PEMERINTAH KAOTA BAU-BAU

BADAN PENANGGULANGAN DAERAH


Bukit Wolio Indah, Murhum, Kota
Bau-Bau, Kode pos 93713
GAMBAR RENCANA
PAKET PEKERJAAN : PENGENDALIAN BANJIR DAN PERKUATAN TEBING SUNGAI BAU-BAU
LOKASI : BAU-BAU
TAHUN ANGGARAN : 2020
U

LAUT LEPAS LAUT LEPAS


MUAR
A KA
L I AM

O
ARS
SUD
. YO
JLN
N BO

I
JLN. KARTIN
JLN . R
A JA WA
KAKAA

IN
TAMR
USN I
JLN. H
M WURUK
JLN. HA YA KA
LI
AM
BO
N
KOTA BAU-BAU
I NG
ELA
. LA
KECAMATAN BETOAMBARI JLN
KA
L IA
M
BO
N
RENCANA LOKASI
PENANGANAN
DENGAN SHEET PILE
PETA LOKASI
LAY OYUT PEKERJAAN
SKALA 1: 1800
02
N
0 +3 0

0+40
0 +2 5

0
0

0+350

0+
4

0+
50
70 4
0+2
0+1

00

e le n g
00

Lo
va sora
si
ra n
ta
-r
0+

ata
±
1.2
m
0+

150
135
Kecamatan Sambaliung
0+0
50
0+0
00
PROFIL MELINTANG 12.000 12.000
11.000 11.000
Keterangan : 10.000 10.000
Horizontal 1 : 1000 9.000 9.000
Vertikal 1 : 100 8.000 8.000
Top Siring 7.000 7.000
Station STA
(

6.000 6.000
Exisisting Jalan/Sungai
5.000 5.000
Rumah Penduduk 4.000 4.000
Station ( STA ) 0+000 0+050 0100 0+150 0+200 0+250 0+300 0+350 0+400 0+450 0+473
Elevasi Rencana Jalan 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000 10.000
Existing Jalan 9.664 9.594 9.672 9.870 9.580 9.565 9.595 9.515 9.545 9.584 9.815
Existing Sungai 8.478 7.768 7.708 7.430 7.523 7.113 7.282 7.202 7.354 7.598 8.007 SITUASI
DAN PROFIL MEMANJANG
09
Lampu Taman
Jalan Refleksi
Pedestrian Pedestrian Drainase
Pipa Drainase Ø4"
Rigid Pavement K-400, t=25 cm Pipa Ø4"
Rigid Pavement K-400, t=25 cm
Beton BO ; t=10 cm 12.00 12.00 Pipa Reling Ø 4" Beton BO ; t=10 cm
300 1000 9000 200 500 200 1000 200 500 2400 1000 850 Stainlees Steel 9000 2000 300
11.00 11.00
Besi Plat t=12 mm
Capping Beam 850x500
Capping Beam 850x500
300

2% 2% 2% 2%
200

200
10.00 10.00
Pasangan Batu Pasangan Batu
Sheet Pile W-450 B L=16 m Sheet Pile W-450 B L=16 m
HWL 9.245 HWL 9.245
9.00 9.00 1000
1512
1845 Tie Rod D40 L=12 m Tie Rod D40 L=12 m
Mini Pile 10/10 2745 8.00 8.00 3064 Turap Ulin Eksisting Mini Pile 10/10
7350 13463 8000
7.00 7.00
Tiang Pancang Ø500 L=10 m
Tiang Pancang Ø500 L=10 m
Turap Ulin Eksisting Timbunan Pilihan
Timbunan Pilihan
1200
Geotextile Woven 6.00 6.00 9509
Material
Equivalen Gw-250 (Berat 250 Porous
mgr/m²)
1200
Geotextile Woven
Dibungkus Dengan Equivalen Gw-250 (Berat 250 mgr/m²)
Timbunan Pilihan
Geotextile Non-Woven 5.00 5.00 Timbunan Pilihan
UW-300 (Berat 300 mgr/m²)
Material Porous
Dibungkus Dengan
7800 Geotextile Non-Woven
UW-300 (Berat 300 mgr/m²)
STA 0 + 000
EXISTING TANAH DASAR (M) EXISTING TANAH DASAR (M)
9.491

