Anda di halaman 1dari 20

Data Chatmen area Statsiun

STASIUN A = 2
STASIUN B = 2.5
STASIUN C = 3.5
Σ luas = 8

Koefiseian Thiesen
LUAS KEBON AGUNG (131) = 0.25
LUAS STATION GUNUNG SARI (136) = 0.31
LUAS STASIUN WONOREJO (136B) = 0.44
Σ Koef = 1.00
Σ Koef = 100.00
Data hujan Pengamatan 50 tahun

Tabel 3. Data hujan pengamatan 10 tahun

NO TAHUN STASION NO
PENGAMATAN A B C
1 2003 141 80 199
2 2004 86 71 119
3 2005 138 110 99
4 2006 200 73 153
5 2007 159 111 141
6 2008 230 120 162
7 2009 98 131 84
8 2010 145 125 137
9 2011 212 119 113
10 2012 167 171 151

Tabel 4. hujan rata-rata metode aritmatik

TAHUN nΣ Urutan
NO PENGAMATAN Σ Ri/N Registrasi
i=1
1 2003 140.00 170.67
2 2004 92.00 163.00
3 2005 115.67 148.00
4 2006 142.00 142.00
5 2007 137.00 140.00
6 2008 170.67 137.00
7 2009 104.33 135.67
8 2010 135.67 115.67
9 2011 148.00 104.33
10 2012 163.00 92.00
1348.33

R= 134.833333333 mm/24jam
Tabel 5. Hasil perhitungan tinggi hujan rata-rata metode thiessen poligon

NO TAHUN STASION NO JUMLAH


PENGAMATAN A B C
1 2003 141 80 199 420.00
2 2004 86 71 119 276.00
3 2005 138 110 99 347.00
4 2006 200 73 153 426.00
5 2007 159 111 141 411.00
6 2008 230 120 162 512.00
7 2009 98 131 84 313.00
8 2010 145 125 137 407.00
9 2011 212 119 113 444.00
10 2012 167 171 151 489.00

Σ = 4045.00

R Metode Thiessen Poligon

Ř= 4045.00 = 80.90 mm/24 jam


50

Tabel 12. Perhitungan masa ulang T = 100 tahun metode gumbel


jika Ri menggunakan Thiesen poligon

xi
Urutan
Ri (R i)2
Registrasi
1 512.00 262144.0000
2 489.00 239121.0000
3 444.00 197136.0000
4 426.00 181476.0000
5 420.00 176400.0000
6 411.00 168921.0000
7 407.00 165649.0000
8 347.00 120409.0000
9 313.00 97969.0000
10 276.00 76176.0000

Σ 4045.00 1685401.00
Gumbel 1

X=Ř = 4045.00 = 80.90 mm/24 jam


50

( Ř )2= = 6544.810000
( Ři )2= = 168540.1
σ =Ѵ = 349.0253254103 121818.68
n= = 10
hal 37 (Reduce men) Yn = = 0.5485
(Tabel SD )Sn = = 1.1607
T 10 :
(T/T-1)= 1.1111
ln (T/T-1) = 0.1054
ln * ln * (T/T-1)= -2.2504
YT = - ln * ln * (T/T-1) = 2.2504

K= YT - Yn = 1.7778
Sn
RT = R 10 = Ř + σ *K = 701.3998988074 mm / etmal

Gumbel 2

Ř= 4045.00 = 80.90 mm / 24 jam


50
( Ř )2= = 6544.810000
( Ři )2= = 168540.1
σx = Ѵ = 349.0253254103
n= = 10
hal 37(Reduce men) Yt = = 3.9028
(Tabel SD ) σy = = 0.9757

T 100 :
(T/T-1)= 1.1111
ln (T/T-1) = 0.1054
ln * ln * (T/T-1)= -2.2504
YT = - ln * ln * (T/T-1) = 2.2504
K= YT - Yn = -1.7496
Sn
1/a = σx / σy = 357.7178696426
b = Ř - (1/a) * Yt = -1315.201
RT = R 10 = ((1/a) * Yt) + b = -510.2047

Q 10 CARA Hss NAKAYASU

Dari perhitungan terdahulu, metode gumbel di dapat :


R 10 = 701.400
mm
/ etmal

maka curah hujan efektif selama 5 jam :


