MANAJEMEN KONSTRUKSI
REKAPITULASI RENCANA ANGGARAN BIAYA
KELOMPOK 3
RUANG/JAM : E-202/10.15-12.45
DOSEN : ENDAH MUSTIKOWATI, ST, MT.
DAFTAR ISI
BAB 1 ............................................................................................................................................................. 3
REKAPITULASI RENCANA ANGGARAN BIAYA ............................................................................................ 3
BAB 2 ............................................................................................................................................................. 4
RENCANA ANGGARAN BIAYA .................................................................................................................... 4
BAB 3 ............................................................................................................................................................. 6
PERHITUNGAN VOLUME PEKERJAAN ....................................................................................................... 6
BAB 4 ........................................................................................................................................................... 10
ANALISA HARGA SATUAN PEKERJAAN .................................................................................................... 10
BAB 5 ........................................................................................................................................................... 25
DAFTAR HARGA SATUAN BAHAN DAN UPAH ......................................................................................... 25
BAB 6 ........................................................................................................................................................... 27
GAMBAR KERJA ....................................................................................................................................... 27
BAB 7 ........................................................................................................................................................... 29
KURVA S .................................................................................................................................................. 29
2
BAB 1
3
BAB 2
HARGA SATUAN
NO URUTAN PEKERJAAN VOLUME SATUAN JUMLAH (RP) SUB TOTAL (RP)
(RP)
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 63,5 m2 Rp25.005 Rp1.587.812
Rp3.792.909
2 Pemasangan Bowplank 30,15 m2 Rp73.138 Rp2.205.097
II PEKERJAAN TANAH
1 Pekerjaan Galian Tanah 46,22 m3 Rp101.075,000 Rp4.671.686,500
Rp5.524.715,887
2 Urugan Tanah Kembali 11,555 m3 Rp73.823,400 Rp853.029,387
III PEKERJAAN PONDASI
1 Urugan Pasir 2,31 Rp304.648,455 Rp703.737,931
2 Pekerjaan Batu Kosong 9,24 Rp2.116.514,487 Rp19.556.593,860 Rp87.683.548,695
3 Pekerjaan Pondasi 26,07 Rp2.586.237,703 Rp67.423.216,904
IV PEKERJAAN STRUKTUR
1 Pekerjaan Sloof 1,29 Rp5.374.488,382 Rp6.933.090,012
2 Pekerjaan Kolom 1,93 Rp12.295.801,217 Rp23.730.896,348 Rp48.162.034,608
3 Pekerjaan Balok 1,73 Rp10.114.478,756 Rp17.498.048,247
V PEKERJAAN DINDING & PLESTERAN
1 Pekerjaan Dinding 177,24 Rp335.270,310 Rp59.423.309,744
2 Pekerjaan Plesteran 309,2 Rp107.765,971 Rp33.321.238,233 Rp110.302.149,646
3 Pekerjaan Acian 309,2 Rp56.783,964 Rp17.557.601,669
VI PEKERJAAN LANTAI
1 Pekerjaan Ubin 40x40 34,1875 Rp389.721,499 Rp13.323.603,747
Rp16.148.349,242
2 Pekerjaan Ubin 20x20 2,25 Rp1.255.442,442 Rp2.824.745,495
VII PEKERJAAN ATAP
Pekerjaan Kuda Kuda Rp
1 Rp3.051.602,165
Baja Ringan -
2 Pekerjaan Penutup Atap 34,48 Rp95.988,097 Rp3.309.670 Rp5.164.199
