Anda di halaman 1dari 20

Data Chatmen area Statsiun

STASIUN A = 2
STASIUN B = 2.5
STASIUN C = 3.5
Σ luas = 8

Koefiseian Thiesen
LUAS KEBON AGUNG (131) = 0.25
LUAS STATION GUNUNG SARI (136) = 0.31
LUAS STASIUN WONOREJO (136B) = 0.44
Σ Koef = 1.00
Σ Koef = 100.00
Data hujan Pengamatan 50 tahun

Tabel 3. Data hujan pengamatan 10 tahun

NO TAHUN STASION NO
PENGAMATAN A B C
1 2003 141 80 199
2 2004 86 71 119
3 2005 138 110 99
4 2006 200 73 153
5 2007 159 111 141
6 2008 230 120 162
7 2009 98 131 84
8 2010 145 125 137
9 2011 212 119 113
10 2012 167 171 151

Tabel 4. hujan rata-rata metode aritmatik

TAHUN nΣ Urutan
NO PENGAMATAN Σ Ri/N Registrasi
i=1
1 2003 140.00 170.67
2 2004 92.00 163.00
3 2005 115.67 148.00
4 2006 142.00 142.00
5 2007 137.00 140.00
6 2008 170.67 137.00
7 2009 104.33 135.67
8 2010 135.67 115.67
9 2011 148.00 104.33
10 2012 163.00 92.00
1348.33

R= 134.833333333 mm/24jam
Tabel 5. Hasil perhitungan tinggi hujan rata-rata metode thiessen poligon

NO TAHUN STASION NO JUMLAH


PENGAMATAN A B C
1 2003 141 80 199 420.00
2 2004 86 71 119 276.00
3 2005 138 110 99 347.00
4 2006 200 73 153 426.00
5 2007 159 111 141 411.00
6 2008 230 120 162 512.00
7 2009 98 131 84 313.00
8 2010 145 125 137 407.00
9 2011 212 119 113 444.00
10 2012 167 171 151 489.00

Σ = 4045.00

R Metode Thiessen Poligon

Ř= 4045.00 = 80.90 mm/24 jam


50

Tabel 12. Perhitungan masa ulang T = 100 tahun metode gumbel


jika Ri menggunakan Thiesen poligon

xi
Urutan
Ri (R i)2
Registrasi
1 512.00 262144.0000
2 489.00 239121.0000
3 444.00 197136.0000
4 426.00 181476.0000
5 420.00 176400.0000
6 411.00 168921.0000
7 407.00 165649.0000
8 347.00 120409.0000
9 313.00 97969.0000
10 276.00 76176.0000

Σ 4045.00 1685401.00
Gumbel 1

X=Ř = 4045.00 = 80.90 mm/24 jam


50

( Ř )2= = 6544.810000
( Ři )2= = 168540.1
σ =Ѵ = 349.0253254103 121818.68
n= = 50
hal 37 (Reduce men) Yn = = 0.4952
(Tabel SD )Sn = = 0.9496
T 10 :
(T/T-1)= 1.1111
ln (T/T-1) = 0.1054
ln * ln * (T/T-1)= -2.2504
YT = - ln * ln * (T/T-1) = 2.2504

K= YT - Yn = 1.7289
Sn
RT = R 10 = Ř + σ *K = 684.3245093238 mm / etmal

Gumbel 2

Ř= 4045.00 = 404.50 mm / 24 jam


10
( Ř )2= = 163620.250000
( Ři )2= = 168540.1
σx = Ѵ = 349.0253254103
n= = 50
hal 37(Reduce men) Yt = = 0.4271
(Tabel SD ) σy = = 0.9757

T 100 :
(T/T-1)= 1.1111
ln (T/T-1) = 0.1054
ln * ln * (T/T-1)= -2.2504
YT = - ln * ln * (T/T-1) = 2.2504
K= YT - Yn = 1.8126
Sn
1/a = σx / σy = 357.7178696426
b = Ř - (1/a) * Yt = 251.7187
RT = R 10 = ((1/a) * Yt) + b = 1056.7153

Q 10 CARA Hss NAKAYASU

Dari perhitungan terdahulu, metode gumbel di dapat :


R 10 = 684.325
mm
/ etmal

maka curah hujan efektif selama 5 jam :


