O
ARS
SUD
. YO
JLN
N BO
I
JLN. KARTIN
JLN . R
A JA WA
KAKAA
IN
TAMR
USN I
JLN. H
M WURUK
JLN. HA YA KA
LI
AM
BO
N
KOTA BAU-BAU
I NG
ELA
. LA
KECAMATAN BETOAMBARI JLN
KA
L IA
M
BO
N
RENCANA LOKASI
PENANGANAN
DENGAN SHEET PILE
PETA LOKASI
LAY OYUT PEKERJAAN
SKALA 1: 1800
02
N
0 +3 0
0+40
0 +2 5
0
0
0+350
0+
4
0+
50
70 4
0+2
0+1
00
e le n g
00
Lo
va sora
si
ra n
ta
-r
0+
ata
±
1.2
m
0+
150
135
Kecamatan Sambaliung
0+0
50
0+0
00
PROFIL MELINTANG 12.000 12.000
11.000 11.000
Keterangan : 10.000 10.000
Horizontal 1 : 1000 9.000 9.000
Vertikal 1 : 100 8.000 8.000
Top Siring 7.000 7.000
Station STA
(
6.000 6.000
Exisisting Jalan/Sungai
5.000 5.000
Rumah Penduduk 4.000 4.000
Station ( STA ) 0+000 0+050 0100 0+150 0+200 0+250 0+300 0+350 0+400 0+450 0+473
Elevasi Rencana Jalan 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000
Existing Jalan 9.664 9.594 9.672 9.870 9.580 9.565 9.595 9.515 9.545 9.584 9.815
Existing Sungai 8.478 7.768 7.708 7.430 7.523 7.113 7.282 7.202 7.354 7.598 8.007 SITUASI
DAN PROFIL MEMANJANG
09
Lampu Taman
Jalan Refleksi
Pedestrian Pedestrian Drainase
Pipa Drainase Ø4"
Rigid Pavement K-400, t=25 cm Pipa Ø4"
Rigid Pavement K-400, t=25 cm
Beton BO ; t=10 cm 12.00 12.00 Pipa Reling Ø 4" Beton BO ; t=10 cm
300 1000 9000 200 500 200 1000 200 500 2400 1000 850 Stainlees Steel 9000 2000 300
11.00 11.00
Besi Plat t=12 mm
Capping Beam 850x500
Capping Beam 850x500
300
2% 2% 2% 2%
200
200
10.00 10.00
Pasangan Batu Pasangan Batu
Sheet Pile W-450 B L=16 m Sheet Pile W-450 B L=16 m
HWL 9.245 HWL 9.245
9.00 9.00 1000
1512
1845 Tie Rod D40 L=12 m Tie Rod D40 L=12 m
Mini Pile 10/10 2745 8.00 8.00 3064 Turap Ulin Eksisting Mini Pile 10/10
7350 13463 8000
7.00 7.00
Tiang Pancang Ø500 L=10 m
Tiang Pancang Ø500 L=10 m
Turap Ulin Eksisting Timbunan Pilihan
Timbunan Pilihan
1200
Geotextile Woven 6.00 6.00 9509
Material
Equivalen Gw-250 (Berat 250 Porous
mgr/m²)
1200
Geotextile Woven
Dibungkus Dengan Equivalen Gw-250 (Berat 250 mgr/m²)
Timbunan Pilihan
Geotextile Non-Woven 5.00 5.00 Timbunan Pilihan
UW-300 (Berat 300 mgr/m²)
Material Porous
Dibungkus Dengan
7800 Geotextile Non-Woven
UW-300 (Berat 300 mgr/m²)
STA 0 + 000
EXISTING TANAH DASAR (M) EXISTING TANAH DASAR (M)
9.491
9.534
9.666
9.594
8.478
9.664
9.663
9.654
8.863
7.768
7.168
6.635
5.814
5.468
5.778
6.621
7.193
7.967
16 8 4 0 -4 -8 -12 -16 JARAK (M) JARAK (M) -18 -20 -22 -26 -28 -30 -32 -36
h g f e d c b a NO. PATOK NO. PATOK a1 b1 c1 d1 e1 f1 g1 h1
Lampu Taman
Jalan Refleksi
Pedestrian Pedestrian Drainase
Pipa Drainase Ø4"
Rigid Pavement K-400, t=25 cm Pipa Ø4"
Rigid Pavement K-400, t=25 cm