3 Pekerjaan bubungan 3,7 Rp291.621,138 Rp1.078.998
4 pekerjaan listplank 7,4 Rp104.801,547 Rp775.531,448
VIII PEKERJAAN LANGIT LANGIT
Rp
1 Pekerjaan Rangka 34,1875 Rp152.865,627
5.226.093,616 Rp
Pekerjaan Penutup Rp 7.430.760,535
2 34,1875 Rp64.487,515
Langit Langit 2.204.666,919
IX PEKERJAAN PLUMBING
1 Pemasangan Closet 1 Rp3.680.692,737 Rp3.680.692,737
Rp1.129.605.947,817
2 Pemasangan Bak Mandi 30 Rp37.530.841,836 Rp1.125.925.255,080
X PEKERJAAN PENGECATAN
4
Pekerjaan Pengecatan
1 309,2 Rp30.832,885 Rp9.533.527,918
Dinding
Rp10.721.268,833
Pekerjaan Pengecatan
2 34,1875 Rp34.741,965 Rp1.187.740,915
Plafond
XI PEKERJAAN LISTRIK
1 saklar tunggal 2 bh Rp460.886,468 Rp921.772,937
2 saklar ganda 5 bh Rp464.566,468 Rp2.322.832,342
3 lampu fitting 6 bh Rp441.566,468 Rp2.649.398,811 Rp12.285.694,647
4 lampu downlight 4 bh Rp445.706,468 Rp1.782.825,874
5 stop kontak 10 bh Rp460.886,468 Rp4.608.864,684
XII PEKERJAAN SANITAIR
1 pekerjaan air bersih 17,075 Rp79.355 Rp1.354.985
2 Pekerjaan Air Kotor 13 Rp417.671 Rp5.429.725 Rp10.543.750
3 Pekerjaan Air Bekas 9 Rp417.671 Rp3.759.041
5
BAB 3
Keliling Bowplank
Pemasangan
2 m2 10.075m + 10,075m + 30,15
Bowplank
5m + 5m
II PEKERJAAN TANAH
L. Penampang x t
0,8 x 1
0,8
1 Galian Tanah m3 volume 46,22
luas x panjang
0,8 x 57,775
46,22
volume
Urugan Tanah 1/4 x volume galian
2 m3 11,555
Kembali 1/4 x 46,22
11.555
III PEKERJAAN PONDASI
L. Penampang
lebar x tinggi
0,8 x 0,05
0,04
1 Urugan Pasir m3 2,31
volume
luas x panjang
0,04 x 57,775
2,311
L. Penampang
lebar x tinggi
0,8 x 0.2
0,16
2 Batu Kosong m3 9,24
volume
luas x panjang
0,16 x 57,775
9,244
6
((atas + bawah) : 2) x t
((0,25+0,7):2 x 0,95
0,45
volume
luas x panjang
0,45 x 57,775
26,07
IV PEKERJAAN STRUKTUR
L. Penampang
0,15 x 0,15
0,0225
1 Sloof m3 Volume 1,29
luas x panjang
0,0225 x 57,775
1,29
L. Penampang
0,15 x 0,15
0,0225
Volume
Kolom Praktis
m3 luas x tinggi
(5bh)
0,0225 x 2.3
0,05175 Total
Volume x 5 0.05175 x
5 0.025875
2 L. Penampang 1,93
0,15 x 0,2
0,03
Volume
Kolom Utama luas x tinggi
m3
(13bh) 0,03 x 4,3
0,18
total volume
0,129 x 13
1,677
L. Penampang
0,15 x 0,2
0,03
3 ringbalok m3 Volume 1,73
luas x panjang
0,03 x 57.775
1,73325
V PEKERJAAN DINDING & PLESTERAN
L. Penampang
tinggi x panjang
1 Dinding (4) m2 177,24
4 x 38,65
154,6
7
L. Penampang x Panjang
Dinding Belakang m2 2,15 x 8,325
17,89
L. Penampang x Panjang
Dinding Depan m2 2,5 x 9,5
4,75
8
Luas Plafond
1 kerangka m2 34,1875
34.1875
8.75 + 7.5 + 11.25 + 1.5 +
penutup indoor m2
2 2.25 29 34,1875
penutup outdoor m2 2.6875 + 2.5 5.1875
IX PEKERJAAN PLUMBING
1 Pemasangan Closet Bh 1 1
Pemasangan Bak
2 m3 30 30
Mandi
X PEKERJAAN PENGECATAN
luas dinding x 2
1 Pengecatan Dinding m2 154.6 x 2 309,2
238,88
luas Plafond
2 Pengecatan Plafond m2 34,1875
34.1875
XI PEKERJAAN LISTRIK
1 saklar tunggal buah 2 2
2 saklar ganda buah 5 5
3 lampu fitting buah 6 6
4 lampu downlight buah 4 4
5 stop kontak buah 10 10
XII PEKERJAAN SANITAIR
4.5 + 2.5 +0.5 + 2.5 +
1 pekerjaan air bersih m 17,075
7.075
2 Pekerjaan Air Kotor m 13 13
9
BAB 4
PEKERJAAN PERSIAPAN
PEKERJAAN PEMBERSIHAN
TENAGA
A Pekerja Oh 0,100 Rp 130.200,00 Rp 13.020,00
Mandor Oh 0,050 Rp 174.468,00 Rp 8.723,40
JUMLAH Rp 21.743,40
Overhead &Profit (Contoh 15%) Rp 3.261,51
JUMLAH TOTAL Rp 25.004,91
TENAGA
Pekerja Oh 0,100 Rp 130.200,00 Rp 13.020,00
A Tukang Kayu Oh 0,100 Rp 149.730,00 Rp 14.973,00
Kepala Tukang Oh 0,010 Rp 164.052,00 Rp 1.640,52
Mandor Oh 0,005 Rp 174.468,00 Rp 872,34
BAHAN
Kayu 5/7 Btg 0,012 Rp 1.550.000,00 Rp 18.600,00
B Paku Biasa 2" - 5" Kg 0,020 Rp 24.600,00 Rp 492,00
Papan Kayu 3/20 kayu kl.
