PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :
N
NO URAIAN PEKERJAAN
Pa
A PEKERJAAN PERSIAPAN
B PEKERJAAN BANGUNAN
I PEKERJAAN TANAH
1 Pekerjaan Galian Tanah
Bidang 1 11.29
bidang 2 2.75
Bangunan Utama
21.10
Teras
1.69
Panggung
3.70
II PEKERJAAN PONDASI
1 Pek. Pondasi Batu Kosong
V 27.18
H 49.00
Bekisting
76.18
V 27.18
H 49.00
Bekisting
76.18
11.64
Bekisting
11.64
K1 4.95
Bekisting
4.95
K2 3.80
Bekisting
3.80
KP 3.80
Bekisting
3.80
0.90
Bekisting
3.60
Bidang Atas
Bidang Bawah
IV PEKERJAAN ATAP
1 Pek. Kuda - kuda & Rangka Atap Baja Ringan
Type I 22.95
Type II 3.23
22.95
7.68
1.11
3.23
3.11
22.95
3.23
Dinding belakang
11.64
11.64
Dinding Samping
21.64
Dinding Depan
11.64
11.64
3.14
252.73
K2 0.20
K1 0.30
KP 0.11
0.19
2.00
VI PEKERJAAN LANTAI
1 Pek. Pasangan Lantai Keramik Uk. 40 x 40
bidang 1 21.85
teras 3.40
bidang 1 21.85
teras 3.40
Teras Keliling
56.64
Pintu
V 0.15
H 0.15
Jendela
V 0.15
H 0.15
2.06
Pintu 0.90
Jendela 0.38
73.7
IX PEKERJAAN ELEKTRIKAL
1 Pek. Instalasi Titik Lampu DownLight Sl 20 Wat
2 Pek. Instalasi Titik Lampu DownLight Sl 12 Wat
3 Pek. Pemasangan Saklar Ganda
4 Pek. Pemasangan Saklar Tunggal
5 Pek. Pemasangan Stop Kontak
6 Pek. Pemasangan MCB
X PEKERJAAN FINISHING
1 Pek. Pengecatan Dinding & Beton
2 Pek. Pengecatan Listplank Kayu
BACKUP DATA
NOTASI HITUNGAN
VOLUME SAT.
Pb La Lb Ta Tb n
1 Ls
1 Ls
1 Ls
1 Ls
36.53 M3
ondasi Telapak
0.90 1.00 6.00 4.86
109.88 M3
2.88 M3
26.64 M3
7.92 M3
Jalur POT. A
0.75 0.15 1.00 1.54
0.75 0.15 1.00 5.13
Jalur POT. B
0.75 0.15 1.00 1.25
24.40 M3
Jalur POT. A
0.30 0.65 0.73 1.00 4.75
0.30 0.65 0.73 1.00 15.80
Jalur POT. B
0.30 0.65 0.73 1.00 3.85
besian (Polos)
360.03 Kg
on Mutu K 225 = 19, 3 Mpa
besian (Polos)
333.62 Kg
besian (Polos)
besian (Polos)
besian (Polos)
besian (Polos)
besian (Polos)
377.09 M2
76.16 M
2.00 45.90
2.00 15.36
2.00 2.22
2.00 6.46
2.00 6.22
26.18 M
1.00 22.95
1.00 3.23
252.73 M2
544.09 M2
2.00 505.46
3.70 16.00 23.68
3.70 6.00 13.32
3.70 2.00 1.63
545.36 M2
1.28 M2
4.00 M
2.00 4.00
272.05 M2
11.85 1.00 258.92
3.86 1.00 13.12
16.43 M3
0.36 M3
1.59 M2
8.79 M2
56.01 M2
73.70 M
15.00 Titik
6.00 Titik
3.00 Titik
2.00 Titik
4.00 Titik
1.00 Titik
575.98 M2
76.16 M
FORMULA
Pa . La . Ta . N
Pa . La . Ta . N
Pa . La . Ta . N
Pa . La . Ta . N
Pa . (La + Lb)/2 . Ta . N
Pa . (La + Lb)/2 . Ta . N
Pa . (La + Lb)/2 . Ta . N
Pa . La . Ta . N
Pa . La . Ta . N
Pa . La . Ta . N
Pa . La . Ta . N
Pa . La . Ta . N
Pa . La . Ta . N
Pa . La . Ta . N
Pa . La . Ta . N
Pa . La . Ta . N
Pa . La . Ta . N
Pa . La . Ta . N
Pa . La . Ta . N