9.534

9.666

9.594

8.478
9.664

9.663

9.654

8.863
7.768

7.168

6.635

5.814

5.468

5.778

6.621

7.193

7.967
16 8 4 0 -4 -8 -12 -16 JARAK (M) JARAK (M) -18 -20 -22 -26 -28 -30 -32 -36
h g f e d c b a NO. PATOK NO. PATOK a1 b1 c1 d1 e1 f1 g1 h1
Lampu Taman
Jalan Refleksi
Pedestrian Pedestrian Drainase
Pipa Drainase Ø4"
Rigid Pavement K-400, t=25 cm Pipa Ø4"
Rigid Pavement K-400, t=25 cm
Beton BO ; t=10 cm 12.00 12.00 Pipa Reling Ø 4" Beton BO ; t=10 cm
300 1000 9000 200 500 200 1000 200 500 2400 1000 850 Stainlees Steel 9000 2000 300
11.00 11.00
Besi Plat t=12 mm
Capping Beam 850x500
Capping Beam 850x500
300

2% 2% 2% 2%
200

200
10.00 10.00
Pasangan Batu Pasangan Batu
Sheet Pile W-450 B L=16 m Sheet Pile W-450 B L=16 m
HWL 9.245 HWL 9.245
9.00 9.00 1000
1512
1845 Tie Rod D40 L=12 m Tie Rod D40 L=12 m
Mini Pile 10/10 2745 8.00 8.00 3064 Turap Ulin Eksisting Mini Pile 10/10
7350 13463 8000
7.00 7.00
Tiang Pancang Ø500 L=10 m
Tiang Pancang Ø500 L=10 m
Turap Ulin Eksisting Timbunan Pilihan
Timbunan Pilihan
1200
Geotextile Woven 6.00 6.00 9509
Material
Equivalen Gw-250 (Berat 250 Porous
mgr/m²)
1200
Geotextile Woven
Dibungkus Dengan Equivalen Gw-250 (Berat 250 mgr/m²)
Timbunan Pilihan
Geotextile Non-Woven 5.00 5.00 Timbunan Pilihan
UW-300 (Berat 300 mgr/m²)
Material Porous
Dibungkus Dengan
7800 Geotextile Non-Woven
UW-300 (Berat 300 mgr/m²)
STA 0 + 200
EXISTING TANAH DASAR (M) EXISTING TANAH DASAR (M)
9.491

9.534

9.666

9.594

9.664

9.663

9.654
7.768

7.168

6.635

5.814

5.468

5.778

6.621

7.193

7.967

8.478

8.863
16 8 4 0 -4 -8 -12 -16 JARAK (M) JARAK (M) -18 -20 -22 -26 -28 -30 -32 -36
h g f e d c b a NO. PATOK NO. PATOK a b c d e f g h
Lampu Taman
Jalan Refleksi
Pedestrian Pedestrian Drainase
Pipa Drainase Ø4"
Rigid Pavement K-400, t=25 cm Pipa Ø4"
Rigid Pavement K-400, t=25 cm
Beton BO ; t=10 cm 12.00 12.00 Pipa Reling Ø 4" Beton BO ; t=10 cm
300 1000 9000 200 500 200 1000 200 500 2400 1000 850 Stainlees Steel 9000 2000 300
11.00 11.00
Besi Plat t=12 mm
Capping Beam 850x500
Capping Beam 850x500
300