R 24 = α * Rt = 0.6 * R 10 = 420.840 mm

Tinggi hujan jam-jamnya

Jam ke 1= R = 0.58 * R 24 = 244.087 mm 1.000


ke 2 = R = 0.16 * R 24 = 67.334 mm
ke 3 = R = 0.10 * R 24 = 42.084 mm
ke 4 = R = 0.08 * R 24 = 33.667 mm
ke 5 = R = 0.08 * R 24 = 33.667 mm

Panjang sungai (L) = 10.5 Km


Luas DAS (A) = 8 Km2
α= 2.5
Re = 1 mm

Tg = 0,21 * L^ 0,7
= 1.0890599923 jam

Tr = diambil : 1 jam
Tp = Tg + (0,8*Tr)
= 1.8890599923 jam

T 0.3= α * Tg = 2.7226499807 jam

Q max = A * Re
3,6 (0,3*Tp+T0.3)
= 0.676 m3/ detik

Menghitung debit (Q) tiap-tiap jam (t)


a. Kurva naik
0 < t < Tp ------> 0 < t < 1.8890599923 Jam
Q = (t / Tp)2,4 *Q max

Untuk t = 1 Jam
Q= 0.147 m3/ detik
Untuk t = 1.8890599923 Jam
Q= 0.676 m3/ detik

b. Kurva turun
1). Saat Tp < t < Tp +T0,3 --> 1.8890599923 < t < 4.6117099729

u = (t-Tp) / T0.3
Q = 0,3u * Q max

Untuk t = 2 Jam
Q= 0.643 m3/ detik
Untuk t = 3 Jam
Q= 0.413 m3/ detik
Untuk t = 4 Jam
Q= 0.266 m3/ detik
Untuk t = 5 Jam
Q= 0.171 m3/ detik
Untuk t = 6 Jam
Q= 0.110 m3/ detik

2). Saat Tp+T0,3 < t < Tp+T0,3 +1.5*T0,3 ---> 4.6117099729 < t < 8.6956849

u = ((t-Tp) + (0,5 * T0,3 ))/ (1,5 * T0,3)


Q = 0,3u * Q max

Untuk t = 7 Jam
Q= 0.100 m3/ detik
Untuk t = 8 Jam
Q= 0.075 m3/ detik
Untuk t = 9 Jam
Q= 0.056 m3/ detik
Untuk t = 10 Jam
Q= 0.041 m3/ detik
Untuk t = 11 Jam
Q= 0.031 m3/ detik
3). Saat t > Tp+T0.3 + 1.5. T0.3 ----------> t > 8.6956849439

u = ((t-Tp) + (0,5 * T0,3 ))/ (2 * T0,3)


Q = 0,3u * Q max

Untuk t = 12 Jam
Q= 0.053 m3/ detik
Untuk t = 13 Jam
Q= 0.043 m3/ detik
Untuk t = 14 Jam
Q= 0.034 m3/ detik
Untuk t = 15 Jam
Q= 0.028 m3/ detik
Untuk t = 16 Jam
Q= 0.022 m3/ detik
Untuk t = 17 Jam
Q= 0.018 m3/ detik
Untuk t = 18 Jam
Q= 0.014 m3/ detik
Untuk t = 19 Jam
Q= 0.011 m3/ detik
Untuk t = 20 Jam
Q= 0.009 m3/ detik
Untuk t = 21 Jam
Q= 0.007 m3/ detik
Untuk t = 22 Jam
Q= 0.006 m3/ detik
Untuk t = 23 Jam
Q= 0.005 m3/ detik
Untuk t = 24 Jam
Q= 0.004 m3/ detik
Untuk t = 25 Jam
Q= 0.003 m3/ detik
Maka unit hidrograf satuan sintetik metode NAKAYASU ditabelkan sbb :

HASIL PERHITUNGAN HIDROGRAF SATUAN SINTETIK


BERDASARKAN METODE DR NAKAYASU

JAM KE t UNIT HIDROGRAF SATUAN SINTETIK


Q (M3/dt)
0 0.000
1 #REF!
2 #REF!
3 0.643
4 0.266
5 0.110
6 #REF!
7 #REF!
8 0.100
9 0.075
10 0.056
11 0.041
12 0.031
13 #REF!
14 #REF!
15 #REF!
16 #REF!
17 0.053
18 0.043
19 0.034
20 0.028
21 0.022
22 0.018
23 0.014
24 0.011
Km2
Km2
Km2
Km2