Pa . La . Ta . N
Pa . (La + Lb)/2 . Ta . N
Pa . (La + Lb)/2 . Ta . N
Pa . (La + Lb)/2 . Ta . N
1/4 x
Luas Besi Ø 12 = 1/4 x
Pa . La . Ta . N Luas Besi Ø 8 = 1/4 x
Pa . La . Ta . N
Ketetapan Berat Jenis/M³ = 7850.00 (Kg/M³)
-. Jmlh Sengkang
Pa . Ta / Pemakaian Panjang : Jarak
= 76.18 : 0.20
= 380.90
-. Panjang Sengkang
(L. besi x P x Berat Jenis x n) Lebar - Selimut x
= 0.15 - 0.03 x
= 0.12 x 2.00
(L. besi x P x Berat Jenis) = 0.24
= 0.58 x 380.90
= 220.92 (Total Panjang)
1/4 x
Luas Besi Ø 12 = 1/4 x
Pa . La . Ta . N Luas Besi Ø 8 = 1/4 x
Pa . Ta / Pemakaian
-. Jmlh Sengkang
Panjang : Jarak
= 11.64 : 0.20
= 58.20
(L. besi x P x Berat Jenis x n)
-. Panjang Sengkang
Lebar - Selimut x
(L. besi x P x Berat Jenis) = 0.10 - 0.02 x
= 0.09 x 2.00
= 0.17
= 0.38 x 58.20
= 22.12 (Total Panjang)
1/4 x
Luas Besi Ø 12 = 1/4 x
Pa . La . Ta . N Luas Besi Ø 8 = 1/4 x
Pa . Ta . N / pemakaian
-. Jmlh Sengkang
Panjang : Jarak
= 4.95 : 0.20
= 24.75
(L. besi x P x Berat Jenis x n x titik)
-. Panjang Sengkang
Lebar - Selimut x
(L. besi x P x Berat Jenis x n) = 0.30 - 0.03 x
= 0.27 x 2.00
= 0.54
= 1.08 x 24.75
= 26.73 (Total Panjang)
1/4 x
Luas Besi Ø 10 = 1/4 x
Pa . La . Ta . N Luas Besi Ø 8 = 1/4 x
Pa . Ta . N / pemakaian
-. Jmlh Sengkang
Panjang : Jarak
= 3.80 : 0.20
= 19.00
(L. besi x P x Berat Jenis x n x titik)
-. Panjang Sengkang
Lebar - Selimut x
(L. besi x P x Berat Jenis x n) = 0.20 - 0.02 x
= 0.18 x 2.00
= 0.36
= 0.72 x 19.00
= 13.68 (Total Panjang)
1/4 x
Luas Besi Ø 10 = 1/4 x
Pa . La . Ta . N Luas Besi Ø 8 = 1/4 x
Pa . Ta . N / pemakaian
-. Jmlh Sengkang
Panjang : Jarak
= 3.80 : 0.20
= 19.00
(L. besi x P x Berat Jenis x n x titik)
-. Panjang Sengkang
Lebar - Selimut x
(L. besi x P x Berat Jenis x n) = 0.11 - 0.02 x
= 0.09 x 2.00
= 0.18
= 0.36 x 19.00
= 6.84 (Total Panjang)
1/4 x
Luas Besi Ø 12 = 1/4 x
Pa . La . Ta . N Luas Besi Ø 8 = 1/4 x
Pa. La . n / cos 23
Pa . N
Pa . N
Pa . N
Pa . N
Pa . N
Pa . N
Pa . N
Pa. La . N
1/2.Pa. La . N
La . Ta . N
La . Ta . N
La . Ta . N
La . Ta . N
Pa. La . N
La . Ta . N
La . Ta . N
La . Ta . N
La . Ta . N
Pa. La . N
Pa. La . N
Pa. La . N
La . Ta . N
Pa. La . N
La . Ta . N
La . Ta . N
La . Ta . N
Pa . N
Pa. Ta . N . 2
Pa. Ta . N . 2
Pa. Ta . N . 2
Pa. Ta . N . Penampang
Pa . N
Pa . La . N
Pa . La . N
Pa . La . Ta . N
Pa . La . Ta . N
Pa . La . Ta . N
Pa . La . Ta . N
Pa . La . Ta . N
Pa . La . Ta . N. 2
Pa . La . Ta . N. 2
Pa . La .n
Pa . Ta . N
Pa . Ta . N
π x Diameter x Diameter
3.14 x 0.012 x 0.012 = 0.000107
3.14 x 0.008 x 0.008 = 0.000044
π x Diameter x Diameter
3.14 x 0.012 x 0.012 = 0.000107