M3 0,007 Rp 2.000.000,00 Rp 14.000,00
II
JUMLAH Rp 63.597,86
Overhead &Profit (Contoh 15%) Rp 9.539,68
JUMLAH TOTAL Rp 73.137,54
PEKERJAAN TANAH
10
PEKERJAAN GALIAN TANAH
TENAGA
A Pekerja Oh 0,750 Rp 130.200,00 Rp 97.650,00
Mandor Oh 0,025 Rp 137.000,00 Rp 3.425,00
JUMLAH Rp 101.075,00
Overhead &Profit (Contoh 15%) Rp 15.161,25
JUMLAH TOTAL Rp 116.236,25
TENAGA
A Pekerja Oh 0,500 Rp 130.200,00 Rp 65.100,00
Mandor Oh 0,050 Rp 174.468,00 Rp 8.723,40
JUMLAH Rp 73.823,40
Overhead &Profit (Contoh 15%) Rp 11.073,51
JUMLAH TOTAL Rp 84.896,91
PEKERJAAN PONDASI
TENAGA
A Pekerja Oh 0,250 Rp 130.200,00 Rp 32.550,00
Mandor Oh 0,025 Rp 174.468,00 Rp 4.361,70
BAHAN
B
Sirtu m3 1,200 Rp 190.000,00 Rp 228.000,00
JUMLAH Rp 264.911,70
Overhead &Profit (Contoh 15%) Rp 39.736,76
JUMLAH TOTAL Rp 304.648,46
11
TENAGA
Pekerja Oh 0,780 Rp 130.200,00 Rp 101.556,00
A Tukang Batu Oh 0,390 Rp 149.730,00 Rp 58.394,70
Kepala Tukang Oh 0,039 Rp 164.052,00 Rp 6.398,03
Mandor Oh 0,039 Rp 174.468,00 Rp 6.804,25
BAHAN
B Batu Belah 15/20 m3 1,200 Rp 1.268.200,00 Rp 1.521.840,00
Pasir Urug m3 0,432 Rp 336.700,00 Rp 145.454,40
JUMLAH Rp 1.840.447,38
Overhead &Profit (Contoh 15%) Rp 276.067,11
JUMLAH TOTAL Rp 2.116.514,49
TENAGA
Pekerja Oh 1,500 Rp 130.200,00 Rp 195.300,00
A Tukang Batu Oh 0,750 Rp 149.730,00 Rp 112.297,50
Kepala Tukang Oh 0,075 Rp 149.730,00 Rp 11.229,75
Mandor Oh 0,075 Rp 174.468,00 Rp 13.085,10
BAHAN
Batu Belah m3 1,200 Rp 1.268.200,00 Rp 1.521.840,00
B
PC kg 202,000 Rp 1.500,00 Rp 303.000,00
Pasir Pasang m3 0,485 Rp 190.000,00 Rp 92.150,00
JUMLAH Rp 2.248.902,35
Overhead &Profit (Contoh 15%) Rp 337.335,35
JUMLAH TOTAL Rp 2.586.237,70
PEKERJAAN BETON
TENAGA
Pekerja Oh 5,650 Rp 130.200,00 Rp 735.630,00
A Tukang Batu Oh 0,275 Rp 149.730,00 Rp 41.175,75
Tukang Kayu Oh 1,560 Rp 149.730,00 Rp 233.578,80
Tukang Besi Oh 1,400 Rp 149.730,00 Rp 209.622,00
12
Kepala Tukang Oh 0,323 Rp 174.468,00 Rp 56.353,16
Mandor Oh 0,283 Rp 174.468,00 Rp 49.374,44
BAHAN
Kayu Kelas III m3 0,270 Rp 584.200,00 Rp 157.734,00
Paku 5cm - 12cm kg 2,000 Rp 15.200,00 Rp 30.400,00
Minyak Bekisting Liter 0,600 Rp 7.500,00 Rp 4.500,00
B Besi Beton Polos kg 210,000 Rp 11.100,00 Rp 2.331.000,00
Kawat Beton kg 3,000 Rp 25.000,00 Rp 75.000,00
PC kg 336,000 Rp 1.500,00 Rp 504.000,00
Pasir Beton m3 0,540 Rp 25.100,00 Rp 25.100,00
Kerikil m3 0,810 Rp 220.000,00 Rp 220.000,00
JUMLAH Rp 4.673.468,16
Overhead &Profit (Contoh 15%) Rp 701.020,22
JUMLAH TOTAL Rp 5.374.488,38
TENAGA
Pekerja Oh 7,050 Rp 130.200,00 Rp 917.910,00
Tukang Batu Oh 0,275 Rp 149.730,00 Rp 41.175,75
A Tukang Kayu Oh 1,650 Rp 149.730,00 Rp 247.054,50
Tukang Besi Oh 2,100 Rp 149.730,00 Rp 314.433,00