%
Urutan
Registrasi
512.00
489.00
444.00
426.00
420.00
411.00
407.00
347.00
313.00
276.00

mm/24 jam

xi-X (xi-x)^2

431.10 185847.21
408.10 166545.61
363.10 131841.61
345.10 119094.01
339.10 114988.81
330.10 108966.01
326.10 106341.21
266.10 70809.21
232.10 53870.41
195.10 38064.01

1096368.10
mm/24 jam

mm / etmal

mm / 24 jam
mm
/ etmal
K
PERHITUNGAN DEBIT RENCANA
ANALISA HIDROGRAF DENGAN METODE NAKAYASU
DENGAN PERIODE ULANG T = 10 TAHUN

HSS Tinggi Hujan (mm)


jam ke Q(m3/dt) 244.087164785 67.334390286 42.083993928 33.66719514 33.6671951
0 0 0
1 0.146786 35.828627 0
2 0.643234 157.005256 9.8837592219 0
3 0.413353 100.894261 43.311794847 6.1773495137 0
4 0.265628 64.836376 27.832899566 27.06987178 4.941879611 0
5 0.170697 41.664963 17.885896924 17.395562229 21.65589742 4.94187961
6 0.109693 26.774618 11.493783033 11.178685578 13.91644978 21.6558974
7 0.100235 24.466064 7.3861014053 7.1836143956 8.942948462 13.9164498
8 0.074643 18.219325 6.7492590187 4.6163133783 5.746891516 8.94294846
9 0.055585 13.567520 5.0260207389 4.2182868867 3.693050703 5.74689152
10 0.041393 10.103426 3.7427641164 3.1412629618 3.374629509 3.6930507
11 0.030824 7.523793 2.7871518959 2.3392275728 2.513010369 3.37462951
12 0.053464 13.049947 2.0755290607 1.7419699349 1.871382058 2.51301037
13 0.042859 10.461281 3.5999853958 1.2972056629 1.393575948 1.87138206
14 0.034357 8.386119 2.8858707377 2.2499908724 1.03776453 1.39357595
15 0.027542 6.722598 2.313412139 1.8036692111 1.799992698 1.03776453
16 0.022078 5.389063 1.8545098555 1.4458825869 1.442935369 1.7999927
17 0.017699 4.320057 1.4866381766 1.1590686597 1.156706069 1.44293537
18 0.014188 3.463104 1.1917397266 0.9291488604 0.927254928 1.15670607
19 0.011374 2.776142 0.9553390989 0.7448373291 0.743319088 0.92725493
20 0.009117 2.225450 0.7658323151 0.5970869368 0.595869863 0.74331909
21 0.007309 1.783996 0.6139172317 0.478645197 0.477669549 0.59586986
22 0.005859 1.430112 0.4921369337 0.3836982698 0.382916158 0.47766955
23 0.004697 1.146427 0.3945137049 0.3075855836 0.306958616 0.38291616
24 0.003765 0.919015 0.3162556042 0.2465710656 0.246068467 0.30695862
25 0.253521249 0.1976597526 0.197256852 0.24606847
26 0.1584507806 0.158127802 0.19725685
27 0.126760624 0.1581278
28 0.12676062

DEBIT BANJIR MAKSIMAL


SU

Hidrograf
aliran m3/dt

35.828627
166.8890155438
150.3834052878
124.6810273073
103.5441996821
85.0194334115
61.8951779887
44.274737554
32.2517697666
24.0551329128
18.5378121923
21.251838483
18.623430489
15.9533210921
13.6774368043
11.9323838993
9.5654047837
7.6679538177
6.1468925864
4.9275581683
3.9500982262
3.1665330908
2.5384006272
2.0348682801
0.8945063209
0.5138354352
0.2848884266
0.1267606245