2% 2% 2% 2%
200

200
10.00 10.00
Pasangan Batu Pasangan Batu
Sheet Pile W-450 B L=16 m Sheet Pile W-450 B L=16 m
HWL 9.245 HWL 9.245
9.00 9.00 1000
1512
1845 Tie Rod D40 L=12 m Tie Rod D40 L=12 m
Mini Pile 10/10 2745 8.00 8.00 3064 Turap Ulin Eksisting Mini Pile 10/10
7350 13463 8000
7.00 7.00
Tiang Pancang Ø500 L=10 m
Tiang Pancang Ø500 L=10 m
Turap Ulin Eksisting Timbunan Pilihan
Timbunan Pilihan
1200
Geotextile Woven 6.00 6.00 9509
Material
Equivalen Gw-250 (Berat 250 Porous
mgr/m²)
1200
Geotextile Woven
Dibungkus Dengan Equivalen Gw-250 (Berat 250 mgr/m²)
Timbunan Pilihan
Geotextile Non-Woven 5.00 5.00 Timbunan Pilihan
UW-300 (Berat 300 mgr/m²)
Material Porous
Dibungkus Dengan
7800 Geotextile Non-Woven
UW-300 (Berat 300 mgr/m²)
STA 0 + 400
EXISTING TANAH DASAR (M) EXISTING TANAH DASAR (M)
9.491

9.534

9.666

9.594

8.478
9.664

9.663

9.654

8.863
7.768

7.168

6.635

5.814

5.468

5.778

6.621

7.193

7.967
16 8 4 0 -4 -8 -12 -16 JARAK (M) JARAK (M) -18 -20 -22 -26 -28 -30 -32 -36
h g f e d c b a NO. PATOK NO. PATOK a b c d e f g h
Lampu Taman
Jalan Refleksi
Pedestrian Pedestrian Drainase
Pipa Drainase Ø4"
Rigid Pavement K-400, t=25 cm Pipa Ø4"
Rigid Pavement K-400, t=25 cm
Beton BO ; t=10 cm 12.00 12.00 Pipa Reling Ø 4" Beton BO ; t=10 cm
300 1000 9000 200 500 200 1000 200 500 2400 1000 850 Stainlees Steel 9000 2000 300
11.00 11.00
Besi Plat t=12 mm
Capping Beam 850x500
Capping Beam 850x500
300

2% 2% 2% 2%
200

200
10.00 10.00
Pasangan Batu Pasangan Batu
Sheet Pile W-450 B L=16 m Sheet Pile W-450 B L=16 m
HWL 9.245 HWL 9.245
9.00 9.00 1000
1512
1845 Tie Rod D40 L=12 m Tie Rod D40 L=12 m
Mini Pile 10/10 2745 8.00 8.00 3064 Turap Ulin Eksisting Mini Pile 10/10
7350 13463 8000
7.00 7.00
Tiang Pancang Ø500 L=10 m
Tiang Pancang Ø500 L=10 m
Turap Ulin Eksisting Timbunan Pilihan
Timbunan Pilihan
1200
Geotextile Woven 6.00 6.00 9509
Material
Equivalen Gw-250 (Berat 250 Porous
mgr/m²)
1200
Geotextile Woven
Dibungkus Dengan Equivalen Gw-250 (Berat 250 mgr/m²)
Timbunan Pilihan
Geotextile Non-Woven 5.00 5.00 Timbunan Pilihan
UW-300 (Berat 300 mgr/m²)
Material Porous
Dibungkus Dengan
7800 Geotextile Non-Woven
UW-300 (Berat 300 mgr/m²)
STA 0 + 470
EXISTING TANAH DASAR (M) EXISTING TANAH DASAR (M)
9.491

9.534

9.666

9.594

9.664

9.663

9.654
7.768

7.168

6.635

5.814

5.468

5.778

6.621

7.193

7.967

8.478

8.863
16 8 4 0 -4 -8 -12 -16 JARAK (M) JARAK (M) -18 -20 -22 -26 -28 -30 -32 -36
h g f e d c b a NO. PATOK NO. PATOK a b c d e f g h
996 996 996 996
450 278 440 278
123 155 155 123
30

