Anda di halaman 1dari 1

RINCIAN KOMPONEN REMUNERASI PERSONIL

PERENCANAAN DED PEMBANGUNAN JEMBATAN KABUPATEN BENER MERIAH

GAJI DASAR BEBAN BIAYA SOSIAL BEBAN BIAYA UMUM TUNJANGAN KEUNTUNGAN BIAYA LANGSUNG
SUB TOTAL
NO NAMA PERSONIL POSISI PENUGASAN STATUS KEPEGAWAIAN (GD) (BBS) (BBU) PENUGASAN (TP) (K) PERSONIL

(Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)


1 2 3 4 5 6 7 8 9 10 11
1 x GD (0,3-0,4) x GD (0,5-1,3) x GD 5 + 6 + 7 (0,1-0,3) x GD 0,1*(GD+BBS+BBU) 8 + 9 + 10

I. BIAYA TENAGA AHLI

1. Armansyah, ST., MT Team Leader Team Leader 19,810,000 7,924,000 - 27,734,000 - 2,773,400 30,500,000

2. Zikrul Fuadi, ST Ahli Hidrologi/Hidrolika Ahli Hidrologi/Hidrolika 17,211,000 6,884,400 - 24,095,400 - 2,409,540 26,500,000

3. Faisal ST Ahli Kuantitas Ahli Kuantitas 17,211,000 6,884,400 - 24,095,400 - 2,409,540 26,500,000

II. BIAYA TENAGA PENDUKUNG

Surveyor Pekerjaan
1. Tobe Name Tidak Tetap 4,221,000 1,688,400 - 5,909,400 - 590,940 6,500,000
Jembatan

2. Tobe Name Drafmant Tidak Tetap 3,572,000 1,428,800 - 5,000,800 - 500,080 5,500,000

3. Tobe Name Drafmant Tidak Tetap 3,572,000 1,428,800 - 5,000,800 - 500,080 5,500,000

4. Tobe Name Drafmant Tidak Tetap 3,572,000 1,428,800 - 5,000,800 - 500,080 5,500,000

Helper (Pembantu
5. Tobe Name Tidak Tetap 1,629,000 651,600 - 2,280,600 - 228,060 2,500,000
Surveyor)

Helper (Pembantu
6. Tobe Name Tidak Tetap 1,629,000 651,600 - 2,280,600 - 228,060 2,500,000
Surveyor)

Banda Aceh,27 Desember 2019


CV. Axial Highway Engineering Consultant

Zu Irfan, ST., MT
Direktur

Anda mungkin juga menyukai