970.616450
Tabel. Kapasitas Eksisting
Bentuk Kedalaman Lebar Lebar
Ruas Penampang m Saluran (h) Dasar (b1) Atas (b2)
m m m
3 4 5 6 7 8
43 - 44 Segi Empat 0 0.75 1.2 1.2
44 - 46a Trapesium 0.3 1 1.5 2.1
45 - 46 Segi Empat 0 0.8 1.5 1.5
46b - 47 Trapesium 0.3 1.3 2.2 2.98

Tabel. Debit Rencana Ruas Saluran pada Sub Catchment Jemur Andayani

Luas Kemiringan
L
Saluran Ruas Catchment (A) C Lahan (S)
km2 m
1 2 3 4 5 6
Saluran T43 - 44 0.076 0.6 0.0003 320
Saluran S44 - 46a 0.076 0.6 0.0003 100
Saluran T45 - 46 0.069 0.6 0.0003 214
Saluran S46b - 47 0.145 0.6 0.0003 21

Tabel. Jumlah Penduduk Kecamatan Wonocolo

Luas Wilayah Jumlah Penduduk Jumlah Penduduk Laju Pertumbuhan


Kelurahan
km2 Tahun 2000 Tahun 2010 Penduduk
Siwalanke 1.98 19164 18349 -0.4409751
Jemur Won 1.64 22905 21673 -0.560673
Margorejo 0.65 11181 9751 -1.3820161
Bendul Me 0.77 15449 16104 0.4231648
Sidoserm 1.07 12961 13371 0.3172139
Jumlah 6.11 81660 79248 -1.6432855
Sumber: Wonocolo dalam angka 2010

Jemur andayani termasuk kedalam kelurahan Jemur Wonosari


Kepadatan penduduk kelurahan Jemur Wonosari tahun 2010:
= 21673 Jiwa : 1,64 km2
= 13215 Jiwa/ km2
Tabel. Analisa Kapasitas Saluran dengan Debit Rancangan

Q air hujan (Qah) Q air kotor (Qak) Qtotal Q yang


Saluran Ruas T = 10 tahun T = 10 tahun Qah + Qak membebani saluran
m3/det m3/detik m3/detik m3/detik
1 2 3 7 8 9
Saluran T43 - 44 -3.096 0.0002738 -3.096017 -3.096017
Saluran S44 - 46a -5.642 0.0002738 -5.641929 -8.737946
Saluran T45 - 46 -3.460 0.0002486 -3.459334 -3.459334
Saluran S46b - 47 -24.081 0.0005224 -24.080235 -12.197280
Luas Keliling Jari-jari Kemiringan Kecepatan Kapasitas
Penampang (A)Basah (P) n Hidrolis (R) Dasar Saluran (S) (Vs) Saluran (Q)
m2 m m m/det m3/det
9 10 11 12 13 14 15
0.9 2.7 0.023 0.33 0.0004 0.42 0.37
1.8 3.59 0.023 0.50 0.0005 0.61 1.10
1.2 3.1 0.023 0.39 0.0004 0.46 0.55
3.37 4.91 0.023 0.69 0.0005 0.75 2.54

Intensitas Q rencana (Qah)


tc
Hujan (I) T = 10 tahun
Akar (S) jam mm/jam m3/det
7 8 9 10
0.017320508 0.63 -244.44 -3.096
0.017320508 0.26 -445.44 -5.642
0.017320508 0.46 -300.83 -3.460
0.017320508 0.08 -996.45 -24.081

Tabel. Perhitungan Debit air Buangan Domestik (Air Kotor) Qak

Luas Jumlah Jumlah Qak total Qak


Saluran Ruas Catchment (A) Penduduk (Po) Penduduk (Pn) T = 10 tahun T = 10 tahun
km2 Jiwa T = 10 tahun m3/detik/km2 m3/detik
1 2 3 4 5 6 7
Saluran Tersie 43 - 44 0.076 1004 949 0.0036028729 0.00027382
Saluran Sekun44 - 46a 0.076 1004 949 0.0036028729 0.00027382
Saluran Tersie 45 - 46 0.069 912 862 0.0036028729 0.00024860
Saluran Sekun46b - 47 0.145 1916 1811 0.0036028729 0.00052242
Jumlah 0.366
Kapasitas Saluran
Eksisting (Q) Analisa
m3/det
10 11
0.375 Meluap
1.102 Meluap
0.552 Meluap
2.541 Meluap

Anda mungkin juga menyukai