3.14 x 0.008 x 0.008 = 0.000044
π x Diameter x Diameter
3.14 x 0.010 x 0.010 = 0.000079
3.14 x 0.008 x 0.008 = 0.000044
π x Diameter x Diameter
3.14 x 0.010 x 0.010 = 0.000079
3.14 x 0.008 x 0.008 = 0.000044
π x Diameter x Diameter
3.14 x 0.012 x 0.012 = 0.000113
3.14 x 0.008 x 0.008 = 0.000044
DAFTAR HARGA UPAH DAN BAHAN
A UPAH
1. Pekerja Oh 90,000.00
2. Tukang Besi Oh 115,000.00
3. Kepala Tukang Besi Oh 125,000.00
4. Tukang Kayu Oh 120,000.00
5. Kepala Tukang Kayu Oh 125,000.00
6. Tukang Batu Oh 115,000.00
7. Kepala Tukang Batu Oh 125,000.00
8. Tukang Cat Oh 115,000.00
9. Kepala Tukang Cat Oh 125,000.00
10. Tukang Listrik Oh 150,000.00
11. Kepala Tukang Listrik Oh 125,000.00
12. Mandor Oh 95,000.00
13. Tukang Plumbing Oh 120,000.00
14. Kepala Tukang Plumbing Oh 125,000.00
15. Tukang Aluminium Oh 120,000.00
16. Kepala Tukang Aluminium Oh 95,000.00
B BAHAN
B.1.2 B A T U
B.1.3 K A Y U
1. Semen Kg 1,400.00
2. Semen Warna/Grout Kg 15,000.00
3. Tepung Gypsum Kg 4,000.00
4. Sealant Kg 10,000.00
5. Lem Wallpapper Kg
6. Lem Kayu Kg 25,000.00
BIAYA
HARGA SATUAN KETERANGAN
ANGKUT
90,000.00
115,000.00
125,000.00
120,000.00
125,000.00
115,000.00
125,000.00
115,000.00
125,000.00
150,000.00
125,000.00
95,000.00
120,000.00
125,000.00
120,000.00
95,000.00
130,000.00
140,000.00
140,000.00
110,000.00
100,000.00
50,000.00
165,000.00
150,000.00
800.00
150,000.00
160,000.00
3,000.00
8,000.00
12,000,000.00
12,000,000.00
7,500,000.00
7,500,000.00
3,000,000.00
3,000,000.00
25,000.00
215.00
25,000.00
17,500.00
35,000.00
1,000.00
70,000.00
90,000.00
85,000.00
130,000.00
180,000.00
265,000.00
-
-
76,000.00
5,500.00
8,000.00
10,250.00
12,500.00
95,000.00
98,000.00
-
118,000.00
-
5,500.00
7,000.00
8,500.00
10,000.00
13,750.00
53,500.00
30,000.00
40,000.00
61,000.00
85,000.00
115,000.00
15,000.00
35,000.00
1,500,000.00
150,000.00
350,000.00
550,000.00
1,850,000.00
-
-
-
14,000.00
16,000.00
45,000.00
70,000.00
70,000.00
15,000.00
95,000.00
30,000.00
25,000.00
30,000.00
40,000.00
32,000.00
100,000.00
20,000.00
1,700,000.00
5,500.00
40,500.00
24,700.00
28,250.00
49,000.00
45,500.00
28,500.00
46,300.00
-
20,000.00
121,000.00
12,600.00
30,000.00 @ 5Kg/Kaleng
57,000.00
49,000.00
51,000.00
9,000.00
14,000.00
49,500.00
25,000.00
12,000.00
32,500.00
70,000.00
67,500.00
1,000.00
80,000.00
2,500.00
6,250.00
550,000.00
155,000.00
-
Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran
A PEKERJAAN PERSIAPAN
I Pek. Papan Nama Proyek Ls 1.00
2 Pek. Administrasi Dan Dokumentasi Pekerjaan Ls 1.00
3 Pek. Pembersihan Lokasi (Awal & Akhir) Ls 1.00