Beton BO ; t=10 cm 12.00 12.00 Pipa Reling Ø 4" Beton BO ; t=10 cm
300 1000 9000 200 500 200 1000 200 500 2400 1000 850 Stainlees Steel 9000 2000 300
11.00 11.00
Besi Plat t=12 mm
Capping Beam 850x500
Capping Beam 850x500
300
2% 2% 2% 2%
200
200
10.00 10.00
Pasangan Batu Pasangan Batu
Sheet Pile W-450 B L=16 m Sheet Pile W-450 B L=16 m
HWL 9.245 HWL 9.245
9.00 9.00 1000
1512
1845 Tie Rod D40 L=12 m Tie Rod D40 L=12 m
Mini Pile 10/10 2745 8.00 8.00 3064 Turap Ulin Eksisting Mini Pile 10/10
7350 13463 8000
7.00 7.00
Tiang Pancang Ø500 L=10 m
Tiang Pancang Ø500 L=10 m
Turap Ulin Eksisting Timbunan Pilihan
Timbunan Pilihan
1200
Geotextile Woven 6.00 6.00 9509
Material
Equivalen Gw-250 (Berat 250 Porous
mgr/m²)
1200
Geotextile Woven
Dibungkus Dengan Equivalen Gw-250 (Berat 250 mgr/m²)
Timbunan Pilihan
Geotextile Non-Woven 5.00 5.00 Timbunan Pilihan
UW-300 (Berat 300 mgr/m²)
Material Porous
Dibungkus Dengan
7800 Geotextile Non-Woven
UW-300 (Berat 300 mgr/m²)
STA 0 + 200
EXISTING TANAH DASAR (M) EXISTING TANAH DASAR (M)
9.491
9.534
9.666
9.594
9.664
9.663
9.654
7.768
7.168
6.635
5.814
5.468
5.778
6.621
7.193
7.967
8.478
8.863
16 8 4 0 -4 -8 -12 -16 JARAK (M) JARAK (M) -18 -20 -22 -26 -28 -30 -32 -36
h g f e d c b a NO. PATOK NO. PATOK a b c d e f g h
Lampu Taman
Jalan Refleksi
Pedestrian Pedestrian Drainase
Pipa Drainase Ø4"
Rigid Pavement K-400, t=25 cm Pipa Ø4"
Rigid Pavement K-400, t=25 cm
Beton BO ; t=10 cm 12.00 12.00 Pipa Reling Ø 4" Beton BO ; t=10 cm
300 1000 9000 200 500 200 1000 200 500 2400 1000 850 Stainlees Steel 9000 2000 300
11.00 11.00
Besi Plat t=12 mm
Capping Beam 850x500
Capping Beam 850x500
300
2% 2% 2% 2%
200
200
10.00 10.00
Pasangan Batu Pasangan Batu
Sheet Pile W-450 B L=16 m Sheet Pile W-450 B L=16 m
HWL 9.245 HWL 9.245
9.00 9.00 1000
1512
1845 Tie Rod D40 L=12 m Tie Rod D40 L=12 m
Mini Pile 10/10 2745 8.00 8.00 3064 Turap Ulin Eksisting Mini Pile 10/10
7350 13463 8000
7.00 7.00
Tiang Pancang Ø500 L=10 m
Tiang Pancang Ø500 L=10 m
Turap Ulin Eksisting Timbunan Pilihan
Timbunan Pilihan
1200
Geotextile Woven 6.00 6.00 9509
Material
Equivalen Gw-250 (Berat 250 Porous
mgr/m²)
1200
Geotextile Woven
Dibungkus Dengan Equivalen Gw-250 (Berat 250 mgr/m²)
Timbunan Pilihan
Geotextile Non-Woven 5.00 5.00 Timbunan Pilihan
UW-300 (Berat 300 mgr/m²)
Material Porous
Dibungkus Dengan
7800 Geotextile Non-Woven
UW-300 (Berat 300 mgr/m²)
STA 0 + 400
EXISTING TANAH DASAR (M) EXISTING TANAH DASAR (M)
9.491
9.534
9.666
9.594
8.478
9.664
9.663
9.654
8.863
7.768
7.168
6.635
5.814
5.468
5.778
6.621
7.193
7.967
16 8 4 0 -4 -8 -12 -16 JARAK (M) JARAK (M) -18 -20 -22 -26 -28 -30 -32 -36
