A UPAH KERJA
1 Pekerja hari/orang 150,000.00
2 Tukang hari/orang 210,000.00
3 Kepala Tukang hari/orang 260,000.00
4 Mandor hari/orang 270,000.00
B BAHAN
1 Tanah Urug m3 944,000.00
2 Pasir Urug m3 1,490,000.00
3 Pasir Pasang m3 1,490,000.00
4 PB / Pasir Beton m3 1,490,000.00
5 PB / Pasir Beton kg 1,064.29
6 Batu Pecah 2/3 m3 93,125.00
7 Batu Pecah 2/3 kg 93,125.00
8 Kr / Krikil m3 372,500.00
9 Kr / Krikil kg 275.93
10 Batu Bela / Batu Kali m3 93,125.00
11 Air Ltr 50.00
12 Aluminiun gel tebal 0,3 lembar 95,000.00
13 Nok standar 40 x 18 Buah 50,000.00
14 Bata Tela bh 4,000.00
15 PC / Portland Cement kg 16,000.00
16 Semen Warna kg 21,000.00
17 Keramik Ukuran 60 x 60 Dos 739,000.00
18 Keramik Ukuran 30 x 30 Dos 539,000.00
19 Keramik Ukuran 20 x 20 Dos 330,000.00
20 Keramik Ukuran 20 x 25 Bh 335,000.00
21 Papan Ky Linggua m3 6,325,000.00
22 Papan Ky Besi m3 6,325,000.00
23 Papan Ky. Matoa m3 5,096,000.00
24 Papan Ky. Bekisting m3 1,350,000.00
25 Kayu Dolken batang 25,000.00
26 Tripleks 3 mm - 4 mm lembar 139,000.00
27 Multipleks 9 mm lembar 413,000.00
28 Gypsum 9 mm lembar 404,000.00
29 Besi Beton kg 33,000.00
30 Kawat Ikat Beton kg 49,000.00
31 Seng Soka BJLS 0,25 mm lembar 65,000.00
NO URAIAN SATUAN HARGA SATUAN
32 Seng Plat BJLS 0,2 mm lembar 50,000.00
33 Paku Campur kg 44,000.00
34 Pake Skrup bh 4,000.00
35 Besi Tempa m1 20,200.00
36 Baja Ringan Kg 55,000.00
37 Besi Hollow 40x40 mm m1 8,500.00
38 Besi Hollow 20x20 mm m1 9,750.00
NO URAIAN SATUAN HARGA SATUAN
39 Kaca Bening 5 mm m2 107,633.71
40 Sealant Kg 25,000.00
41 Lem Aica Aibon kg 80,000.00
42 Kunci Tanam 2 Slaag bh 150,000.00
43 Engsel Pintu bh 20,000.00
44 Engsel Jendela bh 8,250.00
45 Grendel Pintu bh 20,000.00
46 Grendel Jendela bh 11,000.00
47 Besi Hollow 40x40 mm m2 350,000.00
48 Profil Tank 1100 Liter Buah 2,250,000.00
49 Hak Angin bh 12,500.00
50 Plamir tembok kg 30,000.00
51 Cat Dasar Tembok kg 57,500.00
52 Cat Tembok kg 57,500.00
53 Meni Kayu kg 32,000.00
54 Plamir kayu kg 45,000.00
55 Cat Dasar (Kayu) kg 65,000.00
56 Cat Penutup (Kayu) kg 65,000.00
57 Pengencer kg 25,000.00
58 Ampelas lembar 7,500.00
59 Kuas bh 7,500.00
60 List Kayu Profil m1 9,500.00
61 Pipa Galvanis Dia. 1/2" (Tebal) m1 23,000.00
62 Pipa Galvanis Dia. 3/4" (Tebal) m1 33,333.33
63 Pipa PVC Dia. 2" AW m1 93,666.67
64 Pipa PVC Dia. 3" AW m1 93,666.67
65 Pipa PCV Dia. 4" AW m1 93,666.67
66 Wastafel Gantung Buah 300,000.00
67 Kloset Jongkok Porselen buah 590,000.00
68 Floor Drain buah 150,000.00
69 Kran Dia. 1/2" buah 78,000.00
70 Sealtipe buah 5,000.00
71 Minyak Bekisting liter -
72 Lampu DownLight 18-20 Watt bh 460,000.00
73 Lampu Fitting 14 Watt bh 57,000.00
74 Fitting Lampu bh 27,000.00
75 Stop Kontak Dinding bh 36,000.00
76 Stop Kontak Lantai bh 650,000.00
77 Stop Kontak AC bh 270,000.00
78 Saklar Ganda bh 73,000.00
79 Saklar Tunggal bh 73,000.00
80 Kabel NYM 2 x 2,5 mm m1 23,000.00
No. Uraian pekerjaan Panjang Lebar Tinggi Jumlah Volume M2
Aanstamping
52.00 0.60 0.15 1.00
Pondasi menerus
52.00 0.40 0.56 1.00
Pekerjaan kuda-kuda
180.60 0.05 0.10
Gording
5.00 0.05 0.10 28.00
Pekerjaan atap
7.00 4.70 4.00 131.60
2.50 3.00 4.00 30.00
Plasteran beton
Kolom 0.56 3.75 19.00 39.90
Lispalank 43.00 0.80 1.00 34.40
Pekerjaan Acian
Pekerjaan Kusen
p1 7.00
P2 12.80
J1 72.80
V 5.70
98.30 0.05 0.10 0.49
Gerendel Jendela
27.66 m3
27.66
4.68
4.68
11.65 m3
11.65
6.92 m3
8.03 m3
8.03
4.01 m3
4.01
5.62 m3
5.62
2.60 m3
2.60
3.04 m3
3.04
0.25 m3
0.25
2.60 m3
2.60
4.60 m3
4.60
3.44 m3
3.44
0.90 m3
0.90
0.70
0.70
161.60 m2
56.00 m1
109.22 m2
53.91
218.43 m2
74.30 m2
46.00 m2
292.73 m2
0.49 m3
3.00 m2
17.92 m2
6.19 m3
0.32 m2
76.29 m2
56.56 m1
80.35 m2
9.00 bh
32.00 bh
2.00 bh
1.00 set
32.00 bh
16.00 bh
292.73 m2
19.66 m2
6.00 m2
12.54 m2
5.38
0.91 m2
16.80 m2
20.00 m1