330

330
400

450
120

120
100

155 246 155


996
POTONGAN A-A
SKALA 1: 25
278 440 278
123 155 155 123
30

330

330

450
120

120
155 246 155
996
POTONGAN B-B
SKALA 1: 25
DETAIL SHEET PILE 1: 25
TAMPAK SAMPING SHEET PILE TYPE CCSP-450 B
SKALA 1: 25 SKALA 1: 25
24
850
500

Sheet Pile W-450 B, L=16 m


2000

CNP 26 800
Bearing Plat 200x200x12
Pipa PVC 2" Sambungan
Bearing Plat 200x200x12
Tie Rod D40 L=12 m

800
DETAIL SAMBUNGAN TIE ROD
SKALA 1: 50
Tie Rod D 40 (Upset end Tie Rod)
Pipa PVC Ø 2" (Plain Tie-Rod)
Lapisan Plastik
Sambungan Coupling Sleeve
DETAIL A
SKALA 1: 25
Detail Sambungan 1:50,1:25
Tie Rod
25
850

Ø 16-200
Ø 12-200
850
Ø 12-200
500

PENULANGAN CAPPING BEAM


SKALA 1: 50
Sheet Pile W-450 B L=16 M
CNP 26
Pipa PVC 2"
Tie Rod D 40
Ø 16-200 Ø 12-200
Capping Beam
Tie Rod D40
CNP 26
Beton Fender
DET.PENULANGAN CAPPING BEAM
SKALA 1: 50
TAMPAK DEPAN
SKALA 1: 50
Detail Penulangan
1: 50
Capping Beam
26
RINCIAN ANGGARAN BIAYA
Program : -
Kegiatan : PENGENDALIAN BANJIR DAN PERKUATAN TEBING SUNGAI BAU-BAU
Pekerjaan PEMBANGUNAN TURAP SHEET PILE BETON SUNGI BAU-BAU ( KALI AMBON)
Lokasi : KECAMATAN WOLIO
Hal 1/2

KODE SAT HARGA


NO URAIAN PEKERJAAN VOLUME JUMLAH (Rp.)
ANALISA UAN SATUAN (Rp.)

I. DIVISI I U M U M
1.2 Mobilisasi El - 1.2 1.00 Ls 459,100,000.00 459,100,000.00
1.3 Pengukuran Dan Steak Out - 1.00 Ls 50,000,000.00 50,000,000.00
1.4 Dawetering/Kisdam - 1.00 Ls 60,000,000.00 60,000,000.00
1.5 Keselamatan Kerja - 1.00 Ls 90,000,000.00 90,000,000.00
1.6 Manajemen Lalu Lintas - 1.00 Ls 150,000,000.00 150,000,000.00
1.7 Manajemen Mutu - 1.00 Ls 85,000,000.00 85,000,000.00
1.8 Pemasangan Mistar - 2.00 Ls 75,000,000.00 150,000,000.00

Sub Total Biaya UMUM 1,044,100,000.00

III. DIVISI 2 PEKERJAAN TANAH


3.1 Galian Tanah El - 311 5,017.25 M3 70,218.85 352,305,539.41
3.2 Urugan Tanah Pilihan El - 322 12,901.65 M3 151,161.56 1,950,233,553.01
3.3 Urugan Lapisan Porous (Timbunan tanah ditangkan) El - 322 1,085.60 M3 450,000.00 488,520,000.00