Kepala Tukang Oh 0,403 Rp 174.468,00 Rp 70.310,60
Mandor Oh 0,353 Rp 174.468,00 Rp 61.587,20
BAHAN
Kayu Kelas III m3 0,400 Rp 584.200,00 Rp 233.680,00
Paku 5cm - 12cm kg 4,000 Rp 15.200,00 Rp 60.800,00
Minyak Bekisting Liter 2,000 Rp 7.500,00 Rp 15.000,00
Besi Beton Polos kg 315,000 Rp 11.100,00 Rp 3.496.500,00
Kawat Beton kg 4,500 Rp 25.000,00 Rp 112.500,00
B PC kg 336,000 Rp 1.500,00 Rp 504.000,00
Pasir Beton m3 0,540 Rp 25.000,00 Rp 13.500,00
Kerikil m3 0,810 Rp 220.000,00 Rp 178.200,00
Kayu Kelas II Balok m3 0,150 Rp 23.369.000,00 Rp 3.505.350,00
Plywood 9mm lbr 3,500 Rp 80.000,00 Rp 280.000,00
Dolken kayu (8-10)cm,
batang 20,000 Rp 32.000,00 Rp 640.000,00
panjang 4m
JUMLAH Rp 10.692.001,06
Overhead &Profit (Contoh 15%) Rp 1.603.800,16
JUMLAH TOTAL Rp 12.295.801,22
13
PEKERJAAN BALOK BETON BERTULANG (200KG BESI + BEKISTING)
TENAGA
Pekerja Oh 6,350 Rp 130.200,00 Rp 826.770,00
Tukang Batu Oh 0,275 Rp 149.730,00 Rp 41.175,75
A Tukang Kayu Oh 1,650 Rp 149.730,00 Rp 247.054,50
Tukang Besi Oh 1,400 Rp 149.730,00 Rp 209.622,00
Kepala Tukang Oh 0,333 Rp 174.468,00 Rp 58.097,84
Mandor Oh 0,318 Rp 174.468,00 Rp 55.480,82
BAHAN
Kayu Kelas III m3 0,320 Rp 584.200,00 Rp 186.944,00
Paku 5cm - 12cm kg 3,200 Rp 15.200,00 Rp 48.640,00
Minyak Bekisting Liter 1,600 Rp 7.500,00 Rp 12.000,00
Besi Beton Polos kg 210,000 Rp 11.100,00 Rp 2.331.000,00
Kawat Beton kg 3,000 Rp 25.000,00 Rp 75.000,00
B PC kg 336,000 Rp 1.500,00 Rp 504.000,00
Pasir Beton m3 0,540 Rp 25.100,00 Rp 13.554,00
Kerikil m3 0,810 Rp 220.000,00 Rp 178.200,00
Kayu Kelas II Balok m3 0,140 Rp 23.369.000,00 Rp 3.271.660,00
Plywood 9mm lbr 2,800 Rp 80.000,00 Rp 224.000,00
Dolken kayu (8-10)cm,
batang 16,000 Rp 32.000,00 Rp 512.000,00
panjang 4m
JUMLAH Rp 8.795.198,92
Overhead &Profit (Contoh 15%) Rp 1.319.279,84
JUMLAH TOTAL Rp 10.114.478,76
TENAGA
Pekerja Oh 5,300 Rp 130.200,00 Rp 690.060,00
Tukang Batu Oh 0,275 Rp 149.730,00 Rp 41.175,75
A Tukang Kayu Oh 1,300 Rp 149.730,00 Rp 194.649,00
Tukang Besi Oh 1,050 Rp 149.730,00 Rp 157.216,50
Kepala Tukang Oh 0,265 Rp 174.468,00 Rp 46.234,02
Mandor Oh 0,265 Rp 174.468,00 Rp 46.234,02
BAHAN
Kayu Kelas III m3 0,320 Rp 584.200,00 Rp 186.944,00
B
Paku 5cm - 12cm kg 3,200 Rp 15.200,00 Rp 48.640,00
Minyak Bekisting Liter 1,600 Rp 7.500,00 Rp 12.000,00
14
Besi Beton Polos kg 157,500 Rp 11.100,00 Rp 1.748.250,00
Kawat Beton kg 2,250 Rp 25.000,00 Rp 56.250,00
PC kg 336,000 Rp 1.500,00 Rp 504.000,00
Pasir Beton m3 0,540 Rp 25.100,00 Rp 13.554,00
Kerikil m3 0,810 Rp 220.000,00 Rp 178.200,00
Kayu Kelas II Balok m3 0,120 Rp 23.369.000,00 Rp 2.804.280,00
Plywood 9mm lbr 2,800 Rp 80.000,00 Rp 224.000,00
