Gedung PKK Non Pintu Fix EDIT
Gedung PKK Non Pintu Fix EDIT
I. 1 m² 1 m² Pekerjaan Pembongkaran Penutup Atap Dipakai Kembali(an. HSPK PROP JATIM 2005 A III.15.004)
Upah
0.075 OH Mandor @ Rp.
0.750 OH Pekerja @ Rp.
I. 1 m² 1 m³ Pekerjaan Pembongkaran Beton Bertulang (SNI 03-2835-2002 Analisa Biaya Konstruksi Bangunan Gedung)
Upah
0.333 OH Mandor @ Rp.
6.667 OH Pekerja @ Rp.
II. 1 m³ Pembongkaran Dinding Tembok Bata Merah (SNI 03-2835-2002 Analisa Biaya Pek. Persiapan (6.14))
Upah
0.0333 OH Mandor @ Rp.
1.625 OH Pekerja @ Rp.
A. PEKERJAAN TANAH
1.A 1 m³ Galian Tanah Biasa ( A.2.3.1.1 )
Tenaga
0.750 OH Pekerja @ Rp.
0.025 OH Mandor @ Rp.
Tenaga
1.500 OH Pekerja @ Rp.
0.750 OH Tukang @ Rp.
0.075 OH Kepala Tukang @ Rp.
0.075 OH Mandor @ Rp.
Tenaga
0.600 OH Pekerja @ Rp.
0.200 OH Tukang @ Rp.
0.020 OH Kepala Tukang @ Rp.
0.030 OH Mandor @ Rp.
Tenaga
0.007 OH Pekerja @ Rp.
0.007 OH Tukang @ Rp.
0.0007 OH Kepala Tukang @ Rp.
0.0004 OH Mandor @ Rp.
Tenaga
0.520 OH Pekerja @ Rp.
0.260 OH Tukang @ Rp.
0.026 OH Kepala Tukang @ Rp.
0.026 OH Mandor @ Rp.
Tenaga
0.660 OH Pekerja @ Rp.
0.330 OH Tukang @ Rp.
0.033 OH Kepala Tukang @ Rp.
0.033 OH Mandor @ Rp.
Upah
0.320 Oh Pekerja @ Rp.
0.330 Oh Tukang @ Rp.
0.033 Oh Kepala Tukang @ Rp.
0.006 Oh Mandor @ Rp.
Tenaga
1.320 OH Pekerja @ Rp.
0.220 OH Tukang @ Rp.
0.022 OH Kepala Tukang @ Rp.
0.013 OH Mandor @ Rp.
Tenaga
0.300 OH Pekerja @ Rp.
0.100 OH Tukang @ Rp.
0.010 OH Kepala Tukang @ Rp.
0.015 OH Mandor @ Rp.
Tenaga
0.671 OH Pekerja @ Rp.
0.810 OH Tukang @ Rp.
0.130 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.
Tenaga
0.300 OH Pekerja @ Rp.
0.150 OH Tukang @ Rp.
0.015 OH Kepala Tukang @ Rp.
0.015 OH Mandor @ Rp.
Upah
0.300 OH Pekerja @ Rp.
0.150 OH Tukang @ Rp.
0.015 OH Kepala Tukang @ Rp.
0.015 OH Mandor @ Rp.
Tenaga
0.200 OH Pekerja @ Rp.
0.100 OH Tukang @ Rp.
0.010 OH Kepala Tukang @ Rp.
0.010 OH Mandor @ Rp.
Tenaga
0.050 OH Pekerja @ Rp.
0.200 OH Tukang @ Rp.
0.010 OH Kepala Tukang @ Rp.
0.010 OH Mandor @ Rp.
Tenaga
6.700 OH Pekerja @ Rp.
20.100 OH Tukang @ Rp.
2.010 OH Kepala Tukang @ Rp.
0.335 OH Mandor @ Rp.
Tenaga
0.100 OH Pekerja @ Rp.
0.100 OH Tukang @ Rp.
0.100 OH Kepala Tukang @ Rp.
0.005 OH Mandor @ Rp.
Tenaga
0.200 OH Pekerja @ Rp.
0.450 OH Tukang @ Rp.
0.010 OH Kepala Tukang @ Rp.
0.050 OH Mandor @ Rp.
Upah
0.060 Oh Pekerja @ Rp.
0.060 Oh Tukang @ Rp.
0.006 Oh Kepala Tukang @ Rp.
0.006 Oh Mandor @ Rp.
Sewa Alat
0.170 jam Sewa Alat @ Rp.