R 24 = α * Rt = 0.6 * R 10 = 410.595 mm

Tinggi hujan jam-jamnya

Jam ke 1= R = 0.58 * R 24 = 238.145 mm 1.000


ke 2 = R = 0.16 * R 24 = 65.695 mm
ke 3 = R = 0.10 * R 24 = 41.059 mm
ke 4 = R = 0.08 * R 24 = 32.848 mm
ke 5 = R = 0.08 * R 24 = 32.848 mm

Panjang sungai (L) = 10.5 Km


Luas DAS (A) = 8 Km2
α= 2.5
Re = 1 mm

Tg = 0,21 * L^ 0,7
= 1.0890599923 jam

Tr = diambil : 1 jam
Tp = Tg + (0,8*Tr)
= 1.8890599923 jam

T 0.3= α * Tg = 2.7226499807 jam

Q max = A * Re
3,6 (0,3*Tp+T0.3)
= 0.676 m3/ detik

Menghitung debit (Q) tiap-tiap jam (t)


a. Kurva naik
0 < t < Tp ------> 0 < t < 1.8890599923 Jam
Q = (t / Tp)2,4 *Q max

Untuk t = 1 Jam
Q= 0.147 m3/ detik
Untuk t = 1.8890599923 Jam
Q= 0.676 m3/ detik

b. Kurva turun
1). Saat Tp < t < Tp +T0,3 --> 1.8890599923 < t < 4.6117099729

u = (t-Tp) / T0.3
Q = 0,3u * Q max

Untuk t = 2 Jam
Q= 0.643 m3/ detik
Untuk t = 3 Jam
Q= 0.413 m3/ detik
Untuk t = 4 Jam
Q= 0.266 m3/ detik
Untuk t = 5 Jam
Q= 0.171 m3/ detik
Untuk t = 6 Jam
Q= 0.110 m3/ detik

2). Saat Tp+T0,3 < t < Tp+T0,3 +1.5*T0,3 ---> 4.6117099729 < t < 8.6956849

u = ((t-Tp) + (0,5 * T0,3 ))/ (1,5 * T0,3)


Q = 0,3u * Q max

Untuk t = 7 Jam
Q= 0.100 m3/ detik
Untuk t = 8 Jam
Q= 0.075 m3/ detik
Untuk t = 9 Jam
Q= 0.056 m3/ detik
Untuk t = 10 Jam
Q= 0.041 m3/ detik
Untuk t = 11 Jam
Q= 0.031 m3/ detik
3). Saat t > Tp+T0.3 + 1.5. T0.3 ----------> t > 8.6956849439

u = ((t-Tp) + (0,5 * T0,3 ))/ (2 * T0,3)


Q = 0,3u * Q max

Untuk t = 12 Jam
Q= 0.053 m3/ detik
Untuk t = 13 Jam
Q= 0.043 m3/ detik
Untuk t = 14 Jam
Q= 0.034 m3/ detik
Untuk t = 15 Jam
Q= 0.028 m3/ detik
Untuk t = 16 Jam
Q= 0.022 m3/ detik
Untuk t = 17 Jam
Q= 0.018 m3/ detik
Untuk t = 18 Jam
Q= 0.014 m3/ detik
Untuk t = 19 Jam
Q= 0.011 m3/ detik
Untuk t = 20 Jam
Q= 0.009 m3/ detik
Untuk t = 21 Jam
Q= 0.007 m3/ detik
Untuk t = 22 Jam
Q= 0.006 m3/ detik
Untuk t = 23 Jam
Q= 0.005 m3/ detik
Untuk t = 24 Jam
Q= 0.004 m3/ detik
Untuk t = 25 Jam
Q= 0.003 m3/ detik
Maka unit hidrograf satuan sintetik metode NAKAYASU ditabelkan sbb :

HASIL PERHITUNGAN HIDROGRAF SATUAN SINTETIK


BERDASARKAN METODE DR NAKAYASU

JAM KE t UNIT HIDROGRAF SATUAN SINTETIK


Q (M3/dt)
0 0.000
1 #REF!
2 #REF!
3 0.643
4 0.266
5 0.110
6 #REF!
7 #REF!
8 0.100
9 0.075
10 0.056
11 0.041
12 0.031
13 #REF!
14 #REF!
15 #REF!
16 #REF!
17 0.053
18 0.043
19 0.034
20 0.028
21 0.022
22 0.018
23 0.014
24 0.011
Km2
Km2
Km2
Km2