Dolken kayu (8-10)cm,
batang 32,000 Rp 32.000,00 Rp 1.024.000,00
panjang 4m
JUMLAH Rp 7.975.687,29
Overhead &Profit (Contoh 15%) Rp 1.196.353,09
JUMLAH TOTAL Rp 9.172.040,38
TENAGA
Pekerja Oh 0,600 Rp 130.200,00 Rp 78.120,00
A Tukang Batu Oh 0,200 Rp 149.730,00 Rp 29.946,00
Kepala Tukang Oh 0,020 Rp 174.468,00 Rp 3.489,36
Mandor Oh 0,030 Rp 174.468,00 Rp 5.234,04
BAHAN
Batu Merah Bh 140,000 Rp 650,00 Rp 91.000,00
B
PC Kg 43,500 Rp 1.500,00 Rp 65.250,00
Pasir Pasang m3 0,080 Rp 231.250,00 Rp 18.500,00
JUMLAH Rp 291.539,40
Overhead &Profit (Contoh 15%) Rp 43.730,91
JUMLAH TOTAL Rp 335.270,31
TENAGA
Pekerja Oh 0,300 Rp 130.200,00 Rp 39.060,00
A Tukang Batu Oh 0,150 Rp 149.730,00 Rp 22.459,50
Kepala Tukang Oh 0,015 Rp 174.468,00 Rp 2.617,02
Mandor Oh 0,015 Rp 174.468,00 Rp 2.617,02
B BAHAN
15
PC Kg 15,504 Rp 1.500,00 Rp 23.256,00
Pasir Pasang m3 0,016 Rp 231.250,00 Rp 3.700,00
JUMLAH Rp 93.709,54
Overhead &Profit (Contoh 15%) Rp 14.056,43
JUMLAH TOTAL Rp 107.765,97
PEKERJAAN ACIAN
TENAGA
Pekerja Oh 0,200 Rp 130.200,00 Rp 26.040,00
A Tukang Batu Oh 0,100 Rp 149.730,00 Rp 14.973,00
Kepala Tukang Oh 0,010 Rp 174.468,00 Rp 1.744,68
Mandor Oh 0,010 Rp 174.468,00 Rp 1.744,68
BAHAN
B
PC Kg 3,250 Rp 1.500,00 Rp 4.875,00
JUMLAH Rp 49.377,36
Overhead &Profit (Contoh 15%) Rp 7.406,60
JUMLAH TOTAL Rp 56.783,96
PEKERJAAN LANTAI
TENAGA
Pekerja Oh 0,250 Rp 130.200,00 Rp 32.550,00
A Tukang Batu Oh 0,125 Rp 149.730,00 Rp 18.716,25
Kepala Tulkang Oh 0,013 Rp 164.052,00 Rp 2.132,68
Mandor Oh 0,013 Rp 174.468,00 Rp 2.268,08
BAHAN
Ubin Warna Bh 6,630 Rp 37.500,00 Rp 248.625,00
B Semen Portlan Kg 9,800 Rp 1.500,00 Rp 14.700,00
Semen Warna Kg 1,300 Rp 7.300,00 Rp 9.490,00
Pasir pasang m3 0,045 Rp 231.250,00 Rp 10.406,25
JUMLAH Rp 338.888,26
Overhead &Profit (Contoh 15%) Rp 50.833,24
JUMLAH TOTAL Rp 389.721,50
16
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
TENAGA
Pekerja Oh 0,270 Rp 130.200,00 Rp 35.154,00
A Tukang Batu Oh 0,135 Rp 149.730,00 Rp 20.213,55
Kepala Tulkang Oh 0,014 Rp 164.052,00 Rp 2.296,73
Mandor Oh 0,014 Rp 174.468,00 Rp 2.442,55
BAHAN
Ubin Warna Bh 26,500 Rp 37.500,00 Rp 993.750,00
B Semen Portlan Kg 10,400 Rp 1.500,00 Rp 15.600,00
Semen Warna Kg 1,620 Rp 7.300,00 Rp 11.826,00
Pasir pasang m3 0,045 Rp 231.250,00 Rp 10.406,25
JUMLAH Rp 1.091.689,08
Overhead &Profit (Contoh 15%) Rp 163.753,36
JUMLAH TOTAL Rp 1.255.442,44
TENAGA
Pekerja Oh 0,150 Rp 130.200,00 Rp 19.530,00
A Tukang Kayu Oh 0,075 Rp 149.730,00 Rp 11.229,75
Kepala Tukang Oh 0,008 Rp 164.052,00 Rp 1.312,42
Mandor Oh 0,008 Rp 174.468,00 Rp 1.395,74
BAHAN
B Genteng
Bh 25,000 Rp 2.000,00 Rp 50.000,00
Pelentong/Vlampress
JUMLAH Rp 83.467,91