h g f e d c b a NO. PATOK NO. PATOK a b c d e f g h
Lampu Taman
Jalan Refleksi
Pedestrian Pedestrian Drainase
Pipa Drainase Ø4"
Rigid Pavement K-400, t=25 cm Pipa Ø4"
Rigid Pavement K-400, t=25 cm
Beton BO ; t=10 cm 12.00 12.00 Pipa Reling Ø 4" Beton BO ; t=10 cm
300 1000 9000 200 500 200 1000 200 500 2400 1000 850 Stainlees Steel 9000 2000 300
11.00 11.00
Besi Plat t=12 mm
Capping Beam 850x500
Capping Beam 850x500
300
2% 2% 2% 2%
200
200
10.00 10.00
Pasangan Batu Pasangan Batu
Sheet Pile W-450 B L=16 m Sheet Pile W-450 B L=16 m
HWL 9.245 HWL 9.245
9.00 9.00 1000
1512
1845 Tie Rod D40 L=12 m Tie Rod D40 L=12 m
Mini Pile 10/10 2745 8.00 8.00 3064 Turap Ulin Eksisting Mini Pile 10/10
7350 13463 8000
7.00 7.00
Tiang Pancang Ø500 L=10 m
Tiang Pancang Ø500 L=10 m
Turap Ulin Eksisting Timbunan Pilihan
Timbunan Pilihan
1200
Geotextile Woven 6.00 6.00 9509
Material
Equivalen Gw-250 (Berat 250 Porous
mgr/m²)
1200
Geotextile Woven
Dibungkus Dengan Equivalen Gw-250 (Berat 250 mgr/m²)
Timbunan Pilihan
Geotextile Non-Woven 5.00 5.00 Timbunan Pilihan
UW-300 (Berat 300 mgr/m²)
Material Porous
Dibungkus Dengan
7800 Geotextile Non-Woven
UW-300 (Berat 300 mgr/m²)
STA 0 + 470
EXISTING TANAH DASAR (M) EXISTING TANAH DASAR (M)
9.491
9.534
9.666
9.594
9.664
9.663
9.654
7.768
7.168
6.635
5.814
5.468
5.778
6.621
7.193
7.967
8.478
8.863
16 8 4 0 -4 -8 -12 -16 JARAK (M) JARAK (M) -18 -20 -22 -26 -28 -30 -32 -36
h g f e d c b a NO. PATOK NO. PATOK a b c d e f g h
996 996 996 996
450 278 440 278
123 155 155 123
30
330
330
400
450
120
120
100
330
330
450
120
120
155 246 155
996
POTONGAN B-B
SKALA 1: 25
DETAIL SHEET PILE 1: 25
TAMPAK SAMPING SHEET PILE TYPE CCSP-450 B
SKALA 1: 25 SKALA 1: 25
24
850
500
CNP 26 800
Bearing Plat 200x200x12
Pipa PVC 2" Sambungan
Bearing Plat 200x200x12
Tie Rod D40 L=12 m
800
DETAIL SAMBUNGAN TIE ROD
SKALA 1: 50
Tie Rod D 40 (Upset end Tie Rod)
Pipa PVC Ø 2" (Plain Tie-Rod)
Lapisan Plastik
Sambungan Coupling Sleeve
DETAIL A
SKALA 1: 25
Detail Sambungan 1:50,1:25
Tie Rod
25
850
Ø 16-200
Ø 12-200
850
Ø 12-200
500
I. DIVISI I U M U M
1.2 Mobilisasi El - 1.2 1.00 Ls 459,100,000.00 459,100,000.00
1.3 Pengukuran Dan Steak Out - 1.00 Ls 50,000,000.00 50,000,000.00
1.4 Dawetering/Kisdam - 1.00 Ls 60,000,000.00 60,000,000.00
1.5 Keselamatan Kerja - 1.00 Ls 90,000,000.00 90,000,000.00
1.6 Manajemen Lalu Lintas - 1.00 Ls 150,000,000.00 150,000,000.00
1.7 Manajemen Mutu - 1.00 Ls 85,000,000.00 85,000,000.00
1.8 Pemasangan Mistar - 2.00 Ls 75,000,000.00 150,000,000.00
Jumlah 81,359,149,676.06
PPn 10 % 8,135,914,967.61
Dibulatkan 89,495,000,000.00