23,26
LAJUR 3 OPEN
B36/R16
CC275T
LAJUR 4 CLOSE
10,03
13,82
MEDIAN
CC180T
10,77
LAJUR 4 CLOSE B38/R1
6,98
0
LAJUR 3 CLOSE
LAJUR 2 OPEN
ke Jakarta (B)
LAJUR 1 OPEN
BAHU JALAN
· PERSIAPAN AREA ERECTION, BUAT TAPPERAN PADA L3&4 (JALUR-B) SEPANJANG ±120 M
· SEQUENCE ERECTION TANPA MEMBONGKAR VIRTUAL MESSAGE SCREEN (PORTAL SIGN MONITOR) LAYOUT VIEW PLAN
· PLOTTING DAN KONFIGURASIKAN CRANE SESUAI GAMBAR (ERECTION MAIN JALUR-B) SCALE 1:800
B36/R16
CC275T
LAJUR 4 CLOSE
10,03
13,82
MEDIAN
1,43
1,98
5,22
CC180
T
10,77
LAJUR 4 CLOSE B38/R1
6,98
0
LAJUR 3 CLOSE
LAJUR 2 OPEN
ke Jakarta (B) 8,87 2,61
LAJUR 1 OPEN
BAHU JALAN
B36/R16
CC275T
LAJUR 4 CLOSE
10,03
13,82
MEDIAN
1,43
5,22
CC180T
10,77
LAJUR 4 CLOSE B38/R1
6,98
0
LAJUR 3 CLOSE
LAJUR 2 OPEN
ke Jakarta (B) 8,87 2,61
LAJUR 1 OPEN
BAHU JALAN
1. SETELAH MULTI WHEEL PERGI, KEMUDIAN SBG DIANGKAT SAMPAI DENGAN MELEBIHI TINGGI PIER HEAD (2M DIATAS PIER HEAD)
2. MULTI AXLE DIPINDAHKAN KE AREA AMAN LAYOUT VIEW PLAN
3. SIAPKAN LANDASAN DOUBLE PAPAN KAYU PADA SAAT TRACK CC BERPUTAR SCALE 1:800
METODE MANUVER & FEEDING SBG, BY MULTI AXLE
DAN METODE ERECTION LINE- 1
B36/R16
CC275T
LAJUR 4 CLOSE
10,03
9,63
MEDIAN
1,03
1,43
CC180
T
B38/R1
0
4,4
11,17
10,77
LAJUR 4 CLOSE
LAJUR 3 CLOSE
LAJUR 2 OPEN
ke Jakarta (B) 7,53 2,61
LAJUR 1 OPEN
BAHU JALAN
CRANE CONFIGURASI ZOOMLION QYU180 100T CRANE HOOK A 100T CRANE HOOK CRANE CONFIGURASI Hitachi Sumitomo SCX-2800-2
A 100T CRANE HOOK
3.1501
3.1501
3.0015
3.0015
52mm IWRC 6x36 (MBL 207 T), 52mm IWRC 6x36 (MBL 207 T), 52mm IWRC 6x36 (MBL 207 T), 52mm IWRC 6x36 (MBL 207 T),
BOOM LENGTH : 38 MTRS THIMBLE EYE (BOTH END) THIMBLE EYE (BOTH END) BOOM LENGTH : 36 MTRS THIMBLE EYE (BOTH END) THIMBLE EYE (BOTH END)
76°
°
76
25T CROSBY SHACKLE 25T CROSBY SHACKLE
OVERALL WIDTH OF CRAWLER : 7.10 MTRS SPREADER BEAM/ LIFTING LUG
25T CROSBY SHACKLE OVERALL WIDTH OF CRAWLER : 7.52 MTRS 25T CROSBY SHACKLE
SPREADER BEAM/ LIFTING LUG
SPREADER BEAM SPREADER BEAM
/ LIFTING LUG / LIFTING LUG
LENGTH OF CRAWLER : 8.87 MTRS LENGTH OF CRAWLER : 9.05 MTRS
1.41
1.41
2.3480
2.3480
2.35
2.35
WORKING RADIUS : 10 MTRS WORKING RADIUS : 16 MTRS
A 2.00 2.00 A
2.5 2.5
2.35 2.35
4,46 4,2
12,32
P067 P068 B
SBG
3,62 23,26
2,2
SBG
8,67 0,58
2
2
3,45
SBG VMS
°
74°
87°