Overhead &Profit (Contoh 15%) Rp 12.520,19
JUMLAH TOTAL Rp 95.988,10
TENAGA
A Pekerja Oh 0,200 Rp 130.200,00 Rp 26.040,00
Tukang Besi Oh 0,450 Rp 149.730,00 Rp 67.378,50
17
Kepala Tukang Oh 0,100 Rp 164.052,00 Rp 16.405,20
Mandor Oh 0,050 Rp 174.468,00 Rp 8.723,40
BAHAN
C75 0,8 m 1,488 Rp 75.000,00 Rp 111.600,00
c750,6 m 2,232 Rp 200.000,00 Rp 446.400,00
B Baut bh 38 Rp 34.000,00 Rp 1.292.000,00
Dynabold bh 1,6 Rp 15.000,00 Rp 24.000,00
Reng m 5,4 Rp 120.000,00 Rp 648.000,00
Talang jurai m 0,124 Rp 105.000,00 Rp 13.020,00
JUMLAH Rp 2.653.567,10
Overhead &Profit (Contoh 15%) Rp 398.035,07
JUMLAH TOTAL Rp 3.051.602,17
PEKERJAAN LISTPLANK
TENAGA
Pekerja Oh 0,100 Rp 130.200,00 Rp 13.020,00
A Tukang Kayu Oh 0,200 Rp 149.730,00 Rp 29.946,00
Kepala Tukang Oh 0,020 Rp 164.052,00 Rp 3.281,04
Mandor Oh 0,005 Rp 174.468,00 Rp 872,34
BAHAN
B Kayu papan Kamper m3 0,007 Rp 5.842.000,00 Rp 42.062,40
Paku 2"-5" kg 0,05 Rp 39.000,00 Rp 1.950,00
JUMLAH Rp 91.131,78
Overhead &Profit (Contoh 15%) Rp 13.669,77
JUMLAH TOTAL Rp 104.801,55
PEKERJAAN BUBUNGAN
TENAGA
Pekerja Oh 0,084 Rp 130.200,00 Rp 10.936,80
A Tukang Kayu Oh 0,125 Rp 149.730,00 Rp 18.716,25
Kepala Tukang Oh 0,013 Rp 164.052,00 Rp 2.132,68
Mandor Oh 0,004 Rp 174.468,00 Rp 697,87
BAHAN
B Nok Stel Gelombang lbr 2,1 Rp 29.000,00 Rp 60.900,00
Paku Skrup 3,5" kg 6 Rp 26.700,00 Rp 160.200,00
JUMLAH Rp 253.584
Overhead &Profit (Contoh 15%) 38.037,54
18
JUMLAH TOTAL Rp 291.621
TENAGA
Pekerja Oh 0,100 Rp 130.200,00 Rp 13.020,00
A Tukang Kayu Oh 0,050 Rp 149.730,00 Rp 7.486,50
Kepala Tukang Oh 0,005 Rp 164.052,00 Rp 820,26
Mandor Oh 0,005 Rp 174.468,00 Rp 872,34
BAHAN
B Gypsum Borad Bh 0,364 Rp 85.000,00 Rp 30.940,00
Paku Skrup Kg 0,110 Rp 26.700,00 Rp 2.937,00
JUMLAH Rp 56.076,10
Overhead &Profit (Contoh 15%) Rp 8.411,42
JUMLAH TOTAL Rp 64.487,52
TENAGA
Pembantu Tukang Oh 0,27 Rp 130.200,00 Rp 35.154,00
A Tukang Kayu Oh 0,4 Rp 149.730,00 Rp 59.892,00
Kepala Tukang Oh 0,04 Rp 164.052,00 Rp 6.562,08
Mandor Oh 0,014 Rp 174.468,00 Rp 2.442,55
BAHAN
Kayu Klas II (Balok 5/7) m3 0,023 Rp 17.000,00 Rp 391,00
B Triplek Tebal 4mm
Lbr 0,39 Rp 69.100,00 Rp 26.949,00
1,10x2,10 m
Paku Triplek / Eternit Kg 0,06 Rp 25.600,00 Rp 1.536,00
JUMLAH Rp 132.926,63
Overhead &Profit (Contoh 15%) Rp 19.938,99
JUMLAH TOTAL Rp 152.865,63
PEKERJAAN PLUMBING
19
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
TENAGA
Pekerja Oh 1 Rp 130.200,00 Rp 130.200,00
A tukang Batu Oh 1,5 Rp 149.730,00 Rp 224.595,00
Kepala Tukang Oh 15 Rp 164.052,00 Rp 2.460.780,00
Mandor Oh 0,16 Rp 174.468,00 Rp 27.914,88
BAHAN
Closet Jongkok Bh 1 Rp 345.800,00 Rp 345.800,00
B
semen Portland Kg 6 Rp 1.500,00 Rp 9.000,00
