sloof 15/20
1 m3 = 33.33 m'
Beugel = 33.33 : 0.125 = 266.6667 ¥ 267.00 Bh
Besi Polos
Ø 12 = 33.33 x 4.00 x 0.888 = 118.368
Ø 10 = 267.00 x 0.61 x 0.617 = 100.409
218.777 ¥ 218.00 Kg
Pemakaian Bekisting :
33.33 x 0.40 = 13.3333 ¥ 13.333 m2
Pemakaian Stoot Werk :
NO SKETSA HITUNGAN
4 Pas. Kolom 20/20
1 m3 = 25.00 m'
Beugel = 25.00 : 0.125 = 200 ¥ 201.00 Bh
Besi Polos
Ø 12 = 25.00 x 4.00 x 0.888 = 88.776
Ø 10 = 201.00 x 0.71 x 0.617 = 87.981
176.757 ¥ 176.00 Kg
Pemakaian Bekisting :
25.00 x 0.90 = 22.5000 ¥ 22.500 m2
Pemakaian Stoot Werk :
Besi Polos
Ø12 = 38.46 x 4.00 x 0.888 = 136.578
Ø 12 = 257.00 x 0.45 x 0.617 = 71.298
207.877 ¥ 207.00 Kg
Pemakaian Bekisting :
38.46 x 0.40 = 15.3846 ¥ 15.385 m2
Pemakaian Stoot Werk :
TIME - SCHEDULLE
A PEKERJAAN REHAB GEDUNG BANSAL ANAK 70.70 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93 3.93
B PEKERJAAN RUANG TUNGGU POLY ANAK 4.77 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
C PEKERJAAN REHAB GUDANG FARMASI 24.54 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36
JUMLAH 100.00
PERMINGGU 5.29 5.29 5.29 5.29 5.29 5.29 5.69 5.69 5.69 5.69 5.69 5.69 5.69 5.69 5.69 5.69 5.69 5.69
AKUMULASI 5.29 10.58 15.87 21.16 26.45 31.74 37.43 43.12 48.81 54.50 60.18 65.87 71.56 77.25 82.94 88.62 94.31 ###
RENCANA KEMAJUANPERMINGGU
PEKERJAAN AKUMULASI
CEPAT PERMINGGU
LAMBAT AKUMULASI
Rencana Waktu Pelaksanaan : 120 (Seratus Dua Puluh) Hari Kalender
Padang, Maret 2016
Dibuat Oleh,
KONSULTAN PERENCANA
CV. TOTAL CITRA CONSULTANT
FRENGKY, ST
Direktur
TABEL KOZEN
### ###
###
KEGIATAN : REHABILITASI BANGUNAN RUMAH SAKIT
PEKERJAAN : REHABILITASI BANGSAL ANAK DAN GUDANG FARMASI
LOKASI : RSUD SOLOK SELATAN
K
U VPJ.1/2 2 0.9 10.80 6.00 12.00
S
E VP.1 8 1.2 14.40 8.00 16.00
N