87
8,87
VMS
8,79
8,67
SBG
ZOOMLION ZOOMLION ZOOMLION ZOOMLION ZOOMLION
2
2
2,5 ke Cikampek (A) ke Jakarta (B)
7,53 1,34 9,25 4,77 4,19
ELEVATION VIEW 1,83 CROSS VIEW 8,95
SCALE 1:500 SCALE 1:500
METODE MANUVER & FEEDING SBG, BY MULTI AXLE
DAN METODE ERECTION LINE- 2
B36/R16
CC275T
LAJUR 4 CLOSE
10,03
13,82
MEDIAN
1,43
1,98
5,22
CC180T
10,77
LAJUR 4 CLOSE B38/R1
6,98
0
LAJUR 3 CLOSE
LAJUR 2 OPEN
ke Jakarta (B) 2,61
LAJUR 1 OPEN
BAHU JALAN
1. CC180T PADA AREA JANGKAUAN RADIUS ANGKAT 10 M, DI POSISIKAN LAYOUT VIEW PLAN
2. CC275T PADA AREA JANGKAUAN RADIUS ANGKAT 16 M, DI POSISIKAN SCALE 1:800
3. PASANG SACKLE UNTUK MENGHUBUNGKAN ANTARA SLING ANGKAT CRANE DENGAN SPREADER BEAM SBG ATAU LIFTING LUG SBG
4. SETELAH SACKLE TERPASANG LEPAS IKATAN PENGAMAN ANTARA SBG TERHADAP TURNTABLE MULTI WHEEL.
5. SBG DIANGKAT SETINGGI 30 CM DARI ATAS TURNTABLE, SELANJUTNYA MULTI WHEEL BERGERAK MENINGGALKAN LOKASI PENGANGKATAN.
B36/R16
CC275T
LAJUR 4 CLOSE
10,03
13,82
MEDIAN
1,43
5,22
CC180T
10,77
LAJUR 4 CLOSE B38/R1
6,98
0
LAJUR 3 CLOSE
LAJUR 2 OPEN
ke Jakarta (B) 2,61
LAJUR 1 OPEN
BAHU JALAN
1. SETELAH MULTI WHEEL PERGI, KEMUDIAN SBG DIANGKAT SAMPAI DENGAN MELEBIHI TINGGI PIER HEAD (2M DIATAS PIER HEAD) LAYOUT VIEW PLAN
2. MULTI AXLE DIPINDAHKAN KE AREA AMAN
3. SIAPKAN LANDASAN DOUBLE PAPAN KAYU PADA SAAT TRACK CC BERPUTAR
METODE MANUVER & FEEDING SBG, BY MULTI AXLE
DAN METODE ERECTION LINE- 2
B36/R16
CC275T
LAJUR 4 CLOSE
10,03
12,97
MEDIAN
1,43
4,37
CC180T
10,77
LAJUR 4 CLOSE B38/R1
0,95
0
7,83
LAJUR 3 CLOSE
LAJUR 2 OPEN
ke Jakarta (B) 2,61
LAJUR 1 OPEN
BAHU JALAN
CRANE CONFIGURASI ZOOMLION QYU180 100T CRANE HOOK A 100T CRANE HOOK CRANE CONFIGURASI Hitachi Sumitomo SCX-2800-2
A 100T CRANE HOOK
3.1501
3.1501
3.0015
3.0015
52mm IWRC 6x36 (MBL 207 T), 52mm IWRC 6x36 (MBL 207 T), 52mm IWRC 6x36 (MBL 207 T), 52mm IWRC 6x36 (MBL 207 T),
BOOM LENGTH : 38 MTRS THIMBLE EYE (BOTH END) THIMBLE EYE (BOTH END) BOOM LENGTH : 36 MTRS THIMBLE EYE (BOTH END) THIMBLE EYE (BOTH END)
76°
°
76
25T CROSBY SHACKLE 25T CROSBY SHACKLE
OVERALL WIDTH OF CRAWLER : 7.10 MTRS SPREADER BEAM/ LIFTING LUG
25T CROSBY SHACKLE OVERALL WIDTH OF CRAWLER : 7.52 MTRS 25T CROSBY SHACKLE
SPREADER BEAM/ LIFTING LUG
SPREADER BEAM SPREADER BEAM
