LAPORAN REALISASI SIPEDE 2019

JENIS
RINCIAN SIFAT CARA
NO URAIAN BIDANG PRASARAN LOKASI
BIDANG KEGIATAN PENGADAAN VOLUME (M)
A

KP CILOA-
READIMIX JALAN DESA SWAKELOLA 1,193
KP NAGRAK

KP NAGRAK
DRAINASE JALAN DESA SWAKELOLA 413
- KP CILOA

KP NAGRAK
- KP
TPT JALAN DESA SWAKELOLA 59.5
PACARBAD
AK

kp lame rw
TPT JALAN DESA SWAKELOLA 16
02
INTERNET/WEBSATE KP CILOA SWAKELOLA 1 UNIT
DESA SIMPANG

NAGRANG
TPT JALING BOJONG CITENGUL

KP CILOA
TPT SALURAN IRIGASI SIMPANG SWAKELOLA 17
CIHERANG SWAKELOLA 10
JUMLAH IRIGASI 27
JUMLAH SARPRAS
PMT
BKAD
PEMBINAAN GURU
SISKEUDES
STUDY TIRU
JUMLAH NON SARPRAS
BUMDESMA
HARI ORANG KERJA
LAMA
TGL MULAI TGL SELESAI RENCANA REALISASI PROGRES
HARI
PEKERJAAN PEKERJAAN BIAYA BIAYA %
KERJA
PEKERJA TUKANG MANDOR

8/28/2019 10/31/2019 20 520,992,800 520,992,800 100% 561 146 60

6/11/2019 8/18/2019 10 278,445,500 278,445,500 100% 1,042 277 47

6/16/2019 7/18/2016 18 27,828,000 27,828,000 100% 65 29 3

27/04/20198 5/2/2019 6 18,800,000 18,800,000 100% 59 18 1

6/15/2019 7/16/2019 30 23,580,000 23,580,000 100% 121 2 0

106,268,800 106,268,800
975,915,100

4/8/2019 4/21/2019 100%


5 18,153,000 18,153,000 101 13 0
4/22/2019 4/25/2019 4 13,756,900 13,756,900 100% 83 8
9 31,909,900 184 21
1,007,825,000
16,750,000
5,000,000
8,625,000
5,000,000
20,000,000
55,375,000
50,000,000
JUMLAH TENAGA KERJA JUMLAH TENAGA KERJA
BERDASARKAN JENIS PEMANFAAT
BERDASARKAN SETATUS
KELAMIN
RENCANA REALISASI
TOTAL UPAH TOTAL UPAH KEL
1/2 DNGN
LAKI-LAKI PEREMPUAN ARTM PENGAN LK PR ARTM
GIJI
GGURAN BURUK

64,280,000 64,280,000 25 56 2,138 1,980 2,066

105,320,000 105,320,000 19 90 2,138 1,980 2,066

8,340,000 8,340,000 14 2,138 1,980 2,066

6,600,000 6,600,000 13 2,138 1,980 2,066

0 0 14

9,380,000 9,380,000 14 8
7,440,000 7,440,000 10 8
16,820,000 16,820,000 24 16 578 586 122
POTO

0% 50% 100%