LAPORAN KEMAJUAN

STUDIO PERENCANAAN TAMBANG I


TAMBANG TIMAH PRIMER
(TA-4124) PERENCANAAN TAMBANG I
Tanggal 15 November 2019 – 23 November 2019

Kelompok 14
Timah

Anggota Kelompok :
Farhan Sulthan Sammary 12116050
Iqlima Nur Annisa 12116010
Asril Fitrabuana 12116013
Jalu De Neiro Mozes Rais Indonesia 12116060
M. Marwan Aziz 12116080

PROGRAM STUDI TEKNIK PERTAMBANGAN


FAKULTAS TEKNIK PERTAMBANGAN DAN PERMINYAKAN
INSTITUT TEKNOLOGI BANDUNG
2019

MILESTONE PEKERJAAN
SEPTEMBER OKTOBER NOVEMBER DESEMBER

PEKERJAAN 1 2 3 4 1 2 3 4 1 2 3 4 1 2
1 Pembuatan Milestone Pekerjaan V V
Penentuan Ultimate Pit Limit dan V
2
Perhitungan Cadangan V
3 Perancangan Pushback/Sequences
v V
4 Penjadwalan Produksi
v V
Perancangan Jalan dan Tata Letak
5 V
Tambang
Perancangan ROM Stockpile dan v
6
Waste Dump v
Perancangan Sistem Penyaliran
7
Tambang
Perencanaan Kebutuhan Peralatan v
8
Tambang V
Perencanaan SMK3, Struktur
9
Organisasi Perusahaan, Tenaga Kerja
1
Perencanaan Pengelolaan Lingkungan
0
1 Perencanaan CSR (Corporate Social
1 Resposibility)
1 Analisis Kelayakan Ekonomi (IRR,
2 NPV, PBP, BEP)
1 Persiapan Laporan Akhir dan
3 Presentasi
1
Laporan Akhir dan Presentasi
4
JARAK TEMPUH

Dari pit ke wastedump

Dari pit ke stockpile


PERALATAN TAMBANG

Target produksi tahunan

Perhitungan Excavator
Kebutuhan Excavator Tiap Tahun

Perhitungan Dumptruck
Panjang Jalan Kebutuhan Dumptruck

Sehingga match factor yang didapat adalah sebagai berikut.


PERALATAN GALI MUAT ANGKUT

Material Density 3,3 ton/m3


Overburden Density 2,7 ton/m3

Effective Working Time 5840 hours/year

Target Produksi (BcM/Jam)

Target Produksi
Tahun
OB (BCM/Jam) Ore (BCM/Jam) SR %sn

1 53,78 9,45 5,30 0,43


2 93,50 15,11 5,77 0,51
3 89,08 15,36 5,38 0,51
4 120,52 20,17 5,61 0,39
5 80,69 13,58 5,45 0,56
6 97,41 16,15 5,55 0,49
7 112,47 18,65 5,51 0,41
8 95,91 16,67 5,25 0,46
9 122,75 19,73 5,57 0,38
10 85,37 14,84 5,21 0,51
11 57,81 19,14 5,44 0,40
12 54,47 17,78 5,25 0,42
13 58,73 19,55 5,60 0,38
14 58,97 19,36 5,03 0,39
15 48,10 15,79 3,94 0,38

Alat Gali Muat


Ore  Ore ( PC 200-8)
Excavator
PC 200-8
Cms (S) 17,00
Cms x Correction Factor 1,3 22,10
bucket
capacity q1 0,5
Prtoduction per
(LCM)
cycle
Bucket Fill
K 0,8
Factor (%)
Job Efficiency E 0,83
Swell Factor 0,74
LCM/jam 54,08
Produktivitas BCM/jam 40,02
Ton/jam 132,07
 Overburden
(PC-600-8)
Ore Ore OB OB
Excavator Excavator
PC 200-8 PC 200-8PC 600-8 PC 600-8

Cms (S) Cms (S) 17,00 17,00 20,00 20,00

Cms x Correction Factor Cms x Correction


1,3 Factor 22,10 1,3 22,10 26,00 26,00

bucket capacity (LCM) bucket


q1 capacity (LCM) 0,5 q1 0,5 2,8 2,8
Prtoduction Prtoduction
per cycle Bucket Fill Factor
per (%) K Fill Factor (%) 0,8
cycle Bucket K 0,8 0,8 0,8

Job Efficiency E
Job Efficiency 0,83 E 0,83 0,83 0,83
Swell Factor Swell Factor 0,74 0,74 0,74 0,74
LCM/jam LCM/jam
Ore
54,08 54,08 257,43
OB
257,43
Produktivitas BCM/jam
Produktivitas Year
BCM/jam PC
40,02 40,02 190,50 Year PC
190,50
Ton/jam Ton/jam 200-8
132,07 132,07 514,34 600-8
514,34
1 1 1 1
2 1 2 1
3 1 3 1
4 tiap 1Tahun
Kebutuhan Alat Gali 4 1
5 1 5 1
Ore 6 Ore1 OB 6 OB1
Year PC Year 7 PC1 Year PC Year
7 PC1
200-8 8 200-8 1 600-8 8 600-8
1
1 1 19 1 1 1 91 1
2 1 10 2 1 2 1 102 1
3 1 11 3 1 3 1 113 1
4 1 12 4 1 4 1 124 1
5 1 13 5 1 5 1 135 1
6 1 14 6 1 6 1 146 1
7 1 15
7 1 7 1 157 1
8 1 8 1 8 1 8 1
9 1 9 1 9 1 9 1
10 1 10 1 10 1 10 1
11 1 11 1 11 1 11 1
12 1 12 1 12 1 12 1
13 1 13 1 13 1 13 1
14 1 14 1 14 1 14 1
15 1 15 1 15 1 15 1
Alat Muat