Upah
0.040 Oh Pekerja @ Rp.
0.020 Oh Tukang @ Rp.
0.002 Oh Kepala Tukang @ Rp.
0.002 Oh Mandor @ Rp.
Tenaga
0.150 OH Pekerja @ Rp.
0.300 OH Tukang @ Rp.
0.030 OH Kepala Tukang @ Rp.
0.002 OH Mandor @ Rp.
Tenaga
0.150 OH Pekerja @ Rp.
0.075 OH Tukang @ Rp.
0.008 OH Kepala Tukang @ Rp.
0.008 OH Mandor @ Rp.
Tenaga
0.140 OH Pekerja @ Rp.
0.070 OH Tukang @ Rp.
0.007 OH Kepala Tukang @ Rp.
0.007 OH Mandor @ Rp.
Tenaga
0.400 OH Pekerja @ Rp.
0.200 OH Tukang @ Rp.
0.020 OH Kepala Tukang @ Rp.
0.002 OH Mandor @ Rp.
Tenaga
0.100 OH Pekerja @ Rp.
0.050 OH Tukang @ Rp.
0.005 OH Kepala Tukang @ Rp.
0.002 OH Mandor @ Rp.
Tenaga
0.150 OH Pekerja @ Rp.
0.300 OH Tukang @ Rp.
0.030 OH Kepala Tukang @ Rp.
0.002 OH Mandor @ Rp.
Tenaga
0.250 OH Pekerja @ Rp.
0.150 OH Tukang @ Rp.
0.025 OH Kepala Tukang @ Rp.
0.075 OH Mandor @ Rp.
Tenaga
0.250 OH Pekerja @ Rp.
0.150 OH Tukang @ Rp.
0.025 OH Kepala Tukang @ Rp.
0.075 OH Mandor @ Rp.
Tenaga
0.050 OH Pekerja @ Rp.
0.050 OH Tukang @ Rp.
0.005 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.
Tenaga
1.320 OH Pekerja @ Rp.
0.220 OH Tukang @ Rp.
0.022 OH Kepala Tukang @ Rp.
0.132 OH Mandor @ Rp.
Tenaga
0.240 OH Pekerja @ Rp.
0.120 OH Tukang @ Rp.
0.012 OH Kepala Tukang @ Rp.
0.012 OH Mandor @ Rp.
Tenaga
0.020 OH Pekerja @ Rp.
0.063 OH Tukang @ Rp.
0.006 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.
Tenaga
0.200 OH Pekerja @ Rp.
0.300 OH Tukang @ Rp.
0.030 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.
Tenaga
0.070 OH Pekerja @ Rp.
0.009 OH Tukang @ Rp.
0.006 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.
Tenaga
0.700 OH Pekerja @ Rp.
0.350 OH Tukang @ Rp.
0.035 OH Kepala Tukang @ Rp.
0.035 OH Mandor @ Rp.
Tenaga
0.0430 OH Pekerja @ Rp.
0.0430 OH Tukang @ Rp.
0.0043 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.
Tenaga
0.200 OH Pekerja @ Rp.
0.625 OH Tukang @ Rp.
0.012 OH Kepala Tukang @ Rp.
0.012 OH Mandor @ Rp.
Tenaga
0.015 OH Pekerja @ Rp.
0.150 OH Tukang @ Rp.
0.015 OH Kepala Tukang @ Rp.
0.012 OH Mandor @ Rp.
Tenaga
0.015 OH Pekerja @ Rp.
0.150 OH Tukang @ Rp.
0.015 OH Kepala Tukang @ Rp.
0.012 OH Mandor @ Rp.
Tenaga
0.050 OH Pekerja @ Rp.
0.500 OH Tukang @ Rp.
0.050 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.
Tenaga
0.085 OH Pekerja @ Rp.
0.085 OH Tukang @ Rp.
0.009 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.