4 Pek. Pengukuran/Pemasangan Bouwplank Ls 1.00
B PEKERJAAN PERSIAPAN
I PEKERJAAN TANAH
1 Pek. Galian Tanah M3 36.53
2 Pek. Urugan Tanah Kembali M3 109.88
3 Pek. Urugan Pasir Bawah Pondasi M3 2.88
4 Pek. Urugan Pasir Bawah Lantai M3 26.64
II PEKERJAAN PONDASI
1 Pek. Aanstamping Batu Kali/Batu Kosong M3 7.92
2 Pek. Pondasi Batu Kali Sp. 1 : 5 M3 24.40
IV PEKERJAAN ATAP
1 Pek. Kuda - kuda & Rangka Atap Baja Ringan M2 377.09
2 Pek. Atap Spandek M 2
377.09
3 Pek. Listplank Kayu Kls. II Uk.3/30 M1 76.16
4 Pek. Bubungan Atap Spandek M1 26.18
VI PEKERJAAN LANTAI
1 Pek. Pasangan Lantai Keramik Uk. 40 x 40 M2 272.05
2 Pek. Cor rabat Beton Mutu K 100 M3 16.43
IX PEKERJAAN FINISHING
1 Pek. Pengecatan Dinding & Beton M2 575.98
2 Pek. Pengecatan Listplank Kayu M1 76.16
JUMLAH ( A + B)
PPN 10 %
JUMLAH TOTAL
PEMBULATAN
HARGA SATUAN JUMLAH HARGA
2,000,000.00
500,000.00 500,000.00
500,000.00 500,000.00
500,000.00 500,000.00
500,000.00 500,000.00
384,900,728.92
11,595,705.78
76,862.50 2,807,863.99
25,620.83 2,815,092.91
202,345.00 583,208.88
202,345.00 5,389,540.01
22,143,666.74
415,569.00 3,290,371.45
772,541.00 18,853,295.29
63,384,834.57
1,046,126.28 3,984,694.99
16,112.80 5,801,093.38
246,367.00 3,128,039.68
1,046,126.28 2,390,817.00
16,112.80 5,375,618.59
403,711.00 5,638,362.40
1,046,126.28 146,122.92
16,112.80 756,362.22
246,367.00 325,007.35
1,046,126.28 4,660,492.57
16,112.80 6,875,319.51
338,811.00 6,708,457.80
1,046,126.28 2,544,179.11
16,112.80 3,637,231.64
338,811.00 5,493,255.68
1,046,126.28 96,201.77
16,112.80 378,249.45
246,367.00 274,617.08
1,046,126.28 1,525,252.11
16,112.80 2,900,690.25
229,867.00 744,769.08
102,511,947.99
170,500.00 64,294,090.39
71,852.00 27,094,774.09
131,285.00 9,998,665.60
42,949.50 1,124,417.91
89,926,068.81
128,729.70 32,533,766.97
64,292.36 34,980,611.56
39,875.00 21,746,365.58
310,530.00 396,484.70
67,210.00 268,840.00
61,590,591.45
178,870.32 48,661,044.51
786,740.37 12,929,546.94
7,117,615.49
12,375,412.50 4,459,789.28
885,225.00 1,404,143.90
142,561.10 1,253,682.31
8,112,497.03
55,027.50 3,082,200.33
19,096.00 1,407,375.20
3,622,921.50
147,257.00 2,208,855.00
141,482.00 848,892.00
56,600.50 169,801.50
47,360.50 94,721.00
45,050.50 180,202.00
120,450.00 120,450.00
14,894,879.57
21,546.25 12,410,209.08
32,624.35 2,484,670.50
Rp 386,900,728.92
Rp 38,690,072.89
Rp 425,590,801.81
Rp 425,590,000.00
ANALISA HARGA SATUAN
Kegiatan :
Lokasi :
Thn. Angg :
I UPAH
1. Pekerja Oh 0.7500
2. Tukang Batu Oh
3. Kepala Tukang Batu Oh
4. Mandor Oh 0.0250
II BAHAN
1.
