Dasar
Di South West Gossan Prospect, Kabupaten Lamandau Provinsi Kalimantan Tengah
ANDRY FERDIAN
Universitas Gadjah Mada, 2015 | Diunduh dari http://etd.repository.ugm.ac.id/
ABSTRAK
Oleh:
ANDRY FERDIAN
11/326409/PTK/07912
Jumlah titik sampel yang masuk dalam kategori cut off grade sebanyak 166 titik,
setelah dilakukan kriging terdapat 198 titik. Hasil perhitungan sementara
sumberdaya skarn Pb-Zn dengan metoda kriging memberikan hasil sebanyak
423.400 ton, dengan rincian 74.675 ton untuk High Grade, 101.500 ton Medium
Grade, dan 247.225 Low Grade. Luas area sementara yang terdapat mineralisasi
berdasarkan hasil pengeboran di PIT SW Gossan adalah seluas 40357,71 m2.
i
Analisis Geostatistik untuk Pemodelan dan Estimasi Sumberdaya Endapan Bijih Skarn Besi-Logam
Dasar
Di South West Gossan Prospect, Kabupaten Lamandau Provinsi Kalimantan Tengah
ANDRY FERDIAN
Universitas Gadjah Mada, 2015 | Diunduh dari http://etd.repository.ugm.ac.id/
ABSTRACT
By:
ANDRY FERDIAN
11/326409 / PTK / 07912
This study aims to modeling and estimate resources of skarn ore deposits by using
geostatistical methods using the borehole data and comparing calculation results
between the conventional method by the company with the results of calculation
using geostatistical method in study area that is exploration area of PT Kapuas
Prima Coal in South West Gossan Prospect, Lamandau Regency, Central
Kalimantan.
The number of sample points including within the cut-off grade category
amounted to 166 points, after ran kriging amounted to 198 points. The temporary
calculations results of Pb-Zn skarn resources using kriging method giving results
amounted to 423.400 tonnes, with details of 74.675 tonnes for High Grade,
101.500 tonnes for Grade Medium, and 247 225 tonnes for Low Grade. The
temporary mineralized area based on the results of drilling at PIT SW Gossan is
40357.71 m2.
The results of the estimation ran using kriging method gives fairly accurate
results, this results shown with the result of statistical analysis to the statistical
parameter value of modeling results that have been done giving the coefficient of
variance were quite small, which indicated a fairly high precision level to the
results of the calculation of Pb-Zn skarn ore deposits resources in the prospect
area.
ii