Tenaga
0.015 OH Pekerja @ Rp.
0.15 OH Tukang @ Rp.
0.015 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.
Total Upah dan Bahan
40 1 bh Pemasangan 1 buah engsel casement (A.4.6.2.7)
Bahan
1.000 bh Engsel Casement 10" @ Rp.
Tenaga
0.015 OH Pekerja @ Rp.
0.15 OH Tukang @ Rp.
0.015 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.
Tenaga
0.01 OH Pekerja @ Rp.
0.1 OH Tukang @ Rp.
0.01 OH Kepala Tukang @ Rp.
0.002 OH Mandor @ Rp.
Tenaga
0.01 OH Pekerja @ Rp.
0.1 OH Tukang @ Rp.
0.01 OH Kepala Tukang @ Rp.
0.002 OH Mandor @ Rp.
Tenaga
0.025 OH Pekerja @ Rp.
0.25 OH Tukang @ Rp.
0.025 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.
Tenaga
0.1500 OH Pekerja @ Rp.
0.5000 OH Tukang @ Rp.
0.0500 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.
Tenaga
0.0050 OH Pekerja @ Rp.
0.0200 OH Tukang @ Rp.
0.0100 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.
Tenaga
0.0050 OH Pekerja @ Rp.
0.2000 OH Tukang @ Rp.
0.0500 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.
Alat
0.050 unit/hr Cangkul/Sekop/Linggis @ Rp.
0.050 unit/hr Gerobak @ Rp.
Tenaga
0.0050 OH Pekerja @ Rp.
0.2000 OH Tukang @ Rp.
0.0500 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.
Tenaga
0.0050 OH Pekerja @ Rp.
0.4000 OH Tukang @ Rp.
0.0500 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.
Tenaga
0.3000 OH Pekerja @ Rp.
0.4500 OH Tukang @ Rp.
0.0500 OH Kepala Tukang @ Rp.
0.090 OH Mandor @ Rp.
Total Upah dan Bahan
51 1 bh Pekerjaan Pemasangan Floor Drain (A.5.1.1.14)
Bahan
1.000 bh Floor Drain @ Rp.
Tenaga
0.0100 OH Pekerja @ Rp.
0.1000 OH Tukang @ Rp.
0.0100 OH Kepala Tukang @ Rp.
0.005 OH Mandor @ Rp.
Tenaga
0.0360 OH Pekerja @ Rp.
0.0600 OH Tukang @ Rp.
0.0060 OH Kepala Tukang @ Rp.
0.002 OH Mandor @ Rp.
Tenaga
0.0100 OH Pekerja @ Rp.
0.4000 OH Tukang @ Rp.
0.0400 OH Kepala Tukang @ Rp.
0.005 OH Mandor @ Rp.
Tenaga
0.1000 OH Pekerja @ Rp.
0.2000 OH Tukang @ Rp.
0.0500 OH Kepala Tukang @ Rp.
0.003 OH Mandor @ Rp.
016
- = Rp. -
100,000.00 = Rp. 7,500.00
Sub total = Rp. 7,500.00
Total Upah = Rp. 7,500.00
PROP JATIM 2005 A III.15.004)
- = Rp. -
100,000.00 = Rp. 75,000.00
Sub total = Rp. 75,000.00
Total Upah = Rp. 75,000.00
isa Biaya Konstruksi Bangunan Gedung)
- = Rp. -
100,000.00 = Rp. 666,700.00
Sub total = Rp. 666,700.00
Total Upah = Rp. 666,700.00
Biaya Pek. Persiapan (6.14))
- = Rp. -
100,000.00 = Rp. 162,500.00
Sub total = Rp. 162,500.00
Total Upah = Rp. 162,500.00
0.1 m'
0.2 m'
0.6 m'
0.012 m³
1. Pekerjaan Galian
A.
B.
2. Pekerjaan Urugan
A.
B.
A'.
5. Pekerjaan Balok
A.
D.
A'.