2.
3.
4.
5.
Kegiatan :
Lokasi :
Thn. Angg :
Jenis Pekerjaan : 1 M3 Urugan Pasir Bawah Pondasi/Lantai
I UPAH
1. Pekerja Oh 0.3000
2. Tukang Batu Oh
3. Kepala Tukang Batu Oh
4. Mandor Oh 0.0100
II BAHAN
Kegiatan :
Lokasi :
Thn. Angg :
I UPAH
1. Pekerja Oh 0.5000
2. Tukang Batu Oh
3. Kepala Tukang Batu Oh
4. Mandor Oh 0.0500
II BAHAN
1.
2.
3.
4.
5.
JUMLAH HARGA
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH HARGA
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH HARGA
-
-
-
-
-
-
-
-
-
-
-
-
-
ANALISA HARGA SATUAN
Kegiatan :
Lokasi :
Thn. Angg :
I UPAH
1. Pekerja Oh 0.7800
2. Tukang Batu Oh 0.3900
3. Kepala Tukang Batu Oh 0.0390
4. Mandor Oh 0.0390
II BAHAN
Kegiatan :
Lokasi :
Thn. Angg :
I UPAH
1. Pekerja Oh 1.5000
2. Tukang Batu Oh 0.7500
3. Kepala Tukang Batu Oh 0.0750
4. Mandor Oh 0.0750
II BAHAN
JUMLAH HARGA
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
ANALISA HARGA SATUAN
Kegiatan :
Lokasi :
Thn. Angg :
Jenis Pekerjaan : 1 M3 Pekerjaan Lantai Kerja Beton Mutu K 100 = 7,4 Mpa, Slump 3-6 Cm
I UPAH
1. Pekerja Oh 1.2000
2. Tukang Batu Oh 0.2000
3. Kepala Tukang Batu Oh 0.0200
4. Mandor Oh 0.0600
II BAHAN
1. Semen Kg 230.0000
2. Pasir Beton/Pasang M³ 0.6379
3. Kerikil M³ 0.7607
4. Air Liter 200.0000
5.
Kegiatan :
Lokasi :
Thn. Angg :
I UPAH
1. Pekerja Oh 1.6500
2. Tukang Batu Oh 0.2750
3. Kepala Tukang Batu Oh 0.0280
4. Mandor Oh 0.0830
II BAHAN
1. Semen Kg 371.0000
2. Pasir Beton/Pasang M³ 0.4986
3. Kerikil M³ 0.7756
4. Air Liter 215.0000
5.
JUMLAH HARGA
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH HARGA
-
-
-
-
-
-
-
-
-
-
-
-
ANALISA HARGA SATUAN
Kegiatan :
Lokasi :
Thn. Angg :
I UPAH
1. Pekerja Oh 0.5200
2. Tukang Kayu Oh 0.2600
3. Kepala Tukang Kayu Oh 0.0260
4. Mandor Oh 0.0260
II BAHAN
Kegiatan :
Lokasi :
Thn. Angg :
I UPAH
1. Pekerja Oh 0.6600
2. Tukang Kayu Oh 0.3300
3. Kepala Tukang Kayu Oh 0.0330
4. Mandor Oh 0.0330
II BAHAN
Kegiatan :
Lokasi :
Thn. Angg :
I UPAH
1. Pekerja Oh 0.6600
2. Tukang Kayu Oh 0.3300
3. Kepala Tukang Kayu Oh 0.0330
4. Mandor Oh 0.0330
II BAHAN
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH HARGA
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH HARGA
-
-
-
-
-
-
-
-
-
-
-
-
ANALISA HARGA SATUAN
Kegiatan :
Lokasi :
Thn. Angg :
I UPAH
1. Pekerja Oh 0.3000
2. Tukang Batu Oh 0.1000
3. Kepala Tukang Batu Oh 0.0100
4. Mandor Oh 0.0150
II BAHAN
JUMLAH HARGA
-
-
-
-
-
-
-
-
-
-
-
-