/ LIFTING LUG / LIFTING LUG
LENGTH OF CRAWLER : 8.87 MTRS LENGTH OF CRAWLER : 9.05 MTRS
1.41
1.41
2.3480
2.3480
2.35
2.35
WORKING RADIUS : 10 MTRS WORKING RADIUS : 16 MTRS
A 2.00 2.00 A
2.5 2.5
2.35 2.35
5,36 8,45
12,32
P067 P068 B
LINE-1
SBG
2,2
8,67 0,58
4,2
2
SBG VMS
°
74°
87°
87
8,87
VMS
8,79
8,67
SBG
ZOOMLION
ZOOMLION ZOOMLION ZOOMLIONZOOMLION
2
2
ke Cikampek (A) ke Jakarta (B)
8,44 0,43 9,25 8,1 0,85
ELEVATION VIEW 1,83 CROSS VIEW 8,95
SCALE 1:500 SCALE 1:500
METODE MANUVER & FEEDING SBG, BY MULTI AXLE
DAN METODE ERECTION LINE- 3
B36/R16
CC275T
LAJUR 4 CLOSE
10,03
MEDIAN
1,43
19,74
5,33
11,14
10,77
LAJUR 4 CLOSE
LAJUR 3 CLOSE CC180T
B38/R10
4,66
LAJUR 2 CLOSE
ke Jakarta (B) 2,61
LAJUR 1 OPEN
BAHU JALAN
B36/R16
CC275T
LAJUR 4 CLOSE
10,03
MEDIAN
1,43
19,74
11,14
10,77
LAJUR 4 CLOSE
LAJUR 3 CLOSE CC180T
B38/R10
4,66
LAJUR 2 CLOSE
ke Jakarta (B)
LAJUR 1 OPEN 1,16
BAHU JALAN
1. SETELAH MULTI WHEEL PERGI, KEMUDIAN SBG DIANGKAT SAMPAI DENGAN MELEBIHI TINGGI PIER HEAD (2M DIATAS PIER HEAD) LAYOUT VIEW PLAN
2. MULTI AXLE DIPINDAHKAN KE AREA AMAN SCALE 1:800
3. SIAPKAN LANDASAN DOUBLE PAPAN KAYU PADA SAAT TRACK CC BERPUTAR
METODE MANUVER & FEEDING SBG, BY MULTI AXLE
DAN METODE ERECTION LINE- 3
B36/R16
CC275T
LAJUR 4 CLOSE
10,03
MEDIAN
1,43
19,74
11,14
10,77
LAJUR 4 CLOSE
LAJUR 3 CLOSE CC180T
B38/R10
4,66
LAJUR 2 CLOSE
ke Jakarta (B) 2,61
LAJUR 1 OPEN
BAHU JALAN
CRANE CONFIGURASI ZOOMLION QYU180 100T CRANE HOOK A 100T CRANE HOOK CRANE CONFIGURASI Hitachi Sumitomo SCX-2800-2
A 100T CRANE HOOK
3.1501
3.1501
3.0015
3.0015
52mm IWRC 6x36 (MBL 207 T), 52mm IWRC 6x36 (MBL 207 T), 52mm IWRC 6x36 (MBL 207 T), 52mm IWRC 6x36 (MBL 207 T),
BOOM LENGTH : 38 MTRS THIMBLE EYE (BOTH END) THIMBLE EYE (BOTH END) BOOM LENGTH : 36 MTRS THIMBLE EYE (BOTH END) THIMBLE EYE (BOTH END)
76°
°
76
25T CROSBY SHACKLE 25T CROSBY SHACKLE
OVERALL WIDTH OF CRAWLER : 7.10 MTRS SPREADER BEAM/ LIFTING LUG
25T CROSBY SHACKLE OVERALL WIDTH OF CRAWLER : 7.52 MTRS 25T CROSBY SHACKLE
SPREADER BEAM/ LIFTING LUG
SPREADER BEAM SPREADER BEAM
/ LIFTING LUG / LIFTING LUG
LENGTH OF CRAWLER : 8.87 MTRS LENGTH OF CRAWLER : 9.05 MTRS
1.41
1.41
2.3480
2.3480
2.35
2.35
WORKING RADIUS : 10 MTRS WORKING RADIUS : 16 MTRS
A 2.00 2.00 A
2.5 2.5
2.35 2.35
7,06 7,07