Jenis Kegiatan
Take Of Sheet Lokasi
Luas
Perhitungan : Kebutuhan :
Perhitungan Vol. Galian Analisa Galian Tanah
Galian Pondasi Sloof 12x20 cm Volume = 0.399
Panjang = 10.60 m'
Lebar = 0.12 m' 1) Kebutuhan Tenaga kerja
Tinggi = 0.10 m' -Pekerja = 0.750
Volume = PxLxT = 0.299
= 0.127 m³
c. Pasir Pasang :
= 0.618
= 0.157
2. Kebutuhan Tenaga :
a. Tukang = 0.220
= 0.056
b. Pekerja = 1.320
= 0.336
Total = 55.600 kg
c. Pasir Pasang :
= 0.618
= 0.128
2. Kebutuhan Tenaga :
a. Tukang = 0.220
= 0.046
b. Pekerja = 1.320
= 0.274
2. Kebutuhan Tenaga :
a. Tukang = 0.220
= 0.069
b. Pekerja = 1.320
= 0.416
x 0.40
OH
Analisa Urugan
m³
x 11.026
OH
x 11.026
m³
x 0.25
zak
x 0.25
m³
x 0.25
OH
x 0.25
OH
55.6 kg
x 55.60
kg
x 55.60
kg
x 55.60
OH
x 55.60
OH
lisa Beton camp. 1 : 2 : 3
0.20736 m³
0.207 m³
x 0.207
m³
x 0.207
zak
x 0.207
m³
x 0.207
OH
x 0.207
OH
x 69.350
kg
x 69.350
kg
x 69.350
OH
x 69.350
OH
lisa Beton camp. 1 : 2 : 3
0.19 m³
0.12 m³
0.316 m³
x 0.316
m³
x 0.316
zak
x 0.316
m³
x 0.316
OH
x 0.316
OH
1 2 3
1. Pekerjaan Tanah
1.1 Pek. Galian Tanah Biasa
1.2 Pek. Urugan Pasir Urug
3. Pekerjaan Struktur Gedung
3.1 Pekerjaan Sloof
Luas Bekisting Bidang Sloof
Kebutuhan Besi Sloof
Volume Beton Sloof 12x20 cm
3.2 Pekerjaan Kolom 12x12 cm
Luas Bekisting Bidang Kolom 12x12 cm
Kebutuhan Besi Kolom 12X12 cm
Volume Beton Kolom 12x12 cm
3.3 Pekerjaan Ring Balok
Luas Bekisting Bidang Ring Balok 12x120 cm
Kebutuhan Besi Ring Balok 12x20 cm
Volume Beton Ring Balok 12x15 cm
3.4 Pekerjaan Gewel
Luas Bekisiting Bidang Gewel 12x12 cm
Kebutuhan Besi Balok Gewel 12x12 cm
Volume Beton Gewel 12x12 cm
4. Pekerjaan Pasangan Dinding
4.1 Pek. Pasangan Bata Merah
4.2 Pek. Plesteran 1 : 4 Tebal 15 mm
4.3 Pek. Acian
5. Pekerjaan Penutup Atap
5.1 Pek. Pasangan Kaso + Reng
5.2 Pek. Pasang genteng bubung ex. Karangpilang
6. Pekerjaan Plafond
6.1 Pek. Pasangan Rangka Plafond Hollow
6.2 Pek. Pasangan Penutup Plafond Gypsumboard 120 x 240
7. Pekerjaan Penutup Dinding & Lantai
7.1 Pekerjaan Pasangan Lantai Kerja / Bedding
8.1 Pek. Pemasangan Pintu Kayu Kuputarung (P1)
8.2 Pek. Pemasangan Jendela Kayu Single (J1)
8.3 Pek. Pemasangan Jendela Kayu Double (J2)
9. Pekerjaan Instalasi Listrik
9.1 Pek. Instalasi titik lampu
9.2 Pek. Pasang lampu
9.3 Pek. Pasang Instalasi Stop kontak
10. Pekerjaan Tambahan
10.2 Pek. Pemasangan Loster Beton
11. BOP
11.1 Biaya Operasional
Sumber Dana
........................... ...........................
NA KEGIATAN BIAYA (RAB)
ANGUNAN GEDUNG PKK
UN ANGGARAN 2019
4 5 6 7
Punten , ....................................2019
fikasi Dibuat Oleh :
unten Pelaksana Kegiatan
.......... ...........................
