berat Per
10 12
btg Kg
4,898 19 total 10 12
83 12 5,878 14,000 68,572,000 82,286,400
1,974 7 100 14,000 1,164,800 1,397,760
2,369 14,000 27,641,600 33,169,920
Harga
No Uraian Satuan Vol Jumlah DP
Satuan
A Persiapan pekerjaan
1 Mobilisasi Team 1 2,000,000 2,000,000 30% 600,000
2 Jasa Bored Pile ø30 cm 12 titik 16 m M1 192 85,000 16,320,000 30% 4,896,000
3 Jasa Bored Pile ø40 cm, 20 titik 16 m M1 320 90,000 28,800,000 30% 8,640,000
14,136,000
B Besi Beton
1 D16 btg 310 166,060 51,478,600 195,800
2 D13 btg 8 109,250 874,000 151,800
3 D10 btg 320 63,825 20,424,000 80,300 72000
TS 40
D10 mm Rp.72.00
D13 mm Rp.117.400
D16 mm Rp.184.900
pt harapan mitra sejati
Harga
Jumlah
Satuan
144,096 44,669,760
94,848 758,784
56,240 17,996,800
63,425,344
Disc 0
63,425,344