12,32
P067 P068 B
LINE-1 LINE-2
SBG
3,62 23,26
2,2
SBG
8,67 0,58
5,61
2
SBG VMS
°
°
74°
87
8,87
VMS
8,79
87
8,67
SBG
ZOOMLION ZOOMLION ZOOMLION
2
2
ke Cikampek (A) ke Jakarta (B)
4,99 5,16 9,25 4,04 7,1
ELEVATION VIEW 1,16 CROSS VIEW 11,14
SCALE 1:500 SCALE 1:500
METODE MANUVER & FEEDING SBG, BY MULTI AXLE
DAN METODE ERECTION LINE- 4
B36/R16
CC275T
LAJUR 4 CLOSE
10,03
MEDIAN
1,43
20,57
11,97
10,77
LAJUR 4 CLOSE
LAJUR 3 CLOSE CC180T
B38/R10
3,83
LAJUR 2 CLOSE
ke Jakarta (B) 2,61
LAJUR 1 OPEN
BAHU JALAN
B36/R16
CC275T
LAJUR 4 CLOSE
10,03
MEDIAN
1,43
20,57
11,97
10,77
LAJUR 4 CLOSE
LAJUR 3 CLOSE CC180T
B38/R10
3,83
LAJUR 2 CLOSE
ke Jakarta (B) 2,61
LAJUR 1 OPEN
BAHU JALAN
1. SETELAH MULTI WHEEL PERGI, KEMUDIAN SBG DIANGKAT SAMPAI DENGAN MELEBIHI TINGGI PIER HEAD (2M DIATAS PIER HEAD) LAYOUT VIEW PLAN
2. MULTI AXLE DIPINDAHKAN KE AREA AMAN SCALE 1:800
3. SIAPKAN LANDASAN DOUBLE PAPAN KAYU PADA SAAT TRACK CC BERPUTAR
METODE MANUVER & FEEDING SBG, BY MULTI AXLE
DAN METODE ERECTION LINE- 4
B36/R16
CC275T
LAJUR 4 CLOSE
10,03
MEDIAN
1,43
20,57
11,97
10,77
LAJUR 4 CLOSE
LAJUR 3 CLOSE CC180T
B38/R10
3,83
LAJUR 2 CLOSE
ke Jakarta (B) 2,61
LAJUR 1 OPEN
BAHU JALAN
CRANE CONFIGURASI ZOOMLION QYU180 100T CRANE HOOK A 100T CRANE HOOK CRANE CONFIGURASI Hitachi Sumitomo SCX-2800-2
A 100T CRANE HOOK
3.1501
3.1501
3.0015
3.0015
52mm IWRC 6x36 (MBL 207 T), 52mm IWRC 6x36 (MBL 207 T), 52mm IWRC 6x36 (MBL 207 T), 52mm IWRC 6x36 (MBL 207 T),
BOOM LENGTH : 38 MTRS THIMBLE EYE (BOTH END) THIMBLE EYE (BOTH END) BOOM LENGTH : 36 MTRS THIMBLE EYE (BOTH END) THIMBLE EYE (BOTH END)
76°
°
76
25T CROSBY SHACKLE 25T CROSBY SHACKLE
OVERALL WIDTH OF CRAWLER : 7.10 MTRS SPREADER BEAM/ LIFTING LUG
25T CROSBY SHACKLE OVERALL WIDTH OF CRAWLER : 7.52 MTRS 25T CROSBY SHACKLE
SPREADER BEAM/ LIFTING LUG
SPREADER BEAM SPREADER BEAM
/ LIFTING LUG / LIFTING LUG
LENGTH OF CRAWLER : 8.87 MTRS LENGTH OF CRAWLER : 9.05 MTRS
1.41
1.41
2.3480
2.3480
2.35
2.35
WORKING RADIUS : 10 MTRS WORKING RADIUS : 16 MTRS
A 2.00 2.00 A
2.5 2.5
2.35 2.35
9,16 3,22
12,32
P067 P068 B
2
1,15
SBG VMS
74°
8,87
VMS
8,79
8,67
SBG
ZOOMLION ZOOMLION
VMS
2
2
ke Cikampek (A) ke Jakarta (B)
6,07 3,07 9,25 7,92 4,05
ELEVATION VIEW 1,16 CROSS VIEW 11,97
SCALE 1:500 SCALE 1:500