REKAPITULASI UPAH & BAHAN
PEMBANGUNAN GEDUNG PKK
TAHUN ANGGARAN 2019
1 2 3 4
1. BAHAN
1.1 Pasir Urug 13.00 13.00
1.2 Pasir Pasang 6.00 6.00
1.3 Portland Cement 50.00 50.00
1.4 Kayu Kelas III 0.70 0.70
1.5 Paku 5 cm - 12 cm 20.00 20.00
1.6 Balok Kayu Kelas II 0.81 0.81
1.7 Balok Kayu Kelas III 0.10 0.10
1.8 Plywood t : 9 mm 2.50 2.50
1.9 Kayu Dolken 14.00 14.00
1.10 Besi Beton 230.00 230.00
1.11 Kawat Beton 3.00 3.00
1.12 Koral 3.00 3.00
1.13 Bata Merah 3,000.00 3,000.00
1.14 Baut Screw Drive 900.00 900.00
1.15 Genteng Bubungan 31.50 31.50
1.16 Hollow 4 x 4 157.00 157.00
1.17 Gypsumboard 120 x 240 20.00 20.00
1.18 Saklar Tunggal ex. Broco 5.00 5.00
1.19 Kabel NYA 1 x 2,5 ex. Supreme 30.00 30.00
1.20 Kabel NYA 1 x 1,5 ex. Supreme 28.00 28.00
1.21 Pipa Pralon 5/8 27.00 27.00
1.22 T Doos Pvc 6.00 6.00
1.23 Fiting Plafond ex. Broco 5.00 5.00
1.24 Klem Pipa 5/8 25.00 25.00
1.25 Lampu 5.00 5.00
1.26 Stop Kontak ex. Broco 1.00 1.00
1.27 Loster Kayu 7.00 7.00
1.28 Pintu Kayu Kuputarung (P1) 1.00 1.00
1.30 Jendela Kayu Single (J1) 2.00 2.00
1.31 Jendela Kayu Double (J1) 2.00 2.00
S
2. UPAH
2.1 Pekerja 35.00 35.00
2.2 Tukang 35.00 35.00
S
3. BOP
3.1. Papan Proyek 1.00 1.00
3.2. Prasasti 1.00 1.00
3.3. Honor TPK 1.00 1.00
S
Sumber Dana
........................... ...............................
Harga Satuan
Satuan Jumlah Total (Rp.)
(Rp.)
5 6 7
m³ 125,000 1,625,000
m³ 210,000 1,260,000
zak 55,000 2,750,000
m³ 1,270,000 893,963
kg 22,000 440,000
m³ 3,313,700 2,678,013
m³ 1,270,300 131,705
lbr 132,600 331,500
btg 9,400 131,600
kg 11,600 2,668,000
kg 22,100 66,300
m³ 265,100 795,300
bh 700 2,100,000
bh 500 450,000
bh 5,600 176,400
m¹ 7,700 1,208,900
lbr 78,500 1,570,000
bh 21,100 105,500
m¹ 5,700 171,000
m¹ 5,200 145,600
m¹ 3,900 105,300
bh 3,600 21,600
bh 25,000 125,000
bh 900 22,500
unit 95,000 475,000
unit 56,000 56,000
unit 38,700 270,900
unit -
unit 400,000 800,000
unit -
OH 110,000 3,850,000
OH 125,000 4,375,000
Sub Total 2) 8,225,000
Punten, ....................................2019
Dibuat Oleh :
Pelaksana Kegiatan
...........................
REKAPITULASI REKAPITULASI ANGGARAN & BIAYA ( RAB )
PEMBANGUNAN GEDUNG PKK
NO URAIAN PEKERJAAN
1 2
Total
Jumlah Dibulatkan
Punten ,………………...........
Menyetujui Diverifikasi Oleh
Kepala Desa Punten Seksdes Punten
........................... ...........................
BIAYA ( RAB )
JUMLAH
(Rp.)
3
43,496,202
Total 43,496,202
Jumlah Dibulatkan 43,496,000
Punten ,………………......................2019
Dibuat Oleh :
Pelaksana Kegiatan
...........................