Pasir Pasang M3 0,01 Rp 231.250,00 Rp 2.312,50
JUMLAH Rp 3.200.602,38
Overhead &Profit (Contoh 15%) Rp 480.090,36
JUMLAH TOTAL Rp 3.680.692,74
TENAGA
Pekerja Oh 6 Rp 130.200,00 Rp 781.200,00
A tukang Batu Oh 3 Rp 149.730,00 Rp 449.190,00
Kepala Tukang Oh 0,3 Rp 164.052,00 Rp 49.215,60
Mandor Oh 0,03 Rp 174.468,00 Rp 5.234,04
BAHAN
Bata Merah Bh 150 650 Rp 97.500
Semen Portlan Kg 120 1.500 Rp 180.000
B
Pasir Pasang M3 0,3 231.250 Rp 69.375
Porselen 11X11 bh 360 86.000 Rp 30.960.000
Semen Warna kg 6 7.300 Rp 43.800
JUMLAH Rp 32.635.514,64
Overhead &Profit (Contoh 15%) Rp 4.895.327,20
JUMLAH TOTAL Rp 37.530.841,84
PEKERJAAN PENGECATAN
PENGECATAN TEMBOK BARU (1lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
TENAGA
A
Pekerja Oh 0,02 Rp 130.200,00 Rp 2.604,00
20
Tukang Cat Oh 0,063 Rp 130.200,00 Rp 8.202,60
Kepala Tukang Oh 0,006 Rp 130.200,00 Rp 781,20
Mandor Oh 0,003 Rp 174.468,00 Rp 523,40
BAHAN
Plamir Tembok Kg 0,100 Rp 21.000,00 Rp 2.100,00
B
Cat Dasar Kg 0,100 Rp 35.000,00 Rp 3.500,00
Cat Penutup 2x Kg 0,260 Rp 35.000,00 Rp 9.100,00
JUMLAH Rp 26.811,20
Overhead &Profit (Contoh 15%) Rp 4.021,68
JUMLAH TOTAL Rp 30.832,88
PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMUR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
TENAGA
Pekerja Oh 0,07 Rp 130.200,00 Rp 9.114,00
A Tukang Cat Oh 0,009 Rp 130.200,00 Rp 1.171,80
Kepala Tukang Oh 0,006 Rp 130.200,00 Rp 781,20
Mandor Oh 0,003 Rp 174.468,00 Rp 523,40
BAHAN
Plamir Tembok Kg 0,170 Rp 21.000,00 Rp 3.570,00
B
Cat Dasar Kg 0,170 Rp 35.000,00 Rp 5.950,00
Cat Penutup 2x Kg 0,260 Rp 35.000,00 Rp 9.100,00
JUMLAH Rp 30.210,40
Overhead &Profit (Contoh 15%) Rp 4.531,56
JUMLAH TOTAL Rp 34.741,96
PEKERJAAN LISTRIK
TENAGA
A Pekerja Oh 2,237 Rp 130.200,00 Rp 291.236,84
Mandor Oh 0,5 Rp 174.468,00 Rp 87.234,00
BAHAN
B
Saklar Tunggal bh 1,000 Rp 22.300,00 Rp 22.300,00
JUMLAH Rp 400.770,84
Overhead &Profit (Contoh 15%) Rp 60.115,63
JUMLAH TOTAL Rp 460.886,47
21
PEKERJAAN SAKLAR GANDA
TENAGA
A Pekerja Oh 2,237 Rp 130.200,00 Rp 291.236,84
Mandor Oh 0,5 Rp 174.468,00 Rp 87.234,00
BAHAN
B
Saklar Ganda bh 1,000 Rp 25.500,00 Rp 25.500,00
JUMLAH Rp 403.970,84
Overhead &Profit (Contoh 15%) Rp 60.595,63
JUMLAH TOTAL Rp 464.566,47
TENAGA
A Pekerja Oh 2,237 Rp 130.200,00 Rp 291.236,84
Mandor Oh 0,5 Rp 174.468,00 Rp 87.234,00
BAHAN
B
Lampu Sl philip 25 watt bh 1 Rp 5.500,00 Rp 5.500,00
JUMLAH Rp 383.970,84
Overhead &Profit (Contoh 15%) Rp 57.595,63
JUMLAH TOTAL Rp 441.566,47
TENAGA
A Pekerja Oh 2,237 Rp 130.200,00 Rp 291.236,84
Mandor Oh 0,5 Rp 174.468,00 Rp 87.234,00
BAHAN
B Downlight + SL 25 watt
Rp 9.100,00 Rp 9.100,00
philip bh 1