 Overburden
OB
Dump Truck Simbol PC 600-8
HD 405-7
Loading time (min) nxCms 10,8
Hauling time (min) D/V1 7,51
Cycle Time
Returning time (min) D/V2 2,7
DT
Dumping time (min) t1 1,2
spot and delay time (min) t2 0,30
Average Speed of Loaded DT (m/min ) V1 250
Average Speed of Empty DT (m/min) V2 333
Number of Rated capacity of DT (LCM) C1 27,30
cycle required
for loader to
Bucket capacity of loader (LCM) q1 1,40
fill DT Bucket fill factor K 0,80
Cycle Time Loader (min) Cms 0,43
Total Cmt 22,50
Number of cycle for loader to fill
Production dump truck n 25
per cycle
Bucket capacity loader (LCM) q1 1,40
©
Bucket fill factor of loader K 0,80
Job Efficiency E 0,83
Swell Factor 0,74
LCM/jam 61,97
Hourly Production (Untuk 1 DT) BCM/jam 45,86
Ton/jam 320,99

 Ore
 Ore
Dump Truck Simbol PC200-8
Hino Dutro 130 HD
Loading time (min) nxCms 4,8
Hauling time (min) D/V1 3,40
Cycle Time
Returning time (min) D/V2 2,6
DT
Dumping time (min) t1 0,5
spot and delay time (min) t2 0,20
Average Speed of Loaded DT (m/min ) V1 250
Average Speed of Empty DT (m/min) V2 333
Number of Rated capacity of DT (LCM) C1 5,00
cycle required
for loader to
Bucket capacity of loader (LCM) q1 0,50
fill DT Bucket fill factor K 0,80
Cycle Time Loader (min) Cms 0,37
Total Cmt 11,45
Number of cycle for loader to fill
Production dump truck n 13
per cycle
Bucket capacity loader (LCM) q1 0,50
©
Bucket fill factor of loader K 0,80
Job Efficiency E 0,83
Swell Factor 0,74
LCM/jam 22,62
Hourly Production (Untuk 1 DT) BCM/jam 16,74
Ton/jam 45,20

Kebutuhan Alat Muat


Truck
Distance (m) CT
Needs
Year
OB Ore
OB Ore OB Ore
(min) (min)
1 885 851 1 1 11,68 11,45
2 1166 1163 2 2 13,65 13,63
3 1294 1098 2 2 14,55 13,18
4 1734 1585 3 2 17,63 16,58
5 1773 1040 2 1 17,90 12,77
6 1869 1130 2 2 18,57 13,40
7 1829 1151 2 2 18,29 13,55
8 2248 1299 2 2 21,23 14,58
9 1981 951 3 2 19,36 12,15
10 2171 1151 2 2 20,69 13,55
11 2123 1006 2 2 20,35 12,53
12 2271 1118 2 2 21,39 13,31
13 2156 1351 2 2 20,58 14,95
14 2126 1602 2 2 20,37 16,70
15 2547 1922 2 2 23,32 18,94

Penentuan Match Factor

𝑀𝑎𝑡𝑐ℎ 𝐹𝑎𝑐𝑡𝑜𝑟=(𝑁𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑃𝑎𝑠𝑠 ×𝐶𝑦𝑐𝑙𝑒 𝑇𝑖𝑚𝑒 𝐸𝑥𝑐 ×𝑁𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝐷𝑇)/(𝐶𝑦𝑐𝑙𝑒 𝑇𝑖𝑚𝑒 𝐷𝑇


×𝑁𝑢𝑚𝑏𝑒𝑟 𝑂𝑓 𝐸𝑥𝑐)

Match Factor
Tahun
OB Ore
1 0,71 0,32
2 1,22 0,54
3 1,15 0,56
4 1,42 0,44
5 0,93 0,29
6 0,90 0,55
7 0,91 0,54
8 0,79 0,51
9 1,29 0,61
10 0,81 0,54
11 0,82 0,59
12 0,78 0,55
13 0,81 0,49
14 0,82 0,44
15 0,71 0,39
LAMPIRAN

Gambar HD 405-7

Sumber: https://st.mascus.com/imagetilewm/product/90756d6c/komatsu-hd405-7,216c750d.jpg

Gambar Hino Dutro 130 –HD

Sumber : www.dutahino.co.id
Gambar PC 200-8

Sumber : www.tradeearthmovers.com.au

Gambar PC 600-8

Sumber : www.lectura-specs.com