DIMENSI
KOLOM (D19) ATAS (D10) (D10) (D10)
K1 350 X 800 15
K2 350 X 800 15
15 54 15
K3 350 X 800 12
K4 350 X 800 18
TOTAL 60 15 54 15
WASTE 7% 4.2 1.05 3.78 1.05
TOTAL (BTG) 64 16 58 16
158
Kg 1720.56 1171.864
TUL UTAMA K1
KEBUTUHAN
BESI = 1
JUMLAH BATANG JUMLAH KEBUTUHAN BESI SISA PANJANG BESI
TYPE TULANGAN (BTG) MENJADI 3 KOLOM (UNIT) (BTG) (M)
TUL UTAMA
(BTG)
K1 18 6 3 18 1.2
K2 14 5 3 15 1.2
4.8
K3 12 4 3 12 1.2
K4 18 6 3 18 1.2
SENGKANG
ATAS = 1/6 HO
BAWAH = 1/6 HO
D 10 - 100
JUMLAH PENAMBAHAN 1
KEB. SENGKANG BATANG UNTUK
PANJANG
TYPE SENGKANG DALAM 1 JUMLAH BESI MENCUKUPI
SENGKANG ATAS BATANG BESI P KEBUTUHAN
= 12 METER SENGKANG
K1 2.24 6 5 1
K2 2.24 6 5 1
1
K3 2.24 6 5 1
K4 2.24 6 5 1
TOTAL 21 4 5
SENGKANG TENGAH
D 10 - 150
JUMLAH PENAMBAHAN 2
KEB. SENGKANG JUMLAH BESI YANG BATANG UNTUK
PANJANG
TYPE SENGKANG DALAM 1 MENCUKUPI
SENGKANG ATAS BATANG BESI P DIBUTUHKAN (BTG) KEBUTUHAN
= 12 METER SENGKANG
K1 2.24 22 5 4
K2 2.24 22 5 4
2
K3 2.24 22 5 4
K4 2.24 22 5 4
TOTAL 21 16 18
K1 1.276 9 60 6 54
K2 1.276 9 60 6 54
K3 0.638 18 30 2 36
K4 1.276 9 60 6 54
TOTAL 210 20
KEBUTUHAN SETELAH PENGURANGAN DARI SISA DAN MENGACU KEPADA 1 BATANG = 9 PCS
64
64
4.48
68
6 18 15 1.2 18
4 12 15 1.2 12
1 3 1.2 3
4 12 12 1.2 12
6 18 18 1.2 18
SISA SENGKANG (M)
4.48
TOTAL 3 UNIT
JUMLAH UNIT DALAM HITUNGAN KEKURANGAN
KOLOM = 3 UNIT PEMBAGI 1 (PCS)
(PCS) BATANG (PCS)
LUAS KG (-)
VOID TANGGA 8.090 -166.384
2,689.015
10.28
REKAPITULASI PEMBESIAN
AREA D 19 (U42) D 10 (U42)
PLAT 2,689.015
TOTAL 10,489.946 5,202.348
waste 5% 524.497 260.117
11,014.443 5,462.466
BALOK ARAH TYPE BALOK P (M) L (M) T (M) V (M3)
X
AS EA-EC G 36-2 5.325 0.3 0.6 5.59
2.52
2.44
2.52
2.52
10.00
PLAT L (M) P (M) T (M) V (M3)
MEMANJANG
AS EA - EC 14.350 19.350 0.15 41.65
REKAPITULASI COR
AREA FC' 25 (M3)
KOLOM 10.00
BALOK 212.92
PLAT 41.65
TOTAL 264.57
REKAPITULASI PEMBESIAN
AREA D 19 (U42) D 16 (U42) D 13 (U42) D 10 (U42)
LANTAI 3
LANTAI ATAP
TOTAL 13,072.508 2,058.065 - 9,419.424
waste 5% 653.625 470.971
13,726.133 9,890.395 1,336.540
PERHITUNGAN TC
TYPE TC YIXIN QTZ 100 - TC 6016
COUNTER WEIGHT 17 TON
MAX ANGKUT 6 TON
PANJANG JIB 60 METER
MAX BEBAN UJUNG 1.6 TON
JARAK MAX ANGKUT 20.57 METER
PANJANG COUNTER WEIGHT 14.1 METER
LEBAR SECTION TC 1.8 METER
MUTU BETON FC' 30 Mpa
MUTU BAJA fy 520 Mpa
LEBAR PONDASI 5 METER
PANJANG PONDASI 5 METER
TINGGI PONDASI 1.6 METER
BEBAN TC (BROSUR)
KONDISI DALAM KEADAAN OPERASI TON KNm
MOMEN BEKERJA 185.6 1856
GAYA HORIZONTAL 2.29 22.9
GAYA VERTIKAL 68.7 687
MOMEN TORSI 26.5 265
PERENCANAAN PONDASI TC
BERAT PONDASI 96000 KG
96 TON
𝐵_(𝑐 )= 𝐶1/𝐶2 1
7.2 METER
𝐵_(𝑜 )= (C1 + C2) x 2
31,548.82 KN
21,032.55 KN
AMAN
�_𝐶>�_𝑣
�_𝐶>�_𝑣
126.2456211951 KN/m2
〖��〗 _ ={�_𝑣/(0,8𝑏𝑑^2 )}
0.1262456212 N/mm2
�_ ={𝑓_�/0,85𝑓𝑐} 20.3921568627
dipakai
〖�ρ_perlu
_𝑝𝑒𝑟𝑙� 〗 _ <�_�𝑖� �_�𝑖�
tulangan D 19
Jumlah Tulangan
36 btg
tulangan D 19
Jumlah Tulangan
36 btg