%
Urutan
Registrasi
512.00
489.00
444.00
426.00
420.00
411.00
407.00
347.00
313.00
276.00

mm/24 jam

xi-X (xi-x)^2

431.10 185847.210000
408.10 166545.610000
363.10 131841.610000
345.10 119094.010000
339.10 114988.810000
330.10 108966.010000
326.10 106341.210000
266.10 70809.210000
232.10 53870.410000
195.10 38064.010000

1096368.100000
mm/24 jam

mm / etmal

mm / 24 jam
mm
/ etmal
K
PERHITUNGAN DEBIT RENCANA
ANALISA HIDROGRAF DENGAN METODE NAKAYASU
DENGAN PERIODE ULANG T = 10 TAHUN

HSS Tinggi Hujan (mm)


jam ke Q(m3/dt) 238.1449292447 65.695152895 41.059470559 32.84757645 32.8475764
0 0 0
1 0.146786 34.956389 0
2 0.643234 153.183006 9.6431417959 0
3 0.413353 98.438018 42.257380999 6.0269636224 0
4 0.265628 63.257952 27.155315207 26.410863125 4.821570898 0
5 0.170697 40.650641 17.450469636 16.972072005 21.1286905 4.8215709
6 0.109693 26.122797 11.213970016 10.906543522 13.5776576 21.1286905
7 0.100235 23.870444 7.2062887785 7.0087312598 8.725234818 13.5776576
8 0.074643 17.775781 6.5849501463 4.5039304865 5.606985008 8.72523482
9 0.055585 13.237222 4.903663633 4.1155938414 3.603144389 5.60698501
10 0.041393 9.857460 3.6516475435 3.0647897706 3.292475073 3.60314439
11 0.030824 7.340628 2.7192994422 2.2822797147 2.451831816 3.29247507
12 0.053464 12.732250 2.025000871 1.6995621514 1.825823772 2.45183182
13 0.042859 10.206604 3.5123447319 1.2656255444 1.359649721 1.82582377
14 0.034357 8.181961 2.8156150007 2.1952154575 1.012500436 1.35964972
15 0.027542 6.558938 2.2570927506 1.7597593754 1.756172366 1.01250044
16 0.022078 5.257868 1.8093623182 1.4106829691 1.4078075 1.75617237
17 0.017699 4.214886 1.4504463752 1.1308514489 1.128546375 1.4078075
18 0.014188 3.378796 1.1627271476 0.9065289845 0.904681159 1.12854638
19 0.011374 2.708558 0.9320816288 0.7267044673 0.725223188 0.90468116
20 0.009117 2.171272 0.747188336 0.582551018 0.581363574 0.72522319
21 0.007309 1.740565 0.5989715839 0.46699271 0.466040814 0.58136357
22 0.005859 1.395296 0.4801559941 0.3743572399 0.373594168 0.46604081
23 0.004697 1.118517 0.3849093762 0.3000974963 0.299485792 0.37359417
24 0.003765 0.896641 0.3085564477 0.2405683601 0.240077997 0.29948579
25 0.2473493432 0.1928477798 0.192454688 0.240078
26 0.1545933395 0.154278224 0.19245469
27 0.123674672 0.15427822
28 0.12367467

DEBIT BANJIR MAKSIMAL


SU

Hidrograf
aliran m3/dt

34.956389
162.826147919
146.7223622487
121.6457016591
101.023444345
82.9496584634
60.38835674
43.1968811281
31.4666092166
23.4695172544
18.0865142039
20.7344682639
18.1700481466
15.5649418356
13.3444633309
11.6418932635
9.3325376097
7.4812795707
5.9972481607
4.8075981069
3.8539341608
3.0894447052
2.4766039554
1.9853299661
0.8727298082
0.5013262515
0.2779528955
0.1236746716

