WEEKLY SERVICE SCHEDULE


Jan-11
D A T E
NO UNIT NO BARU UNIT MODEL
8 9 10 11 12 13 14

UNIT PRODUKSI
2 EX135 #N/A PC750-7 500&Backlog Reoring
4 AT083 #N/A HM 400-1 750
14 DT090 #N/A K350 250
7 DT020-0091 #N/A SCANIA P380 750
19 DT020-0094 #N/A SCANIA P380 500
9 DT020-0095 #N/A SCANIA P380 500
21 DT020-0101 #N/A SCANIA P380 500
10 DT020-0106 #N/A SCANIA P380 500

UNIT SUPPORT
1 DZ037 #N/A D85ESS-2 1000
4 GD016 #N/A G705A-4 1000
10 WT033 #N/A FM 9 1000

UNIT SUPPORT
1 GS070 #N/A EGS240-6 750
2 TL047 #N/A P30 2000
4 TL048 #N/A LS4-6000 500
5 TL049 #N/A LS4-6000 250

UNIT SUBCONT
20 EXA04 #N/A PC400LC-7 1000
21 EXA08 #N/A PC400LC-7
1 EXA09 #N/A PC200-7 1000
26 VRD01 #N/A COMPACTOR 250
PLT/08/F-013
PT SAPTAINDRA SEJATI
PLANT DEPARTEMENT Halaman: 1/1

WEEKLY PLAN AVAILABILITY


Period : 8-14 JANUARI 2011

Working days : 7

SCHEDULE SERVICE*) MIDLIFE OVERHAUL


NO MODEL APPLICATION POP PM Backlog UP PLAN AVAILABILITY
HOURS
250/SA 500/SB 1000/SC 2000 ALT STM TUR WTP ENGINE T/M & T/C ST BRAKE FD DIFF SW MAC U/C OTHER

1 PC400LC-7 LOAD 2 336 5 48 84.23%

2 PC750-7 LOAD 1 168 1 6 92 2 40.48%

3 HM400-1 + A40E HAUL 9 1512 1 5 35 165 86.44%

5 SCANIA P380 HAUL 9 1512 1 4 38 7 112 89.62%

6 KERAX 350 (DT) HAUL 3 504 1 4 15 45 87.30%

TOTAL 24 4032 3 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 53 154 372 85.64%

Dibuat oleh, Menyetujui, Menyetujui, Menyetujui,

Abu Hurairah Ahmad Farid Luther Tuntunan Herry Wisnu Murti


Planner Maintenance Plant Section Head Engineering Spv Production Section Head

Revisi: 0
PLT/08/F-013
PT SAPTAINDRA SEJATI
PLANT DEPARTEMENT Halaman: 1/1

WEEKLY PLAN AVAILABILITY


Period : 8-14 JANUARI 2011

Working days : 7

SERVICE*) MIDLIFE OVERHAUL


SCHEDULE
NO MODEL APPLICATION POP PM Backlog UP PLAN AVAILABILITY
HOURS
250/SA 500/SB 1000/SC 2000 ALT STM TUR WTP ENGINE T/M & T/C ST BRAKE FD DIFF SW MAC U/C OTHER

1 D85ESS-2 DZNG 1 168 1 5 3 15 86.31%

2 GD705A-4 GRDG 2 336 1 5 4 23 90.48%

3 LUBTRUCK SUPP 2 336 4 8 96.43%

4 FUELTRUCK SUPP 2 336 4 8 96.43%

5 WATER TRUCK HAUL 2 336 1 5 4 4 96.13%

6 WASHING TRUCK HAUL 1 168 4 8 92.86%

7 CRAN TRUCK HAUL 1 168 4 8 92.86%

8 TIRE HANDLER HAUL 1 168 8 36 73.81%

TOTAL 12 2016 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 15 35 110 92%

Dibuat oleh, Menyetujui, Menyetujui, Menyetujui,

Abu Hurairah Ahmad Farid Luther Tuntunan Herry Wisnu Murti


Planner Maintenance Plant Section Head Engineering Spv Production Section Head

Revisi: 0

Anda mungkin juga menyukai