JUMLAH Rp 387.570,84
Overhead &Profit (Contoh 15%) Rp 58.135,63
JUMLAH TOTAL Rp 445.706,47
A TENAGA
22
Pekerja Oh 2,237 Rp 130.200,00 Rp 291.236,84
Mandor Oh 0,5 Rp 174.468,00 Rp 87.234,00
BAHAN
B Stop kontak broko standard
Rp 22.300,00 Rp 22.300,00
(1 phase) bh 1
JUMLAH Rp 400.770,84
Overhead &Profit (Contoh 15%) Rp 60.115,63
JUMLAH TOTAL Rp 460.886,47
PEKERJAAN SANITAIR
A TENAGA
Pekerja Oh 0,036 Rp 130.200,00 Rp 4.687,20
tukang Batu Oh 0,06 Rp 149.730,00 Rp 8.983,80
Kepala Tukang Oh 0,006 Rp 164.052,00 Rp 984,31
Mandor Oh 0,002 Rp 174.468,00 Rp 348,94
B BAHAN
Pipa PVC 1" m 1,2 Rp 45.000,00 Rp 54.000,00
JUMLAH Rp 69.004,25
Overhead &Profit (Contoh 15%) Rp 10.350,64
JUMLAH TOTAL Rp 79.354,89
A TENAGA
Pekerja Oh 0,081 Rp 130.200,00 Rp 10.546,20
tukang Batu Oh 0,135 Rp 149.730,00 Rp 20.213,55
Kepala Tukang Oh 0,0135 Rp 164.052,00 Rp 2.214,70
Mandor Oh 0,004 Rp 174.468,00 Rp 697,87
BAHAN
B
Pipa PVC 1" m 1,2 Rp 274.600,00 Rp 329.520,00
JUMLAH Rp 363.192,32
Overhead &Profit (Contoh 15%) Rp 54.478,85
JUMLAH TOTAL Rp 417.671,17
23
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN (RP) JUMLAH HARGA (RP)
TENAGA
Pekerja Oh 0,081 Rp 130.200,00 Rp 10.546,20
A tukang Batu Oh 0,135 Rp 149.730,00 Rp 20.213,55
Kepala Tukang Oh 0,0135 Rp 164.052,00 Rp 2.214,70
Mandor Oh 0,004 Rp 174.468,00 Rp 697,87
BAHAN
B
Pipa PVC 1" m 1,2 Rp 274.600,00 Rp 329.520,00
JUMLAH Rp 363.192,32
Overhead &Profit (Contoh 15%) Rp 54.478,85
JUMLAH TOTAL Rp 417.671,17
24
BAB 5
25
18 Roll cat bh 25.000
19 Cat tembok kg 30.000
20 Planir kg 21.000
21 List gypsum profil m' 16.000
22 Tepung gypsum kg 7.200
23 Genteng nok/bubungan plentong bh 35.000
24 Paku skrup kg 26.700
25 Dolken Dia(8-10) cm, panjang 4 m btg 32.000
26
BAB 6
GAMBAR KERJA*
(terlampir)
27
28
BAB 7
KURVA S
29
B
O WAKTU (MINGGU)
D
PEK B
N PEK. UR
ERJA O
O SEBELUM AS
AN T
I
(%
) 1 2
PEK
ERJA
AN
-
PER 0,
5.83
SIAP 3, 5.447470817
38
5.058365759
4.6692607
I AN 8 11 4.280155642 0,3891 91
3.891050584
PEK 3.501945525
3.112840467
2.723735409
ERJA 2.33463035
1.945525292
1.556420233
AN 24 1.167315175
0.778210117
TAN ,1 0.389105058
II AH I 62 2
PEK
ERJA
AN
II PON 6,
I DASI II 16 23
PEK
ERJA
AN
STR
UKT
UR
BET
ON
BER
I TUL 2,
V ANG III 7 72
30
PEK
ERJA
AN
DIN
DIN
G&
PLES 30
TER ,3
V AN IV 78 5
PEK
ERJA
AN
V LAN 1,
I TAI V 3 17
PEK
ERJA
AN
V ATA 1,
II P VI 3 17
PEK
ERJA
AN
LAN
V GIT
II LAN 2,
I GIT VII 7 72
PEK
ERJA
AN
PLU 23
I MBI ,3
X NG VIII 60 5
PEK 1,
X ERJA IX 5 95
31
AN
PEN
GEC
TAN
PEK
ERJA
AN
X LIST 2,
I RIK X 6 33
PEK
ERJA
AN
X SANI 0,
II TAIR XI 2 78
10
25 0,
TOTAL 7 00
BOBOT
0, 0, 0,
BULANA
38 38 38
N (%)
91 91 0,3891 91
BOBOT 0, 0, 1,
KUMULA 38 77 55
TIF (%) 91 82 1,1673 64
32