946.987057
Tabel. Kapasitas Eksisting
Bentuk Kedalaman Lebar Lebar
Ruas Penampang m Saluran (h) Dasar (b1) Atas (b2)
m m m
3 4 5 6 7 8
43 - 44 Segi Empat 0 0.75 1.2 1.2
44 - 46a Trapesium 0.3 1 1.5 2.1
45 - 46 Segi Empat 0 0.8 1.5 1.5
46b - 47 Trapesium 0.3 1.3 2.2 2.98

Tabel. Debit Rencana Ruas Saluran pada Sub Catchment Jemur Andayani

Luas Kemiringan
L
Saluran Ruas Catchment (A) C Lahan (S)
km2 m
1 2 3 4 5 6
Saluran T43 - 44 0.076 0.6 0.0003 320
Saluran S44 - 46a 0.076 0.6 0.0003 100
Saluran T45 - 46 0.069 0.6 0.0003 214
Saluran S46b - 47 0.145 0.6 0.0003 21

Tabel. Jumlah Penduduk Kecamatan Wonocolo

Luas Wilayah Jumlah Penduduk Jumlah Penduduk Laju Pertumbuhan


Kelurahan
km2 Tahun 2000 Tahun 2010 Penduduk
Siwalanke 1.98 19164 18349 -0.4409751
Jemur Won 1.64 22905 21673 -0.560673
Margorejo 0.65 11181 9751 -1.3820161
Bendul Me 0.77 15449 16104 0.4231648
Sidoserm 1.07 12961 13371 0.3172139
Jumlah 6.11 81660 79248 -1.6432855
Sumber: Wonocolo dalam angka 2010

Jemur andayani termasuk kedalam kelurahan Jemur Wonosari


Kepadatan penduduk kelurahan Jemur Wonosari tahun 2010:
= 21673 Jiwa : 1,64 km2
= 13215 Jiwa/ km2
Tabel. Analisa Kapasitas Saluran dengan Debit Rancangan

Q air hujan (Qah) Q air kotor (Qak) Qtotal Q yang


Saluran Ruas T = 10 tahun T = 10 tahun Qah + Qak membebani saluran
m3/det m3/detik m3/detik m3/detik
1 2 3 7 8 9
Saluran T43 - 44 6.413 0.0002738 6.413187 6.413187
Saluran S44 - 46a 11.686 0.0002738 11.686175 18.099361
Saluran T45 - 46 7.165 0.0002486 7.165596 7.165596
Saluran S46b - 47 49.875 0.0005224 49.875611 25.264957
Luas Keliling Jari-jari Kemiringan Kecepatan Kapasitas
Penampang (A)Basah (P) n Hidrolis (R) Dasar Saluran (S) (Vs) Saluran (Q)
m2 m m m/det m3/det
9 10 11 12 13 14 15
0.9 2.7 0.023 0.33 0.0004 0.42 0.37
1.8 3.59 0.023 0.50 0.0005 0.61 1.10
1.2 3.1 0.023 0.39 0.0004 0.46 0.55
3.37 4.91 0.023 0.69 0.0005 0.75 2.54

Intensitas Q rencana (Qah)


tc
Hujan (I) T = 10 tahun
Akar (S) jam mm/jam m3/det
7 8 9 10
0.017320508 0.63 506.28 6.413
0.017320508 0.26 922.57 11.686
0.017320508 0.46 623.07 7.165
0.017320508 0.08 2063.80 49.875

Tabel. Perhitungan Debit air Buangan Domestik (Air Kotor) Qak

Luas Jumlah Jumlah Qak total Qak


Saluran Ruas Catchment (A) Penduduk (Po) Penduduk (Pn) T = 10 tahun T = 10 tahun
km2 Jiwa T = 10 tahun m3/detik/km2 m3/detik
1 2 3 4 5 6 7
Saluran Tersie 43 - 44 0.076 1004 949 0.0036028729 0.00027382
Saluran Sekun44 - 46a 0.076 1004 949 0.0036028729 0.00027382
Saluran Tersie 45 - 46 0.069 912 862 0.0036028729 0.00024860
Saluran Sekun46b - 47 0.145 1916 1811 0.0036028729 0.00052242
Jumlah 0.366
Kapasitas Saluran
Eksisting (Q) Analisa
m3/det
10 11
0.375 Meluap
1.102 Meluap
0.552 Meluap
2.541 Meluap

Anda mungkin juga menyukai