Sub Total Biaya Pekerjaan Tanah 2,791,059,092.43

IV. DIVISI 3 PEKERJAAN PERKERASAN (RIGID PAVEMENT)

4.1 Lantai Kerja Beton Bo El - 718 423.00 M3 1,153,171.79 487,791,667.49


4.2 Beton K-300 El - 714 1,057.50 M3 1,745,055.26 1,845,395,939.22

Sub Total Biaya Pekerjaan Perkerasan 2,333,187,606.71

V. DIVISI 4 PEKERJAAN STRUKTUR


a. Pengadaan
5.1 Pengadaan CCSP Beton W-325 A 1.000 B EI - 76(5)b 35,000.00 M' 1,395,693.75 48,849,281,250.00
b. Pemancangan
5.3 Pemancangan CCSP Beton W-450 B EI - 76(5) d 32,000.00 M' 607,216.91 19,430,941,023.08
5.5 Pemotongan CCSP Beton El - 7814 2,500.00 Bh 573,508.20 1,433,770,492.86
c. Struktur Penunjang
- Capping Beam
5.7 Beton K - 250 El - 715 203.50 M3 1,900,000.00 386,650,000.00
5.8 Baja Tulangan (Polos) U24 El - 731 1,995.75 KG 26,591.75 53,070,485.06
5.9 Baja Tulangan (Ulir) D20 El - 733 14,774.42 KG 26,591.75 392,877,736.22
- Pile Cap
5.10 Beton K - 300 El - 715 121.59 M3 1,900,000.00 231,024,420.00
5.11 Baja Tulangan (Polos) U24 El - 731 8,284.78 Kg 26,591.75 220,306,766.65
5.12 Baja Tulangan (Ulir) D16 El - 733 22,453.92 Kg 26,591.75 597,088,942.07
- Penjangkaran
5.13 Pengadaan & Pemasangan Tie Rod D 40 mm L = 12 M El - 785 a 1,251.00 Bh 225,000.00 281,475,000.00
5.14 Pengadaan & Pemasangan Besi Canal CNP 26 El - 786 2,500.00 M' 746,703.74 1,866,759,360.99
5.16 Pengadaan dan Pemasangan Geotextile (NonWoven) El - 754 10,423.60 M2 75,000.00 781,770,000.00
5.17 Pengadaan dan Pemasangan Geotextile (Woven) 4,500.00 M2 120,175.00 540,787,500.00

Sub Total Biaya Pekerjaan Struktur 75,065,802,976.93


Sub Total Biaya Pekerjaan Bangunan Pelengkap -

VII. PEKERJAAN GEOLOGI TAMBAHAN


7.1 Pemboran dan Analisis Laboratorium 1.00 Ls 125,000,000.00 125,000,000.00

Sub Total Biaya Pekerjaan Bangunan Pelengkap 125,000,000.00


REKAPITULASI BIAYA
Program : -
Kegiatan : PENGENDALIAN BANJIR DAN PERKUATAN TEBING SUNGAI BAU-BAU
Pekerjaan PEMBANGUNAN TURAP SHEET PILE BETON SUNGI BAU-BAU ( KALI AMBON)
Lokasi : KECAMATAN WOLIO

No. JENIS PEKERJAAN SUB TOTAL (Rp.)

I. DIVISI I UMUM 1,044,100,000.00

III. DIVISI 2 PEKERJAAN TANAH 2,791,059,092.43

IV. DIVISI 3 PEKERJAAN PERKERASAN (RIGID PAVEMENT) 2,333,187,606.71

V. DIVISI 4 PEKERJAAN STRUKTUR 75,065,802,976.93

VI. PEKERJAAN GEOLOGI TAMBAHAN 125,000,000.00

Jumlah 81,359,149,676.06

PPn 10 % 8,135,914,967.61

Jumlah Total 89,495,064,643.67

Dibulatkan 89,495,000,000.00

Terbilang : Empat Puluh Satu Milyar Dua Ratus Juta Rupiah

Baubau, November 2019

Kepala Badan Penanggulanagn


Bencana Daerah
Kota Bau-Bau

Laode Muslimin Hibali, SE, MS.i


Nip.19660629 198903 1 009